Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output

IRRIGATION ISOLATION VALVE CHAMBER-


C0306-UAE-EUT-DG-32305
a. TYPE-1 design Height 12.7m
b. TYPE-2 design Height 6.8m
Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output

Table of Contents

1 - Introduction

2 - Geometry

3 - Materials and Design parameters

4 - Loads

5 - Analysis Model
5.1 - Idealization of analysis model
5.2 - Boundary condition
5.3 - Element local axis

6 - Load Combinations

7 - Stability checks
7.1 - Soil pressure
7.2 - Base settlement
7.3 - Flotation check

8 - Element design
8.1 - Base slab
8.2 - Walls
8.3 - Cover slab
8.4 - Early thermal cracking calculations
Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output

4.1 Buoyancy Check:


Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output


Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output


Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output


Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output

4.2 Rotational Stability Check:


Ground Level, GL = #REF! m
Ground Water Level, GWL = #REF! m
Density of Dry Soil = #REF! kN/m³
Density of Submerged Soil = #REF! kN/m³
Density of Water = #REF! kN/m³
Skew angle of the underpass from vertical = 45.0 °
GL
Superimposed dead load + Live load + Impact

GWL

Surcharge Water Pr. Earth Pr. Earth Pr. Water Pr. Surcharge
Water Pr.
Typical Cross Section Loading Diagram

Structure Plan

Active Pressure Failure Zone Width Calculation

f of backfill material = #REF! °


Failure zone active soil wedge angle = #REF! °
Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output


Failure zone passive soil wedge angle = #REF! °
Total height of structure = #REF! m
Active Soil failure zone width = #REF! m
Passive Soil failure zone width = #REF! m
Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output

Loading Diagram in Plan

Left Side Right Side


Wall Wall
Dry Soil Height = #REF! m #REF! m
Fill Height on top slab = #REF! m #REF! m
Total Height from ground level up to Base slab soffit level = #REF! m #REF! m
Top Slab Thickness = #REF! m #REF! m
Total height of structure = #REF! m #REF! m
Thickness of wall at top = #REF! m #REF! m
Thickness variation along height (either "N/A" or "1 : X") = #REF! #REF!
Thickness of wall at Mid height = #REF! m #REF! m
Thickness of wall at bottom = #REF! m #REF! m
Thickness of Base Slab = #REF! m #REF! m
Base Slab Projection = #REF! m #REF! m
Base slab soffit level = #REF! m #REF! m
Top of Concrete Level = #REF! m #REF! m
Fill on Base Slab (Excluding Surfacing) = #REF! m #REF! m
Fill height on base slab projection (excluding ballast) = #REF! m #REF! m
UDL due to ballast = #REF! kPa #REF! kPa
UDL due to rail appurtenances = #REF! kPa #REF! kPa
UDL due to Cooper E 80 (EM 360) railway vehicle = #REF! kPa #REF! kPa
Active earth pressure coefficient = #REF! #REF!
Total Lateral Surchage due to dead & live loads = #REF! kPa #REF! kPa
Alternate Live Load Surcharge throughout wall length = 20.0 kPa 20.0 kPa
Refer Total Length of Wall = 19.80 m 19.80 m
Length of wall supporting soil = 19.80 m 19.80 m
Loading Length of full active pressure development in wall = #REF! m #REF! m
Diagram in Length of varying active pressure development in wall = #REF! m #REF! m
Length of varying passive pressure development in wall = #REF! m #REF! m
Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output


Distance from C.G. to outer wall end = 4.55 m 4.55 m
Plan Distance from C.G. to end of soil at outer wall = 4.55 m 4.55 m
Distance from C.G. to full active pressure development = #REF! m #REF! m
Partial Plan Area of the base (Based on vertical C.G. line) = 135.6 m² 135.6 m²
Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output


Distance b/w C.G. of individual parts and C.G. of the structure = 5.74 m 5.74 m
Partial Plan Area of the fill on base (Based on vertical C.G. line) = 88.1 m² 88.1 m²
Distance b/w C.G. of individual fill areas and C.G. of the structure = 5.28 m 5.28 m
Tributory area of loads on top slab at outer walls = 105.9 m² 105.9 m²
Distance b/w C.G. of individual fill areas and C.G. of the structure = 5.43 m 5.43 m
Tributory area of loads on top slab at inner walls (Part 1) = 0.00 m² 0.00 m²
Tributory area of loads on top slab at inner walls (Part 2) = 0.00 m² 0.00 m²
Tributory area of loads on top slab at inner walls (Part 3) = 0.00 m² 0.00 m²
Inner Wall Thickness (Part 1) = 0.00 m 0.00 m
Inner Wall Thickness (Part 2) = 0.00 m 0.00 m
Inner Wall Thickness (Part 3) = 0.00 m 0.00 m
Inner Wall Length (Part 1) = 0.00 m 0.00 m
Distance from C.G. of the structure to inner wall end (Part 1) = 0.00 m 0.00 m
Inner Wall Length (Part 2) = 0.00 m 0.00 m
Distance from C.G. of the structure to inner wall end (Part 2) = 0.00 m 0.00 m
Inner Wall Length (Part 3) = 0.00 m 0.00 m
Distance from C.G. of the structure to inner wall end (Part 3) = 0.00 m 0.00 m
Loaded Length of Ballast at outer walls = 7.57 m 7.57 m
Loaded Length of Ballast at inner walls (Part 1) = 0.00 m 0.00 m
Loaded Length of Ballast at inner walls (Part 2) = 0.00 m 0.00 m
Loaded Length of Ballast at inner walls (Part 3) = 0.00 m 0.00 m
Minimum height of earth fill above base slab = 1.000 m 1.000 m
Shear Key Depth = 0.000 m 0.000 m
Shear Key Thickness = 0.000 m 0.000 m
Passive earth pressure coefficient = 3.000 3.000
Maximum passive earth pressure coefficient used = #REF! #REF!
Passive pressure development length in footing = 7.566 m 7.566 m

Rotational Sliding Torque Calculations


Left side Wall Right side Wall

#REF! #REF!
Due to Earth: Pressure upto water level = #REF! ### #REF! ###
Pressure at the top of structure = #REF! kPa #REF! kPa
Pressure at the soffit of structure = #REF! kPa #REF! kPa
Force per unit length of wall = #REF! kN/m #REF! kN/m
Total Force at fully active earth behind wall = #REF! kN #REF! kN
Lever Arm from C.G. of the structure = #REF! m #REF! m
Reduced active force per unit length at C.G. line = #REF! kN/m #REF! kN/m
Total Force at varying earth behind wall (Trapezoidal) = #REF! kN #REF! kN
Lever Arm from C.G. of the structure = #REF! m #REF! m
Passive pressure at top of wall on the other side of CG (Triangular) = #REF! kPa #REF! kPa
Passive pressure at top of embedment on the other side of CG (Triangular) = #REF! kPa #REF! kPa
Passive force per unit length of wall on the other side of CG (Triangular) = #REF! kN/m #REF! kN/m
Total passive Force at varying earth behind wall (Triangular) = #REF! kN #REF! kN
Lever Arm from C.G. of the structure = 1.52 m 1.52 m
Due to Minimum Earth at Wall Extensions:
Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output


Pressure at the soffit of structure = #REF! kPa #REF! kPa
Force per unit length of wall = #REF! kN/m #REF! kN/m
Total Force at active earth behind outer wall extension = #REF! kN #REF! kN
Lever Arm from C.G. of the structure = -2.27 m -2.27 m
Total Force at active earth behind inner wall extension (Part 1) = #REF! kN #REF! kN
Lever Arm from C.G. of the structure = 0.00 m 0.00 m
Total Force at active earth behind inner wall extension (Part 3) = #REF! kN #REF! kN
Lever Arm from C.G. of the structure = 0.00 m 0.00 m
Resisting Earth Pressure at inclined soil embedded part of base slab:
Passive Pressure at the top of fill on base slab part above/below CG = 0.00 kPa 0.00 kPa
Passive Pressure at the soffit of base slab part above/below CG = #REF! kPa #REF! kPa
Passive Force per unit length on base slab part above/below CG = #REF! kN/m #REF! kN/m
Passive Force on base slab part above/below CG = #REF! kN #REF! kN
Lever Arm from C.G. of the structure = 10.78 m 10.78 m
Active Force per unit length on base slab part above/below CG = #REF! kN/m #REF! kN/m
Active Force on base slab part above/below CG = #REF! kN #REF! kN
Lever Arm from C.G. of the structure = 3.22 m 3.22 m
Resisting Earth Pressure at horizontal soil embedded part of base slab:
Reduced Pressure at the top of embedment at CG line (Triangular) = #REF! kPa #REF! kPa
Passive Pressure at soffit of base at CG line (Triangular) = #REF! kPa #REF! kPa
Passive Force per unit length on embedded part at CG line = #REF! kN/m #REF! kN/m
Pressure at the top of embedment at end of fill(Triangular) = 0.00 kPa 0.00 kPa
Passive Pressure at soffit of base at end of fill (Triangular) = #REF! kPa #REF! kPa
Passive Force per unit length on embedded part at end of fill = #REF! kN/m #REF! kN/m
Passive Force at horizontal embedded part of base slab = #REF! kN #REF! kN
Lever Arm from C.G. of the structure = #REF! m #REF! m
Passive Force per unit length on embedded wall extensions = #REF! kN/m #REF! kN/m
Passive Force on embedded wall extensions = #REF! kN #REF! kN
Lever Arm from C.G. of the structure = 4.55 m 4.55 m
Rotational Sliding Torque due to earth pressure = #REF! kNm #REF! kNm

= Left side Wall Right side Wall

Due to Water: Pressure at the top of structure = #REF! ### #REF! ###
Pressure at the soffit of structure = #REF! ### #REF! ###
Force per unit length of wall = #REF! ### #REF! ###
Total Force at fully active earth behind wall = #REF! ### #REF! ###
Lever Arm from C.G. of the structure = #REF! ### #REF! ###
Total Force at varying earth behind wall = #REF! ### #REF! ###
Lever Arm from C.G. of the structure = #REF! ### #REF! ###
Due to Minimum Earth at Wall Extensions:
Pressure at the soffit of structure = #REF! ### #REF! ###
Force per unit length of wall = #REF! ### #REF! ###
Total Force at fully active earth behind wall = #REF! ### #REF! ###
Lever Arm from C.G. of the structure = #REF! ### #REF! ###
Total Force at active earth behind inner wall extension (Part 1) = #REF! ### #REF! ###
Lever Arm from C.G. of the structure = #REF! ### #REF! ###
Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output


Total Force at active earth behind inner wall extension (Part 3) = #REF! ### #REF! ###
Lever Arm from C.G. of the structure = #REF! ### #REF! ###
Rotational Sliding Torque due to water pressure = #REF! ### #REF! ###

= Left side Wall Right side Wall

Due to Surcharge: Force per unit length of wall = #REF! kN/m #REF! kN/m
Total Force at fully active earth behind wall = #REF! kN #REF! kN
Lever Arm from C.G. of the structure = #REF! m #REF! m
Total Force at varying earth behind wall = #REF! kN #REF! kN
Lever Arm from C.G. of the structure = #REF! m #REF! m
Rotational Sliding Torque due to surcharge = #REF! kNm #REF! kNm

Resisting Torque Calculations

Unit weight of reinforced concrete = #REF! kN/m³


Unit weight of water = #REF! kN/m³
Unit weight of asphalt & mass concrete = #REF! kN/m³
Coefficient of friction at base = #REF!
Coefficient of friction at wall = 0.30
Loaded width of live load = 5.8 m (for two tracks)
Loaded width of ballast = 9.8 m
Loaded width of fill = 11.2 m

= Left Part Right Part


Selfweight of Top slab = #REF! kN #REF! kN
Buoyancy Force on part above base slab (Outer Walls) = #REF! ### #REF! ###
Net downward Force due to weight of top slab = #REF! kN #REF! kN
Frictional resistance force from above = #REF! kN #REF! kN
Lever Arm (Top Slab) = 5.43 m 5.43 m
Selfweight of Wall (Outer Walls) = #REF! kN #REF! kN
Frictional resistance force from above = #REF! kN #REF! kN
Lever Arm (Outer wall) = 5.35 m 5.35 m
Weight of fill on top slab (Outer Walls) = #REF! kN #REF! kN
Weight of ballast & rail appurtenances (Outer Walls) = #REF! kN #REF! kN
Weight of fill on base slab projection = #REF! ### #REF! ###
Net downward Force due to fill & ballast = #REF! kN #REF! kN
Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output


Frictional resistance force from above (Fill+ballast) = #REF! kN #REF! kN
Lever Arm (Fill) = 5.35 m 5.35 m
Resisting torque due to dead load of top slab, wall, fill & live load = #REF! kNm #REF! kNm
Inner Walls:
Selfweight of Top slab (Part 1) = #REF! kN #REF! kN
Selfweight of Wall (Part 1) = #REF! kN #REF! kN
Buoyancy Force on part above base slab (Part 1) = #REF! kN #REF! kN
Weight of fill on top slab (Part 1) = #REF! kN #REF! kN
Weight of ballast & rail appurtenances (Part 1) = #REF! kN #REF! kN
Net downward Force due to weight of top slab, wall, fill & live load = #REF! kN #REF! kN
Frictional resistance force from above (Part 1) = #REF! kN #REF! kN
Lever Arm (Part 1) = 0.00 m 0.00 m
Selfweight of Top slab (Part 2) = #REF! kN #REF! kN
Selfweight of Wall (Part 2) = #REF! kN #REF! kN
Buoyancy Force on part above base slab (Part 2) = #REF! kN #REF! kN
Weight of fill on top slab (Part 2) = #REF! kN #REF! kN
Weight of ballast & rail appurtenances (Part 2) = #REF! kN #REF! kN
Net downward Force due to weight of top slab, wall, fill & live load = #REF! kN #REF! kN
Frictional resistance force from above (Part 2) = #REF! kN #REF! kN
Lever Arm (Part 2) = 0.00 m 0.00 m
Selfweight of Top slab (Part 3) = #REF! kN #REF! kN
Selfweight of Wall (Part 3) = #REF! kN #REF! kN
Buoyancy Force on part above base slab (Part 3) = #REF! kN #REF! kN
Weight of fill on top slab (Part 3) = #REF! kN #REF! kN
Weight of ballast & rail appurtenances (Part 3) = #REF! kN #REF! kN
Net downward Force due to weight of top slab, wall, fill & live load = #REF! kN #REF! kN
Frictional resistance force from above (Part 3) = #REF! kN #REF! kN
Lever Arm (Part 3) = 0.00 m 0.00 m
Resisting torque due to dead load of top slab, wall, fill & live load = #REF! kNm #REF! kNm
Selfweight of Base Slab = #REF! kN #REF! kN
Buoyancy Force on base slab = #REF! ### #REF! ###
Net downward Force due to weight of base slab = #REF! kN #REF! kN
Frictional resistance force from above = #REF! kN #REF! kN
Lever Arm = 5.74 m 5.74 m
Weight of fill on base slab (excluding projection) = #REF! kN #REF! kN
Buoyancy Force on fill on base slab = #REF! ### #REF! ###
Net downward Force due to weight of fill on base slab = #REF! kN #REF! kN
Frictional resistance force from above = #REF! kN #REF! kN
Lever Arm = 5.28 m 5.28 m
Resisting torque due to dead load of base slab & fill on it = #REF! kNm #REF! kNm
Wall Friction:
Total lateral load on horizontal wall = #REF! kN #REF! kN
Frictional resistance force from above = #REF! kN #REF! kN
Lever Arm from CG to outer face of wall = 5.35 m 5.35 m
Total lateral load on inclined part (base slab + fill) = #REF! kN #REF! kN
Frictional resistance force from above = #REF! kN #REF! kN
Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output


Lever Arm from CG to outer face of inclined part of base slab = 7.00 m 7.00 m
Resisting torque due to wall friction = #REF! kNm #REF! kNm

Total rotational sliding torque about C.G. of the structure = #REF! kNm
Total resisting torque about C.G. of the structure = #REF! kNm
Factor of safety against rotational sliding = #REF! ###
Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output

4.3 Sliding Check:


Ground Level, GL = #REF! m
Ground Water Level, GWL = #REF! m
Density of Dry Soil = #REF! kN/m³
Density of Submerged Soil = #REF! kN/m³
Density of Water = #REF! kN/m³
Unit weight of reinforced concrete = #REF! kN/m³
Unit weight of water = #REF! kN/m³
Unit weight of asphalt & mass concrete = #REF! kN/m³
Coefficient of friction = 0.4
Refer plan Loaded length of live load = 28.00 m
Loaded width of live load = #REF! m (for two tracks)
Plan area of the structure = 392.0 m²
GL
Superimposed dead load + Live load + Impact

GWL

Surcharge Water Pr. Earth Pr. Earth Pr. Water Pr.


Water Pr.
Typical Cross Section Loading Diagram

Snip from Drawing

Structure Plan

Left Side Right Side


Wall Wall
Dry Soil Height = #REF! m #REF! m
Fill Height on top slab = #REF! m #REF! m
Total Height from ground level up to Base slab soffit level = #REF! m #REF! m
Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output


Top Slab Thickness = #REF! m #REF! m
Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output


Total height of structure = #REF! m #REF! m
Thickness of wall at top = #REF! m #REF! m
Thickness variation along height (either "N/A" or "1 : X") = #REF! 100000
Thickness of wall at Mid height = #REF! m #REF! m
Thickness of wall at bottom = #REF! m #REF! m
Thickness of Base Slab = #REF! m #REF! m
Base Slab Projection = #REF! m #REF! m
Base slab soffit level = #REF! m #REF! m
Top of Concrete Level = #REF! m #REF! m
Fill on Base Slab (Excluding Surfacing) = #REF! m #REF! m
Fill height on base slab projection (excluding ballast) = #REF! m #REF! m
UDL due to ballast + rail appurtenances = #REF! kPa #REF! kPa
UDL due to Cooper E 80 (EM 360) railway vehicle = #REF! kPa #REF! kPa
Active earth pressure coefficient = #REF! #REF!
Total Lateral Surchage due to dead & live loads = #REF! kPa #REF! kPa
Length of Wall = 14.000 m 14.000 m
Length of full active pressure development in wall = 14.000 m 14.000 m
Length of varying active pressure development in wall = 0.000 m 0.000 m

Sliding Force Calculations


AREMA Left side Wall

Cl. 5.3.2.g For Box culverts, lateral earth pressure has been increased by 25% #REF!
Due to Earth: Pressure upto water level = #REF! ###
Pressure at the top of structure = #REF! kPa
Pressure at the soffit of structure = #REF! kPa
Force per unit length of wall = #REF! kN/m
Total Force at fully active earth behind wall = #REF! kN
Total Force at varying earth behind wall = #REF! kN
Sliding force due to earth pressure = #REF! kN

= Left side Wall

Due to Water: Pressure at the top of structure = #REF! ###


Pressure at the soffit of structure = #REF! ###
Force per unit length of wall = #REF! ###
Total Force at fully active earth behind wall = #REF! ###
Total Force at varying earth behind wall = #REF! ###
Sliding force due to water pressure = #REF! ###

= Left side Wall

Due to Surcharge: Force per unit length of wall = #REF! kN/m


Total Force at fully active earth behind wall = #REF! kN
Total Force at varying earth behind wall = #REF! kN
Rotational Sliding Torque due to surcharge = #REF! kN
Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output


Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output

Resisting Force Calculations


AREMA Right side Wall

Cl. 5.3.2.g For Box culverts, lateral earth pressure has been increased by 25% #REF!
Due to Earth: Pressure upto water level = #REF! ###
Pressure at the top of structure = #REF! kPa
Pressure at the soffit of structure = #REF! kPa
Force per unit length of wall = #REF! kN/m
Total Force at fully active earth behind wall = #REF! kN
Total Force at varying earth behind wall = #REF! kN
Sliding force due to earth pressure = #REF! kN

= Right side Wall

Due to Water: Pressure at the top of structure = #REF! ###


Pressure at the soffit of structure = #REF! ###
Force per unit length of wall = #REF! ###
Total Force at fully active earth behind wall = #REF! ###
Total Force at varying earth behind wall = #REF! ###
Sliding force due to water pressure = #REF! ###

= Structure
Selfweight of Top slab = #REF! kN
Selfweight of Wall = #REF! kN
Selfweight of Base Slab = #REF! kN
Buoyancy Force = #REF! ###
Weight of fill on top slab = #REF! kN
Weight of fill on base slab projection = #REF! ###
Weight of live load, ballast & rail appurtenances = #REF! kN
Weight of fill on base slab (excluding projection) = #REF! kN
Net downward Force due to weight of top slab, wall, fill & live load = #REF! kN
Frictional resistance force from above = #REF! kN

Total Sliding Force = #REF! kNm


Total Resisting Force = #REF! kNm
Factor of safety against rotational sliding = #REF! ###
Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output


Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3


Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output

1. INTRODUCTION

This set of calculations contain the analysis and design of IRRIGATION ISOLATION VALVE CHAMBER -
C0306-UAE-EUT-DG-32305, the structure is an underground box structure with opening for utilities. The
structures are grouped based on their height, analysis and design are performed for 2 design heights in
this report.

The loads and combination as per AASHTO LRFD and relevant design criteria have been adopted.
Structural members will be modelled in MIDAS software as uncracked section. Soil under the base slab
will be modeled as springs with stiffness corresponding to their modulus of subgrade reaction. The load
effects thus obtained from various load combinations for service limit state shall be used to satisfy the
section for crack control and deflection as per code requirements. Ultimate design checks for ultimate
moment and shear for the most critical sections as well as minimum reinforcement requirement check
shall also be carried out. All the design checks shall be made by in-house verified spread sheets. or
Autodesk Structural Bridge Design software. The stability of the structure will also be checked for
bearing pressure and buoyancy effects. In the case of buoyancy, the concept of checking the uplift will
be based on the volume displaced, as per Archimedes principle.

Breadth Design height


Item Height (m) Length (m) (m) (m)
3.07 3.5 2.8 7.1
3.422 3.5 2.8 7.1
2.702 3.5 2.8 7.1
3.927 3.5 2.8 7.1
4.329 3.5 2.8 7.1
4.453 3.5 2.8 7.1
4.963 3.5 2.8 7.1
4.412 3.5 2.8 7.1
3.477 3.5 2.8 7.1
4.556 3.5 2.8 7.1
4.181 3.5 2.8 7.1
IRRIGATION
ISOLATION VALVE CHAMBER - 4.097 3.5 2.8 7.1
C0306-UAE-EUT-DG- 2.96 3.5 2.8 7.1
32305
5.47 3.5 2.8 7.1
6.791 3.5 2.8 7.1
3.691 3.5 2.8 7.1
4.319 3.5 2.8 7.1
3.125 3.5 2.8 7.1
2.064 3.5 2.8 7.1
3.107 3.5 2.8 7.1
3.365 3.5 2.8 7.1
3.107 3.5 2.8 7.1
4.134 3.5 2.8 7.1
4.134 3.5 2.8 7.1
Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3


Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output


3.157 3.5 2.8 7.1
3.157 3.5 2.8 7.1
5.601 3.5 2.8 7.1
5.601 3.5 2.8 7.1
5.423 3.5 2.8 7.1
12.677 3.5 2.8 12.7
12.677 3.5 2.8 12.7
4.574 3.5 2.8 7.1
6.52 3.5 2.8 7.1
4.574 3.5 2.8 7.1
4.963 3.5 2.8 7.1
4.412 3.5 2.8 7.1
3.477 3.5 2.8 7.1
4.556 3.5 2.8 7.1
4.57 3.5 2.8 7.1
6.791 3.5 2.8 7.1
6.691 3.5 2.8 7.1
Table for design heights of different Isolation Valve Chambers

2. GEOMETRY
tw tw tw tw
L L
tts FGL
tw
1m
WT
W

H
tw

PLAN

tbs
ex ELEVATION

Design height, Wall


Length, L Breadth, W thickness, Top Slab Base Slab Base Slab
Item Thickness, Thickness, extension,
H (m) (m) (m) tw (m) tts (m) tbs (m) ex(m)

TYPE-1 12.7 3.5 2.8 0.75/1.25 0.25 0.9 0.75


I-IVC-32305
TYPE-2 7.1 3.5 2.8 0.35/1 0.25 0.5 0.35
Table for design dimensions.
Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no


FK Sep-23 RC Sep-23 AF

Ref. Calculations Output

3. MATERIALS & DESIGN PARAMETERS

MATERIAL PARAMETER
Cast in place reinforced concrete strength f'c/fcu 40/50 MPa
Density of reinforced concrete γc 25.0 kN/m3
CONCRETE
Modulus Elasticity of Reinforced Concrete Ec 30618 MPa
Mass concrete γMC 24.0 kN/m3
Yield strength of Steel bars fy 500 MPa
REINFORCEMENT
Modulus of Elasticity Es 200000 MPa
Density of Soil (Dry) γs(d) 19.0 kN/m3
Density of Soil (Submerged) γs(s) 9.00 kN/m3
Soil Friction Angle 30.0 Deg
SOIL At Rest Lateral Earth Pressure Coefficient Ko 0.50 -
Active Lateral Earth Pressure Coefficient Ka 0.333 -
Minimum Lateral Earth Pressure Coefficient Kmin 0.2 -
Passive Lateral Earth Pressure Coefficient Kp 3.0 -
WATER Density of Water γw 10.00 kN/m3
FRICTION Coefficient of Friction b/w concrete & soil m 0.40

The crack width of the structure is restricted to 0.3mm.

Clear cover for different elements


Elements casted against earth = 100 mm
Element casted against shuttering but exposed to soil during service = 80 mm
Element casted against shuttering not exposed to soil during service = 60 mm

4. LOADS

A. SELF WEIGHT
Self weight of the structure will be auto calculated by the software and shall be based upon the density
of reinforced concrete as mentioned under the section "Materials"

B. SUPERIMPOSED DEAD LOAD


Superimposed dead load considered on cover slab = 5 kN/m2
Superimposed dead load considered on base slab = 2 kN/m3

C. LIVE LOAD
Live load considered on cover slab = 5 kN/m2
Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3


Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output

D. EARTH PRESSURE AND HYDROSTATIC PRESSURE

The average depth of water table is 6m below ground level, since this design caters for a large
number of chambers, the water table is considered be at 1m below the top of cover slab for analysis
and design consrvatively.

Lateral loads
Surcharge load considered, γSL = 20 kN/m3
Horizontal earth pressure due to Surcharge load (A) = γSL x ko = 10 kN/m2

The are 2 cases for horizontal Earth pressure


Case 1. No Presence of water table
Dry density of soil, γs(d) = 19.0 kN/m3
Horizontal Earth pressure due to soil (B) = ko x γs(d) x H' = 9.5H' kN/m2

Case 2. With presence of Water table


Dry density of soil, γs(d) = 19.0 kN/m3
Horizontal Earth pressure due to dry soil for 1m (E) = ko x γs(d) x h = 9.5 kN/m2

Submerged density of soil, γs(s) = 9.0 kN/m3


Horizontal Earth pressure due to submerged soil (D) = ko x γs(s) x(H'-1) = 4.5(H'-1) kN/m2

Density of water, γw = 10.00 kN/m3


Horizontal water pressure (C) = γw x (H'-1) = 10(H'-1) kN/m2
Hydrostatic uplift force (F) = γw x (H''-1) = 10(H''-1) kN/m2

Vertical loads
The are 2 cases for vertical force due to earth fill on extension of base slab
Case 1. No Presence of water table
Dry density of soil, γs(d) = 19.0 kN/m3
Vertical Earth pressure due to dry soil (G) = γs(d) x h = 19H kN/m2

Case 2. With presence of Water table


Submerged density of soil, γs(s) = 9.0 kN/m3
Vertical Earth pressure due to submerged soil (I) = γs(d) x 1 + γs(s) x(H-1)
= 19+9(H-1) kN/m2

Vertical load due to accidental water fill in chamber (J) = 10(H-tts) kN/m2

h = Height of water table from top of cover slab


H' = Height of Camber from top of cover slab to center line of base slab
H'' = Height of Camber from top of cover slab to bottom of base slab
Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output

H (m) H' (m) H'' (m) A (kN/m2) B (kN/m2) C (kN/m2) D (kN/m2) E (kN/m2) F (kN/m2)

I-IVC-32305-T1 12.7 13.15 13.6 10 124.9 121.5 54.7 9.5 126.0


I-IVC-32305-T2 7.1 7.35 7.6 10 69.8 63.5 28.6 9.5 66.0
Table for Lateral forces due to Earth Retained and water table

Vertical pressure due to soil Vertical pressure due to soil Vertical pressure due to
H (m) case 1 (G) (kN/m2) case 2 (I) (kN/m2) water fill (J) (kN/m2)

I-IVC-32305-T1 12.7 241.3 124.3 124.5


I-IVC-32305-T2 7.1 134.9 73.9 68.5
Table for Vertical forces due to Earth Retained and water inside chamber
Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output

5. ANALYSIS MODEL

5.1 IDEALIZATION OF ANALYSIS MODEL

The chambers are modeled with shell elements, loads are applied as pressure loads and foundation has
been idealized as spring with stiffness corresponding to modulus of subgrade reaction of soil.

a. 32305-TYPE 1, Design height= 12.7m b. 32305-TYPE 2, Design height= 6.8m


L = 6.5 m L = 4.9 m
W = 5.8 m W = 4.2 m

5.2 BOUNDARY CONDITION

Modulus of subgrade reaction for vertical soil spring = 24000 kN/m3


Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output

5.3 ELEMENT LOCAL AXIS

BASE SLAB & COVER SLAB

WALLS
Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output


Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output

6. LOAD COMBINATION

The following combinations have been considered for checking the structural adequacy

* Service I for Crack width, soil pressure and base settlement


* Strength I and Strength IV for ultimate capacity check
Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output

7. STABILITY CHECKS

7.1 SOIL PRESSURE


a. IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305-TYPE 1, Design height= 12.7m

Soil pressure at Service loads

Maximum Soil pressure from MIDAS model = 298 kN/m2


Allowable soil pressure. = 400 kN/m2

b. IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305-TYPE 2, Design height= 6.8m

Soil pressure at Service loads

Maximum Soil pressure from MIDAS model = 140 kN/m2


Allowable soil pressure. = 400 kN/m2
Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output

7.2 BASE SETTLEMENT

a. IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305-TYPE 1, Design height= 12.7m

Maximum base settlement from MIDAS model = 12 mm


Permissible base settlement = 25 mm

b. IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305-TYPE 2, Design height= 6.8m

Maximum base settlement from MIDAS model = 6 mm


Permissible base settlement = 25 mm
Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output

7.3 FLOTATION CHECK

The reactions from MIDAS model is presented below, SIDL and earth fill on the base slab projection is
not tabulated from software

a. IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305-TYPE 1, Design height= 12.7m

Factor of safety from Model reaction = 1.6604

b. IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305-TYPE 2, Design height= 6.8m

Factor of safety from Model reaction = 1.1656


Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output

8. ELEMENT DESIGN

8.1 BASE SLAB

Service moment Mxx

a. 32305-TYPE 1, Design height= 12.7m b. 32305-TYPE 2, Design height= 6.8m

Service moment Myy

a. 32305-TYPE 1, Design height= 12.7m b. 32305-TYPE 2, Design height= 6.8m

Ultimate moment Mxx

a. 32305-TYPE 1, Design height= 12.7m b. 32305-TYPE 2, Design height= 6.8m


Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output

Ultimate moment Myy

a. 32305-TYPE 1, Design height= 12.7m b. 32305-TYPE 2, Design height= 6.8m

Ultimate shear Vxx

a. 32305-TYPE 1, Design height= 12.7m b. 32305-TYPE 2, Design height= 6.8m

Ultimate shear Vyy

a. 32305-TYPE 1, Design height= 12.7m b. 32305-TYPE 2, Design height= 6.8m


Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output

8.2 WALL

Service moment Mxx

a. 32305-TYPE 1, Design height= 12.7m b. 32305-TYPE 2, Design height= 6.8m

Service moment Myy

a. 32305-TYPE 1, Design height= 12.7m b. 32305-TYPE 2, Design height= 6.8m


Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output

Ultimate moment Mxx

a. 32305-TYPE 1, Design height= 12.7m b. 32305-TYPE 2, Design height= 6.8m

Ultimate moment Myy

a. 32305-TYPE 1, Design height= 12.7m b. 32305-TYPE 2, Design height= 6.8m


Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output

Ultimate shear Vxx

a. 32305-TYPE 1, Design height= 12.7m b. 32305-TYPE 2, Design height= 6.8m

Ultimate shear Vyy

a. 32305-TYPE 1, Design height= 12.7m b. 32305-TYPE 2, Design height= 6.8m


Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output

8.3 COVER SLAB

Service moment Mxx

a. 32305-TYPE 1, Design height= 12.7m b. 32305-TYPE 2, Design height= 6.8m

Service moment Myy

a. 32305-TYPE 1, Design height= 12.7m b. 32305-TYPE 2, Design height= 6.8m

Ultimate moment Mxx

a. 32305-TYPE 1, Design height= 12.7m b. 32305-TYPE 2, Design height= 6.8m


Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output

Ultimate moment Myy

a. 32305-TYPE 1, Design height= 12.7m b. 32305-TYPE 2, Design height= 6.8m

Ultimate shear Vxx

a. 32305-TYPE 1, Design height= 12.7m b. 32305-TYPE 2, Design height= 6.8m

Ultimate shear Vyy

a. 32305-TYPE 1, Design height= 12.7m b. 32305-TYPE 2, Design height= 6.8m


Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output


8
8.4 EARLY THERMAL CRACKING
Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output

PLAN ELEVATION

Design height, Length, L Breadth, W Wall Top Slab Base Slab Base Slab
Item H (m) (m) (m) thickness, Thickness, Thickness, extension,
tw (m) tts (m) tbs (m) ex(m)

I-AVC-32304 TYPE-1 7.3 3.5 3.5 Err:509 Err:509 Err:509 Err:509


TYPE-1 10.8 17.1 4.4 Err:509 Err:509 Err:509 Err:509
S-AVC-32404
TYPE-2 5.8 17.1 4.4 Err:509 Err:509 Err:509 Err:509
TYPE-1 10.8 3.8 2.8 Err:509 Err:509 Err:509 Err:509
S-AVC-32415
TYPE-2 5.8 3.8 2.8 Err:509 Err:509 Err:509 Err:509
I-FCC-32308 TYPE-1 6.3 3 2.8 Err:509 Err:509 Err:509 Err:509
TYPE-1 12.7 3.5 2.8 0.75/1.25 0.25 0.9 0.75
I-IVC-32305
TYPE-2 6.8 3.5 2.8 0.35/1 0.25 0.5 0.35
TYPE-1 10.3 3.6 3.6 Err:509 Err:509 Err:509 Err:509
S-IVC-32407
TYPE-2 6.3 3.6 3.6 Err:509 Err:509 Err:509 Err:509
TYPE-1 11.1 13.6 3.6 Err:509 Err:509 Err:509 Err:509
S-IVC-32416
TYPE-2 7.7 13.6 3.6 Err:509 Err:509 Err:509 Err:509
TYPE-1 13.5 6 5.4 Err:509 Err:509 Err:509 Err:509
I-WVC-32310
TYPE-2 7.3 6 5.4 Err:509 Err:509 Err:509 Err:509
S-WVC-32414 TYPE-1 8.3 5.1 5 Err:509 Err:509 Err:509 Err:509
S-WVC-32403 TYPE-1 8.3 18 15.5 Err:509 Err:509 Err:509 Err:509
Table for design dimensions of different chambers

I-AVC : Irrigation Air Valve Chamber S-AVC : Sewer Air Valve Chamber

H (m) H' (m) H'' (m) A (kN/m2) B (kN/m2) C (kN/m2) D (kN/m2) E (kN/m2) F (kN/m2)

I-AVC-32304-T1 7.3 Err:509 Err:509 10 Err:509 Err:509 Err:509 9.5 Err:509


S-AVC-32404-T1 10.8 Err:509 Err:509 10 Err:509 Err:509 Err:509 9.5 Err:509
S-AVC-32404-T2 5.8 Err:509 Err:509 10 Err:509 Err:509 Err:509 9.5 Err:509
S-AVC-32415-T1 10.8 Err:509 Err:509 10 Err:509 Err:509 Err:509 9.5 Err:509
S-AVC-32415-T2 5.8 Err:509 Err:509 10 Err:509 Err:509 Err:509 9.5 Err:509
I-FCC-32308-T1 6.3 Err:509 Err:509 10 Err:509 Err:509 Err:509 9.5 Err:509
I-IVC-32305-T1 12.7 13.15 13.6 10 124.9 121.5 54.7 9.5 126.0
Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output


I-IVC-32305-T2 6.8 7.05 7.3 10 67.0 60.5 27.2 9.5 63.0
S-IVC-32407-T1 10.3 Err:509 Err:509 10 Err:509 Err:509 Err:509 9.5 Err:509
S-IVC-32407-T2 6.3 Err:509 Err:509 10 Err:509 Err:509 Err:509 9.5 Err:509
S-IVC-32416-T1 11.1 Err:509 Err:509 10 Err:509 Err:509 Err:509 9.5 Err:509
S-IVC-32416-T2 7.7 Err:509 Err:509 10 Err:509 Err:509 Err:509 9.5 Err:509
I-WVC-32310-T1 13.5 Err:509 Err:509 10 Err:509 Err:509 Err:509 9.5 Err:509
I-WVC-32310-T2 7.3 Err:509 Err:509 10 Err:509 Err:509 Err:509 9.5 Err:509
S-WVC-32414-T1 8.3 Err:509 Err:509 10 Err:509 Err:509 Err:509 9.5 Err:509
S-WVC-32403-T1 8.3 Err:509 Err:509 10 Err:509 Err:509 Err:509 9.5 Err:509
Table for Lateral forces due to Earth Retained and water table

Vertical presure due to soil Vertical presure due to soil Vertical presure due to
H (m) case 1 (G) (kN/m2) case 2 (I) (kN/m2) water fill (J) (kN/m2)

I-AVC-32304-T1 7.3 138.7 75.7 Err:509


S-AVC-32404-T1 10.8 205.2 107.2 Err:509
S-AVC-32404-T2 5.8 110.2 62.2 Err:509
S-AVC-32415-T1 10.8 205.2 107.2 Err:509
S-AVC-32415-T2 5.8 110.2 62.2 Err:509
I-FCC-32308-T1 6.3 119.7 66.7 Err:509
I-IVC-32305-T1 12.7 241.3 124.3 124.5
I-IVC-32305-T2 6.8 129.2 71.2 65.5
S-IVC-32407-T1 10.3 195.7 102.7 Err:509
S-IVC-32407-T2 6.3 119.7 66.7 Err:509
S-IVC-32416-T1 11.1 210.9 109.9 Err:509
S-IVC-32416-T2 7.7 146.3 79.3 Err:509
I-WVC-32310-T1 13.5 256.5 131.5 Err:509
I-WVC-32310-T2 7.3 138.7 75.7 Err:509
S-WVC-32414-T1 8.3 157.7 84.7 Err:509
S-WVC-32403-T1 8.3 157.7 84.7 Err:509

4. ANALYSIS

Different cases of loading have been considered to capture the worst effects.

1. The camber is full with water and no lateral earth pressure is present.
2. With lateral earth pressure when there is no water table present.
Project Job Ref.

Etihad Rail Stage Utilities structures 37463520


Part of Structure Status

IRRIGATION ISOLATION VALVE CHAMBER-C0306-UAE-EUT-DG-32305 DCP3

Calculated by Date Checked by Date Sheet no Rev. no

FK Sep-23 RC Sep-23 AF

Ref. Calculations Output

3. With lateral pressure from soil and water when the water table is 1m below the top of cover slab
(along with boyancy force).
4. With lateral earth pressure and chamber filled with water when no water table is present.

3.4 Load Combinations:


Project Job Ref.
### #REF!
Part of Structure Status
### - Design of Section 16 #REF!
Calculated by Date Checked by Date Sheet no Rev. no
#REF! #REF! #REF! #REF! #REF!

Ref. Calculations Output

ULS Flexure Design (Rectangular Section With Tension Reinforcement Only) Slab

Concrete cylindrical strength f'c = 40 Mpa


Reinforcement yield strength fy = 420 Mpa
Section Depth h = 1000 mm
Section Width b = 1000 mm
Provided cover cover = 100 mm
Dist. b/w extreme comp. fibre to tension rft. Centeriod 'd' = 861 mm No. Dia
Provided Reinforcement (1st Layer) As1 = 6434 mm2 8 T32
Provided Reinforcement (2nd Layer) As2 = 3927 mm2 8 T25
Provided Reinforcement (3rd Layer) As3 = 0 mm2 0 T20
Provided Reinforcement As = 10361 mm2 Total Rft.
β factor β1 = 0.76 - (AREMA 2.31.1-f)
Φ factor Φ = 0.90 - (AREMA 2.30.2-b)
Factored Moment Mu = 701 kNm

Check for maximum reinforcement:

ρ < 0.75 (ρb)

ρ = 0.0120

ρb = 0.85 * β1 * f'c * [ 600 / (600+fy) ] (EQ 2-30)


fy
ρb = 0.036
Satisfies the maximum reinforcement check.Kindly proceed to design section

Design Section Capacity

Φ Mn = Φ [ As * fy * ( d - a/2 ) ] (EQ 2-29)

a = As * fy a = 128 mm
0.85 * fc' * b

Applied Moment Mu = 701 kNm


Φ Mn (Moment Capacity) ΦMn = 3122 kNm
Section is adequate

Check for minimum reinforcement: (AREMA 2.7 & 16.5.4)


Modulus of Rupture of concrete fr = 3921.2 kN/m²
Moment of inertia of gross concrete section Ig = 0.083 m4
Distance from centroidal axis to extreme fiber in tension yt = 0.500 m
Cracking Moment Mcr = 654 kNm OK
Fill depth H = #REF! m
Minimum area of reinforcement required (Per Face) Asm = #REF! mm2 #REF!
Project Job Ref.
### #REF!
Part of Structure Status
### - Design of Section 16 #REF!
Calculated by Date Checked by Date Sheet no Rev. no
#REF! #REF! #REF! #REF! #REF!

Ref. Calculations Output

ULS Shear Design (Rectangular Section With Tension Reinforcement Only)

Concrete cylindrical strength fc' = 40 Mpa


Reinforcement yield strength fy = 420 Mpa
Section Depth h = 1000 mm
Section Width b = 1000 mm
Provided cover cover = 100 mm
Dist. b/w extreme comp. fibre to tension rft. Centeriod 'd' = 861 mm No. Dia
Provided Reinforcement (1st Layer) As1 = 6434 mm2 8 T32
Provided Reinforcement (2nd Layer) As2 = 3927 mm2 8 T25
Provided Reinforcement (3rd Layer) As3 = 0 mm2 0 T20
Provided Reinforcement As = 10361 mm2 Total Rft.
Φ factor Φ = 0.85 - (AREMA 2.30.2-b)
Factored Shear Force (Vu) Vu = 2000 kN
Axial Force (-ve if Tension, 0 if no axial force) Nu = 0 kN
Corresponding Moment Mu = 2713 kNm

Shear Stress
vu = Vu / (Φ*bw*d) vu = 2.733 Mpa (EQ 2-45)

Concrete Shear Capacity


√f'c √f'c = 6.325 Mpa (AREMA 2.35.2)
V u * d / Mu Vu * d / M = 0.635 -
ρw ρw = 0.0120 -

a) Member subjected to shear & flexure only

vc = 0.16 * √f'c + 17 * ρw * Vu * d / Mu vc = 1.142 Mpa (EQ 2-46)

b) Member subjected to shear, flexure and axial compression

vc = 0.17 * ( 1 + 0.072 * Nu / Ag) * √f'c vc = 1.075 Mpa (EQ 2-47)

c) Member subjected to shear, flexure and axial tension

vc = 0.17 * ( 1 + 0.29 * Nu / Ag) * √f'c vc = 1.075 Mpa (EQ 2-48)

Since Member subjected to shear & flexure only, concrete shear capacity is

vc (max. shear stress concrete can bear) vc = 1.142 Mpa


vu allowable (without changing Rft. Spacing) vu(max-1) = 3.250 Mpa (AREMA 2.35.3-d)
vu allowable (requires changing Rft. Spacing) vu(max-2) = 5.358 Mpa (AREMA 2.35.3-e)

Section is Adequate
Project Job Ref.
### #REF!
Part of Structure Status
### - Design of Section 16 #REF!
Calculated by Date Checked by Date Sheet no Rev. no
#REF! #REF! #REF! #REF! #REF!

Ref. Calculations Output

Minimum Shear Reinforcement (AREMA 2.10.1)

Av / s = 0.42 * bw / fy

Av / s = 1.00 mm2/mm Provided Reinforcement satisfies Minimum Shear R/F requirements

Design of Shear Reinforcement (AREMA 2.35.3)


Av/s (Required) Av/s = 3.79 mm2/mm
Provided Shear Reinforcement Link Dia Legs
= T16 4.0
Required Spacing of Stirrups s Req. = 212 mm
Provided Spacing of Stirrups s prov. = 250 mm
Av/s (Provided) Av/s = 3.22 mm2/mm

Maximum Stirrups Spacing

The spacing of shear reinforcement shall not exceed smax. = 430.5 mm (2.10.3)
If ( vu - vc ) exceed 1/3*√f'c, Maximum spacing shall be reduced to smax. = 215.3 mm (2.35.3-d)

vu - vc = 1.59 < 1/3*√f'c = 2.1082 Max. spacing shall be 430.534718010916mm


Project Job Ref.
### #REF!
Part of Structure Status
### - Design of Section 16 #REF!
Calculated by Date Checked by Date Sheet no Rev. no
#REF! #REF! #REF! #REF! #REF!

Ref. Calculations Output

SLS Flexural Reinforcement Distribution (Rectangle Section with tension reinforcement only)

Section Depth h = 1000 mm


Provided cover cover = 100 mm
d 'dis. bw extreme comp. fibre to tension rft. Centroid' = 861 mm
dc 'dis. bw ext. ten. fibre to closest tension bar centeriod' = 66 mm
Section Width b = 1000 mm
Concrete cylindrical strength f'c = 40 Mpa
Reinforcement yield strength fy = 420 Mpa No. Dia
Provided Reinforcement (1st Layer) As1 = 6434 mm2 8 T32
Provided Reinforcement (2nd Layer) As2 = 3927 mm2 8 T25
Provided Reinforcement (3rd Layer) As3 = 0 mm2 0 T20
Provided Reinforcement As = 10361 mm2 Total Rft.
Service Moment Ms = 1170 kNm
Exposure conditions Exp. = Severe -
Exposure Factor γ = 0.47
Allowable Crack Width = 0.20 mm
Corresponding Z Factor Z = 15119 N/mm

E of Concrete Ec = 33994 MPa (AREMA 2.23.4)


E of Reinforcement Es = 200000 MPa
Modular Ratio n n = 6.0 MPa (AREMA 2.27-d)
Provided Reinforcement As = 10361 mm2

Neutral Axis by working stress design method:

(0.5 x b) X2 + (As x n) X - (As x n x d)

x1 x1 = 271 mm
x2 x2 = -395 mm
Neutral Axis Depth (X) X = 271 mm

Total Moment of Intertia I = 2.8.E+10 mm4

Check for distribution reinforcement (AREMA 2.39)

effective number of bars based on largest dia = 13 Nos.


A 'eff. tension area of conc. Surrounding tension rft.' = 13806 mm2
fs (allowable service stress in reinforcement) fs = 156 Mpa (EQ 2-60)
fs from max. service moment applied fs = 147 Mpa

Section is adequate