1.0 Purpose
The purpose of this document is to furnish the design calculation for the foundations for
Tank no. 1212-TK-001 to 1212-TK-011.
3.0 Materials
Basic foundation design and sizing is carried out under following Assumptions:
a) Unit load under the foundation ring for fixed cone roof consists of the weight of the
concrete, tank shell, tank roof and that portion of tank content directly above the
foundation. Unit load under the confined earth at the same depth of the foundation
consists of the weight of the earth of fill material, tank bottom, tank contents.
b) Unit load under the foundation ring for floating roof consists of the weight of the
concrete, tank shell and that portion of tank content directly above the foundation. Unit
load under the confined earth at the same depth of the foundation consists of the
weight of the earth of fill material, tank bottom, tank contents and tank floating roof.
c) For tanks located in areas having Existing ground level (EGL) at lower level than FGL
(RL 15.5m), plum concrete is provided below the ring wall up to a depth of 2m below
EGL.
BY: VRS DETAIL ENGG. CONSULTANT: TCE Consulting Engineers Limited Project :
DATE:26/11/09 CLIENT: M/S CAIRN ENERGY INDIA PTY LIMITED.
Bhogat Terminal.
CHD: SND SUB: DESIGN DATA AND DESIGN PHILOSOPHY
DATE:26/11/09 DOC.No. BSPL-1282-TCEL-CV-CAL-0001 SH 2 OF 2
Job. No. TCE.5795A Office: DV Dept: CV REV- C1
d) The dimensions of the concrete foundation ring shall be such that the average unit soil
loading under the foundation ring will be approximately the same as under the
confined earth within the ring at the same depth.
e) Resistance of soil below FGL outside tank foundation has been considered to resist the
sliding force.
f) Ring walls are designed to resist lateral soil pressures due to maximum tank loadings.
g) Tank liquid weight is not considered as counter balance weight for tank up-lift.
LOAD CALCULATIONS:
Internal Pressure= 6 kN/m2
Uplift Pressure= 16964.60 kN
PAGE 1 OF 36
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 19-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 19-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
SOIL CONDITION:
Soil Bearing Capacity of Area
Net Soil Bearing Capacity below Raft 300 kN/m2 Refer: Geotechnical Report 16 Nov 2009 Rev-2.
Gross Soil Bearing Capacity below Raft 343.2 kN/m2
Gross Soil Bearing Capacity below Raft for Wind Loadcase 429 kN/m2 Refer: Clause 8.1, Note-6, IS 875 Part-5.
Gross Soil Bearing Capacity below Raft for Earthquake Load 514.8 kN/m2 Refer: Clause 7.4.2, IS 1893-Part-4.
Coefficient of Lateral Soil Pressure
Angle of Internal Friction f= 30
Active soil pressure coefficient Ka = tan² (45 - f/2) 0.33
At rest soil pressure coefficient Ko = 1 - sinf 0.50
Passive soil pressure coefficient Kp = tan² (45 + f/2) 3.00
Coefficient of friction concrete & Soil m= 0.49
Coefficient of friction Soil & Soil m= 0.1
Areas & Moment of Inertia
Area of Ring Wall AF = p ( D02-Di2 ) / 4 320.442 m2
Area of Footing AF = p ( D02-Di2 ) / 4 320.442 m2
Area of Ring wall enclosed by Tank 157.951 m2
Area of Footing enclosed by Tank 157.951 m2
2
Area of Soil inside ring wall: AS = p Di / 4 2669.5 m2
Area of Soil inside Footing: 2669.482 m2
Area enclosed by Tank AT = p D2 / 4 2827.4 m2
Area of soil on the footing overhang inside tank 0.0 m2
Area of soil on the footing overhang outside tank 0.0 m2
Section Modulus of Ring footing Z= 4678.0 m4 Z = (pi/32)*(( Do4-Di4 )/Do)
LOADING AT BOTTOM OF FOUNDATION
Weight of Ring Wall 31243.1 kN
Weight of Ring Footing WF = AF * df * gConcrete 0.0 kN Fnd Weight (Wfd) = 31244.00 KN
Weight of Soil on the footing overhang inside tank 0.0 kN Soil weight (Wg) = 0.00 KN
Weight of Soil on the footing overhang outside tank 0.0 kN
Weight of soil inside the foundation raft 187397.6 kN
Weight of soil inside the ring wall 187397.6 kN
Below Footing Below Tank
% Content Load transferred to Footing ( P1 ) 5.59 % % Content Load transferred to Ring ( P1 ) 5.59 %
% Content Load transferred to Soil ( P2 ) 94.41 % % Content Load transferred to Soil ( P2 ) 94.41 %
P1 = (AT - AS) / AT * 100
P2 = 100 - P1
Vertical - Bot of Raft Vertical - top of raft Horizontal Moment
Below Raft Below soil Below wall Bet'n Wall
PRIMARY LOAD CASE H M
NR NS NTR NTR
kN kN kN kN kN kN-m
1 Foundation Selfwt 31244.00 0.00 31243.14 0.00 0.00 0.00
2 Soil Weight 0.00 187397.63 0.00 187397.63
3 Tank Empty Wt 13216.56 2223.44 13216.56 2223.44 0.00 0.00
4 Tank Oper.Wt 37227.14 408017.86 37227.14 408017.86 0.00 0.00
5 Tank Hydrotest Wt 44810.94 536189.06 44810.94 536189.06 0.00 0.00
6 Wind Load 0.00 0.00 1983.33 0.00 930.00 122627.00
7 Seismic Load 0.00 0.00 3085.00 0.00 24610.00 281079.00
STABILITY CHECKS
Unfactored Loading Combination (L/C)
NR NS NR NS
H M
L/C Nos Load Combinations Below Raft Below Soil below wall Bet'n Wall
(kN) (kN) (kN) (kN) (kN) (kN-m)
1 Erection+Soil+Wind 44460.56 189621.07 46443.03 189621.07 930.00 122627.00
2 Erection+Soil+Eq 44460.56 189621.07 47544.70 189621.07 1570.20 28499.13
3 Operation+Soil 68471.14 595415.50 68470.28 595415.50 0.00 0.00
4 Operation+Soil+Wind 68471.14 595415.50 70453.61 595415.50 930.00 122627.00
5 Operation+Soil+Eq 68471.14 595415.50 71555.28 595415.50 24610.00 281079.00
6 Hydrotest+Soil 76054.94 723586.69 76054.08 723586.69 0.00 0.00
7 Hydrotest+Soil+Wind 76054.94 723586.69 78037.41 723586.69 930.00 122627.00
PAGE 2 OF 36
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 19-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 19-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
DESIGN OF REINFORCEMENT
PS
F
df
Di
T T
Factored Load Combination
FOS 1.5
KaPS Ka γsoil df
2 2
Area of Soil AS = p /4Di 2669.5 m
Max soil pressure Below Soil PS = NS / AS
Hoop Stress F =F1 + F2
F1 = Ka PS df
2
Soil Pressure F2 = 1/2 Ka gSOIL df 45.6 kN / m
Hoop Tension T = 1/2 F Di
Ns PS F1(surchar
F(Total) T
L/C Nos Load Combinations Below Soil Below Soil ge)
(kN) (kN/ m2) (kN / m) (kN/m) (kN)
1 Erection+Wind 3335.16 1.249366 1.62 47.25 1377.46
2 Erection+Earthquake 3335.16 1.249366 1.62 47.25 1377.46
3 Operation 612026.79 229.268 298.05 343.68 10018.23
4 Operation+Wind 612026.79 229.268 298.05 343.68 10018.23
5 Operation+Earthquake 612026.79 229.268 298.05 343.68 10018.23
6 Hydrotest 804283.59 301.2883 391.67 437.30 12747.43
7 Hydrotest+Wind 804283.59 301.2883 391.67 437.30 12747.43
Circumferencial Reinforcement
Maximum Hoop Tension TMAX = 12747.43 kN
PAGE 3 OF 36
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 19-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 19-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
Vertical Reinforcement
Maximum Vertical load on the wall = 78037.41 kN
Circumference of wall = 188.49556 m
Max Load per m run of wall = 414.00133 kN
e= 0 mm
ea = 0 mm
Design Axial Strength of wall = Puw = 0.3 (t - 1.2 e - 2ea)fck = 12.75 kN/m run of wall
Circumference of wall = 188.49556 m
P=0.4fckAc+0.67fy As
As = -59651.14 mm²
Minimum Factor of Safety against Overturning= 2 Clause: E.6.2.3, API 650 2008.
PAGE 4 OF 36
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 19-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 19-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
LOAD CALCULATIONS:
Internal Pressure= 6 kN/m2
Uplift Pressure= 16964.60 kN
PAGE 5 OF 36
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 19-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 19-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
SOIL CONDITION:
Soil Bearing Capacity of Area
Net Soil Bearing Capacity below Raft 300 kN/m2 Refer: Geotechnical Report 16 Nov 2009 Rev-2.
Gross Soil Bearing Capacity below Raft 343.2 kN/m2
Gross Soil Bearing Capacity below Raft for Wind Loadcase 429 kN/m2 Refer: Clause 8.1, Note-6, IS 875 Part-5.
Gross Soil Bearing Capacity below Raft for Earthquake Load 514.8 kN/m2 Refer: Clause 7.4.2, IS 1893-Part-4.
Coefficient of Lateral Soil Pressure
Angle of Internal Friction f= 30
Active soil pressure coefficient Ka = tan² (45 - f/2) 0.33
At rest soil pressure coefficient Ko = 1 - sinf 0.50
Passive soil pressure coefficient Kp = tan² (45 + f/2) 3.00
Coefficient of friction concrete & Soil m= 0.49
Coefficient of friction Soil & Soil m= 0.1
Areas & Moment of Inertia
Area of Ring Wall AF = p ( D02-Di2 ) / 4 320.442 m2
Area of Footing AF = p ( D02-Di2 ) / 4 320.442 m2
Area of Ring wall enclosed by Tank 157.951 m2
Area of Footing enclosed by Tank 157.951 m2
2
Area of Soil inside ring wall: AS = p Di / 4 2669.5 m2
Area of Soil inside Footing: 2669.482 m2
Area enclosed by Tank AT = p D2 / 4 2827.4 m2
Area of soil on the footing overhang inside tank 0.0 m2
Area of soil on the footing overhang outside tank 0.0 m2
Section Modulus of Ring footing Z= 4678.0 m4 Z = (pi/32)*(( Do4-Di4 )/Do)
LOADING AT BOTTOM OF FOUNDATION
Weight of Ring Wall 31243.1 kN
Weight of Ring Footing WF = AF * df * gConcrete 0.0 kN Fnd Weight (Wfd) = 31244.00 KN
Weight of Soil on the footing overhang inside tank 0.0 kN Soil weight (Wg) = 0.00 KN
Weight of Soil on the footing overhang outside tank 0.0 kN
Weight of soil inside the foundation raft 187397.6 kN
Weight of soil inside the ring wall 187397.6 kN
Below Footing Below Tank
% Content Load transferred to Footing ( P1 ) 5.59 % % Content Load transferred to Ring ( P1 ) 5.59 %
% Content Load transferred to Soil ( P2 ) 94.41 % % Content Load transferred to Soil ( P2 ) 94.41 %
P1 = (AT - AS) / AT * 100
P2 = 100 - P1
Vertical - Bot of Raft Vertical - top of raft Horizontal Moment
Below Raft Below soil Below wall Bet'n Wall
PRIMARY LOAD CASE H M
NR NS NTR NTR
kN kN kN kN kN kN-m
1 Foundation Selfwt 31244.00 0.00 31243.14 0.00 0.00 0.00
2 Soil Weight 0.00 187397.63 0.00 187397.63
3 Tank Empty Wt 13216.56 2223.44 13216.56 2223.44 0.00 0.00
4 Tank Oper.Wt 37227.14 408017.86 37227.14 408017.86 0.00 0.00
5 Tank Hydrotest Wt 44810.94 536189.06 44810.94 536189.06 0.00 0.00
6 Wind Load 0.00 0.00 1983.33 0.00 930.00 122627.00
7 Seismic Load 0.00 0.00 3085.00 0.00 24610.00 281079.00
STABILITY CHECKS
Unfactored Loading Combination (L/C)
NR NS NR NS
H M
L/C Nos Load Combinations Below Raft Below Soil below wall Bet'n Wall
(kN) (kN) (kN) (kN) (kN) (kN-m)
1 Erection+Soil+Wind 44460.56 189621.07 46443.03 189621.07 930.00 122627.00
2 Erection+Soil+Eq 44460.56 189621.07 47544.70 189621.07 1570.20 28499.13
3 Operation+Soil 68471.14 595415.50 68470.28 595415.50 0.00 0.00
4 Operation+Soil+Wind 68471.14 595415.50 70453.61 595415.50 930.00 122627.00
5 Operation+Soil+Eq 68471.14 595415.50 71555.28 595415.50 24610.00 281079.00
6 Hydrotest+Soil 76054.94 723586.69 76054.08 723586.69 0.00 0.00
7 Hydrotest+Soil+Wind 76054.94 723586.69 78037.41 723586.69 930.00 122627.00
PAGE 6 OF 36
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 19-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 19-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
DESIGN OF REINFORCEMENT
PS
F
df
Di
T T
Factored Load Combination
FOS 1.5
KaPS Ka γsoil df
2 2
Area of Soil AS = p /4Di 2669.5 m
Max soil pressure Below Soil PS = NS / AS
Hoop Stress F =F1 + F2
F1 = Ka PS df
2
Soil Pressure F2 = 1/2 Ka gSOIL df 45.6 kN / m
Hoop Tension T = 1/2 F Di
Ns PS F1(surchar
F(Total) T
L/C Nos Load Combinations Below Soil Below Soil ge)
(kN) (kN/ m2) (kN / m) (kN/m) (kN)
1 Erection+Wind 3335.16 1.249366 1.62 47.25 1377.46
2 Erection+Earthquake 3335.16 1.249366 1.62 47.25 1377.46
3 Operation 612026.79 229.268 298.05 343.68 10018.23
4 Operation+Wind 612026.79 229.268 298.05 343.68 10018.23
5 Operation+Earthquake 612026.79 229.268 298.05 343.68 10018.23
6 Hydrotest 804283.59 301.2883 391.67 437.30 12747.43
7 Hydrotest+Wind 804283.59 301.2883 391.67 437.30 12747.43
Circumferencial Reinforcement
Maximum Hoop Tension TMAX = 12747.43 kN
PAGE 7 OF 36
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 19-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 19-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
Vertical Reinforcement
Maximum Vertical load on the wall = 78037.41 kN
Circumference of wall = 188.49556 m
Max Load per m run of wall = 414.00133 kN
e= 0 mm
ea = 0 mm
Design Axial Strength of wall = Puw = 0.3 (t - 1.2 e - 2ea)fck = 12.75 kN/m run of wall
Circumference of wall = 188.49556 m
P=0.4fckAc+0.67fy As
As = -59651.14 mm²
Minimum Factor of Safety against Overturning= 2 Clause: E.6.2.3, API 650 2008.
PAGE 8 OF 36
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 19-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 19-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
LOAD CALCULATIONS:
Internal Pressure= 6 kN/m2
Uplift Pressure= 16964.60 kN
PAGE 9 OF 36
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 19-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 19-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
SOIL CONDITION:
Soil Bearing Capacity of Area
Net Soil Bearing Capacity below Raft 300 kN/m2 Refer: Geotechnical Report 16 Nov 2009 Rev-2.
Gross Soil Bearing Capacity below Raft 332.4 kN/m2
Gross Soil Bearing Capacity below Raft for Wind Loadcase 415.5 kN/m2 Refer: Clause 8.1, Note-6, IS 875 Part-5.
Gross Soil Bearing Capacity below Raft for Earthquake Load 498.6 kN/m2 Refer: Clause 7.4.2, IS 1893-Part-4.
Coefficient of Lateral Soil Pressure
Angle of Internal Friction f= 30
Active soil pressure coefficient Ka = tan² (45 - f/2) 0.33
At rest soil pressure coefficient Ko = 1 - sinf 0.50
Passive soil pressure coefficient Kp = tan² (45 + f/2) 3.00
Coefficient of friction concrete & Soil m= 0.49
Coefficient of friction Soil & Soil m= 0.1
Areas & Moment of Inertia
Area of Ring Wall AF = p ( D02-Di2 ) / 4 376.991 m2
Area of Footing AF = p ( D02-Di2 ) / 4 376.991 m2
Area of Ring wall enclosed by Tank 185.354 m2
Area of Footing enclosed by Tank 185.354 m2
2
Area of Soil inside ring wall: AS = p Di / 4 2642.1 m2
Area of Soil inside Footing: 2642.079 m2
Area enclosed by Tank AT = p D2 / 4 2827.4 m2
Area of soil on the footing overhang inside tank 0.0 m2
Area of soil on the footing overhang outside tank 0.0 m2
Section Modulus of Ring footing Z= 5478.5 m4 Z = (pi/32)*(( Do4-Di4 )/Do)
LOADING AT BOTTOM OF FOUNDATION
Weight of Ring Wall 31101.8 kN
Weight of Ring Footing WF = AF * df * gConcrete 0.0 kN Fnd Weight (Wfd) = 31102.00 KN
Weight of Soil on the footing overhang inside tank 0.0 kN Soil weight (Wg) = 0.00 KN
Weight of Soil on the footing overhang outside tank 0.0 kN
Weight of soil inside the foundation raft 156939.5 kN
Weight of soil inside the ring wall 156939.5 kN
Below Footing Below Tank
% Content Load transferred to Footing ( P1 ) 6.56 % % Content Load transferred to Ring ( P1 ) 6.56 %
% Content Load transferred to Soil ( P2 ) 93.44 % % Content Load transferred to Soil ( P2 ) 93.44 %
P1 = (AT - AS) / AT * 100
P2 = 100 - P1
Vertical - Bot of Raft Vertical - top of raft Horizontal Moment
Below Raft Below soil Below wall Bet'n Wall
PRIMARY LOAD CASE H M
NR NS NTR NTR
kN kN kN kN kN kN-m
1 Foundation Selfwt 31102.00 0.00 31101.77 0.00 0.00 0.00
2 Soil Weight 0.00 156939.52 0.00 156939.52
3 Tank Empty Wt 13239.38 2200.62 13239.38 2200.62 0.00 0.00
4 Tank Oper.Wt 41415.49 403829.51 41415.49 403829.51 0.00 0.00
5 Tank Hydrotest Wt 50314.98 530685.02 50314.98 530685.02 0.00 0.00
6 Wind Load 0.00 0.00 1983.33 0.00 930.00 122069.00
7 Seismic Load 0.00 0.00 3085.00 0.00 24610.00 266313.00
STABILITY CHECKS
Unfactored Loading Combination (L/C)
NR NS NR NS
H M
L/C Nos Load Combinations Below Raft Below Soil below wall Bet'n Wall
(kN) (kN) (kN) (kN) (kN) (kN-m)
1 Erection+Soil+Wind 44341.38 159140.13 46324.48 159140.13 930.00 122069.00
2 Erection+Soil+Eq 44341.38 159140.13 47426.15 159140.13 1570.20 27557.01
3 Operation+Soil 72517.49 560769.03 72517.26 560769.03 0.00 0.00
4 Operation+Soil+Wind 72517.49 560769.03 74500.59 560769.03 930.00 122069.00
5 Operation+Soil+Eq 72517.49 560769.03 75602.26 560769.03 24610.00 266313.00
6 Hydrotest+Soil 81416.98 687624.53 81416.75 687624.53 0.00 0.00
7 Hydrotest+Soil+Wind 81416.98 687624.53 83400.08 687624.53 930.00 122069.00
PAGE 10 OF 36
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 19-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 19-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
DESIGN OF REINFORCEMENT
PS
F
df
Di
T T
Factored Load Combination
FOS 1.5
KaPS Ka γsoil df
2 2
Area of Soil AS = p /4Di 2642.1 m
Max soil pressure Below Soil PS = NS / AS
Hoop Stress F =F1 + F2
F1 = Ka PS df
2
Soil Pressure F2 = 1/2 Ka gSOIL df 32.7 kN / m
Hoop Tension T = 1/2 F Di
Ns PS F1(surchar
F(Total) T
L/C Nos Load Combinations Below Soil Below Soil ge)
(kN) (kN/ m2) (kN / m) (kN/m) (kN)
1 Erection+Wind 3300.93 1.249366 1.37 34.04 987.28
2 Erection+Earthquake 3300.93 1.249366 1.37 34.04 987.28
3 Operation 605744.27 229.268 252.19 284.86 8261.08
4 Operation+Wind 605744.27 229.268 252.19 284.86 8261.08
5 Operation+Earthquake 605744.27 229.268 252.19 284.86 8261.08
6 Hydrotest 796027.53 301.2883 331.42 364.09 10558.53
7 Hydrotest+Wind 796027.53 301.2883 331.42 364.09 10558.53
Circumferencial Reinforcement
Maximum Hoop Tension TMAX = 10558.53 kN
PAGE 11 OF 36
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 19-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 19-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
Vertical Reinforcement
Maximum Vertical load on the wall = 83400.08 kN
Circumference of wall = 188.49556 m
Max Load per m run of wall = 442.45119 kN
e= 0 mm
ea = 0 mm
Design Axial Strength of wall = Puw = 0.3 (t - 1.2 e - 2ea)fck = 15 kN/m run of wall
Circumference of wall = 188.49556 m
P=0.4fckAc+0.67fy As
As = -70338.24 mm²
Minimum Factor of Safety against Overturning= 2 Clause: E.6.2.3, API 650 2008.
PAGE 12 OF 36
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 19-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 19-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
LOAD CALCULATIONS:
Internal Pressure= 6 kN/m2
Uplift Pressure= 16964.60 kN
PAGE 13 OF 36
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 19-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 19-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
SOIL CONDITION:
Soil Bearing Capacity of Area
Net Soil Bearing Capacity below Raft 300 kN/m2 Refer: Geotechnical Report 16 Nov 2009 Rev-2.
Gross Soil Bearing Capacity below Raft 332.4 kN/m2
Gross Soil Bearing Capacity below Raft for Wind Loadcase 415.5 kN/m2 Refer: Clause 8.1, Note-6, IS 875 Part-5.
Gross Soil Bearing Capacity below Raft for Earthquake Load 498.6 kN/m2 Refer: Clause 7.4.2, IS 1893-Part-4.
Coefficient of Lateral Soil Pressure
Angle of Internal Friction f= 30
Active soil pressure coefficient Ka = tan² (45 - f/2) 0.33
At rest soil pressure coefficient Ko = 1 - sinf 0.50
Passive soil pressure coefficient Kp = tan² (45 + f/2) 3.00
Coefficient of friction concrete & Soil m= 0.49
Coefficient of friction Soil & Soil m= 0.1
Areas & Moment of Inertia
Area of Ring Wall AF = p ( D02-Di2 ) / 4 376.991 m2
Area of Footing AF = p ( D02-Di2 ) / 4 376.991 m2
Area of Ring wall enclosed by Tank 185.354 m2
Area of Footing enclosed by Tank 185.354 m2
2
Area of Soil inside ring wall: AS = p Di / 4 2642.1 m2
Area of Soil inside Footing: 2642.079 m2
Area enclosed by Tank AT = p D2 / 4 2827.4 m2
Area of soil on the footing overhang inside tank 0.0 m2
Area of soil on the footing overhang outside tank 0.0 m2
Section Modulus of Ring footing Z= 5478.5 m4 Z = (pi/32)*(( Do4-Di4 )/Do)
LOADING AT BOTTOM OF FOUNDATION
Weight of Ring Wall 31101.8 kN
Weight of Ring Footing WF = AF * df * gConcrete 0.0 kN Fnd Weight (Wfd) = 31102.00 KN
Weight of Soil on the footing overhang inside tank 0.0 kN Soil weight (Wg) = 0.00 KN
Weight of Soil on the footing overhang outside tank 0.0 kN
Weight of soil inside the foundation raft 156939.5 kN
Weight of soil inside the ring wall 156939.5 kN
Below Footing Below Tank
% Content Load transferred to Footing ( P1 ) 6.56 % % Content Load transferred to Ring ( P1 ) 6.56 %
% Content Load transferred to Soil ( P2 ) 93.44 % % Content Load transferred to Soil ( P2 ) 93.44 %
P1 = (AT - AS) / AT * 100
P2 = 100 - P1
Vertical - Bot of Raft Vertical - top of raft Horizontal Moment
Below Raft Below soil Below wall Bet'n Wall
PRIMARY LOAD CASE H M
NR NS NTR NTR
kN kN kN kN kN kN-m
1 Foundation Selfwt 31102.00 0.00 31101.77 0.00 0.00 0.00
2 Soil Weight 0.00 156939.52 0.00 156939.52
3 Tank Empty Wt 13239.38 2200.62 13239.38 2200.62 0.00 0.00
4 Tank Oper.Wt 41415.49 403829.51 41415.49 403829.51 0.00 0.00
5 Tank Hydrotest Wt 50314.98 530685.02 50314.98 530685.02 0.00 0.00
6 Wind Load 0.00 0.00 1983.33 0.00 930.00 122069.00
7 Seismic Load 0.00 0.00 3085.00 0.00 24610.00 266313.00
STABILITY CHECKS
Unfactored Loading Combination (L/C)
NR NS NR NS
H M
L/C Nos Load Combinations Below Raft Below Soil below wall Bet'n Wall
(kN) (kN) (kN) (kN) (kN) (kN-m)
1 Erection+Soil+Wind 44341.38 159140.13 46324.48 159140.13 930.00 122069.00
2 Erection+Soil+Eq 44341.38 159140.13 47426.15 159140.13 1570.20 27557.01
3 Operation+Soil 72517.49 560769.03 72517.26 560769.03 0.00 0.00
4 Operation+Soil+Wind 72517.49 560769.03 74500.59 560769.03 930.00 122069.00
5 Operation+Soil+Eq 72517.49 560769.03 75602.26 560769.03 24610.00 266313.00
6 Hydrotest+Soil 81416.98 687624.53 81416.75 687624.53 0.00 0.00
7 Hydrotest+Soil+Wind 81416.98 687624.53 83400.08 687624.53 930.00 122069.00
PAGE 14 OF 36
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 19-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 19-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
DESIGN OF REINFORCEMENT
PS
F
df
Di
T T
Factored Load Combination
FOS 1.5
KaPS Ka γsoil df
2 2
Area of Soil AS = p /4Di 2642.1 m
Max soil pressure Below Soil PS = NS / AS
Hoop Stress F =F1 + F2
F1 = Ka PS df
2
Soil Pressure F2 = 1/2 Ka gSOIL df 32.7 kN / m
Hoop Tension T = 1/2 F Di
Ns PS F1(surchar
F(Total) T
L/C Nos Load Combinations Below Soil Below Soil ge)
(kN) (kN/ m2) (kN / m) (kN/m) (kN)
1 Erection+Wind 3300.93 1.249366 1.37 34.04 987.28
2 Erection+Earthquake 3300.93 1.249366 1.37 34.04 987.28
3 Operation 605744.27 229.268 252.19 284.86 8261.08
4 Operation+Wind 605744.27 229.268 252.19 284.86 8261.08
5 Operation+Earthquake 605744.27 229.268 252.19 284.86 8261.08
6 Hydrotest 796027.53 301.2883 331.42 364.09 10558.53
7 Hydrotest+Wind 796027.53 301.2883 331.42 364.09 10558.53
Circumferencial Reinforcement
Maximum Hoop Tension TMAX = 10558.53 kN
PAGE 15 OF 36
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 19-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 19-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
Vertical Reinforcement
Maximum Vertical load on the wall = 83400.08 kN
Circumference of wall = 188.49556 m
Max Load per m run of wall = 442.45119 kN
e= 0 mm
ea = 0 mm
Design Axial Strength of wall = Puw = 0.3 (t - 1.2 e - 2ea)fck = 15 kN/m run of wall
Circumference of wall = 188.49556 m
P=0.4fckAc+0.67fy As
As = -70338.24 mm²
Minimum Factor of Safety against Overturning= 2 Clause: E.6.2.3, API 650 2008.
PAGE 16 OF 36
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 19-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 19-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
LOAD CALCULATIONS:
Internal Pressure= 6 kN/m2
Uplift Pressure= 16964.60 kN
PAGE 17 OF 36
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 19-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 19-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
SOIL CONDITION:
Soil Bearing Capacity of Area
Net Soil Bearing Capacity below Raft 300 kN/m2 Refer: Geotechnical Report 16 Nov 2009 Rev-2.
Gross Soil Bearing Capacity below Raft 332.4 kN/m2
Gross Soil Bearing Capacity below Raft for Wind Loadcase 415.5 kN/m2 Refer: Clause 8.1, Note-6, IS 875 Part-5.
Gross Soil Bearing Capacity below Raft for Earthquake Load 498.6 kN/m2 Refer: Clause 7.4.2, IS 1893-Part-4.
Coefficient of Lateral Soil Pressure
Angle of Internal Friction f= 30
Active soil pressure coefficient Ka = tan² (45 - f/2) 0.33
At rest soil pressure coefficient Ko = 1 - sinf 0.50
Passive soil pressure coefficient Kp = tan² (45 + f/2) 3.00
Coefficient of friction concrete & Soil m= 0.49
Coefficient of friction Soil & Soil m= 0.1
Areas & Moment of Inertia
Area of Ring Wall AF = p ( D02-Di2 ) / 4 376.991 m2
Area of Footing AF = p ( D02-Di2 ) / 4 376.991 m2
Area of Ring wall enclosed by Tank 185.354 m2
Area of Footing enclosed by Tank 185.354 m2
2
Area of Soil inside ring wall: AS = p Di / 4 2642.1 m2
Area of Soil inside Footing: 2642.079 m2
Area enclosed by Tank AT = p D2 / 4 2827.4 m2
Area of soil on the footing overhang inside tank 0.0 m2
Area of soil on the footing overhang outside tank 0.0 m2
Section Modulus of Ring footing Z= 5478.5 m4 Z = (pi/32)*(( Do4-Di4 )/Do)
LOADING AT BOTTOM OF FOUNDATION
Weight of Ring Wall 31101.8 kN
Weight of Ring Footing WF = AF * df * gConcrete 0.0 kN Fnd Weight (Wfd) = 31102.00 KN
Weight of Soil on the footing overhang inside tank 0.0 kN Soil weight (Wg) = 0.00 KN
Weight of Soil on the footing overhang outside tank 0.0 kN
Weight of soil inside the foundation raft 156939.5 kN
Weight of soil inside the ring wall 156939.5 kN
Below Footing Below Tank
% Content Load transferred to Footing ( P1 ) 6.56 % % Content Load transferred to Ring ( P1 ) 6.56 %
% Content Load transferred to Soil ( P2 ) 93.44 % % Content Load transferred to Soil ( P2 ) 93.44 %
P1 = (AT - AS) / AT * 100
P2 = 100 - P1
Vertical - Bot of Raft Vertical - top of raft Horizontal Moment
Below Raft Below soil Below wall Bet'n Wall
PRIMARY LOAD CASE H M
NR NS NTR NTR
kN kN kN kN kN kN-m
1 Foundation Selfwt 31102.00 0.00 31101.77 0.00 0.00 0.00
2 Soil Weight 0.00 156939.52 0.00 156939.52
3 Tank Empty Wt 13239.38 2200.62 13239.38 2200.62 0.00 0.00
4 Tank Oper.Wt 41415.49 403829.51 41415.49 403829.51 0.00 0.00
5 Tank Hydrotest Wt 50314.98 530685.02 50314.98 530685.02 0.00 0.00
6 Wind Load 0.00 0.00 1983.33 0.00 930.00 122069.00
7 Seismic Load 0.00 0.00 3085.00 0.00 24610.00 266313.00
STABILITY CHECKS
Unfactored Loading Combination (L/C)
NR NS NR NS
H M
L/C Nos Load Combinations Below Raft Below Soil below wall Bet'n Wall
(kN) (kN) (kN) (kN) (kN) (kN-m)
1 Erection+Soil+Wind 44341.38 159140.13 46324.48 159140.13 930.00 122069.00
2 Erection+Soil+Eq 44341.38 159140.13 47426.15 159140.13 1570.20 27557.01
3 Operation+Soil 72517.49 560769.03 72517.26 560769.03 0.00 0.00
4 Operation+Soil+Wind 72517.49 560769.03 74500.59 560769.03 930.00 122069.00
5 Operation+Soil+Eq 72517.49 560769.03 75602.26 560769.03 24610.00 266313.00
6 Hydrotest+Soil 81416.98 687624.53 81416.75 687624.53 0.00 0.00
7 Hydrotest+Soil+Wind 81416.98 687624.53 83400.08 687624.53 930.00 122069.00
PAGE 18 OF 36
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 19-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 19-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
DESIGN OF REINFORCEMENT
PS
F
df
Di
T T
Factored Load Combination
FOS 1.5
KaPS Ka γsoil df
2 2
Area of Soil AS = p /4Di 2642.1 m
Max soil pressure Below Soil PS = NS / AS
Hoop Stress F =F1 + F2
F1 = Ka PS df
2
Soil Pressure F2 = 1/2 Ka gSOIL df 32.7 kN / m
Hoop Tension T = 1/2 F Di
Ns PS F1(surchar
F(Total) T
L/C Nos Load Combinations Below Soil Below Soil ge)
(kN) (kN/ m2) (kN / m) (kN/m) (kN)
1 Erection+Wind 3300.93 1.249366 1.37 34.04 987.28
2 Erection+Earthquake 3300.93 1.249366 1.37 34.04 987.28
3 Operation 605744.27 229.268 252.19 284.86 8261.08
4 Operation+Wind 605744.27 229.268 252.19 284.86 8261.08
5 Operation+Earthquake 605744.27 229.268 252.19 284.86 8261.08
6 Hydrotest 796027.53 301.2883 331.42 364.09 10558.53
7 Hydrotest+Wind 796027.53 301.2883 331.42 364.09 10558.53
Circumferencial Reinforcement
Maximum Hoop Tension TMAX = 10558.53 kN
PAGE 19 OF 36
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 19-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 19-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
Vertical Reinforcement
Maximum Vertical load on the wall = 83400.08 kN
Circumference of wall = 188.49556 m
Max Load per m run of wall = 442.45119 kN
e= 0 mm
ea = 0 mm
Design Axial Strength of wall = Puw = 0.3 (t - 1.2 e - 2ea)fck = 15 kN/m run of wall
Circumference of wall = 188.49556 m
P=0.4fckAc+0.67fy As
As = -70338.24 mm²
Minimum Factor of Safety against Overturning= 2 Clause: E.6.2.3, API 650 2008.
PAGE 20 OF 36
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 19-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 19-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
LOAD CALCULATIONS:
Internal Pressure= 6 kN/m2
Uplift Pressure= 16964.60 kN
PAGE 21 OF 36
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 19-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 19-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
SOIL CONDITION:
Soil Bearing Capacity of Area
Net Soil Bearing Capacity below Raft 300 kN/m2 Refer: Geotechnical Report 16 Nov 2009 Rev-2.
Gross Soil Bearing Capacity below Raft 332.4 kN/m2
Gross Soil Bearing Capacity below Raft for Wind Loadcase 415.5 kN/m2 Refer: Clause 8.1, Note-6, IS 875 Part-5.
Gross Soil Bearing Capacity below Raft for Earthquake Load 498.6 kN/m2 Refer: Clause 7.4.2, IS 1893-Part-4.
Coefficient of Lateral Soil Pressure
Angle of Internal Friction f= 30
Active soil pressure coefficient Ka = tan² (45 - f/2) 0.33
At rest soil pressure coefficient Ko = 1 - sinf 0.50
Passive soil pressure coefficient Kp = tan² (45 + f/2) 3.00
Coefficient of friction concrete & Soil m= 0.49
Coefficient of friction Soil & Soil m= 0.1
Areas & Moment of Inertia
Area of Ring Wall AF = p ( D02-Di2 ) / 4 376.991 m2
Area of Footing AF = p ( D02-Di2 ) / 4 376.991 m2
Area of Ring wall enclosed by Tank 185.354 m2
Area of Footing enclosed by Tank 185.354 m2
2
Area of Soil inside ring wall: AS = p Di / 4 2642.1 m2
Area of Soil inside Footing: 2642.079 m2
Area enclosed by Tank AT = p D2 / 4 2827.4 m2
Area of soil on the footing overhang inside tank 0.0 m2
Area of soil on the footing overhang outside tank 0.0 m2
Section Modulus of Ring footing Z= 5478.5 m4 Z = (pi/32)*(( Do4-Di4 )/Do)
LOADING AT BOTTOM OF FOUNDATION
Weight of Ring Wall 31101.8 kN
Weight of Ring Footing WF = AF * df * gConcrete 0.0 kN Fnd Weight (Wfd) = 31102.00 KN
Weight of Soil on the footing overhang inside tank 0.0 kN Soil weight (Wg) = 0.00 KN
Weight of Soil on the footing overhang outside tank 0.0 kN
Weight of soil inside the foundation raft 156939.5 kN
Weight of soil inside the ring wall 156939.5 kN
Below Footing Below Tank
% Content Load transferred to Footing ( P1 ) 6.56 % % Content Load transferred to Ring ( P1 ) 6.56 %
% Content Load transferred to Soil ( P2 ) 93.44 % % Content Load transferred to Soil ( P2 ) 93.44 %
P1 = (AT - AS) / AT * 100
P2 = 100 - P1
Vertical - Bot of Raft Vertical - top of raft Horizontal Moment
Below Raft Below soil Below wall Bet'n Wall
PRIMARY LOAD CASE H M
NR NS NTR NTR
kN kN kN kN kN kN-m
1 Foundation Selfwt 31102.00 0.00 31101.77 0.00 0.00 0.00
2 Soil Weight 0.00 156939.52 0.00 156939.52
3 Tank Empty Wt 13239.38 2200.62 13239.38 2200.62 0.00 0.00
4 Tank Oper.Wt 41415.49 403829.51 41415.49 403829.51 0.00 0.00
5 Tank Hydrotest Wt 50314.98 530685.02 50314.98 530685.02 0.00 0.00
6 Wind Load 0.00 0.00 1983.33 0.00 930.00 122069.00
7 Seismic Load 0.00 0.00 3085.00 0.00 24610.00 266313.00
STABILITY CHECKS
Unfactored Loading Combination (L/C)
NR NS NR NS
H M
L/C Nos Load Combinations Below Raft Below Soil below wall Bet'n Wall
(kN) (kN) (kN) (kN) (kN) (kN-m)
1 Erection+Soil+Wind 44341.38 159140.13 46324.48 159140.13 930.00 122069.00
2 Erection+Soil+Eq 44341.38 159140.13 47426.15 159140.13 1570.20 27557.01
3 Operation+Soil 72517.49 560769.03 72517.26 560769.03 0.00 0.00
4 Operation+Soil+Wind 72517.49 560769.03 74500.59 560769.03 930.00 122069.00
5 Operation+Soil+Eq 72517.49 560769.03 75602.26 560769.03 24610.00 266313.00
6 Hydrotest+Soil 81416.98 687624.53 81416.75 687624.53 0.00 0.00
7 Hydrotest+Soil+Wind 81416.98 687624.53 83400.08 687624.53 930.00 122069.00
PAGE 22 OF 36
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 19-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 19-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
DESIGN OF REINFORCEMENT
PS
F
df
Di
T T
Factored Load Combination
FOS 1.5
KaPS Ka γsoil df
2 2
Area of Soil AS = p /4Di 2642.1 m
Max soil pressure Below Soil PS = NS / AS
Hoop Stress F =F1 + F2
F1 = Ka PS df
2
Soil Pressure F2 = 1/2 Ka gSOIL df 32.7 kN / m
Hoop Tension T = 1/2 F Di
Ns PS F1(surchar
F(Total) T
L/C Nos Load Combinations Below Soil Below Soil ge)
(kN) (kN/ m2) (kN / m) (kN/m) (kN)
1 Erection+Wind 3300.93 1.249366 1.37 34.04 987.28
2 Erection+Earthquake 3300.93 1.249366 1.37 34.04 987.28
3 Operation 605744.27 229.268 252.19 284.86 8261.08
4 Operation+Wind 605744.27 229.268 252.19 284.86 8261.08
5 Operation+Earthquake 605744.27 229.268 252.19 284.86 8261.08
6 Hydrotest 796027.53 301.2883 331.42 364.09 10558.53
7 Hydrotest+Wind 796027.53 301.2883 331.42 364.09 10558.53
Circumferencial Reinforcement
Maximum Hoop Tension TMAX = 10558.53 kN
PAGE 23 OF 36
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 19-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 19-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
Vertical Reinforcement
Maximum Vertical load on the wall = 83400.08 kN
Circumference of wall = 188.49556 m
Max Load per m run of wall = 442.45119 kN
e= 0 mm
ea = 0 mm
Design Axial Strength of wall = Puw = 0.3 (t - 1.2 e - 2ea)fck = 15 kN/m run of wall
Circumference of wall = 188.49556 m
P=0.4fckAc+0.67fy As
As = -70338.24 mm²
Minimum Factor of Safety against Overturning= 2 Clause: E.6.2.3, API 650 2008.
PAGE 24 OF 36
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 19-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 19-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
LOAD CALCULATIONS:
Internal Pressure= 6 kN/m2
Uplift Pressure= 16964.60 kN
PAGE 25 OF 36
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 19-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 19-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
SOIL CONDITION:
Soil Bearing Capacity of Area
Net Soil Bearing Capacity below Raft 300 kN/m2 Refer: Geotechnical Report 16 Nov 2009 Rev-2.
Gross Soil Bearing Capacity below Raft 343.2 kN/m2
Gross Soil Bearing Capacity below Raft for Wind Loadcase 429 kN/m2 Refer: Clause 8.1, Note-6, IS 875 Part-5.
Gross Soil Bearing Capacity below Raft for Earthquake Load 514.8 kN/m2 Refer: Clause 7.4.2, IS 1893-Part-4.
Coefficient of Lateral Soil Pressure
Angle of Internal Friction f= 30
Active soil pressure coefficient Ka = tan² (45 - f/2) 0.33
At rest soil pressure coefficient Ko = 1 - sinf 0.50
Passive soil pressure coefficient Kp = tan² (45 + f/2) 3.00
Coefficient of friction concrete & Soil m= 0.49
Coefficient of friction Soil & Soil m= 0.1
Areas & Moment of Inertia
Area of Ring Wall AF = p ( D02-Di2 ) / 4 320.442 m2
Area of Footing AF = p ( D02-Di2 ) / 4 320.442 m2
Area of Ring wall enclosed by Tank 157.951 m2
Area of Footing enclosed by Tank 157.951 m2
2
Area of Soil inside ring wall: AS = p Di / 4 2669.5 m2
Area of Soil inside Footing: 2669.482 m2
Area enclosed by Tank AT = p D2 / 4 2827.4 m2
Area of soil on the footing overhang inside tank 0.0 m2
Area of soil on the footing overhang outside tank 0.0 m2
Section Modulus of Ring footing Z= 4678.0 m4 Z = (pi/32)*(( Do4-Di4 )/Do)
LOADING AT BOTTOM OF FOUNDATION
Weight of Ring Wall 31243.1 kN
Weight of Ring Footing WF = AF * df * gConcrete 0.0 kN Fnd Weight (Wfd) = 31244.00 KN
Weight of Soil on the footing overhang inside tank 0.0 kN Soil weight (Wg) = 0.00 KN
Weight of Soil on the footing overhang outside tank 0.0 kN
Weight of soil inside the foundation raft 187397.6 kN
Weight of soil inside the ring wall 187397.6 kN
Below Footing Below Tank
% Content Load transferred to Footing ( P1 ) 5.59 % % Content Load transferred to Ring ( P1 ) 5.59 %
% Content Load transferred to Soil ( P2 ) 94.41 % % Content Load transferred to Soil ( P2 ) 94.41 %
P1 = (AT - AS) / AT * 100
P2 = 100 - P1
Vertical - Bot of Raft Vertical - top of raft Horizontal Moment
Below Raft Below soil Below wall Bet'n Wall
PRIMARY LOAD CASE H M
NR NS NTR NTR
kN kN kN kN kN kN-m
1 Foundation Selfwt 31244.00 0.00 31243.14 0.00 0.00 0.00
2 Soil Weight 0.00 187397.63 0.00 187397.63
3 Tank Empty Wt 13216.56 2223.44 13216.56 2223.44 0.00 0.00
4 Tank Oper.Wt 37227.14 408017.86 37227.14 408017.86 0.00 0.00
5 Tank Hydrotest Wt 44810.94 536189.06 44810.94 536189.06 0.00 0.00
6 Wind Load 0.00 0.00 1983.33 0.00 930.00 122627.00
7 Seismic Load 0.00 0.00 3085.00 0.00 24610.00 281079.00
STABILITY CHECKS
Unfactored Loading Combination (L/C)
NR NS NR NS
H M
L/C Nos Load Combinations Below Raft Below Soil below wall Bet'n Wall
(kN) (kN) (kN) (kN) (kN) (kN-m)
1 Erection+Soil+Wind 44460.56 189621.07 46443.03 189621.07 930.00 122627.00
2 Erection+Soil+Eq 44460.56 189621.07 47544.70 189621.07 1570.20 28499.13
3 Operation+Soil 68471.14 595415.50 68470.28 595415.50 0.00 0.00
4 Operation+Soil+Wind 68471.14 595415.50 70453.61 595415.50 930.00 122627.00
5 Operation+Soil+Eq 68471.14 595415.50 71555.28 595415.50 24610.00 281079.00
6 Hydrotest+Soil 76054.94 723586.69 76054.08 723586.69 0.00 0.00
7 Hydrotest+Soil+Wind 76054.94 723586.69 78037.41 723586.69 930.00 122627.00
PAGE 26 OF 36
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 19-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 19-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
DESIGN OF REINFORCEMENT
PS
F
df
Di
T T
Factored Load Combination
FOS 1.5
KaPS Ka γsoil df
2 2
Area of Soil AS = p /4Di 2669.5 m
Max soil pressure Below Soil PS = NS / AS
Hoop Stress F =F1 + F2
F1 = Ka PS df
2
Soil Pressure F2 = 1/2 Ka gSOIL df 45.6 kN / m
Hoop Tension T = 1/2 F Di
Ns PS F1(surchar
F(Total) T
L/C Nos Load Combinations Below Soil Below Soil ge)
(kN) (kN/ m2) (kN / m) (kN/m) (kN)
1 Erection+Wind 3335.16 1.249366 1.62 47.25 1377.46
2 Erection+Earthquake 3335.16 1.249366 1.62 47.25 1377.46
3 Operation 612026.79 229.268 298.05 343.68 10018.23
4 Operation+Wind 612026.79 229.268 298.05 343.68 10018.23
5 Operation+Earthquake 612026.79 229.268 298.05 343.68 10018.23
6 Hydrotest 804283.59 301.2883 391.67 437.30 12747.43
7 Hydrotest+Wind 804283.59 301.2883 391.67 437.30 12747.43
Circumferencial Reinforcement
Maximum Hoop Tension TMAX = 12747.43 kN
PAGE 27 OF 36
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 19-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 19-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
Vertical Reinforcement
Maximum Vertical load on the wall = 78037.41 kN
Circumference of wall = 188.49556 m
Max Load per m run of wall = 414.00133 kN
e= 0 mm
ea = 0 mm
Design Axial Strength of wall = Puw = 0.3 (t - 1.2 e - 2ea)fck = 12.75 kN/m run of wall
Circumference of wall = 188.49556 m
P=0.4fckAc+0.67fy As
As = -59651.14 mm²
Minimum Factor of Safety against Overturning= 2 Clause: E.6.2.3, API 650 2008.
PAGE 28 OF 36
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 19-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 19-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
LOAD CALCULATIONS:
Internal Pressure= 6 kN/m2
Uplift Pressure= 16964.60 kN
PAGE 29 OF 36
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 19-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 19-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
SOIL CONDITION:
Soil Bearing Capacity of Area
Net Soil Bearing Capacity below Raft 300 kN/m2 Refer: Geotechnical Report 16 Nov 2009 Rev-2.
Gross Soil Bearing Capacity below Raft 343.2 kN/m2
Gross Soil Bearing Capacity below Raft for Wind Loadcase 429 kN/m2 Refer: Clause 8.1, Note-6, IS 875 Part-5.
Gross Soil Bearing Capacity below Raft for Earthquake Load 514.8 kN/m2 Refer: Clause 7.4.2, IS 1893-Part-4.
Coefficient of Lateral Soil Pressure
Angle of Internal Friction f= 33
Active soil pressure coefficient Ka = tan² (45 - f/2) 0.29
At rest soil pressure coefficient Ko = 1 - sinf 0.46
Passive soil pressure coefficient Kp = tan² (45 + f/2) 3.39
Coefficient of friction concrete & Soil m= 0.49
Coefficient of friction Soil & Soil m= 0.1
Areas & Moment of Inertia
Area of Ring Wall AF = p ( D02-Di2 ) / 4 320.442 m2
Area of Footing AF = p ( D02-Di2 ) / 4 320.442 m2
Area of Ring wall enclosed by Tank 157.951 m2
Area of Footing enclosed by Tank 157.951 m2
2
Area of Soil inside ring wall: AS = p Di / 4 2669.5 m2
Area of Soil inside Footing: 2669.482 m2
Area enclosed by Tank AT = p D2 / 4 2827.4 m2
Area of soil on the footing overhang inside tank 0.0 m2
Area of soil on the footing overhang outside tank 0.0 m2
Section Modulus of Ring footing Z= 4678.0 m4 Z = (pi/32)*(( Do4-Di4 )/Do)
LOADING AT BOTTOM OF FOUNDATION
Weight of Ring Wall 31243.1 kN
Weight of Ring Footing WF = AF * df * gConcrete 0.0 kN Fnd Weight (Wfd) = 31244.00 KN
Weight of Soil on the footing overhang inside tank 0.0 kN Soil weight (Wg) = 0.00 KN
Weight of Soil on the footing overhang outside tank 0.0 kN
Weight of soil inside the foundation raft 187397.6 kN
Weight of soil inside the ring wall 187397.6 kN
Below Footing Below Tank
% Content Load transferred to Footing ( P1 ) 5.59 % % Content Load transferred to Ring ( P1 ) 5.59 %
% Content Load transferred to Soil ( P2 ) 94.41 % % Content Load transferred to Soil ( P2 ) 94.41 %
P1 = (AT - AS) / AT * 100
P2 = 100 - P1
Vertical - Bot of Raft Vertical - top of raft Horizontal Moment
Below Raft Below soil Below wall Bet'n Wall
PRIMARY LOAD CASE H M
NR NS NTR NTR
kN kN kN kN kN kN-m
1 Foundation Selfwt 31244.00 0.00 31243.14 0.00 0.00 0.00
2 Soil Weight 0.00 187397.63 0.00 187397.63
3 Tank Empty Wt 6446.05 5763.95 6446.05 5763.95 0.00 0.00
4 Tank Oper.Wt 30008.88 403991.12 30008.88 403991.12 0.00 0.00
5 Tank Hydrotest Wt 38020.32 539389.68 38020.32 539389.68 0.00 0.00
6 Wind Load 0.00 0.00 1983.33 0.00 930.00 122627.00
7 Seismic Load 0.00 0.00 2665.00 0.00 23010.00 249639.00
STABILITY CHECKS
Unfactored Loading Combination (L/C)
NR NS NR NS
H M
L/C Nos Load Combinations Below Raft Below Soil below wall Bet'n Wall
(kN) (kN) (kN) (kN) (kN) (kN-m)
1 Erection+Soil+Wind 37690.05 193161.58 39672.52 193161.58 930.00 122627.00
2 Erection+Soil+Eq 37690.05 193161.58 40354.19 193161.58 732.60 13296.69
3 Operation+Soil 61252.88 591388.76 61252.02 591388.76 0.00 0.00
4 Operation+Soil+Wind 61252.88 591388.76 63235.35 591388.76 930.00 122627.00
5 Operation+Soil+Eq 61252.88 591388.76 63917.02 591388.76 23010.00 249639.00
6 Hydrotest+Soil 69264.32 726787.31 69263.46 726787.31 0.00 0.00
7 Hydrotest+Soil+Wind 69264.32 726787.31 71246.79 726787.31 930.00 122627.00
PAGE 30 OF 36
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 19-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 19-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
DESIGN OF REINFORCEMENT
PS
F
df
Di
T T
Factored Load Combination
FOS 1.5
KaPS Ka γsoil df
2 2
Area of Soil AS = p /4Di 2669.5 m
Max soil pressure Below Soil PS = NS / AS
Hoop Stress F =F1 + F2
F1 = Ka PS df
2
Soil Pressure F2 = 1/2 Ka gSOIL df 40.4 kN / m
Hoop Tension T = 1/2 F Di
Nt PS F1(surchar
F(Total) T
L/C Nos Load Combinations Below Soil Below Soil ge)
(kN) (kN/ m2) (kN / m) (kN/m) (kN)
1 Erection+Wind 8645.93 3.238803 3.72 44.08 1284.90
2 Erection+Earthquake 8645.93 3.238803 3.72 44.08 1284.90
3 Operation 605986.68 227.0053 260.99 301.35 8784.31
4 Operation+Wind 605986.68 227.0053 260.99 301.35 8784.31
5 Operation+Earthquake 605986.68 227.0053 260.99 301.35 8784.31
6 Hydrotest 809084.52 303.0867 348.47 388.82 11334.14
7 Hydrotest+Wind 809084.52 303.0867 348.47 388.82 11334.14
Circumferencial Reinforcement
Maximum Hoop Tension TMAX = 11334.14 kN
PAGE 31 OF 36
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 19-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 19-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
Vertical Reinforcement
Maximum Vertical load on the wall = 71246.79 kN
Circumference of wall = 188.49556 m
Max Load per m run of wall = 377.97597 kN
e= 0 mm
ea = 0 mm
Design Axial Strength of wall = Puw = 0.3 (t - 1.2 e - 2ea)fck = 12.75 kN/m run of wall
Circumference of wall = 188.49556 m
P=0.4fckAc+0.67fy As
As = -59780.7 mm²
Minimum Factor of Safety against Overturning= 2 Clause: E.6.2.3, API 650 2008.
PAGE 32 OF 36
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 19-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 19-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
LOAD CALCULATIONS:
Internal Pressure= 6 kN/m2
Uplift Pressure= 5772.68 kN
PAGE 33 OF 36
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 19-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 19-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
SOIL CONDITION:
Soil Bearing Capacity of Area
Net Soil Bearing Capacity below Raft 300 kN/m2 Refer: Geotechnical Report 16 Nov 2009 Rev-2.
Gross Soil Bearing Capacity below Raft 354 kN/m2
Gross Soil Bearing Capacity below Raft for Wind Loadcase 442.5 kN/m2 Refer: Clause 8.1, Note-6, IS 875 Part-5.
Gross Soil Bearing Capacity below Raft for Earthquake Load 531 kN/m2 Refer: Clause 7.4.2, IS 1893-Part-4.
Coefficient of Lateral Soil Pressure
Angle of Internal Friction f= 30
Active soil pressure coefficient Ka = tan² (45 - f/2) 0.33
At rest soil pressure coefficient Ko = 1 - sinf 0.50
Passive soil pressure coefficient Kp = tan² (45 + f/2) 3.00
Coefficient of friction concrete & Soil m= 0.49
Coefficient of friction Soil & Soil m= 0.1
Areas & Moment of Inertia
Area of Ring Wall AF = p ( D02-Di2 ) / 4 87.965 m2
Area of Footing AF = p ( D02-Di2 ) / 4 87.965 m2
Area of Ring wall enclosed by Tank 43.480 m2
Area of Footing enclosed by Tank 43.480 m2
2
Area of Soil inside ring wall: AS = p Di / 4 918.6 m2
Area of Soil inside Footing: 918.633 m2
Area enclosed by Tank AT = p D2 / 4 962.1 m2
Area of soil on the footing overhang inside tank 0.0 m2
Area of soil on the footing overhang outside tank 0.0 m2
Section Modulus of Ring footing Z= 752.9 m4 Z = (pi/32)*(( Do4-Di4 )/Do)
LOADING AT BOTTOM OF FOUNDATION
Weight of Ring Wall 9896.0 kN
Weight of Ring Footing WF = AF * df * gConcrete 0.0 kN Fnd Weight (Wfd) = 9897.00 KN
Weight of Soil on the footing overhang inside tank 0.0 kN Soil weight (Wg) = 0.00 KN
Weight of Soil on the footing overhang outside tank 0.0 kN
Weight of soil inside the foundation raft 74409.3 kN
Weight of soil inside the ring wall 74409.3 kN
Below Footing Below Tank
% Content Load transferred to Footing ( P1 ) 4.52 % % Content Load transferred to Ring ( P1 ) 4.52 %
% Content Load transferred to Soil ( P2 ) 95.48 % % Content Load transferred to Soil ( P2 ) 95.48 %
P1 = (AT - AS) / AT * 100
P2 = 100 - P1
Vertical - Bot of Raft Vertical - top of raft Horizontal Moment
Below Raft Below soil Below wall Bet'n Wall
PRIMARY LOAD CASE H M
NR NS NTR NTR
kN kN kN kN kN kN-m
1 Foundation Selfwt 9897.00 0.00 9896.02 0.00 0.00 0.00
2 Soil Weight 0.00 74409.28 0.00 74409.28
3 Tank Empty Wt 2004.20 2095.80 2004.20 2095.80 0.00 0.00
4 Tank Oper.Wt 7229.19 112488.81 7229.19 112488.81 0.00 0.00
5 Tank Hydrotest Wt 8959.22 149040.78 8959.22 149040.78 0.00 0.00
6 Wind Load 0.00 0.00 720.57 0.00 435.00 27177.50
7 Seismic Load 0.00 0.00 1359.14 0.00 8470.00 85685.00
STABILITY CHECKS
Unfactored Loading Combination (L/C)
NR NS NR NS
H M
L/C Nos Load Combinations Below Raft Below Soil below wall Bet'n Wall
(kN) (kN) (kN) (kN) (kN) (kN-m)
1 Erection+Soil+Wind 11901.20 76505.09 12620.78 76505.09 435.00 27177.50
2 Erection+Soil+Eq 11901.20 76505.09 13259.36 76505.09 228.60 4286.25
3 Operation+Soil 17126.19 186898.10 17125.20 186898.10 0.00 0.00
4 Operation+Soil+Wind 17126.19 186898.10 17845.77 186898.10 435.00 27177.50
5 Operation+Soil+Eq 17126.19 186898.10 18484.35 186898.10 8470.00 85685.00
6 Hydrotest+Soil 18856.22 223450.06 18855.24 223450.06 0.00 0.00
7 Hydrotest+Soil+Wind 18856.22 223450.06 19575.81 223450.06 435.00 27177.50
PAGE 34 OF 36
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 19-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 19-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
DESIGN OF REINFORCEMENT
PS
F
df
Di
T T
Factored Load Combination
FOS 1.5
KaPS Ka γsoil df
2 2
Area of Soil AS = p /4Di 918.6 m
Max soil pressure Below Soil PS = NS / AS
Hoop Stress F =F1 + F2
F1 = Ka PS df
2
Soil Pressure F2 = 1/2 Ka gSOIL df 60.8 kN / m
Hoop Tension T = 1/2 F Di
Nt PS F1(surchar
F(Total) T
L/C Nos Load Combinations Below Soil Below Soil ge)
(kN) (kN/ m2) (kN / m) (kN/m) (kN)
1 Erection+Wind 3143.71 3.422156 5.13 65.88 1126.60
2 Erection+Earthquake 3143.71 3.422156 5.13 65.88 1126.60
3 Operation 168733.22 183.6786 275.52 336.27 5750.18
4 Operation+Wind 168733.22 183.6786 275.52 336.27 5750.18
5 Operation+Earthquake 168733.22 183.6786 275.52 336.27 5750.18
6 Hydrotest 223561.17 243.3628 365.04 425.79 7281.08
7 Hydrotest+Wind 223561.17 243.3628 365.04 425.79 7281.08
Circumferencial Reinforcement
Maximum Hoop Tension TMAX = 7281.08 kN
PAGE 35 OF 36
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 19-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 19-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
Vertical Reinforcement
Maximum Vertical load on the wall = 19575.81 kN
Circumference of wall = 109.95574 m
Max Load per m run of wall = 178.03352 kN
e= 0 mm
ea = 0 mm
Design Axial Strength of wall = Puw = 0.3 (t - 1.2 e - 2ea)fck = 6 kN/m run of wall
Circumference of wall = 109.95574 m
P=0.4fckAc+0.67fy As
As = -28131.51 mm²
Minimum Factor of Safety against Overturning= 2 Clause: E.6.2.3, API 650 2008.
PAGE 36 OF 36
TCE Consulting Engineers Limited SECTION: TITLE
2
Grade of Concrete (f ck) = 25 N/mm
2
Permissible Stress in Bond for Plain Bars (τ bd) = 0.9 N/mm
2
Net Tensile Stress Area (A nb)= 2675.80 mm Ref: IS:4218 (Part-III) 1976, Clause-3.
2
Nominal Plain Shank Area (A sb)= 3216.99 mm (Asb)= Pi*D2/4
Ref: IS 800: 2007, Clause 11.6.2.1.
Nominal Shear Capacity of Bolt (V nsb)= 617950.59 N (Vnsb)= (fu/sqrt(3))*(n n*Anb+ns*Asb)
2
Permissible shear Stress of Bolt (f asb)= 115.25 N/mm (fasb)= 0.6*Vnsb/Asb
2
Permissible tensile Stress of Bolt (f atb)= 163.64 N/mm (fatb)= 0.6*Tnb/Asb
PAGE 1 OF 4
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 19-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 19-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
PAGE 2 OF 4
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 27-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 27-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
2
Bond stress of concrete = Tbd = 0.9 N/mm
=
p of stiffner p
Depth plate 252.00 mm
Circumference = 201.06 mm
148
Circumference/4 = 50.27 mm
2
Net area transferring force by = 126383.01 mm
bearing on concrete
2
Average bearing pr. On concrete = 1.59 N/mm
2
Permissible bearing stress on concrete = 6.25 N/mm safe
2
Permissible Yeild Stress of Plate = 240.00 N/mm
2
Permissible Bending Stress for Plate = 158.40 N/mm
3
Zreqd. = 162.59 mm check, 165 or 158.4
3
Z pro = 170.67 mm safe
PAGE 3 OF 4
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 27-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 27-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
Load intenstity at Q = 50.87 N/mm
3
Zreqd. = 44833.00 mm
3
Z availbale = 84672.00 mm safe
PAGE 4 OF 4
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 19-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 19-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
2
Grade of Concrete (f ck) = 25 N/mm
2
Permissible Stress in Bond for Plain Bars (τ bd) = 0.9 N/mm
2
Net Tensile Stress Area (A nb)= 2675.80 mm Ref: IS:4218 (Part-III) 1976, Clause-3.
2
Nominal Plain Shank Area (A sb)= 3216.99 mm (Asb)= Pi*D2/4
Ref: IS 800: 2007, Clause 11.6.2.1.
Nominal Shear Capacity of Bolt (V nsb)= 617950.59 N (Vnsb)= (fu/sqrt(3))*(n n*Anb+ns*Asb)
2
Permissible shear Stress of Bolt (f asb)= 115.25 N/mm (fasb)= 0.6*Vnsb/Asb
2
Permissible tensile Stress of Bolt (f atb)= 163.64 N/mm (fatb)= 0.6*Tnb/Asb
PAGE 1 OF 2
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 19-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 19-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
PAGE 2 OF 2
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 19-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 19-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
2
Grade of Concrete (f ck) = 25 N/mm
2
Permissible Stress in Bond for Plain Bars (τ bd) = 0.9 N/mm
2
Net Tensile Stress Area (A nb)= 1473.05 mm Ref: IS:4218 (Part-III) 1976, Clause-3.
2
Nominal Plain Shank Area (A sb)= 1809.56 mm (Asb)= Pi*D2/4
Ref: IS 800: 2007, Clause 11.6.2.1.
Nominal Shear Capacity of Bolt (V nsb)= 340185.25 N (Vnsb)= (fu/sqrt(3))*(n n*Anb+ns*Asb)
2
Permissible shear Stress of Bolt (f asb)= 112.80 N/mm (fasb)= 0.6*Vnsb/Asb
2
Permissible tensile Stress of Bolt (f atb)= 163.64 N/mm (fatb)= 0.6*Tnb/Asb
PAGE 1 OF 3
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 19-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 19-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
PAGE 2 OF 3
By : VRS TCE Consulting Engineers Limited Project: Bhogat Terminal
Date : 27-11-2009 Client : CAIRN ENERGY INDIA PTY LIMITED Subject : Tank Foundation
Chd : SND Doc.No.: BSPL-1282-TCEL-CV-CAL-0001-B Rev. No. : C1
Date : 27-11-2009 Job No : 5795A Office : DV Dept. CV Sheet of
2
Bond stress of concrete = Tbd = 0.9 N/mm
2
Hatch area (a) = 4786.3274 mm 150
Strength of weld
Shear transferred thro' 37.70
filled weld on one side of the plate = 13.05
Permissible Stress of Weld = 96.00 N/mm2 Refer: Clause 11.6.3.1, IS 800: 2007.
Size of Weld (Tw) = 10.00 mm