EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAC TIP NUMBER SAC ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
The CPTu logs shall contain not less than the information specified
hereinafter: Project name and location, start and completion date of
Project Specs :
CPTu, name of CPTu operator, CPTu number, location and ground
A2 RE-621003
surface elevation. CPTu logs shall also include tip resistance,
Sec. 4.8
sleeve friction, friction ratio (sleeve friction/tip resistance) and pore
water pressure.
ITEM RE-INSP
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A
No. DATE
REMARKS:
REFERENCE DOCUMENTS:
1- SCOPE OF WORK FOR GEOTECHNICAL INVESTIGATIONS RE-621003 Rev. B
2- ASTM D 5778-12 (Reapproved 2012)Electronic Friction Cone and Piezocone Penetration Test
QC Supervisor Others
Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date: