SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Radiation Safety Procedure Review SAIC-RT-2003 25-May-05 NDE-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

The RT Agency has a written Radiation Safety Procedure submitted to


Inspection Department and approved for use in the Project, unless the
agency opted to utilize SAEP-1141.
NOTES: SAEP-1143,
A1
a. A letter of approval from NDT/OID of Saudi Aramco Sec. 4
Inspection Dept is attached to the RT Procedure .
b. This is required only if RT is to be done within Saudi
Aramco Facilities .

RMARKS:

REFERENCE DOCUMENTS:
1. SAEP-1143, Radiographic Examination, (29 May, 2002)
2. SAEP-1141, Industrial Radiation Safety, (31 December, 1996)

Contractor / Third-Party Saudi Aramco


Construction Representative* / Third Party PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:
N/A
QC Supervisor Proponent and Others
Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date: N/A
*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED