Cathodic Protection System


Detailed Engineering Design, Materials Supply, Installation Supervision, Testing and
Commissioning for Tank Bottom Plate External

Project:

A220002 Bottom Plate Replacement of Tank 23-


D-107, EPCL, JAFZA
Client

Prepared for:

M/s: Rotary Engineering Fujairah FZE


Block D, Fujairah Free zone-2,
PO Box-5052,Fujairah, UAE.

Attn. Mr. Christy Thomas Titus


Electrical and Instrumentation

Prepared by Approved by
Jahferali M Joseph Varghese
Estimation Engineer GM-Estimation/Proposal

Document Reference No : BSST-CP23163B~Rev 0 Tech 31 January 2023


Project
Doc No : BSST-CP23163B
A220002 Bottom Plate Replacement of Tank 23-
Rev : 0
D-107, EPCL, JAFZA
Technical- Proposal Date : 31/01/2023
Pioneers in Corrosion
Control & Cathodic
Protection Cathodic Protection for Tank Bottom Plate External Page : 2 of 8

Technical Proposal

1. Introduction

Bin Sari Specialized Technologies (B.S.S. Tech) has been invited to submit a revised technical proposal to
cover the scope of work for the Cathodic Protection (CP) system as part of the “A220002 Bottom Plate
Replacement of Tank 23- D-107, EPCL, JAFZA”. B.S.S Tech is pleased to putting forward this proposal
based on the provided information.

2. BSS Tech Core Activities

Given below is a summary of our main areas of activity:

• Cathodic protection designs, retrofits and specification


• Cathodic protection audits and troubleshooting
• Annual and semi-annual CP surveys
• Construction supervision and commissioning of CP systems
• Pipeline integrity engineering and assessments
• Risk assessment and consequence studies
• Material selection for severe service
• Coating assessment, defect location and sizing and coating refurbishment specifications
• Formulation of multi-year pipeline rehabilitation plans
• Interference (AC and DC) studies and mitigation system design
• Identification, impact assessment and mitigation of stray current effects caused by DC rail
traction systems
• Anti-fouling system design
• Corrosion monitoring system design
• Failure investigations

3. BSS Tech Scope

Summary of Scope of Works covered by BSS Tech

• Site survey and report


• Detailed Engineering design
• Material supply.
• Preparation of Installation procedures and QA/QC documents.
• Installation Supervision
• Testing & Commissioning.
• Preparation and submittal of final commissioning report and data sheets.

P.O. Box 33464-Abu Dhabi-UAE. Tel.: +971 (02) 446 0700 Fax: +971 (02) 446 0800 e-mail: bsstech@bsstechnologies.com
P.O. Box 52455-Dubai-UAE. Tel.: +971 (04) 886 7015 Fax: +971 (04) 886 7013 e-mail: bsstech@bsstechnologies.com
Project
Doc No : BSST-CP23163B
A220002 Bottom Plate Replacement of Tank 23-
Rev : 0
D-107, EPCL, JAFZA
Technical- Proposal Date : 31/01/2023
Pioneers in Corrosion
Control & Cathodic
Protection Cathodic Protection for Tank Bottom Plate External Page : 3 of 8

4. Codes & Standards

All the activities will be carried out as per the following Specifications, Standards & Documents

International Standards
NACE SP0193 External Cathodic Protection of On-Grade Carbon Steel Storage Tank Bottoms
Galvanic Anode Cathodic Protection of Internal Submerged Surfaces of Steel Water
NACE SP0196
Storage Tanks
Impressed Current Cathodic Protection of Internal Submerged Surfaces of
NACE SP0388
Carbon Steel Water Storage
Standard Practice Design, Installation, Operation, and Maintenance of Impressed
NACE SP0572
Current Deep Anode Beds
Measurement Techniques Related to Criteria for Cathodic Protection on
NACE TM0497
Underground or Submerged Metallic Piping Systems
Design, Installation, Operation and Maintenance of Internal Cathodic Protection
NACE SP0575
System.
API RP-651, “Cathodic Protection of Above Ground Petroleum Storage Tanks”
Project documents
23-D-13319-0001_04_1_Jet_Fuel_Storage_Tank__23-D-0107_0108_0114_0118__General_Arrangement
23-Q-24802-0001_03_1_Tank_Foundations__30m_Dia_Jet_Fuel_Tank_

5. Cathodic Protection for Tank Bottom Plate (External- ICCP System)

5.1 Design Parameters

Design Life - 30 years (Considered)


Operating Temperature - 50°C (Considered as Ambient Temp)
Coating - Coated (Considered)
Soil resistivity - 100 ohm-m (Considered)
Current density - 20 mA/m2 (Considered)
Temperature Effect - CD shall be increased by 25% per 100C above 300C
(Considered)
Coating Breakdown factor - 50% (Considered)
CP System - ICCP System (Specified in mail)
Anodes - MMO Ti Ribbon Anodes (Considered)

Any change in parameters shall vary the BOM, Which can be supplied at additional cost

5.2 Structures to be protected

SN Tank No: Fluid Qty Dia (m) SA (m2)

1 23-D-107 JET Fuel 1 30 706.86

P.O. Box 33464-Abu Dhabi-UAE. Tel.: +971 (02) 446 0700 Fax: +971 (02) 446 0800 e-mail: bsstech@bsstechnologies.com
P.O. Box 52455-Dubai-UAE. Tel.: +971 (04) 886 7015 Fax: +971 (04) 886 7013 e-mail: bsstech@bsstechnologies.com
Project
Doc No : BSST-CP23163B
A220002 Bottom Plate Replacement of Tank 23-
Rev : 0
D-107, EPCL, JAFZA
Technical- Proposal Date : 31/01/2023
Pioneers in Corrosion
Control & Cathodic
Protection Cathodic Protection for Tank Bottom Plate External Page : 4 of 8

Note -The above details conceived from the Project Documents. As specified in mail tank bottom
plate CP is only in considered in our offer.

5.3 Design concept- ICCP system

The Cathodic protection system design will be based on the above parameters. Calculations are carried out
based on the above design life and bill of quantities are derived accordingly.
Mixed Metal Oxide Ribbon Anodes will be installed in mesh/Grid form to protect the tank bottom plates.
Conductor bars will be spot welded to the ribbon anodes to feed positive current to the anodes. Anodes will be
powered by means of factory-assembled power feed connections. Individual DC output Transformer Rectifier
with sufficient additional capacity as that of actually required will be used to supply current to the anode system
of each tank.
CP system for each tank will comprise of individual anode mesh. Anode mesh will be laid on a sweet sand
cushion of 100 ~ 150 mm thick. Spacing between anode mesh and the tank bottom plate will be at min 400
mm. calculated number of power feeders will be connected to titanium bars, interconnecting the Active Anode
ribbon. The distance between interconnecting titanium conductor bars will be kept less than 3-5m and those
between the anodes ribbons will be 1000mm max. Power feeders for each tank will be terminated inside the
anode junction box through current measuring shunts. Negative drain cables will be connected to the tank and
terminated in negative terminal of the TR.

5.4 System monitoring

Permanent reference electrodes will be installed within the foundation pad below the tank bottom, prior to tank
construction, to monitor the potential at inaccessible and critical points.
Permanent reference electrodes will be placed at tank bottom (according to the diameter of tank) for monitoring
of CP performance of tanks. Reference electrode Tail cables will be terminated in the test station outside the
tank for monitoring purpose. Monitoring cable from the tank will also be routed to the test station and
terminated.
Perforated PVC tube dia 3”, wrapped with geo-textile, laying at a distance of 100 to 200 mm below the external
face of the tank, and crossing through the concrete ring wall, will also be installed to facilitate monitoring of
potentials using portable reference electrodes.

Isolation
The Tanks bottom backfilling shall be done with clean sand. Secondary containment using HDPE liner or thick
plastic sheet must be provided for the sand backfill. This must be confirmed by main contractor

The actual anode qty, cable lengths etc., will be finalized up during detailed design. All equipment and
materials are selected for classified area. Installation location of the equipment will be finalized during
the design according to the classification of the area.

6. Installation Supervision, Test and commissioning

BSS Tech will supervise and verify that the construction test procedures are being correctly implemented
by the Contractor and sub-contractors. As a separate exercise BSS Tech will do the testing and
commissioning and produce commissioning reports of the system performances.

P.O. Box 33464-Abu Dhabi-UAE. Tel.: +971 (02) 446 0700 Fax: +971 (02) 446 0800 e-mail: bsstech@bsstechnologies.com
P.O. Box 52455-Dubai-UAE. Tel.: +971 (04) 886 7015 Fax: +971 (04) 886 7013 e-mail: bsstech@bsstechnologies.com
Project
Doc No : BSST-CP23163B
A220002 Bottom Plate Replacement of Tank 23-
Rev : 0
D-107, EPCL, JAFZA
Technical- Proposal Date : 31/01/2023
Pioneers in Corrosion
Control & Cathodic
Protection Cathodic Protection for Tank Bottom Plate External Page : 5 of 8

7. Exclusions

• Installation of system
• Materials & Activities other than that listed in the BOQ.
• Any third party inspection will be under main contractor’s scope.
• Trenching.
• Cable laying crew.
• Electrician.
• Access / entry passes shall be issued by COMPANY for the personnel
• Isolation of CP structures from other metallic structures.

8. Technical points

The following are technical points to be noted.

• All CP components will be suitable for safe area use.


• We considered all as per the material requisition and other details given.
• All equipment and material used for Cathodic Protection will be compatible with the environmental
conditions of the project.
• All equipments and cables used for CP will be supplied with identification plates and tag numbers.
• The actual anode quantity, cable lengths etc. will be verified during detailed design, after site survey
and detailed design.

9. List of Deliverables

BSST will provide the following deliverables as a minimum under the Contract:-

• Detailed design of CP system


• Installation methodology and other QA/QC documents
• Commissioning Procedure
• Equipment data sheet
• Installation detailed drawing
• Inspection & Test Report
• Marking, Export packing and transportation to the port (FOB)
• Schematic diagram
• Material factory pick up required documents
• CP system O&M manual
• Commissioning report and as built drawing for CP system

10. Material Inspection

The materials shall be procured, manufactured and stored in our Factory / store in Dubai. Our QA/QC will
inspect all materials and will record the results and status. The client will be formally informed for the
materials inspection in our store; if advised. If the client or 3rd party inspection is required shall be carried
out at no cost to BSS Tech. You are requested to confirm the schedule, date and time, so that BSS tech

P.O. Box 33464-Abu Dhabi-UAE. Tel.: +971 (02) 446 0700 Fax: +971 (02) 446 0800 e-mail: bsstech@bsstechnologies.com
P.O. Box 52455-Dubai-UAE. Tel.: +971 (04) 886 7015 Fax: +971 (04) 886 7013 e-mail: bsstech@bsstechnologies.com
Project
Doc No : BSST-CP23163B
A220002 Bottom Plate Replacement of Tank 23-
Rev : 0
D-107, EPCL, JAFZA
Technical- Proposal Date : 31/01/2023
Pioneers in Corrosion
Control & Cathodic
Protection Cathodic Protection for Tank Bottom Plate External Page : 6 of 8

will facilitate the procedure and the documents required for the same. After getting a confirmation of the
inspection result status, the materials will be properly packed for shipping to site as per the P.O conditions

P.O. Box 33464-Abu Dhabi-UAE. Tel.: +971 (02) 446 0700 Fax: +971 (02) 446 0800 e-mail: bsstech@bsstechnologies.com
P.O. Box 52455-Dubai-UAE. Tel.: +971 (04) 886 7015 Fax: +971 (04) 886 7013 e-mail: bsstech@bsstechnologies.com
Project
Doc No : BSST-CP23163B
A220002 Bottom Plate Replacement of Tank 23-
Rev : 0
D-107, EPCL, JAFZA
Technical- Proposal Date : 31/01/2023
Pioneers in Corrosion
Control & Cathodic
Protection Cathodic Protection for Tank Bottom Plate External Page : 7 of 8

11. BILL OF QUANTITIES

11.1 ICCP for External Surface of the Tanks Bottom Plates – (01 Tank)
Item # Description Unit Qty
Transformer/ Rectifier outdoor installation with sun shades dust and waterproof
type, oil immersed and self-cooled (naturally cooled), 415V, 50Hz, 3phase AC, DC
1. Ea. 01
output channel of 25V/25A self-standing steel enclosure with a degree of protection
minimum IP55.
2. MMO Ribbon Anode 6.35mm wide x 0.6mm thick size M 700
3. Titanium conductor bar 12.7mm wide x 0.9mm thick size M 205
Factory assembled Power feed connections c/w 60m long 1Cx 16mm2 XLPE/PVC
4. Ea. 05
insulated cables
Anode Junction Box- stainless steel-316L type sufficiently sized, with at least an
5. Ea. 01
ingress protection IP55c/w current measuring shunts.10 terminal
Multi-purpose Junction Box – stainless steel-316L type sufficiently sized, with at
6. Ea. 01
least an ingress protection of IP55
Permanent type Cu/CuSO4 reference electrode pre-packed, c/w 1C x 10 mm²
7. Ea. 05
XLPE/PVC cable, 60m long
8. Positive and negative structure connections 1C x 50 mm² XLPE/PVC copper cable M 100
9. 10mm2 XLPE/PVC copper Monitoring Cable. M 50
Perforated uPVC tube dia 3”, wrapped with geo-textile (6m Section) with rope, end
10. Ea. 10
cap.
11. 8C x 1.5mm2 XLPE/PVC Cu Cable for monitoring extension to TR M 50
12. AC cable to TR By Others
13. Weld pad By Others

11.2 Spare parts & Tools (if required)


Item # Description Unit Qty.
1. Spare parts for start-up Lot 01
2. Commissioning spares Lot 01
3. 2-Year operating spares parts Lot 01

11.3 Engineering Services


Item # Description Unit Qty.
Detail engineering design, installation procedures, QA documents and design
1. Lot 01
report for tanks.
2. Installation supervision Man day
3. Testing and commissioning Man day
4. Commissioning report Lot 01

12. Terms and Conditions

• Prices are based on ex works of BSST Dubai Factory.


• Payment: As per mutually agreed terms.
• Delivery of design and QA documents within 4 weeks from placement of irrevocable letter of credit.
• Delivery of materials except TR within 8~10 weeks from approval of design.
• Partial invoicing should be acceptable.

P.O. Box 33464-Abu Dhabi-UAE. Tel.: +971 (02) 446 0700 Fax: +971 (02) 446 0800 e-mail: bsstech@bsstechnologies.com
P.O. Box 52455-Dubai-UAE. Tel.: +971 (04) 886 7015 Fax: +971 (04) 886 7013 e-mail: bsstech@bsstechnologies.com
Project
Doc No : BSST-CP23163B
A220002 Bottom Plate Replacement of Tank 23-
Rev : 0
D-107, EPCL, JAFZA
Technical- Proposal Date : 31/01/2023
Pioneers in Corrosion
Control & Cathodic
Protection Cathodic Protection for Tank Bottom Plate External Page : 8 of 8

• Water, electricity, transportation etc. for site activities, should be made available by the main contractor
at no cost to BSST.
• This quotation is valid for 90 days from the date of submittal.

Thank you

Best regards

For BSS Technologies

P.O. Box 33464-Abu Dhabi-UAE. Tel.: +971 (02) 446 0700 Fax: +971 (02) 446 0800 e-mail: bsstech@bsstechnologies.com
P.O. Box 52455-Dubai-UAE. Tel.: +971 (04) 886 7015 Fax: +971 (04) 886 7013 e-mail: bsstech@bsstechnologies.com

You might also like