(Standards Cutoff - 30 Jun 2020) Rev.

01 23-Feb-22

SINOHYDRO INSPECTION CHECKLIST SH IC NUMBER DATE APPROVED RFI NUMBER

Trial Area Inspection for Dynamic Compaction SHIC-A-0005


PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

Infrastructure and Maintenance Building BI-25-00040/0020 Branch of Sinohydro Corporation LTD.


LOCATION

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP.

ITP NUMBER ACTIVITY ITP NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A REMARKS
No.

A General

Dynamic Compaction trials should be carried out to verify the compaction


process/compaction design parameters, the suitability of the proposed SABP-A-073,
A1
equipment and accessories, and to confirm the competence of the soil Sec. 10.3
treatment scheme.

Trial objective to Calibration of several parameters that should be used


SABP-A-073,
A2 during production phase (grid spacing, drop height, the pounder weight, the
Sec. 10.3
number of blows per print and the number of phases/passes).

Method
Trial area shall be 30m x 30m for each activity box of 100m x 200m for
A3 Statement,
Dynamic Compaction.
Sec. 11

The grid and spacing for trials area depend on the thickness of fill. After
calibration trial following main parameters shall be determined and used for
Method
all project areas.
A4 Statement,
- Drop height
Sec. 11
- Optimum number of blows per print
- Number of phases

Method
After drops are completed, depression shall be regraded and proofing rolled
A5 Statement,
prior to post-Cone penetration test.
Sec. 8

Quality control testing by CPT tests down to the thickness of fill (1 CPT/ Method
A6 4,000 m2)Coordinates of Post-Cone Penetration Test locations shall be Statement,
recorded and provided with Survey report. Sec. 8

After completion of a soil treatment area a report should be provided


compiling the following information:
- Details of soil treatment methods utilized (with appropriate parameters)
including data of both the pre and post treatment testing.
SABP-A-073,
- As-build drawings including:
A7 Sec. 12.3
-Dynamic compaction point identification, grid spacing, weight pounder, drop
height, phase/pass numbers, number of drops, UTM coordinates.
- Pre and post treatment survey assessments.
- Pre and post treatment quality control tests.

Page 1 of 2
(Standards Cutoff - 30 Jun 2020) Rev. 01 23-Feb-22

SINOHYDRO INSPECTION CHECKLIST SH IC NUMBER DATE APPROVED RFI NUMBER

Trial Area Inspection for Dynamic Compaction SHIC-A-0005


PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

Infrastructure and Maintenance Building BI-25-00040/0020 Branch of Sinohydro Corporation LTD.

REMARKS:

REFERENCE DOCUMENTS:
1- Saudi Aramco Best Practice SABP-A-073
2- Method Statement RIC/DC

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Sign and Date: Name, Initials and Date:

Page 2 of 2