SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Review of Personnel Qualification for Magnetic Particle Testing SAIC-MPT-2002 25-May-05 NDE-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A General Requirements

Personnel performing Magnetic Particle Test shall be certified in the Schedule Q,


A1 Magnetic Particle Testing. (Ref: Schedule Q, Attachment 1, Para. Attachment III,
2.2.1) Para. 3.7
The NDT company has a written practice or procedure covering NDT
(Includes Magnetic Particle Test Method) personnel training,
experience, qualification, and certification submitted to the Saudi
Aramco Inspection Department, Dhahran and approved.
a. For in-kingdom works, the written practice shall meet or
exceed the minimum requirements of ANSI/ASNT CP-189 SAEP-1142
A1
(latest edition) Para. 4.2
b. For out-of-kingdom works, personnel may be certified to
ASNT SNT-TC-1A or any of the Certification Programs in
updated list maintained by OID Supvr. (Refer to SAEP-1142,
App. II).

Personnel responsible for interpretation of or affecting the results of


NDT operations shall be certified to a minimum of Level II per the
certifying organization's written practice.
Schedule Q,
Note: Saudi Aramco may, at it's sole discretion, require all NDT
A3 Attachment 1,
personnel, as well as any individuals interpreting or
Para. 2.2.1
influencing the interpretation of NDT results to take and
pass a verification examination administered by Saudi
Aramco.
The claimed training and/or experience of the NDT personnel from the
previous employer(s) has been obtained and verified by the current
SAEP-1142
A5 employeer and has retained the verification on file.
Para. 5.3
Note: Any claimed training or experience that cannot be verified
and documented shall be considered invalid.

The responsible NDT Level III has verified the SAEP-1142


A7
documentation/certification and attested in writing to its validity. Para. 5.4

Vision examinations shall be performed annually according to Section SAEP-1142


A9
6 of ANSI/ASNT CP-189. Para. 6.3

Level I and II personnel shall be recertified by the employer as per


SAEP-1142
A11 Section 6 of CP-189, i.e., by examination. Recertification by
Para. 7.3.1
demonstration of experience is not allowed.

Level III personnel shall be recertified by verification of the individual's


ASNT Level III certificate in each method for which re-certification is
SAEP-1142
A13 sought.
Para. 7.3.2
Note: A practical examination may be required for level III
re-certification at the discretion of the Saudi Aramco Level III.
NOTES:
1. Saudi Aramco have the right to request submission of, or be granted access to, any and all training, experience, qualification, and
certification records pertaining to NDT personnel (SAEP-1142, Para. 5.5).
2. This checklist may be used to evaluate each one or a batch of personnel qualifications submitted in one transmittal.

Page 1 of 2
#REF!
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review of Personnel Qualification for Magnetic Particle Testing SAIC-MPT-2002 25-May-05 NDE-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

REMARKS:

REFERENCE DOCUMENTS:
1. Schedule Q, Contractor's Quality Requirements, (November 2003)
2. SAEP-1142, Qualification of Non-Saudi Aramco NDT Personnell, (29 February, 2004)

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:
N/A
QC Supervisor Proponent and Others
Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date: N/A
*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED