ANIMALA PSS_33kV LINE-3 (D3) CONTROL CABLE SCHEDULE & TERMINATION

SOURCE DESTINATION
10% Tolerance TOTAL
Core MEASURED
S.No CABLE ID TYPE FUNCTION on Measured ESTIMATED GLAND TYPE NOTES
EQUIPMENT Term No. Ferrule No. Ferrule Term No. EQUIPMENT LENGTH (mt)
Length (mt) LENGTH (mt)
1S1 1S1(R) 1 1S1(R) TB1:1
1S2 1S2(R) 2 1S2(R) TB1:2
6c 4.0mm2
1S3 1S3(R) 3 1S3(R) TB1:3
1 D3 C01 D3CT1_R D3CT1_JB Cu/PVC/SWA/PVC CT CONNECTIONS 5 0.5 6.00 9
2S1 2S1(R) 4 2S1(R) TB2:1
CABLE
2S2 2S2(R) 5 2S2(R) TB2:2
2S3 2S3(R) 6 2S3(R) TB2:3

1S1 1S1(Y) 1 1S1(Y) TB1:4


1S2 1S2(Y) 2 1S2(Y) TB1:5
6c 4.0mm2
1S3 1S3(Y) 3 1S3(Y) TB1:6
2 D3 C02 D3CT1_Y D3CT1_JB Cu/PVC/SWA/PVC CT CONNECTIONS 3 0.3 4.00 9
2S1 2S1(Y) 4 2S1(Y) TB2:4
CABLE
2S2 2S2(Y) 5 2S2(Y) TB2:5
2S3 2S3(Y) 6 2S3(Y) TB2:6

1S1 1S1(B) 1 1S1(B) TB1:7


1S2 1S2(B) 2 1S2(B) TB1:8
6c 4.0mm2
1S3 1S3(B) 3 1S3(B) TB1:9
3 D3 C03 D3CT1_B D3CT1_JB Cu/PVC/SWA/PVC CT CONNECTIONS 5 0.5 6.00 9
2S1 2S1(B) 4 2S1(B) TB2:7
CABLE
2S2 2S2(B) 5 2S2(B) TB2:8
2S3 2S3(B) 6 2S3(B) TB2:9

TB1:1 C10 1 C10 X01:10


4c 4.0mm2
TB1:4 C30 2 C30 X01:12 PROTECTION CT
4 D3 C04 D3CT1_JB D3CRP Cu/PVC/SWA/PVC 50 5 55.00 8
TB1:7 C50 3 C50 X01:14 CONNECTIONS
CABLE
TB1:10 C70 4 C70 X01:16

TB2:3 D10 1 D10 X01:1


4c 4.0mm2
TB2:6 D30 2 D30 X01:3 METERING CT
5 D3 D01 D3CT1_JB D3CRP Cu/PVC/SWA/PVC 50 5 55.00 8
TB2:9 D50 3 D50 X01:5 CONNECTIONS
CABLE
TB2:10 D70 4 D70 X01:7

TB3:12 E10 1 E10 X02:1


4c 2.5mm2
TB3:13 E30 2 E30 X02:2 PT METERING
6 D3 E01 33kV BUS PT-1_JB D3CRP Cu/PVC/SWA/PVC 27 2.7 30.00 3
TB3:14 E50 3 E50 X02:3 CONNECTIONS
CABLE
TB3:15 E70 4 E70 X02:4

TB1:12 E110 1 E110 X02:5


4c 2.5mm2
TB1:13 E130 2 E130 X02:6 PT PROTECTION
7 D3 E02 33kV BUS PT-1_JB D3CRP Cu/PVC/SWA/PVC 27 2.7 30.00 3
TB1:14 E150 3 E150 X02:7 CONNECTIONS
CABLE
TB1:15 E170 4 E170 X02:8

16A MCB:Ph H1/D3 1 H1/D3 X03:15 2c 2.5mm2 D3SFDB TERMINALS TO BE VERIFIED AT


8 D3 H01 D3SFDB D3CRP AC SUPPLY 47 4.7 52.00 2
16A MCB:N H2/D3 2 H2/D3 X03:16 Cu/PVC/SWA/PVC SITE

6A MCB:Ph H1/52 1 H1/52 303 2c 2.5mm2 D3SFDB TERMINALS TO BE VERIFIED AT


9 D3 H02 D3SFDB D352 AC SUPPLY 12 1.2 14.00 2
6A MCB:N H2/52 2 H2/52 304 Cu/PVC/SWA/PVC SITE

6A MCB:Ph M1/52 1 M1/52 301 2c 2.5mm2 D3SFDB TERMINALS TO BE VERIFIED AT


10 D3 H03 D3SFDB D352 MOTOR AC SUPPLY 12 1.2 14.00 2
6A MCB:N M2/52 2 M2/52 302 Cu/PVC/SWA/PVC SITE

16A MCB:R H1/89A 1 H1/89A TB2:2


4c 2.5mm2
16A MCB:Y H2/89A 2 H2/89A TB2:3 D3SFDB TERMINALS TO BE VERIFIED AT
11 D3 H04 D3SFDB D389A Cu/PVC/SWA/PVC MOTOR AC SUPPLY 11 1.1 13.00 3
16A MCB:B H3/89A 3 H3/89A TB2:4 SITE
CABLE
16A MCB:N H20/89A 4 H20/89A TB2:1

16A MCB:R H1/89B 1 H1/89B TB2:2


4c 2.5mm2
16A MCB:Y H2/89B 2 H2/89B TB2:3 D3SFDB TERMINALS TO BE VERIFIED AT
12 D3 H05 D3SFDB D389B Cu/PVC/SWA/PVC MOTOR AC SUPPLY 24 2.4 27.00 3
16A MCB:B H3/89B 3 H3/89B TB2:4 SITE
CABLE
16A MCB:N H20/89B 4 H20/89B TB2:1

DC SUB DB-1 16A MCB:+ve J1/D3 1 J1/D3 X03:1 2c 2.5mm2 DC SUB DB-1 TERMINALS TO BE
13 D3 J01 D3CRP DC SUPPLY 12 1.2 14 2
(BCR-D1) 16A MCB:-ve J2/D3 2 J2/D3 X03:2 Cu/PVC/SWA/PVC VERIFIED AT SITE

Page 1 of 4
ANIMALA PSS_33kV LINE-3 (D3) CONTROL CABLE SCHEDULE & TERMINATION
SOURCE DESTINATION
10% Tolerance TOTAL
Core MEASURED
S.No CABLE ID TYPE FUNCTION on Measured ESTIMATED GLAND TYPE NOTES
EQUIPMENT Term No. Ferrule No. Ferrule Term No. EQUIPMENT LENGTH (mt)
Length (mt) LENGTH (mt)

DC SUBDB-2 16A MCB:+ve J3/D3 1 J3/D3 X03:5 2c 2.5mm2 DC SUB DB-2 TERMINALS TO BE
14 D3 J02 D3CRP DC SUPPLY 12 1.2 14 2
(BCR-D1) 16A MCB:-ve J4/D3 2 J4/D3 X03:6 Cu/PVC/SWA/PVC VERIFIED AT SITE

TB:2 K101 1 M2 X04:11


TB:1 K113 2 M1 X04:12
TB:9 K114 3 M9 X04:13
TB2:5 K115 4 H4A X04:15
10c 2.5mm2
TB1:15 K116 5 K116 X04:17 ISOLATOR
15 D3 K01 D389A D3CRP Cu/PVC/SWA/PVC 48 4.8 53.00 4
TB1:16 K117 6 K117 X04:18 INDICATION
CABLE
TB1:2 K118 7 K118 X04:20
TB:11 K17 8 M11 X04:199
TB:12 K18 9 M12 X04:202
SPARE 10 SPARE

TB1:5 1K801 1 K1 X04:143


TB1:6 1K802 2 K70 X04:144
TB1:7 1K803 3 K3 X04:145
TB1:8 1K804 4 K4 X04:146
10c 2.5mm2
TB1:11 1K805 5 K11 X04:147
16 D3 K02 D389A D3CRP Cu/PVC/SWA/PVC ISOLATOR CONTROL 48 4.8 53.00 4
TB1:13 1K806 6 K13 X04:148
CABLE
TB1:12 1K807 7 K14 X04:149
SPARE 8 SPARE
SPARE 9 SPARE
SPARE 10 SPARE

TB:2 K101 1 M2 X04:24


TB:1 K121 2 M1 X04:25
TB:9 K122 3 M9 X04:26
TB2:5 K123 4 H4A X04:28
10c 2.5mm2
TB1:15 K124 5 K124 X04:30 ISOLATOR
17 D3 K03 D389B D3CRP Cu/PVC/SWA/PVC 51 5.1 57.00 4
TB1:16 K125 6 K125 X04:31 INDICATION
CABLE
TB1:2 K126 7 K126 X04:33
TB:11 K18 8 M11 X04:203
TB:12 K19 9 M12 X04:207
SPARE 10 SPARE

TB1:5 2K801 1 K1 X04:150


TB1:6 2K802 2 K70 X04:151
TB1:7 2K803 3 K3 X04:152
TB1:8 2K804 4 K4 X04:153
10c 2.5mm2
TB1:11 2K805 5 K11 X04:154
18 D3 K04 D389B D3CRP Cu/PVC/SWA/PVC ISOLATOR CONTROL 51 5.1 57.00 4
TB1:13 2K806 6 K13 X04:155
CABLE
TB1:12 2K807 7 K14 X04:156
SPARE 8 SPARE
SPARE 9 SPARE
SPARE 10 SPARE

TB3:2 K101 1 M2 X04:34


TB3:1 K127 2 M1 X04:35
TB3:9 K128 3 M9 X04:36
TB3:17 4K801 4 K1 X04:167
10c 2.5mm2 EARTH SWITCH
TB3:18 4K802 5 K2 X04:168
19 D3 K05 D357B D3CRP Cu/PVC/SWA/PVC INDICATION & 55 5.5 61.00 4
TB3:19 4K803 6 K3 X04:169
CABLE INTERLOCK
TB3:20 4K804 7 K3A X04:170
SPARE 8 SPARE
SPARE 9 SPARE
SPARE 10 SPARE

Page 2 of 4
ANIMALA PSS_33kV LINE-3 (D3) CONTROL CABLE SCHEDULE & TERMINATION
SOURCE DESTINATION
10% Tolerance TOTAL
Core MEASURED
S.No CABLE ID TYPE FUNCTION on Measured ESTIMATED GLAND TYPE NOTES
EQUIPMENT Term No. Ferrule No. Ferrule Term No. EQUIPMENT LENGTH (mt)
Length (mt) LENGTH (mt)
354 K101 1 U43 X04:1
353 K105 2 U41 X04:2
355 K106 3 U45 X04:3
351 K107 4 K111 X04:4
418 K108 5 M5 X04:5
410 K109 6 K13 X04:6
14c 2.5mm2
414 K110 7 K21 X04:7
20 D3 K06 D352 D3CRP Cu/PVC/SWA/PVC CB INDICATION 44 4.4 49.00 5
408 K111 8 K77 X04:9
CABLE
406 K112 9 K73A X04:10
SPARE 10 SPARE
SPARE 11 SPARE
SPARE 12 SPARE
SPARE 13 SPARE
SPARE 14 SPARE

203 K8 1 K3 X04:208
204 K16 2 K4 X04:209
208 K17 3 K11 X04:210
209 K19 4 K4 X04:211
201 K1 5 J1 X04:214
202 K2 6 J2 X04:215
14c 2.5mm2
253 K3 7 K1 X04:216 TC1& CLOSE
21 D3 K07 D352 D3CRP Cu/PVC/SWA/PVC 44 4.4 49.00 5
254 K4 8 K54 X04:217 CONTROL
CABLE
256 K5 9 K55 X04:218
259 K6 10 K52 X04:219
260 K7 11 K54 X04:220
SPARE 12 SPARE
SPARE 13 SPARE
SPARE 14 SPARE

251 K51 1 J3 X04:223


252 K52 2 J4 X04:224
263 K53 3 K61 X04:225
264 K54 4 K67 X04:226
10c 2.5mm2
265 K55 5 K69 X04:227
22 D3 K08 D352 D3CRP Cu/PVC/SWA/PVC TC2 CONTROL 44 4.4 49.00 4
261 K56 6 K63 X04:228
CABLE
262 K57 7 K67 X04:229
SPARE 8 SPARE
SPARE 9 SPARE
SPARE 10 SPARE

X03:11 3K101 1 3K101 X03:22


4c 2.5mm2
X03:12 3K202 2 3K202 X03:23
23 D3 K09 D1CRP D3CRP Cu/PVC/SWA/PVC LBB SUPPLY 9 0.9 10.00 3
SPARE 3 SPARE
CABLE
SPARE 4 SPARE

X04:196 K329 1 K329 X04:196 2c 2.5mm2


24 D3 K10 D2CRP D3CRP LBB TRIP 8 0.8 9.0 2
SPARE 2 SPARE Cu/PVC/SWA/PVC

X04:49 K905 1 K101 X04:230


4c 2.5mm2
X04:50 K907 2 K145 X04:231 DC FAIL/BCPU
25 D3 K11 D3CRP D2CRP Cu/PVC/SWA/PVC 8 0.8 9.00 3
X04:80 K909 3 K113A X04:233 FAIL/BCPU MCB TRIP
CABLE
X04:82 K911 4 K114A X04:235

Page 3 of 4
ANIMALA PSS_33kV LINE-3 (D3) CONTROL CABLE SCHEDULE & TERMINATION
SOURCE DESTINATION
10% Tolerance TOTAL
Core MEASURED
S.No CABLE ID TYPE FUNCTION on Measured ESTIMATED GLAND TYPE NOTES
EQUIPMENT Term No. Ferrule No. Ferrule Term No. EQUIPMENT LENGTH (mt)
Length (mt) LENGTH (mt)

NOTE
1 D3CT1_R Cable BOQ Lugs BOQ
1) LOOP 2S3 TO S' GLAND
CABLE TYPE Total Length (Mts) Total GLANDS Lug Size Total Lugs
TYPE
2 D3CT1_Y 1 10pr 1.0mm2 Shield/Armour CABLE 0 0 1.0 Sq.mm Lug 0
1) LOOP 2S3 TO S' 2 2c 2.5mm2 Cu/PVC/SWA/PVC CABLE 117 12 2.5 Sq.mm Lug 248
3 4c 2.5mm2 Cu/PVC/SWA/PVC CABLE 119 12 4.0 Sq.mm Lug 52
3 D3CT1_B 4 10c 2.5mm2 Cu/PVC/SWA/PVC CABLE 330 12 6.0 Sq.mm Lug 0
1) LOOP 2S3 TO S' 5 14c 2.5mm2 Cu/PVC/SWA/PVC CABLE 98 4 16.0 Sq.mm Lug 0
6 19c 2.5mm2 Cu/PVC/SWA/PVC CABLE 0 0 25.0 Sq.mm Lug 0
4 D3CT1_JB 7 2c 4.0mm2 Cu/PVC/SWA/PVC CABLE 0 0 35.0 Sq.mm Lug 0
1) LOOP TB1:3,6,9,10 AND CONNECT TO EARTH 8 4c 4.0mm2 Cu/PVC/SWA/PVC CABLE 110 4 70.0 Sq.mm Lug 0
2) LOOP TB2:1,4,7,10 AND CONNECT TO EARTH 9 6c 4.0mm2 Cu/PVC/SWA/PVC CABLE 16 6 200.0 Sq.mm Lug 0
10 10c 4.0mm2 Cu/PVC/SWA/PVC CABLE 0 0 400.0 Sq.mm Lug 0
5 D389A 11 4c 6.0mm2 Cu/PVC/SWA/PVC CABLE 0 0
1) LOOP TB:2,10, TB2:6, TB1:3,14 12 4c 16.0mm2 Al/XLPE/SSA/PVC CABLE 0 0
2) LOOP TB1:9,10 13 1c 25.0mm2 Cu/PVC/SSA/PVC CABLE 0 0
14 3.5c 70.0mm2 Al/XLPE/SSA/PVC CABLE 0 0
6 D389B 15 3.5c 400.0mm2 Al/XLPE/SSA/PVC CABLE 0 0
1) LOOP TB:2,10, TB2:6, TB1:3,14
2) LOOP TB1:9,10

7 D357B
1) LOOP TB3:2,10

8 D352
1) LOOP 354,356,352,419,411,415,407,405

9 D3CRP
1) X01:2,4,6,8,9 TERMINALS DISCONNECTING LINKS TO
BE KEPT OPEN
2) X01:11,13,15,17,18 TERMINALS DISCONNECTING
LINKS TO BE KEPT OPEN
3) LOOP X04:230,232
4) DISCONNECT CONNECTION FROM MCB-19(1) TO
X03:22
5) DISCONNECT CONNECTION FROM MCB-19(3) TO
X03:23

10 GENERAL
1) ALL CABLE LENGTHS TO BE VERIFIED AT SITE

Client : ANIMALA WIND POWER PRIVATE LIMITED


Title: 33kV LINE-3 (D3) CONTROL CABLE SCHEDULE& TERMINATION
FOR CONSTRUCTION
Substation: 220/33kV POOLING SUBSTATION AT ANIMALA
Rev.
Drawing. No. 005-WPL-26-003
A

Page 4 of 4