01 23-Feb-22
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP.
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A REMARKS
No.
A General
Method
Trial area shall be 30m x 30m for each activity box of 100m x 200m for
A3 Statement,
Dynamic Compaction.
Sec. 11
The grid and spacing for trials area depend on the thickness of fill. After
calibration trial following main parameters shall be determined and used for
Method
all project areas.
A4 Statement,
- Drop height
Sec. 11
- Optimum number of blows per print
- Number of phases
Method
After drops are completed, depression shall be regraded and proofing rolled
A5 Statement,
prior to post-Cone penetration test.
Sec. 8
Quality control testing by CPT tests down to the thickness of fill (1 CPT/ Method
A6 4,000 m2)Coordinates of Post-Cone Penetration Test locations shall be Statement,
recorded and provided with Survey report. Sec. 8
Page 1 of 2
(Standards Cutoff - 30 Jun 2020) Rev. 01 23-Feb-22
REMARKS:
REFERENCE DOCUMENTS:
1- Saudi Aramco Best Practice SABP-A-073
2- Method Statement RIC/DC
Page 2 of 2