You are on page 1of 3

(Standards Cutoff - May 31, 2016) Rev 4

SAC INSPECTION CHECKLIST SACIC NUMBER DATE APPROVED QR NUMBER

Electronic Friction Cone and Piezocone Penetration


SACIC-CV-0003 4-Nov-19 CIVIL-
Test
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
CONSORTIUM of BRANCH OF
25-00053-0004, 0005, SINOHYDRO CORPORATION
KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME
0006, 0007 / COMPANY LTD and SEPCO ARABIA
INDUSTRIES AND SERVICES (MYP) PACKAGE 4, 5 AND 6 6600042823 (IK) COMPANY

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAC TIP NUMBER SAC ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

Piezocone penetrometer testing (CPTu) shall be undertaken at the


Project Specs :
locations indicated on the Drawing, in accordance with ASTM
A1 RE-621003
D5778. Where soil is encountered below caprock, the contractor
Sec. 4.8
shall drill through the caprock and carry out CPTu tests to refusal.

The CPTu logs shall contain not less than the information specified
hereinafter: Project name and location, start and completion date of
Project Specs :
CPTu, name of CPTu operator, CPTu number, location and ground
A2 RE-621003
surface elevation. CPTu logs shall also include tip resistance,
Sec. 4.8
sleeve friction, friction ratio (sleeve friction/tip resistance) and pore
water pressure.

Pressure meter testing shall also be undertaken in caprock and in


Project Specs :
bedrock at 3m and 5m intervals respectively at locations indicated
A3 RE-621003
by the Contractor. Interpretation of the results to include coefficient
Sec. 4.8
of lateral stress and stiffness modulus shall be undertaken...

The pore pressure measurement locations of the porous element


are limited to the face or tip of the cone, u1, directly behind the
ASTM D5778-12
A4 cylindrical extension of the base of the cone, u2, or behind the
Sec. 7.1.8.2
sleeve, u3. Some penetrometers used for research purposes may
have multiple measurement locations.

The miniature diaphragm type electronic pressure transducer is


normally housed near the tip of the cone. For dynamic pressure ASTM D5778-12
A5
measurements, the filter and ports are filled with deaired fluid to Sec. 7.1.8.4
measure dynamic pore pressure response.

The volume of connecting ports to the transducer should be


minimized to facilitate dynamic pressure response. These
electronic transducers are normally very reliable, accurate, and ASTM D5778-12
A6
linear in response. The transducer shall have a precision of at least Sec. 7.1.8.4
614 kPa. The pore pressure transducer must meet requirements
given in 10.2.

The signals from the penetrometer transducers are to be displayed


at the surface during testing as a continuously updated plot against ASTM D5778-12
A7
depth. The data are also to be recorded electronically for Sec. 7.2
subsequent processing.

Saudi Aramco: Company General Use


Use of analog systems is acceptable but the system resolution may
be lower than requirements in the annex and Section 10. Use of an ASTM D5778-12
A8
analog recorder as a supplement to digital system is advantageous Sec. 7.2.1
because it can provide system backup.

Saudi Aramco: Company General Use


(Standards Cutoff - May 31, 2016) Rev 4

SAC INSPECTION CHECKLIST SACIC NUMBER DATE APPROVED QR NUMBER

Electronic Friction Cone and Piezocone Penetration


SACIC-CV-0003 4-Nov-19 CIVIL-
Test
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
CONSORTIUM of BRANCH OF
25-00053-0004, SINOHYDRO CORPORATION
KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME
0005, 0006, 0007 / COMPANY LTD and SEPCO ARABIA
INDUSTRIES AND SERVICES (MYP) PACKAGE 4, 5 AND 6 6600042823 (IK) COMPANY

ITEM RE-INSP
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A
No. DATE

A penetrometer tip with a conical point having a 60° apex angle


and a cone base area of 10 or 15 cm2 is advanced through the soil
at a constant rate of 20 mm/s. The force on the conical point (cone)
required to penetrate the soil is measured by electrical methods, at
a minimum of every 50 mm of penetration. Improved resolution
may often be obtained at 20- or 10-mm interval readings. Stress is ASTM D5778-
A9
calculated by dividing the measured force (total cone force) by the 12 Sec 4.1
cone base area to obtain cone resistance, qc.

A friction sleeve is present on the penetrometer immediately


behind the cone tip, and the force exerted on the friction sleeve is
measured by electrical methods at a minimum of every 50 mm of
penetration. Stress is calculated by dividing the measured axial ASTM D5778-
A10
force by the surface area of the friction sleeve to determine sleeve 12 Sec 4.2
resistance, fs

The piezocone is advanced at a rate of 20 mm/s, and readings are


taken at a minimum of every 50 mm of penetration. The dissipation
of either positive or negative excess porewater pressure can be
monitored by stopping penetration, unloading the push rod, and
ASTM D5778-
A11 recording porewater pressure as a function of time. When
porewater pressure becomes constant it is measuring the 12 Sec 4.3
equilibrium value (designated u0) or piezometric level at that depth.

REMARKS:

REFERENCE DOCUMENTS:
1- SCOPE OF WORK FOR GEOTECHNICAL INVESTIGATIONS RE-621003 Rev. B
2- ASTM D 5778-12 (Reapproved 2012)Electronic Friction Cone and Piezocone Penetration Test

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Others
Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Saudi Aramco: Company General Use