INSPECTION REQUEST LOG

Project No.: DB53 SUMMARY


Project Title: 59 Villas (33 villas at Park Residence 1 and 26 at Residence 4) at Damac Hills master Development on Plot no 6761061, Al Hebiah Third, Dubai Land A Approved 0
(Mudon), Dubai ,UAE
Consultant: M/s. Arif & Bintoak Consulting Architects & Engineering B Approved As Noted 207
Client: M/s. DAMAC Crescent Properties LLC C Revise and Resubmit 8
Main Contractor: Delta Al Emarate Bldg. Contracting Company D Not Required 0
UCR Under Review 15
TOTAL 230

Date Days
Date received
Sl. Date Submittal Inspection Inspection Receiv Replie
Rev Description Activity Group Cluster Originator by Arif & Request time Code Status Remarks
No. Prepared Reference Date time ed by d by
Bintoak
DELTA BHNS

Inspection request for the Establishment of Engineer, client and contractor offices
1 23-May-22 IR-DB53-CIV-001 0
and accommodations
offices Delta 12:00PM 24-May-22 10:00AM ### B Re Submit Inspection Request

2 23-May-22 IR-DB53-CIV-002 0 Inspection request to check the availability of equipment list as per attached Equipment CALERO Delta 2:00 PM 24-May-22 10:00 AM ### B

Inspection request for Genral excavation the villas @ calero ALC-G8-6 (2K311F to ###
3 24-May-22 IR-DB53-CIV-003 0 Exacavtion ALC-G8-6,6-2 CALERO Delta 2:00 PM 25-May-22 10:00 AM Covered by ir # 004
2K318F) ALC-G6-2 (2K319F to 2K324F) & ALC-G6-2 (2K331F to 2K336F).

B
Inspection request for soil excavation to reach formation level for the villas @ calero
4 24-May-22 IR-DB53-CIV-004 0 ALC-G8-6 (2K311F to 2K318F) ALC-G6-2 (2K319F to 2K324F) & ALC-G6-2 (2K331F Exacavtion ALC-G8-6,6-2 CALERO Delta 2:00 PM 25-May-22 10:00 AM ###
to 2K336F).

Inspection request for plate load test for calero ALC-G8-villas 2K312F as per
5 30-May-22 IR-DB53-CIV-005 0 plate load test ALC-G8-6 CALERO Delta 10:00 AM 31-May-22 11:00.AM ### B
highlighted plan attached.

Inspection request for compaction test as per highlighted drawing Group - ALC-G8-
6 5-Jun-22 IR-DB53-CIV-006 0 6– Villa No. 2K311F,2K312F,2K313F,2K314F,2K315F,2K316F,2K317F,2k318F FDT ALC-G8-6,6-2 CALERO Delta 12:00PM 6-Jun-22 10:00AM 7/Jun/22
Group 6-2 2K319F,2K320F,2K321F,2K322F,2K323F,2K324F
B
Inspection request for compaction test as per highlighted drawing Group - ALC-G8-
6 13-Jun-22 IR-DB53-CIV-006 01 6– Villa No. 2K311F,2K312F,2K313F,2K314F,2K315F,2K316F,2K317F,2k318F FDT ALC-G8-6,6-2 CALERO Delta 12:00PM 13-Jun-22 10:00AM ###
Group 6-2 2K319F,2K320F,2K321F,2K322F,2K323F,2K324F

Inspection request for formation level and setting out as per highlighted drawing
Group -ALC-G8-6 Villa No. Formation level and
7 6-Jun-22 IR-DB53-CIV-007 0
2K311F,2K312F,2K313F,2K314F,2K315F,2K316F,2K317F,2k318F Group 6-2 setting out
ALC-G8-6,6-2 CALERO Delta 10:00 AM 7-Jun-22 11:00 AM UCR
2K319F,2K320F,2K321F,2K322F,2K323F,2K324F
B
Inspection request for formation level and setting out as per highlighted drawing
Group -ALC-G8-6 Villa No. Formation level and
7 13-Jun-22 IR-DB53-CIV-007 01 ALC-G8-6,6-2 CALERO Delta 10:00 AM 14-Jun-22 10:30 AM
2K311F,2K312F,2K313F,2K314F,2K315F,2K316F,2K317F,2k318F Group 6-2 setting out
2K319F,2K320F,2K321F,2K322F,2K323F,2K324F

Inspection request for Anti-termite bellow footing blinding prior to blinding concrete
Anti-termite below
8 7-Jun-22 IR-DB53-CIV-008 0 as per highlighted drawing Group - ALC-G6-2 villa no. 2K319F, 2K320F, 2K321F, footing blinding
ALC-G6-2 CALERO Delta 11:00.AM 8-Jun-22 11:30AM UCR
2K322F, 2K323F, 2K324F
B
Inspection request for Anti-termite bellow footing blinding prior to blinding concrete
Anti-termite below
8 13-Jun-22 IR-DB53-CIV-008 1 as per highlighted drawing Group - ALC-G6-2 villa no. 2K319F, 2K320F, 2K321F, footing blinding
ALC-G6-2 CALERO Delta 11:00.AM 14-Jun-22 11:30AM UCR
2K322F, 2K323F, 2K324F

Inspection request for compaction test bellow footing blinding as per highlighted compaction test
9 7-Jun-22 IR-DB53-CIV-009 0 drawing Group - ALC-G6-2– Villa No. bellow footing ALC-G6-2 CALERO Delta 11:00 AM 8-Jun-22 11:20AM UCR
2K331F,2K332F,2K333F,2K334F,2K335F,2K336F blinding
B
Inspection request for compaction test bellow footing blinding as per highlighted compaction test
9 13-Jun-22 IR-DB53-CIV-009 01 drawing Group - ALC-G6-2– Villa No. bellow footing ALC-G6-2 CALERO Delta 11:00 AM 14-Jun-22 11:00AM UCR
2K331F,2K332F,2K333F,2K334F,2K335F,2K336F blinding

Inspection request for blinding concrete as per highlighted drawing Group - ALC-G6-
10 7-Jun-22 IR-DB53-CIV-010 0 Blinding Concrete ALC-G6-2 CALERO Delta 11:00PM 8-Jun-22 2:00 PM UCR
2– Villa No. 2K319F, 2K320F, 2K321F, 2K322F, 2K323F, 2K324F

Inspection request for blinding concrete as per highlighted drawing Group - ALC-G6-
10 13-Jun-22 IR-DB53-CIV-010 01 Blinding Concrete ALC-G6-2 CALERO Delta 11:40 AM 14-Jun-22 2:00 PM UCR
2– Villa No. 2K319F, 2K320F, 2K321F, 2K322F, 2K323F, 2K324F

Inspection request for completion of 2 coats bitumen above footing blinding as per
11 9-Jun-22 IR-DB53-CIV-011 0 highlighted drawing Group - ALC-G6-2– Villa No. 2K319F, 2K320F, 2K321F, Bitumen ALC-G6-2 CALERO Delta 10:00 AM 10-Jun-22 10:00AM B
2K322F, 2K323F, 2K324F

Inspection request for Anti-termite bellow footing blinding prior to blinding concrete Anti-termite below
12 10-Jun-22 IR-DB53-CIV-012 0 ALC-G8-6 CALERO Delta 11:00 AM 12-Jun-22 10:00AM B
as per highlighted drawing Group - ALC-G8-6 villa no. ,2K316F,2K317F,2k318F footing blinding

Inspection request for blinding concrete as per highlighted drawing Group - ALC-G8-
13 10-Jun-22 IR-DB53-CIV-013 0 Blinding Concrete ALC-G8-6 CALERO Delta 11:00PM 12-Jun-22 2:00 PM UCR B
6– Villa No,2K316F,2K317F,2k318F

Inspection request for completion of 2 coats bitumen above footing blinding as per
14 10-Jun-22 IR-DB53-CIV-014 0 Bitumen ALC-G8-6 CALERO Delta 10:00 AM 13-Jun-22 10:00AM B
highlighted drawing Group - ALC-G8-6– Villa No,2K316F,2K317F,2k318F

Inspection request for Anti-termite bellow footing blinding prior to blinding concrete
Anti-termite below
15 12-Jun-22 IR-DB53-CIV-015 0 as per highlighted drawing Group - ALC-G8-6 villa ALC-G8-6 CALERO Delta 10:00 AM 13-Jun-22 10:00AM B
footing blinding
no.2K311F ,2K312F,2K313F,2K314F,2K315F

Inspection request for blinding concrete as per highlighted drawing Group - ALC-G8-
16 12-Jun-22 IR-DB53-CIV-016 0 Blinding Concrete ALC-G8-6 CALERO Delta 11:00 AM 13-Jun-22 11:30 AM UCR B
6– Villa No,2K311F ,2K312F,2K313F,2K314F,2K315F

Inspection request for completion of 2 coats bitumen above footing blinding as per
17 12-Jun-22 IR-DB53-CIV-017 0 highlighted drawing Group - ALC-G8-6– Villa Bitumen ALC-G8-6 CALERO Delta 11:40 AM 13-Jun-22 3:30 PM B
No,2K311F ,2K312F,2K313F,2K314F,2K315F

Inspection request for steel reinforcement, formwork and concreting works for footing
Steel reinforcement
18 12-Jun-22 IR-DB53-CIV-018 0 as per highlighted drawing Group - ALC-G6-2, Villa no. 2K319F, 2K320F,2K321F, ALC-G6-2 CALERO Delta 11:40 AM 13-Jun-22 2:00 PM B
and formwork
2K322F, 2K323F, 2K324F.

Inspection request for plate load test for Calero ALC-G6-2-villas


19 13-Jun-22 IR-DB53-CIV-019 0 plate load test ALC-G6-2 CALERO Delta 11:00 AM 14-Jun-22 10:00AM B
2K331F,2K332F,2K333F,2K334F,2K335F,2K336F as per highlighted plan attached.

Inspection request for plate load test for Phoenix ALC-G5-2-villas


20 13-Jun-22 IR-DB53-CIV-020 0 plate load test ALC-G5-2 PHOENIX Delta 11:00 AM 14-Jun-22 11:00AM B
H811F,H812F,H813F,H814F,H815F as per highlighted plan attached.

Inspection request for formation level and setting out as per highlighted drawing Formation level and
21 13-Jun-22 IR-DB53-CIV-021 0
Group - ALC-G6-2– Villa No. 2K331F,2K332F,2K333F,2K334F,2K335F,2K336F setting out
ALC-G6-2 CALERO Delta 11:00 AM 14-Jun-22 10:00AM UCR B

Inspection request for Anti-termite bellow footing blinding prior to blinding concrete as Anti-termite below
22 14-Jun-22 IR-DB53-CIV-022 0 ALC-G6-2 CALERO Delta 1:00 PM 15-Jun-22 10:00AM B
per highlighted drawing Group - ALC-G6-2 villa no.2K331F ,2K332F,2K333F. footing blinding

Inspection request for blinding concrete as per highlighted drawing Group - ALC-G6-
23 14-Jun-22 IR-DB53-CIV-023 0 Blinding Concrete ALC-G6-2 CALERO Delta 1:00 PM 15-Jun-22 1:30 PM UCR B
2– Villa No,2K331F ,2K332F,2K333F.

Inspection request for completion of 2 coats bitumen above footing blinding as per
24 14-Jun-22 IR-DB53-CIV-024 0 Bitumen ALC-G6-2 CALERO Delta 1:00 PM 15-Jun-22 4:00PM B
highlighted drawing Group - ALC-G6-2– Villa No,2K331F,2K332F,2k333F

Inspection request for Anti-termite bellow footing blinding prior to blinding concrete as Anti-termite below
25 15-Jun-22 IR-DB53-CIV-025 0 ALC-G6-2 CALERO Delta 1:00 PM 16-Jun-22 10:00AM B
per highlighted drawing Group - ALC-G6-2 villa no.2K334F ,2K335F,2K336F. footing blinding

Inspection request for blinding concrete as per highlighted drawing Group - ALC-G6-
26 15-Jun-22 IR-DB53-CIV-026 0 Blinding Concrete ALC-G6-2 CALERO Delta 1:00 PM 16-Jun-22 3:00 PM UCR B
2– Villa No,2K334F ,2K335F,2K336F.

Inspection request for completion of 2 coats bitumen above footing blinding as per
27 15-Jun-22 IR-DB53-CIV-027 0 Bitumen ALC-G6-2 CALERO Delta 1:00 PM 16-Jun-22 4:00PM
highlighted drawing Group - ALC-G6-2– Villa No,2K334F,2K335F,2k336F

Inspection request for completion of 2 coats bitumen above footing blinding as per
27 17-Jun-22 IR-DB53-CIV-027 1 Bitumen ALC-G6-2 CALERO Delta 1:00 PM 19-Jun-22 10:00AM
highlighted drawing Group - ALC-G6-2– Villa No,2K334F,2K335F,2k336F

compaction test
Inspection request for compaction test bellow footing blinding as per highlighted
28 15-Jun-22 IR-DB53-CIV-028 0 bellow footing ALC-G5-2 PHOENIX Delta 1:00 PM 16-Jun-22 9:00AM B
drawing Group - ALC-G5-2– Villa No. H811F,H812F, H813F, H814F, H815F.
blinding

Inspection request for Anti-termite bellow footing blinding prior to blinding concrete as
Anti-termite below
29 15-Jun-22 IR-DB53-CIV-029 0 per highlighted drawing Group - ALC-G5-2 villa no. H811F,H812F, H813F, H814F, ALC-G5-2 PHOENIX Delta 1:00 PM 16-Jun-22 10:00AM B
footing blinding
H815F.

Inspection request for blinding concrete as per highlighted drawing Group - ALC-G5-
30 15-Jun-22 IR-DB53-CIV-030 0 Blinding Concrete ALC-G5-2 PHOENIX Delta 1:00 PM 16-Jun-22 3:00 PM UCR B
2– Villa No,H811F,H812F, H813F, H814F, H815F.

Inspection request for completion of 2 coats bitumen above footing blinding as per
31 15-Jun-22 IR-DB53-CIV-031 0 highlighted drawing Group - ALC-G5-2– Villa no H811F,H812F, H813F, H814F, Bitumen ALC-G5-2 PHOENIX Delta 1:00 PM 16-Jun-22 4:00PM
H815F.
B
Inspection request for completion of 2 coats bitumen above footing blinding as per
31 17-Jun-22 IR-DB53-CIV-031 01 highlighted drawing Group - ALC-G5-2– Villa no H811F,H812F, H813F, H814F, Bitumen ALC-G5-2 PHOENIX Delta 1:00 PM 19-Jun-22 4:00PM
H815F.

Inspection request for formation level and setting out as per highlighted drawing Formation level and
32 17-Jun-22 IR-DB53-CIV-032 0 ALC-G5-2 PHOENIX Delta 1:00 PM 19-Jun-22 9:00AM B
Group -ALC-G5-2 Villa no H811F,H812F, H813F, H814F, H815F. setting out

Inspection request for steel reinforcement, formwork and concreting works for neck
Steel reinforcement
33 19-Jun-22 IR-DB53-CIV-033 0 columns as per highlighted drawing Group - ALC-G6-2– Villa No. 2K319F, 2K320F, ALC-G6-2 CALERO Delta 10:00AM 11:00AM B B
and formwork
2K321F, 2K322F, 2K323F, 2K324F

Inspection request for 2 coats of bitumen with protection for footing and neck
Bitumen for footing
34 19-Jun-22 IR-DB53-CIV-034 0 columns prior to backfilling as per highlighted drawing Group - ALC-G6-2– Villa No. ALC-G6-2 CALERO Delta 10:30AM 11:40AM B B
and neck columns
2K319F, 2K320F, 2K321F, 2K322F, 2K323F, 2K324F

Inspection request for steel reinforcement, formwork and concreting works for footing
Steel reinforcement
35 20-Jun-22 IR-DB53-CIV-035 0 as per highlighted drawing Group - ALC-G6-2– Villa No. ALC-G6-2 CALERO Delta 1:00 PM 21-Jun-22 10:00: AM B
and formwork
2K331F,2K332F,2K333F,2K334F,2K335F,2K336F

compaction test
Inspection request for compaction test bellow footing blinding as per highlighted
36 21-Jun-22 IR-DB53-CIV-036 0 bellow footing ALC-G6-11 PHOENIX Delta 1:00 PM 22-Jun-22 3:00PM B
drawing Group - ALC-G6-11– Villa No. H822F,H823F, H824F, H825F, H841F,H842F
blinding

Inspection request for blinding concrete as per highlighted drawing Group - ALC-G6-
37 22-Jun-22 IR-DB53-CIV-037 0 Blinding Concrete ALC-G6-11 PHOENIX Delta 1:00 PM 23-Jun-22 10:00 AM UCR
11– Villa No,H822F,H823F, H824F, H825F, H841F,H842F

Inspection request for blinding concrete as per highlighted drawing Group - ALC-G6-
37 26-Jun-22 IR-DB53-CIV-037 1 Blinding Concrete ALC-G6-11 PHOENIX Delta 1:00 PM 27-Jun-22 10:00 AM
11– Villa No,H822F,H823F, H824F, H825F, H841F,H842F

Inspection request for 1st layer Compaction test below tie beam as per highlighted
Compaction test
38 22-Jun-22 IR-DB53-CIV-038 0 drawing Group -ALC-G6-2, Villa No 2K319F, 2K320F, 2K321F, 2K322F, 2K323F, ALC-G6-2 CALERO Delta 1:00 PM 23-Jun-22 11:00 AM B
below tie beam
2K324F

TGC/QAQC/CHK/CVL/SEO/01 REV-00 Page 1 of 11


Inspection request for steel reinforcement, formwork and concreting works for footing
Steel reinforcement
39 22-Jun-22 IR-DB53-CIV-039 0 as per highlighted drawing Group - ALC-G8-6– Villa No. ALC-G8-6 CALERO Delta 1:00 PM 23-Jun-22 3:00: PM B
and formwork
2K311F,2K312F,2K313F,2K314F,2K315F,2K316F,2K317F,2k318F

Inspection request for steel reinforcement, formwork and concreting works for neck
Steel reinforcement
40 22-Jun-22 IR-DB53-CIV-040 0 columns as per highlighted drawing Group - ALC-G6-2– Villa No. 2K331F, 2K332F, ALC-G6-2 CALERO Delta 1:00 PM 23-Jun-22 11:00 AM
and formwork
2K333F, 2K334F, 2K335F, 2K336F
B
Inspection request for steel reinforcement, formwork and concreting works for neck
Steel reinforcement
40 26-Jun-22 IR-DB53-CIV-040 1 columns as per highlighted drawing Group - ALC-G6-2– Villa No. 2K331F, 2K332F, ALC-G6-2 CALERO Delta 1:00 PM 27-Jun-22 11:00 AM
and formwork
2K333F, 2K334F, 2K335F, 2K336F

Inspection request for Anti-termite bellow footing blinding prior to blinding concrete as
Anti-termite below
41 23-Jun-22 IR-DB53-CIV-041 0 per highlighted drawing Group - ALC-G6-11 villa no. ,H822F,H823F, H824F, H825F, ALC-G6-11 PHOENIX Delta 1:00 PM 24-Jun-22 10:00AM B
footing blinding
H841F,H842F

Inspection request for completion of 2 coats bitumen above footing blinding as per
42 23-Jun-22 IR-DB53-CIV-042 0 highlighted drawing Group -ALC-G6-11 villa no. ,H822F,H823F, H824F, H825F, Bitumen ALC-G6-11 PHOENIX Delta 1:00 PM 24-Jun-22 3:00PM B
H841F,H842F

Inspection request for plate load test for Phoenix ALC-G6-11-villas


43 23-Jun-22 IR-DB53-CIV-043 0 plate load test ALC-G6-11 -2 PHOENIX Delta 1:00 PM 24-Jun-22 11:00AM B
H843F,H844F,H845F,H846F,H847F,H848F as per highlighted plan attached.

compaction test
Inspection request for compaction test bellow footing blinding as per highlighted
44 23-Jun-22 IR-DB53-CIV-044 0 bellow footing ALC-G6-11 -2 PHOENIX Delta 1:00 PM 24-Jun-22 3:00PM B
drawing Group - ALC-G6-11– Villa No. H843F,H844F,H845F,H846F,H847F,H848F
blinding

Inspection request for 2nd layer Compaction test below tie beam as per highlighted
Compaction test
45 23-Jun-22 IR-DB53-CIV-045 0 drawing Group -ALC-G6-2, Villa No 2K319F, 2K320F, 2K321F, 2K322F, 2K323F, ALC-G6-2 CALERO Delta 1:00 PM 24-Jun-22 9:00 AM B
below tie beam
2K324F

Inspection request for formation level and setting out as per highlighted drawing Formation level and
46 26-Jun-22 IR-DB53-CIV-046 0 ALC-G6-11 PHOENIX Delta 1:00 PM 27-Jun-22 9:00AM B
Group -ALC-G6-11 Villa no H822F,H823F, H824F, H825F, H841F,H842F. setting out

Inspection request for Below tie beam Anti-termite 1st part prior to blinding concrete
Anti-termite below tie
47 26-Jun-22 IR-DB53-CIV-047 0 as per highlighted drawing Group -ALC-G6-2, Villa Nos. 2K319F, 2K320F, 2K321F, ALC-G6-2 CALERO Delta 1:00 PM 27-Jun-22 9:30AM B
beam
2K322F, 2K323F,2K324F.

Inspection request for blinding concrete for Tie beam 1st part as per highlighted
48 26-Jun-22 IR-DB53-CIV-048 0 drawing Group -ALC-G6-2, Villa Nos. 2K319F, 2K320F, 2K321F, 2K322F, Tie beam blinding ALC-G6-2 CALERO Delta 1:00 PM 27-Jun-22 10:30AM B
2K323F,2K324F.

Inspection request for 2 coats of Bitumen with protection for tie beam pcc 1st part as
Tie beam pcc
49 26-Jun-22 IR-DB53-CIV-049 0 per highlighted drawing Group - ALC-G6-2, Villa Nos. 2K319F, 2K320F, 2K321F, ALC-G6-2 CALERO Delta 1:00 PM 27-Jun-22 4:30PM B
bitumen
2K322F, 2K323F,2K324F.

Inspection request for 2 coats of bitumen with protection for footing and neck
Bitumen for footing
50 26-Jun-22 IR-DB53-CIV-050 0 columns prior to backfilling as per highlighted drawing Group - ALC-G6-2– Villa No. ALC-G6-2 CALERO Delta 1:00 PM 27-Jun-22 11:30AM B B
and neck columns
2K331F, 2K332F, 2K333F, 2K334F, 2K335F, 2K336F

Inspection request for 1st layer Compaction test below tie beam as per highlighted
Compaction test
51 27-Jun-22 IR-DB53-CIV-051 0 drawing Group -ALC-G6-2, Villa No 2K331F, 2K332F, 2K333F, 2K334F, 2K335F, ALC-G6-2 CALERO Delta 1:00 PM 28-Jun-22 9:00 AM B
below tie beam
2K336F

Inspection request for steel reinforcement, formwork and concreting works for footing
Steel reinforcement
52 27-Jun-22 IR-DB53-CIV-052 0 as per highlighted drawing Group - ALC-G5-2– Villa No. ALC-G5-2 PHOENIX Delta 1:00 PM 28-Jun-22 10:30AM B
and formwork
H811F,H812F,H813F,H814F,H815F.

Inspection request for Below tie beam Anti-termite 2nd part prior to blinding concrete
Anti-termite below tie
53 27-Jun-22 IR-DB53-CIV-053 0 as per highlighted drawing Group -ALC-G6-2, Villa Nos. 2K319F, 2K320F, 2K321F, ALC-G6-2 CALERO Delta 1:00 PM 28-Jun-22 8:30AM B
beam
2K322F, 2K323F,2K324F.

Inspection request for blinding concrete for Tie beam 2nd part as per highlighted
54 27-Jun-22 IR-DB53-CIV-054 0 drawing Group -ALC-G6-2, Villa Nos. 2K319F, 2K320F, 2K321F, 2K322F, Tie beam blinding ALC-G6-2 CALERO Delta 1:00 PM 28-Jun-22 11:30AM B
2K323F,2K324F.

Inspection request for 2 coats of Bitumen with protection for tie beam pcc 2nd part as
Tie beam pcc
55 27-Jun-22 IR-DB53-CIV-055 0 per highlighted drawing Group - ALC-G6-2, Villa Nos. 2K319F, 2K320F, 2K321F, ALC-G6-2 CALERO Delta 1:00 PM 28-Jun-22 4:30PM B
bitumen
2K322F, 2K323F,2K324F.

Inspection request for steel reinforcement, formwork and concreting works for neck
Steel reinforcement
56 28-Jun-22 IR-DB53-CIV-056 0 columns as per highlighted drawing Group - ALC-G8-6– Villa No. ALC-G8-6 CALERO Delta 11:00 AM 29-Jun-22 11:00 AM B
and formwork
2K311F,2K312F,2K313F,2K314F,2K315F,2K316F,2K317F,2k318F

Inspection request for 2 coats of bitumen with protection for footing and neck
Bitumen for footing
57 28-Jun-22 IR-DB53-CIV-057 0 columns prior to backfilling as per highlighted drawing Group - ALC-G8-6– Villa No. ALC-G8-6 CALERO Delta 1:00 PM 29-Jun-22 3:00 PM B
and neck columns
2K311F,2K312F,2K313F,2K314F,2K315F,2K316F,2K317F,2k318F

Inspection request for 2nd layer compaction test bellow Tie beam as per highlighted
Compaction test
58 29-Jun-22 IR-DB53-CIV-058 0 drawing Group - ALC-G6-2– Villa No. 2K331F,2K332F, 2K333F, 2K334F, ALC-G6-2 CALERO Delta 1:00 PM 30-Jun-22 9:00 AM B
bellow tie beam
2K335F,2K336F.

Inspection request for steel reinforcement, formwork and concreting works for neck
Steel reinforcement
59 30-Jun-22 IR-DB53-CIV-059 0 columns as per highlighted drawing Group - ALC-G5-2– Villa No. H811F, H812F, ALC-G5-2 PHOENIX Delta 1:00 PM 1-Jul-22 11:00 AM B
and formwork
H813F, H814F, H815F.

Inspection request for 2 coats of bitumen with protection for footing and neck
Bitumen for footing
60 30-Jun-22 IR-DB53-CIV-060 0 columns prior to backfilling as per highlighted drawing Group - ALC-G5-2– Villa No. ALC-G5-2 PHOENIX Delta 1:00 PM 1-Jul-22 3:30 PM
and neck columns
H811F, H812F, H813F, H814F, H815F.
B
Inspection request for 2 coats of bitumen with protection for footing and neck
Bitumen for footing
60 4-Jul-22 IR-DB53-CIV-060 1 columns prior to backfilling as per highlighted drawing Group - ALC-G5-2– Villa No. ALC-G5-2 PHOENIX Delta 1:00 PM 5-Jul-22 10:00 AM
and neck columns
H811F, H812F, H813F, H814F, H815F.

Inspection request for 1st layer Compaction test below tie beam as per highlighted
Compaction test
61 1-Jul-22 IR-DB53-CIV-061 0 drawing Group -ALC-G8-6– Villa No. ALC-G8-6 CALERO Delta 1:00 PM 3-Jul-22 11:00 AM B
below tie beam
2K311F,2K312F,2K313F,2K314F,2K315F,2K316F,2K317F,2k318F

Inspection request for Below tie beam Anti-termite prior to blinding concrete as per
Anti-termite below tie
62 1-Jul-22 IR-DB53-CIV-062 0 highlighted drawing Group -ALC-G6-2– Villa No. 2K331F,2K332F, 2K333F, 2K334F, ALC-G6-2 CALERO Delta 2:00 PM 3-Jul-22 9:30AM B B
beam
2K335F,2K336F..

Inspection request for blinding concrete for Tie beam as per highlighted drawing
63 1-Jul-22 IR-DB53-CIV-063 0 Tie beam blinding ALC-G6-2 CALERO Delta 1:00 PM 3-Jul-22 11:30AM B
Group -ALC-G6-2, Villa Nos. 2K331F, 2K332F, 2K333F, 2K334F, 2K335F,2K336F.

Inspection request for 2 coats of Bitumen with protection for tie beam pcc as per
Tie beam pcc
64 1-Jul-22 IR-DB53-CIV-064 0 highlighted drawing Group - ALC-G6-2– Villa No. 2K331F,2K332F, 2K333F, ALC-G6-2 CALERO Delta 1:00 PM 3-Jul-22 3:30pM B
bitumen
2K334F, 2K335F,2K336F

Inspection request for steel reinforcement, formwork and concreting works for tie
65 4-Jul-22 IR-DB53-CIV-065 0 beam as per highlighted drawingGroup - ALC-G6-2 villa no. 2K319F, 2K320F, Tie Beam ALC-G6-2 CALERO Delta 1:00 PM 4-Jul-22 9:00 AM B
2K321F, 2K322F, 2K323F, 2K324F.

Inspection request for 2nd layer Compaction test below tie beam as per highlighted
Compaction test
66 4-Jul-22 IR-DB53-CIV-066 0 drawing Group -ALC-G8-6– Villa No. ALC-G8-6 CALERO Delta 1:00 PM 4-Jul-22 3:00 PM B
below tie beam
2K311F,2K312F,2K313F,2K314F,2K315F,2K316F,2K317F,2k318F

Inspection request for 2 coats of Bitumen with protection for tie beam as per
67 6-Jul-22 IR-DB53-CIV-067 0 highlighted drawing Group - ALC-G6-2 villa no. 2K319F, 2K320F, 2K321F, 2K322F, Tie beam Bitumen ALC-G6-2 CALERO Delta 1:00 PM 7-Jul-22 11:30AM C
2K323F, 2K324F.

Inspection request for 2 coats of Bitumen with protection for tie beam as per
67 13-Jul-22 IR-DB53-CIV-067 01 highlighted drawing Group - ALC-G6-2 villa no. 2K319F, 2K320F, 2K321F, 2K322F, Tie beam Bitumen ALC-G6-2 CALERO Delta 1:00 PM 14-Jul-22 11:30AM B
2K323F, 2K324F.

Inspection request for Below tie beam Anti-termite prior to blinding concrete as per Anti-termite below tie
68 7-Jul-22 IR-DB53-CIV-068 0 ALC-G 8-6 CALERO Delta 2:00 PM 12-Jul-22 9:30AM B B
highlighted drawing Group - ALC-G8-6– Villa No. 2K315F,2K316F,2K317F,2k318F beam

Inspection request for blinding concrete for Tie beam as per highlighted drawing
69 7-Jul-22 IR-DB53-CIV-069 0 Tie beam blinding ALC-G 8-6 CALERO Delta 1:00 PM 12-Jul-22 10:30AM B
Group -ALC-G8-6– Villa No. 2K315F,2K316F,2K317F,2k318F

Inspection request for 2 coats of Bitumen with protection for tie beam pcc as per Tie beam pcc
70 7-Jul-22 IR-DB53-CIV-070 0 ALC-G 8-6 CALERO Delta 1:00 PM 12-Jul-22 10:50AM B B
highlighted drawing Group - ALC-G8-6– Villa No. 2K315F,2K316F,2K317F,2k318F bitumen

Inspection request for steel reinforcement, formwork and concreting works for tie
71 7-Jul-22 IR-DB53-CIV-071 0 beam as per highlighted drawingGroup - ALC-G6-2 villa no. 2K331F, 2K332F, Tie Beam ALC-G6-2 CALERO Delta 1:00 PM 12-Jul-22 3:00 PM B
2K333F, 2K334F, 2K335F, 2K336F.

Inspection request for 1st layer Compaction test below tie beam as per highlighted Compaction test
72 12-Jul-22 IR-DB53-CIV-072 0 ALC-G5-2 PHOENIX Delta 1:00 PM 13-Jul-22 11:00 AM B
drawing Group - ALC-G5-2– Villa No. H811F, H812F, H813F, H814F, H815F. below tie beam

Inspection request for steel reinforcement, formwork and concreting works for footing
Steel reinforcement
73 12-Jul-22 IR-DB53-CIV-073 0 as per highlighted drawing Group - ALC-G6-11-villas ALC-G6-11 PHOENIX Delta 1:00 PM 13-Jul-22 10:30AM B
and formwork
H822F,H823F,H824F,H825F,H841F,H842F

Inspection request for Below tie beam Anti-termite prior to blinding concrete as per Anti-termite below tie
74 13-Jul-22 IR-DB53-CIV-074 0 ALC-G 8-6 CALERO Delta 2:00 PM 14-Jul-22 9:30AM B
highlighted drawing Group - ALC-G8-6– Villa No. 2K311F,2K312F,2K313F,2k314F beam

Inspection request for blinding concrete for Tie beam as per highlighted drawing
75 13-Jul-22 IR-DB53-CIV-075 0 Tie beam blinding ALC-G 8-6 CALERO Delta 1:00 PM 14-Jul-22 10:30AM B
Group -ALC-G8-6– Villa No. 2K311F,2K312F,2K313F,2k314F

Inspection request for 2 coats of Bitumen with protection for tie beam pcc as per Tie beam pcc
76 13-Jul-22 IR-DB53-CIV-076 0 ALC-G 8-6 CALERO Delta 1:00 PM 14-Jul-22 10:50AM B
highlighted drawing Group - ALC-G8-6– Villa No. 2K311F,2K312F,2K313F,2k314F bitumen

Inspection request for 2 coats of Bitumen with protection for tie beam as per
77 14-Jul-22 IR-DB53-CIV-077 0 highlighted drawing Group - ALC-G6-2 villa no. 2K331F, 2K332F, 2K333F, 2K334F, Tie beam Bitumen ALC-G6-2 CALERO Delta 1:00 PM 15-Jul-22 8:00 AM B
2K335F, 2K336F.

Inspection request for 2nd layer Compaction test below tie beam as per highlighted Compaction test
78 14-Jul-22 IR-DB53-CIV-078 0 ALC-G5-2 PHOENIX Delta 1:00 PM 15-Jul-22 11:00 AM B
drawing Group - ALC-G5-2– Villa No. H811F, H812F, H813F, H814F, H815F. below tie beam

Inspection request for Anti-termite bellow footing blinding prior to blinding concrete as Anti-termite below
79 14-Jul-22 IR-DB53-CIV-079 0 ALC-G6-11 PHOENIX Delta 1:00 PM 15-Jul-22 8:00AM B
per highlighted drawing Group - ALC-G6-11 villa no.H843F ,H844F,H845F. footing blinding

Inspection request for Anti-termite bellow footing blinding prior to blinding concrete as Anti-termite below
79 14-Jul-22 IR-DB53-CIV-079 01 ALC-G6-11 PHOENIX Delta 1:00 PM 24-Jul-22 8:00AM B
per highlighted drawing Group - ALC-G6-11 villa no.H843F ,H844F,H845F. footing blinding

Inspection request for blinding concrete as per highlighted drawing Group - ALC-G6-
80 14-Jul-22 IR-DB53-CIV-080 0 blinding Concrete ALC-G6-11 PHOENIX Delta 1:00 PM 15-Jul-22 3:00PM B
11– Villa No: H843F,H844F, H845F.

Inspection request for completion of 2 coats bitumen above footing blinding as per
81 14-Jul-22 IR-DB53-CIV-081 0 Bitumen Blinding ALC-G6-11 PHOENIX Delta 1:00 PM 15-Jul-22 4:30PM B
highlighted drawing Group - ALC-G6-11– Villa No: H843F,H844F, H845F.

Inspection request for completion of 2 coats bitumen above footing blinding as per
81 14-Jul-22 IR-DB53-CIV-081 01 Bitumen Blinding ALC-G6-11 PHOENIX Delta 1:00 PM 24-Jul-22 10:30 AM B
highlighted drawing Group - ALC-G6-11– Villa No: H843F,H844F, H845F.

Inspection request for Anti-termite bellow footing blinding prior to blinding concrete as Anti-termite below
82 17-Jul-22 IR-DB53-CIV-082 0 ALC-G6-11 PHOENIX Delta 1:00 PM 18-Jul-22 11:00AM B
per highlighted drawing Group - ALC-G6-11 villa no.,H846F,H847F,H848F footing blinding

Inspection request for blinding concrete as per highlighted drawing Group - ALC-G6-
83 17-Jul-22 IR-DB53-CIV-083 0 blinding Concrete ALC-G6-11 PHOENIX Delta 1:00 PM 18-Jul-22 3:00PM B
11– Villa No:H846F,H847F,H848F.

Inspection request for completion of 2 coats bitumen above footing blinding as per
84 17-Jul-22 IR-DB53-CIV-084 0 Bitumen Blinding ALC-G6-11 PHOENIX Delta 2:00 PM 19-Jul-22 3:00PM B
highlighted drawing Group - ALC-G6-11– Villa No: H846F,H847F, H848F.

Inspection request for steel reinforcement, formwork and concreting works for neck
Steel reinforcement
85 18-Jul-22 IR-DB53-CIV-085 0 columns as per highlighted drawing Group - ALC-ALC-G6-11 Villa no ALC-G6-11 PHOENIX Delta 1:00 PM 19-Jul-22 11:00 AM B B
and formwork
H822F,H823F, H824F, H825F, H841F,H842F

Inspection request for steel reinforcement, formwork and concreting works for neck
Steel reinforcement
85 18-Jul-22 IR-DB53-CIV-085 1 columns as per highlighted drawing Group - ALC-ALC-G6-11 Villa no ALC-G6-11 PHOENIX Delta 1:00 PM 19-Jul-22 11:00 AM B B
and formwork
H822F,H823F, H824F, H825F, H841F,H842F

TGC/QAQC/CHK/CVL/SEO/01 REV-00 Page 2 of 11


Inspection request for blinding concrete for Tie beam as per highlighted drawing
86 18-Jul-22 IR-DB53-CIV-086 0 Tie beam blinding ALC-G5-2 PHOENIX Delta 1:20 PM 19-Jul-22 11:30AM B
Group -ALC-G5-2– Villa No. H811F, H812F, H813F, H814F, H815F

Inspection request for steel reinforcement, formwork and concreting works for tie
87 18-Jul-22 IR-DB53-CIV-087 0 beam as per highlighted drawingGroup ALC-G8-6– Villa No. Tie Beam ALC-G 8-6 CALERO Delta 1:00 PM 19-Jul-22 3:00 PM UCR B
2K311F,2K312F,2K313F,2K314F,2K315F,2K316F,2K317F,2k318F

Inspection request for completion of 2 coats bitumen above tie beam blinding as per
Bitumen Blinding tie
88 19-Jul-22 IR-DB53-CIV-088 0 highlighted drawing Group - ALC-G5-2– Villa No. H811F, H812F, H813F, H814F, ALC-G5-2 PHOENIX Delta 1:00 PM 20-Jul-22 8:30 AM B
beam
H815F

Inspection request for completion of 2 coats bitumen above footing and neck
Bitumen footing and
89 19-Jul-22 IR-DB53-CIV-089 0 columns as per highlighted drawing Group - ALC-G6-11 Villa No. H822F, H823F, ALC-G6-11 PHOENIX Delta 1:00 PM 20-Jul-22 9:00 AM B
neck columns
H824F, H825F, H841F, H842F

Inspection request for compaction test bellow footing blinding as per highlighted compaction test
90 19-Jul-22 IR-DB53-CIV-090 0 drawing Group - ALC-G2-4– Villa No. bellow footing ALC-G2-4 CALERO Delta 1:00 PM 20-Jul-22 9:30 AM B
2K325F,2K326F,2K327F,2K328F,2K329F,2K330F blinding

Inspection request for Anti-termite bellow footing blinding prior to blinding concrete as
Anti-termite below
91 19-Jul-22 IR-DB53-CIV-091 0 per highlighted drawing Group - ALC-G2-4– Villa No. ALC-G2-4 CALERO Delta 1:00 PM 20-Jul-22 10:30AM B
footing blinding
2K325F,2K326F,2K327F,2K328F,2K329F,2K330F

Inspection request for blinding concrete as per highlighted drawing Group - ALC-G2-
92 19-Jul-22 IR-DB53-CIV-092 00 Blinding Concrete ALC-G2-4 CALERO Delta 1:00 PM 20-Jul-22 3:00 PM B
4– Villa No. 2K325F,2K326F,2K327F,2K328F,2K329F,2K330F

Inspection request for compaction test bellow footing blinding as per highlighted compaction test
93 26-Jul-22 IR-DB53-CIV-093 0 drawing Group - ALC-G6-2 villa no. 2K319F, 2K320F, 2K321F, 2K322F, 2K323F, bellow footing ALC-G6-2 CALERO Delta 1:00 PM 26-Jul-22 9:30 AM B
2K324F. blinding

Inspection request for completion of 2 coats bitumen Blinding Footing PCC as per
94 22-Jul-22 IR-DB53-CIV-094 0 highlighted drawing Group - ALC-G2-4– Villa No. Bitumen Blinding ALC-G2-4 CALERO Delta 1:00 PM 24-Jul-22 9:30 AM B
2K325F,2K326F,2K327F,2K328F,2K329F,2K330F

Inspection request for steel reinforcement, formwork and concreting works for footing
Steel reinforcement
95 22-Jul-22 IR-DB53-CIV-095 0 as per highlighted drawing Group - ALC-G2-4– Villa No. ALC-G2-4 CALERO Delta 1:00 PM 24-Jul-22 3:30 PM B
and formwork
2K325F,2K326F,2K327F,2K328F,2K329F,2K330F

Inspection request for steel reinforcement, formwork and concreting works for neck
Steel reinforcement
96 22-Jul-22 IR-DB53-CIV-096 0 columns as per highlighted drawing Group - ALC-ALC-G6-11 Villa no ALC-G6-11 -2 PHOENIX Delta 1:00 PM 24-Jul-22 3:30 PM B
and formwork
H843F,H844F, H845F, H846F, H847F,H848F

Inspection request for completion of 2 coats bitumen Blinding Footing PCC as per
97 22-Jul-22 IR-DB53-CIV-097 0 highlighted drawing Group - ALC-G2-4– Villa No. Bitumen Blinding ALC-G2-4 CALERO Delta 1:00 PM 24-Jul-22 9:30 AM B
2K325F,2K326F,2K327F,2K328F,2K329F,2K330F

Inspection request for Compaction test below Slab on Grade as per highlighted
Compaction test
98 25-Jul-22 IR-DB53-CIV-098 0 drawing Group -ALC-G6-2 villa no. 2K319F, 2K320F, 2K321F, 2K322F, 2K323F, ALC-G6-2 CALERO Delta 2:00 PM 26-Jul-22 3:30 PM B
below grade slab
2K324F.

Inspection request for granular fill below grade slab as per highlighted drawing Granular Fill Below
99 25-Jul-22 IR-DB53-CIV-099 0 ALC-G6-2 CALERO Delta 12:00 AM 26-Jul-22 12:00 AM B
Group ALC-G6-2 villa no. 2K319F, 2K320F, 2K321F, 2K322F, 2K323F, 2K324F.. Slab on Grade

Inspection request for Anti-termite bellow Anti-termite below grade slab as per
Anti-termite below
100 26-Jul-22 IR-DB53-CIV-100 0 highlighted drawing Group -ALC-G6-2 villa no. 2K319F, 2K320F, 2K321F, 2K322F, ALC-G6-2 CALERO Delta 1:00 PM 26-Jul-22 10:30AM B
grade slab
2K323F, 2K324F.

Inspection request for formation level and setting out as per highlighted drawing Formation level and
101 26-Jul-22 IR-DB53-CIV-101 0 ALC-G2-4 CALERO Delta 1:00 PM 27-Jul-22 9:00AM B
Group -ALC-G2-4– Villa No. 2K325F,2K326F,2K327F,2K328F,2K329F,2K330F. setting out

Inspection request for Steel reinforcement, formwork and concreting works (including Steel reinforcement,
102 27-Jul-22 IR-DB53-CIV-102 0 insulation) for Slab on Grade as per highlighted drawing Group -ALC-G6-2 villa no. formwork for Slab on ALC-G6-2 CALERO Delta 2:00 PM 28-Jul-22 9:00AM B
2K319F, 2K320F, 2K321F, 2K322F, 2K323F, 2K324F. Grade

Inspection request for Steel reinforcement, formwork and concreting works (including Steel reinforcement,
102 31-Jul-22 IR-DB53-CIV-102 1 insulation) for Slab on Grade as per highlighted drawing Group -ALC-G6-2 villa no. formwork for Slab on ALC-G6-2 CALERO Delta 2:00 PM 31-Jul-22 9:00AM B
2K319F, 2K320F, 2K321F, 2K322F, 2K323F, 2K324F. Grade
Rev-01

Inspection request for steel reinforcement, formwork and concreting works for tie
103 27-Jul-22 IR-DB53-CIV-103 0 beam as per highlighted drawingGroupALC-G5-2– Villa No. H811F, H812F, H813F, Tie Beam ALC-G5-2 PHOENIX Delta 2:00 PM 28-Jul-22 10:30 AM B
H814F, H815F

Inspection request for steel reinforcement, formwork and concreting works for tie
103 31-Jul-22 IR-DB53-CIV-103 1 beam as per highlighted drawingGroupALC-G5-2– Villa No. H811F, H812F, H813F, Tie Beam ALC-G5-2 PHOENIX Delta 2:00 PM 1-Aug-22 10:30 AM B
H814F, H815F

Inspection request for Anti-termite bellow footing blinding prior to blinding concrete as
Anti-termite below
104 27-Jul-22 IR-DB53-CIV-104 0 per highlighted drawing Group -ALC-G6-11 (3) Villa no H853F,H854F, H855F, ALC-G6-11 (3) CALERO Delta 1:00 PM 28-Jul-22 10:30AM B
footing blinding
H856F, H857F,H858F

Inspection request for blinding concrete as per highlighted drawing Group -ALC-G6-
105 27-Jul-22 IR-DB53-CIV-105 00 Blinding Concrete ALC-G6-11 (3) CALERO Delta 1:00 PM 29-Jul-22 3:00 PM B
11 (3) Villa no H853F,H854F, H855F, H856F, H857F,H858F

Inspection request for 1st layer compaction test bellow Tie beam as per highlighted
Compaction test
106 29-Jul-22 IR-DB53-CIV-106 0 drawing Group -ALC-ALC-G6-11 Villa no H822F,H823F, H824F, H825F, ALC-G6-11 -1 CALERO Delta 1:00 PM 31-Jul-22 9:00 AM B
bellow tie beam
H841F,H842F.

Inspection request for completion of 2 coats bitumen Blinding Footing PCC as per
107 29-Jul-22 IR-DB53-CIV-107 00 highlighted drawing Group -ALC-G6-11 (3) Villa no H853F,H854F, H855F, H856F, Blinding Concrete ALC-G6-11 (3) PHOENIX Delta 1:00 PM 31-Jul-22 3:00 PM B
H857F,H858F

Inspection request for steel reinforcement, formwork and concreting works for footing
Steel reinforcement
108 29-Jul-22 IR-DB53-CIV-108 0 as per highlighted drawing Group - ALC-G6-11 (3) Villa no H853F,H854F, H855F, ALC-G6-11 (3) CALERO Delta 1:00 PM 31-Jul-22 3:30 PM B
and formwork
H856F, H857F,H858F

Inspection request for 2nd layer compaction test bellow Tie beam as per highlighted
Compaction test
109 31-Jul-22 IR-DB53-CIV-109 0 drawing Group -ALC-ALC-G6-11 Villa no H822F,H823F, H824F, H825F, ALC-G6-11 -1 CALERO Delta 1:00 PM 1-Aug-22 9:30 AM B
bellow tie beam
H841F,H842F.

Inspection request for steel reinforcement, formwork and concreting works for ground Ground floor column
110 31-Jul-22 IR-DB53-CIV-110 0 floor column as per highlighted drawing Group - ALC-G6-2 villa no. 2K319F, 2K320F, Steel reinforcement ALC-G6-2 CALERO Delta 2:00 PM 1-Aug-22 3:00: PM B
2K321F, 2K322F, 2K323F, 2K324F. and formwork

Inspection request for compaction test bellow footing blinding as per highlighted compaction test
111 31-Jul-22 IR-DB53-CIV-111 0 drawing Group - ALC-G6-10– Villa No. H816F, H817F, H818F, H819F, bellow footing ALC-G6-10 PHOENIX Delta 1:00 PM 1-Aug-22 3:00PM B
H820FH,821F blinding

Inspection request for formation level and setting out as per highlighted drawing Formation level and
112 31-Jul-22 IR-DB53-CIV-112 0 ALC-G6-10 PHOENIX Delta 1:00 PM 1-Aug-22 9:30AM B
Group -ALC-G6-10– Villa No. H816F, H817F, H818F, H819F, H820FH,821F setting out

Inspection request for steel reinforcement, formwork and concreting works for neck
Steel reinforcement
113 1-Aug-22 IR-DB53-CIV-113 0 columns as per highlighted drawing Group - ALC-G2-4– Villa No. ALC-G2-4 CALERO Delta 1:00 PM 2-Aug-22 3:30 PM B
and formwork
2K325F,2K326F,2K327F,2K328F,2K329F,2K330F

Inspection request for completion of 2 coats bitumen above footing and neck
Bitumen footing and
114 2-Aug-22 IR-DB53-CIV-114 0 columns as per highlighted drawing Group - ALC-G2-4– Villa No. ALC-G2-4 CALERO Delta 1:00 PM 3-Aug-22 9:00 AM B
neck columns
2K325F,2K326F,2K327F,2K328F,2K329F,2K330F

Inspection request for Compaction test below Slab on Grade as per highlighted
Compaction test
115 2-Aug-22 IR-DB53-CIV-115 0 drawing Group - ALC-G6-2– Villa No. ALC-G6-2 - 2 CALERO Delta 2:00 PM 3-Aug-22 3:30 PM B
below grade slab
2K331F,2K332F,2K333F,2K334F,2K335F,2K336F

Inspection request for granular fill below grade slab as per highlighted drawing Granular Fill Below
116 2-Aug-22 IR-DB53-CIV-116 0 ALC-G6-2 - 2 CALERO Delta 12:00 AM 3-Aug-22 3:20 PM B
Group ALC-G6-2– Villa No. 2K331F,2K332F,2K333F,2K334F,2K335F,2K336F Slab on Grade

Inspection request for Anti-termite bellow Anti-termite below grade slab as per
Anti-termite below
117 2-Aug-22 IR-DB53-CIV-117 0 highlighted drawing Group -ALC-G6-2– Villa No. ALC-G6-2 - 2 CALERO Delta 1:00 PM 3-Aug-22 3:50PM B
grade slab
2K331F,2K332F,2K333F,2K334F,2K335F,2K336F

Inspection request for Steel reinforcement, formwork and concreting works (including Steel reinforcement,
118 3-Aug-22 IR-DB53-CIV-118 0 insulation) for Slab on Grade as per highlighted drawing Group -ALC-G6-2– Villa No. formwork for Slab on ALC-G6-2 - 2 CALERO Delta 2:00 PM 4-Aug-22 3:00 PM B
2K334F,2K335F,2K336F Grade

Inspection request for steel reinforcement, formwork and concreting works for ground Ground floor column
119 3-Aug-22 IR-DB53-CIV-119 0 floor column as per highlighted drawing Group - ALC-G6-2 villa no. Steel reinforcement ALC-G6-2 - 2 CALERO Delta 2:00 PM 4-Aug-22 3:30: PM B
2K334F,2K335F,2K336F and formwork

Inspection request for steel reinforcement, formwork and concreting works for ground Ground floor column
119 10-Aug-22 IR-DB53-CIV-119 1 floor column as per highlighted drawing Group - ALC-G6-2 villa no. Steel reinforcement ALC-G6-2 - 2 CALERO Delta 2:00 PM 11-Aug-22 09:30: AM B rRev-01
2K334F,2K335F,2K336F and formwork

Inspection request for steel reinforcement, formwork and concreting works for ground Ground floor column
119 10-Aug-22 IR-DB53-CIV-119 1 floor column as per highlighted drawing Group - ALC-G6-2 villa no. Steel reinforcement ALC-G6-2 - 2 CALERO Delta 2:00 PM 11-Aug-22 09:30: AM B rRev-01
2K334F,2K335F,2K336F and formwork

Inspection request for 1st layer compaction test bellow Tie beam as per highlighted
Compaction test
120 4-Aug-22 IR-DB53-CIV-120 0 drawing Group -ALC-ALC-G6-11 Villa no H843F,H844F, H845F, H846F, ALC-G6-11 -2 CALERO Delta 1:00 PM 5-Aug-22 9:00 AM B
bellow tie beam
H847F,H848F

Inspection request for Steel reinforcement, formwork and concreting works (including Steel reinforcement,
121 4-Aug-22 IR-DB53-CIV-121 0 insulation) for Slab on Grade as per highlighted drawing Group -ALC-G6-2– Villa No. formwork for Slab on ALC-G6-2 - 2 CALERO Delta 2:00 PM 5-Aug-22 3:00 PM B
2K331F,2K332F,2K333F Grade

Inspection request for steel reinforcement, formwork and concreting works for ground Ground floor column
122 4-Aug-22 IR-DB53-CIV-122 0 floor column as per highlighted drawing Group - ALC-G6-2 villa no. Steel reinforcement ALC-G6-2 - 2 CALERO Delta 2:00 PM 6-Aug-22 3:30: PM B
2K331F,2K332F,2K333F and formwork

Inspection request for steel reinforcement, formwork and concreting works for ground Ground floor column
122 10-Aug-22 IR-DB53-CIV-122 1 floor column as per highlighted drawing Group - ALC-G6-2 villa no. Steel reinforcement ALC-G6-2 - 2 CALERO Delta 2:00 PM 11-Aug-22 3:30: PM B
2K331F,2K332F,2K333F and formwork

Inspection request for Below tie beam Anti-termite prior to blinding concrete as per
Anti-termite below tie
123 4-Aug-22 IR-DB53-CIV-123 0 highlighted drawing Group - ALC-ALC-G6-11 Villa no H822F,H823F, H824F, ALC-G6-11 -1 pHOENIX Delta 2:00 PM 5-Aug-22 9:30AM B
beam
H825F, H841F,H842F.

Inspection request for blinding concrete for Tie beam as per highlighted drawing
124 4-Aug-22 IR-DB53-CIV-124 0 Tie beam blinding ALC-G6-11 -1 PHOENIX Delta 1:20 PM 5-Aug-22 11:30AM B
Group -ALC-G6-11 Villa no H822F,H823F, H824F, H825F, H841F,H842F

Inspection request for completion of 2 coats bitumen above tie beam blinding as per
Bitumen Blinding tie
125 7-Aug-22 IR-DB53-CIV-125 0 highlighted drawing Group ALC-G6-11 Villa no H822F,H823F, H824F, H825F, ALC-G6-11 -1 PHOENIX Delta 1:00 PM 8-Aug-22 8:30 AM B
beam
H841F,H842F

Inspection request for Compaction test below Slab on Grade as per highlighted
Compaction test
126 7-Aug-22 IR-DB53-CIV-126 0 drawing Group - ALC-G8-6– Villa No. ALC-G8-6 CALERO Delta 2:00 PM 8-Aug-22 3:30 PM B
below grade slab
2K311F,2K312F,2K313F,2K314F,2K315F,2K316F,2K317F,2k318F

Inspection request for granular fill below grade slab as per highlighted drawing
Granular Fill Below
127 7-Aug-22 IR-DB53-CIV-127 0 Group ALC-G8-6– Villa No. ALC-G8-6 CALERO Delta 12:00 AM 8-Aug-22 3:20 PM B
Slab on Grade
2K311F,2K312F,2K313F,2K314F,2K315F,2K316F,2K317F,2k318F

Inspection request for steel reinforcement, formwork and concreting works for neck
Steel reinforcement
128 10-Aug-22 IR-DB53-CIV-128 0 columns as per highlighted drawing Group - -ALC-G6-11 (3) Villa no H853F,H854F, ALC-G6-11-3 CALERO Delta 1:00 PM 11-Aug-22 3:30 PM B
and formwork
H855F, H856F, H857F,H858F

Inspection request for Anti-termite bellow footing blinding prior to blinding concrete as
Anti-termite below
129 10-Aug-22 IR-DB53-CIV-129 0 per highlighted drawing Group - ALC-G6-10– Villa No. H816F, H817F, H818F, ALC-G6-10 PHOENIX Delta 1:00 PM 11-Aug-22 10:30AM B
footing blinding
H819F, H820FH,821F

Inspection request for blinding concrete as per highlighted drawing Group - ALC-G6-
130 10-Aug-22 IR-DB53-CIV-130 00 Blinding Concrete ALC-G6-10 PHOENIX Delta 1:00 PM 11-Aug-22 3:00 PM B
10– Villa No. H816F, H817F, H818F, H819F, H820FH,821F

Inspection request for completion of 2 coats bitumen Blinding Footing PCC as per
131 10-Aug-22 IR-DB53-CIV-131 0 highlighted drawing Group - ALC-G6-10– Villa No. H816F, H817F, H818F, H819F, Bitumen Blinding ALC-G6-10 PHOENIX Delta 1:00 PM 11-Aug-22 9:30 AM B
H820FH,821F

Inspection request for reinforcement, formwork and concreting works for first floor
First floor slab
132 11-Aug-22 IR-DB53-CIV-132 0 slab as per highlighted drawing Group - ALC-G6-2 villa no. 2K319F, 2K320F, ALC-G6-2 CALERO Delta 2:00 PM 12-Aug-22 09:00AM B
concreting
2K321F, 2K322F, 2K323F, 2K324F

Inspection request for Steel reinforcement, formwork and concreting works (including Steel reinforcement,
133 11-Aug-22 IR-DB53-CIV-133 0 insulation) for Slab on Grade as per highlighted drawing Group ALC-G8-6– Villa No. formwork for Slab on ALC-G8-6 CALERO Delta 2:00 PM 12-Aug-22 3:00 PM B
2K311F,2K312F,2K313F,2K314F Grade

TGC/QAQC/CHK/CVL/SEO/01 REV-00 Page 3 of 11


Inspection request for Anti-termite bellow Anti-termite below grade slab as per
Anti-termite below
134 12-Aug-22 IR-DB53-CIV-134 0 highlighted drawing Group -ALC-G8-6– Villa No. ALC-G8-6 CALERO Delta 2:00 PM 14-Aug-22 09:00AM B
grade slab
2K311F,2K312F,2K313F,2K314F,2K315F,2K316F,2K317F,2K318F

Inspection request for Steel reinforcement, formwork and concreting works (including Steel reinforcement,
135 12-Aug-22 IR-DB53-CIV-135 0 insulation) for Slab on Grade as per highlighted drawing Group ALC-G8-6– Villa No. formwork for Slab on ALC-G8-6 CALERO Delta 2:00 PM 14-Aug-22 3:00 PM B
2K315F,2K316F,2K317F,2K318F Grade

Inspection request for steel reinforcement, formwork and concreting works for ground Ground floor column
136 15-Aug-22 IR-DB53-CIV-136 0 floor column as per highlighted drawing Group - ALC-G8-6 villa no. Steel reinforcement ALC-G8-6 CALERO Delta 2:00 PM 16-Aug-22 3:30: PM B
2K311F,2K312F,2K313F,2K314F and formwork

Inspection request for steel reinforcement, formwork and concreting works for ground Ground floor column
137 16-Aug-22 IR-DB53-CIV-137 0 floor column as per highlighted drawing Group - ALC-G8-6 villa no. Steel reinforcement ALC-G8-6 CALERO Delta 2:00 PM 17-Aug-22 3:30: PM B
2K315F,2K316F,2K317F,2K318F and formwork

Inspection request for steel reinforcement, formwork and concreting works for tie Tie Beam
Group ALC-G6-11-
138 17-Aug-22 IR-DB53-CIV-138 0 beam as per highlighted drawing Group ALC-G6-11-1 Villa no H822F,H823F, reinforcement and PHOENIX Delta 2:00 PM 18-Aug-22 3:30: PM B
1
H824F, H825F, H841F,H842F. formwork

Inspection request for steel reinforcement, formwork and concreting works for tie Tie Beam
Group ALC-G6-11-
138 5-Aug-22 IR-DB53-CIV-138 1 beam as per highlighted drawing Group ALC-G6-11-1 Villa no H822F,H823F, reinforcement and PHOENIX Delta 2:00 PM 6-Sep-22 3:30: PM B
1
H824F, H825F, H841F,H842F. formwork

Inspection request for steel reinforcement, formwork and concreting works for tie Tie Beam
Group ALC-G6-11-
138 25-Aug-22 IR-DB53-CIV-138 02 beam as per highlighted drawing Group ALC-G6-11-1 Villa no H822F,H823F, reinforcement and PHOENIX Delta 2:00 PM 26-Aug-22 3:00: PM B
1
H824F, H825F, H841F,H842F. formwork

Inspection request for 2 coats of bitumen with protection for neck columns prior to
Bitumen for neck
139 18-Aug-22 IR-DB53-CIV-139 0 backfilling as per highlighted drawing Group - ALC-G6-11 (3) Villa no H853F,H854F, ALC-G6-11-3 PHOENIX Delta 1:00 PM 19-Aug-22 3:30 PM B
columns
H855F, H856F, H857F,H858F

Inspection request for 1st layer compaction test bellow Tie beam as per highlighted
Compaction test
140 18-Aug-22 IR-DB53-CIV-140 0 drawing Group -ALC-G6-11 (3) Villa no H853F,H854F, H855F, H856F, ALC-G6-11 -3 PHOENIX Delta 1:00 PM 19-Aug-22 9:00 AM B
bellow tie beam
H857F,H858F

Inspection request for 1st layer compaction test bellow Tie beam as per highlighted
1st Compaction test
141 18-Aug-22 IR-DB53-CIV-141 0 drawing Group -ALC-G2-4– Villa No. ALC-G2-4 PHOENIX Delta 1:00 PM 19-Aug-22 9:00 AM UCR
bellow tie beam
2K325F,2K326F,2K327F,2K328F,2K329F,2K330F

Inspection request for reinforcement, formwork and concreting works for first floor
142 19-Aug-22 IR-DB53-CIV-142 0 column as per highlighted drawing Group -ALC-G6-2 villa no. 2K319F, 2K320F, First floor column ALC-G6-2-1 CALERO Delta 2:00 PM 21-Aug-22 10:00 AM B
2K321F, 2K322F, 2K323F, 2K324

Inspection request for formation level and setting out as per highlighted drawing Formation level and
143 21-Aug-22 IR-DB53-CIV-143 0 ALC-G4-6 PHOENIX Delta 10:00 AM 22-Aug-22 11:00 AM B
Group -ALC-G4-6 Villa No. H849F,H850F,H851F,H852F setting out

Inspection request for Compaction test below Slab on Grade as per highlighted Compaction test
144 21-Aug-22 IR-DB53-CIV-144 0 ALC-G5-2 PHOENIX Delta 2:00 PM 22-Aug-22 3:30 PM B
drawing Group - ALC-G5-2 H811F, H812F, H813F, H814F, H815F below grade slab

Inspection request for steel reinforcement, formwork and concreting works for footing
Steel reinforcement
145 22-Aug-22 IR-DB53-CIV-145 0 as per highlighted drawing Group - ALC-G6-10 – Villa No. H816F, H817F, H818F, ALC-G6-10 PHOENIX Delta 1:00 PM 22-Aug-22 4:30 PM B
and formwork
H819F, H820FH,821F

Inspection request for reinforcement, formwork and concreting works for first floor
Steel reinforcement
146 22-Aug-22 IR-DB53-CIV-146 0 slab as per highlighted drawing Group - ALC-G6-2 villa no. 2K319F, 2K320F, ALC-G6-2-2 CALERO Delta 2:00 PM 23-Aug-22 3:30 PM B
and formwork
2K321F, 2K322F, 2K323F, 2K324F

Inspection request for Blockwork layout at ground floor as per highlighted drawing Blockwork layout
147 23-Aug-22 IR-DB53-CIV-147 0 ALC-G6-2-1 CALERO Delta 3:00 PM 24-Aug-22 3:30 PM B
Group - ALC-G6-2 villa no 2K319F, 2K320F, 2K321F GF

Inspection request for Blockwork layout at ground floor as per highlighted drawing Blockwork layout
147 28-Aug-22 IR-DB53-CIV-147 1 ALC-G6-2-1 CALERO Delta 2:00 PM 28-Aug-22 3:00: PM B
Group - ALC-G6-2 villa no 2K319F, 2K320F, 2K321F GF

Inspection request for Blockwork layout at ground floor as per highlighted drawing Blockwork layout
147 30-Aug-22 IR-DB53-CIV-147 2 ALC-G6-2-1 CALERO Delta 2:00 PM 31-Aug-22 3:00: PM B
Group - ALC-G6-2 villa no 2K319F, 2K320F, 2K321F GF

Inspection request for Blockwork layout at ground floor as per highlighted drawing Blockwork layout
147 23-Sep-22 IR-DB53-CIV-147 3 ALC-G6-2-1 CALERO Delta 2:00 PM 25-Sep-22 3:00: PM B
Group - ALC-G6-2 villa no 2K319F, 2K320F, 2K321F GF

Inspection request for 2nd layer compaction test bellow Tie beam as per highlighted
Compaction test
148 25-Aug-22 IR-DB53-CIV-148 0 drawing Group -ALC-G6-11 (3) Villa no H853F,H854F, H855F, H856F, ALC-G6-11 -3 PHOENIX Delta 1:00 PM 26-Aug-22 9:00 AM B
bellow tie beam 2nd
H857F,H858F

Inspection request for 2nd layer compaction test bellow Tie beam as per highlighted
2nd Compaction test
149 25-Aug-22 IR-DB53-CIV-149 0 drawing Group -ALC-G2-4– Villa No. ALC-G2-4 CALERO Delta 1:00 PM 26-Aug-22 11:00 AM UCR
bellow tie beam
2K325F,2K326F,2K327F,2K328F,2K329F,2K330F

Inspection request for 2nd layer compaction test bellow Tie beam as per highlighted
2nd Compaction test
149 A 20-Sep-22 IR-DB53-CIV-149 01 drawing Group -ALC-G2-4– Villa No. ALC-G2-4 CALERO Delta 1:00 PM 21-Sep-22 11:00 AM UCR
bellow tie beam
2K325F,2K326F,2K327F,2K328F,2K329F,2K330F

compaction test
Inspection request for compaction test bellow footing blinding as per highlighted
150 25-Aug-22 IR-DB53-CIV-150 0 bellow footing ALC-G4-6 PHOENIX Delta 1:00 PM 26-Aug-22 3:00PM B
drawing Group - ALC-G4-6 Villa No. H849F,H850F,H851F,H852F
blinding

Inspection request for Anti-termite bellow footing blinding prior to blinding concrete as Anti-termite below
151 25-Aug-22 IR-DB53-CIV-151 0 ALC-G4-6 PHOENIX Delta 1:00 PM 26-Aug-22 3:00PM B
per highlighted drawing Group -ALC-G4-6 Villa no H849F,H850F,H851F,H852F footing blinding

Inspection request for blinding concrete as per highlighted drawing Group -ALC-G4-
152 25-Aug-22 IR-DB53-CIV-152 0 Blinding Concrete ALC-G4-6 PHOENIX Delta 11:00PM 26-Aug-22 2:00 PM B
6 Villa no H849F,H850F,H851F,H852F

Inspection request for completion of 2 coats bitumen Blinding Footing PCC as per bitumen Blinding
153 25-Aug-22 IR-DB53-CIV-153 00 ALC-G4-6 PHOENIX Delta 1:00 PM 27-Aug-22 3:30 PM B
highlighted drawing Group -ALC-G4-6 Villa no H849F,H850F,H851F,H852F Footing PCC

Inspection request for completion of 2 coats bitumen Blinding Footing PCC as per bitumen Blinding
153 A 5-Sep-22 IR-DB53-CIV-153 01 ALC-G4-6 PHOENIX Delta 1:00 PM 6-Sep-22 3:30 PM B
highlighted drawing Group -ALC-G4-6 Villa no H849F,H850F,H851F,H852F Footing PCC

Inspection request for reinforcement, formwork and concreting works for first floor
154 25-Aug-22 IR-DB53-CIV-154 00 column as per highlighted drawing Group -ALC-G6-2-2 villa no. 2K31F, 2K332F, First floor column ALC-G6-2-2 CALERO Delta 2:00 PM 26-Aug-22 10:00 AM B
2K333F

Inspection request for reinforcement, formwork and concreting works for first floor
155 28-Aug-22 IR-DB53-CIV-155 00 column as per highlighted drawing Group -ALC-G6-2-2 villa no. 2K34F, 2K335F, First floor column ALC-G6-2-2 CALERO Delta 2:00 PM 29-Aug-22 10:00 AM B
2K336F

Inspection request for reinforcement, formwork and concreting works for first floor
155 30-Aug-22 IR-DB53-CIV-155 01 column as per highlighted drawing Group -ALC-G6-2-2 villa no. 2K34F, 2K335F, First floor column ALC-G6-2-2 CALERO Delta 2:00 PM 31-Aug-22 10:00 AM B
2K336F

Inspection request for 2nd layer compaction test bellow Tie beam as per highlighted
Compaction test
156 1-Sep-22 IR-DB53-CIV-156 0 drawing Group -ALC-ALC-G6-11 -2 Villa no H843F,H844F, H845F, H846F, ALC-G6-11 -2 pHOENIX Delta 1:00 PM 2-Sep-22 9:00 AM B
bellow tie beam
H847F,H848F

Inspection request for Below tie beam Anti-termite prior to blinding concrete as per
Anti-termite below tie
157 1-Sep-22 IR-DB53-CIV-157 0 highlighted drawing Group - ALC-ALC-G6-11 -2 Villa no H843F,H844F, H845F, ALC-G6-11 -2 pHOENIX Delta 2:00 PM 2-Sep-22 9:30AM B
beam
H846F, H847F,H848F

Inspection request for blinding concrete for Tie beam as per highlighted drawing
158 1-Sep-22 IR-DB53-CIV-158 0 Tie beam blinding ALC-G6-11 -2 PHOENIX Delta 1:20 PM 2-Sep-22 11:30AM B
Group -ALC-G6-11 -2 Villa no H843F,H844F, H845F, H846F, H847F,H848F

Inspection request for completion of 2 coats bitumen above tie beam blinding as per
Bitumen Blinding tie
159 1-Sep-22 IR-DB53-CIV-159 0 highlighted drawing Group ALC-G6-11 Villa no H822F,H823F, H824F, H825F, ALC-G6-11 -2 PHOENIX Delta 1:00 PM 3-Sep-22 8:30 AM B
beam
H841F,H842F

Inspection request for Blockwork layout at ground floor as per highlighted drawing Blockwork layout
160 1-Sep-22 IR-DB53-CIV-160 0 ALC-G6-2-1 CALERO Delta 3:00 PM 2-Sep-22 3:30 PM B
Group - ALC-G6-2 villa no 2K322F, 2K323F, 2K324F GF

Inspection request for Compaction test below Slab on Grade as per highlighted Compaction test
161 1-Sep-22 IR-DB53-CIV-161 0 ALC-G5-2 PHOENIX Delta 2:00 PM 2-Sep-22 3:30 PM B
drawing Group - ALC-G5-2 H811F, H812F, H813F, H814F, H815F below grade slab

Inspection request for Below Slab on Grad Anti-termite prior to blinding concrete as Anti-termite Below
162 1-Sep-22 IR-DB53-CIV-162 0 ALC-G5-2 PHOENIX Delta 3:00 PM 2-Sep-22 4:30 PM B
per highlighted drawing Group - ALC-G5-2 H811F, H812F, H813F, H814F, H815F Slab on Grad

Inspection request for granular fill below grade slab as per highlighted drawing Granular Fill Below
163 1-Sep-22 IR-DB53-CIV-163 0 ALC-G5-2 PHOENIX Delta 12:00 AM 2-Sep-22 3:30 PM B
Group ALC-G5-2 H811F, H812F, H813F, H814F, H815F. Slab on Grade

Inspection request for steel reinforcement, formwork and concreting works for neck
Steel reinforcement
164 1-Sep-22 IR-DB53-CIV-164 0 columns as per highlighted drawing Group - ALC-G6-10 – Villa No. H816F, H817F, ALC-G6-10 PHOENIX Delta 1:00 PM 2-Sep-22 3:30 PM B
and formwork
H818F, H819F, H820FH,821F

Inspection request for reinforcement, formwork and concreting works for first floor
165 2-Sep-22 IR-DB53-CIV-165 0 column as per highlighted drawing Group -ALC-G8-6 villa no. First floor column ALC-G 8-6 CALERO Delta 2:00 PM 4-Sep-22 10:00 AM B
2K311F,2K312F,2K313F,2K314F

Inspection request for Steel reinforcement, formwork and concreting works (including Steel reinforcement,
166 2-Sep-22 IR-DB53-CIV-166 0 insulation) for Slab on Grade as per highlighted drawing Group ALC-G5-2 H811F, formwork for Slab on ALC-G5-2 PHOENIX Delta 2:00 PM 4-Sep-22 3:00 PM B
H812F, H813F, H814F, H815F Grade

Inspection request for completion of 2 coats bitumen above footing and neck
Bitumen footing and
167 2-Sep-22 IR-DB53-CIV-167 0 columns as per highlighted drawing Group - ALC-G6-10 – Villa No. H816F, H817F, ALC-G6-10 PHOENIX Delta 1:00 PM 3-Aug-22 9:00 AM C
neck columns
H818F, H819F, H820FH,821F

Inspection request for reinforcement, formwork and concreting works for Staircase
168 4-Sep-22 IR-DB53-CIV-168 0 Staircase ALC-G 6-2-1 CALERO Delta 2:00 PM 5-Sep-22 10:00 AM C
as per highlighted drawing Group -ALC-G6-2-1 villa no. 2K319F ,2k320F

Inspection request for reinforcement, formwork and concreting works for Staircase
168 A 7-Sep-22 IR-DB53-CIV-168 01 Staircase ALC-G 6-2-1 CALERO Delta 2:00 PM 8-Sep-22 10:00 AM B
as per highlighted drawing Group -ALC-G6-2-1 villa no. 2K319F ,2k320F

Inspection request for reinforcement, formwork and concreting works for Roof floor
169 4-Sep-22 IR-DB53-CIV-169 0 slab as per highlighted drawing Group -ALC-G6-2 villa no. 2K319F, 2K320F, Roof floor slab ALC-G6-2-1 CALERO Delta 3:00 PM 5-Sep-22 3:00 PM C
2K321F, 2K322F, 2K323F, 2K324

Inspection request for reinforcement, formwork and concreting works for Roof floor
169 A 8-Sep-22 IR-DB53-CIV-169 1 slab as per highlighted drawing Group -ALC-G6-2 villa no. 2K319F, 2K320F, Roof floor slab ALC-G6-2-1 CALERO Delta 3:00 PM 9-Sep-22 B
2K321F, 2K322F, 2K323F, 2K324

reinforcement,
Inspection request for steel reinforcement, formwork and concreting works for tie
formwork and
170 5-Sep-22 IR-DB53-CIV-170 0 beam as per highlighted drawingGroup ALC-G6-11 -2 Villa no H843F,H844F, G6-11 -2 PHOENIX Delta 2:00 PM 6-Sep-22 10:30 AM B
concreting worksTie
H845F, H846F, H847F,H848F
Beam
reinforcement,
Inspection request for steel reinforcement, formwork and concreting works for tie
formwork and
170 A 9-Sep-22 IR-DB53-CIV-170 01 beam as per highlighted drawingGroup ALC-G6-11 -2 Villa no H843F,H844F, G6-11 -2 PHOENIX Delta 2:00 PM 11-Sep-22 10:30 AM B
concreting worksTie
H845F, H846F, H847F,H848F
Beam

Inspection request for 2 coats of Bitumen with protection for tie beam as per
171 5-Sep-22 IR-DB53-CIV-171 0 highlighted drawing Group - ALC-G6-11-1 Villa no H822F,H823F, H824F, H825F, Tie beam Bitumen ALC-G6-11-1 PHOENIX Delta 1:00 PM 6-Sep-22 8:00 AM B
H841F,H842F.

Inspection request for Below tie beam Anti-termite prior to blinding concrete as per
Anti-termite below tie
172 7-Sep-22 IR-DB53-CIV-172 0 highlighted drawing Group - ALC-ALC-G6-11 -3 Villa no H853F,H854F, H855F, ALC-G6-11 -3 pHOENIX Delta 2:00 PM 8-Sep-22 9:30AM B
beam
H856F, H857F,H858F

Inspection request for blinding concrete for Tie beam as per highlighted drawing
173 7-Sep-22 IR-DB53-CIV-173 0 Tie beam blinding ALC-G6-11 -3 PHOENIX Delta 1:20 PM 8-Sep-22 3:30 PM B
Group -ALC-G6-11 -3 Villa no H853F,H854F, H855F, H856F, H857F,H858F

Inspection request for 2 coats of Bitumen with protection for tie beam as per
174 7-Sep-22 IR-DB53-CIV-174 0 highlighted drawing Group - ALC-G6-11-3 Villa noH853F,H854F, H855F, H856F, Tie beam Bitumen ALC-G6-11 -3 PHOENIX Delta 2:20 PM 9-Sep-22 4:00 PM B
H857F,H858F

Inspection request for completion of Blockwork up to lintel level at ground floor as per completion of
175 9-Sep-22 IR-DB53-CIV-175 0 highlighted drawing Group -ALC-G6-2 villa no. 2K319F, 2K320F, 2K321F, 2K322F, Blockwork up to ALC-G6-2-1 CALERO Delta 3:20 PM 11-Sep-22 4:00 PM B
2K323F, 2K324 lintel level

TGC/QAQC/CHK/CVL/SEO/01 REV-00 Page 4 of 11


Inspection request for reinforcement, formwork and concreting works for Staircase
176 9-Sep-22 IR-DB53-CIV-176 0 Staircase ALC-G 6-2-1 CALERO Delta 2:00 PM 11-Sep-22 10:00 AM B
as per highlighted drawing Group -ALC-G6-2-1 villa no. 2K321F ,2k322F

Inspection request for reinforcement, formwork and concreting works for Ground
177 9-Sep-22 IR-DB53-CIV-177 0 floor column as per highlighted drawing Group - ALC-G5-2 H811F, H812F, H813F, Ground floor column ALC-G5-2 PHOENIX Delta 2:00 PM 11-Sep-22 3::00 PM B
H814F, H815F

Tie Beam
Inspection request for steel reinforcement, formwork and concreting works for tie
reinforcement,
178 9-Sep-22 IR-DB53-CIV-178 0 beam as per highlighted drawingGroup ALC-G6-11-3 Villa noH853F,H854F, H855F, ALC-G6-11-3 PHOENIX Delta 2:00 PM 12-Sep-22 3:30 PM C
formwork and
H856F, H857F,H858F
concreting
Tie Beam
Inspection request for steel reinforcement, formwork and concreting works for tie
reinforcement,
178 A 15-Sep-22 IR-DB53-CIV-178 01 beam as per highlighted drawingGroup ALC-G6-11-3 Villa noH853F,H854F, H855F, ALC-G6-11-3 PHOENIX Delta 3:00 PM 16-Sep-22 10:00 AM UCR
formwork and
H856F, H857F,H858F
concreting

Inspection request for reinforcement, formwork and concreting works for Roof floor
179 11-Sep-22 IR-DB53-CIV-179 0 slab as per highlighted drawing Group -ALC-G6-2-2 villa no. 2K331F, 2K332F, Roof floor slab ALC-G6-2-2 CALERO Delta 3:00 PM 12-Sep-22 3:00 PM B
2K333F, 2K334F, 2K335F, 2K336F

Inspection request for Blockwork layout at ground floor as per highlighted drawing Blockwork layout
180 11-Sep-22 IR-DB53-CIV-180 0 ALC-G6-2-2 CALERO Delta 3:00 PM 12-Sep-22 3:30 PM B
Group - ALC-G6-2-2 villa no 2K331F, 2K332F, 2K333F,2K334F,2K335F,2K336F GF

Inspection request for 1st layer Compaction test below tie beam as per highlighted
Compaction test
181 13-Sep-22 IR-DB53-CIV-181 0 drawing Group -ALC-G6-10 – Villa No. H816F, H817F, H818F, H819F, ALC-G6-10 PHOENIX Delta 1:00 PM 14-Sep-22 9:00 AM C
below tie beam
H820FH,821F

Inspection request for 1st layer Compaction test below tie beam as per highlighted
Compaction test
181 A 23-Sep-22 IR-DB53-CIV-181 01 drawing Group -ALC-G6-10 – Villa No. H816F, H817F, H818F, H819F, ALC-G6-10 PHOENIX Delta 1:00 PM 25-Sep-22 9:00 AM C
below tie beam
H820FH,821F

Inspection request for Compaction test below Slab on Grade as per highlighted
Compaction test
182 13-Sep-22 IR-DB53-CIV-182 0 drawing Group - ALC-G6-11-1 Villa no H822F,H823F, H824F, H825F, ALC-G6-11-1 PHOENIX Delta 2:00 PM 14-Sep-22 3:30 PM B
below grade slab
H841F,H842F.

Inspection request for reinforcement, formwork and concreting works for Roof floor
183 14-Sep-22 IR-DB53-CIV-183 0 slab as per highlighted drawing Group -ALC-G8-6 villa no. 2K311F, 2K312F, Roof floor slab ALC-G8-6 CALERO Delta 2:00 PM 15-Sep-22 10:00 AM UCR
2K313F, 2K314F, 2K315F, 2K316, 2k317, 2k318

Inspection request for Blockwork layout at ground floor as per highlighted drawing
Blockwork layout
184 15-Sep-22 IR-DB53-CIV-184 0 Group - -ALC-G8-6 villa no. 2K311F, 2K312F, 2K313F, 2K314F, 2K315F, 2K316, ALC-G8-6 CALERO Delta 3:00 PM 16-Sep-22 3:30 PM B
GF
2k317, 2k318

Inspection request for steel reinforcement, formwork and concreting works for footing Steel reinforcement
185 18-Sep-22 IR-DB53-CIV-185 0 ALC-G4-6 PHOENIX Delta 1:00 PM 19-Sep-22 3:30 PM B
as per highlighted drawing Group - ALC-G4-6 Villa No. H849F,H850F,H851F,H852F and formwork

Inspection request for Below Slab on Grad Anti-termite prior to blinding concrete as
Anti-termite Below
186 18-Sep-22 IR-DB53-CIV-186 0 per highlighted drawing Group - ALC-G6-11-1 Villa no H822F,H823F, H824F, ALC-G6-11-1 PHOENIX Delta 3:00 PM 19-Sep-22 4:30 PM B
Slab on Grad
H825F, H841F,H842F.

Inspection request for granular fill below grade slab as per highlighted drawing Granular Fill Below
187 18-Sep-22 IR-DB53-CIV-187 0 ALC-G6-11-1 PHOENIX Delta 12:00 AM 19-Sep-22 3:30 PM B
Group - ALC-G6-11-1 Villa no H822F,H823F, H824F, H825F, H841F,H842F Slab on Grade

Inspection request for Steel reinforcement, formwork and concreting works (including
Steel reinforcement
188 18-Sep-22 IR-DB53-CIV-188 0 insulation) for Slab on Grade as per highlighted drawing Group ALC-G6-11-1 Villa ALC-G6-11-1 PHOENIX Delta 2:00 PM 20-Sep-22 3::00 PM B
and formwork
no H822F,H823F, H824F, H825F, H841F,H842F

Inspection request for reinforcement, formwork and concreting works for Staircase
189 19-Sep-22 IR-DB53-CIV-189 0 as per highlighted drawing Group -ALC-G8-6 villa no. 2K311F, 2K312F, 2K313F, Staircase ALC-G 8-6 CALERO Delta 2:00 PM 20-Sep-22 10:00 AM UCR
2K314F, 2K315F, 2K316, 2k317, 2k318F

Inspection request for reinforcement, formwork and concreting works for Staircase
189 A 26-Sep-22 IR-DB53-CIV-189 01 as per highlighted drawing Group -ALC-G8-6 villa no. 2K315F, 2K316, 2k317, Staircase ALC-G 8-6 CALERO Delta 2:00 PM 27-Sep-22 10:00 AM UCR
2k318F

Inspection request for Blockwork layout at roof floor as per highlighted drawing Blockwork layout at
190 20-Sep-22 IR-DB53-CIV-190 0
Group - ALC-G6-2 villa no. 2K319F, 2K320F, 2K321F, 2K322F, 2K323F, 2K324 roof
ALC-G6-2-1 CALERO Delta 3:00 PM 21-Sep-22 11:00 AM UCR

Inspection request for Below tie beam Anti-termite prior to blinding concrete as per
Anti-termite below tie
191 20-Sep-22 IR-DB53-CIV-191 0 highlighted drawing Group - ALC-G2-4– Villa No. ALC-G2-4 CALERO Delta 2:00 PM 21-Sep-22 9:30AM B
beam
2K325F,2K326F,2K327F,2K328F,2K329F,2K330F

Inspection request for blinding concrete for Tie beam as per highlighted drawing
192 20-Sep-22 IR-DB53-CIV-192 0 Tie beam blinding ALC-G2-4 CALERO Delta 1:20 PM 21-Sep-22 3:30 PM B
Group -ALC-G2-4– Villa No. 2K325F,2K326F,2K327F,2K328F,2K329F,2K330F

Inspection request for 2 coats of Bitumen with protection for tie beam as per
193 20-Sep-22 IR-DB53-CIV-193 0 highlighted drawing Group - ALC-G2-4– Villa No. Tie beam Bitumen ALC-G2-4 CALERO Delta 2:20 PM 21-Sep-22 4:00 PM B
2K325F,2K326F,2K327F,2K328F,2K329F,2K330F

Inspection request for 2 coats of Bitumen with protection for tie beam as per
194 21-Sep-22 IR-DB53-CIV-194 0 highlighted drawing Group -ALC-G6-11 -2 Villa no H843F,H844F, H845F, H846F, Tie beam Bitumen ALC-G6-11-2 PHOENIX Delta 1:00 PM 22-Sep-22 9:00 AM B
H847F,H848F

Inspection request for reinforcement, formwork and concreting works for Ground
195 21-Sep-22 IR-DB53-CIV-195 0 floor column as per highlighted drawing Group - ALC-G6-11-1 Villa no Ground floor column ALC-G6-11-1 PHOENIX Delta 2:00 PM 22-Sep-22 3::00 PM C
H822F,H823F, H824F, H825F, H841F,H842F

Inspection request for reinforcement, formwork and concreting works for Ground
195 A 25-Sep-22 IR-DB53-CIV-195 01 floor column as per highlighted drawing Group - ALC-G6-11-1 Villa no Ground floor column ALC-G6-11-1 PHOENIX Delta 2:00 PM 26-Sep-22 3::00 PM B
H822F,H823F, H824F, H825F, H841F,H842F

Inspection request for Compaction test below Slab on Grade as per highlighted
Compaction test
196 21-Sep-22 IR-DB53-CIV-196 0 drawing Group - ALC-G6-11 -2 Villa no H843F,H844F, H845F, H846F, ALC-G6-11-2 PHOENIX Delta 2:00 PM 22-Sep-22 3:20 PM B
below grade slab
H847F,H848F

Inspection request for Blockwork layout at 1st Floor as per highlighted drawing Blockwork layout
197 21-Sep-22 IR-DB53-CIV-197 0
Group - ALC-G6-2 villa no. 2K319F, 2K320F, 2K321F, 2K322F, 2K323F, 2K324 1st Floor
ALC-G6-2-1 CALERO Delta 3:00 PM 22-Sep-22 11:00 AM UCR

Inspection request for reinforcement, formwork and concreting works for first floor
198 22-Sep-22 IR-DB53-CIV-198 0 slab as per highlighted drawing Group ALC-G5-2 H811F, H812F, H813F, H814F, first floor slab ALC-G 5-2 PHOENIX Delta 4:00 PM 23-Sep-22 2:00 PM UCR
H815F

Inspection request for steel reinforcement, formwork and concreting works for neck
Steel reinforcement
199 22-Sep-22 IR-DB53-CIV-199 0 columns as per highlighted drawing Group - ALC-G4-6 Villa no ALC-G 4-6 PHOENIX Delta 1:00 PM 23-Sep-22 3:30 PM B
and formwork
H849F,H850F,H851F,H852F

Inspection request for reinforcement, formwork and concreting works for Staircase
200 22-Sep-22 IR-DB53-CIV-200 0 Staircase ALC-G 6-2-1 CALERO Delta 2:00 PM 23-Sep-22 10:00 AM B
as per highlighted drawing Group -ALC-G6-2-1 villa no. 2K323F ,2k324F

Inspection request for Below tie beam Anti-termite prior to blinding concrete as per
Below tie beam Anti-
201 23-Sep-22 IR-DB53-CIV-201 highlighted drawing Group - ALC-G6-11 -2 Villa no H843F,H844F, H845F, H846F, termite
ALC-G6-11 -2 PHOENIX Delta 3:00 PM 25-Sep-22 11:00 AM UCR
H847F,H848F

Inspection request for granular fill below grade slab as per highlighted drawing Granular Fill Below
202 23-Sep-22 IR-DB53-CIV-202 0 ALC-G6-11-2 PHOENIX Delta 12:00 AM 25-Sep-22 3:30 PM B
Group - ALC-G6-11 -2 Villa no H843F,H844F, H845F, H846F, H847F,H848F Slab on Grade

Inspection request for Steel reinforcement, formwork and concreting works (including
Steel reinforcement
203 23-Sep-22 IR-DB53-CIV-203 0 insulation) for Slab on Grade as per highlighted drawing Group ALC-G6-11 -2 Villa ALC-G6-11-2 PHOENIX Delta 2:00 PM 25-Sep-22 3::00 PM B
and formwork
no H843F,H844F, H845F, H846F, H847F,H848F

Inspection request for Below tie beam Anti-termite prior to blinding concrete as per
Anti-termite below tie
204 25-Sep-22 IR-DB53-CIV-204 0 highlighted drawing Group - ALC-G6-10 – Villa No. H816F, H817F, H818F, H819F, ALC-G6-10 PHOENIX Delta 2:00 PM 26-Sep-22 9:30AM UCR
beam
H820FH,821F

Inspection request for blinding concrete for Tie beam as per highlighted drawing
205 25-Sep-22 IR-DB53-CIV-205 0 Tie beam blinding ALC-G6-10 PHOENIX Delta 1:20 PM 26-Sep-22 3:30 PM UCR
Group -ALC-G6-10 – Villa No. H816F, H817F, H818F, H819F, H820FH,821F

Inspection request for 2 coats of Bitumen with protection for tie beam as per
206 25-Sep-22 IR-DB53-CIV-206 0 highlighted drawing Group - ALC-G6-10 – Villa No. H816F, H817F, H818F, H819F, Tie beam Bitumen ALC-G6-10 PHOENIX Delta 2:20 PM 27-Sep-22 4:00 PM UCR
H820FH,821F

Inspection request for completion of Blockwork up to lintel level at ground floor as per completion of
207 26-Sep-22 IR-DB53-CIV-207 0 highlighted drawing Group -ALC-G6-2 villa no. 2K319F, 2K320F, 2K321F, 2K322F, Blockwork up to ALC-G6-2-2 CALERO Delta 3:20 PM 27-Sep-22 3:00 PM UCR
2K323F, 2K324 lintel level

TGC/QAQC/CHK/CVL/SEO/01 REV-00 Page 5 of 11


TGC/QAQC/CHK/CVL/SEO/01 REV-00 Page 6 of 11
TGC/QAQC/CHK/CVL/SEO/01 REV-00 Page 7 of 11
TGC/QAQC/CHK/CVL/SEO/01 REV-00 Page 8 of 11
TGC/QAQC/CHK/CVL/SEO/01 REV-00 Page 9 of 11
TGC/QAQC/CHK/CVL/SEO/01 REV-00 Page 10 of 11
TGC/QAQC/CHK/CVL/SEO/01 REV-00 Page 11 of 11