DES GN BAS S MEMORANDUM (DBM)


(ELECTR CAL)

DOCUMENT NO :AHD-PP-E-RD-270 01 REV.: 0 PAGE 1OF


38

AL-WAHA PETROLEUM COMPANY L M TED


(WAPEC)

ADHEB O LF ELD SURFACE FAC L T


ES DEVELOPMENT PROJECT

This document is updated from Revision 'B'


due to scope confirmation of 120,000 BOPD as
per
Letter No.AHD-PMT-CCH-L-01 60 dated 28th June 2010.

0 SSUED FOR CONSTRUCTION 24-0CT-10 l TEL S. PARKAR CG.


j It
REV. DESCRIPTION DATE PREP'D CHK'D Af;y
r

Class 1
EPC CONTRACTOR CLIENT

DESIGN BASIS MEMORANDUM (DBM)


(ELECTRICAL)

DOCUMENT NO : AHD-PP-E-RD-27001 REV.: 0 PAGE 2 OF


38

TABLE OF CONTENTS

1.0 GENERAL.................................................................................................................. 4

1.1 Purpose.......................................................................................................... 4

1.2 PROJECT Overview..............................................................................................4

1.3 Properties of Media and Meteorological and Geological Conditions....................5

1.4 Units................................................................................................................ 5

1.5 Definitions..............................................................................................................5

1.6 Abbreviations.........................................................................................................6

2.0 CODES, STANDARDS AND SPECIFICATIONS.......................................................9

2.1 International Codes and Standards.......................................................................9

2.2 Order of Precedence............................................................................................12

3.1 General..................................................................................................................... 13

3.2 Area Classification...............................................................................................13

3.3 Power Supply and Distribution Generation...................................................14

3.4 Utilization Voltages....................................................................................15

3. 5 Brief Specifications of the Electrical Equipment, Materials and Installations .. 17

3.6 Control.................................................................................................................25

3.7 Protection and Measurement...............................................................................26

3.9 Lighting System...................................................................................................26

3.10 Local Control Stations..........................................................................................28

3.11 Uninterruptible Power Supply Equipment............................................................29

3.12 Earthing and Lightning Protection.................................................................29

3.13 Cable Trays.............................................................................................................. 32

3.14 Receptacles.........................................................................................................32
EPC CONTRACTOR
CLIENT

DESIGN BASIS MEMORANDUM (DBM)


(ELECTRICAL)

DOCUMENT NO : AHD-PP-E-RD- 27001 REV.: 0 PAGE 3 OF


38
3.15 Cable Glands.......................................................................................................33

3.16 Cables Installation................................................................................................34

3.17 Cathodic Protection System..........................................................................35

3.18 Electric Heat Tracing ................................,........,....................................35

3.19 Substation............................................................................................................36
EPC CONTRACTOR CLIENT

DESIGN BASIS MEMORANDUM {DBM)


{ELECTRICAL)

DOCUMENT NO : AHD-PP-E-RD- 27001 REV.: 0 PAGE 4 0F 38

1.1 GENERAL

1.2 Purpose

This document outlines the Electrical Design Basis to be followed for the design,
selection and supply of Electrical Equipments for Power Plant Area of Ahdeb Oilfield
Surface Facilities Development PROJECT.

This document should be read in conjunction with the technical requirements specified
in the Equipment Data Sheets and related PROJECT specifications, codes and
standards.

1.3 PROJECT Overview

AI-Waha Petroleum Company Limited [The "OWNER" - A joint venture of CNPC


(75%) and NOC - Iraq (25%)] plans to develop Ahdeb Oilfield, located south of
Baghdad, Iraq. The peak oil production expected from this field is 120,000 BOPD
of heavy crude oil (API gravity of 21-23). The oilfield is located at the agricultural
area of alluvial plain formed by Tigris and Euphrates Rivers, which is 20m above
sea level.

The PROJECT is titled "Ahdeb Oilfield Surface Facilities Development PROJECT".


The first phase of the PROJECT is expected to be completed by 2011 and commercial
production will be started with 60,000 BOPD (Two processing trains in CPF). Two
more trains with 60,000 BOPD combined capacity will be commissioned in 2012 to
reach the final capacity of oil processing to 120,000 BOPD... Production enhancement
by water injection will also be implemented in different phases.

The produced oil is pumped through a new pipeline to existing strategic pipeline
terminal station PS2. A part of produced oil is also sent via a new pipeline to existing
Zubaidiya Power plant as fuel.

Associated gas will be pressure boosted, sweetened and used as internal fuel as well
as exported to existing Zubaidiya power plant through a pipeline. This facility will be
commissioned along with first set of CPF trains in 2011. During the next phase, two
trains of dehydration, dehydrocarbon, LPG separation, LPG storage, LPG loading
facility and a single Sulphur recovery unit will be added. .LPG produced from the gas
processing plant is sent to Kut city via trucks. Sulphur produced is also trucked out for
shipping/disposal.

Produced water during first phase will be sent to disposal wells. The water will be used
as main source for injection during second phase after treatment to the required
quality. Utility and potable water will be sourced from Tigris river through dedicated
facility in Phase I. A second source of fresh water from canal is also planned during
the second phase of the PROJECT.

The PROJECT also involves the development of supporting utilities and infrastructure
which is required for the safe functioning of the surface facilities to meet the "OWNER"
objectives.
EPC CONTRACTOR CLIENT

DESIGN BASIS MEMORANDUM (DBM)


(ELECTRICAL)

DOCUMENT NO : AHD-PP-E-RD- 27001 REV.: 0 PAGE S OF 38

It is planned to drill several wells (including producers and water injectors) during the
development of the field in different phases. The scope of developing the subsurface
facility and well heads entirely rests with the "OWNER".

The FEED (Front End Engineering Design) of this PROJECT is undertaken by CPE
(China Petroleum Engineering Company, Beijing). CPECC (China Petroleum
Engineering and Construction Corporation, Beijing) is nominated as the EPC
CONTRACTOR for the PROJECT. The detailed design of the PROJECT will be
executed jointly by CPE and CH2M HILL.

1.3 Properties of Media and Meteorological and Geological Conditions

Refer to General Design Basis, Document No. AUH-GEN-G-RD-61003.

1.4 Units

Measurement units employed in this PROJECT shall be based on the International


System of Units (SI), except for pipes and tubes and flanges.

1.5 Definitions

OWNER AL-WAHA PETROLEUM COMPANY LIMITED (WAPEC)

PROJECT . AHDEB OILFIELD SURFACE

FACILITIES
DEVELOPMENT

EPC CONTRACTOR China Petroleum Engineering & Construction Corporation


(CPECC)

Engineering China Petroleum Engineering Company Limited (CPE) I


SUBCONTRACTOR CH2M HILL VECO Engineering

VENDOR MANUFACTURER(s)/SUPPLIER(s) of goods/equipments

Shall Indicates a mandatory requirement

Should Indicates a strong recommendation to comply with the


requirements of this document
EPC CONTRACTOR CLIENT

DESIGN BASIS MEMORANDUM (DBM)


(ELECTRICAL)

DOCUMENT NO :AHD-PP-E-RD-27001 REV.: 0 PAGE 6 0F 38

1.6 Abbreviations

AMF Automatic Mains Failure

ACB Air Circuit Breaker


API American Petroleum Institute

ATEX Atmospheres Explosibles

BASEEFA British Approvals Service for Electrical Equipment in


Flammable Atmospheres

BOPD barrels of oil per day

BS British Standards

CBCT Core Balance Current Transformer

CCTV Close Circuit TV

CENELEC European Committee for Electroctechnical Standardization

CNPC China National Petroleum Corporation

CPF Central Processing Facilities

DB Distribution Board

DCS Distributed Control System

DG Diesel Generator

DI/Al Digital Input I Analog Input

DOL Direct On Line

EICS Electrical Integrated Control system

ELCB Earth Leakage Circuit breaker

EMC Electromagnetic compatibility

EN Euro Normes

EPABX Electronic Private Automatic Branch Exchange

ERA Electrical Research Association


EPC CONTRACTOR CLIENT

DESIGN BASIS MEMORANDUM (DBM)


(ELECTRICAL)

DOCUMENT NO :AHD-PP-E-RD-27001 REV.: 0 PAGE 7 OF 38

ESD Emergency Shutdown

ETAP Electrical Transient and Analysis program

FA Fire Alarm

F&G Fire and Gas

FLC Full Load Current

GRP Glass Reinforced Plastic

HMI Human Machine Interface

HPMV High Pressure Mercury Vapour

HPSV High pressure Sodium Vapour

HV High Voltage

IEC International Electro technical Commission

IEEE Institute of Electrical and Electronics Engineers

IP Institute of Petroleum

ISO International Standards Organization

LAN Local Area Network

LCP Local Control Panel

LCS Local Control Station

LPG Liquefied Petroleum Gas

LV Low Voltage

MCCB Moulded Case Circuit Breaker

MPP Metalized Poly Propylene

MV Medium Voltage

NACE National Association of Corrosion Engineers

NC Normally Closed

NER Neutral Earthing Resistor


Internal Ctrl. No.: 40191O-PP-EE10 -001
EPC CONTRACTOR CLIENT

" DESIGN BASIS MEMORANDUM


(DBM) (ELECTRICAL)

DOCUMENT NO : AHD-PP-E-RD-27001 REV.: 0 PAGE 8 OF 38

NO Normally Open

NOC North Oil Company

ONAF Oil Natural Air Forced

ONAN Oil Natural Air Natural

P&ID Piping and Instrumentation Diagrams

PMCC Power and Motor Control Center

pp Power Plant

PTC Positive Temperature Co-efficient

PVC Poly Vinyl Chloride

RTD Resistance Temperature Detector

RTU Remote Terminal Unit

SSS Safety Shutdown System

SCADA Supervisory Control and Data Acquisition

SI International System of Units

SIP Substation Interface Panel

TPNE Triple Pole Neutral Earth

UPS Uninterruptible Power Supply

VFD Variable Frequency Drive

XLPE Cross Linked Poly Ethylene


Internal Ctrl. No.: 401910-PP-EE10 -001
EPC CONTRACTOR CLIENT

DESIGN BASIS MEMORANDUM (DBM)


(ELECTRICAL)

DOCUMENT NO : AHD-PP-E-RD-27001 REV.: 0 PAGE 9 OF 38

2.1 CODES, STANDARDS AND SPECIFICATIONS

2.2 International Codes and Standards

Unless otherwise specified in Data Sheets I OWNER's Specifications, the latest edition
of following codes and standards as applicable at the time of order shall be followed. In
addition to below, codes and standards mentioned in individual equipment
specification shall also be complied.

IEC 60034 Rotating Electrical Machines

IEC 60044-1 Current Transformers

IEC 60044-2 Voltage Transformers

Direct Acting indicating Analogue electrical -


IEC 60051
measuring instruments and their Accessories

IEC 60060 High Voltage test techniques

IEC 60071 Insulation Co-ordination

IEC 60072 Dimensions and output ratings-frame numbers 56 to 400

Basic and safety principles for Man machine interface,


IEC 60073
marking and identification.

IEC 60076 Power Transformers

IEC 60079 Electrical apparatus for Explosive Atmospheres

IEC 60092 Cables (construction, testing and installation)

IEC 60129 A.C. disconnectors and earthing Switches

IEC 60146 Semiconductor Converters

IEC 60173 Colours for the cores of flexible cables and cords

PVC insulated cables of rated voltages up to and


IEC 60227-1
including 450/750V

IEC 60228 Conductors for Insulated cables

IEC 60229 Test on Cable Over-sheaths

IEC 60255 Electrical protection relays


EPC CONTRACTOR CLIENT

DESIGN BASIS MEMORANDUM (DBM)


(ELECTRICAL)
W6: "
DOCUMENT NO : AHD-PP-E-RD-27001 REV.: 0 PAGE 10 OF 38

IEC 60265 High Voltage Switches

IEC 60269 L.V. Fuses

IEC 60282 High Voltage Fuses (Part -1)

IEC 60287 Steady State Current Calculation in

Cables IEC 60289 Reactors

IEC 60331 Fire Resisting characteristics of Electric

Cables IEC 60332-1 Tests on Electric cables under Fire conditions

IEC 60364 Electrical Installation of Buildings

IEC 60417 Graphical symbols for use on equipment

IEC 60439 Low voltage Switchgear and Control gear Assemblies

Identification of equipment terminals and terminations of


IEC 60445 certain designated conductors.

IEC 60446 Colour Identification of Insulated and Non-insulated

Cores IEC 60470 High Voltage A.C. Contactors

Extruded Solid Di-electric Insulated Power Cables for Rated


IEC 60502 Voltages 1kV to 30kV

IEC 60529 Classification of degrees of Protection provided by enclosures

Test methods for Insulation and Sheaths of Electric Cables


IEC 60540
and Cords

IEC 60617 Graphical symbol for Electrical Diagrams

IEC 60664 Insulation Coordination for equipment within low voltage


systems, including clearances and creepage distances for
equipment

IEC 60076-11 Dry Type Transformers

IEC 60751 Platinum Resistance Thermometer Sensors Thermocouples

IEC 60754 Tests on gases evolved during combustion of electric cables


EPC CONTRACTOR CLIENT

DESIGN BASIS MEMORANDUM (DBM)


(ELECTRICAL)

DOCUMENT NO :AHD-PP-E-RD- 27001 REV.: 0 PAGE 11OF 38

Common test method for insulating and sheathing


IEC 60811 of materials of electric and optical cables

Shunt power capacitors of self healing type for AC systems


IEC 60831 having a rated voltage up to and including 1OOOV

IEC 60885 Electrical test methods for electric

cables IEC 60947 LV Switchgear and Control gear

IEC 61000-4 Electromagnetic Compatibility (EMC)

Measurement of smoke density of cables under defined


IEC 61034 conditions

Electrical Apparatus for Explosive Gas


IEC 62086 Atmospheres, Electrical Resistance Trace Heating

Common Clause-Specification for High Voltage Switchgear &


IEC 62271-1 Control gear.

IEC 62271-100 High Voltage A.C. Circuit Breakers

AC Metal Enclosed switchgear and Control gear for rated


IEC 62271-200 voltages above 1kV and up to and including 52kV

IEEE 80 Guide for Safety in AC Substation Grounding

IEEE 665 Guide for Generating Station Grounding

BS 3643 ISO Metric Screw Threads - principles and basic data

Insulated cables up to 3.3kV - Armoured cables with


BS 5467 thermosetting insulation

BS 6121 Cable Glands

BS 6451 Electrical Surface Heating

Cables with Extruded XLPE or EPR insulation for rated


BS 6622 voltages 3.8/ 6.6kV up to 19/33kV

BS 6651 Protection of structures against lightning

Cathodic Protection: Part 1: 1991 Code of Practice for Land


BS 7361 and Marine Applications
EPC CONTRACTOR CLIENT

DESIGN BASIS MEMORANDUM (DBM)


(ELECTRICAL)
OPEOC

DOCUMENT NO : AHD-PP-E-RD- 27001 REV.: 0 PAGE 12 OF 38

BS 7430 Design of Medium and High voltage substation

BS EN 62305 Design of Lightning Protection System

IP 15 IP model code of safe practice Part 15, July 2005 3rd edition

External Cathodic Protection of On-grade Metallic Storage


NACE RP 019
Tank Bottoms

Control of External Corrosion on Underground or Submerged


NACE RP0169
Metallic piping Systems

Mitigation of Alternating Current and Lightning Effects


NACE RP0177 01
Metallic Structures and Control Systems
NACE RP0286 Electrical Isolation of Catholically Protected Pipelines

NACE RP0572 Design, installation operation and maintenance of


Impressed Current Deep Ground Beds

NFPA 72 National Fire Alarm and Signalling Code

2.2 Order of Precedence

Equipment selected shall be as per data sheets and in conformity to applicable Codes,
Standards and OWNER's specifications. In case of a conflict of technical
requirements, the order of precedence shall be as follows:

• Laws and Regulations in Iraq;

• Electrical Design Basis;

• Data Sheets;

• Material Requisition;

• OWNER's Specifications;

• International Codes and Standards.

The EPC CONTRACTOR shall obtain a written approval from the OWNER, in case of
any deviations proposed to be taken to the OWNER's Specifications/Data
Sheets/Codes and Standards.
EPC CONTRACTOR CLIENT

DESIGN BASIS MEMORANDUM (DBM)


(ELECTRICAL)

DOCUMENT NO : AHD-PP-E-RD- 27001 REV.: 0 PAGE 13 OF 38

3.1 DESIGN SPECIFIC REQUIREMENTS

3.2 General

The following major equipments shall be engineered and installed at PP:

• Gas Turbine Generator System (including Power Management System);

• Emergency Diesel Generator;

• 11kV/34.5kV Power Transformers;

• 33kV MV AIS Switchgear;

• 11kV MV AIS Switchgear;

• 11kV/420V Distribution Transformers;

• LV Switchgear;

• EICS;

• MV & LV Power Cables and Control Cables;

• AC & DC UPS;

• Lighting fixtures, Poles and Accessories;

• Earthing System;

• Lightning Protection System;

• Miscellaneous Control Devices.

3.2 Area Classification

The PP shall be classified into Hazardous Area in accordance with the following:

• Area Classification shall be in accordance with IP Part 15.

• Equipment selection shall be in accordance with IEC 60079.

In areas classified to be potentially explosive, the electrical equipment and material


shall be certified by BASEEFA, CESI, KEMA, SIRA or CENELEC as per ATEX/IECEX
guidelines and certificate of conformity shall be issued for review/information.
EPC CONTRACTOR CLIENT

DESIGN BASIS MEMORANDUM


(DBM) (ELECTRICAL)

DOCUMENT NO :AHD-PP-E-RD- 27001 REV.: 0 PAGE 14 OF 38

3.3 Power Supply and Distribution Generation

Ahdeb Oilfield Surface Facilities Development PROJECT shall comprise of several


areas like FSF, CPF, GPS, WS1, Base Camp, etc. The electrical power to all this
facility shall be sourced from the Power Plant. This is the only source of power and no
power will be sourced from electrical network or grid.

The Power Plant will be built at the northwest corner of the CPF in Ahdeb

Field. The Power Plant shall comprise of following:

• Gas turbine power units;

• Electrical Distribution and Control System;

• Diesel fuel supply system;

• Gas fuel supply system;

• Auxiliary facilities and utilities.

Before the gas processing station in the CPF is put into production, diesel fuel will be
supplied for the turbine generators. After the gas processing station in the CPF is put into
operation, wet purified gas in Phase I and the dry gas in Phase II which is produced in
the GPS will be supplied by the gas processing station for the turbine generators. The
fuel required by the turbine generator will be directly piped into power plant through
gas pipeline or diesel pipeline.

An emergency generator is provided for black start of the Gas turbine power units.

The water required by the Power Plant will be taken from the adjacent CPF.

The rated voltage of the turbine generators will be 11kV. The power generators will be
connected to the main MV switchgear and 11kV will be the main distribution voltage. The
power to CPF and WS1/base camp will be powered from the main MV switchgear directly.

For OGM and Wellheads, the 11kV voltage shall be raised to 33kV voltage by step-up
Power Transformers and then power shall be distributed at 33kV level.

The power required for the MV motors in ORS, PP, PWS, IS and respective distribution
transformers shall be fed directly from main 11kV switchgear in PP. The power required
for GPS substation shall fed from 11kV switchgear in PP. GPS shall have own 11kV
substation to cater MV & LV motors loads.
EPC CONTRACTOR CLIENT

DESIGN BASIS MEMORANDUM (DBM)


(ELECTRICAL)

DOCUMENT NO : AHD-PP-E-RD- 27001 REV.: 0 PAGE 15 OF 38

3.4 Utilization Voltages

The following voltage levels shall be followed:

Generating Voltage 11,000V, 3Ph, 3 wire,


50Hz. (Resistance
grounded)

Distribution Voltage (CPF area) 11,000V, 3Ph, 3 wire, 50Hz.

Distribution Voltage (PW/WI, IES & : 11,000V, 3Ph, 3 wire,


50Hz. GPS)

Distribution Voltage (FSF Area) 33,000V, 3Ph, 3 wires, 50Hz.


(solid grounded)

MV Motors (including and above 250 : 11,000V, 3Ph, 3 wire,


50Hz. kW)

LV Motors (less than 250 kW ) 400V, AC, 3Ph, 3 wire,

50Hz. Power Distribution Board 400V, AC, 3Ph, 4 wire,

50Hz.
(solidly earthed)

Small Power And Lighting Distribution 400V/230V, AC, 3Ph, 4 wire or 230V,
AC, 1 Ph, 50Hz.

MV Incomer And Bus-Coupler Circuit : 11OV,


DC Breaker's Control Supply for
Switchgear

LV Incomer And Bus-Coupler Circuit : 11OV,


DC Breaker's Control Supply for PMCC

Spring Charging Motor of MV and LV : 230V, AC (From Emergency Bus)


Breakers

LV control supply and motor starter : 230V,


AC feeder

Space Heater 230V, AC, 1Ph, 50Hz

Lighting Distribution 400V/230V, AC, 3Ph, 50Hz, 4 wire or


230V, AC, 1Ph, 50Hz

Convenience Socket Outlet 230V, AC, 1Ph, 50Hz


EPC CONTRACTOR CLIENT

DESIGN BASIS MEMORANDUM


(DBM) (ELECTRICAL)
OPEOO
DOCUMENT NO : AHD-PP-E-RD- 27001 REV.: 0 PAGE 16 OF 38

Instrument and Local Control Panel : 230V, AC 1Ph, 50Hz UPS Supply
(LCP)

Telecommunication and SCADA 230V,AC 1Ph, 50 Hz UPS Supply

The design and installation shall comply with EMC requirements as per relevant IEC I
EN Standards.
The variations allowed in the system are as follows:

Supply Voltage Variation for MV and ± 10 %


LV System

Supply Frequency Variation for MV and ±5%


LV System

Combine Voltage and Frequency ± 10 %


Variation

AC-UPS Voltage and Frequency


± 1%
Variation

DC-UPS Voltage variation ± 1%

During starting or re-acceleration of Motors either singly or in a group, the voltage at


the motor terminals shall not deviate by more than + 10 % or - 15 % from rated
equipment voltage. The design of the Electrical System shall be such that the above
requirements are fulfilled while maintaining the minimum voltage on switchgear bus
during start-up of one or more electric motor.

• 90% of Rated Voltage on Remote Switchgear bus.


EPC CONTRACTOR . CLIENT

DESIGN BASIS MEMORANDUM (DBM)


(ELECTRICAL)

DOCUMENT NO : AHD-PP-E-RD- 27001 REV.: 0 PAGE 17 OF 38

3. 5 Brief Specifications of the Electrical Equipment, Materials and Installations

3. 5.1 Gas Turbine

The Gas Turbine is specifically designed for power generation applications in Simple
Cycle mode shall be considered. It will have single skid lift architecture which will
minimize site installation. The main skid incorporates the Gas Turbine, Electric
Generator and the Gearbox configured for outdoor installation in a container. As the
system is in container the VENDOR shall supply heating, ventilation and air
conditioning system to ensure that system is insulated from harsh environmental
condition and necessary working condition is maintained.

It will comprise of following system:

• Control System;

• Power Management System;

• Lube Oil System;

• Fuel System;

• Start-up System;

• Cooling System;

• HVAC System;

• FA System;

• F&G System;

• Cleaning System;

• Air Inlet System;

• Gas Exhaust System.

All the systems will be as specified in the Specification and Data Sheet and
VENDOR's standard.

3.5.2 Generator

The components of a generator are mainly the generator (stator plus rotor), brushless
exciter system, air cooling system and bearings. These components are skid-mounted.
The generator neutral earthing resistor with switch/contactor as recommended by
VENDOR shall be part of the system.

Basic Parameters of Generator:


• Power factor 0.8
• Voltage 11kV
• Frequency 50Hz
• Number of phases 3
• Connection of phases star
• Class of insulation F ( Temp Rise limited to Class B )
• . Exciter system Brushless exciter system
• Cooling Air cooled
• Neutral Earthing Resistance earthed

3.5.3 Power Management System

This will be a stand-alone system to control and monitor power flow,


manage generation, start/stop of the Turbine Generator units, avoid overloading of
generators and turbines, load shedding, etc.

The system shall provide, but not limited to, the following functions:

• Interfaces (1/0) with:

Gas Turbine units;

11kV Switchgear;

Other switchgear as required by load shedding.

• Generator output control;

• Gas Turbine Control;

• Load Feeder Control;

• Human Machine Interface.

Note: The system shall be provided with dual redundant serial communication link and
also hardwired for signals exchange between the PMS and the EICS equipment.
EPC CONTRACTOR CLIENT

DESIGN BASIS MEMORANDUM (DBM)


(ELECTRICAL)

DOCUMENT NO : AHD-PP-E-RD-27001 REV.: 0 PAGE 19 OF 38

3.5.4 EICS

The EICS shall be a modern, but well proven, microprocessor technology based
system. The architecture shall be built with distributed intelligence as an automated
real-time process engine for data acquisition, processing, transmission, storage and
archival, graphical presentation and display. EICS shall be designed as an
amalgamation of Intelligent Electronic Devices (IEDs), communication equipment,
database and workstation computers, HMls, gateways, software and all necessary
components.

The system will interface with all electrical equipments components like intelligent
relays, status contacts, etc. to collect the data through hardwired and dual redundant
serial communication link.

It shall be linked also to DCS and PMS for data exchange.

3.5.5 33kV MV AIS Switchgear

The 33kV MV AIS switchgear shall be for indoor use, metal clad, vertical self-standing
and single tier cubicle type.

The circuit breakers shall be of draw-out execution components. 33kV circuit breakers
shall be SF6 or Vacuum type. The circuit breakers shall be operated by motor charged
spring type stored energy mechanism, with lockout and anti-pumping features.

All circuit breakers of same rating shall be fully interchangeable.

3.5.6 11kV MV AIS Switchgear

The 11kV MV AIS switchgear shall be for indoor use, metal clad, vertical self-standing
and single tier cubicle type.

The circuit breakers shall be of draw-out execution components. 11kV circuit breakers
shall be SF6 or Vacuum. The circuit breakers shall be operated by motor charged
spring type stored energy mechanism, with lockout and anti-pumping features.

All circuit breakers of same rating shall be fully interchangeable.

3.5.7 Transformer

Power Transformers

11/34.5kV Power Transformers shall be two (2) winding copper wound, oil-filled,
class A insulated, ONAN/ONAF cooled, with conservator. Power rating for each
cooling shall be shown and cooling fans shall be provided in each transformer for the
ONAF rating.for future load increase by 25%.

The transformer shall be located at the substation under sunshade.


-- ---- ---- -- --- - -- -- -

Internal Ctrl. No_: 401910-PP-EE10 -001


EPC CONTRACTOR CLIENT

DESIGN BASIS MEMORANDUM (DBM)


(ELECTRICAL)
OPEOO
DOCUMENT NO : AHD-PP-E-RD-27001 REV.: 0 PAGE 20 OF 38

The transformer shall have ±5% off circuit tap changer (OCTC) arrangement.

The transformer shall be sized on following basis:

• 100% continuous load;

• 20% standby load or the largest standby load whichever is higher;

• 50% intermittent

load; Distribution

Transformers

11/0.420kV Distribution Transformer shall be two (2) winding copper wound, oil-filled,
class A insulated, ONAN cooled, sealed type for rating up to 2,000kVA But for rating
above 2,000kVA it shall be with conservator.

The transformer shall be located at the substation under sunshade. The transformer
shall have ±5% off circuit tap changer (OCTC) arrangement.

The transformer shall be sized on following basis:

• 100% continuous load;

• 20% standby load or the largest standby load whichever is higher;

• 50% intermittent load;

• Power factor compensation will be applied to each transformer irrespective of


size of transformer to achieve Power factor of 0.95

• Transformer rating will be selected based on actual KVA rating obtained after
applying power factor compensation.

• 20% spare for future load while sizing transformer rating will not be considered.

3.5.8 Emergency (Black Start) Diesel Generating Set

The DG set shall be of 400 Volts, 3 ph, 0.8 p.f., 4 wire, 50 Hz, 1500 rpm. The set shall
be complete with the control panel, excitation system, Automatic Voltage Regulator
(AVR), the governing system and automatic synchronizing operation facility.

The DG set shall be started automatically in event of power failure via AMF to ensure
that emergency loads receive power in least time.

The DG set shall be sized to cater the following loads:

• 100% of the emergency loads identified in the electrical load schedule;


Internal Ctrl. No.: 401910-PP-EE10 -001
EPC CONTRACTOR CLIENT

DESIGN BASIS MEMORANDUM {DBM)


{ELECTRICAL)

DOCUMENT NO : AHD-PP-E-RD- 27001 REV.: 0 PAGE 21 OF 38

• 20% standby emergency load or the largest emergency standby load whichever
is higher;

• 50% intermittent load;

Manual Start mode shall also be available for the DG Set.

3.5.9 400 LV Switchgear

The LV switchgear shall be fully draw out type and completely metal enclosed.
Enclosures shall meet requirement of IEC 60439. Minimum IP rating shall be IP-42.

The spare feeders shall be judiciously selected across type and rating to provide
adequate redundancy.

3.5.10 Motors

The electric motors shall be squirrel cage induction machine and comply with following

• Voltage Rating:

For Motor Rating ;;: 250kW 7 11,000V ±

10%; For Motor Rating < 250kW 7 400V ±

10%.

• Frequency: 50Hz ± 5%;

• Enclosure (IP stated is minimum requirement):

Zone 1 - EEx-'d', Frame - IP55, Terminal Box -

IP65; Zone 2 - EEx-'e', Frame - IP55, Terminal

Box - IP65;

Safe Outdoor- Industrial, Frame - IP55, Terminal Box -

IP65; Safe Indoor - Industrial, Frame - IP42, Terminal

Box - IP65.

Motor Accessories

For 11,000V motor RTD and Space heaters shall be provided as follow:

The quantity of RTD is as follows:

Wi_nding RTD per Phase RTD for Bearing


EPC CONTRACTOR CLIENT

DESIGN BASIS MEMORANDUM (DBM)


{ELECTRICAL)

DOCUMENT NO : AHD-PP-E-RD-27001 REV.: 0 PAGE 22 OF 38

Space heaters shall be provided for all MV motors.

For 400V motor, PTC thermistor and Space heater shall be provided as follows:

PTC thermistor per Phase


Below 90kW -N.A
90kW and above 1

Space heater
Below 45kW -N.A
45kW and above 1

Motors above 30kW shall be provided with ground fault protection through zero
sequence CT.

3.5.11 Soft Starters

Power Supply for this PROJECT is solely from Gas Turbine Generating sets. As a
result, the power system is not stiff enough to supply the starting current of larger
motors.

For motor starting studies, minimum 2 nos., Turbine Generators shall be considered in
service as worst case.

Based on motor starting study, all MV motors above 1OOOkW shall be provided with
soft starting device. This will be either electronic soft starter or Variable Frequency
Drive depending on starting torque and needs for speed variation.

In case of soft starters, starting current of motor shall be limited to max. 250% of FLC.

In case of VFD, starting current of motor shall be limited to max. 100% of FLC.

The limits for DOL starting in case of 400V motors shall depend on the transformer
MVA rating. The motors above the DOL starting limit shall be started using soft
starters.

The requirement of soft starters shall be established by carrying out motor starting
study on plant electrical system model.

The motors shall be procured along with the mechanical driven equipment and the
performance requirements and the mounting type of the motors shall match the driven
equipment.

3.5.12 Cables
Internal Ctrl. No.: 40191 O-PP-EE10 -001
EPC CONTRACTOR CLIENT

DESIGN BASIS MEMORANDUM {DBM)


{ELECTRICAL)

DOCUMENT NO : AHD-PP-E-RD- 27001 REV.: 0 PAGE 23 OF 38

3.5.12.1 Markings and Drums for MV and LV Cable Requirements

The outer sheath of all cables shall be embossed throughout the cable length at every
one meter on the two sides with the following information:

• Manufacturer's name;

• National I International standard identification;

• Cable designation (cores, size, voltage grade, type, etc.);

• Year of manufacture.

• The following information shall be marked on the drum:

• Weight of the drum;

• Length of the cable;

• Direction of rotation of the drum;

• Designation of the PROJECT site destination;

• Number of drum;

• Cable designation.

All cables shall be subjected to routine tests as per IEC and the same will be
witnessed by the PURCHASER/OWNER. Test certificates shall be provided for
routine tests on each cable length and type test certificates of cable of similar
specification I rating.

• All cables shall be provided with non-fibrous and non-hygroscopic fillers;

• Single core cables shall be Aluminium wire armoured;

MV Cables- 8.7/15kV I for 11kV system) and 18/30kV l for 33kV system)

The cables shall be 8.7/15kV grade, single or multi-core, stranded annealed copper
conductor, screened, XLPE insulated, insulation screened, PVC bedded, galvanized
steel wire armoured and overall red PVC sheathed. The outer sheath shall be flame
retardant type conforming to the requirement of IEC-60332-1. Single core cable shall
be aluminum wire armoured.

The cables shall be 18/30kV grade stranded annealed copper conductor, screened,
XLPE insulated, insulation screened, PVC bedded, galvanized steel wire armoured
and overall red PVC sheathed. The outer sheath shall be flame retardant type
Internal Ctrl. No.: 401910-PP-EE10 -001
EPC CONTRACTOR CLIENT

DESIGN BASIS MEMORANDUM (DBM)


(ELECTRICAL)
OPE:00

DOCUMENT NO : AHD-PP-E-RD- 27001 REV.: 0 PAGE 24 0F 38

conforming to the requirement of IEC-60332-1. Single core cable shall be aluminum


wire armoured.

LV Cables - 600V I 1OOOV Cables

The LV multicore cables shall be XLPE insulated, single or multi-core, stranded


annealed copper, PVC bedding, galvanized steel wire armoured and overall black PVC
sheathed. The LV single core cables shall be the same as multicore cables except with
aluminum wire armoured.

The outer sheath shall be flame retardant type conforming to the requirements of IEC-
60332-1.

The minimum size of power cable conductor shall be 2.5mm2 and for control cable
shall be 2.5mm2. Maximum cable sizes shall be:
2
• Motor "7 3C x 185mm ;

2 2
• Distribution "7 3C x 300mm , 1C x 630mm •

3.5.12.2 Cable sizing:

Cable sizing shall be decided based on:

• Derating due to ambient temperature, soil thermal resistivity, depth of laying, the
methods of laying and grouping of cables, as applicable. Current ratings and
derating factors for cables shall be as per VENDOR's recommendation or ERA
report 69-30;

• Voltage drop shall be restricted to 5% and to 15% in cable during steady state
and starting of motors respectively;

• Voltage drop.shall be restricted to 1.5% at steady state between LV switchboard


and DB;

• Voltage drop shall be restricted to 2.5% at steady state between DB and end load;

• Voltage drop shall be restricted to 3% at steady state between UPS DB and end
load;

• Short circuit current and the duration (depending upon the switching device and
the protection time).

• Ambient temperature for sizing of cables shall be considered as 50°C for air and
25°C for ground, (For Nasirya ground temperature shall be 40°C).

3.5.12.3 Cables Segregation


Internal Ctrl. No.: 40191O-PP-EE10 -001
EPC CONTRACTOR CLIENT

DESIGN BASIS MEMORANDUM (DBM)


{ELECTRICAL)

DOCUMENT NO :AHD-PP-E-RD- 27001 REV.: 0 PAGE 25 OF 38

The following minimum distances shall be kept between MV, LV and instrumentation
Cables:

MV and Instrumentation Cables 600mm

LV and Instrumentation Cables 300mm

All type of cables from hot pipes 300mm

3.6 Control

3.6.1 MV Switchgear

All MV circuit breakers shall be controlled locally and through EICS. A two (2)
position local/remote selector switch shall be installed on the switchgear panel to
determine the operation.

In addition the circuit breakers will be controlled from Load Shedding System.

Status signals will be transmitted to DCS from EICS through MODBUS on TCP/IP.

For 33KV MV switchgear auto transfer scheme shall be incorporated such that
loss of any one incoming supply would result in tripping of that incomer and
closing of buscoupler. Also, momentary paralleling facility through manual
selection by trip selector switch/MM I terminal shall be provided.

3.6.2 400V LV Switchgear

All Incoming Air Circuit Breakers shall have interface with Electrical Integrated
Control System (EICS) mainly for Transfer of Breaker status signals. In case, there is
a requirement of controlling the breaker from the remote EICS system located in
Power Plant substation, then that breaker feeder shall incorporate a 2- position
selector switch.

All LV motors starters shall be controlled manually from local control stations near
the motors and remotely from DCS as applicable. There shall be no control of motors
from remote EICS system.

Some of the non essential Bulk Feeders/ large Motor Feeders shall have provision of
remote tripping during a load shedding process. This shall be decided based on
Load Shedding philosophy and study.

Auto transfer scheme shall be incorporated such that loss of any one incoming
supply would result in tripping of that incomer and closing of bus coupler. Also,
momentary paralleling facility through manual selection by trip selector switch/MM!
terminal shall be provided.
Internal Ctrl. No.: 401910-PP-EE10
EPC CONTRACTOR -001 CLIENT

DESIGN BASIS MEMORANDUM (DBM)


(ELECTRICAL)

DOCUMENT NO : AHD-PP-E-RD- 27001 REV.: 0 PAGE 26 OF 38

3.7 Protection and Measurement

The protection and measurement facility for the electrical system shall be provided
as per relevant general specifications and single line diagrams.

There shall be an Electrical Integrated Control System (EICS) installed in power


plant.

In lieu of above, the relays and metering elements in all switchgear shall be
intelligent, microprocessor based with ability to communicate with EICS.

In addition, required signals from UPS, Transformer etc. shall be communicated to


EICS on serial link.

3.8 Signals to DCS/SSS

Status Indication at DCS

The following indication signals from motor starter shall be sent to the plant DCS in
the control room hard wired through Interposing Relay Panel located in Electrical
Substation.

• RUN, TRIP for 400V motor feeders;


• RUN, TRIP for 400V Electric Heaters;
• Required signal from transformer, motor, UPS, etc. shall be communicated
to DCS from EICS through serial interface link.

Command from DCS/SSS

Command from DCS/SSS shall be as per Process requirements. However, to ensure


common motor control scheme following signals shall be provided.

• Motor Local operation enable from DCS;

• Motor start from DCS;

• Motor stop from DCS;

• Motor trip from SSS.

The above signals interface shall be hard wired through an Interposing Relay Panel
located in Electrical Substation.

3.9 Lighting System

The lighting system is categorized into outdoor lighting for plant area, road, and
indoor lighting for within buildings.
EPC CONTRACTOR CLIENT

DESIGN BASIS MEMORANDUM (DBM)


(ELECTRICAL)
OPEC:O
DOCUMENT NO : AHD-PP-E-RD-27001 REV.: 0 PAGE 27 0F 38

3.9.1 Outdoor Lighting

For Outdoor lighting, auto control shall be provided through photoelectric cell.
Manual override facility shall also be available.

Normal outdoor area lighting shall be by EEx (n)/ EEx (de), II, T3 250/400 Watts,
HPSV flood lighting fixtures mounted on 10 meter high· poles. These fixtures shall
have minimum Ingress protection of IP65 according to IEC 60529.

All platforms and staircases for equipments located shall be illuminated by using 2 x
36 Watts fluorescent lighting fixtures or 70W HPS with IP 65 minimum degree of
protection, using stanchion mounting of 3m height. The lighting fixtures shall be of
EEx (n)/ EEx (de), II, T3 type.

Shelter Lighting - This lighting shall be by 2 x 36 Watts, weatherproof,


fluorescent lamp fixtures and skids with shelters in safe areas. EEx (n)/ EEx (de),
II, T3, 2 x 36 Watts fittings shall be used for shelters located in hazardous areas.

3.9.2 Indoor Lighting

2 x 36 Watts, decorative, mirror optic, surface mounted fluorescent lamp fixture for all
buildings except mechanical workshop and UPS battery room. Mechanical workshop
lighting shall be by medium bay lighting fixtures with aluminum reflector suitable for
250Watts HPMV lamp. The lighting fixtures for UPS battery room housing vented
type batteries shall be EEx-'d', IIC, T6 and 2 x 36 Watts. For substation bldg., lighting
fixtures shall also be fluorescent lamp fixtures recessed mounted unless otherwise
dictated by the type of ceiling finish then this shall be surface mounted (with reflector)
or hanging with pendant support (and with reflector).

3.9.3 Illumination Levels

The following illumination levels shall be provided:

Area/ Location Lux Level


Required (Lux)
Control Room/ Instrument/
Equipment room/Offices/Laboratory 500

Substation/Switchgear Room/UPS Room/ 200


Kitchen/Mess/Prayer Room/Guard Room/Workshop 200
Pumps, Valves, Compressor, Manifold and Shelter
150
for Equipment skids; Generating sets
Outdoor Areas, Roads, Parking Area and Tank-age Area
(General Process area and Roads) 10

Outdoor Operational areas/Platforms/Walkways/Staircases I


50
EPC CONTRACTOR CLIENT

DESIGN BASIS MEMORANDUM (DBM)


(ELECTRICAL)

DOCUMENT NO : AHD-PP-E-RD- 27001 REV.: 0 PAGE 28 OF 38

Area/ Location Lux Level Required


(Lux)
Change Room Toilet, Locker Room 100
Perimeter Lighting Incidental

The illumination level shall be considered as average illumination levels on a


working plane, which shall be at 1.0m above the floor level for indoor and ground
level for outdoors.A maintenance factor of 0.7 shall be used for outdoor fixtures and
0.8 for indoor fixtures.

3.9.4 Critical Lighting

This lighting with battery backup (for 60 minutes) shall be provided in all man
occupied buildings viz, DG Shelter, Control Room, workshop, etc. 33.3% of the
lighting fittings shall be with battery back-up.

In case of Substation, the emergency lighting shall be fed from the emergency DG
set.

In plant areas battery backed up lights (60 minutes back-up) shall be provided for all
platforms and escape routes.

3.9.5 Lighting Poles

The poles for flood lighting shall be tubular steel of the hinged type of 10 meters
height and complete with winch type manual lowering devices. The poles shall be hot
dip galvanized.

3.10 Local Control Stations

The motor shall be controlled in the field from near the motor by push button
control stations. Ammeter shall be provided in the local control stations for motors
rated 5.5kW and above.

The start push buttons shall be green and stop push button shall be red with
mushroom head padlocked with stay put feature arranged for twist/pull to unlock.
The enclosure shall be provided with bottom cable entries and external brass
earthing studs. Ammeters in push button station shall be of suppressed scale type to
suit 1A CT Secondary.

The enclosure of the local control station shall be weatherproof, GRP with integral
canopy suitable for 50°C and solar radiation temperature of 85°C. Degree of
protection provided by the enclosure shall be minimum IP 55 and shall be EEx 'de'
type, temperature Class T3 Gas group IIA and IIB. The push buttons shall have 1 NO
+ 1 NC contacts with 5A, AC rating at 230Volts.
EPC CONTRACTOR CLIENT

DESIGN BASIS MEMORANDUM


(DBM) (ELECTRICAL)

DOCUMENT NO : AHD-PP-E-RD- 27001 REV.: 0 PAGE 29 OF 38

3.11 Uninterruptible Power Supply Equipment

The DC UPS shall be required to feed all Electrical switchgear loads.

DC UPS system shall have an output of 11OV-DC ±1% output, with vented type Ni
Cd batteries for 1 hour backup and in double redundant type configuration.

The redundant batteries shall be designed for 2 x 50% capacity.

The exact rating shall be based on the loads. Over and above the power requirement
of the above loads, the DC UPS shall have 20% spare capacity for future utilization.

Any loads that need 230V AC UPS supply shall be sourced from AC UPS located in
Main Control Room.

3.12 Earthing and Lightning Protection

The following shall be earthed:

• System neutral;

• Current and potential transformer secondary's;

• Metallic non current carrying parts of all electrical apparatus such as transformers,
switchgears, motors, lighting I power panels, cable trays, cable conduits, terminal
boxes, control stations, lighting fixtures, lighting poles, receptacles etc.;

• Steel structures;

• Storage tanks, vessels, spheres, columns and all other process equipment;

• Cable shield and armour;

• Trucks at tanker loading areas;

• Any other equipment required to be earthed I bonded;

• Container/Layout areas.

The earth resistance of each electrode shall be as low as is practicable, but shall in
any event be such that the electrical resistance between the earth grid and the
general mass of earth ensures the operation of all electrical protective devices.

All main earthing loop conductors and branch conductors shall be PVC insulated,
copper conductor yellow-green cables.
EPC CONTRACTOR CLIENT

DESIGN BASIS MEMORANDUM (DBM)


(ELECTRICAL)
OPEGO WME.C:

DOCUMENT NO : AHD-PP-E-RD- 27001 REV.: 0 PAGE 30 OF 38

Earth conductor around the switchgear room and for the transformer earthing shall
be sized to withstand maximum calculated fault current for 0.3 sec (Minimum size
185mm2 ).

The main earth loop conductor in plant areas for equipment earthing shall be to
withstand the cut off current permitted by fuse or current limited by the MCCB on the
highest rated feeder in the PMCC. Tinned copper earth buses shall be provided near
equipment for earthing the group of equipment. Underground connections between
main earth loop conductor and branch conductor shall be carried out with C type
compression connectors.

Two (2) separate earth pits shall be provided for earthing of transformer neutral and
DG set. The earth pits in turn shall be connected to main earth ring.

The cross-sectional area of branch conductors connecting equipment and structures


to the earth ring shall be as follows:

• To metallic enclosures of MV electrical equipment 70mm2


• To metallic enclosures of LV electrical
70mm2 equipment, having a supply cable
cross-
sectional area> 35mm2

• To metallic enclosures of LV electrical


25mm2 equipment, having a supply cable cross-
sectional area < 35mm2

• To control panels, etc. 25mm2


• To non-electrical equipment exposed to
70mm2 lightning, e.g. columns and tall structures
• Fence Earthing
35mm2

• To other non-electrical equipment 25mm2


• Junction boxes, 230V-AC instruments & LCS 10mm2

Branch conductors shall be connected to the earth buses by bolted connection. From
earth bus to equipment, the earthing connections shall be carried out using adequately
sized copper conductor; PVC insulated yellow/green type earthing cables.

The earth resistance of each electrode shall be as low as is practicable, but shall in
any event be such that the electrical resistance between the earth grid and the general
mass of earth ensures the operation of all electrical protective devices. It shall not
exceed 5 ohms when any one group of electrodes is disconnected. All enclosures of
electrical equipment carrying voltage more than 230V and those of mechanical, static
equipment shall be earthed at two (2) points. However, all enclosures of electrical
EPC CONTRACTOR CLIENT

DESIGN BASIS MEMORANDUM (DBM)


(ELECTRICAL)

DOCUMENT NO : AHD-PP-E-RD-27001 REV.: 0 PAGE 31 OF 38

equipment carrying voltage less than or equal to 230V shall be earthed at one point
only.

A separate earth electrode shall be considered for Instrument "Clean" Earth (each for
IS & Non-IS). These earth electrodes shall be further connected to main earth grid for
equipotential bonding. All main earthing loop conductors and branch conductors shall
be PVC insulated, copper conductor yellow-green cables. All earthing terminations
shall be made with compression cable lugs. Interconnections shall be directly made
using thermoweld or compression branch connectors.

For the requirements of telecom system, a general earthing shall be provided wherein
all metallic structure and telecom equipment shall be bonded to Telecom Main
Grounding Bus bar (TMGB), this is then connected to the building's earthing
(grounding) system.

The plant fence shall be earthed at regular intervals of maximum 50m. PVC insulated
yellow/green 35mm2 cable shall be used for bonding.

Pipe rack column shall be earthed not exceeding 20mtr length interval.

Earth rods shall be made of copper clad steel rods, 20mm diameter, 3m long with
pointed end and "chamfered" tops. The sectional earthing rod shall be equipped with
bronzed or hot dip galvanized couplings and driving bolts. A hand or power driving
method shall produce a force in line of the earth rod and the blow shall drive the rod
straight to the required depth in the earth. Earth rods shall be tested with Insulation
Resistance Tester.

The connections between earth rods and conductors shall be so executed that easy
inspection and testing of the earth resistance of each individual earth rods, without
disconnecting any part from the earthing system. The earth rod shall be installed inside
concrete earth chamber. The earth rod shall be located at centre of the box and
equipped with earth rod clamp. The cover of the earth chamber shall be marked with
"Earthu

Lightning protection shall be provided to plant buildings and buildings storing


hazardous substances. The lightning protection shall be designed and installed in
accordance with BS 6651.

The lightning protection system shall consist of air terminations, down conductors, test
joints, earth termination, earth rods and lightning rod chamber.

Each down conductor shall be provided with test joint in such a position that, while not
inviting unauthorized interference, it is convenient for use during testing. The conductor
used to connect the test joint and earth termination shall be of the same dimensions
and material as the down conductor.

An independent earthing network shall be provided for lightning protection and this
shall be bonded with the main earthing network only at the buried electrode.
EPC CONTRACTOR CLIENT

DESIGN BASIS MEMORANDUM (DBM)


(ELECTRICAL)
OPECG
DOCUMENT NO : AHD-PP-E-RD-27001 REV.: 0 PAGE 32 OF 38

3.13 Cable Trays

Cable trays materials shall be heavy duty mild steel sheet 2.0mm thick. The finishing
after fabricating of the cable tray shall be hot dip galvanized as per BS. All fasteners
such as bolts, nuts and washer shall be electro-galvanized.

300mm wide cable trays shall be perforated tray type and cable trays > 300mm shall
be ladder type. Cable trays shall have a maximum rung spacing of 300mm and a
minimum depth of 100mm.

Main cable trays of 6m length shall be supported at a maximum spacing of


2.5meters and at all elbows, tees and fittings as necessary to make the installation
secure and stable. The deflection shall not exceed L/300 where 'L' is the distance
between the supports, in mm.

Aboveground cables shall be fixed individually with ultraviolet-resistant coated


stainless steel cable ties. Interval of cable ties for vertical cable run on tray shall be
450mm and for horizontal cable run on tray shall be 1OOOmm.

All cables trays/racks shall be fully covered with removable covers to protect cables
from the following:

• Mechanical damage of the cables where likely to occur during plant maintenance;

• Oil or chemical spillage;

• Direct solar radiation;

• Cable trays shall be designed with 20% spare capacity for future cables.

3.14 Receptacles

The following receptacles shall be provided:

LV Switchgear/Control Room, Offices, Guard Room - Decorative type


receptacles, with ELCB controlled (30 mA) socket, 230V, 1 phase 10 Amps, 3 pin
at 1O meter interval.

In outdoor area, 400V, 63 Amps, ELCB controlled, TPNE welding socket shall be
provided to cover the process area such that the maximum horizontal distance from
any welding socket is not more than 60m.

In plant area 230V, 1 phase, 10 Amps, 3 pin receptacles shall be provided such that
no equipment is more than 10 meters from an outlet.

Power Distribution for Receptacles


EPC CONTRACTOR CLIENT

DESIGN BASIS MEMORANDUM (DBM)


(ELECTRICAL)

DOCUMENT NO :AHD-PP-E-RD-27001 REV.: 0 PAGE 33 OF 38

Power supply for receptacles, installed in the substation, control Room,


Communication Room, Office and Guard room shall be drawn from the nearest
lighting and small power distribution board.

Welding receptacles shall be fed from the LV Switchgear and a maximum of two (2)
welding receptacles shall be connected in one circuit.

All receptacles located in Zone 2 areas shall be EEx-de type, suitable for Gas
Groups IIA or IIB and temperature Class T3, with minimum IP-65.

The residual operating current shall be 30mA for single-phase convenience outlets
and 300mA for 3 phase and welding outlets. The operating time shall not exceed
30ms.

3.15 Cable Glands

All cable terminations shall use compression type cable glands, which meet the
requirement of BS 6121, to secure the armour wires and provide earth continuity.

The armoured cable shall enter lighting fixture or junction boxes through suitably
rated compression gland suitable for weather proof and as per hazardous area
requirement.

All cables termination shall be done via suitably rated cable glands for all areas.

The cable glands shall be brass nickel plated, complete with locknut, earth tag, and
watertight seals for ensuring IP66 ingress protection. All cable glands for equipment
and motor that are subject to vibrations shall have serrated washer:

The glands shall be arranged to protrude at least 25mm above the gland plate to
avoid moisture collecting in the cable crutch.

Glands shall be covered with an outer PVC shroud and the shroud shall be suitable
for use for the SITE conditions. Cable glands and cable shrouds shall be
compatible.

All reducers or adapters if used shall be compatible having matching thread


standards (ISO) as the cable glands. Earthing continuity shall be maintained
between all parts of reducer or adapter and the gland assembly.

All glands shall be provided with a Metric entry thread to BS 3643.

The glands shall be stamped with the type and size of gland, entry thread and the
relevant approval details for the particular hazardous classification.

Cable lug or tube terminal shall be a compression crimp high conductivity tinned
copper.
EPC CONTRACTOR CLIENT

DESIGN BASIS MEMORANDUM (DBM)


(ELECTRICAL)

DOCUMENT NO : AHD-PP-E-RD- 27001 REV.: 0 PAGE 34 OF 38

All cable glands shall be dual certified (EEx-'e' & 'd'), brass nickel plated, complete
with locknut, earth tag PVC shroud and nylon entry thread/seals for ensuring IP 66
ingress protection, suitable for Ex(n) I Ex'e' I EEx'd' enclosures.

Requirement of barrier type Cable gland for Ex "d" equipment shall be determined
based on IEC 60079:14.

3.16 Cables Installation

Underground Cable Installation

• Cables when installed underground shall be installed at a depth of minimum


700mm below grade level and cables laid in horizontal arrangement at max
two
(2) layers.

• MV Power Cable for motor circuit shall be laid close together with it's
associated control cable and shall be separated from other circuit with at
least 150mm and covered with cable marker concrete tile above

The underground cable routes shall be designed to avoid close pipe crossings and
adjacent runs with underground pipelines, i.e. a clear distance of at least 300mm
between cable and pipe (including insulation) shall be maintained.

The cables should cross underneath buried pipelines except where the depth
measured at the top of the pipeline is more than 1 meter.

All road crossings cables shall be installed in PVC pipes encased in concrete bank.

If close crossings with underground pipelines carrying hot liquids or gases, or which
are regularly steam-cleaned, cannot be avoided, the pipeline shall be insulated in
order to limit its outside temperature to a maximum of 60°C, and the clear distance
increased to 600mm. In these cases cables may need to be run above pipelines
using a sand-filled concrete bridge.

All the power and control cables shall be in continuous lengths. Cable splices or
cable jointing shall not be permitted.

The PVC pipes laid for mechanical protection shall be sealed at both ends.

For direct buried cable trench, concrete tiles shall be installed on top of the sieved
clean sand as mechanical protection before backfilling of original soil.

The cable trench shall be compacted before and after backfilling of original soil for
direct buried.

In general where cables leave the ground they shall be mechanically protected by
PVC pipe to a height of 150mm above grade. The pipes protection shall be sealed at
the top around the cable(s) with a suitable sealing compound.
EPC CONTRACTOR CLIENT

DESIGN BASIS MEMORANDUM {DBM)


{ELECTRICAL)

DOCUMENT NO : AHD-PP-E-RD- 27001 REV.: 0 PAGE 35 OF 38

The cable trench route and size of cable trench shall be shown in Underground
Services drawing for interfacing coordination with other services.

Aboveground Cable Installation

The cables installed aboveground shall be in ventilated cable trays where pipe racks
are available.
The individual cables may be fixed directly to the main structures, walls, ceilings or
columns by means of proper fixing and supporting materials. However, no more than
two cables shall be so installed along a common route.

When MV cables and LV cables are present in the same cable tray, barriers shall be
provided for separation. However, separate cable trays for MV cables shall be
provided as required.

The spacing between power and instrumentation cables without barriers shall be
provided and as specified in section 3.6.12.3 of this document. A minimum spacing
of 300mm shall be between cables and hot piping and surfaces when surface
temperature exceeds the wire thermal class.

Cable Route Marker

For direct buried trench, cable route markers shall be provided at every 40m interval
on trench, when cable trench change direction and when cable leaving and entering
building.
For concrete trench, the route marker is the concrete trench cover itself. The covers
shall be red in colour.
Cable markers are to be provided to identify location of cable joints, if

any. Cable and Wire Markers

The cable markers shall be provided on each cable at every 15m interval or where
cable changes direction for underground and 25m for above ground. Cable tags or
markers shall also be provided at both ends of cables.

The wire marker shall be provided for each phase.

3.17 Cathodic Protection System

Impressed current type, cathodic protection system shall be provided for all the buried
pipes, drain lines and tanks/vessels resting on the ground. Deep well ground anode
beds shall be preferred for cathodic protection system.

3.18 Electric Heat Tracing

Electrical heat tracing shall be provided for piping, instrumentation and equipment as
indicated in relevant P&ID's.
EPC CONTRACTOR CLIENT

DESIGN BASIS MEMORANDUM (DBM)


(ELECTRICAL)

DOCUMENT NO :AHD-PP-E-RD- 27001 REV.: 0 PAGE 36 OF 38

Electrical heat tracing shall be carried out with self regulating heating tapes complete
with insulation, temperature sensors, etc as per relevant IEC/IEEE/BS Standards

The temperature to be maintained shall be the normal operating temperature as


specified in the Process Line List.

3.19 Substation

Substation

Location

• The substations shall be located in a safe area (minimum 15 meters away from
the edge of hazardous area of process plants;

• The substations shall be located close to the load centre. Consideration shall
also be given to the environmental conditions:

Cooling tower sprays, vapour contributing to the insulation break


down;

Presence of ammonia and other corrosive elements in


the atmosphere;

Vehicular traffic;

Presence of radiation from the flare stacks;

Any other factor that might affect the operation of the sub-station.

There shall be no floor depression at the site of switchgear foundations. All gaps
between the switchgear bottom and the flooring shall be fully sealed.

Separate battery room shall be provided for the installation of vented type UPS
battery.

All the electrical fixtures in the battery room e.g. lighting fixtures, exhaust fans, etc.
shall be EEx-'d'. IIC,T6 temperature class. ON-OFF controlling switches for the
lighting fixtures and exhaust fans of the battery room shall be mounted outside the
battery room. Wash basin and eye wash shall be provided in the battery room with
acid-proof tilling on the floor and up to 1.5m height on all the walls.

Switchgear rooms shall be provided with parallel redundant air conditioning system.
Cool air for the battery room shall be sucked from the switchgear room and vented
out through the exhaust fan in the battery room. An interlock shall be provided such
that the boost charging of the battery is inhibited when the exhaust fan in the battery
room is stopped I tripped.

Fire partition (rated for 2 hours) wall shall be provided between the transformers and
between the transformers and substation building.
EPC CONTRACTOR CLIENT

DESIGN BASIS MEMORANDUM (DBM)


(ELECTRICAL)
DPECG
DOCUMENT NO : AHD-PP-E-RD- 27001 REV.: 0 PAGE 37 OF 38

Framed Single Line Diagrams and overall Key Single Line Diagram shall be provided
at the Substation. Rubber mat shall be provided around the switchgear and MCC.

Minimum clear height of the switchgear room shall be 3.5m, i.e. the bottom of false
ceiling to finished grade level shall be 3.5m. The substation shall be of elevated
construction with a minimum of 2000mm clear space between finished grade level
and bottom of beam of the cable cellar. ·

Fire detection system shall be provided. Telephone and LAN socket also to be
provided.

Substation Sizing

• The substation building shall be sized to take care of present and future needs
and to maintain adequate clearances between equipment for ease of
maintenance;

• There shall be at least space for two (2) additional panels for future extension
at each end of each switchboard, provided with cable entry opening filled with
soft concrete and if required, switch board mounting railing;

• The following are the minimum clearances to be provided around various


equipments:

Front clearance for MV switchgear 2500mm

Front clearance for all other switchgears/panels 2000mm

Rear clearance for panels having only maintenance 900mm


from front
or less than 200mm

Rear clearance for panels requiring maintenance 1500 /


1OOOmm from rear (Hinged/Removable)

Side clearance between two (2) switchgears or from 1000mm


nearest obstruction after allowance for any future
additional panels

All round clearance for transformers 1000mm

Head room clearance below bus ducts or any other 2000mm


overhead equipment

Wall mounted equipment front clearance 1000mm

Minimum vertical clearance between the top of


500mm highest equipment and the
false ceiling shall be
EPC CONTRACTOR CLIENT

DESIGN BASIS MEMORANDUM (DBM)


(ELECTRICAL)
OiPECO

DOCUMENT NO : AHD-PP-E-RD- 27001 REV.: 0 PAGE 38 OF 38

Battery rack to wall clearance for:

Single row, single/double tier 100mm

Double row, single tier 100mm

Double row, double tier 750mm


Battery rack to rack clearance 1000mm