M. Risk Schedule: Confidential External

The document discusses risk management for a construction project. It states that the tenderer should take a proactive approach to risk identification and management. The tenderer is asked to identify potential risks related to cost, schedule, health and safety, and other objectives, and assess the likelihood and potential impact of each risk. The tenderer should also describe mitigation plans for any risks deemed unacceptable. A 5-level system is to be used to assess impact and likelihood, and a 4-level rating will be applied to each identified risk.

Uploaded by

01095902062ahmed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
93 views1 page

M. Risk Schedule: Confidential External

The document discusses risk management for a construction project. It states that the tenderer should take a proactive approach to risk identification and management. The tenderer is asked to identify potential risks related to cost, schedule, health and safety, and other objectives, and assess the likelihood and potential impact of each risk. The tenderer should also describe mitigation plans for any risks deemed unacceptable. A 5-level system is to be used to assess impact and likelihood, and a 4-level rating will be applied to each identified risk.

Uploaded by

01095902062ahmed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

RFP 1100013866- Framework for Minor Works Strictly

Confidential External Confidential

M. Risk Schedule

The Tenderer shall adopt a proactive approach to addressing risks.


To demonstrate the Tenderer’s adoption of risk management, the Tenderer shall review
potential areas of risk risks relating to the delivery of the Works and identify the potential impact
on cost, schedule, HSE and other Objectives and the likelihood of occurrence. The Tenderer
shall also identify and describe mitigations for any unacceptable risks. For this analysis, the
Tenderer shall adopt a 5-level assessment of impact and likelihood and a 4-level rating of risk.

attached.

Duly authorised signatory to sign tenders and contract documents for and on behalf of the tendering entity

Authorised Company Company Stamp:


Signatory: Name: Projects Pioneers Contracting Co.
Name: Mr.
Mr
r. Shaheen
SSh
hah
a een Dawud Address: Umar bn Khattab, Building no 8574, PO
box no.5188, Ash Shulah, Dammam
32432, Kingdom of Saudi Arabia.
Position: Estimation and Tender Manager Email: [Link]@[Link]

Date: 17-Jan-24 Tel: +966138372532

Document No.: DocCuomnefnidt eNnutmiableEr xternal Section 5 - Technical Submission Returnable Documents
Template No.: A. 03-06-2022 Page 22 of 23

You might also like