ERECTION METHOD STATEMENT

PROJECT:CCL DALIAN SEDANG


LOCATION:INDONESIA

OCT-2021
AS-BUILT ANCHOR BOLT

MATERIAL ARRANGEMENT AND INSPECTION

COLUMN INSTALLATION & TEMPORARY BRACING

ASSEMBLING RAFTER AND ERECTION

PURLIN & BRACING INSTALLATION

CHECK ALIGNMENT OF FIRST BAY

SAME SEQUENCE FOR NEXT BAY

CONTINUE TO ERECT FOR NEXT BAY

FINISH MAIN FRAME & ACCESSORIES DES: DHT DRN: TVH CHK: HHT APP: NHK

02 29-09-21 RE-ISSUED FOR PROPOSAL


01 30-08-21 RE-ISSUED FOR PROPOSAL
REV. DATE DESCRIPTION

FINAL INSPECTION

JOB CODE : ID2112-205 BUILDING NO. :


PROJECT : CCL DALIAN SADANG
ITEM :
LOCATION : INDONESIA
SEQUENCE OF MAINFRAME INSTALLATION DRAWING TITLE : DRAWING NO.
ERECTION DIRECTION

1A 1 2 3 4 5 6 7 8 9 10 11 12 13 14

ZONE 1 ZONE 2

ERECTION ZONE DIVISION FROM GL-1 TO GL-14

ERECTION DIRECTION
14 15 16 17 18 19 20 21 22 23 24 25 26 27

ZONE 2 ZONE 3

DES: DHT DRN: TVH CHK: HHT APP: NHK

02 29-09-21 RE-ISSUED FOR PROPOSAL


01 30-08-21 RE-ISSUED FOR PROPOSAL
REV. DATE DESCRIPTION

ERECTION ZONE DIVISION FROM GL-14 TO GL-27


JOB CODE : ID2112-205 BUILDING NO. :
PROJECT : CCL DALIAN SADANG
ITEM :
LOCATION : INDONESIA
DRAWING TITLE : DRAWING NO.
ERECTION DIRECTION

STEEL COMPONENT STEEL COMPONENT STEEL COMPONENT STEEL COMPONENT

DIRECTION DIRECTION
CRANE 20-25 TON CRANE 20-25 TON CRANE 20-25 TON

STEEL COMPONENT STEEL COMPONENT STEEL COMPONENT STEEL COMPONENT STEEL COMPONENT STEEL COMPONENT

STEEL COMPONENT STEEL COMPONENT STEEL COMPONENT STEEL COMPONENT

DIRECTION DIRECTION
CRANE 20-25 TON CRANE 20-25 TON CRANE 20-25 TON

SITE ARRANGEMENT FROM GL-1 TO GL-14

ERECTION DIRECTION

STEEL COMPONENT STEEL COMPONENT STEEL COMPONENT


STEEL COMPONENT STEEL COMPONENT

CRANE 20-25 TON CRANE 20-25 TON CRANE 20-25 TON

DIRECTION DIRECTION

STEEL COMPONENT STEEL COMPONENT STEEL COMPONENT STEEL COMPONENT STEEL COMPONENT

CRANE 20-25 TON DES: DHT DRN: TVH CHK: HHT APP: NHK
CRANE 20-25 TON
DIRECTION DIRECTION
CRANE 20-25 TON

STEEL COMPONENT STEEL COMPONENT STEEL COMPONENT STEEL COMPONENT 02 29-09-21 RE-ISSUED FOR PROPOSAL
01 30-08-21 RE-ISSUED FOR PROPOSAL
REV. DATE DESCRIPTION

SITE ARRANGEMENT FROM GL-14 TO GL-27


JOB CODE : ID2112-205 BUILDING NO. :
PROJECT : CCL DALIAN SADANG
ITEM :
LOCATION : INDONESIA
DRAWING TITLE : DRAWING NO.
RF-2 RF-3
L=9.6m, WEIGH=610 Kg L=9.6m, WEIGH=610 Kg
COMPONENT WEIGHT STATISTICS

PART MARK DESCRIPTION LENGTH WEIGHT REMARK +18000


RF-1
OK L=24m, WEIGH=1225 Kg
CL-1 500x5W+215x10F 10000 588

BOOM LENGTH=26.2m
CL-2 500x5W+300x12F 18000 1560 OK

CL-3 500x5W+250x10F 18000 1230 OK


RF-1 24000 1225 OK

BOOM LENGTH=18.3m
RF-2 (500-300)x5W+150x8F 9600 610 OK
RF-3 (500-300)x5W+150x8F 9600 610 OK

UNIT: mm-kg

+10000
CL-2
L=18m, WEIGH=1560 Kg
CL-3
L=18m, WEIGH=1230 Kg

CL-1
L=10m, WEIGH=588 Kg

ATA ATA

CRANE 20-25 TON CRANE 20-25 TON

+ 0.00

19200 14400

33600

C B A

TYPICAL SECTION OF ELEVATION & CRANE CAPACITY

DES: DHT DRN: TVH CHK: HHT APP: NHK

02 29-09-21 RE-ISSUED FOR PROPOSAL


01 30-08-21 RE-ISSUED FOR PROPOSAL
REV. DATE DESCRIPTION

JOB CODE : ID2112-205 BUILDING NO. :


PROJECT : CCL DALIAN SADANG
ITEM :
LOCATION : INDONESIA
LOAD RADIUS CHART 25 TON CRANE CAPACITY 25 TON DRAWING TITLE : DRAWING NO.
STEP 1
- USE 1 CRANE 25 TONS ERECTS COLUMNS AT AXIS 1a/C AND GL-1a/B
- BRACING ENOUGH TEMPORARY CABLES BEFORE REMOVING SLING
- INSTALLING 100% BRACED BEAMS, GIRTS, IF ANY
- WORKERS REMOVE SLING ON CLAMP LADDER
RESOURCES FOR STRUT ERECTION

MACHINERY, 1 MOBILE CRANE 7~10 TONS, 1


EQUIP. CRANE 20-25 TON

MANPOWER 6~8 WORKERS

CLAIM LADDER
DETAIL 3
+10000 BO
OM
LE
NG
TH
=1
A
AT

CL-1 8.3
m

2 -1

TEM
D10

P. C
E
ABL

ABL
P. C
2
0-1

ED
CLAIM LADDER CL-1
D1

TEM

10-1
LE

2
AB

CRANE 20-25 TON


TE
C

ATA

DETAIL 2
P.
P.
TEM

CA
BL

DETAIL 1
ED
10
-12

11858

24000 18000

42000

C B A

TYPICAL CROSS SECTION OF COLUMN ERECTION AT @GL-1a

DES: DHT DRN: TVH CHK: HHT APP: NHK

WEBBING SLING
02 29-09-21 RE-ISSUED FOR PROPOSAL
TEMPORARY CABLE D10 01 30-08-21 RE-ISSUED FOR PROPOSAL
SOFT MATERIAL
REV. DATE DESCRIPTION
TURN BUCKLE PLATE STEEL SEAM COLUMN
COLUMN

STAKE V50x5, L=1200 SHACKLE


DETAIL 2 DETAIL 3
DETAIL 1 JOB CODE : ID2112-205 BUILDING NO. :
DETAIL OF BRACING TEMPORARY CABLE ON GROUND DETAIL OF INSERT PLATE
PROJECT : CCL DALIAN SADANG
ITEM :
LOCATION : INDONESIA
DRAWING TITLE : DRAWING NO.
STEP 2:

- USE 1 CRANES 25 TONS TO ERECT END WALL RAFTER RF-1, MOBILE


CRANE 7~10 TONS LIFTS PURLINS (IF ANY)
- WORKERS ASSEMBLE CONNECTION BOLT & REMOVE SLING ON
CLAMP LADDER
- TEMPORARY CABLES WILL BE APPLIED TO KEEP RAFTER IN
POSITION AND SHOULD BE KEEP UNTIL COMPLETED ALL ITEMS OF
MAINFRAME, QUANTITY OF GUIDE WIRE SHOULD BE 6m/pcs IN PLAN

SAFETY POST
RESOURCES FOR STRUT ERECTION
LIFE LINE +14900
MACHINERY, 1 MOBILE CRANE 7~10 TONS, 1
EQUIP. CRANE 20-25 TON

BOOM LENGTH=18.3m
MANPOWER 6~8 WORKERS
RF-1
A

CLAIM LADDER
AT

DETAIL 3
+10000

12
AT

CL-1

TEM
D10-

P.
BLE

CAB

0-12
P. CA

LE

TEM
D

E D1
10-
TEM

P. C
12

ABL

ABL
P. C
2
0-1

ED
CLAIM LADDER CL-1

TEM
D1

10-1
BLE

2
CRANE 20-25 TON
TE
CA

ATA

DETAIL 2
P.
P.
TEM

CA
BL

DETAIL 1
ED
10
-12

11858 12152

24000 18000

42000

C B A
TYPICAL CROSS SECTION OF RAFTER ERECTION AT @GL-1a DES: DHT DRN: TVH CHK: HHT APP: NHK

WEBBING SLING
02 29-09-21 RE-ISSUED FOR PROPOSAL
TEMPORARY CABLE D10 01 30-08-21 RE-ISSUED FOR PROPOSAL
SOFT MATERIAL REV. DATE DESCRIPTION
TURN BUCKLE PLATE STEEL SEAM COLUMN

COLUMN

STAKE V50x5, L=1200


SHACKLE
DETAIL 2
DETAIL 1 DETAIL 3 JOB CODE : ID2112-205 BUILDING NO. :
DETAIL OF INSERT PLATE
DETAIL OF BRACING TEMPORARY CABLE ON GROUND PROJECT : CCL DALIAN SADANG
ITEM :
LOCATION : INDONESIA
DRAWING TITLE : DRAWING NO.
STEP 3 RESOURCES FOR STRUT ERECTION
- USE 1 CRANE 25 TONS ERECTS COLUMNS AT AXIS 1/C
MACHINERY, 1 MOBILE CRANE 7~10 TONS, 1
- USE CRANE 20 -25 TONS ERECTS COLUMNS AT AXIS 1/B
EQUIP. CRANE 20-25 TON
- BRACING ENOUGH TEMPORARY CABLES BEFORE REMOVING SLING
- INSTALLING 100% BRACED BEAMS, GIRTS, IF ANY
MANPOWER 6~8 WORKERS
- WORKERS REMOVE SLING ON CLAMP LADDER

+18000 CL-2 A
AT

.2M
26
H=
CLAIM LADDER

NGT
LE
OM
BO
DETAIL 3
+10000 CL-1

2
1
D10-

TEM
BLE

P. CA
P. CA

BLE
TEM

D10-
12
2
0-1

CLAIM LADDER
D1
BLE

TE
CA

DETAIL 2
P.
P.

ATA
TEM

CA
BL

DETAIL 1
ED

CRANE 20-25 TON


10
-12

11957
24000 18000

42000

C B A
TYPICAL CROSS SECTION OF RAFTER ERECTION AT @GL-1 DES: DHT DRN: TVH CHK: HHT APP: NHK

WEBBING SLING
02 29-09-21 RE-ISSUED FOR PROPOSAL
TEMPORARY CABLE D10 01 30-08-21 RE-ISSUED FOR PROPOSAL
SOFT MATERIAL REV. DATE DESCRIPTION
TURN BUCKLE PLATE STEEL SEAM COLUMN

COLUMN

STAKE V50x5, L=1200


SHACKLE
DETAIL 2
DETAIL 1 DETAIL 3 JOB CODE : ID2112-205 BUILDING NO. :
DETAIL OF INSERT PLATE
DETAIL OF BRACING TEMPORARY CABLE ON GROUND PROJECT : CCL DALIAN SADANG
ITEM :
LOCATION : INDONESIA
DRAWING TITLE : DRAWING NO.
BRACING BAY
STEP 4:

- USE 1 CRANES 25 TONS TO ERECT COMBINATION RAFTER, MOBILE CRANE 7~10


TONS LIFTS PURLINS,
- INSTALL 100% PURLINS, ROOF BRACE, TUBE STRUTS AND FLANGE BRACE FOR
FIRST BAY ATA

- WORKERS ASSEMBLE CONNECTION BOLT & REMOVE SLING ON CLAMP LADDER


- CHECKING ALIGNMENT OF FIRST BAY BEFORE PROCEEDING NEXT STEP

ATA

MAIN ERECTING DIRECTION

RAFTER ERECTION FOR FIRST BAY

STEP 5:
BRACING BAY
- CONTINUE TO INSTALL COLUMN AT GL-B AND GL-C AS STEP 1, 2
ATA

- INSTALLING FULL GIRT, TUBE STRUTS AND FLANGE BRACE (IF ANY)
- INSTALL CRANE BEAM AFTER FINISHING PURLINS

ATA

DES: DHT DRN: TVH CHK: HHT APP: NHK


ATA

ATA
02 29-09-21 RE-ISSUED FOR PROPOSAL
01 30-08-21 RE-ISSUED FOR PROPOSAL
REV. DATE DESCRIPTION

MAIN ERECTING DIRECTION

JOB CODE : ID2112-205 BUILDING NO. :


ATA

PROJECT : CCL DALIAN SADANG


ITEM :
LOCATION : INDONESIA
DRAWING TITLE : DRAWING NO.

COLUMN AND STRUTS ERECTION


STEP 6:
BRACING BAY
- CONTINUE TO INSTALL RAFTER AND PURLINS SAME AS STEP 4, 5
- CRANE IS ONLY RELEASED WHEN ALL CONNECTION BOLTS WERE TIGHTEN, TEMPORARY ATA

BRACINGS, BRACING PURLINS, FLANGE BRACES WERE INSTALLED ADEQUATELY


- PROCEED WITH THE ERECTION OF THE REMAINING FRAMES AND BEARING END FRAMES

ATA

ATA

ATA

BRACING BAY
ATA

ATA

ATA

ATA

MAIN ERECTING DIRECTION

BRACING BAY
ATA

ATA

DES: DHT DRN: TVH CHK: HHT APP: NHK


ATA

02 29-09-21 RE-ISSUED FOR PROPOSAL


01 30-08-21 RE-ISSUED FOR PROPOSAL
REV. DATE DESCRIPTION

ATA

JOB CODE : ID2112-205 BUILDING NO. :


PROJECT : CCL DALIAN SADANG
ITEM :
LOCATION : INDONESIA
RAFTER AND PURLIN ERECTION FOR REMAINING FRAME DRAWING TITLE : DRAWING NO.
STEP 7:
BRACING BAY
- USE 1 CRANES 20-25 TONS TO ERECT COULUMN CL-3 AS SKETCH MOBILE CRANE 7~10 TONS LIFTS PURLINS (IF ANY)
- TEMPORARY CABLES WILL BE APPLIED TO KEEP THE COLUMN IN PLACE ATA

- CRANE IS ONLY RELEASED WHEN ALL CONNECTION BOLTS WERE TIGHTEN, TEMPORARY WERE INSTALLED ADEQUATELY

ATA

ATA

ATA

ATA

BRACING BAY
ATA

ATA

ATA

ATA

MAIN ERECTING DIRECTION

BRACING BAY
ATA

ATA

DES: DHT DRN: TVH CHK: HHT APP: NHK


ATA

02 29-09-21 RE-ISSUED FOR PROPOSAL


01 30-08-21 RE-ISSUED FOR PROPOSAL
REV. DATE DESCRIPTION

ATA

JOB CODE : ID2112-205 BUILDING NO. :


PROJECT : CCL DALIAN SADANG
ITEM :
LOCATION : INDONESIA
COLUMN ERECTION AT GLA DRAWING TITLE : DRAWING NO.
STEP 8:
BRACING BAY
- CONTINUE TO INSTALL COLUMNS AT GL-A AS SKETCH,
- TEMPORARY CABLES WILL BE APPLIED TO KEEP THE COLUMN IN PLACE. ATA

- INSTALL FULL GIRT, FLANGE BRACE, TUBE STRUTS (IF ANY)


- CRANE IS ONLY RELEASED WHEN ALL CONNECTION BOLTS WERE TIGHTEN, TEMPORARY WERE INSTALLED ADEQUATELY
- INSTALL CRANE BEAM AFTER FINISHING PURLIN ATA

ATA

ATA

BRACING BAY

BRACING BAY
ATA

ATA

ATA

BRACING BAY

ATA

ATA

BRACING BAY
ATA

ATA

MAIN ERECTING DIRECTION

DES: DHT DRN: TVH CHK: HHT APP: NHK


ATA

02 29-09-21 RE-ISSUED FOR PROPOSAL


01 30-08-21 RE-ISSUED FOR PROPOSAL
REV. DATE DESCRIPTION

ATA

JOB CODE : ID2112-205 BUILDING NO. :


PROJECT : CCL DALIAN SADANG
ITEM :
LOCATION : INDONESIA
COLUMN ERECTION AT GLA DRAWING TITLE : DRAWING NO.
STEP 8:
BRACING BAY
- USE 1 CRANES 20-25 TONS TO ERECT COMBINATION RAFTER AS SKETCH, MOBILE CRANE 7~10 TONS LIFTS PURLINS (IF ANY)
- TEMPORARY CABLES WILL BE APPLIED TO KEEP THE RAFTER IN PLACE ATA

- CRANE IS ONLY RELEASED WHEN ALL CONNECTION BOLTS WERE TIGHTEN, TEMPORARY WERE INSTALLED ADEQUATELY

ATA

ATA

ATA

ATA

BRACING BAY

BRACING BAY
ATA

ATA

ATA

ATA

BRACING BAY
ATA

ATA

MAIN ERECTING DIRECTION

DES: DHT DRN: TVH CHK: HHT APP: NHK


ATA

02 29-09-21 RE-ISSUED FOR PROPOSAL


01 30-08-21 RE-ISSUED FOR PROPOSAL
REV. DATE DESCRIPTION

ATA

JOB CODE : ID2112-205 BUILDING NO. :


PROJECT : CCL DALIAN SADANG
ITEM :
LOCATION : INDONESIA
RAFTER ERECTION AT GL1/A-B DRAWING TITLE : DRAWING NO.
STEP 9:
BRACING BAY
- USE 1 CRANES 20-25 TONS TO ERECT COMBINATION RAFTER AS SKETCH, MOBILE CRANE 7~10 TONS LIFTS PURLINS (IF ANY)
- INSTALL FULL PURLINS, FLANGE BRACE, TUBE STRUTS (IF ANY) ATA

- INSTALL RIDGE FRAME AFTER FINISHING PURLIN


- CRANE IS ONLY RELEASED WHEN ALL CONNECTION BOLTS WERE TIGHTEN, TEMPORARY WERE INSTALLED ADEQUATELY
- CHECKING ALIGNMENT OF FIRST BAY BEFORE PROCEEDING NEXT STEP ATA

ATA

ATA

ATA

BRACING BAY

BRACING BAY
ATA

ATA

ATA

ATA

BRACING BAY
ATA

ATA

MAIN ERECTING DIRECTION DES: DHT DRN: TVH CHK: HHT APP: NHK
ATA

02 29-09-21 RE-ISSUED FOR PROPOSAL


01 30-08-21 RE-ISSUED FOR PROPOSAL
REV. DATE DESCRIPTION

ATA

JOB CODE : ID2112-205 BUILDING NO. :


PROJECT : CCL DALIAN SADANG
ITEM :
LOCATION : INDONESIA
RAFTER ERECTION AT GL2/A-B DRAWING TITLE : DRAWING NO.
STEP 10:
BRACING BAY
CONTINUE TO INSTALL COMBINATION AT GL-AB SAME AS STEP 9
ATA

ATA

ATA

ATA

BRACING BAY

BRACING BAY
ATA

ATA

ATA

ATA

ATA

BRACING BAY
ATA

ATA

MAIN ERECTING DIRECTION DES: DHT DRN: TVH CHK: HHT APP: NHK
ATA

02 29-09-21 RE-ISSUED FOR PROPOSAL


01 30-08-21 RE-ISSUED FOR PROPOSAL
REV. DATE DESCRIPTION

ATA

JOB CODE : ID2112-205 BUILDING NO. :


PROJECT : CCL DALIAN SADANG
ITEM :
LOCATION : INDONESIA
RAFTER ERECTION AT GL-A TO GL-B DRAWING TITLE : DRAWING NO.
STEP 10:
BRACING BAY
- PROCEED WITH THE ERECTION OF THE REMAINING FRAMES AND BEARING END FRAMES
ATA

GENERAL NOTES ATA

EAVE STRUTS AND PEAK PURLINS MAY BE INSTALLED IN INTERMEDIATE BAYS BETWEEN
BRACED BAYS TO STABILIZE FRAMES, HOWEVER, DO NOT START MORE WORK THAN CAN
BE COMPLETED IN A WORK DAY TO ENSURE ALL STRUCTURAL FRAMING IS COMPLETED IN ATA

THOSE BAYS BEFORE LEAVING THE SITE AT THE END OF THE DAY.

ATA

BRACING BAY

BRACING BAY
ATA

ATA

ATA

ATA

BRACING BAY
ATA

ATA

MAIN ERECTING DIRECTION DES: DHT DRN: TVH CHK: HHT APP: NHK
ATA

02 29-09-21 RE-ISSUED FOR PROPOSAL


01 30-08-21 RE-ISSUED FOR PROPOSAL
REV. DATE DESCRIPTION

ATA ATA

JOB CODE : ID2112-205 BUILDING NO. :


PROJECT : CCL DALIAN SADANG
ITEM :
LOCATION : INDONESIA
RAFTER ERECTION FOR REMAINING FRAME DRAWING TITLE : DRAWING NO.
APENDIX

1. BOLT TIGHTENING 4. CRANE RUNWAY BEAM ERECTION


BOLTS WILL BE TIGHTENED BY METHOD OF TURN OF NUT OR TORQUE WRENCH
1.1 TURN OF NUT
A METHOD OF TIGHTENING BOLTS IN A CONNECTION. A ROTATION OF THE NUT THROUGH 1/2 TO ¾ TURN BEYOND
A ‘SNUG’ POSITION W ILL PRODUCE AT LEAST THE DESIRED M INIMUM TENSION ON THE BOLT. (“SNUG” IS
DEFINED AS THE POINT AT WHICH THE MATERIAL BETWEEN THE BOLT HEAD AND THE NUT IS RIGID. IF POWER
TOOLS ARE USED, “SNUG” WOULD BE THE POINT AT WHICH THE WRENCH BEGINS TO IMPACT).
1.2 TORQUE WRENCH
A WRENCH CONTAINING AN ADJUSTABLE MECHANISM FOR MEASURING AND CONTROLLING THE AMOUNT OF
TORQUE OF TURNING FORCE TO BE EXERTED USED TO TIGHTEN NUTS ON HIGH STRENGTH BOLTS AS FOLLOW TABLE.

2. FRAME PLUMBING-DEFLECTION CRITERION


ALL FRAME MEMBERS ERECTED AS ERECTION DRAWINGS ISSUED BY KIRBY WILL BE COMPLIED WITH FOLLOW TOLERANCE

3. ANCHOR BOLT TIGHTENNING


DES: DHT DRN: TVH CHK: HHT APP: NHK
- ANCHOR BOLTS SHALL BE BROUGHT TO A SNUG-TIGHT CONDITION AFTER THE FIRST TIER IS PLUMBED AND THE
COLUMNS ARE GROUTED .SNUG TIGHT IS DEFINED AS THE TIGHTNESS ATTAINED BY THE FULL EFFORT OF A MAN USING
AN ORDINARY TYPICAL SPUD WRENCH (SEE PICTURES).
02 29-09-21 RE-ISSUED FOR PROPOSAL
- ANCHOR BOLTS WERE APPLIED 02 NUTS WITH THE NUT AT THE TOP CALLED LOCKED NUT TO AVOID LOSING OF NUT BELOW.
01 30-08-21 RE-ISSUED FOR PROPOSAL
REV. DATE DESCRIPTION

JOB CODE : ID2112-205 BUILDING NO. :


PROJECT : CCL DALIAN SADANG
ITEM :
LOCATION : INDONESIA
DRAWING TITLE : DRAWING NO.
Notes:
Applied code for inspection of erection and fabrication is AISC & MBMA
REFERENCE PICTURES (SINGLE RAFTER)

DES: DHT DRN: TVH CHK: HHT APP: NHK

02 29-09-21 RE-ISSUED FOR PROPOSAL


01 30-08-21 RE-ISSUED FOR PROPOSAL
REV. DATE DESCRIPTION

JOB CODE : ID2112-205 BUILDING NO. :


PROJECT : CCL DALIAN SADANG
ITEM :
LOCATION : INDONESIA
DRAWING TITLE : DRAWING NO.
REFERENCE PICTURES (TWIN RAFTER)

DES: DHT DRN: TVH CHK: HHT APP: NHK

02 29-09-21 RE-ISSUED FOR PROPOSAL


01 30-08-21 RE-ISSUED FOR PROPOSAL
REV. DATE DESCRIPTION

JOB CODE : ID2112-205 BUILDING NO. :


PROJECT : CCL DALIAN SADANG
ITEM :
LOCATION : INDONESIA
DRAWING TITLE : DRAWING NO.