Professional Documents
Culture Documents
CLIENT
ENGINEER PMC
OHL CONSULTANT
OHL CONTRACTOR
PROJECT
DEWA REV. 1
ER-2C-C0306-HSYNCOAL-MBRSOLAR 1&2 (T-52 & T-53)-E-19-30009
DOC. NO. SHT 1 OF 9
The contents, information, drawings and images in this document are confidential and proprietary to DEWA. Any unauthorized
use or disclosure of the contents are strictly prohibited. DEWA reserves its rights.
ً
ويحظر بتاتا اإلفصاح عن محتوياتها أو استخدامها بأي طريقة.دب
تعتب المحتويات والمعلومات والرسومات والصور المتضمنة يف هذا المستند رسية وتعود ملكيتها لهيئة كهرباء ومياه ر ي
ر
. وتحتفظ الهيئة بجميع حقوقها بما يتعلق بهذه المعلومات.غب مرصح بهار
C0306 – 2020 - 004 Package 2C Design & Build Contract
PROJECT :
Design, Supply, Installation, Testing and Commissioning of 400 kV
DEWA Overhead Transmission Line Modification Works to Resolve the
ER-2C-C0306-HSYNCOAL-MBRSOLAR
DATE 20.04.2022
DOC.NO: 1&2 (T-52 & T-53)-E-19-30009
DOC. REV. 1
TITLE : Final stringing chart, Phase conductors
SHT NO.
TABLE OF CONTENTS
1 INTRODUCTION 3
2 CONDUCTOR PROPERTIES 3
3 WEATHER CASES 4
1. INTRODUCTION
C0306 – 2020 - 004 Package 2C Design & Build Contract Design, Supply, Installation, Testing and Commissioning
of 400 kV Overhead Transmission Line Modification Works to Resolve the Conflicts with Rail Alignment
The Etihad Rail alignment crosses overhead transmission lines (DEWA Network) at various location (around 13 location) in
Dubai area. Wherever it crosses electrical clearances are not satisied the DEWA requirements.
Description 132kV 400kV
Vertical Clearance from Top of Rail (TOR) to OHTL Conductor 14.5m 15.5m
Vertical Clearance from Top of Road to OHTL Conductor 15.5m 16.5m
Horizontal Clearance from OHTL structure 40m 40m
The 400kV and 132kV OHL shall be modifed/relocated to achieve minimum vertical clearance of 15.5m and 14.5m respectively
to the Top of Rail (120ºC with no wind) at proposed Etihad Rail crossing.
Following Tower ranges of 400kV & 132kV OverHead Lines are being modified to achieve the electrical clearances.
Conflict-1 = CNE/0072/2008 - HYSNCOAL to MBRSOLAR S/S (Tower# 52 to 54)
Conflict-2 = CNE/286A/95 - TRSD - JFZS - DXBJANUB (Tower# 64 to 67)
Conflict-3 = CNE/005B/2006 - ENPO to Garden S/S (Tower# 32 to 34)
Conflict-4A = CNE/005B/2006 - ENPO to Garden S/S (Tower# 46 to 48)
Conflict-4B = CNE/286A/95 - TRSD - JFZS - DXBJANUB (Tower# 46 to 48)
Conflict-5 = CNE/005B/2006 - ENPO to Garden S/S (Tower# 49 to 50)
Conflict-6 = CNE/005B/2006 - MSTA to Garden S/S (Tower# 30 to 31)
Conflict-7 = CNE/005B/2006 - MSTA to Garden S/S (Tower# 13 to 14)
Conflict-8 = CNE/286A/95 - LSTA - JFZS (Tower# 17 to 18)
Conflict-9 = CNE/0072/2008 - MBRSOLAR -CARX - HRSR S/S (Tower# 134 to 135)
Conflict-10 = MEW/E01/2003-Lot II.1 - WRSN-TWPS (Tower# 25 to 26)
Conflict-11 = MEW/E01/2003-Lot II.1 - DAID - WRSN (Tower# 122 to 123)
Conflict-12 = CNE/001A/93 - AWIR - MUTN (Tower# 12 to 13)
C0306 – 2020 - 004 Package 2C Design & Build Contract
PROJECT : Design, Supply, Installation, Testing and Commissioning of 400 kV Overhead
Transmission Line Modification Works to Resolve the Conflicts with Rail Alignment
ER-2C-C0306-HSYNCOAL-MBRSOLAR 1&2 (T-52 & T-
DEWA DOC.NO: REV. 1 DATE 20.04.2022 SHT NO.
53)-E-19-30009
DOC. TITLE : Final stringing chart, Phase conductors
2 SCOPE OF DOCUMENT:
This document demonstrates the Final stringing chart, Phase conductors of conflict -1- HSYNCOAL-MBRSOLAR 1&2 (T-52 & T-53)
SECTION DETAILS
Section-1 52 53A
Section-2 53A 64 Re-stringing * Creep to be consider for Initial Tension
STRINGING LEGEND
C0306 – 2020 - 004 Package 2C Design & Build Contract
PROJECT : Design, Supply, Installation, Testing and Commissioning of 400 kV Overhead Transmission Line Modification Works
to Resolve the Conflicts with Rail Alignment
DOC.NO: ER-2C-C0306-HSYNCOAL-MBRSOLAR 1&2 (T-52 & T-53)-E-19-30009 DATE 20.04.2022
DOC. REV. 1
TITLE : Final stringing chart, Phase conductors
SHT NO.
STRINGING CHART SECTION-1 (New Conductor)
Section #4 from structure #HYSN-MBRS 52 to structure #HYSN-MBRS 53A, start set #3 'RC', end set #3 'RC'
Cable 'D:\Stringing Chart\LOC 1\PLS\aaac-yew.wir', Ruling span (m) 432.946
Sagging data: Catenary (m) 1829.6, Horiz. Tension (N) 25425 Condition C Temperature (deg C) 35
Weather case for final after creep 35°C + Nil Wind (EDS), Equivalent to 22.0 (deg C) temperature increase
Weather case for final after load 5°C + 1400.44 N/m²(T-Wind), Equivalent to 0.1 (deg C) temperature increase
Results below for condition 'Creep RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Number Projection
5 C 10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
433.0 11.19 11.47 11.74 12.02 12.28 12.56 12.82 13.09 13.35 13.60 13.86 14.11 HYSN-MBRS 52 4.68
Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
5 C 10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C
(N) (N) (N) (N) (N) (N) (N) (N) (N) (N) (N) (N)
29140 28428 27758 27132 26537 25964 25429 24914 24427 23972 23527 23104
65 C 70 C 75 C 80 C 85 C 90 C 95 C 100 C 105 C 110 C 115 C 120 C
(N) (N) (N) (N) (N) (N) (N) (N) (N) (N) (N) (N)
22703 22322 21953 21605 21268 20941 20636 20336 20047 19774 19506 19249
C0306 – 2020 - 004 Package 2C Design & Build Contract
PROJECT : Design, Supply, Installation, Testing and Commissioning of 400 kV Overhead Transmission Line Modification Works
to Resolve the Conflicts with Rail Alignment
DOC.NO: ER-2C-C0306-HSYNCOAL-MBRSOLAR 1&2 (T-52 & T-53)-E-19-30009 DATE 20.04.2022
DOC. REV. 1
TITLE : Final stringing chart, Phase conductors
SHT NO.
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Number Projection
5 C 10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
327.2 6.18 6.38 6.57 6.76 6.95 7.14 7.33 7.51 7.69 7.88 8.06 8.23 HYSN-MBRS 53A -6.48
365.0 7.69 7.94 8.17 8.41 8.65 8.89 9.12 9.35 9.57 9.80 10.03 10.25 HYSN-MBRS 54 6.31
340.0 6.68 6.89 7.09 7.30 7.51 7.71 7.91 8.11 8.31 8.51 8.70 8.89 HYSN-MBRS 55 5.27
384.5 8.54 8.81 9.07 9.34 9.60 9.86 10.12 10.37 10.62 10.88 11.13 11.37 HYSN-MBRS 56 0.45
410.8 9.75 10.05 10.35 10.66 10.96 11.26 11.55 11.84 12.13 12.42 12.70 12.98 HYSN-MBRS 57 -3.01
376.8 8.20 8.46 8.71 8.97 9.22 9.47 9.72 9.97 10.21 10.45 10.69 10.92 HYSN-MBRS 58 9.80
398.0 9.15 9.44 9.72 10.00 10.29 10.57 10.84 11.12 11.39 11.66 11.92 12.19 HYSN-MBRS 59 6.00
389.0 8.74 9.01 9.28 9.56 9.83 10.09 10.36 10.62 10.88 11.14 11.39 11.64 HYSN-MBRS 60 -6.00
372.1 8.00 8.25 8.49 8.74 8.99 9.23 9.48 9.72 9.95 10.19 10.42 10.65 HYSN-MBRS 61 -3.00
371.9 7.99 8.24 8.49 8.74 8.98 9.23 9.47 9.71 9.94 10.18 10.41 10.64 HYSN-MBRS 62 3.00
421.8 10.28 10.60 10.92 11.24 11.56 11.87 12.19 12.49 12.79 13.10 13.40 13.69 HYSN-MBRS 63 10.86
C0306 – 2020 - 004 Package 2C Design & Build Contract
PROJECT : Design, Supply, Installation, Testing and Commissioning of 400 kV Overhead Transmission Line Modification Works
to Resolve the Conflicts with Rail Alignment
DOC.NO: ER-2C-C0306-HSYNCOAL-MBRSOLAR 1&2 (T-52 & T-53)-E-19-30009 DATE 20.04.2022
DOC. REV. 1
TITLE : Final stringing chart, Phase conductors
SHT NO.
Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
5 C 10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C
(N) (N) (N) (N) (N) (N) (N) (N) (N) (N) (N) (N)
29667 28768 27931 27137 26396 25696 25039 24423 23850 23297 22777 22288
65 C 70 C 75 C 80 C 85 C 90 C 95 C 100 C 105 C 110 C 115 C 120 C
(N) (N) (N) (N) (N) (N) (N) (N) (N) (N) (N) (N)
21825 21383 20967 20568 20189 19826 19484 19158 18843 18543 18254 17975
C0306 – 2020 - 004 Package 2C Design & Build Contract
PROJECT : Design, Supply, Installation, Testing and Commissioning of 400 kV Overhead Transmission Line Modification Works
to Resolve the Conflicts with Rail Alignment
DOC.NO: ER-2C-C0306-HSYNCOAL-MBRSOLAR 1&2 (T-52 & T-53)-E-19-30009 DATE 20.04.2022
DOC. REV. 1
TITLE : Final stringing chart, Phase conductors
SHT NO.