Tower Schedule 500 kV Sukatani Incomer_REV.

D17/04/202011

TOWER SCHEDULE 500KV TRANSMISSION LINE Issued : TWINK

(**) Insulator String Indications of Legs: PROJECT NAME : PEKERJAAN DESAIN, SUPLAI DAN INSTALASI PEMASANGAN -
(*) Type Insulator GIS 150 KV SUKATANI DAN KONEKSI KE SISTEM 500 KV DAN SISTEM 150 KV Checked : Arifin
SS = Single Suspension D C PT. PLN (PERSERO) SECTION : Transmission Line 500 KV
DS = Double Suspension CONTRACT No. : 1523.PJ/DAN.02.02/DIR/2018 Date : 21 Desember 2018
ST = Single Tension UNIT INDUK PEMBANGUNAN CONDUCTOR : 4 X ACSR 450-A1/SA1A-54/7 Std Checked : GIO
DT = Double Tension JAWA BAGIAN TENGAH II EARTH WIRE : GSW AS95 mm2 X OPGW 100 mm2
STR = Single Tension 20 Apr 20
Contractor Drawing No. : Client Drawing No. : Date : Revision No.
Reversed 20 Apr 20
JU INS. = Jumper Insulator CONTRACTOR
20 Apr 20
A B SKT-GIS150-TL-CN-001-D 17/04/2020 D
RATIO Wt/Wd = 0.7 - 1.7
PT. TWINK20INDONESIA
Apr 20
TOWERS SPAN Body Extensions FIITINGS REGION
Coordinate REMARKS
Accum Center Insulators Tower Name of Name of Name of Tower
Final Site Deviat. Leg Stub-
Type Length . Tension Equiv. Wind Weight Wt/Wd peg String ELE Village Region Region Location
No. No. Angle X Y TOWER CROSSING
Length A B C D A B C D dH (m) *) Z
----------- ----------------- ----------- ------ --------------- ------------- ------------- ------------- ------ ------ ------ ------ ------ ------ ------ ------ ----------- ------------------------------------------------------------------
------------------------------------------
------------------------------------------
------------------------------------------ -----------------------
--------------------------------
------------ ------------ ------------ ------------ -----------------------------------------------------------------------------
----------- ----------------- ----------- ------ --------------- ------------- ------------- ------------- ------ ------ ------ ------ ------ ------ ------ ------ ----------- ------------------------------------------------------------------
------------------------------------------
------------------------------------------
------------------------------------------ -----------------------
--------------------------------
68 AA +6 0° ------------ ------------ ------------ ------------ 450.03 439.31 0.98 741697.1712 9309473.486 8.40 Sukatani Cikarang Bekasi Rice field -----------------------------------------------------------------------------
----------- ----------------- ----------- ------ --------------- 437.27 437.27 437.27 437.27 ------------- ------------- ------------- ------ ------ ------ ------ ------ ------ ------ ------ ----------- ------------------------------------------------------------------
------------------------------------------
------------------------------------------
------------------------------------------ -----------------------
--------------------------------
1 69 CC +3 10° 05' L ------------ ------------ ------------ ------------ 346.89 356.24 1.03 +0 +0 +0 +0 0.0 0.0 0.0 0.0 0.0 DT/DT 741881.253 9309076.854 8.76 Sukatani Cikarang Bekasi Rice field -----------------------------------------------------------------------------
----------- ----------------- ----------- ------ --------------- 256.50 693.77 256.5 256.5 ------------- ------------- ------------- ------ ------ ------ ------ ------ ------ ------ ------ ----------- ------------------------------------------------------------------
------------------------------------------
------------------------------------------
------------------------------------------ -----------------------
--------------------------------
2 70B FFR +3 98° 56' L ------------ ------------ ------------ ------------ 163.53 479.98 2.94 +0 +0 +0 +0 0.0 0.0 0.0 0.0 0.0 DT/DT 742049.652 9308832.817 9.00 Sukatani Cikarang Bekasi GIS Sukatani
-----------------------------------------------------------------------------
----------- ----------------- ----------- ------ --------------- 70.56 764.33 70.56 70.56 ------------- ------------- ------------- ------ ------ ------ ------ ------ ------ ------ ------ ----------- ------------------------------------------------------------------
------------------------------------------
------------------------------------------
------------------------------------------ -----------------------
--------------------------------
GANTRY 27° 15' L ------------ ------------ ------------ ------------ 50.28 -264.81 5.27 742078.025 9308914.496 10.25 Sukatani Cikarang Bekasi GIS Sukatani
-----------------------------------------------------------------------------
----------- ----------------- ----------- ------ --------------- ------------- ------------- ------------- ------ ------ ------ ------ ------ ------ ------ ------ ----------- ------------------------------------------------------------------
------------------------------------------
------------------------------------------
------------------------------------------ -----------------------
--------------------------------
------------ ------------ ------------ ------------ -----------------------------------------------------------------------------
----------- ----------------- ----------- ------ --------------- ------------- ------------- ------------- ------ ------ ------ ------ ------ ------ ------ ------ ----------- ------------------------------------------------------------------
------------------------------------------
------------------------------------------
------------------------------------------ -----------------------
--------------------------------
GANTRY ------------ ------------ ------------ ------------ 66.50 -271.90 4.09 742134.703 9308894.808 10.25 Sukatani Cikarang Bekasi -----------------------------------------------------------------------------
GIS Sukatani
----------- ----------------- ----------- ------ --------------- 103 103 103 103 ------------- ------------- ------------- ------ ------ ------ ------ ------ ------ ------ ------ ----------- ------------------------------------------------------------------
------------------------------------------
------------------------------------------
------------------------------------------ ----------------------- Asphalt road, 20kV line, River
--------------------------------
3 70A FF +12 36° 05' L ------------ ------------ ------------ ------------ 338.57 669.00 1.98 +0 +0 +0 +0 0.0 0.0 0.0 0.0 0.0 DT/DT 742099.117 9308798.141 9.00 Sukatani Cikarang Bekasi GIS Sukatani
-----------------------------------------------------------------------------
----------- ----------------- ----------- ------ --------------- 574.13 677.13 574.13 574.13 ------------- ------------- ------------- ------ ------ ------ ------ ------ ------ ------ ------ ----------- ------------------------------------------------------------------
------------------------------------------
------------------------------------------
------------------------------------------ -----------------------
--------------------------------
4 71 BB +15 07° 41' L ------------ ------------ ------------ ------------ 441.90 447.75 1.01 +0 +0 +0 +0 0.0 0.0 0.0 0.0 0.0 DT/DT 742256.072 9308245.882 9.48 Sukatani Cikarang Bekasi Rice field -----------------------------------------------------------------------------
----------- ----------------- ----------- ------ --------------- 309.67 986.8 ------------- ------------- ------------- ------ ------ ------ ------ ------ ------ ------ ------ ----------- ------------------------------------------------------------------
------------------------------------------
------------------------------------------
------------------------------------------ -----------------------
--------------------------------
72 AA +15 0° ------------ ------------ ------------ ------------ 414.47 453.70 1.09 742379.875 9307962.035 9.48 Sukatani Cikarang Bekasi Rice field -----------------------------------------------------------------------------
----------- ----------------- ----------- ------ --------------- ------------- ------------- ------------- ------ ------ ------ ------ ------ ------ ------ ------ ----------- ------------------------------------------------------------------
------------------------------------------
------------------------------------------
------------------------------------------ -----------------------
--------------------------------
------------ ------------ ------------ ------------ -----------------------------------------------------------------------------
----------- ----------------- ----------- ------ --------------- ------------- ------------- ------------- ------ ------ ------ ------ ------ ------ ------ ------ ----------- ------------------------------------------------------------------
------------------------------------------
------------------------------------------
------------------------------------------ -----------------------
--------------------------------
------------ ------------ ------------ ------------ -----------------------------------------------------------------------------
----------- ----------------- ----------- ------ --------------- ------------- ------------- ------------- ------ ------ ------ ------ ------ ------ ------ ------ ----------- ------------------------------------------------------------------
------------------------------------------
------------------------------------------
------------------------------------------ -----------------------
--------------------------------
------------ ------------ ------------ ------------ -----------------------------------------------------------------------------
----------- ----------------- ----------- ------ --------------- ------------- ------------- ------------- ------ ------ ------ ------ ------ ------ ------ ------ ----------- ------------------------------------------------------------------
------------------------------------------
------------------------------------------
------------------------------------------ -----------------------
--------------------------------
TOTAL SPAN ( m ) 1751.130

Note :
01 24/09/2019 Penggeseran T.70B 10m kearah Tower 69 Approved by : Prepared by :
02 13/04/2020 Penggeseran T.70B 30m kearah Tower 69 PT. PLN (PERSERO) PT. TWINK INDONESIA
UIP JAWA BAGIAN TENGAH II

……………………………………… M. ARIFIN
CONTRACTOR PROJECT : PEKERJAAN DESAIN, SUPLAI DAN INSTALASI PEMASANGAN -
GIS 150 KV SUKATANI DAN KONEKSI KE SISTEM 500 KV DAN SISTEM 150 KV
PT. PLN (PERSERO) Section : Transmission Line 500 KV
UNIT INDUK PEMBANGUNAN Contract No. : 1523.PJ/DAN.02.02/DIR/2018 Date : 21 Desember 2018

JAWA BAGIAN TENGAH II


20 Apr 20
Conductor
Earth Wire
: 4 X ACSR 450-A1/SA1A-54/7
: 4 X ACSR 450-A1/SA1A-54/7
20 Apr 20
PT. TWINK INDONESIA Date : 17/04/2020 Revision : D
20 Apr 20
20 Apr 20 SUMMARY OF TOWER TYPES
PEKERJAAN PEMBANGUNAN GIS 500KV dan 150 KV SUKATANI

BODY TOWER
TYPE SUM.
-3 +0 +3 +6 +9 +12 +15 +18 +21
-3 +0 +3 +6 +9 +12 +15 +18 +18
AA 0 0 0 0 0 0 0 0 0 0

BB 0 0 0 0 0 0 1 0 0 1

CC 0 0 1 0 0 0 0 0 0 1

DD 0 0 0 0 0 0 0 0 0 0

EE 0 0 0 0 0 0 0 0 0 0

FF 0 0 0 0 0 1 0 0 0 1

FFR 0 0 1 0 0 0 0 0 0 1

TOTAL ( Tower ) 4

Approved by : Prepared by :

PT. TWINK INDONESIA


PT. PLN (PERSERO)
UIP JAWA BAGIAN TENGAH II

…………………………………………………………………….. M. ARIFIN