Professional Documents
Culture Documents
PLN (PERSERO)
CONTRACT NO : 035.PJ/041/DIR/2012
DOCUMENT NO:
TITLE :
LIGHTNING PROTECTION
CALCULATION
PURPOSE :
FOR APPROVAL
INTERNAL DOCUMENT NO :
PT REKAYASA INDUSTRI
ENGINEERING & CONSTRUCTION CNG-00-E5-CS-002
DOC. NO. :
REV
LIGHTNING PROTECTION
0
CALCULATION CNG-00-E5-CS-002
DISTRIBUTION ORDER
DDO Attachment
Project Director OWNER
Project Manager JakartaOffice
Engineering Manager Site Office
Procurement Manager
Construction Manager
Chief Construction Control
Mechanical GSI
Electrical GSI
Chief QA & QC
Chief Safety
Civil Lead Eng.
Electrical Lead Eng.
Instrument Lead Eng.
Mechanical Lead Eng.
Piping Lead Eng.
Process Lead Eng.
DOC. NO. :
REV
LIGHTNING PROTECTION 0
CALCULATION CNG-00-E5-CS-002
TABLE OF CONTENTS
ATTACHMENTS
DOC. NO. :
REV
LIGHTNING PROTECTION 0
CALCULATION CNG-00-E5-CS-002
1. GENERAL
1.1. Purpose
The purpose of this document is to study the Lightning Protection System in the CNG Plant
Project at Sei Gelam Jambi, Indonesia.
1.2. Scope
This document covers the building in the CNG Plant Project as follows :
Control Building
Administration Building
Work Shop and Ware House
Guard House
Cylinder Storage Shelter
CNG Compressor Shelter
Water Treatment Plant Shelter
2. DESIGN REQUIREMENT
2.1. General
A lightning protection system is a complete system of air terminal, down conductor, ground
terminals, interconnecting conductor, surge suppression devices and other connector of
fittings required to complete the system. The lightning protection System shall be designed
and installed in accordance with IEC 62305-3 and NFPA-780.
DOC. NO. :
REV
LIGHTNING PROTECTION 0
CALCULATION CNG-00-E5-CS-002
The efficiency of lightning protection system shall be protection level II in accordance with
IEC 62305-3. The radius of the rolling sphere to define the zone of protection level II is 30
M
Table 1. Positioning air termination according to the protection level (IEC 62305-3)
h(m) 20 30 45 60 Mesh
Protection Width
Level (m)
R(m) ∂0 ∂0 ∂0 ∂0
I 20 25 * * * 5
II 30 35 25 * * 10
III 45 45 35 25 * 15
IV 60 55 45 35 25 20
* Not Applicable.
Note :
H : Is the height of air termination above the reference plane of the area to be protected
R : Is the radius of the rolling spare
∂0 : Is the protection angle
All down conductors shall be of copper wires with a cross sectional area in accordance with
the prescribed standard. The conductors shall be supported and protected.
All equipment and accessories and all metal objects at the top of a structure shall be
connected or bonded to the lightning protection system.
The connection of air terminal to the grounding system shall be separate to avoid induce
over voltage in case of lightning strike. The air terminal is connected through down
conductor to its own grounding
DOC. NO. :
REV
LIGHTNING PROTECTION 0
CALCULATION CNG-00-E5-CS-002
3. METHOD OF CALCULATION
p R R 2
(d / 2) 2
d max 2 x R 2 ( R ht ) 2
The protected space generated by the air terminal is the volume not penetrated by the
rolling sphere when it is in contact with the conductor and applied to the building. The
penetration distance p should be less then ht .
Note :
DOC. NO. :
REV
LIGHTNING PROTECTION 0
CALCULATION CNG-00-E5-CS-002
p 20 20 2
(13 / 2) 2 1.08
The summary of lightning protection calculation for buildings in the CNG Plant Project
shall be refer to attachment 1.
ATTACHMENT 1
CALCULATION SHEET
CNG-00-E5-CS-002 0
CALCULATION
ATTACHMENT 2
ZONE OF PROTECTION