ANNEXURE - I

COMMENTS RESOLUTION SHEET AGAINST WORLEY DOCUMENT


TRANSMITTAL NO. 44AC9100-W-OSBL-VT- 00003, DATED 31.03.2021 FOR PACKAGE G-1
(WORLEY JOB NO. 44AC9100) OF IOCL DUMAD JOB,
(DOCUMENTS / DRAWINGS WERE SUBMITTED BY GREPL VIDE TRANSMITTAL NO. 850-DFT-ED-2021-0008, DATED 16 March 2021
DRAWING /DOCUMENT NUMBER REV. NO DRAWING/DOCUMENT TITLE PRESENT STATUS
ARCHITECTURAL GA OF PROPYLENE PUMP & COMPRESSOR SHED INDICATING APPROVED,
44AC9100-GRE-931/A.01/1002/A1 R0
PLAN, ELEVATION, & CROSS SECTIONAL ELEVATION CODE - 2

SL. NO COMMENTS OF WORLEY CLARIFICATION FURNISHED BY GREPL FINAL DECISION BY WORLEY


 PLAN
1.0 Typical Comment:
Proper gap between
We have checked and found the gap adequate.
pumps/compressor shall be
maintained after piping for operation Incidentally adequacy was demonstrated during 30% model review.
and maintenance point of view

2.0 Number of compressor shall match


with the compressor process 3(2W + 1SB) compressors envisaged and capacity of each compressor is
datasheet. adequate to unload four road tankers (capacity 15MT or 18MT or 21MT)
simultaneously.
Vendor to update the size of the
We have checked and found the gap adequate.
shed as per the compressor size
given by compressor vendor. Incidentally adequacy was demonstrated during 30% model review.

 VIEW-A
3.0 Typical Comment:
All around shed it is paved area
HPP is 101.000 Incorporated in revised drawing.

4.0 Is this area with brick wall or open?


Since the facility will have explosive gas/vapour – air mixture the industry
If its open with shed on top how will practice is to keep all sides open to facilitate natural ventilation.
it help shelter from rain.
Since Propylene is heavier than air we have provided side cladding up to
3000mm from FFL. All sides is open up to 3000 mm from FFL.

DRG-A.01/1002/A1- Page -1
ANNEXURE - I
COMMENTS RESOLUTION SHEET AGAINST WORLEY DOCUMENT
TRANSMITTAL NO. 44AC9100-W-OSBL-VT- 00003, DATED 31.03.2021 FOR PACKAGE G-1
(WORLEY JOB NO. 44AC9100) OF IOCL DUMAD JOB,
(DOCUMENTS / DRAWINGS WERE SUBMITTED BY GREPL VIDE TRANSMITTAL NO. 850-DFT-ED-2021-0008, DATED 16 March 2021
DRAWING /DOCUMENT NUMBER REV. NO DRAWING/DOCUMENT TITLE PRESENT STATUS
ARCHITECTURAL GA OF PROPYLENE PUMP & COMPRESSOR SHED INDICATING APPROVED,
44AC9100-GRE-931/A.01/1002/A1 R0
PLAN, ELEVATION, & CROSS SECTIONAL ELEVATION CODE - 2

SL. NO COMMENTS OF WORLEY CLARIFICATION FURNISHED BY GREPL FINAL DECISION BY WORLEY


 SECTION- 1-1
5.0 1. Lightening arrestor solar panels if 1. Not envisaged. High Mast provided in close vicinity
needed to be checked.
2. Access to roof to be provided 2. Not envisaged

3. Griha and specs to be followed 3. Specific additional requirement, if any, to be identified.

6.0 pump sectional arrangement to be The details would be indicated in following drawings:
shown for proper clarity
i) 44AC9100-GRE-932/L.01/0004
( Equipment Layout inside Propylene Pump cum Compressor Shed)

ii) 44AC9100-GRE-932/L.01/0024
( Detailed unit Piping for Propylene Pump & Compressor Shed)
(Reference numbers indicated in revised drawing)
7.0 Follow Tender HPP EL 101.00
Incorporated in revised drawing.

8.0 E.O.T Crane Capacity: The weight of single largest equipment to be handled in 2480 Kg. (2.48 MT.)
capacity to lift heaviest equipment
component Accordingly, 5.0 MT capacity crane is provided.

 KEY PLAN
9.0 Sl.1.3
a) FGL : 100.55

b) FFL : 101.00 Incorporated in revised drawing.

c) Roof (B.O.S of Truss) : Revise


DRG-A.01/1002/A1- Page -2
ANNEXURE - I
COMMENTS RESOLUTION SHEET AGAINST WORLEY DOCUMENT
TRANSMITTAL NO. 44AC9100-W-OSBL-VT- 00003, DATED 31.03.2021 FOR PACKAGE G-1
(WORLEY JOB NO. 44AC9100) OF IOCL DUMAD JOB,
(DOCUMENTS / DRAWINGS WERE SUBMITTED BY GREPL VIDE TRANSMITTAL NO. 850-DFT-ED-2021-0008, DATED 16 March 2021
DRAWING /DOCUMENT NUMBER REV. NO DRAWING/DOCUMENT TITLE PRESENT STATUS
ARCHITECTURAL GA OF PROPYLENE PUMP & COMPRESSOR SHED INDICATING APPROVED,
44AC9100-GRE-931/A.01/1002/A1 R0
PLAN, ELEVATION, & CROSS SECTIONAL ELEVATION CODE - 2

SL. NO COMMENTS OF WORLEY CLARIFICATION FURNISHED BY GREPL FINAL DECISION BY WORLEY


10.0 Other Parameters: SL: 3.4, 3.5, 3.6:

Package Vendor to indicate


Electrical Drawing Nos. for cross- Incorporated in revised drawing.
referencing

11.0 Package Vendor to furnish Electrical


Load List with Motor kW rating, This shall be indicated in following documents:
normal / emergency power
requirement, VFD requirement etc. a) 44AC9100-GRE-931/E.09/0002
(ELECTRICAL LOAD LIST – SUMMARY)

DRG-A.01/1002/A1- Page -3