Feasibility Study for
Relocation of GAIL PLL Dahej Terminal
ABBREVIATION
AG Above Ground
KVNPL Kakinada-Vijayawada-Nellore Natural Gas Pipeline
i.e. That is
Format: C191022-FMT-002_00
Feasibility Study for
Relocation of GAIL PLL Dahej Terminal
CONTENTS
1.0 INTRODUCTION.....................................................................................4
2.0 PROJECT DESCRIPTION.........................................................................4
3.0 PURPOSE...............................................................................................4
4.0 STATION WISE DESCRIPTION OF FACILITIES.......................................5
5.0 DESIGN PARAMETERS..........................................................................14
6.0 DESIGN LOADS....................................................................................15
7.0 LIST OF ATTACHMENTS........................................................................16
Format: C191022-FMT-002_00
Feasibility Study for
Relocation of GAIL PLL Dahej Terminal
1.0 INTRODUCTION
IMC Group was established in 1935 and leading Liquid Bulk and dry Cargo port
based terminals, operation and maintenance services and international trading over
last seven decades.
IMC Group has been authorized by PNGRB to lay and operate Natural Gas pipeline
from Kakinada to Nellore via Vijayawada in the state of Andhra Pradesh, referred to
as KVNPL (Kakinada-Vijayawada- Nellore pipeline) for transportation and supply of
natural gas to consumers in the state of Andhra Pradesh.
The pipeline has been designed for a total capacity of 18 MMSCMD (approx.) for
transportation & supply of gas to major demand centers en-route KVNPL.
3.0 PURPOSE
The scope of the document is to describe the basic information and design criteria
which will be used for “Feasibility Study for Relocation of GAIL PLL Dahej
Terminal” project.
Following main facilities are envisaged under the scope of this job.
Format: C191022-FMT-002_00
Feasibility Study for
Relocation of GAIL PLL Dahej Terminal
Control Building: This is a Single Storey RCC framed building with brick masonry
side cladding of overall size as 22.0mx10.0m consisting of Electrical Room, CCR Room
(SCADA Master Control Room), CER (Control Equipment Room), Office room, Store
room, battery room and toilet facilities with Septic tank & Soak pit shall be provided
for sewage treatment.
Fire water Pump House Shed: This is a Steel Structure Building having area of
15.0m x 15m with Zincalume Sheeting for roof & Side Cladding, having of 3nos of Fire
pump and 3 nos of Jockey with EOT Crane for maintenance purpose.
Fire Water Tender Shed: Steel structure building having area of 12.0m x 7.5M with
Zincalume Sheeting for roof & Side Cladding.
Fire Water Storage Tank: Steel Water storage tank (2nos) of 16M diameter having
2000CUM Capacity each resting on sand pad foundation with anticorrosive layer on
top and RCC on sloped portion.
Guard Room: This building will be 3.5M x 3.5M of RCC Framed Structure with brick
masonry side cladding.
GG Set: Foundation for 1 no. gas generator set of size 5m x 5m shall be provided.
Process Area: Process area will be RCC paved with independent foundations for
equipment’s like Jib Crane, Pig Handling trolley, Filter Skid, Metering Skid, Drain pit,
Pig Launcher/Receiver, pipe supports & crossovers etc.
Roads: 4.0M Wide RCC road shall be Constructed to connect all the facilities within
the station.
Drainage: To drain-off the storm/rain water inside the plot, interconnecting drainage
system shall be established and it shall be connected with nearby drainage point.
Boundary Wall: 3.0M high Boundary wall including 0.6M Y Angle Barbed wire and
concertina coil fencing on top shall be provided all around the Plot.
Paver Blocks: Paver Blocks shall be provided around the control building & guard
room.
Format: C191022-FMT-002_00
Feasibility Study for
Relocation of GAIL PLL Dahej Terminal
Control Building: This is a Single Storey RCC framed building with brick masonry
side cladding of overall size as 22.0mx10.0m consisting of Electrical Room, CCR Room
(SCADA Master Control Room), CER (Control Equipment Room), Office room, Store
room, battery room and toilet facilities with Septic tank & Soak pit shall be provided
for sewage treatment.
Guard Room: This building will be 3.5M x 3.5M of RCC Framed Structure with brick
masonry side cladding.
Process Area: Process area will be 50m x 29.5m RCC paved with independent
foundations for equipment’s like Jib Crane, Pig Handling trolley, Filter Skid, Metering
Skid, Drain pit, Pig Launcher/Receiver, pipe supports & crossovers etc.
Roads: 4.0M Wide RCC road shall be Constructed to connect all the facilities within
the station.
Drainage: To drain-off the storm/rain water inside the plot, interconnecting drainage
system shall be established and it shall be connected with nearby drainage point.
Boundary Wall: 3.0M high Boundary wall including 0.6M Y Angle Barbed wire and
concertina coil fencing on top shall be provided all around the Plot.
Paver Blocks: Paver Blocks shall be provided around the control building & guard
room.
b) KRISHNAPATANAM PORT.
The Civil/Structural works shall be as per Schematic Plot plan drawing no. C191022-
00-CS-PPL-6001 (Sh. 3 of 3).
Control Building: This is a Single Storey RCC framed building with brick masonry
side cladding of overall size as 12m x 8m consisting of Electrical Room,
Instrumentation Room, Battery room and toilet facilities with Septic tank & Soak pit
shall be provided for sewage treatment.
Fire water Pump House Shed: This is a Steel Structure Building having area of
15.0m x 15m with Zincalume Sheeting for roof & Side Cladding, having of 3nos of Fire
pump and 3 nos of Jockey with EOT Crane for maintenance purpose.
Format: C191022-FMT-002_00
Feasibility Study for
Relocation of GAIL PLL Dahej Terminal
Fire Water Tender Shed: Steel structure building having area of 12.0m x 7.5M with
Zincalume Sheeting for roof & Side Cladding.
Fire Water Storage Tank: Steel Water storage tank (2nos) of 16M diameter having
2000CUM Capacity each resting on sand pad foundation with anticorrosive layer on
top and RCC on sloped portion.
Guard Room: This building will be 3.5M x 3.5M of RCC Framed Structure with brick
masonry side cladding.
GG Set: Foundation for 1 no. gas generator set of size 5m x 5m shall be provided.
Process Area: Process area will be RCC paved with independent foundations for
equipment’s like Jib Crane, Pig Handling trolley, Filter Skid, Metering Skid, Drain pit,
Pig Launcher/Receiver, pipe supports & crossovers etc.
Roads: 4.0M Wide RCC road shall be Constructed to connect all the facilities within
the station.
Drainage: To drain-off the storm/rain water inside the plot, interconnecting drainage
system shall be established and it shall be connected with nearby drainage point.
Boundary Wall: 3.0M high Boundary wall including 0.6M Y Angle Barbed wire and
concertina coil fencing on top shall be provided all around the Plot.
Paver Blocks: Paver Blocks shall be provided around the control building & guard
room.
a) VIJJESWARAM
b) GMR
The Civil/Structural works shall be as per Schematic Plot plan drawing no. C191022-
00-CS-PPL-6002 (Sh. 1 of 3).
Control Building: This is a single storey RCC framed building with brick masonry side
cladding of overall size as 12.0m x 6.0m consisting of Electrical Room,
Instrumentation Room, Battery Room and toilet facilities with Septic tank & Soak pit
shall be provided for sewage treatment.
Guard Room: This building will be 3.5M x 3.5M of RCC Framed Structure with brick
masonry side cladding.
Format: C191022-FMT-002_00
Feasibility Study for
Relocation of GAIL PLL Dahej Terminal
Process Area: Process area will be 38.5m x 22.0m RCC paved with independent
foundations for equipment’s like Metering skid, Drain pit, Pig Launcher, jib crane, Pig
handling trolley. Drain pit, pipe supports & Crossovers etc.
Roads: 4.0M Wide RCC road shall be constructed to connect all the facilities in the
within the plot.
Drainage: To drain-off the storm/rain water inside the plot, interconnecting drainage
system shall be established and it shall be connected with nearby drainage point.
Boundary Wall: 3.0M high Boundary wall including 0.6M Y Angle Barbed wire and
concertina coil fencing on top shall be provided all around the Plot.
Paver Blocks: Paver Blocks shall be provided around the control building & guard
room.
Control Building: This is a single storey RCC framed building with brick masonry side
cladding of overall size as 12.0m x 6.0m consisting of Electrical Room,
Instrumentation room, Battery room and toilet facilities with septic tank & Soak pit
shall be provided for sewage treatment.
Guard Room: This building will be 3.5M x 3.5M of RCC Framed Structure with brick
masonry side cladding.
Process Area: Process area will be 38.4m x 17.0m RCC paved with independent
foundations for equipment’s like Drain pit, Pig Launcher, pipe supports & crossovers
etc.
Roads: 4.0M Wide RCC road shall be constructed to connect all the facilities in the
within the plot.
Drainage: To drain-off the storm/rain water inside the plot, interconnecting drainage
system shall be established and it shall be connected with nearby drainage point.
Boundary Wall: 3.0M high Boundary wall including 0.6M Y Angle Barbed wire and
concertina coil fencing on top shall be provided all around the Plot.
Format: C191022-FMT-002_00
Feasibility Study for
Relocation of GAIL PLL Dahej Terminal
Paver blocks: Paver Blocks shall be provided around the control building and guard
room.
Bore well: 1 no. Bore well shall be provided at each Dispatch terminal.
Control Building: This is a single storey RCC framed building with brick masonry side
cladding of overall size as 12.0m x 6.0m consisting of Electrical Room,
Instrumentation room, Battery room and toilet facilities with septic tank & Soak pit
shall be provided for sewage treatment.
Guard Room: This building will be 3.5M x 3.5M of RCC Framed Structure with brick
masonry side cladding.
Roads: 4.0M Wide RCC road shall be Constructed to connect all the facilities in the
within the plot.
Drainage: To drain-off the storm/rain water inside the plot, interconnecting drainage
system shall be established and it shall be connected with nearby drainage point.
Boundary Wall: 3.0M high Boundary wall including 0.6M Y Angle Barbed wire and
concertina coil fencing on top shall be provided all around the Plot.
Paver Blocks: Paver Blocks shall be provided around the guard room.
Format: C191022-FMT-002_00
Feasibility Study for
Relocation of GAIL PLL Dahej Terminal
Control Building: This is a single storey RCC framed building with brick masonry side
cladding of overall size as 12.0m x 6.0m consisting of Electrical Room,
Instrumentation room, Battery room and toilet facilities with septic tank & Soak pit
shall be provided for sewage treatment.
Guard Room: This building will be 3.5M x 3.5M of RCC Framed Structure with brick
masonry.
Roads: 4.0M Wide RCC road shall be Constructed to connect all the facilities in the
within the plot.
Drainage: To drain-off the storm/rain water inside the plot, interconnecting drainage
system shall be established and it shall be connected with nearby drainage point.
Boundary Wall: 3.0M high Boundary wall including 0.6M Y Angle Barbed wire and
concertina coil fencing on top shall be provided all around the Plot.
Pavement: Paver Blocks shall be provided around the control building and RCC
paving in process area with pipe support and cross overs etc.
Control Building: This is a single storey RCC framed building with brick masonry side
cladding of overall size as 12.0m x 8.0m consisting of Electrical Room,
Instrumentation Room, Battery room and toilet facilities with Septic tank & Soak pit
for sewage treatment.
Guard Room: This building will be 3.5M x 3.5M of RCC Framed Structure with brick
masonry side cladding.
Process Area: Process area will be 35m x 21.5m RCC paved with independent
foundations for equipment’s like, Jib Crane, Pig Handling trolley, Drain pit, Pig
Launcher.
Roads: 4.0M Wide RCC road shall be Constructed to connect all the facilities in the
within the plot.
Format: C191022-FMT-002_00
Feasibility Study for
Relocation of GAIL PLL Dahej Terminal
Drainage: To drain-off the storm/rain water inside the plot, interconnecting drainage
system shall be established and it shall be connected with nearby drainage point.
Boundary Wall: 3.0M high Boundary wall including 0.6M Y Angle Barbed wire and
concertina coil fencing on top shall be provided all around the Plot.
Paver blocks: Paver Blocks shall be provided around the control building and guard
room.
Control Building: This is a single storey RCC framed building with brick masonry side
cladding of overall size as 12.0m x 8.0m consisting of Electrical Room,
Instrumentation Room, battery room and toilet facilities with Septic tank & Soak pit
shall be provided for sewage treatment.
Guard Room: This building will be 3.5M x 3.5M of RCC Framed Structure with brick
masonry side cladding.
Process Area: Process area will be 35m x 15.5m RCC paved with independent
foundations for equipment’s like, Jib Crane, Pig Handling trolley, Drain pit, Pig
Launcher, pipe supports & crossovers etc.
Roads: 4.0M Wide RCC road shall be Constructed to connect all the facilities in the
within the plot.
Drainage: To drain-off the storm/rain water inside the plot, interconnecting drainage
system shall be established and it shall be connected with nearby drainage point.
Boundary Wall: 3.0M high Boundary wall including 0.6M Y Angle Barbed wire and
concertina coil fencing on top shall be provided all around the Plot.
Paver Blocks: Paver Blocks shall be provided around the control building and guard
room.
Format: C191022-FMT-002_00
Feasibility Study for
Relocation of GAIL PLL Dahej Terminal
Control Building: This is a single storey RCC framed building with brick masonry side
cladding of overall size as 22.0m x 10.0m consisting of Electrical Room, CCR Room
(SCADA Master Control Room), CER (Control Equipment Room), Office room, Store
room, battery room and toilet facilities with Septic tank & Soak pit shall be provided
for sewage treatment.
Guard Room: This building will be 3.5M x 3.5M of RCC Framed Structure with brick
masonry side cladding.
Process Area: Process area will be 47m x 28m RCC paved with independent
foundations for equipment’s like, Jib Crane, Pig Handling trolley, Drain pit, Pig
Launcher, pipe supports & crossovers etc.
Roads: 4.0M Wide RCC road shall be Constructed to connect all the facilities in the
within the plot.
Drainage: To drain-off the storm/rain water inside the plot, interconnecting drainage
system shall be established and it shall be connected with nearby drainage point.
Boundary Wall: 3.0M high Boundary wall with 0.6M Y Angle Barbed wire and
concertina coil fencing on top shall be provided all around the Plot.
Paver Blocks: Paver Blocks shall be provided around the control building and guard
room.
Future facilities like Fire Water Network System & Compressor Station
facilities are not considered.
Format: C191022-FMT-002_00
Feasibility Study for
Relocation of GAIL PLL Dahej Terminal
a) GMR POWERPLANT
b) ODALAVERU
c) VIJJESWARAM POWERPLANT
e) LANCOKONDAPALLI
f) NAGARJUNA FERTILIZER
The Civil/Structural works shall be as per Schematic Plot plan drawing no. C191022-
00-CS-PPL-6002 (Sh. 3 of 3).
Control Building: This is a single storey RCC framed building with brick masonry side
cladding of overall size as 12.0m x 6.0m consisting of Electrical Room,
Instrumentation Room, Battery Room and toilet facilities with Septic tank & Soak pit
shall be provided for sewage treatment.
Guard Room: This building will be 3.5M x 3.5M of RCC Framed Structure with brick
masonry side cladding.
Process Area: Process area will be 47m x 28m RCC paved with independent
foundations for equipment’s like, Jib Crane, Pig Handling trolley, Drain pit, Pig
Launcher pipe supports & cross overs etc.
Roads: 4.0M Wide RCC road shall be Constructed to connect all the facilities in the
within the plot.
Drainage: To drain-off the storm/rain water inside the plot, interconnecting drainage
system shall be established and it shall be connected with nearby drainage point.
Boundary Wall: 3.0M high Boundary wall including 0.6M Y Angle Barbed wire and
concertina coil fencing on top shall be provided all around the Plot.
Paver Blocks: Paver Blocks shall be provided around the control building and guard
room.
Format: C191022-FMT-002_00
Feasibility Study for
Relocation of GAIL PLL Dahej Terminal
a) GVK PEDDAPRAUM
b) RAK CERAMICS
d) CORAMANDAL FERTILIZER
e) GMR KAKINADA
f) GVK POWERPLANT
g) KONASEEMA POWERPLANT
Porta Cabin: 8.0m x 4.0m sized porta cabin shall be provided for
Electrical/Instrumentation equipments.
Guard Room: This building will be 3.5M x 3.5M of RCC Framed Structure with brick
masonry side cladding.
Process Area: Process area will be 18m x 12m RCC paved with independent
foundations for equipment’s like metering skid, Pipe supports & crossovers etc.
Roads: 4.0M Wide RCC road shall be Constructed to connect all the facilities in the
within the plot.
Drainage: To drain-off the storm/rain water inside the plot, interconnecting drainage
system shall be established and it shall be connected with nearby drainage point.
Boundary Wall: 3.0M high Boundary wall including 0.6M Y Angle Barbed wire and
concertina coil fencing on top shall be provided all around the Plot.
Paver Blocks: Paver Blocks shall be provided around the guard room.
Format: C191022-FMT-002_00
Feasibility Study for
Relocation of GAIL PLL Dahej Terminal
a) KAK SRKLM
b) EAST GODAVARI
c) KRISHNA
Chain Link Fencing: 2.4m high chain link fencing with 0.6 Y angle barbed wire and
concertina coil fencing on top shall be provided around the pit area. Main entrance
gate shall be of 1.5M wide.
a) The Indian codes and standards shall be generally used for design of Civil and
structural works.
c) Material of construction
REINFORCEMENT BARS
High Strength deformed steel bars of grade Fe 415(min.) conforming to IS: 1786
shall be used for all RCC framed structures.
CONCRETE
STEEL GREDE
Structural steel shall be grade E 250 (Fe410W) conforming to IS: 2062. Tubular
steel shall conform to Yst 240 of IS: 1161.
MASONRY WORKS
All external brick, stone and hollow concrete block masonry wall shall be minimum
230,350 and 250mm thickness respectively. Bricks for masonry work shall be class
7.5 conforming to IS:1077.
Format: C191022-FMT-002_00
Feasibility Study for
Relocation of GAIL PLL Dahej Terminal
All structures shall be checked and designed to satisfy the worst load combination
(Refer BIS: 875, BIS: 1893, BIS: 456, & BIS: 800) that produces maximum forces
and effects and consequently maximum stresses. Wind and earthquake (or blast)
loads shall not be considered to act simultaneously.
The design and detailing of all structures, whether concrete or steel, shall suffice a
minimum fire rating of greater than 2 (two) hours or as specified by licensor. Norms
as defined in OISD-STD-164, BIS: 800 and BIS: 456 shall be strictly adhered to for
structural steel and concrete works, respectively.
The various parameters to be used in analysis and design have been extracted from
the project documents. These include the various loads and force to be considered.
The same are as listed below.
The weight of all permanent construction including walls, fire proofing, floors, roofs,
partitions, stairways and fixed service and other equipment’s excluding their content.
The weight superimposed by the use and occupancy of the building or structure, not
including the wind, earthquake or dead load. Live load shall generally be as per BIS
875 (Part 2).
The major live loads for different units shall be as per Table – 2.
Format: C191022-FMT-002_00
Feasibility Study for
Relocation of GAIL PLL Dahej Terminal
MONORAIL LOAD
Monorail loads shall be considered in design, with impact factors and longitudinal
surge as per BIS: 875 (Part2).
It is the weight of equipment including fire proofing, piping, all loose internals,
insulation, platforms supported from the equipment and weight of water & liquid.
Format: C191022-FMT-002_00