EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
A Personnel Qualification
A Equipment
Bubble forming solution is a type of solution that does not break away
from the area to be tested and bubbles does not break rapidly due to air
drying or low surface tension.
A1
(NOTE: Soaps or household detergents shall not be used for the bubble
forming solution.)
(Reference: ASME Sec.V, Article 10, Appendix II, Para II-1031)
B Testing
The surface areas to be tested are dry, free of oil, grease, paint, or other
B1 contaminants that might mask a leak.
(Reference: ASME Sec.V, Article 10, Para. T-1041)
Surface temperature of the part to be tested shalll not be below
B2 40°F (4°C) nor above 125°F (52°C) throughout the examination.
(Reference: ASME Sec.V, Article 10, Appendix II, Para II-1071)
The bubble forming solution is applied by flowing, spraying, or brushing
the solution over the examination area before placement
B3
of the vacuum box.
(Reference: ASME Sec.V, Article 10, Appendix II, Para II-1072)
The vacuum box is placed over the solution coated section of the
B4 test surface and the box evacuated to the required partial vacuum.
(Reference: ASME Sec.V, Article 10, Appendix II, Para II-1073)
A partial Vacuum of 70 kPa (10 psi) gage shall be applied for vacuum 32-SAMSS-005
B5
box testing. Para 6.6.3
Page 2 of 3
SAUDI ARAMCO ID/PID - 2/19/05 - REV A (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
In-Process Inspection of Leak Testing Application. SAIC-LT-2007 25-May-05 MECH-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
The required partial vacuum (differential pressure) shall be maintained
B6 for at least 10 sec examination time.
(Reference: ASME Sec.V, Article 10, Appendix II, Para II-1074)
An overlap of 2 in. (51 mm) minimum for adjacent
placement of the vacuum box shall be used for each
B7
subsequent examination.
(Reference: ASME Sec.V, Article 10, Appendix II, Para II-1075)
C Evaluation
REFERENCE DOCUMENTS:
1. 32-SAMSS-005, Manufacture of Atmospheric Tanks, (31 December, 2003)
2. ASME SECTION V 2001 - Nondestructive Methods of Examination, (Article 10 Leak testing).
Contractor / Third-Party Saudi Aramco
Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:
Page 3 of 3