OCT-2021
AS-BUILT ANCHOR BOLT
FINISH MAIN FRAME & ACCESSORIES DES: DHT DRN: TVH CHK: HHT APP: NHK
FINAL INSPECTION
1A 1 2 3 4 5 6 7 8 9 10 11 12 13 14
ZONE 1 ZONE 2
ERECTION DIRECTION
14 15 16 17 18 19 20 21 22 23 24 25 26 27
ZONE 2 ZONE 3
DIRECTION DIRECTION
CRANE 20-25 TON CRANE 20-25 TON CRANE 20-25 TON
STEEL COMPONENT STEEL COMPONENT STEEL COMPONENT STEEL COMPONENT STEEL COMPONENT STEEL COMPONENT
DIRECTION DIRECTION
CRANE 20-25 TON CRANE 20-25 TON CRANE 20-25 TON
ERECTION DIRECTION
DIRECTION DIRECTION
STEEL COMPONENT STEEL COMPONENT STEEL COMPONENT STEEL COMPONENT STEEL COMPONENT
CRANE 20-25 TON DES: DHT DRN: TVH CHK: HHT APP: NHK
CRANE 20-25 TON
DIRECTION DIRECTION
CRANE 20-25 TON
STEEL COMPONENT STEEL COMPONENT STEEL COMPONENT STEEL COMPONENT 02 29-09-21 RE-ISSUED FOR PROPOSAL
01 30-08-21 RE-ISSUED FOR PROPOSAL
REV. DATE DESCRIPTION
BOOM LENGTH=26.2m
CL-2 500x5W+300x12F 18000 1560 OK
BOOM LENGTH=18.3m
RF-2 (500-300)x5W+150x8F 9600 610 OK
RF-3 (500-300)x5W+150x8F 9600 610 OK
UNIT: mm-kg
+10000
CL-2
L=18m, WEIGH=1560 Kg
CL-3
L=18m, WEIGH=1230 Kg
CL-1
L=10m, WEIGH=588 Kg
ATA ATA
+ 0.00
19200 14400
33600
C B A
CLAIM LADDER
DETAIL 3
+10000 BO
OM
LE
NG
TH
=1
A
AT
CL-1 8.3
m
2 -1
TEM
D10
P. C
E
ABL
ABL
P. C
2
0-1
ED
CLAIM LADDER CL-1
D1
TEM
10-1
LE
2
AB
ATA
DETAIL 2
P.
P.
TEM
CA
BL
DETAIL 1
ED
10
-12
11858
24000 18000
42000
C B A
WEBBING SLING
02 29-09-21 RE-ISSUED FOR PROPOSAL
TEMPORARY CABLE D10 01 30-08-21 RE-ISSUED FOR PROPOSAL
SOFT MATERIAL
REV. DATE DESCRIPTION
TURN BUCKLE PLATE STEEL SEAM COLUMN
COLUMN
SAFETY POST
RESOURCES FOR STRUT ERECTION
LIFE LINE +14900
MACHINERY, 1 MOBILE CRANE 7~10 TONS, 1
EQUIP. CRANE 20-25 TON
BOOM LENGTH=18.3m
MANPOWER 6~8 WORKERS
RF-1
A
CLAIM LADDER
AT
DETAIL 3
+10000
12
AT
CL-1
TEM
D10-
P.
BLE
CAB
0-12
P. CA
LE
TEM
D
E D1
10-
TEM
P. C
12
ABL
ABL
P. C
2
0-1
ED
CLAIM LADDER CL-1
TEM
D1
10-1
BLE
2
CRANE 20-25 TON
TE
CA
ATA
DETAIL 2
P.
P.
TEM
CA
BL
DETAIL 1
ED
10
-12
11858 12152
24000 18000
42000
C B A
TYPICAL CROSS SECTION OF RAFTER ERECTION AT @GL-1a DES: DHT DRN: TVH CHK: HHT APP: NHK
WEBBING SLING
02 29-09-21 RE-ISSUED FOR PROPOSAL
TEMPORARY CABLE D10 01 30-08-21 RE-ISSUED FOR PROPOSAL
SOFT MATERIAL REV. DATE DESCRIPTION
TURN BUCKLE PLATE STEEL SEAM COLUMN
COLUMN
+18000 CL-2 A
AT
.2M
26
H=
CLAIM LADDER
NGT
LE
OM
BO
DETAIL 3
+10000 CL-1
2
1
D10-
TEM
BLE
P. CA
P. CA
BLE
TEM
D10-
12
2
0-1
CLAIM LADDER
D1
BLE
TE
CA
DETAIL 2
P.
P.
ATA
TEM
CA
BL
DETAIL 1
ED
11957
24000 18000
42000
C B A
TYPICAL CROSS SECTION OF RAFTER ERECTION AT @GL-1 DES: DHT DRN: TVH CHK: HHT APP: NHK
WEBBING SLING
02 29-09-21 RE-ISSUED FOR PROPOSAL
TEMPORARY CABLE D10 01 30-08-21 RE-ISSUED FOR PROPOSAL
SOFT MATERIAL REV. DATE DESCRIPTION
TURN BUCKLE PLATE STEEL SEAM COLUMN
COLUMN
ATA
STEP 5:
BRACING BAY
- CONTINUE TO INSTALL COLUMN AT GL-B AND GL-C AS STEP 1, 2
ATA
- INSTALLING FULL GIRT, TUBE STRUTS AND FLANGE BRACE (IF ANY)
- INSTALL CRANE BEAM AFTER FINISHING PURLINS
ATA
ATA
02 29-09-21 RE-ISSUED FOR PROPOSAL
01 30-08-21 RE-ISSUED FOR PROPOSAL
REV. DATE DESCRIPTION
ATA
ATA
ATA
BRACING BAY
ATA
ATA
ATA
ATA
BRACING BAY
ATA
ATA
ATA
- CRANE IS ONLY RELEASED WHEN ALL CONNECTION BOLTS WERE TIGHTEN, TEMPORARY WERE INSTALLED ADEQUATELY
ATA
ATA
ATA
ATA
BRACING BAY
ATA
ATA
ATA
ATA
BRACING BAY
ATA
ATA
ATA
ATA
ATA
BRACING BAY
BRACING BAY
ATA
ATA
ATA
BRACING BAY
ATA
ATA
BRACING BAY
ATA
ATA
ATA
- CRANE IS ONLY RELEASED WHEN ALL CONNECTION BOLTS WERE TIGHTEN, TEMPORARY WERE INSTALLED ADEQUATELY
ATA
ATA
ATA
ATA
BRACING BAY
BRACING BAY
ATA
ATA
ATA
ATA
BRACING BAY
ATA
ATA
ATA
ATA
ATA
ATA
BRACING BAY
BRACING BAY
ATA
ATA
ATA
ATA
BRACING BAY
ATA
ATA
MAIN ERECTING DIRECTION DES: DHT DRN: TVH CHK: HHT APP: NHK
ATA
ATA
ATA
ATA
ATA
BRACING BAY
BRACING BAY
ATA
ATA
ATA
ATA
ATA
BRACING BAY
ATA
ATA
MAIN ERECTING DIRECTION DES: DHT DRN: TVH CHK: HHT APP: NHK
ATA
ATA
EAVE STRUTS AND PEAK PURLINS MAY BE INSTALLED IN INTERMEDIATE BAYS BETWEEN
BRACED BAYS TO STABILIZE FRAMES, HOWEVER, DO NOT START MORE WORK THAN CAN
BE COMPLETED IN A WORK DAY TO ENSURE ALL STRUCTURAL FRAMING IS COMPLETED IN ATA
THOSE BAYS BEFORE LEAVING THE SITE AT THE END OF THE DAY.
ATA
BRACING BAY
BRACING BAY
ATA
ATA
ATA
ATA
BRACING BAY
ATA
ATA
MAIN ERECTING DIRECTION DES: DHT DRN: TVH CHK: HHT APP: NHK
ATA
ATA ATA