SAUDIARAMCO.

NOTES:

1A 1 2 3 4

OF
CONSENT
LEGEND

TTEN
RS REFRIGERANT SUCTION LINE

WRI
RL REFRIGERANT LIQUID LINE
ACC AIR COOLED CONDENSER

THE
ACU AIR CONDITIONING UNIT
RW RAW WATER (MAKE-UP)
MFSD MOTORIZED FIRE/SMOKE

THOUT
COMBINATION DAMPER
VD
VOLUME DAMPER
FACP

WI
FIRE ALARM CONTROL PANEL

T THERMOSTAT

NG
DRAWI
3650 10261 LEGEND (BI-10-00844-0001):

PACU PACKAGED AIR CONDITIONING UNIT

S
3251 3251 3251

THI
MVD MOTORIZED VOLUME DAMPER

UP

FROMNED
OBTAI
BE
A

PART,SHALL
3226

NOTES (BI-10-00844-0001):

N
I
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ALL
ELEVATIONS ARE IN METERS UNLESS OTHERWISE

FULL,OR
NOTED.

2
B 2. HVAC SYSTEM SHALL BE DESIGNED , INSTALLED AND
TESTED AS PER SAUDI ARAMCO AND ASHRAE STANDARDS.

3. EQUIPMENT SIZING, LOCATION, DUCT WORK SIZES, DUCT

N
I
WORK ROUTING SHALL BE FURTHER DEVELOPED DURING
3226

DETAIL DESIGN ENGINEERING.

ON
•"{ RW FROM NEAREST

REPRODUCTI
UP
UP

4. ALL DUCT WORKS SHALL BE OF GALAVANIZED STEEL


AVAILABLE SOURCE, REFER
VD AND MINIMUM THICKNESS OF DUCTWORK SHALL BE IN
NON-ELECTRICAL UTILITY PLAN
ACCORDACNE WITH SAUDI ARAMCO, ASHRAE AND SMACNA
DWG. VA-291398.001
STANDARDS.
12904

2 DRAWING CONTROL FOR J.O.BI-10-00844-0001 PD-00ADCL


•"{ HUMIDIFIER DRAIN AND 5. ALL SUPPLY AND RETURN DUCTS LOCATED INSIDE AND
HVAC EQUIPMENT SCHEDULE DA-7930709.008
ƒ"{ EVAPORATOR DRAIN LINE C OUTSIDE SHALL BE INSULATED WITH FIBERGLASS AS PER

TO NEAREST DRY WELL, REFER SAUDI ARAMCO AND ASHRAE STANDARDS.

SAUDIARAMCO.NO
NON-ELECTRICAL UTILITY PLAN
6. ALL EXPOSED SUPPLY AND RETURN DUCTS SHALL BE
DWG. VA-291398.001 CLAD WITH ALUMINIUM METAL JACKETING AS PER
ACU-3
3226

150x150 SAUDI ARAMCO AND ASHRAE STANDARDS.

MFSD 7. ALL EXHAUST/INTAKE/RELIEF AIR OPENINGS TO BE


SCD
3 COVERED WITH A LOUVER /GRILL.
114 M /HR
‡"{ RS LINE
8. CONDENSATE DRAIN SHALL BE ROUTED TO THE
…"{ RL LINE
APPROPRIATE MEANS ALLOWED BY STANDARDS
DURING DETAIL DESIGN CONTRACTOR.
A
ACC-3

OF
9. NOISE CRITERIA (NC) LEVEL SHALL NOT EXCEED AS PER
VA-291371.001
105 T D SAES-A-105, SAES-K-001 AND ALL APPLICABLE SAUDI

PROPERTY
•"{ RW FROM NEAREST
ARAMCO STANDARDS.
AVAILABLE SOURCE, REFER
60950

NON-ELECTRICAL UTILITY PLAN AUTO 10. HVAC UNIT FOUNDATION SHALL BE OF 750MM THICK,
DWG. VA-291398.001 CHANGEOVER WITH A MINIMUM 150MM THICK FROM TOP OF
3226

CONTROLLER FOUNDATION TO THE FINISHED FLOOR LEVEL.


ACU-4

•"{ HUMIDIFIER DRAIN AND 11. THIS IS A PROJECT PROPOSAL DRAWING ONLY. DRAWINGS

SOLE
22850

ƒ"{ EVAPORATOR DRAIN LINE SHALL BE DEVELOPED FURTHER DURING DETAIL DESIGN
BMO
ACC-4

TO NEAREST DRY WELL, REFER T ENGINEERING.


1200X700
NON-ELECTRICAL UTILITY PLAN
2000 L/S 12. DETAIL DESIGN CONTRACTOR SHALL RE-INSTATE THE HVAC

THE
DWG. VA-291398.001
CONTROLS, UPON COMPLETION OF NEW HVAC DUCT WORKS,

E AS PER SITE CONDITIONS

ARE
13. CLOUDED PORTION INDICATES THE PROJECT SCOPE UNDER
THIS BI-10-00844.
‡"{ RS LINE RAD 600X400 RAD 600X400
2076

2226

N
HEREI
…"{ RL LINE MVD-04 14. FIELD VERIFICATION SHALL BE CARRIED OUT PRIOR TO THE

MVD-03 M M COMMENCEMENT OF WORKS AND ANY DISCREPANCIES SHALL 0 1.0 2.0 3.0 4.0 5.0

670 BE BROUGHT TO THE NOTICE OF COMPANY REPRESENTATIVE.


METERS
0A2 15. DETAIL DESIGN CONTRACTOR SHALL VERIFY THE REUSAGE OF

NED
THE DUCT SMOKE DETECTORS, IF FOUND FAULTY, THESE SHALL SCALE: 1 : 50M

CONTAI
MVD-01 MVD-02 BE REPLACED WITH NEW ONES COMPATIBLE WITH THE EXISTING
FIRE ALARM SYSTEM. EXISTING INTERFACES WITH FIRE ALARM
REVISION VALIDATION
SHALL BE UTILIZED.
THIS REVISION NO. IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
M M
2747

16. FLEXIBLE DUCT CONNECTIONS SHALL NOT EXCEED REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
SEE NOTE-10
1 FT (300 MM) IN LENGTH AS PER SAES-K-001

ON
PARA. 4.8.12.7.

NFORMATI
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)

0A2 ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

REV.NO. DATE REVISION DESCRIPTION

I
0A2 07/01/21 ISSUED FOR 100% - PP
150 2200 2400

THE
PACU-02 JOB ORDER/EWO NO.
PACU-01 THIS REVISION IS NOT TO BE USED FOR
(STANDBY) 10-00844-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
(DUTY)

SAUDI ARABIAN OIL COMPANY

AND
DRAWING TYPE

HVAC DUCT LAYOUT PLAN HVA


1 HVAC LAYOUT

NG
CONTROL BUILDING NO. 6001

DRAWI
-
SCALE 1 :50M
SH
EAST/WEST PIPELINE PUMP STATION #5

YANBU SAUDI ARABIA

S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

THI
K08 K DA-730709 005 0A2
Saudi Aramco 2615 ENG. (05/05)

RESTRICTED HYBRID CADD-01