NEW ABU DHABI AIRPORT (ADIA) AVIATION FUEL DEPOT PROJECT; PROJECT NO. 5643
ENGINEERING, PROCUREMENT, CONSTRUCTION, COMMISSIONING AND START- UP (EPC) WORKS
AGREEMENT NO. 11-5643-E-1
EXHIBIT C.1.18
FOR
FOR THE
EXHIBIT C.1.18
CATHODIC PROTECTION PAGE 1 of 11
ABU DHABI OIL REFINING COMPANY (TAKREER)
NEW ABU DHABI AIRPORT (ADIA) AVIATION FUEL DEPOT PROJECT; PROJECT NO. 5643
ENGINEERING, PROCUREMENT, CONSTRUCTION, COMMISSIONING AND START- UP (EPC) WORKS
AGREEMENT NO. 11-5643-E-1
TABLE OF CONTENTS
EXHIBIT C.1.18
CATHODIC PROTECTION PAGE 2 of 11
ABU DHABI OIL REFINING COMPANY (TAKREER)
NEW ABU DHABI AIRPORT (ADIA) AVIATION FUEL DEPOT PROJECT; PROJECT NO. 5643
ENGINEERING, PROCUREMENT, CONSTRUCTION, COMMISSIONING AND START- UP (EPC) WORKS
AGREEMENT NO. 11-5643-E-1
C.1.18.1 INTRODUCTION
This section applies to Cathodic Protection works and services to be performed by
CONTRACTOR for the Engineering, Procurement, Construction and Start-up (EPC)
works on the following steel items or structures for the New Abu Dhabi Airport
(ADIA) Aviation Fuel Depot Project at New Abu Dhabi Airport (ADIA).
• Buried carbon steel Piping
• Bottom surfaces of on-grade Jet A-1 and fire water tanks in contact with soil
• Internal Surface of on-grade fire water tanks in contact with water
• Reinforcement steel bars embedded in concrete (Corrosion Monitoring)
COMPANY will not provide any Free Issue materials in this Project.
The Project specifications, Project Standard Drawings and Amendment to DGSs were
developed specifically for use on this Project. CONTRACTOR shall inform
COMPANY immediately, in writing, with any proposed deviations from these
specifications and standards or COMPANY original DGSs. All deviations require
written approval from COMPANY.
DGS-MX-001 Painting
EXHIBIT C.1.18
CATHODIC PROTECTION PAGE 3 of 11
ABU DHABI OIL REFINING COMPANY (TAKREER)
NEW ABU DHABI AIRPORT (ADIA) AVIATION FUEL DEPOT PROJECT; PROJECT NO. 5643
ENGINEERING, PROCUREMENT, CONSTRUCTION, COMMISSIONING AND START- UP (EPC) WORKS
AGREEMENT NO. 11-5643-E-1
NACE SP 0572
Design, Installation, operation and Maintenance of Impressed Current
Deep anode Ground bed.
CONTRACTOR shall familiarize itself with the entire Agreement and shall comply
with all requirements related to Cathodic Protection scope of work for the PROJECT.
All referenced Codes and Standards shall be the latest revision at the time of award of
the Contract.
Tank Operating
Sr. CP System
Tank ID Diameter and Temperature Service
No. Required for
Height (m) (ºC)
EXHIBIT C.1.18
CATHODIC PROTECTION PAGE 4 of 11
ABU DHABI OIL REFINING COMPANY (TAKREER)
NEW ABU DHABI AIRPORT (ADIA) AVIATION FUEL DEPOT PROJECT; PROJECT NO. 5643
ENGINEERING, PROCUREMENT, CONSTRUCTION, COMMISSIONING AND START- UP (EPC) WORKS
AGREEMENT NO. 11-5643-E-1
CONTRACTOR’S scope of WORK and supply shall include but not limited to the
following:
• Pre-Design Site Visit / Survey, Engineering and Design for TCP / ICCP system,
construction drawings and layout, Procedures and Inspection and Test Plan for
Installation and commissioning, FAT procedure / report for TR unit, RMCS,
Supply of all CP / Corrosion monitoring materials, Installation, Testing and
commissioning of Temporary Sacrificial anode CP system (for during the
construction period for buried piping) and Impressed Current Cathodic Protection
system for the above structures (Refer clause C.1.18.3).
Corrosion monitoring system shall be provided as per the DGS-CU-010 and its
amendments.
EXHIBIT C.1.18
CATHODIC PROTECTION PAGE 5 of 11
ABU DHABI OIL REFINING COMPANY (TAKREER)
NEW ABU DHABI AIRPORT (ADIA) AVIATION FUEL DEPOT PROJECT; PROJECT NO. 5643
ENGINEERING, PROCUREMENT, CONSTRUCTION, COMMISSIONING AND START- UP (EPC) WORKS
AGREEMENT NO. 11-5643-E-1
The scope of supply for the cathodic protection system equipment shall be in full
compliance with COMPANY Project CP specification (as per the section 2.0). Any
technical deviation/changes to this specification are subject to approval from
COMPANY. Technical changes implemented prior to approval are subject to
rejection.
CONTRACTOR shall prepare and submit for COMPANY approval all the material
requisitions for equipments and materials, then issue the same for approved CP
VENDORS, evaluate the CP VENDOR offers and ensure that they fully comply with
the approved requisition requirements.
CONTRACTOR shall submit the purchase requisitions along with the selected offers
for COMPANY approval before placement the orders.
All cost of the equipment and material supply shall be to the CONTRACTOR.
EXHIBIT C.1.18
CATHODIC PROTECTION PAGE 6 of 11
ABU DHABI OIL REFINING COMPANY (TAKREER)
NEW ABU DHABI AIRPORT (ADIA) AVIATION FUEL DEPOT PROJECT; PROJECT NO. 5643
ENGINEERING, PROCUREMENT, CONSTRUCTION, COMMISSIONING AND START- UP (EPC) WORKS
AGREEMENT NO. 11-5643-E-1
CONTRACTOR shall provide two (2) years operation and maintenance spares for the
TR unit.
Following are, but not limited to, the main equipments and materials to be supplied
by the CONTRACTOR under this scope:
CONTRACTOR shall guarantee all work and materials in his supply against
defective material, poor workmanship, improper design, improper packaging and /or
failure in normal use and ensure that warranty requirements as required by Agreement
are complied with.
All equipment and material shall be new and unused and of current manufacture, of
the highest grade and free from all defects and imperfections, which affect
performance, and in all ways be fit for duty, as detailed by the project CP
specifications and Scope of wok.
EXHIBIT C.1.18
CATHODIC PROTECTION PAGE 7 of 11
ABU DHABI OIL REFINING COMPANY (TAKREER)
NEW ABU DHABI AIRPORT (ADIA) AVIATION FUEL DEPOT PROJECT; PROJECT NO. 5643
ENGINEERING, PROCUREMENT, CONSTRUCTION, COMMISSIONING AND START- UP (EPC) WORKS
AGREEMENT NO. 11-5643-E-1
CONTRACTOR shall repair or replace within one (1) week, without any charge to
the COMPANY, the parts found defective within the guarantee period.
CONTRACTOR shall guarantee the performance of the painting (Shop and Field
applied) for a period of time from the commissioning and handover of the CP system.
The surface covered, timeframes and other requirements shall be in accordance with
project CP specifications.
Provide detailed design for temporary (during construction period) and permanent
cathodic protection systems in compliance with project CP specifications, referenced
standards and suitable for the project environmental conditions.
Detailed design basis and construction drawings for Corrosion monitoring system for
concrete steel rebar.
Commission, test and adjust the newly installed temporary and permanent cathodic
protection systems.
Check, locate and mitigate any shorts in the cathodic protection systems.
Provide documentation for system design, installation, ITP, special surveys and
commissioning.
Provide complete design and interfacing layout and drawings for RMCS.
Prepare general cathodic protection SYSTEM layout. Location of anode ground bed,
Transformer rectifier unit, Test facility, Permanent reference electrode, isolating
joints, and other details shall be shown on applicable drawings.
C.1.18.4.3 Installation
CONTRACTOR shall submit manufacture test certificate and performance test
certificate for all materials prior to dispatch the materials to site.
EXHIBIT C.1.18
CATHODIC PROTECTION PAGE 8 of 11
ABU DHABI OIL REFINING COMPANY (TAKREER)
NEW ABU DHABI AIRPORT (ADIA) AVIATION FUEL DEPOT PROJECT; PROJECT NO. 5643
ENGINEERING, PROCUREMENT, CONSTRUCTION, COMMISSIONING AND START- UP (EPC) WORKS
AGREEMENT NO. 11-5643-E-1
For all TR units FAT procedure and report shall be submitted for review and approval.
CONTRACTOR shall submit detailed Installation Procedure, pre/post installation
check sheets, Inspection and Test Plan to the COMPANY for approval
CONTRACTOR shall carry out the CP installation works for all structures, pre/post
installation check, calibration and testing activities as per the approved design,
construction drawings codes, standards, procedures and regulations. During the
installation CONTRACTOR shall use its own instruments and equipments for pre /
post installation check / test. All instruments shall be used with calibration certificate.
Transformer Rectifier (TR) unit, Anode Junction Box (AJB) shall be installed in the
non-hazardous area. If this is not possible, the installation of the TR unit and AJB
shall fulfil the requirements of the hazardous area classification applicable for the site.
Remote monitoring and control system, Deep well ground bed system, MMO anode
grid system, Platinized niobium anodes, permanent reference electrode, bonding
facilities for mitigation for DC interference problem shall be tested and checked (pre
/post installation) by a qualified and experienced CP Engineer.
During the construction period, buried piping external surface shall be protected by
sacrificial anode CP. All sacrificial anodes connected to the pipeline through Test post.
(Till the time the ICCP system is commissioned, Tank bottom external surface shall be
temporarily protected with temporary DC power source.
All CP materials and equipment shall be supplied from approved manufacturers.
C.1.18.4.4 SUBCONTRACTOR
It is a requirement of this specification that the CONTRACTOR shall engage a
specialist cathodic protection VENDOR / SUBCONTRACTOR to execute the
engineering design, procurement, installation, specialized surveys, commissioning and
final documentation of the CP system. Such expertise shall be sufficient to satisfy the
following:
A Qualified and experienced (minimum 10 years) or NACE accredited CP engineer
(with minimum 10 years experienced) should be provided on a full time basis for the
duration of the Contract.
The CONTRACTOR is required to submit CV of the designated candidate for
position for COMPANY approval as part of his technical submittal.
EXHIBIT C.1.18
CATHODIC PROTECTION PAGE 9 of 11
ABU DHABI OIL REFINING COMPANY (TAKREER)
NEW ABU DHABI AIRPORT (ADIA) AVIATION FUEL DEPOT PROJECT; PROJECT NO. 5643
ENGINEERING, PROCUREMENT, CONSTRUCTION, COMMISSIONING AND START- UP (EPC) WORKS
AGREEMENT NO. 11-5643-E-1
• Disconnect all temporary anodes / temporary DC power supply (for tank bottom)
from the structure and allow the structures to depolarization.
• Check the integrity of the Isolation joint / Flange.
• Measure the anode ground bed resistance and individual anodes.
• Check the total circuit resistance.
• Record all structure to soil / water potentials (As found/Natural potential) on the
entire test points with respect to the Permanent (where appropriate) and Portable
reference electrode.
• Check the spark gap arrestor.
• Check and calibrate the permanent reference electrode.
• Check the connection and interface unit of the remote monitoring and control
system.
• Check all cable continuities where appropriate.
C.1.18.4.6 COMMISSIONING
The CONTRACTOR shall perform all commissioning tests to confirm satisfactory
installation and operation of all equipment. All testing and commissioning shall be
carried out in the presence of the responsible COMPANY’S representative. The
system shall be considered satisfactory when the cathodic protection criteria is met at
test stations and any other accessible points of the structure to be protected where
COMPANY requires tests to conform effectiveness of CP system.
On satisfactory completion of the Pre commissioning, the Commissioning Engineer
shall carry out the following activities:
• Switch on the TR unit to energize the CP system and adjust the TR output current
to get structure to achieve the protection level.
• Allow system to achieve full polarizations and study potential.
• After the sufficient study polarization, structure to soil / water ON/OFF (4:1
cycle) potential with respect to permanent (where appropriate) and portable
reference electrode shall be measured.
• Structure to soil / water potentials shall be recorded at all test points.
• Adjust cathodic protection system output as required to achieve protection in
accordance with the Protection criteria as per the CP specification.
• Measure the potential (swing test) at Isolation Joint (both side), to confirm
satisfactory isolation of the structure.
• Confirm no interference is occurring on other buried structure because of the
operation of the cathodic protection system.
• Make final adjustments as required.
• Measure the Anode output current at AJB and adjust the current.
.
Upon completion of the final adjustments to getting the polarized potential, remote
monitoring system shall be commissioned and parameter verified by accessing data
locally using LAN connection as well as remotely.
EXHIBIT C.1.18
CATHODIC PROTECTION PAGE 10 of 11
ABU DHABI OIL REFINING COMPANY (TAKREER)
NEW ABU DHABI AIRPORT (ADIA) AVIATION FUEL DEPOT PROJECT; PROJECT NO. 5643
ENGINEERING, PROCUREMENT, CONSTRUCTION, COMMISSIONING AND START- UP (EPC) WORKS
AGREEMENT NO. 11-5643-E-1
EXHIBIT C.1.18
CATHODIC PROTECTION PAGE 11 of 11