Professional Documents
Culture Documents
(MSF-T-241A/B)
Revision History:
HOLD POINTS:
S No. Description
Page 2 of 23
OML-13 MAIN FLOW STATION
NPDC & NETCO / ALACRITY
DESIGN CALCULATION REPORT FOR
DOC NO.: SEPA15015-
MFSFF-CV-21-CAL-102
PRODUCED WATER STORAGE TANK Rev No.: A
FOUNDATION (MSF-T-241A/B)
Contents
1. PROJECT INFORMATION ............................................................................................................. 4
2. PURPOSE OF DOCUMENT ............................................................................................................ 4
3. DESIGN CODES, STANDARDS & REFERENCE DOCUMENTS ............................................... 5
4. MATERIALS .................................................................................................................................... 5
5. DESIGN PHILOSOPHY................................................................................................................... 5
6 ANNEXURE 1: - FOUNDATION DESIGN CALCULATION ....................................................... 8
7 ANNEXURE 2: TANK LOAD DATA ........................................................................................... 19
8 ANNEXURE 3: FOUNDATION DRAWINGS ............................................................................. 21
Page 3 of 23
OML-13 MAIN FLOW STATION
NPDC & NETCO / ALACRITY
DESIGN CALCULATION REPORT FOR
DOC NO.: SEPA15015-
MFSFF-CV-21-CAL-102
PRODUCED WATER STORAGE TANK Rev No.: A
FOUNDATION (MSF-T-241A/B)
1. PROJECT INFORMATION
The Nigerian Petroleum Development Purchaser Ltd. (NPDC), a subsidiary of Nigerian National
Petroleum Purchaser Limited (NNPC) plans to install an oil-gas Separation facility, to be referred as
“Main Flow Station (MFS)”, in Utapate field, OML-13. National Engineering & Technical purchaser
Limited (NETCO) have been engaged to carry out the Engineering Design of this Oil-Gas separation
facility.
The Main Flow Station (MFS) is a centralized processing facility designed to handle well fluids from
various reservoirs and surrounding satellite fiels is planned to be installed in NPDC’s OML-13 block
located along Atabrikang – Iko road in Eastern Obolo LGA of AKWA IBOM state, Nigeria.
The well fluid production from various fields, viz. UTAPATE, AKAI, EKIM, IBOTIO and IBIBIO
shall be received and processed in Main Flow Station (MFS), the oil is to be further channeled to Tank
Farm for Storage, Metering and Exporting to VLCC via a subsea pipeline and single point mooring
(SPM) system.
2. PURPOSE OF DOCUMENT
This document covers analysis and design of ring wall Foundation for 28m dia x 15m height
PRODUCED WATER STORAGE TANK.
Page 4 of 23
OML-13 MAIN FLOW STATION
NPDC & NETCO / ALACRITY
DESIGN CALCULATION REPORT FOR
DOC NO.: SEPA15015-
MFSFF-CV-21-CAL-102
PRODUCED WATER STORAGE TANK Rev No.: A
FOUNDATION (MSF-T-241A/B)
4. MATERIALS
Reinforcement: -
All reinforcement shall be hot rolled deformed high yield bars conforming to ASTM A615
grade 60 with characteristic tensile strength of 420 N/mm2.
Concrete: -
Grade C30 of ACI 318 with characteristic strength of concrete i.e., f’c = 25 N/mm 2 (cubic
strength 30 N/mm2) is used for Reinforced concrete.
5. DESIGN PHILOSOPHY
Ringwall foundation designed in accordance with ACI 318, API 650 and PIP STE03020 using
manual calculations.
Dead Load (Self weight of Tank, Fluid Load, Self-weight of concrete, Soil weight), Seismic
load and Wind load and their Load combination as per ASCE/SEI 7-05 considered to design
of Ring wall with base slab.
The Ring wall is designed for the Hoop Stress, Twisting moment and for vertical load from
tank along with seismic moment from tank.
Dead load is the weight of the metal (shell, roof, bottom plates, access ladders, platforms,
nozzles, manways, roof support columns, etc.)
Self-weight of Produced Water Storage Tank = 233 MT (Ref. Annexure 2)
5.3 Liquid weight (F)
Liquid load is the weight of the stored product. Maximum design liquid level and specific gravity
should be used to calculate this weight.
Height = 14 m (Ref. Annexure 2)
The Liquid pressure = 140 kN/m2.
5.4 Test weight (F)
The Test liquid level and test fluid specific gravity should be considered if different from
normal stored product.
Considered, Height = 14 m (Ref. Annexure 2)
Test pressure = 140 kN/m2
5.5 Soil load (H)
As per Annexure 2 Live load and roof live load not given
Page 6 of 23
OML-13 MAIN FLOW STATION
NPDC & NETCO / ALACRITY
DESIGN CALCULATION REPORT FOR
DOC NO.: SEPA15015-
MFSFF-CV-21-CAL-102
PRODUCED WATER STORAGE TANK Rev No.: A
FOUNDATION (MSF-T-241A/B)
5.9 Load Combinations for Allowable Stress Design (ASCE/SEI 7-05) (CL: 2.4)
Sr. No Descriptions
1 D+F
2 D+F+H+L
3 D + F + H + Lr
4 D + F + H + 0.75(L) + 0.7(Lr)
5 D+F+H+W
D + F + H + 0.7(E)
6 D + F + H + 0.75(W) + 0.75(L) + 0.75(Lr)
D + F + H + 0.75(0.7E) + 0.75(L) + 0.75(Lr)
7 0.6(D) + W + H
8 0.6(D) + 0.7E +H
5.10 Load Combinations for Strength Design (ASCE/SEI 7-05) (CL: 2.3)
Sr. No Descriptions
1 1.4 (D + F)
2 1.2 (D + F) + 1.6 (L + H) + 0.5 (Lr)
3 1.2D + 1.6 (Lr) + L
4 1.2D + 1.6 (Lr) + 0.8W
5 1.2D + 1.6W + L + 0.5 (Lr)
6 1.2D + 1.0E + L + 0.2S
7 0.9D + 1.6W + 1.6H
8 0.9D + 1.E + 1.6H
Page 7 of 23
OML-13 MAIN FLOW STATION
NPDC & NETCO / ALACRITY
DESIGN CALCULATION REPORT FOR
DOC NO.: SEPA15015-
MFSFF-CV-21-CAL-102
PRODUCED WATER STORAGE TANK Rev No.: A
FOUNDATION (MSF-T-241A/B)
Page 8 of 23
OML-13 MAIN FLOW SYSTEM
NPDC & NETCO / ALACRITY
Doc. No. DESIGN CALCULATION REPORT FOR PRODUCED WATER
Rev. A
SEPA15015-MFSFF-CV-21-CAL-102 STORAGE TANK MSF-T-241 A/B
1 INPUTS:
LOADING DATA:
Empty Weight of Tank D = 2286 kN (Ref. Mech input)
Wind
Wind shear at tank bottom W = 243.36 kN (Ref. Mech input)
Wind moment on tank shell WM = 1825.20 kN.m (Ref. Mech input)
Seismic
Seismic base shear at tank bottom Eh = 9013.71 kN (Ref. Mech input)
Allowable Bearing Capacity in operating condition = 220 kN/m2 Geo Technical Report
2
Allowable Bearing Capacity in Seismic condition = 220 kN/m
Grade of Concrete used C25/30 fc' = 30 MPa
Grade of Steel used Fe400 fy = 420 MPa
Liquid density = 10 kN/m3 Assumed water
3
Unit weight of Soil ϒsoil = 18 kN/m
Unit weight of Submerged Soil ϒsub = 10 kN/m3
Unit weight of Concrete ϒc = 25 kN/m3
Soil subgrade modulus for foundation k = 7500 kN/m2/m
2 FIG:
3 FOUNDATION SIZING:
Dead Load at top of Ring Wall PT = 26.0 kN/m
Liquid pressure at top of ring wall WP = 140.0 kN/m2 HYDRO
2
= 130.6 kN/m OPERATING
Distance from tank shell to inside edge of fdn base L = 0.500 m PIP CL:5.6.2, L = 0.125
a 2
Net allowable soil bearing capacity q = 185 kN/m
Projection of ring wall above FGL e = 1.000 m Assumed Same as 2.5
OML-13 MAIN FLOW SYSTEM
NPDC & NETCO / ALACRITY
Doc. No. DESIGN CALCULATION REPORT FOR PRODUCED WATER
Rev. A
SEPA15015-MFSFF-CV-21-CAL-102 STORAGE TANK MSF-T-241 A/B
LC Discription
1 Test Weight bLC1 = 0.520 m
2 Operating Weight bLC2 = 0.495 m
3 Operating Weight + Live bLC3 = 0.495 m
4 Operating Weight + Wind bLC4 = 0.482 m
5 Operating Weight + Seismic bLC5 = 0.866 m
FOUNDATION PROPERTIES
Outer dia of RW Foundation Dof = 29.00 m
Inner dia of RW Foundation Dif = 27.00 m
Area of RW Foundation Af = 87.96 m2
MI of RW Foundation If = 8631.53 m4
Section of Modulus of RW Foundation Zf = 595.28 m3
Wt. of the RW Foundation ϒc Af hf = 659.73 kN
Perimeter at centre line of Ring Wall Base Footing = 2 x PI x r = 87.965 m
OML-13 MAIN FLOW SYSTEM
NPDC & NETCO / ALACRITY
Doc. No. DESIGN CALCULATION REPORT FOR PRODUCED WATER
Rev. A
SEPA15015-MFSFF-CV-21-CAL-102 STORAGE TANK MSF-T-241 A/B
4 DETERMINE HOOP STEEL:
Coefficient of earth pressure at rest condition k = 0.500
LC Discription
1 Test Weight = 2843.750 kN
3 Operating Weight + Live = 2679.118 kN
Hoop stress on ring wall due to Liquid ℎ×𝑘×𝑤 = 2.5 x 0.5 x 140
= 175.00 kN/m
ℎ
Hoop Tension 𝑇 =𝑅 ℎ×𝑘×𝑤 +𝑅 ℎ×𝑘×𝛾 × = 14 x (175 + 28.13)
2
Th = 2843.750 kN
Area of hoop Steel required is 12037 Sq.mm > 1000 Sq.mm Min. Reinforcement
Factor = 1.4
Factored Twisting moment due to Seismic / Wind = 0.0 kN.m/m
𝑏
𝑀= 𝑀 𝑅−𝐿+ = 10.5 x (14 - 0.5 + 0.5/2)
2
0.85 𝑓 2×𝑀
% 𝑜𝑓 𝑆𝑡𝑒𝑒𝑙 = 1− 1− = 0.004
𝑓 0.85 × 𝑓 × ∅ × 𝑏 × 𝑑
1.4
𝑀𝑖𝑛. % 𝑜𝑓 𝑆𝑡𝑒𝑒𝑙 = = 0.003
𝑓
1000
Tank Perimeter = 87.965 m
Tank weight per meter = 1.592 kN/m
Liquid weight per meter = 70.000 kN/m
Concrete weight per meter = 35.000 kN/m
Soil weight per meter = 15.300 kN/m
FACTORED
DL (kN/m) FL (kN/m) WL (kN/m) EQ (kN/m) LL (kN/m) Lr (kN/m) H (kN/m)
FACTORED LOAD COMBINATION LOAD
51.89 70 3.02 78.22 0.00 0.00 27.00 (kN/m)
1.4 (D + F) 1.4 1.4 170.65
1.2 (D + F + T) + 1.6 (L + H) + 0.5 (Lr/S/R) 1.2 1.2 1.6 0.5 1.6 189.47
1.2D + 1.6 (Lr or S or R) + L 1.2 1 1.6 62.27
1.2D + 1.6 (Lr or S or R) + 0.8W 1.2 0.8 1 1.6 64.68
1.2D + 1.6W + L + 0.5 (Lr or S or R) 1.2 1.6 1 0.5 67.10
1.2D + 1.0E + L + 0.2S 1.2 1 1 140.49
0.9D + 1.6W + 1.6H 0.9 1.6 1.6 94.73
0.9D + 1.E + 1.6H 0.9 1 1.6 168.12
OML-13 MAIN FLOW SYSTEM
NPDC & NETCO / ALACRITY
Doc. No. DESIGN CALCULATION REPORT FOR PRODUCED WATER
Rev. A
SEPA15015-MFSFF-CV-21-CAL-102 STORAGE TANK MSF-T-241 A/B
𝑓 ∈
𝜌 . = 0.85𝛽 𝛽 = 0.85 ∈ = 0.003
𝑓 ∈ +0.005
ρ0.005 = 0.0194
𝑀
Minimum Required effective depth 𝑑 = ∅ = 0.9
𝑓
∅𝜌𝑓 𝑏 1 − 0.59𝜌
𝑓
Cover = 75 mm
Assume Reinforcement diameter = 12 mm
Total Depth D = 112.04 mm
Total Depth D = 112.04 < 300, Hence Safe
𝑀
𝐴 = = 71.72 mm2
∅𝑓 𝑑 − 𝑎/2
300
Cover 75
Nominal shear stress τv should not exceed the design shear stress, if it is exceeds minimum shear reinforcement is required
λ = 0.750 ACI 318M-08, CL 8.6.1
𝑣 = 0.17𝜆 𝑓 𝑏 𝑑 = 0.638
Nominal Shear Tau V (0.261) < Design shear Tau C (0.638), Hence, Safe i.e. Shear Reinforcement not required
28.000
15.0
0.250
0.0 0.500
28.5 27.5
1.0 0.500
FGL
2.2 2.5
1.2
1.5
0.25 0.25
Toe Heel
0.3
A
29 1.000 27
OML-13 MAIN FLOW STATION
NPDC & NETCO / ALACRITY
DESIGN CALCULATION REPORT FOR
DOC NO.: SEPA15015-
MFSFF-CV-21-CAL-102
PRODUCED WATER STORAGE TANK Rev No.: A
FOUNDATION (MSF-T-241A/B)
Page 19 of 23
R2 MH4
R4 R3 R5 R1 MH3
COURSE-6
N5
N3
COURSE-5
COURSE-4
COURSE-3
COURSE-2
N6 N4
COURSE-1
MH2
N2
N1 MH1
EL ± 0.00
TOP OF ANNULAR PLATE
N2
OML-13 MAIN FLOW STATION
NPDC & NETCO / ALACRITY
DESIGN CALCULATION REPORT FOR
DOC NO.: SEPA15015-
MFSFF-CV-21-CAL-102
PRODUCED WATER STORAGE TANK Rev No.: A
FOUNDATION (MSF-T-241A/B)
Page 21 of 23
NORTH
REVISION STATUS