Saudi Aramco 2617-ENG (11/2010)

DRAWING DRAFTING OFFICE PERIOD ENDING DRAFTING SCHED.


SAUDI CONSOLIDATED ENGINEERING 20-Jun-22
CONTROL COMPANY
START

DRAWING NUMBER SHEE T REV. NO. STARTING DATE


NO.
DRAWING TITLES
SCHED

6. JU'AYMAH NGL
I. GENERAL
INDEX "A"
RD-019403 1-5 00 Drawing Control - Sheet
RE-019404A 00 Calculation-Civil Utilities
RE-019404B 00 Calculation-Structural
RE-019404C 00 Calculation-Mechanical
RE-019404D 00 Calculation-Electrial

II. SITE
Gate House, Support Facilities Building, UVIS Scanner & X-Ray Building
INDEX "A" (CIVIL INFRASTRUCTURE)
RA-019406 001 00 Topographic Survey
INDEX "S" (CIVIL INFRASTRUCTURE)
RA-019407 001 00 SiteDemolition Plan
RA-019408 001 00 Site Development Plan
RA-019409 1-2 00 Site Miscellaneous Details
RA-019410 001 00 Site Sections
RA-019411 001 00 Grading and Drainage Plan
INDEX "S" (CIVIL UTILITIES)
RA-019413 001 00 Site Non-Electric Utilities Layout
RA-019414 001 00 Site Non-Electric Utilities - Miscellaneous Details
RA-019414 002 00 Site Non-Electric Utilities - Miscellaneous Details
INDEX "Q"
RA-019494 001 00 Plan / Section & Details-Holding Tank
Aramco Security Fence- HCIS CAT-1 (Length-10.17km)
INDEX "O" (CIVIL INFRASTRUCTURE)
RA-019415 001 00 Topographic Survey
RA-019416 001 00 Site Demolition Plan
RA-019417 001 00 Fence Layout and Dimension Plan
RA-019418 1-6 00 Fence Layout and Dimension Plan (Cut sheets)
RA-019419 001 00 Site Fence Section
RA-019420 1-5 00 Fence and Gate Details
RA-019421 1-6 00 Grading and Drainage Plan
INDEX "O/T"
RA-019425 001 00 ISS Equipment Layout
RA-019426 001 00 Cable Route Layout, Demolition
LEGEND: NOTES:
1) LIST DRAWINGS BY INDEX IN NUMERICAL ORDER.

2) *NORMALLY THE FIELD ETA OF DRAWINGS CAN BE OBTAINED BY


ADDING 2 TO 3 WEEKS TO THE SCHEDULED COMPLETION DATE ABOVE.
#6
6/21/2022
Saudi Aramco 2617-ENG (11/2010)
DRAWING DRAFTING OFFICE PERIOD ENDING DRAFTING SCHED.
SAUDI CONSOLIDATED ENGINEERING 20-Jun-22
CONTROL COMPANY
START COMPL

DRAWING NUMBER SHEE T REV. STARTING DATE


NO. NO.
DRAWING TITLES
SCHED ACTUAL

6. JU'AYMAH NGL
INDEX "P"
RA-019430 001 00 Site Power Layout
RA-019431 001 00 Fence Grounding Layout

INDEX "Q"
RA-019432 001 00 Gate Foundation Plan, Section & Details
INDEX "T"
RA-019422 001 00 System Block Diagram
RA-019423 001 00 Overall Cable Route Layout
RA-019424 001 00 Cable Schematic Diagram
RA-019433 001 00 System Block & Level Dia. Data/IP Tel
RA-019434 001 00 System Block & Level Dia. WLAN
RA-019435 001 00 System Block & Level Dia. Hotline Tel.
RA-019436 1-3 00 Trench & Cable Route Layout
RA-019437 001 00 Cable Schematic Diagram
RX-019438 SPARE
II. BUILDINGS
A. GATEHOUSE (TYPE-1)
INDEX "O"
RA-019427 001 00 Equipment Layout and Schematic Diagram - GH1
RA-019428 001 00 Building Entrance Layout and Details - GH1

INDEX ."R"
RA-019439 001 00 Life Safety Plan - GH1
RA-019440 001 00 Plans - GH1
RA-019441 001 00 Building Elevations & Sections - GH1
RA-019442 001 00 Wall Sections, Schedules & Details - GH1

INDEX ."Q"
RA-019444 001 00 Foundation ,Columns and Axes,Ground Floor,Roof Plans - GH1
RA-019445 001 00 Schedules, Sections and Details - GH1

INDEX ."K"
RA-019446 001 00 HVAC Layout - GH1
RA-019447 001 00 HVAC Equipment Schedule - GH1
INDEX ."B"
RA-019448 001 00 Fire Protection Layout - GH1
RA-019449 001 00 Fire Alarm Layout - GH1
RA-019450 001 00 Fire Alarm Riser Diagram - GH1
RA-019451 001 00 Cause & Effect Matrix - GH1
LEGEND: NOTES:
1) LIST DRAWINGS BY INDEX IN NUMERICAL ORDER.

2) *NORMALLY THE FIELD ETA OF DRAWINGS CAN BE OBTAINED BY


ADDING 2 TO 3 WEEKS TO THE SCHEDULED COMPLETION DATE ABOVE.
LEGEND: NOTES:
1) LIST DRAWINGS BY INDEX IN NUMERICAL ORDER.

2) *NORMALLY THE FIELD ETA OF DRAWINGS CAN BE OBTAINED BY


ADDING 2 TO 3 WEEKS TO THE SCHEDULED COMPLETION DATE ABOVE.

Saudi Aramco 2617-ENG (11/2010)


DRAWING DRAFTING OFFICE PERIOD ENDING DRAFTING SCHED.
SAUDI CONSOLIDATED ENGINEERING 20-Jun-22
CONTROL COMPANY
START

DRAWING NUMBER SHEE T REV. STARTING DATE


NO. NO.
DRAWING TITLES
SCHED

6. JU'AYMAH NGL
INDEX ."S" (PLUMBING BUILDINGS)
RA-019452 001 00 Plumbing Layout - GH1

INDEX ."P"
RA-019453 001 00 Electrical One Line Diagram - GH1
RA-019454 001 00 Power, Lighting & Grounding Layout - GH1
RA-019455 001 00 Panelboard Schedule - GH1
RA-019455 002 00 Panelboard Schedule - GH1
RD-019456 1-2 00 Cable & Conduit Schedule - GH1

INDEX ."T"
RA-019458 001 00 Horizontal Outlet Location Plan - GH1
RA-019429 001 00 Building Entrance Layout and Details - GH1

B. X-RAY BUILDINGS
INDEX ."R"
RA-019459 001 00 Life Safety Plan - XRB
RA-019460 001 00 Plans - XRB
RA-019461 001 00 Building Elevations & Sections - XRB
RA-019462 001 00 Building Wall Sections, Schedules & Details - XRB

INDEX ."Q"
RA-019463 001 00 Foundation ,Columns and Axes, Plans - XRB
RA-019464 001 00 Slab on Grade & Roof Plans - XRB
RA-019412 001 00 Schedules, Sections and Details - XRB

INDEX ."K"
RA-019465 001 00 HVAC Layout - XRB
RA-019466 001 00 HVAC Equipment Schedule - XRB

INDEX ."B"
RA-019467 001 00 Fire Protection Layout - XRB

INDEX ."S" (PLUMBING BUILDINGS)


RA-019468 001 00 Plumbing Layout - XRB
INDEX ."P"
RA-019469 001 00 Power, Lighting & Grounding Layout - XRB
RA-019470 001 00 Panelboard Schedule - XRB
LEGEND: NOTES:
1) LIST DRAWINGS BY INDEX IN NUMERICAL ORDER.
2) *NORMALLY THE FIELD ETA OF DRAWINGS CAN BE OBTAINED BY ADDING 2 TO 3 WEEKS TO THE SCHEDULED COMPLETION DATE
ABOVE.

Saudi Aramco 2617-ENG (11/2010)


DRAWING DRAFTING OFFICE PERIOD ENDING DRAFTING SCHED.
SAUDI CONSOLIDATED ENGINEERING 20-Jun-22
CONTROL COMPANY
START

DRAWING NUMBER SHEE T REV. STARTING DATE


NO. NO.
DRAWING TITLES
SCHED

6. JU'AYMAH NGL
INDEX ."T"
RA-019471 001 00 Horizontal Outlet Location Plan - XRB
RA-019472 001 00 Building Entrance Layout and Details - XRB

C. SUPPORT BUILDING (TYPE-1)


INDEX ."R"
RA-019475 001 00 Life Safety Plan - SB1
RA-019476 001 00 Floor Plan - SB1
RA-019477 001 00 Reflected Ceiling & Roof Plan - SB1
RA-019478 001 00 Building Elevations - SB1
RA-019479 001 00 Building Sections - SB1
RA-019480 001 00 Wall Sections & Details - SB1
RA-019481 001 00 Schedules & Details - SB1
RA-019482 001 00 Miscellaneous Details - SB1
RX-019483 SPARE

INDEX ."K"
RA-019485 001 00 HVAC Layout - SB1
RA-019486 001 00 HVAC Section - SB1
RA-019487 001 00 HVAC Equipment Schedule - SB1
RA-019488 001 00 HVAC Control Diagram - SB1

INDEX ."S" (PLUMBING BUILDINGS)


RA-019489 001 00 Water Supply Layout - SB1
RA-019490 001 00 Drainage Layout - SB 1
RA-019491 001 00 Enlarged Plumbing Details - SB1
RA-019491 002 00 Enlarged Plumbing Details - SB2
INDEX ."B"
RA-019493 001 00 Fire Protection Layout - SB1
RA-019495 001 00 Fire Alarm Layout - SB1

INDEX ."P"
RA-233406 001 01A Demo - Electrical One Line Diagram
NA-B57488 001 00A Revised - 480V MCC One Line Diagram-Modification
RA-233406 001 01B Revised - Electrical One Line Diagram
RX-019496 SPARE
RX-019497 SPARE
RX-019498 SPARE
RA-019499 1-2 00 Electrical One Line Diagram - SB1
LEGEND: NOTES:
1) LIST DRAWINGS BY INDEX IN NUMERICAL ORDER.
2) *NORMALLY THE FIELD ETA OF DRAWINGS CAN BE OBTAINED BY ADDING 2 TO 3 WEEKS TO THE SCHEDULED COMPLETION DATE ABOVE.

Saudi Aramco 2617-ENG (11/2010)


DRAWING DRAFTING OFFICE PERIOD ENDING DRAFTING SCHED.
SAUDI CONSOLIDATED ENGINEERING 20-Jun-22
CONTROL COMPANY
START

DRAWING NUMBER SHEE T REV. STARTING DATE


NO. NO.
DRAWING TITLES
SCHED

6. JU'AYMAH NGL
RA-019500 001 00 Power Layout - SB1
RA-019500 002 00 Grounding Layout - SB1
RA-019501 001 00 Lighting Layout - SB1
RA-019502 1-2 00 Panelboard Schedule - SB1

INDEX ."Q"
RA-019503 001 00 Foundation ,Columns and Axes Plans - SB1
RA-019504 001 00 Slab on Grade & Roof Plans - SB1
RA-019484 001 00 Schedules, Sections and Details - SB1

INDEX ."T"
RA-019505 001 00 Horizontal Outlet Location Plan - SB1
RA-019506 001 00 Horizontal Data/Voice Cable Way Plan - SB1
RA-019507 001 00 Floor Plan Equipment Layout - SB1
RA-019405 001 00 Rack Face Elevation - SB1

INDEX ."J/P"
RA-019457 001 00 Instrument Block Diagram
RE-019508 001 00 ISS - R83-AT-001/002/003
RE-019508 002 00 ISS - R83-AL-001/002/003
RE-019508 003 00 ISS - R83-AA-001/002/003
RA-019443 001 00 Instrument Connection Diagram - R83-GDP-001/002/003
RA-019473 001 00 Instrument Installation Details
RA-019474 001 00 Instrument Cable Layout
RA-019474 002 00 Instrument Cable Layout
RA-019474 003 00 Instrument Cable Layout
RD-019492 001 00 Cable & Conduit Schedule

LEGEND: NOTES:
1) LIST DRAWINGS BY INDEX IN NUMERICAL ORDER.
2) *NORMALLY THE FIELD ETA OF DRAWINGS CAN BE OBTAINED BY ADDING 2 TO 3 WEEKS TO THE SCHEDULED COMPLETION DATE ABOVE.
DRAFTING SCHED. END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM
TO END OF THIS PERIOD
PROGRESS Fawaz O. Aqeel R83 10-00965
START COMPL
DRAWING IS CONSIDERED 65% COMPLETE WHEN READY FOR CHECKING DESIGN ENG.
Rabee Zakaria

STARTING DATE PERCENT COMPLETE COMPLETION DATE* TRANSMITTED TO FIELD


HOURS REVISION

SCHED ACTUAL 10 20 30 40 50 60 70 80 90 100 SCHED ACTUAL SCHED ACTUAL NO DATE LETTER

REVISION VALIDATION
SAUDI ARABIAN OIL COM
DATE ABOVE.
THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION REQUIREMENTS, PER
SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
10-00965-0001-006 DRAWING CONTROL SHEET

UPGRADE SECURITY FACILITIES-


DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO) OTHER
FRACTIONATOR CENTER OFF
ENGG./DATE CERT. BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
FOA 06/20/2022 NMM 06/20/2022 ZAA 06/20/2022 AAA 06/20/2022
JU'AYMAH

REV. NO. DATE REVISION DESCRIPTION PLANT NO. INDEX DRAWING NO.
00 06/20/2022 ISSUED FOR CONSTRUCTION

R83 A RD-019403
JOB ORDER/EWO NO.
10-00965-0001
THIS REVISION IS NOT TO BE USED FOR CONSTRUCTION UNTIL
CERTIFIED AND DATED R83 A RD-019403

AFTING SCHED. END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO.
TO END OF THIS PERIOD
PROGRESS Fawaz O. Aqeel R83 10-00965
COMPL
DRAWING IS CONSIDERED 65% COMPLETE WHEN READY FOR CHECKING DESIGN ENG.
Rabee Zakaria

STARTING DATE PERCENT COMPLETE COMPLETION TRANSMITTED TO FIELD


DATE* HOURS REVISION

ACTUAL 10 20 30 40 50 60 70 80 90 100 SCHED ACTUAL SCHED ACTUAL NO DATE LETTER DATE

REVISION VALIDATION
SAUDI ARABIAN OIL COM
THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION REQUIREMENTS,
PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
10-00965-0001-006
DRAWING CONTROL SHEET
THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION REQUIREMENTS,
PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
10-00965-0001-006

UPGRADE SECURITY FACILITIES-DH &


DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO) OTHER
FRACTIONATOR CENTER OFFSITE
ENGG./DATE CERT. BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
FOA 06/20/2022 NMM 06/20/2022 ZAA 06/20/2022 AAA 06/20/2022
JU'AYMAH
SAUDI ARABIA

REV. NO. DATE REVISION DESCRIPTION PLANT NO. INDEX DRAWING NO.
00 06/20/2022 ISSUED FOR CONSTRUCTION

JOB ORDER/EWO NO.


10-00965-0001
THIS REVISION IS NOT TO BE USED FOR CONSTRUCTION UNTIL CERTIFIED
AND DATED R83 A RD-019403

DRAFTING SCHED. END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM
TO END OF THIS PERIOD
PROGRESS Fawaz O. Aqeel R83 10-00965
START COMPL
DRAWING IS CONSIDERED 65% COMPLETE WHEN READY FOR CHECKING DESIGN ENG.
Rabee Zakaria

STARTING DATE PERCENT COMPLETE COMPLETION TRANSMITTED TO FIELD


DATE* HOURS REVISION

SCHED ACTUAL 10 20 30 40 50 60 70 80 90 100 SCHED ACTUAL SCHED ACTUAL NO DATE LETTER


REVISION VALIDATION
SAUDI ARABIAN
OMPLETION DATE
THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION REQUIREMENTS, PER
SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
10-00965-0001-006 DRAWING CONTROL SHEET

UPGRADE SECURITY FACIL


DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO) OTHER
FRACTIONATOR CENTER
ENGG./DATE CERT. BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
FOA 06/20/2022 NMM 06/20/2022 ZAA 06/20/2022 AAA 06/20/2022
JU'AYMAH

REV. NO. DATE REVISION DESCRIPTION PLANT NO. INDEX


00 06/20/2022 ISSUED FOR CONSTRUCTION

JOB ORDER/EWO NO.


10-00965-0001
THIS REVISION IS NOT TO BE USED FOR CONSTRUCTION UNTIL
CERTIFIED AND DATED
R83 A

DRAFTING SCHED. END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO.
TO END OF THIS PERIOD
PROGRESS Fawaz O. Aqeel R83 10-00965
COMPL
DRAWING IS CONSIDERED 65% COMPLETE WHEN READY FOR DESIGN ENG.
CHECKING Rabee Zakaria

STARTING DATE PERCENT COMPLETE COMPLETION TRANSMITTED TO FIELD


DATE* HOURS REVISION

ACTUAL 10 20 30 40 50 60 70 80 90 100 SCHED ACTUAL SCHED ACTUAL NO DATE LETTER DATE


REVISION VALIDATION
SAUDI ARABIAN OIL C
N DATE ABOVE.
THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION REQUIREMENTS, PER
SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
10-00965-0001-006 DRAWING CONTROL SHEET

UPGRADE SECURITY FACILITIES


DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO) OTHER
FRACTIONATOR CENTER OFF
ENGG./DATE CERT. BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
FOA 06/20/2022 NMM 06/20/2022 ZAA 06/20/2022 AAA 06/20/2022
JU'AYMAH
SAUDI ARABIA
REV. NO. DATE REVISION DESCRIPTION PLANT NO. INDEX DRAWING NO.
00 06/20/2022 ISSUED FOR CONSTRUCTION

JOB ORDER/EWO NO.


10-00965-0001
THIS REVISION IS NOT TO BE USED FOR CONSTRUCTION UNTIL CERTIFIED AND
DATED R83 A RD-019403

DRAFTING SCHED. END OF LAST PERIOD PROJECT ENG. PLANT NO. BUDGET ITEM WORK ORDER NO.
TO END OF THIS PERIOD
PROGRESS Fawaz O. Aqeel R83 10-00965
COMPL
DRAWING IS CONSIDERED 65% COMPLETE WHEN READY FOR DESIGN ENG.
CHECKING Rabee Zakaria

STARTING DATE PERCENT COMPLETE COMPLETION TRANSMITTED TO FIELD


DATE* HOURS REVISION

ACTUAL 10 20 30 40 50 60 70 80 90 100 SCHED ACTUAL SCHED ACTUAL NO DATE LETTER DATE


REVISION VALIDATION
SAUDI ARABIAN OIL C
N DATE ABOVE.
THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION REQUIREMENTS, PER
SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
10-00965-0001-006 DRAWING CONTROL SHEET

UPGRADE SECURITY FACILITIES


DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO) OTHER
FRACTIONATOR CENTER OFF
ENGG./DATE CERT. BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
FOA 06/20/2022 NMM 06/20/2022 ZAA 06/20/2022 AAA 06/20/2022
JU'AYMAH
SAUDI ARABIA
REV. NO. DATE REVISION DESCRIPTION PLANT NO. INDEX DRAWING NO.
00 06/20/2022 ISSUED FOR CONSTRUCTION

JOB ORDER/EWO NO.


10-00965-0001
THIS REVISION IS NOT TO BE USED FOR CONSTRUCTION UNTIL CERTIFIED AND
DATED R83 A RD-019403
WORK ORDER NO. EWO NO. JOB ORDER NO.
10-00965-0001

TRANSMITTED TO FIELD REMARKS

DATE

DI ARABIAN OIL COMPANY

DRAWING CONTROL SHEET DRAWING TYPE


DSC

GRADE SECURITY FACILITIES-DH & NA

FRACTIONATOR CENTER OFFSITE

SAUDI ARABIA

DRAWING NO. SHEET NO. REV NO.

RD-019403 1 of 5 00
RD-019403 1 of 5 00

WORK ORDER NO. EWO NO. JOB ORDER NO.


10-00965-0001

ANSMITTED TO FIELD REMARKS

DATE

DI ARABIAN OIL COMPANY

DRAWING TYPE
NG CONTROL SHEET DSC
DE SECURITY FACILITIES-DH & NA

CTIONATOR CENTER OFFSITE

SAUDI ARABIA

DRAWING NO. SHEET NO. REV NO.

RD-019403 002 00

BUDGET ITEM WORK ORDER NO. EWO NO. JOB ORDER NO.
10-00965 10-00965-0001

TRANSMITTED TO FIELD REMARKS

LETTER DATE
SAUDI ARABIAN OIL COMPANY

DRAWING CONTROL SHEET DRAWING TYPE


DSC

UPGRADE SECURITY FACILITIES-DH & NA

FRACTIONATOR CENTER OFFSITE

SAUDI ARABIA

DRAWING NO. SHEET NO. REV NO.

RD-019403 003 00

WORK ORDER NO. EWO NO. JOB ORDER NO.


10-00965-0001

TRANSMITTED TO FIELD REMARKS

DATE
AUDI ARABIAN OIL COMPANY

RAWING CONTROL SHEET DRAWING TYPE


DSC

GRADE SECURITY FACILITIES-DH & NA

FRACTIONATOR CENTER OFFSITE

SAUDI ARABIA

DRAWING NO. SHEET NO. REV NO.

RD-019403 004 00

WORK ORDER NO. EWO NO. JOB ORDER NO.


10-00965-0001

TRANSMITTED TO FIELD REMARKS

DATE
AUDI ARABIAN OIL COMPANY

RAWING CONTROL SHEET DRAWING TYPE


DSC

GRADE SECURITY FACILITIES-DH & NA

FRACTIONATOR CENTER OFFSITE

SAUDI ARABIA

DRAWING NO. SHEET NO. REV NO.

RD-019403 005 00