You are on page 1of 2

A1

B1

Lj (Center Line of Chimney)

REFERENCE DOCUMENTS:
DOCUMENT NO. TITLE

EMPLOYER : CONSULTANT : CONTRACTOR :

MOE & EDSA TRACTEBEL ENGINEERING S.A. SINOTEC-GTSCC JV


PROJECT :

LOT 2 - DESIGN, SUPPLY, INSTALLATION, AND COMMISSIONING OF ONE 33KV


OVERHEAD TRANSMISSION LINE BETWEEN BO AND KENEMA AND REHABILITATION OF
11KV AND 0.4 KV DISTRIBUTION NETWORK

PROJECT NO.: P-SL-F00-007

TITLE:

REVISION
0. ERKENO Y. ERKENO Y. SHIYANG LIAN WEILI WANG 18/01/2022 ISSUED FOR INFORMATION

NO. DRAWN DESIGNED CHECKED APPROVED DATE NOTES/DESCRIPTIONS

SCALE: DRAWING NO.: SIZE PAGE NO. PAGE TOTAL


P-SL-F00-007/CM/A0240/H/004/A
A2 1 1
A1

B1

Lj (Center Line of Chimney)

REFERENCE DOCUMENTS:
DOCUMENT NO. TITLE

EMPLOYER : CONSULTANT : CONTRACTOR :

MOE & EDSA TRACTEBEL ENGINEERING S.A. SINOTEC-GTSCC JV


PROJECT :

LOT 2 - DESIGN, SUPPLY, INSTALLATION, AND COMMISSIONING OF ONE 33KV


OVERHEAD TRANSMISSION LINE BETWEEN BO AND KENEMA AND REHABILITATION OF
11KV AND 0.4 KV DISTRIBUTION NETWORK

PROJECT NO.: P-SL-F00-007

TITLE:

REVISION
0. ERKENO Y. ERKENO Y. SHIYANG LIAN WEILI WANG 18/01/2022 ISSUED FOR INFORMATION

NO. DRAWN DESIGNED CHECKED APPROVED DATE NOTES/DESCRIPTIONS

SCALE: DRAWING NO.: SIZE PAGE NO. PAGE TOTAL


P-SL-F00-007/CM/A0240/H/004/A
A2 1 1