PROJECT :
INPUT DATA
Foundation Data
Column Details
Along Breadth (Y) = 3.416 m.
Along Length (X) = 2.916 m.
Base Plate Size = 440 mm. x 440 mm
Size of columns- Ag = (b x d) = 700 mm. x 700 mm
Soil Details
2
Safe Bearing Capacity of soil = 28.55 T/M2: = 280.0 KN/m
3 3
Unit weight of soil : 1.89 T/M 18.54 KN/m
2
Cohesion, c : 130.0 kN/m
Angle of Repose : 21
A l off Frustrum
Angle F t : 21
2
Fy = 60000 PSI = 410 N/MM
2
Fck = 3626 PSI = 25 N/MM
700
2 3
FGL 300
Transverse Face
Y
B
X
3500
1 4
500
X
Longitudinal face
Design Philosophy (Refer STAAD input & output for Tower Mkd. T3 - Doc. No.4-07002-GEDE08001-622-D-103-00):
Foundation for 225 kV Tower Mkd. T3 has been designed for the most critical load.
For node no. 1, most critical loading condition is DL+GIRDER LOAD+WIND ALONG -X, i.e., STAAD input load combination 103.
For node no. 2, most critical loading condition is DL+GIRDER LOAD+WIND ALONG -X, i.e., STAAD input load combination 103.
For node no. 3, most critical loading condition is DL+GIRDER LOAD+WIND ALONG -X, i.e., STAAD input load combination 103..
For node no. 4, most critical loading condition is DL+GIRDER LOAD+WIND ALONG -X, i.e., STAAD input load combination 103.
Footing and pedestal have been designed as per ACI-318-08 and SP-17 of ACI 340 R -97
1 OF 6
Design of Foundation for 225 kV
225kV/33kV SIKASSO SUBSTATION 4-07002-GEDE08001-642-D-103-00
Tower Marked -T3
SUBSTATION NAME DOCUMENT NAME DOCUMENT NO.
Foundation Details
Length of foundation (A) = 5.10 m.
Breadth of footing (B) = 4.60 m.
Depth of footing bottom from FGL = 3.50 m.
Depth of foundation pad (D) = 0.50 m.
Plinth Height above GL = 0.30 m.
Column Details :
Along Breadth (Y) = 3.416 m.
Along Length (X) = 2.916 m.
Size of columns (b x d) = 700 mm. x 700 mm.
Soil Details :
Safe Bearing Capacity of soil : 280.0 KN/m2
Unit weight of soil : 18.54 KN/m3
Cohesion, c : 130
1650.5 KN
Moment Mx = 318.2 KN-m = |(--93.99 + 349.65 + -306.89 - 117.94) x (2.916/2) + (13.84 + 32.16 + 33.75 + 6.01) x (3.5 + 0.3)|
Moment My = 1910.4 KN-m = |(--93.99 + 349.65 - -306.89 + 117.94)x(3.416/2) + (13.84 + 46.21 + 37.53 + 14.8) x (3.5 + 0.3)|
Net Vert. Load from super struct. = 66.7 KN = -93.99 + 349.65 + -306.89 + 117.94
Total vertical Load = 1717.2 KN = 66.71 + 1650.47
Eccentricity :
ex = 0.1853 m. = 318.16/1717.18
ey = 1.1125 m. = 1910.39/1717.18
2 OF 6
Design of Foundation for 225 kV
225kV/33kV SIKASSO SUBSTATION 4-07002-GEDE08001-642-D-103-00
Tower Marked -T3
SUBSTATION NAME DOCUMENT NAME DOCUMENT NO.
3 OF 6
Design of Foundation for 225 kV
225kV/33kV SIKASSO SUBSTATION 4-07002-GEDE08001-642-D-103-00
Tower Marked -T3
SUBSTATION NAME DOCUMENT NAME DOCUMENT NO.
Design moment at centre = 0.00 KN-m/m = 1.5 x 0
Design moment at face of column = -7.13 KN-m/m = 1.5 x -4.75
ϕ = 0.85
As per ACI 318-02 & SP 17 (1997)
an = 4.45
ρmin = 0.0037
ρmax = 0.0214
preferred ρ = 0.0107
Bottom Reinforcement
Required Steel area = (Mu/ϕ) / (an*d) = = 16.89 cm2
4 OF 6
Design of Foundation for 225 kV
225kV/33kV SIKASSO SUBSTATION 4-07002-GEDE08001-642-D-103-00
Tower Marked -T3
SUBSTATION NAME DOCUMENT NAME DOCUMENT NO.
Design of columns
Column on Node COMP. TENSION
Comp. force (P) due to DL = 349.65 KN -306.89 KN
Multiplication Factor for DL = 1.50 1.50
Bending moment about X (Mx) = 152.49 KN-m 123.85 KN-m
Bending moment about Y (MY) = 15.15 KN-m 19.83 KN-m
Pu = 524.48 KN -460.34 KN
Mux = 228.74 KN-m 185.77 KN-m
Muy = 22.72 KN-m 29.75 KN-m
Length of Column = 3.30 m. 3.30 m.
Effective Length = 4.95 m. 4.95 m.
Leff/D = 7.07 7.07
Area of Steel (As) = 44.77 sq.cm 44.77 sq.cm
Percentage of Steel (p) = 0.91 % 0.91 %
p/fck = 0.037 0.037
Pu
= 0.085 0.074
f ckA g
M u
= 0.130 0.120 (7.2.3-R4-60.8-SP-17 of
f ckk A g h ACI 340 R -97)
97)
Mux1 = 1114.75 KN-m 1029.00 KN-m
Muy1 = 1114.75 KN-m 1029.00 KN-m
Puz = 143123 KN 143123 KN
Pu/Puz = 0.004 -0.003
αn = 1 1
Interaction Ratio 0.226 0.209
Hence provide
8 nos. 20 φ and
4 nos. 25 φ
Area of steel provided = 44.77 sq. cm
Provide 10mm dia Stirupps @ 250 c/c (3 per set)
5 OF 6
MALI- SIKASSO Design of Foundation for 225 kV
4-07002-GEDE08001-642-D-103-00
SUBSTATION Tower Marked -T3
ANNEXURE -1
6 OF 6
Monday, January 12, 2009, 11:17 AM
STAAD SPACE -- PAGE NO. 7