SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Review of Radiographic Testing Personnel Qualification SAIC-RT-2002 25-May-05 NDE-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

All NDT personnel shall be qualified in accordance with SAEP-1140 or SAES-W-011,


A1
SAEP-1142, as applicable. Para. 17.1.6
The NDT company has a written practice or procedure covering NDT
(Includes Radiographic Test Method) personnel training, experience,
qualification, and certification submitted to the Saudi Aramco Inspection
Department, Dhahran and approved. SAEP-1142
A2
Note: For in-kingdom works, the written practice shall meet or Para. 4.2
exceed the minimum requirements of ANSI/ASNT CP-189
(latest edition )

Radiographic Film Interpreter have documented and verified training in


ANSI/ASNT CP-189, Appendix B, Radiographic Evaluation and
SAEP-1142
A3 Interpretation Course.
Para. 5.2
(NOTE: Any claimed training or experience that cannot be verified and
documented shall be considered invalid .)
The responsible NDT Level III of the NDE Agency has verified the
SAEP-1142
A4 documentation and attest in writing the validity of the RT personnels'
Para. 5.4
training, qualification and certification..

Personnel performing radiographic film interpretation, has passed the


SAEP-1142
A5 verification examination administered by Saudi Aramco Inspection
Para. 6.2.2
Department.
Radiographic technician has passed the Radiation Safety examination
administered by the Loss Prevention Department and is in possession of
a current "Saudi Aramco Permit to Use Material/Equipment Producing SAEP-1141,
A6
Ionizing Radiation". Para. 2.4
(NOTE: This is required only if RT is to be done within the Saudi
Aramco Facilities. )

REMARKS:

REFERENCE DOCUMENTS:
1. SAES-W-011, Welding Requirements for On-Plot Piping, (30 October, 2002)
2. SAEP-1141, Industrial Radiation Safety, (31 December, 1996 )
3. SAEP-1142, Qualification of Non-Saudi Aramco NDT Personnel, (29 February, 2004)

Contractor / Third-Party Saudi Aramco


Construction Representative* / Third Party PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:
N/A
QC Supervisor Proponent and Others
Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date: N/A
*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED