DETAIL-1A DETAIL-1B
PUMP HOUSE INDOOR & OUTDOOR LUGS TERMINATION DC DECOUPLING & INTERFACING BETWEEN C.P. PROTECTED PIPING ENTERING THE BUILDING
WITH EQUIPOTENTIAL BONDING BUS BARS AND THE BUILDING COMMON BONDING/ GROUNDING NETWORK

DETAIL-2A DETAIL-2B DETAIL-3 DETAIL-4 DETAIL-5


CONCRETE SLAB EMBEDDED TAPE MESHES EQUIPOTENTIAL BONDING CONCRETE SLAB EMBEDDED TAPE MESHES EQUIPOTENTIAL BONDING TAPE TO TAPE CROSS CLAMP TAPE TO CONCRETE REBAR CLAMP DETAIL FOR BONDING CONDUCTORS ERECTING TO WALL BUSHINGS
CONDUCTORS ERECTION CONDUCTORS ERECTION

ENGINEER'S STICKER: CONTRACTOR'S STICKER:

²
²
²

DETAIL-6 DETAIL-7 DETAIL-8 DETAIL-9 DETAIL-10


BUILDING STEEL I-BEAMS ANCHOR BOLT BONDING CWS METALLIC PIPING BONDING STEEL FRAMES BONDING CABLE TO CABLE WELD JOINT EXPANSION JOINT DEVICE

REV. ISSUED FOR DRAWN CHECKED APPROVED DATE

KINGDOM OF SAUDI ARABIA

SALINE WATER CONVERSION CORPORATION (SWCC)

Project No.
20407 SHUQAIQ WATER TRANSMISSION SYSTEM PHASE-3

²
ENGINEER

CONTRACTOR

²
SA3-PS2, MAIN PUMP HOUSE
SCALE BELOW GROUND EARTHING - LOCATION OF LUGS
LAYOUT, SECTIONS AND DETAILS
DETAIL-11 DETAIL-12 1:150
SCREED STEEL WIRE MESH BONDING DETAIL BONDING CONNECTION TO STEEL DOOR FRAME
DOCUMENT NO: SHEET REV.
C 2 2 - Y E 4 1 - Q - 7 8 5 9 03 0
SUB-
CONTRACTOR Assystem-Radicon