You are on page 1of 7

FOR APPROVAL

A 27-Dec-2021 First Issue. Z. Hakim M.Yashiki T.Suzuki


REV. DATE DESCRIPTION DSGN CHKD APPD

PROJECT :

Cirebon 2, 1x1000MW Coal Fired Power Plant Project,


Indonesia
OWNER :

OWNER’S ENGINEER :

CONTRACTOR :

SUBCONTRACTOR / SUBSUPPLIER:

DESIGNED BY DATE TITLE : Site Test Procedure


Hardness Test for Joints Between IPT Elbow & CRV
Z. Hakim 27-12-2021

CHECKED BY DATE OWNER’S DOCUMENT NUMBER REV.

M. Yashiki 27-12-2021 CB2-T-ZEN-05-37309 A

APPROVED BY DATE (CONTRACTOR’S DOCUMENT NUMBER) (REV).

T. Suzuki 27-12-2021 (QCD-FP-XICR5-0020) 0


OWNER: PT. Cirebon Energi Prasarana

PLANT: Cirebon 2
1x1000MW Coal Fired Power Plant Project, Indonesia

Site Test Procedure -


Hardness test for joints between IPT ELBOW & CRV
TITLE.

承認 APPROVED BY 検図 CHECKED BY
T.Suzuki M.Yashiki
27-Dec-2021 27-Dec-2021
設計 DESIGNED BY 製図 DRAWN BY
(6)SHEETS WITH COVER
表紙 共  6枚

Z.Hakim
0 27-Dec-21 T. Suzuki Z.Hakim Issue for Information 27-Dec-2021
変更回数 日付 承認 変更者 記事 発行部課
REV.MARK DATE APP. REV.BY CONTENTS ISSUED.BY
TAPI 1 電力建設部
プラント工事計画グループ
配 布 先
DISTRIBUTION
Plant Field Engineering Group
Thermal PowerPlant Department
Power Plant Systems Devision
図面番号  DRAWING No. REV.MARK

QCD-FP-XICR5-0020


0
1.0 PURPOSE
This document covers the test procedure and the criteria for Hardness test for joints between
IPT ELBOW & CRV for Cirebon-2 1x1000MW Coal Fired Power Plant Project, Indonesia.

2.0 CODES AND STANDARD r


ASTM A1038 Standard Test Method for Portable Hardness Testing by the Ultrasonic Contact
Impedance Method

3.0 REFERENCE DOCUMENT


Outline Drawing for Steam Turbine: CB2-M-MA_-10-32901
Outline Drawing for Combined Reheat Valve: CB2-M-MAB-10-32903

4.0 Personnel
Personnel performing hardness test shall be familiar with and have the knowledge and
previous experience of material, hardness test technique and measuring equipment.

5.0 APPARATUS
Portable Hardness Tester: SONODUR-3.
Probe : SONODUR SONO 50H.

6.0 OBJECT TO BE TESTED (Refer to Table 1)


The following welding points shall be tested (Refer to Table-1)
Table 1 Subject welding points specifications
Pipe Pipe
Sl. Point to Number of Site
Pipe Material Size Thickness
No. be tested Welds
(mm) (SCH / mm)
1 FW-1 G-X12CRMoWVNbN10-1-1 965.2 76.2 1 / Unit x1
2 FW-2 G-X12CRMoWVNbN10-1-1 965.2 76.2 1 / Unit x 1

2
7.0 TEST POINT
7.1 Number of test line on circumferential cross section depends on pipe size. For pipe size up
to and less than DN100, one test line shall be selected. For pipe size from DN100 to two
DN250, test lines shall be selected. For pipe size over DN250, four test lines shall be
selected. (Refer Table 2)

Table 2 Number of Test Line on Circumferential Cross Section

7.2 Each test line shall consist of 5 readings in the sequence,


①Base metal –②HAZ - ③Weld metal - ④HAZ - ⑤Base Metal
except narrow type weld end preparation. (Refer to Fig.1)
The test line where narrow type weld end preparation is applied consist of 3 readings in
the sequence ①Base metal–③Weld metal - ⑤Base Metal.

8.0 TEST STAGE


Before initial boiler firing .

9.0 PREPARATION
The surface of test area shall be grinded and polished by using grinder and sand paper to
avoid the detrimental effect of decarburized, scale, cold work etc. The surface of test area
must be cooled to a max temperature of 60 deg.C after polishing.The surface shall be free
of any impurities (oil, dust, etc.). Surface preparation, the sand paper shall be as specified in
para 8.1.1 of ASTM A 1038.

3
10.0 TEST STANDARD
10.1 To prevent errors from misalignment, probe shall be positioned perpendicularly to the test
surface as long as possible. Probe attachment can be used to ensure a perpendicular
position of the probe, if necessary.

10.2 Each test point in a test line specified in section 7.1 shall have five (5) measurements and
then max and min reading shall be excluded from five reading and calculate the average
hardness value by using remaining three reading. Differential of max and min reading on
remaining three reading shall be within 10%. Additionally, obvious measurement errors
shall not be included. If there is an obvious error measurement the measurement shall be
repeated so that each test point has 5 valid measurements.
10.3 Measurement unit of SONODUR-3 shall be set to HV (Vickers) unit or HB(Brinell) unit.

10.4 Calibration for pre-use of SONODUR-3 shall be performed to be set for material. Once
calibration is settled, it is no need to perform before each using. Para 3.1.1 of ASTM
A1038 requirements shall be followed for calibration

11.0 ACCEPTANCE CRITERIA


Acceptable criteria for hardness range shall be in accordance with follow table.
Loa1 plans to measure three points A, B and C, and evaluate them by the result of B and C.

A B C
Location Heat affected zone
Deposited metal Base Metal
(Solid zone)
Vickers hardness N.A. ≦274
≦350
(HV) (Reference only) (≧215(*1))
Brinell hardness N.A. ≦260
≦331
(HB) (Reference only) (≧204(*1))
(*1) It is a reference value converted from the tensile strength.

12.0 Disposition
If the measured value is outside of acceptance criteria, following actions shall be performed.
1) Re-test shall be performed after grind/polish the test area.
2) If the value is still outside of acceptance criteria after re-test, further action will be
proposed and taken subject to owner approval.

4
13.0 RECORDS (Refer to Attachment)
The test record shall contain the information such as the followings. Any value in the record
shall be indicated using SI unit system.
1) Name of item examined
2) Name of project
3) Date of test
4) Test procedure No., including revision No.
5) Drawing No. & Welding No.
6) Result of test
7) Name of examiner
8) Equipment (Model code, identification)

5
TAPI Hardness Examination Record

TPSC Cirebon 2, 1x1000MW Coal Fired Power Plant Project, Indonesia

Inspection Item Date dd/mm/yyyy

Drawing Number Rev. RFI No.

Joint Number Report No.

Test Procedure
QCD-FP-XICR5-0020 Rev. 0 Pipe Material
Number

Hardness (HV) or Hardness (HB)

Line ①BASE ②HAZ ③Weld ④HAZ ⑤BASE Result

A A A

Average

C D

B
B B

Below DN100 DN100 - 250 Over DN250


Average

Fig-1 Test Line


C

Average

table-1 Acceptance Criteria D

Average

Instrument Tester :
Type : Serial Number : Manufacture :
Range : Calibration Date :

Special Comment if any :

Checked / Inspected by Checked / Inspected by Inspected by Witnessed by Witnessed by

Company WME TPSC / TAPI BV / CEPR BV / CEPR

Name

Signature

Date

***Note

・ Five (5) measurements and then max and min reading shall be excluded from five reading and calculate the average hardness value by using remaining three reading.
Differential of max and min reading on remaining three reading shall be within 10%. Additionally, obvious measurement errors shall not be included. If there is an obvious error
measurement the measurement shall be repeated so that each test point has 5 valid measurements.

-6-

You might also like