PTTEP INTERNATIONAL LIMITED Page 2/10

CONTENTS

1.0  INTRODUCTION..................................................................................................................... 3 
1.1  GENERAL ................................................................................................................... 3 
1.2  ABBREVIATIONS ....................................................................................................... 4 
1.3  PURPOSE OF DOCUMENT ....................................................................................... 5 
2.0  SUMMARY.............................................................................................................................. 6 
3.0  BASIC OF MATERAIL TAKE-OFF ........................................................................................ 8 
4.0  INCLUSIONS .......................................................................................................................... 9 
5.0  EXCLUSIONS ....................................................................................................................... 10 

ATTACHMENT

ATTACHMENT 1: MEMBER TAKE-OFF DEFINITION (FIGURES) 


ATTACHMENT 2: TUBULAR MTO AND BOM SUMMARY 
ATTACHMENT 3: PLATE MTO AND BOM SUMMARY 
ATTACHMENT 4: MTO BREAK-DOWN (BOCAD) 
ATTACHMENT 5: JACKET DRAWINGS 

Basic Engineering Study for Zawtika Project Phase 1B Document: MM-ZTK-1B-WP6-STR-MTO-2001


P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08- Revision: B1
STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-
STR-MTO-2001-B1 WP6JacketMTO&CuttingPlan\Report\MM-ZTK-1B-WP6- Date: 24-Oct-13
STR-MTO-2001-B1 WP6JacketMTO.docx
PTTEP INTERNATIONAL LIMITED Page 3/10

1.0 INTRODUCTION

1.1 GENERAL

The Zawtika Project is a gas field development project located in the Gulf of Martaban,
Myanmar. The development area covers Block M9 and small portion of Block M11, owned
by Myanmar Oil & Gas Enterprise (MOGE). The field lies approximately 300 km south of
Yangon and 290 km west of Tavoy on the Myanmar coast and the average water depth is
approximately 140-150 meters.

Figure 1.1: Zawtika Location


Zawtika field development is planned in three phases 1A (existing facilities), 1B and 1C as
per Figure 1.2 Zawtika Field Layout. Phase 1A development consisting of Zawtika
Processing integrated with living quarter platform (ZPQ), WP1, WP2, and WP3 is currently
being developed. Commercial production is expected to commence in the first quarter of
2014. Phase 1B and 1C (remote wellhead platforms) will be developed in order to sustain
production plateau through the field life.

Basic Engineering Study for Zawtika Project Phase 1B Document: MM-ZTK-1B-WP6-STR-MTO-2001


P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08- Revision: B1
STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-
STR-MTO-2001-B1 WP6JacketMTO&CuttingPlan\Report\MM-ZTK-1B-WP6- Date: 24-Oct-13
STR-MTO-2001-B1 WP6JacketMTO.docx
PTTEP INTERNATIONAL LIMITED Page 4/10

Figure 1.2: Zawtika Field Layout

1.2 ABBREVIATIONS
AISC American Institute of Steel Construction
ALE Abnormal Level Earthquake
API American Petroleum Institute
AWS American Welding Society
BOS Bottom of Steel
CD Chart Datum
CDR Cumulative Damage Ratio
CP Cathodic Protection
COG Centre of Gravity
DAF Dynamic Amplification Factor
DNV Det Norske Veritas
ELE Extreme Level Earthquake
Basic Engineering Study for Zawtika Project Phase 1B Document: MM-ZTK-1B-WP6-STR-MTO-2001
P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08- Revision: B1
STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-
STR-MTO-2001-B1 WP6JacketMTO&CuttingPlan\Report\MM-ZTK-1B-WP6- Date: 24-Oct-13
STR-MTO-2001-B1 WP6JacketMTO.docx
PTTEP INTERNATIONAL LIMITED Page 5/10

FOS Factor of Safety


HAT Highest Astronomical Tide
LAT Lowest Astronomical Tide
LOA Length Overall
LQ Living Quarter
MHWS Mean High Water Spring
MLWS Mean Low Water Spring
MSL Mean Sea Level
PGA Peak Ground Acceleration
PPS Project Particular Specification
PSI Pile Soil Interaction
SACS Structural Analysis Computer System
SCF Stress Concentration Factor
TADR Tender Assisted Drilling Rig
TOS Top of Steel
UC Unity Check
VIV Vortex Induced Vibration
WCR Weight Control Report
WJ Welded Joint
WSD Working Stress Design
ZWP Zawtika Wellhead Platform

1.3 PURPOSE OF DOCUMENT

The purpose of this report is to documents WP6 Jacket primary steel MTO.

Basic Engineering Study for Zawtika Project Phase 1B Document: MM-ZTK-1B-WP6-STR-MTO-2001


P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08- Revision: B1
STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-
STR-MTO-2001-B1 WP6JacketMTO&CuttingPlan\Report\MM-ZTK-1B-WP6- Date: 24-Oct-13
STR-MTO-2001-B1 WP6JacketMTO.docx
PTTEP INTERNATIONAL LIMITED Page 6/10

2.0 SUMMARY

This report presents the material take-off for structural steel of WP6 jacket platform which is
a wellhead platform. The material take-off includes structural steel for both jacket and piles.

The jacket primary steel material take-off includes the following materials:

 Steel plates
 Seamless tubulars
 Welded tubulars
 Shapes
For tubular pipe category, tubular of diameter smaller or equal than 406.4mm (16”) shall be
seamless. Welded tubular should apply to tubular of diameter greater than 406.4mm (16”).
The extent of structural steel included in this report are those primary steel such as rolled
and seamless pipes, beams and plate.

The final required material presented in the MTO is reported as the net required quantity.

The summary of primary steel MTO is as follows:


Weight (MT)
Group III Group III Weight
WP6 Jacket S 355 S 355 Summary
Special Primary
Jacket
- Plate 801.5 30.5 832.0
- Tubular OD < 406.4mm - 3.9 3.9
- Tubular OD > 406.4mm 2450.2 2092.1 4542.3
- Shape - -
Jacket Total 3251.7 2126.5 5378.2
Piles
- Plate - -
- Tubular OD > 406.4mm 3576.4 - 3576.4
Pile Total 3576.4 - 3576.4

Basic Engineering Study for Zawtika Project Phase 1B Document: MM-ZTK-1B-WP6-STR-MTO-2001


P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08- Revision: B1
STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-
STR-MTO-2001-B1 WP6JacketMTO&CuttingPlan\Report\MM-ZTK-1B-WP6- Date: 24-Oct-13
STR-MTO-2001-B1 WP6JacketMTO.docx
PTTEP INTERNATIONAL LIMITED Page 7/10

The detailed material take-off have been carried out based on the BOCAD computer model
used to generate WP6 jacket primary structural drawings which have been issued for IFR
(Issued for Review) and 2D drawings. A set of applicable structural drawings for generating
of this MTO is given in Attachment 5.

The Tubular and Plate MTO and BOM summary are provided in Attachment 2 and 3
respectively while detailed MTO breakdown from BOCAD are provided in Attachment 4.

Basic Engineering Study for Zawtika Project Phase 1B Document: MM-ZTK-1B-WP6-STR-MTO-2001


P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08- Revision: B1
STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-
STR-MTO-2001-B1 WP6JacketMTO&CuttingPlan\Report\MM-ZTK-1B-WP6- Date: 24-Oct-13
STR-MTO-2001-B1 WP6JacketMTO.docx
PTTEP INTERNATIONAL LIMITED Page 8/10

3.0 BASIC OF MATERIAL TAKE-OFF

This section contains the primary steel material take off (MTO) for the WP6 jacket platform.

For primary steel, the MTO is generated using BOCAD computer model or manual
calculation based on 2D structural drawings.

The following are the basis for the MTO generation.

 ‘Long to Long’ length is taken for all tubular.


 ‘Center to Center’ (work point to work point) length is taken for all rolled shape
 Plate size for cones is based on total gross plate.
 Plate size for joint is based on net quantity. e.g. ring plate will exclude plate punched
by column.
 Plate girders are reported as plates
 MTO weights are of base weight which excludes all contingencies including cutting
and end wastage allowance
 Steel density is taken as 7850 kg/m3

Basic Engineering Study for Zawtika Project Phase 1B Document: MM-ZTK-1B-WP6-STR-MTO-2001


P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08- Revision: B1
STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-
STR-MTO-2001-B1 WP6JacketMTO&CuttingPlan\Report\MM-ZTK-1B-WP6- Date: 24-Oct-13
STR-MTO-2001-B1 WP6JacketMTO.docx
PTTEP INTERNATIONAL LIMITED Page 9/10

4.0 INCLUSIONS

For this primary and secondary steel MTO, the following items are included:

Jacket (special and primary steel)

Item Rev.
Structure Reference Drawing
No
1 Jacket Legs Primary MM-ZTK-1B-WP6-STR-DWG-2100 – 2105 B1
Framing
2 Jacket Framing Details MM-ZTK-1B-WP6-STR-DWG-2110 – 2121 B1
3 Jacket Launch Cradle MM-ZTK-1B-WP6-STR-DWG-2131 – 2133 B1
4 Pile Sleeves & Piles MM-ZTK-1B-WP6-STR-DWG-2141 – 2143 B1
5 Jacket Hydrostatic Ring MM-ZTK-1B-WP6-STR-DWG-2200 B1
6 Jacket Casing Guide MM-ZTK-1B-WP6-STR-DWG-2300 – 2301 B1
7 Jacket Closer Plate MM-ZTK-1B-WP6-STR-DWG-2900 – 2901 B1
8 Leg Partition Details MM-ZTK-1B-WP6-STR-DWG-2902 B1
9 Jacket Upending Padeyes MM-ZTK-1B-WP6-STR-DWG-2911 B1

Piles (special steel)


Item
Structure Reference Drawing
No
1 Pile make-up MM-ZTK-1B-WP6-STR-DWG-2144 B1

Basic Engineering Study for Zawtika Project Phase 1B Document: MM-ZTK-1B-WP6-STR-MTO-2001


P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08- Revision: B1
STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-
STR-MTO-2001-B1 WP6JacketMTO&CuttingPlan\Report\MM-ZTK-1B-WP6- Date: 24-Oct-13
STR-MTO-2001-B1 WP6JacketMTO.docx
PTTEP INTERNATIONAL LIMITED Page 10/10

5.0 EXCLUSIONS

The following lists have not been accounted for this primary and secondary steel MTO and
shall be derived further during detail design phase:

 Handrail and its accessories,


 Gratings,
 Bolts and nuts for casings,
 Bolts and nuts for boatlanding supports,
 Timber (for launch cradle) and its accessories (bolts, FB plates, angle shape, etc),
 Polychloroprene (neoprene) for ribbed and non-ribbed liner.
Complete material take-off shall be provided by EPCI Contractor.

Basic Engineering Study for Zawtika Project Phase 1B Document: MM-ZTK-1B-WP6-STR-MTO-2001


P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08- Revision: B1
STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-
STR-MTO-2001-B1 WP6JacketMTO&CuttingPlan\Report\MM-ZTK-1B-WP6- Date: 24-Oct-13
STR-MTO-2001-B1 WP6JacketMTO.docx
PTTEP INTERNATIONAL LIMITED

ATTACHMENT 1: MEMBER TAKE-OFF DEFINITION (FIGURES)

 LONG POINT TO LONG POINT

 WORK POINT TO WORK POINT

Basic Engineering Study for Zawtika Project Phase 1B Document: MM-ZTK-1B-WP6-STR-MTO-2001


P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08- Revision: B1
STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-
STR-MTO-2001-B1 WP6JacketMTO&CuttingPlan\Report\MM-ZTK-1B-WP6- Date: 24-Oct-13
STR-MTO-2001-B1 WP6JacketMTO.docx
PTTEP INTERNATIONAL LIMITED

Basic Engineering Study for Zawtika Project Phase 1B Document: MM-ZTK-1B-WP6-STR-MTO-2001


P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08- Revision: B1
STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-
STR-MTO-2001-B1 WP6JacketMTO&CuttingPlan\Report\MM-ZTK-1B-WP6- Date: 24-Oct-13
STR-MTO-2001-B1 WP6JacketMTO.docx
PTTEP INTERNATIONAL LIMITED

Basic Engineering Study for Zawtika Project Phase 1B Document: MM-ZTK-1B-WP6-STR-MTO-2001


P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08- Revision: B1
STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-
STR-MTO-2001-B1 WP6JacketMTO&CuttingPlan\Report\MM-ZTK-1B-WP6- Date: 24-Oct-13
STR-MTO-2001-B1 WP6JacketMTO.docx
PTTEP INTERNATIONAL LIMITED

ATTACHMENT 2: TUBULAR MTO AND BOM SUMMARY

Basic Engineering Study for Zawtika Project Phase 1B Document: MM-ZTK-1B-WP6-STR-MTO-2001


P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08- Revision: B1
STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-
STR-MTO-2001-B1 WP6JacketMTO&CuttingPlan\Report\MM-ZTK-1B-WP6- Date: 24-Oct-13
STR-MTO-2001-B1 WP6JacketMTO.docx
Tubular - Material Take Off Tubular - Bill of Material
Line/ Steel Steel Steel Special Size (mm) Length Unit Wt Weight Length Total Weight (mton)
TTP
Item Category Grade Quality Requirement OD thk (m) (kg/m) (mton) (mm) (pieces) per piece Total

S S 355 KT 0 Z 35 750.0 25.0 10.4 447.0 4.65 12000.0 1 5.36 5.36


S S 355 KT-20 Z 35 750.0 30.0 16.2 532.7 8.65 12000.0 2 6.39 12.78
S S 355 KT-20 Z 35 750.0 35.0 7.9 617.2 4.84 12000.0 1 7.41 7.41
S S 355 KT 0 Z 35 900.0 25.0 8.2 539.5 4.43 12000.0 1 6.47 6.47
S S 355 KT-20 Z 35 900.0 30.0 38.8 643.7 24.94 12000.0 4 7.72 30.90
S S 355 KT-20 Z 35 900.0 35.0 34.9 746.6 26.04 12000.0 3 8.96 26.88
S S 355 KT-20 Z 35 900.0 40.0 62.0 848.4 52.60 12000.0 6 10.18 61.08
S S 355 KT-20 Z 35 1000.0 35.0 8.7 832.9 7.24 12000.0 1 10.00 10.00
S S 355 KT-20 Z 35 1000.0 40.0 16.2 947.0 15.34 12000.0 2 11.36 22.73
S S 355 KT-20 Z 35 1200.0 30.0 4.3 865.6 3.74 12000.0 1 10.39 10.39
S S 355 KT-20 Z 35 1200.0 35.0 7.2 1005.6 7.24 12000.0 1 12.07 12.07
S S 355 KT-20 Z 35 1200.0 40.0 35.1 1144.3 40.21 12000.0 3 13.73 41.19
S S 355 KT-40 Z 35 1200.0 45.0 7.4 1281.8 9.49 12000.0 1 15.38 15.38
S S 355 KT-20 1350.0 25.0 134.5 816.9 109.85 12000.0 12 9.80 117.64
S S 355 KT-20 Z 35 1350.0 40.0 10.8 1292.3 13.96 12000.0 1 15.51 15.51
S S 355 KT-20 1500.0 30.0 83.0 1087.6 90.23 12000.0 7 13.05 91.36
S S 355 KT-20 1500.0 40.0 30.1 1440.2 43.41 12000.0 3 17.28 51.85
S S 355 KT-40 Z 35 1500.0 60.0 41.2 2130.8 87.79 12000.0 4 25.57 102.28
S S 355 KT-40 Z 35 1500.0 75.0 28.4 2635.7 74.86 12000.0 3 31.63 94.89
S S 355 KT-20 1650.0 25.0 102.5 1001.9 102.68 4500.0 24 4.51 108.20
S S 355 KT-20 1650.0 40.0 16.8 1588.2 26.74 4500.0 4 7.15 28.59
S S 355 KT-20 Z 35 1650.0 40.0 12.7 1588.2 20.17 4500.0 3 7.15 21.44
S S 355 KT-40 1650.0 45.0 16.5 1781.2 29.46 4500.0 4 8.02 32.06
S S 355 KT-40 Z 35 1650.0 45.0 55.4 1781.2 98.68 4500.0 13 8.02 104.20
S S 355 KT-40 Z 35 1650.0 50.0 19.7 1972.9 38.87 4500.0 5 8.88 44.39
S S 355 KT-40 Z 35 1650.0 60.0 38.5 2352.7 90.58 4500.0 9 10.59 95.28
S S 355 KT-20 2000.0 30.0 87.1 1457.5 126.91 4500.0 20 6.56 131.17
S S 355 KT-20 2000.0 35.0 65.7 1696.1 111.51 4500.0 15 7.63 114.49
S S 355 KT-40 Z 35 2000.0 60.0 32.2 2870.6 92.43 4500.0 8 12.92 103.34
S S 355 KT-40 Z 35 2000.0 65.0 24.9 3101.8 77.24 4500.0 6 13.96 83.75
S S 355 KT-40 2438.4 50.0 636.0 2945.1 1873.07 4500.0 145 13.25 1921.66
Tubular - Material Take Off Tubular - Bill of Material
Line/ Steel Steel Steel Special Size (mm) Length Unit Wt Weight Length Total Weight (mton)
TTP
Item Category Grade Quality Requirement OD thk (m) (kg/m) (mton) (mm) (pieces) per piece Total

S S 355 KT-40 2438.4 60.0 484.0 3519.3 1703.34 4500.0 110 15.84 1742.05
S S 355 KT-20 2500.0 40.0 88.0 2426.7 213.49 4500.0 20 10.92 218.40
S S 355 KT-40 2500.0 50.0 55.5 3021.0 167.60 4500.0 13 13.59 176.73
S S 355 KT-40 Z 35 2500.0 60.0 85.4 3610.4 308.33 4500.0 20 16.25 324.94
S S 355 KT-20 2750.0 40.0 118.2 2673.3 315.98 4500.0 27 12.03 324.81

1 S 355 KL 0 273.0 9.3 39.4 60.5 2.39 12000.0 4 0.73 2.90


1 S 355 KL 0 406.0 9.5 10.5 92.9 0.97 12000.0 1 1.11 1.11
1 S 355 KL 0 406.0 25.4 2.3 238.4 0.54 12000.0 1 2.86 2.86
1 S 355 KL 0 457.0 15.9 11.8 173.0 2.03 12000.0 1 2.08 2.08
1 S 355 KL 0 500.0 10.0 78.4 120.8 9.47 12000.0 7 1.45 10.15
1 S 355 KL 0 500.0 20.0 3.6 236.8 0.86 12000.0 1 2.84 2.84
1 S 355 KL 0 600.0 12.0 106.4 174.0 18.52 12000.0 9 2.09 18.79
1 S 355 KL 0 600.0 15.0 81.5 216.4 17.65 12000.0 7 2.60 18.18
1 S 355 KL 0 600.0 20.0 349.2 286.1 99.91 12000.0 30 3.43 102.99
1 S 355 KL 0 660.0 30.0 2.5 466.1 1.17 12000.0 1 5.59 5.59
1 S 355 KL 0 750.0 20.0 503.5 360.1 181.30 12000.0 43 4.32 185.79
1 S 355 KL 0 750.0 25.0 49.8 447.0 22.26 12000.0 5 5.36 26.82
1 S 355 KL 0 762.0 30.0 3.5 541.6 1.90 12000.0 1 6.50 6.50
1 S 355 KL 0 900.0 15.0 102.2 327.4 33.47 12000.0 9 3.93 35.36
1 S 355 KL 0 900.0 20.0 1062.3 434.0 461.08 12000.0 90 5.21 468.77
1 S 355 KL 0 900.0 25.0 552.9 539.5 298.29 12000.0 47 6.47 304.26
1 S 355 KL 0 900.0 30.0 46.3 643.7 29.82 12000.0 4 7.72 30.90
1 S 355 KL 0 900.0 35.0 10.4 746.6 7.79 12000.0 1 8.96 8.96
1 S 355 KL 0 900.0 40.0 26.7 848.4 22.66 12000.0 3 10.18 30.54
1 S 355 KL 0 1000.0 20.0 254.1 483.4 122.83 12000.0 22 5.80 127.61
1 S 355 KL 0 1000.0 25.0 31.0 601.1 18.66 12000.0 3 7.21 21.64
1 S 355 KL 0 1000.0 35.0 64.5 832.9 53.69 12000.0 6 10.00 59.97
1 S 355 KL 0 1200.0 20.0 453.6 582.0 263.99 12000.0 39 6.98 272.38
1 S 355 KL 0 1200.0 25.0 325.0 724.4 235.42 12000.0 28 8.69 243.41
1 S 355 KL 0 1200.0 30.0 40.9 865.6 35.38 12000.0 4 10.39 41.55
Tubular - Material Take Off Tubular - Bill of Material
Line/ Steel Steel Steel Special Size (mm) Length Unit Wt Weight Length Total Weight (mton)
TTP
Item Category Grade Quality Requirement OD thk (m) (kg/m) (mton) (mm) (pieces) per piece Total

1 S 355 KL-20 1200.0 30.0 89.5 865.6 77.45 12000.0 8 10.39 83.10
1 S 355 KL 0 1200.0 35.0 25.4 1005.6 25.50 12000.0 3 12.07 36.20
1 S 355 KL-20 1200.0 35.0 38.2 1005.6 38.45 12000.0 4 12.07 48.27
1 S 355 KL 0 1350.0 25.0 10.6 816.9 8.68 12000.0 1 9.80 9.80
PTTEP INTERNATIONAL LIMITED

ATTACHMENT 3: PLATE MTO AND BOM SUMMARY

Basic Engineering Study for Zawtika Project Phase 1B Document: MM-ZTK-1B-WP6-STR-MTO-2001


P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08- Revision: B1
STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-
STR-MTO-2001-B1 WP6JacketMTO&CuttingPlan\Report\MM-ZTK-1B-WP6- Date: 24-Oct-13
STR-MTO-2001-B1 WP6JacketMTO.docx
Plate - Material Take Off Plate - Bill of Material
Line/ Steel Steel Steel Special thk Weight Width Length Total Unit Wt Weight (mton)
TTP
Item Category Grade Quality Requirement (mm) (mton) (mm) (mm) (pieces) (kg/m2) per piece Total

S S 355 KT 0 20.0 16.56 3000.0 6000.0 6 157.0 2.8 16.96


S S 355 KT 0 25.0 53.67 3000.0 6000.0 16 196.3 3.5 56.52
S S 355 KT-20 30.0 138.75 3000.0 6000.0 33 235.5 4.2 139.89
S S 355 KT-20 35.0 16.61 3000.0 6000.0 4 274.8 4.9 19.78
S S 355 KT-20 40.0 442.55 3000.0 6000.0 79 314.0 5.7 446.51
S S 355 KT-40 45.0 19.97 3000.0 6000.0 4 353.3 6.4 25.43
S S 355 KT-40 50.0 69.91 3000.0 6000.0 10 392.5 7.1 70.65
S S 355 KT-40 60.0 12.55 3000.0 6000.0 2 471.0 8.5 16.96
S S 355 KT-40 65.0 27.84 3000.0 6000.0 4 510.3 9.2 36.74
S S 355 KT-40 80.0 3.10 3000.0 6000.0 1 628.0 11.3 11.30

1 S 355 KL 0 8.0 0.12 3000.0 6000.0 1 62.8 1.1 1.13


1 S 355 KL 0 10.0 4.33 3000.0 6000.0 4 78.5 1.4 5.65
1 S 355 KL 0 12.0 7.92 3000.0 6000.0 5 94.2 1.7 8.48
1 S 355 KL 0 15.0 0.09 3000.0 6000.0 1 117.8 2.1 2.12
1 S 355 KL 0 20.0 1.31 3000.0 6000.0 1 157.0 2.8 2.83
1 S 355 KL 0 25.0 13.25 3000.0 6000.0 4 196.3 3.5 14.13
1 S 355 KL 0 35.0 0.31 3000.0 6000.0 1 274.8 4.9 4.95
1 S 355 KL 0 40.0 2.69 3000.0 6000.0 1 314.0 5.7 5.65
1 S 355 KL-20 50.0 0.50 3000.0 6000.0 1 392.5 7.1 7.07
PTTEP INTERNATIONAL LIMITED

ATTACHMENT 4: MTO BREAK-DOWN (BOCAD)

Basic Engineering Study for Zawtika Project Phase 1B Document: MM-ZTK-1B-WP6-STR-MTO-2001


P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08- Revision: B1
STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-
STR-MTO-2001-B1 WP6JacketMTO&CuttingPlan\Report\MM-ZTK-1B-WP6- Date: 24-Oct-13
STR-MTO-2001-B1 WP6JacketMTO.docx
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 101
Customer PTTEP Phase weight 245858.7
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description ELEVATION TRUSS ROW A Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0013 1 ø1200x40 III-S-Z 2800 3204 10.6 CAN
0014 1 ø1200x40 III-S-Z 2300 2631.9 8.7 CAN
0015 1 ø1200x40 III-S-Z 2100 2403 7.9 CAN
Total ø1200x40 III-S-Z 7200 8238.9 27.1
0002 1 ø1200x25 III-1 21666 15695.2 81.7 BRACING
0004 1 ø1200x25 III-1 20265 14680.9 76.4 BRACING
0006 1 ø1200x25 III-1 19542 14157.1 73.7 BRACING
0009 1 ø1200x25 III-1 18142 13142.9 68.4 BRACING
Total ø1200x25 III-1 79616 57676.1 300.1
0001 1 ø1200x20 III-1 21874 12731.1 82.5 BRACING
0003 1 ø1200x20 III-1 20724 12061.8 78.1 BRACING
0005 1 ø1200x20 III-1 19792 11519.2 74.6 BRACING
0007 1 ø1200x20 III-1 18951 11029.5 71.4 BRACING
0008 1 ø1200x20 III-1 18742 10908.1 70.7 BRACING
0010 1 ø1200x20 III-1 17801 10360.2 67.1 BRACING
0011 1 ø1200x20 III-1 17181 9999.8 64.8 BRACING
0012 1 ø1200x20 III-1 16131 9388.6 60.8 BRACING
Total ø1200x20 III-1 151197 87998.4 570
0020 1 ø1000x40 III-S-Z 2000 1894 6.3 CAN
Total ø1000x40 III-S-Z 2000 1894 6.3
0016 1 ø1000x20 III-1 19130 9246.5 60.1 BRACING
0017 1 ø1000x20 III-1 18130 8763.2 57 BRACING
0018 1 ø1000x20 III-1 15683 7580.5 49.3 BRACING
0019 1 ø1000x20 III-1 14683 7097.1 46.1 BRACING
Total ø1000x20 III-1 67624 32687.3 212.4
0021 1 ø900x25 III-1 14694 7926.8 41.5 BRACING
0022 1 ø900x25 III-1 14694 7926.8 41.5 BRACING
0023 1 ø900x25 III-1 13724 7403.8 38.8 BRACING
0024 1 ø900x25 III-1 13724 7403.8 38.8 BRACING
0025 1 ø900x25 III-1 12865 6940.2 36.4 BRACING
0026 1 ø900x25 III-1 12865 6940.2 36.4 BRACING
0027 1 ø900x25 III-1 11884 6411.3 33.6 BRACING
0028 1 ø900x25 III-1 11884 6411.3 33.6 BRACING
Total ø900x25 III-1 106334 57364 300.7

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 102
Customer PTTEP Phase weight 245916.3
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description ELEVATION TRUSS ROW B Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0041 1 ø1200x40 III-S-Z 2800 3204 10.6 CAN
0042 1 ø1200x40 III-S-Z 2300 2631.9 8.7 CAN
0043 1 ø1200x40 III-S-Z 2100 2403 7.9 CAN
Total ø1200x40 III-S-Z 7200 8238.9 27.1
0030 1 ø1200x25 III-1 21665 15695.1 81.7 BRACING
0032 1 ø1200x25 III-1 20266 14681 76.4 BRACING
0034 1 ø1200x25 III-1 19542 14157.1 73.7 BRACING
0037 1 ø1200x25 III-1 18142 13142.9 68.4 BRACING
Total ø1200x25 III-1 79616 57676.1 300.1
0029 1 ø1200x20 III-1 21874 12731.2 82.5 BRACING
0031 1 ø1200x20 III-1 20724 12061.8 78.1 BRACING
0033 1 ø1200x20 III-1 19792 11519.2 74.6 BRACING
0035 1 ø1200x20 III-1 18951 11029.5 71.4 BRACING
0036 1 ø1200x20 III-1 18742 10908.1 70.7 BRACING
0038 1 ø1200x20 III-1 17801 10360.2 67.1 BRACING
0039 1 ø1200x20 III-1 17181 9999.7 64.8 BRACING
0040 1 ø1200x20 III-1 16131 9388.6 60.8 BRACING
Total ø1200x20 III-1 151197 87998.4 570
0048 1 ø1000x40 III-S-Z 2000 1894 6.3 CAN
Total ø1000x40 III-S-Z 2000 1894 6.3
0044 1 ø1000x20 III-1 19130 9246.6 60.1 BRACING
0045 1 ø1000x20 III-1 18130 8763.2 57 BRACING
0046 1 ø1000x20 III-1 15683 7580.5 49.3 BRACING
0047 1 ø1000x20 III-1 14683 7097.1 46.1 BRACING
Total ø1000x20 III-1 67624 32687.3 212.4
0049 1 ø900x25 III-1 14747 7955.6 41.7 BRACING
0050 1 ø900x25 III-1 14747 7955.5 41.7 BRACING
0051 1 ø900x25 III-1 13724 7403.8 38.8 BRACING
0052 1 ø900x25 III-1 13724 7403.8 38.8 BRACING
0053 1 ø900x25 III-1 12865 6940.2 36.4 BRACING
0054 1 ø900x25 III-1 12865 6940.2 36.4 BRACING
0056 1 ø900x25 III-1 11884 6411.3 33.6 BRACING
0055 1 ø900x25 III-1 11884 6411.3 33.6 BRACING
Total ø900x25 III-1 106441 57421.6 301

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 103
Customer PTTEP Phase weight 875234.7
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description ELEVATION TRUSS ROW 1 Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0059 2 ø2500x60 III-S-Z 9500 68598.4 149.2 CAN
0060 2 ø2500x60 III-S-Z 6100 44047.4 95.8 CAN
0061 2 ø2500x60 III-S-Z 5750 41520.1 90.3 CAN
Total ø2500x60 III-S-Z 42700 154166 335.4
0058 2 ø2500x50 III-S 13870 83800.8 217.9 LEG
Total ø2500x50 III-S 27739 83800.8 217.9
0057 2 ø2500x40 III-S 21994 106744 345.5 LEG
Total ø2500x40 III-S 43988 106744 345.5
0065 2 ø2000x65 III-S-Z 7200 44666 90.5 CAN
Total ø2000x65 III-S-Z 14400 44666 90.5
0064 2 ø2000x60 III-S-Z 10550 60569.6 132.6 CAN
Total ø2000x60 III-S-Z 21100 60569.6 132.6
0063 2 ø2000x35 III-S 13937 47276.4 175.1 LEG
Total ø2000x35 III-S 27874 47276.4 175.1
0062 2 ø2000x30 III-S 20794 60613.6 261.3 LEG
Total ø2000x30 III-S 41588 60613.6 261.3
0071 2 ø1500x75 III-S-Z 3831 20195.3 36.1 CAN
0073 1 ø1500x75 III-S-Z 3270 8618.2 15.4 CAN
0072 1 ø1500x75 III-S-Z 3270 8618.2 15.4 CAN
Total ø1500x75 III-S-Z 14202 37431.7 66.9
0070 2 ø1500x60 III-S-Z 5250 22372.9 49.5 CAN
0074 2 ø1500x60 III-S-Z 3100 13210.7 29.2 CAN
0075 2 ø1500x60 III-S-Z 1950 8309.9 18.4 CAN
Total ø1500x60 III-S-Z 20600 43893.5 97.1
0067 2 ø1500x40 III-S 7535 21704.6 71 LEG
Total ø1500x40 III-S 15070 21704.6 71
0066 2 ø1500x30 III-S 8633 18778.1 81.4 LEG
0068 2 ø1500x30 III-S 6176 13434 58.2 LEG
0069 2 ø1500x30 III-S 5933 12905.2 55.9 LEG
Total ø1500x30 III-S 41484 45117.3 195.5
0076 1 ø1200x25 III-1 2811 2036.3 10.6 BRACING
0077 1 ø1200x25 III-1 2811 2036.3 10.6 BRACING
Total ø1200x25 III-1 5622 4072.6 21.2
0080 1 ø1000x35 III-1 7042 5865.2 22.1 BRACING
0078 1 ø1000x35 III-1 7042 5865.2 22.1 BRACING
0083 1 ø1000x35 III-1 3567 2970.7 11.2 BRACING
0081 1 ø1000x35 III-1 3567 2970.7 11.2 BRACING

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 103
Customer PTTEP Phase weight 875234.7
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description ELEVATION TRUSS ROW 1 Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
Total ø1000x35 III-1 21216 17671.7 66.7
0098 1 ø900x40 III-S-Z 2100 1781.5 5.9 CAN
0099 1 ø900x40 III-S-Z 2020 1713.7 5.7 CAN
Total ø900x40 III-S-Z 4120 3495.2 11.6
0084 1 ø900x25 III-1 15091 8141.1 42.7 BRACING
0079 1 ø900x25 III-1 15091 8141.1 42.7 BRACING
0085 1 ø900x25 III-1 14715 7938.4 41.6 BRACING
0087 1 ø900x25 III-1 14665 7911.1 41.5 BRACING
0086 1 ø900x25 III-1 14665 7911.1 41.5 BRACING
0082 1 ø900x25 III-1 14320 7725.1 40.5 BRACING
0088 1 ø900x25 III-1 14320 7725.1 40.5 BRACING
0089 1 ø900x25 III-1 14178 7648.6 40.1 BRACING
0090 1 ø900x25 III-1 13679 7379.3 38.7 BRACING
0091 1 ø900x25 III-1 13169 7104.1 37.2 BRACING
0092 1 ø900x25 III-1 13122 7078.9 37.1 BRACING
0093 1 ø900x25 III-1 12089 6521.5 34.2 BRACING
0095 1 ø900x25 III-1 11712 6318 33.1 BRACING
0094 1 ø900x25 III-1 11712 6318 33.1 BRACING
0096 1 ø900x25 III-1 11220 6052.7 31.7 BRACING
0097 1 ø900x25 III-1 10209 5507.6 28.9 BRACING
Total ø900x25 III-1 213954 115422 604.9
0103 1 PL65 III-S 13.64 6959.2 28.3 CONE PL
0102 1 PL65 III-S 13.64 6959.2 28.3 CONE PL
Total PL65 III-S 27.28 13918.4 56.6
0101 1 PL50 III-S 17.7 6949 36.4 CONE PL
0100 1 PL50 III-S 17.7 6949 36.4 CONE PL
Total PL50 III-S 35.41 13898 72.7
0104 1 PL25 III-1 1.97 386.6 4.1 CONE PL
0105 1 PL25 III-1 1.97 386.6 4.1 CONE PL
Total PL25 III-1 3.94 773.2 8.3

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 104
Customer PTTEP Phase weight 954664.5
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description ELEVATION TRUSS ROW 2 Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0108 2 ø2500x60 III-S-Z 9500 68598 149.2 CAN
0109 2 ø2500x60 III-S-Z 6100 44047.4 95.8 CAN
0110 2 ø2500x60 III-S-Z 5750 41520.1 90.3 CAN
Total ø2500x60 III-S-Z 42700 154166 335.4
0107 2 ø2500x50 III-S 13870 83800.8 217.9 LEG
Total ø2500x50 III-S 27739 83800.8 217.9
0106 2 ø2500x40 III-S 21994 106744 345.5 LEG
Total ø2500x40 III-S 43988 106744 345.5
0114 2 ø2000x65 III-S-Z 5250 32569 66 CAN
Total ø2000x65 III-S-Z 10500 32569 66
0113 2 ø2000x60 III-S-Z 5550 31863.6 69.7 CAN
Total ø2000x60 III-S-Z 11100 31863.6 69.7
0112 2 ø2000x35 III-S 18937 64237.4 238 LEG
Total ø2000x35 III-S 37874 64237.4 238
0111 2 ø2000x30 III-S 22744 66297.9 285.8 LEG
Total ø2000x30 III-S 45488 66297.9 285.8
0120 2 ø1500x75 III-S-Z 3831 20195.2 36.1 CAN
0121 1 ø1500x75 III-S-Z 3270 8618.2 15.4 CAN
0122 1 ø1500x75 III-S-Z 3270 8618.2 15.4 CAN
Total ø1500x75 III-S-Z 14202 37431.6 66.9
0119 2 ø1500x60 III-S-Z 5250 22372.9 49.5 CAN
0123 2 ø1500x60 III-S-Z 3100 13210.7 29.2 CAN
0124 2 ø1500x60 III-S-Z 1950 8309.9 18.4 CAN
Total ø1500x60 III-S-Z 20600 43893.5 97.1
0116 2 ø1500x40 III-S 7535 21704.6 71 LEG
Total ø1500x40 III-S 15070 21704.6 71
0115 2 ø1500x30 III-S 8633 18778.1 81.4 LEG
0117 2 ø1500x30 III-S 6176 13434 58.2 LEG
0118 2 ø1500x30 III-S 5933 12905.2 55.9 LEG
Total ø1500x30 III-S 41484 45117.3 195.5
0137 1 ø1200x40 III-S-Z 2800 3204 10.6 CAN
0138 1 ø1200x40 III-S-Z 2300 2631.9 8.7 CAN
0139 1 ø1200x40 III-S-Z 2100 2403 7.9 CAN
Total ø1200x40 III-S-Z 7200 8238.9 27.1
0126 1 ø1200x25 III-1 21665 15695 81.7 BRACING
0128 1 ø1200x25 III-1 20265 14680.9 76.4 BRACING
0130 1 ø1200x25 III-1 19542 14157.1 73.7 BRACING

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 104
Customer PTTEP Phase weight 954664.5
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description ELEVATION TRUSS ROW 2 Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0133 1 ø1200x25 III-1 18142 13142.8 68.4 BRACING
Total ø1200x25 III-1 79615 57675.8 300.1
0125 1 ø1200x20 III-1 21874 12731 82.5 BRACING
0127 1 ø1200x20 III-1 20724 12061.7 78.1 BRACING
0129 1 ø1200x20 III-1 19792 11519.1 74.6 BRACING
0131 1 ø1200x20 III-1 18951 11029.4 71.4 BRACING
0132 1 ø1200x20 III-1 18742 10908 70.7 BRACING
0134 1 ø1200x20 III-1 17801 10360.1 67.1 BRACING
0135 1 ø1200x20 III-1 17181 9999.7 64.8 BRACING
0136 1 ø1200x20 III-1 16131 9388.6 60.8 BRACING
Total ø1200x20 III-1 151196 87997.8 570
0152 1 ø900x40 III-S-Z 2020 1713.7 5.7 CAN
0153 2 ø900x40 III-S-Z 1900 3223.8 10.7 CAN
Total ø900x40 III-S-Z 5820 4937.4 16.5
0146 1 ø900x25 III-1 14179 7648.9 40.1 BRACING
0148 1 ø900x25 III-1 13169 7104.1 37.2 BRACING
0150 1 ø900x25 III-1 11220 6052.7 31.7 BRACING
0151 1 ø900x25 III-1 10210 5507.8 28.9 BRACING
Total ø900x25 III-1 48776 26313.5 137.9
0140 1 ø900x20 III-1 19136 8305.9 54.1 BRACING
0141 1 ø900x20 III-1 18186 7893.6 51.4 BRACING
0142 1 ø900x20 III-1 15871 6888.6 44.9 BRACING
0143 1 ø900x20 III-1 15678 6804.8 44.3 BRACING
0144 1 ø900x20 III-1 14921 6476.2 42.2 BRACING
0145 1 ø900x20 III-1 14728 6392.5 41.6 BRACING
0147 1 ø900x20 III-1 13259 5755.1 37.5 BRACING
0149 1 ø900x20 III-1 12309 5342.7 34.8 BRACING
Total ø900x20 III-1 124088 53859.4 350.9
0157 1 PL65 III-S 13.64 6959.2 28.3 CONE PL
0156 1 PL65 III-S 13.64 6959.2 28.3 CONE PL
Total PL65 III-S 27.28 13918.4 56.6
0154 1 PL50 III-S 17.7 6949 36.4 CONE PL
0155 1 PL50 III-S 17.7 6949 36.4 CONE PL
Total PL50 III-S 35.41 13898 72.7

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 105
Customer PTTEP Phase weight 432101.7
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description ELEVATION TRUSS ROW Aa Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0166 1 ø1650x60 III-S-Z 6350 14939.7 32.9 CAN
0167 1 ø1650x60 III-S-Z 5750 13528.1 29.8 CAN
0179 1 ø1650x60 III-S-Z 4000 9410.8 20.7 CAN
0180 1 ø1650x60 III-S-Z 3150 7411 16.3 CAN
Total ø1650x60 III-S-Z 19250 45289.7 99.8
0171 1 ø1650x50 III-S-Z 5500 10851.1 28.5 CAN
0178 1 ø1650x50 III-S-Z 4350 8582.2 22.5 CAN
Total ø1650x50 III-S-Z 9850 19433.3 51.1
0168 1 ø1650x45 III-S-Z 5700 10152.6 29.5 CAN
0169 1 ø1650x45 III-S-Z 5650 10063.7 29.3 CAN
0170 1 ø1650x45 III-S-Z 5600 9974.6 29 CAN
0173 1 ø1650x45 III-S-Z 4600 8193.4 23.8 CAN
0177 1 ø1650x45 III-S-Z 4400 7837.2 22.8 CAN
0182 1 ø1650x45 III-S-Z 1750 3117.1 9.1 CAN
Total ø1650x45 III-S-Z 27700 49338.5 143.6
0163 1 ø1650x45 III-S 8270 14730.1 42.9 LEG
Total ø1650x45 III-S 8270 14730.1 42.9
0175 1 ø1650x40 III-S-Z 4450 7067.5 23.1 CAN
0181 1 ø1650x40 III-S-Z 1900 3017.6 9.8 CAN
Total ø1650x40 III-S-Z 6350 10085.1 32.9
0162 1 ø1650x40 III-S 8420 13372.4 43.6 LEG
Total ø1650x40 III-S 8420 13372.4 43.6
0158 1 ø1650x25 III-S 9917 9935.9 51.4 LEG
0159 1 ø1650x25 III-S 9317 9334.8 48.3 LEG
0160 1 ø1650x25 III-S 8845 8861.4 45.8 LEG
0161 1 ø1650x25 III-S 8545 8560.8 44.3 LEG
0164 1 ø1650x25 III-S 7411 7425 38.4 LEG
0165 1 ø1650x25 III-S 7211 7224.5 37.4 LEG
Total ø1650x25 III-S 51246 51342.5 265.6
0191 1 ø1350x40 III-S-Z 2000 2584.5 8.5 CAN
0192 2 ø1350x40 III-S-Z 1700 4393.7 14.4 CAN
Total ø1350x40 III-S-Z 5400 6978.2 22.9
0184 1 ø1350x25 III-S 15500 12662.1 65.7 LEG
0185 1 ø1350x25 III-S 10625 8679.7 45.1 LEG
0186 1 ø1350x25 III-S 10275 8393.8 43.6 LEG
0187 1 ø1350x25 III-S 9500 7760.7 40.3 LEG
0188 1 ø1350x25 III-S 9400 7679 39.9 LEG

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 105
Customer PTTEP Phase weight 432101.7
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description ELEVATION TRUSS ROW Aa Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0189 1 ø1350x25 III-S 8700 7107.1 36.9 LEG
0190 1 ø1350x25 III-S 8550 6984.6 36.3 LEG
Total ø1350x25 III-S 72550 59267 307.7
0197 1 ø1200x45 III-S-Z 3700 4742.6 13.9 CAN
Total ø1200x45 III-S-Z 3700 4742.6 13.9
0176 1 ø1200x35 III-S-Z 3600 3620.1 13.6 CAN
Total ø1200x35 III-S-Z 3600 3620.1 13.6
0193 1 ø1200x35 III-1 19118 19224.4 72.1 BRACING
Total ø1200x35 III-1 19118 19224.4 72.1
0172 1 ø1200x30 III-1 16286 14097.5 61.4 BRACING
0174 1 ø1200x30 III-1 15777 13656.9 59.5 BRACING
0196 1 ø1200x30 III-1 12674 10971.2 47.8 BRACING
Total ø1200x30 III-1 44737 38725.5 168.7
0194 1 ø1200x25 III-1 15683 11361.2 59.1 BRACING
0195 1 ø1200x25 III-1 15280 11069.4 57.6 BRACING
Total ø1200x25 III-1 30963 22430.6 116.7
0202 1 ø1000x35 III-S-Z 3050 2540.5 9.6 CAN
Total ø1000x35 III-S-Z 3050 2540.5 9.6
0200 1 ø1000x25 III-1 15523 9331.1 48.8 BRACING
Total ø1000x25 III-1 15523 9331.1 48.8
0198 1 ø1000x20 III-1 22092 10678.7 69.4 BRACING
0199 1 ø1000x20 III-1 21965 10617.3 69 BRACING
0201 1 ø1000x20 III-1 15372 7430.4 48.3 BRACING
Total ø1000x20 III-1 59430 28726.5 186.7
0183 1 ø900x20 III-1 15848 6878.7 44.8 BRACING
0203 1 ø900x20 III-1 15064 6538.6 42.6 BRACING
Total ø900x20 III-1 30912 13417.3 87.4
0211 1 PL50 III-S 7.07 2774.4 14.8 CONE PL
Total PL50 III-S 7.07 2774.4 14.8
0209 1 PL45 III-S 7.09 2506.1 14.7 CONE PL
0210 1 PL45 III-S 7.09 2506.1 14.7 CONE PL
0208 1 PL45 III-S 7.09 2506.1 14.7 CONE PL
0207 1 PL45 III-S 7.09 2506.1 14.7 CONE PL
Total PL45 III-S 28.38 10024.5 59
0205 1 PL40 III-S 7.12 2235.9 14.7 CONE PL
0204 1 PL40 III-S 7.12 2235.9 14.7 CONE PL
0206 1 PL40 III-S 7.12 2235.9 14.7 CONE PL

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 105
Customer PTTEP Phase weight 432101.7
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description ELEVATION TRUSS ROW Aa Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
Total PL40 III-S 21.36 6707.6 44.2

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 106
Customer PTTEP Phase weight 431950.7
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description ELEVATION TRUSS ROW Bb Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0220 1 ø1650x60 III-S-Z 6350 14939.7 32.9 CAN
0221 1 ø1650x60 III-S-Z 5750 13528.1 29.8 CAN
0234 1 ø1650x60 III-S-Z 4000 9410.8 20.7 CAN
0235 1 ø1650x60 III-S-Z 3150 7411 16.3 CAN
Total ø1650x60 III-S-Z 19250 45289.6 99.8
0229 1 ø1650x50 III-S-Z 5500 10851.1 28.5 CAN
0233 1 ø1650x50 III-S-Z 4350 8582.2 22.5 CAN
Total ø1650x50 III-S-Z 9850 19433.3 51.1
0223 1 ø1650x45 III-S-Z 5700 10152.6 29.5 CAN
0227 1 ø1650x45 III-S-Z 5650 10063.7 29.3 CAN
0228 1 ø1650x45 III-S-Z 5600 9974.6 29 CAN
0230 1 ø1650x45 III-S-Z 4600 8193.4 23.8 CAN
0232 1 ø1650x45 III-S-Z 4400 7837.2 22.8 CAN
0237 1 ø1650x45 III-S-Z 1750 3117.1 9.1 CAN
Total ø1650x45 III-S-Z 27700 49338.5 143.6
0217 1 ø1650x45 III-S 8270 14730.1 42.9 LEG
Total ø1650x45 III-S 8270 14730.1 42.9
0231 1 ø1650x40 III-S-Z 4450 7067.5 23.1 CAN
0236 1 ø1650x40 III-S-Z 1900 3017.6 9.8 CAN
Total ø1650x40 III-S-Z 6350 10085.1 32.9
0216 1 ø1650x40 III-S 8420 13372.4 43.6 LEG
Total ø1650x40 III-S 8420 13372.4 43.6
0212 1 ø1650x25 III-S 9917 9935.9 51.4 LEG
0213 1 ø1650x25 III-S 9317 9334.8 48.3 LEG
0214 1 ø1650x25 III-S 8845 8861.4 45.8 LEG
0215 1 ø1650x25 III-S 8545 8560.8 44.3 LEG
0218 1 ø1650x25 III-S 7411 7424.9 38.4 LEG
0219 1 ø1650x25 III-S 7211 7224.6 37.4 LEG
Total ø1650x25 III-S 51246 51342.5 265.6
0245 1 ø1350x40 III-S-Z 2000 2584.5 8.5 CAN
0246 2 ø1350x40 III-S-Z 1700 4393.7 14.4 CAN
Total ø1350x40 III-S-Z 5400 6978.2 22.9
0238 1 ø1350x25 III-S 15500 12662.1 65.7 LEG
0240 1 ø1350x25 III-S 10275 8393.8 43.6 LEG
0241 1 ø1350x25 III-S 9500 7760.7 40.3 LEG
0242 1 ø1350x25 III-S 9400 7679 39.9 LEG
0243 1 ø1350x25 III-S 8700 7107.1 36.9 LEG

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 106
Customer PTTEP Phase weight 431950.7
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description ELEVATION TRUSS ROW Bb Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0244 1 ø1350x25 III-S 8550 6984.6 36.3 LEG
Total ø1350x25 III-S 61925 50587.3 262.6
0239 1 ø1350x25 III-1 10625 8679.7 45.1 LEG
Total ø1350x25 III-1 10625 8679.7 45.1
0250 1 ø1200x45 III-S-Z 3700 4742.6 13.9 CAN
Total ø1200x45 III-S-Z 3700 4742.6 13.9
0226 1 ø1200x35 III-S-Z 3600 3620.1 13.6 CAN
Total ø1200x35 III-S-Z 3600 3620.1 13.6
0247 1 ø1200x35 III-1 19118 19224.4 72.1 BRACING
Total ø1200x35 III-1 19118 19224.4 72.1
0222 1 ø1200x30 III-1 16286 14097.5 61.4 BRACING
0224 1 ø1200x30 III-1 15777 13656.9 59.5 BRACING
0225 1 ø1200x30 III-1 12674 10970.7 47.8 BRACING
Total ø1200x30 III-1 44737 38725 168.7
0248 1 ø1200x25 III-1 15683 11361.2 59.1 BRACING
0249 1 ø1200x25 III-1 15280 11069.4 57.6 BRACING
Total ø1200x25 III-1 30963 22430.6 116.7
0255 1 ø1000x35 III-S-Z 3050 2540.5 9.6 CAN
Total ø1000x35 III-S-Z 3050 2540.5 9.6
0253 1 ø1000x25 III-1 15523 9331.1 48.8 BRACING
Total ø1000x25 III-1 15523 9331.1 48.8
0251 1 ø1000x20 III-1 22092 10678.7 69.4 BRACING
0252 1 ø1000x20 III-1 21965 10617.3 69 BRACING
0254 1 ø1000x20 III-1 15372 7430.4 48.3 BRACING
Total ø1000x20 III-1 59430 28726.5 186.7
0256 1 ø900x20 III-1 15848 6878.7 44.8 BRACING
0257 1 ø900x20 III-1 15064 6538.6 42.6 BRACING
Total ø900x20 III-1 30912 13417.3 87.4
0263 1 PL50 III-S 7.07 2774.4 14.8 CONE PL
Total PL50 III-S 7.07 2774.4 14.8
0260 1 PL45 III-S 7.09 2506.1 14.7 CONE PL
0261 1 PL45 III-S 7.09 2506.1 14.7 CONE PL
0262 1 PL45 III-S 7.09 2506.1 14.7 CONE PL
0265 1 PL45 III-S 6.87 2426.5 14.3 CONE PL
Total PL45 III-S 28.15 9944.9 58.5
0258 1 PL40 III-S 7.12 2235.9 14.7 CONE PL
0259 1 PL40 III-S 7.12 2235.9 14.7 CONE PL

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 106
Customer PTTEP Phase weight 431950.7
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description ELEVATION TRUSS ROW Bb Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0264 1 PL40 III-S 6.89 2165.1 14.3 CONE PL
Total PL40 III-S 21.14 6636.8 43.8

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 107
Customer PTTEP Phase weight 111275.4
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description ELEVATION TRUSS ROW 1.1 Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0281 1 ø900x40 III-S-Z 2400 2036.1 6.8 CAN
0282 1 ø900x40 III-S-Z 2300 1951.2 6.5 CAN
0283 1 ø900x40 III-S-Z 2100 1781.5 5.9 CAN
Total ø900x40 III-S-Z 6800 5768.8 19.2
0266 1 ø900x20 III-1 15126 6565.4 42.8 BRACING
0267 1 ø900x20 III-1 15126 6565.4 42.8 BRACING
0268 2 ø900x20 III-1 14882 12919.2 84.2 BRACING
0269 1 ø900x20 III-1 14623 6347 41.3 FRAMING
0270 1 ø900x20 III-1 13926 6044.6 39.4 BRACING
0271 1 ø900x20 III-1 13926 6044.6 39.4 BRACING
0272 2 ø900x20 III-1 13732 11920.9 77.7 BRACING
0273 2 ø900x20 III-1 9846 8547.5 55.7 BRACING
0274 2 ø900x20 III-1 9846 8547.5 55.7 BRACING
0275 2 ø900x20 III-1 9113 7910.5 51.5 BRACING
0278 2 ø900x20 III-1 8896 7722.8 50.3 BRACING
0279 2 ø900x20 III-1 8896 7722.8 50.3 BRACING
0280 2 ø900x20 III-1 8063 6999 45.6 BRACING
0284 2 ø900x20 III-1 1900 1649.4 10.7 BRACING
Total ø900x20 III-1 243079 105507 687.3

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 118
Customer PTTEP Phase weight 36366.6
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description FRAMING PLAN AT EL.(+)8000 Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0292 2 ø900x35 III-S-Z 2600 3882.5 14.7 CAN
0293 1 ø900x35 III-S-Z 2300 1717.2 6.5 CAN
Total ø900x35 III-S-Z 7500 5599.7 21.2
0288 1 ø900x35 III-1 5218 3895.5 14.8 FRAMING
0289 1 ø900x35 III-1 5218 3895.5 14.8 FRAMING
Total ø900x35 III-1 10435 7791.1 29.5
0285 1 ø900x20 III-1 12735 5527.5 36 FRAMING
0286 1 ø900x20 III-1 7274 3157.4 20.6 FRAMING
0287 1 ø900x20 III-1 7274 3157.4 20.6 FRAMING
0290 1 ø900x20 III-1 2860 1241.3 8.1 FRAMING
0291 1 ø900x20 III-1 2860 1241.3 8.1 FRAMING
Total ø900x20 III-1 33003 14324.9 93.3
0276 1 ø750x20 III-1 13439 4839 31.7 FRAMING
Total ø750x20 III-1 13439 4839 31.7
0277 2 ø600x12 III-1 10953 3811.9 41.3 FRAMING
Total ø600x12 III-1 21906 3811.9 41.3

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 119
Customer PTTEP Phase weight 38429.3
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description FRAMING PLAN AT EL.(-)3000 Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0294 2 ø1000x40 III-S-Z 3000 5682 18.9 CAN
Total ø1000x40 III-S-Z 6000 5682 18.9
0296 1 ø900x40 III-S-Z 2510 2129.4 7.1 CAN
0299 3 ø900x40 III-S-Z 1520 3868.5 12.9 CAN
Total ø900x40 III-S-Z 7070 5997.9 20
0295 3 ø900x20 III-1 3423 4457.2 29 FRAMING
0298 1 ø900x20 III-1 2433 1056 6.9 FRAMING
0300 2 ø900x20 III-1 641 556.6 3.6 FRAMING
0301 2 ø900x20 III-1 641 556.6 3.6 FRAMING
Total ø900x20 III-1 15267 6626.4 43.2
0305 1 ø750x35 III-S-Z 2250 1388.6 5.3 CAN
0306 1 ø750x35 III-S-Z 1400 864 3.3 CAN
Total ø750x35 III-S-Z 3650 2252.6 8.6
0302 1 ø750x20 III-1 9694 3490.4 22.8 FRAMING
0303 1 ø750x20 III-1 8844 3184.4 20.8 FRAMING
0304 2 ø750x20 III-1 4179 3009.1 19.7 FRAMING
Total ø750x20 III-1 26895 9683.9 63.4
0297 1 ø600x20 III-1 14712 4208.6 27.7 FRAMING
0307 1 ø600x20 III-1 11317 3237.6 21.3 FRAMING
Total ø600x20 III-1 26029 7446.2 49.1
0309 1 PL40 III-1 0.59 185.1 1.4 CONE PL
0310 1 PL40 III-1 0.59 185.1 1.4 CONE PL
0311 1 PL40 III-1 0.59 185.1 1.4 CONE PL
0308 1 PL40 III-1 0.59 185.1 1.4 CONE PL
Total PL40 III-1 2.36 740.3 5.7

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 120
Customer PTTEP Phase weight 41183.6
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description FRAMING PLAN AT EL.(-)14000 Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0324 1 ø900x35 III-S-Z 3200 2389.2 9 CAN
Total ø900x35 III-S-Z 3200 2389.2 9
0323 2 ø900x30 III-S-Z 3350 4312.6 18.9 CAN
Total ø900x30 III-S-Z 6700 4312.6 18.9
0325 1 ø900x25 III-S-Z 2300 1240.8 6.5 CAN
Total ø900x25 III-S-Z 2300 1240.8 6.5
0312 1 ø900x15 III-1 9158 2998.2 25.9 FRAMING
0313 1 ø900x15 III-1 9158 2998.2 25.9 FRAMING
0314 1 ø900x15 III-1 7051 2308.3 19.9 FRAMING
0315 1 ø900x15 III-1 7051 2308.3 19.9 FRAMING
0316 1 ø900x15 III-1 6601 2161 18.7 FRAMING
0318 1 ø900x15 III-1 6601 2161 18.7 FRAMING
0319 1 ø900x15 III-1 3893 1274.4 11 FRAMING
0322 1 ø900x15 III-1 3893 1274.4 11 FRAMING
Total ø900x15 III-1 53405 17483.8 151
0326 1 ø750x25 III-1 17106 7646.2 40.3 FRAMING
Total ø750x25 III-1 17106 7646.2 40.3
0320 2 ø600x12 III-1 13520 4705.4 51 FRAMING
0321 2 ø600x12 III-1 9786 3405.6 36.9 FRAMING
Total ø600x12 III-1 46612 8111 87.9

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 121
Customer PTTEP Phase weight 37859.4
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description FRAMING PLAN AT EL.(-)26000 Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0327 2 ø1000x40 III-S-Z 3100 5871.4 19.5 CAN
Total ø1000x40 III-S-Z 6200 5871.4 19.5
0331 4 ø900x30 III-S-Z 1500 3862 17 CAN
Total ø900x30 III-S-Z 6000 3862 17
0328 2 ø900x20 III-1 3251 2822 18.4 FRAMING
0329 2 ø900x20 III-1 3251 2822 18.4 FRAMING
0330 4 ø900x20 III-1 2700 4687.6 30.5 FRAMING
Total ø900x20 III-1 23803 10331.6 67.3
0334 2 ø750x30 III-S-Z 1300 1385 6.1 CAN
Total ø750x30 III-S-Z 2600 1385 6.1
0332 2 ø750x20 III-1 11661 8397 55 FRAMING
0333 2 ø750x20 III-1 6145 4425.3 29 FRAMING
Total ø750x20 III-1 35612 12822.4 83.9
0336 1 ø600x20 III-1 9951 2846.8 18.8 FRAMING
Total ø600x20 III-1 9951 2846.8 18.8
0337 1 PL40 III-1 0.59 185.1 1.4 CONE PL
0338 1 PL40 III-1 0.59 185.1 1.4 CONE PL
0339 1 PL40 III-1 0.59 185.1 1.4 CONE PL
0340 1 PL40 III-1 0.59 185.1 1.4 CONE PL
Total PL40 III-1 2.36 740.3 5.7

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 122
Customer PTTEP Phase weight 83942.4
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description FRAMING PLAN AT EL.(-)38000 Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0343 1 ø1000x35 III-S-Z 1295 1078.4 4.1 CAN
0344 1 ø1000x35 III-S-Z 1295 1078.4 4.1 CAN
Total ø1000x35 III-S-Z 2589 2156.8 8.1
0341 1 ø1000x35 III-1 2015 1678.5 6.3 FRAMING
0342 1 ø1000x35 III-1 2015 1678.5 6.3 FRAMING
Total ø1000x35 III-1 4030 3356.9 12.7
0356 6 ø900x40 III-S-Z 1600 8144.2 27.1 CAN
Total ø900x40 III-S-Z 9600 8144.2 27.1
0354 1 ø900x30 III-S-Z 1908 1228.2 5.4 CAN
0355 1 ø900x30 III-S-Z 1908 1228.2 5.4 CAN
Total ø900x30 III-S-Z 3816 2456.5 10.8
0335 2 ø900x30 III-1 8811 11342.9 49.8 FRAMING
0349 2 ø900x30 III-1 4853 6246.9 27.4 FRAMING
Total ø900x30 III-1 27328 17589.8 77.3
0352 1 ø900x25 III-S-Z 3000 1618.4 8.5 CAN
Total ø900x25 III-S-Z 3000 1618.4 8.5
0351 1 ø900x20 III-1 3958 1717.9 11.2 FRAMING
0350 1 ø900x20 III-1 3958 1717.9 11.2 FRAMING
0353 2 ø900x20 III-1 2050 1779.3 11.6 FRAMING
Total ø900x20 III-1 12015 5215.1 34
0345 1 ø900x15 III-1 14621 4786.8 41.3 FRAMING
0346 2 ø900x15 III-1 8700 5696.4 49.2 FRAMING
0347 1 ø900x15 III-1 8407 2752.4 23.8 FRAMING
0348 1 ø900x15 III-1 8407 2752.4 23.8 FRAMING
Total ø900x15 III-1 48836 15988.1 138.1
0361 1 ø750x30 III-S-Z 2600 1385 6.1 CAN
Total ø750x30 III-S-Z 2600 1385 6.1
0364 2 ø750x25 III-S-Z 1300 1162.2 6.1 CAN
Total ø750x25 III-S-Z 2600 1162.2 6.1
0357 1 ø750x20 III-1 9373 3374.8 22.1 FRAMING
0358 1 ø750x20 III-1 6461 2326.5 15.2 FRAMING
0317 2 ø750x20 III-1 4490 3233.5 21.2 FRAMING
0359 1 ø750x20 III-1 4346 1564.7 10.2 FRAMING
0360 1 ø750x20 III-1 3857 1388.9 9.1 FRAMING
0362 2 ø750x20 III-1 2306 1660.8 10.9 FRAMING
0363 2 ø750x20 III-1 1818 1309.3 8.6 FRAMING
0366 1 ø750x20 III-1 800 287.9 1.9 FRAMING

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 122
Customer PTTEP Phase weight 83942.4
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description FRAMING PLAN AT EL.(-)38000 Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
Total ø750x20 III-1 42067 15146.4 99.1
0368 1 ø600x20 III-1 9851 2818.2 18.6 FRAMING
Total ø600x20 III-1 9851 2818.2 18.6
0365 1 ø600x12 III-1 10037 1746.6 18.9 FRAMING
0367 1 ø600x12 III-1 10025 1744.5 18.9 FRAMING
0369 2 ø600x12 III-1 8914 3102.3 33.6 FRAMING
Total ø600x12 III-1 37890 6593.4 71.4
0370 1 PL35 III-1 0.57 155.7 1.3 CONE PL
0371 1 PL35 III-1 0.57 155.7 1.3 CONE PL
Total PL35 III-1 1.13 311.4 2.7

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 123
Customer PTTEP Phase weight 30734.8
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description FRAMING PLAN AT EL.(-)52000 Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0376 2 ø900x30 III-S-Z 1500 1931 8.5 CAN
Total ø900x30 III-S-Z 3000 1931 8.5
0372 2 ø900x20 III-1 9049 7855.6 51.2 FRAMING
0373 1 ø900x20 III-1 7764 3369.9 22 FRAMING
0375 1 ø900x20 III-1 7764 3369.9 22 FRAMING
Total ø900x20 III-1 33627 14595.4 95.1
0380 2 ø750x30 III-S-Z 1300 1385 6.1 CAN
Total ø750x30 III-S-Z 2600 1385 6.1
0377 1 ø750x20 III-1 9861 3550.6 23.2 FRAMING
0374 1 ø750x20 III-1 9548 3437.9 22.5 FRAMING
0378 1 ø750x20 III-1 4346 1564.7 10.2 FRAMING
0379 1 ø750x20 III-1 4033 1452.1 9.5 FRAMING
Total ø750x20 III-1 27788 10005.3 65.5
0381 1 ø600x20 III-1 9851 2818.2 18.6 FRAMING
Total ø600x20 III-1 9851 2818.2 18.6

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 124
Customer PTTEP Phase weight 113902.4
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description FRAMING PLAN AT EL.(-)66000 Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0382 1 ø1000x35 III-1 4428 3688.3 13.9 FRAMING
0383 1 ø1000x35 III-1 4428 3688.2 13.9 FRAMING
Total ø1000x35 III-1 8856 7376.5 27.8
0392 2 ø900x40 III-S-Z 2950 5005.3 16.7 CAN
Total ø900x40 III-S-Z 5900 5005.3 16.7
0393 2 ø900x35 III-S-Z 2600 3882.5 14.7 CAN
0394 1 ø900x35 III-S-Z 2550 1903.9 7.2 CAN
0397 1 ø900x35 III-S-Z 1412 1053.9 4 CAN
0398 1 ø900x35 III-S-Z 1412 1053.9 4 CAN
Total ø900x35 III-S-Z 10573 7894.1 29.9
0396 1 ø900x25 III-S-Z 1458 786.6 4.1 CAN
0395 1 ø900x25 III-S-Z 1458 786.6 4.1 CAN
Total ø900x25 III-S-Z 2916 1573.2 8.2
0391 2 ø900x25 III-1 6852 7393.3 38.8 FRAMING
Total ø900x25 III-1 13705 7393.3 38.8
0384 1 ø900x20 III-1 14621 6346.3 41.3 FRAMING
0385 1 ø900x20 III-1 10966 4759.6 31 FRAMING
0386 1 ø900x20 III-1 10966 4759.6 31 FRAMING
0388 1 ø900x20 III-1 10941 4748.9 30.9 FRAMING
0387 1 ø900x20 III-1 10941 4748.9 30.9 FRAMING
0389 2 ø900x20 III-1 9483 8232.1 53.6 FRAMING
0390 2 ø900x20 III-1 8311 7214.8 47 FRAMING
Total ø900x20 III-1 94024 40810.3 265.8
0404 1 ø750x35 III-S-Z 2400 1481.2 5.7 CAN
Total ø750x35 III-S-Z 2400 1481.2 5.7
0405 2 ø750x25 III-S-Z 1300 1162.2 6.1 CAN
Total ø750x25 III-S-Z 2600 1162.2 6.1
0399 1 ø750x20 III-1 9373 3374.8 22.1 FRAMING
0400 1 ø750x20 III-1 6553 2359.6 15.4 FRAMING
0402 1 ø750x20 III-1 4346 1564.7 10.2 FRAMING
0403 1 ø750x20 III-1 3857 1388.9 9.1 FRAMING
0406 1 ø750x20 III-1 908 326.8 2.1 FRAMING
Total ø750x20 III-1 25037 9014.8 59
0407 1 ø600x20 III-1 12100 3461.4 22.8 FRAMING
0408 1 ø600x20 III-1 12100 3461.4 22.8 FRAMING
0409 2 ø600x20 III-1 10259 5869.8 38.7 FRAMING
0410 1 ø600x20 III-1 9845 2816.5 18.6 FRAMING

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 124
Customer PTTEP Phase weight 113902.4
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description FRAMING PLAN AT EL.(-)66000 Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0411 1 ø600x20 III-1 8430 2411.7 15.9 FRAMING
0412 1 ø600x20 III-1 8430 2411.6 15.9 FRAMING
0413 2 ø600x20 III-1 7660 4382.6 28.9 FRAMING
0414 2 ø600x20 III-1 6585 3767.5 24.8 FRAMING
0415 1 ø600x20 III-1 6308 1804.5 11.9 FRAMING
0416 1 ø600x20 III-1 6308 1804.4 11.9 FRAMING
Total ø600x20 III-1 112529 32191.5 212.1

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 125
Customer PTTEP Phase weight 34951.4
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description FRAMING PLAN AT EL.(-)79500 Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0420 2 ø900x30 III-S-Z 2005 2581.5 11.3 CAN
Total ø900x30 III-S-Z 4011 2581.5 11.3
0417 1 ø900x25 III-1 9574 5164.7 27.1 FRAMING
0418 1 ø900x25 III-1 9530 5141.2 26.9 FRAMING
Total ø900x25 III-1 19104 10305.8 54
0419 2 ø900x20 III-1 9049 7855.6 51.2 FRAMING
Total ø900x20 III-1 18099 7855.6 51.2
0425 2 ø750x30 III-S-Z 1300 1385 6.1 CAN
Total ø750x30 III-S-Z 2600 1385 6.1
0421 1 ø750x20 III-1 9861 3550.6 23.2 FRAMING
0422 1 ø750x20 III-1 9548 3438 22.5 FRAMING
0423 1 ø750x20 III-1 4346 1564.7 10.2 FRAMING
0424 1 ø750x20 III-1 4033 1452.1 9.5 FRAMING
Total ø750x20 III-1 27788 10005.2 65.5
0426 1 ø600x20 III-1 9851 2818.2 18.6 FRAMING
Total ø600x20 III-1 9851 2818.2 18.6

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 126
Customer PTTEP Phase weight 135857.7
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description FRAMING PLAN AT EL.(-)93000 Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0427 1 ø1000x35 III-1 6296 5244.4 19.8 FRAMING
0428 1 ø1000x35 III-1 6296 5244.4 19.8 FRAMING
Total ø1000x35 III-1 12592 10488.8 39.6
0437 2 ø900x40 III-S-Z 2900 4920.5 16.4 CAN
0442 1 ø900x40 III-S-Z 1362 1155.2 3.9 CAN
0443 1 ø900x40 III-S-Z 1362 1155.2 3.9 CAN
Total ø900x40 III-S-Z 8523 7230.9 24.1
0438 1 ø900x35 III-S-Z 2350 1754.6 6.6 CAN
0439 2 ø900x35 III-S-Z 2300 3434.5 13 CAN
Total ø900x35 III-S-Z 6950 5189.1 19.6
0441 1 ø900x30 III-S-Z 1437 925.1 4.1 CAN
0440 1 ø900x30 III-S-Z 1437 925.1 4.1 CAN
Total ø900x30 III-S-Z 2874 1850.1 8.1
0435 2 ø900x30 III-1 9502 12232.5 53.7 FRAMING
Total ø900x30 III-1 19004 12232.5 53.7
0429 1 ø900x20 III-1 14621 6346.3 41.3 FRAMING
0430 1 ø900x20 III-1 13070 5673.1 37 FRAMING
0431 1 ø900x20 III-1 13070 5673.1 37 FRAMING
0432 1 ø900x20 III-1 13045 5662.1 36.9 FRAMING
0433 1 ø900x20 III-1 13045 5662.1 36.9 FRAMING
0434 2 ø900x20 III-1 11633 10098.5 65.8 FRAMING
0436 2 ø900x20 III-1 8461 7345 47.8 FRAMING
Total ø900x20 III-1 107041 46460.2 302.6
0450 1 ø750x35 III-S-Z 1800 1110.9 4.2 CAN
Total ø750x35 III-S-Z 1800 1110.9 4.2
0451 2 ø750x25 III-S-Z 1300 1162.2 6.1 CAN
Total ø750x25 III-S-Z 2600 1162.2 6.1
0444 1 ø750x20 III-1 9861 3550.6 23.2 FRAMING
0445 2 ø750x20 III-1 9699 6984.3 45.7 FRAMING
0446 1 ø750x20 III-1 9373 3374.8 22.1 FRAMING
0447 2 ø750x20 III-1 8799 6336.2 41.5 FRAMING
0448 1 ø750x20 III-1 4346 1564.7 10.2 FRAMING
0449 1 ø750x20 III-1 3857 1388.9 9.1 FRAMING
Total ø750x20 III-1 64432 23199.4 151.8
0401 2 ø600x20 III-1 10582 6054.6 39.9 FRAMING
0456 1 ø600x20 III-1 9851 2818.2 18.6 FRAMING
0457 2 ø600x20 III-1 8224 4705.5 31 FRAMING

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 126
Customer PTTEP Phase weight 135857.7
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description FRAMING PLAN AT EL.(-)93000 Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
Total ø600x20 III-1 47464 13578.3 89.5
0452 1 ø600x15 III-1 11856 2565.7 22.3 FRAMING
0453 1 ø600x15 III-1 11840 2562.3 22.3 FRAMING
0454 1 ø600x15 III-1 11135 2409.7 21 FRAMING
0455 1 ø600x15 III-1 11133 2409.3 21 FRAMING
0458 2 ø600x15 III-1 7876 3408.6 29.7 FRAMING
Total ø600x15 III-1 61715 13355.5 116.3

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 127
Customer PTTEP Phase weight 56889.1
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description FRAMING PLAN AT EL.(-)107000 Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0459 1 ø1200x35 III-1 12678 12748.3 47.8 FRAMING
0460 1 ø1200x35 III-1 12677 12747.9 47.8 FRAMING
Total ø1200x35 III-1 25355 25496.3 95.6
0462 1 ø1200x30 III-S-Z 2160 1869.5 8.1 CAN
0463 1 ø1200x30 III-S-Z 2159 1869.2 8.1 CAN
Total ø1200x30 III-S-Z 4319 3738.8 16.3
0461 2 ø1200x25 III-1 9291 13461.6 70.1 FRAMING
Total ø1200x25 III-1 18582 13461.6 70.1
0468 2 ø750x30 III-S-Z 1300 1385 6.1 CAN
Total ø750x30 III-S-Z 2600 1385 6.1
0464 1 ø750x20 III-1 9686 3487.6 22.8 FRAMING
0465 1 ø750x20 III-1 9641 3471.5 22.7 FRAMING
0466 1 ø750x20 III-1 4171 1501.7 9.8 FRAMING
0467 1 ø750x20 III-1 4126 1485.6 9.7 FRAMING
Total ø750x20 III-1 27624 9946.4 65.1
0469 1 ø600x20 III-1 10001 2861.1 18.9 FRAMING
Total ø600x20 III-1 10001 2861.1 18.9

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 128
Customer PTTEP Phase weight 180714.3
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description FRAMING PLAN AT EL.(-)121000 Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0472 2 ø1200x40 III-S-Z 3150 7209.1 23.8 CAN
0473 2 ø1200x40 III-S-Z 1685 3855.2 12.7 CAN
Total ø1200x40 III-S-Z 9669 11064.2 36.5
0470 2 ø1200x30 III-1 11802 20432.1 89 FRAMING
0471 2 ø1200x30 III-1 8636 14951.2 65.1 FRAMING
Total ø1200x30 III-1 40876 35383.2 154.1
0474 1 ø1000x35 III-1 8881 7397.4 27.9 FRAMING
0475 1 ø1000x35 III-1 8881 7397.4 27.9 FRAMING
Total ø1000x35 III-1 17762 14794.7 55.8
0486 1 ø900x40 III-S-Z 1800 1527 5.1 CAN
0487 1 ø900x40 III-S-Z 1437 1219.2 4.1 CAN
0488 1 ø900x40 III-S-Z 1437 1219.2 4.1 CAN
Total ø900x40 III-S-Z 4674 3965.4 13.2
0484 1 ø900x35 III-S-Z 2250 1679.9 6.4 CAN
0485 2 ø900x35 III-S-Z 2200 3285.2 12.4 CAN
Total ø900x35 III-S-Z 6650 4965.1 18.8
0476 1 ø900x20 III-1 15454 6707.5 43.7 FRAMING
0477 1 ø900x20 III-1 15454 6707.5 43.7 FRAMING
0478 1 ø900x20 III-1 15428 6696.6 43.6 FRAMING
0479 1 ø900x20 III-1 15428 6696.5 43.6 FRAMING
0480 1 ø900x20 III-1 14621 6346.3 41.3 FRAMING
0481 2 ø900x20 III-1 14016 12167.5 79.3 FRAMING
0482 2 ø900x20 III-1 10537 9146.9 59.6 FRAMING
0483 2 ø900x20 III-1 9637 8365.6 54.5 FRAMING
Total ø900x20 III-1 144766 62834.5 409.3
0493 2 ø750x25 III-S-Z 1300 1162.2 6.1 CAN
Total ø750x25 III-S-Z 2600 1162.2 6.1
0489 1 ø750x20 III-1 9641 3471.5 22.7 FRAMING
0490 1 ø750x20 III-1 9373 3374.8 22.1 FRAMING
0491 1 ø750x20 III-1 4126 1485.5 9.7 FRAMING
0492 1 ø750x20 III-1 3857 1388.9 9.1 FRAMING
Total ø750x20 III-1 26998 9720.7 63.6
0494 1 ø600x20 III-1 14290 4088 26.9 FRAMING
0495 1 ø600x20 III-1 14290 4088 26.9 FRAMING
0496 2 ø600x20 III-1 13861 7930.5 52.3 FRAMING
0497 2 ø600x20 III-1 13738 7859.9 51.8 FRAMING
0498 2 ø600x20 III-1 10046 5748.1 37.9 FRAMING

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 128
Customer PTTEP Phase weight 180714.3
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description FRAMING PLAN AT EL.(-)121000 Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0500 1 ø600x20 III-1 9851 2818.2 18.6 FRAMING
Total ø600x20 III-1 113722 32532.7 214.4
0499 2 ø600x15 III-1 9915 4291.5 37.4 FRAMING
Total ø600x15 III-1 19831 4291.5 37.4

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 130
Customer PTTEP Phase weight 215716.4
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description FRAMING PLAN AT EL.(-)145500 Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman WDA Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0501 2 ø1200x40 III-S-Z 1934 4426.4 14.6 CAN
Total ø1200x40 III-S-Z 3868 4426.4 14.6
0516 2 ø900x40 III-S-Z 3900 6617.2 22.1 CAN
0519 1 ø900x40 III-S-Z 1700 1442.2 4.8 CAN
Total ø900x40 III-S-Z 9500 8059.4 26.9
0502 2 ø900x40 III-1 13353 22656.8 75.5 FRAMING
Total ø900x40 III-1 26707 22656.8 75.5
0517 1 ø900x30 III-S-Z 2750 1770.1 7.8 CAN
0518 2 ø900x30 III-S-Z 2550 3282.7 14.4 CAN
0520 3 ø900x30 III-S-Z 1500 2896.5 12.7 CAN
Total ø900x30 III-S-Z 12350 7949.3 34.9
0506 1 ø900x25 III-1 11785 6357.5 33.3 FRAMING
0507 1 ø900x25 III-1 11377 6137.5 32.2 FRAMING
0510 1 ø900x25 III-1 10935 5899 30.9 FRAMING
0511 1 ø900x25 III-1 10527 5678.9 29.8 FRAMING
Total ø900x25 III-1 44623 24073 126.2
0521 1 ø900x20 III-1 14621 6346.3 41.3 FRAMING
0503 1 ø900x20 III-1 13250 5751 37.5 FRAMING
0505 2 ø900x20 III-1 12695 11020.6 71.8 FRAMING
0504 2 ø900x20 III-1 12695 11020.6 71.8 FRAMING
0509 1 ø900x20 III-1 11086 4811.7 31.3 FRAMING
0508 1 ø900x20 III-1 11086 4811.7 31.3 FRAMING
0512 1 ø900x20 III-1 9860 4279.6 27.9 FRAMING
0513 1 ø900x20 III-1 9860 4279.6 27.9 FRAMING
0514 2 ø900x20 III-1 7810 6779.4 44.2 FRAMING
0515 2 ø900x20 III-1 7750 6727.7 43.8 FRAMING
Total ø900x20 III-1 151663 65828.3 428.8
0533 2 ø750x30 III-S-Z 1615 1721 7.6 CAN
Total ø750x30 III-S-Z 3231 1721 7.6
0529 2 ø750x25 III-1 14405 12877.6 67.9 FRAMING
Total ø750x25 III-1 28810 12877.6 67.9
0522 1 ø750x20 III-1 20279 7301.5 47.8 FRAMING
0523 1 ø750x20 III-1 16949 6102.6 39.9 FRAMING
0524 1 ø750x20 III-1 16913 6089.5 39.8 FRAMING
0526 1 ø750x20 III-1 16744 6028.9 39.5 FRAMING
0525 1 ø750x20 III-1 16744 6028.9 39.5 FRAMING
0527 1 ø750x20 III-1 15506 5583.2 36.5 FRAMING

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 130
Customer PTTEP Phase weight 215716.4
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description FRAMING PLAN AT EL.(-)145500 Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman WDA Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0528 1 ø750x20 III-1 14530 5231.8 34.2 FRAMING
0530 2 ø750x20 III-1 12046 8674.8 56.8 FRAMING
0531 2 ø750x20 III-1 11265 8112 53.1 FRAMING
0532 2 ø750x20 III-1 10777 7760.6 50.8 FRAMING
Total ø750x20 III-1 185842 66913.7 437.9
0534 1 PL40 III-1 1.93 605.5 4.2 CONE PL
0535 1 PL40 III-1 1.93 605.5 4.2 CONE PL
Total PL40 III-1 3.86 1210.9 8.3

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 140
Customer PTTEP Phase weight 637999.2
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description PILE CLUSTER AT EL.(-)145500 Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0536 12 ø2750x40 III-S 9000 288717 933 PILE SLEEVE
0537 12 ø2750x40 III-S 850 27267.7 88.1 PILE SLEEVE
Total ø2750x40 III-S 118200 315985 1021.2
0538 8 PL40 III-S 68.28 171526 1112.1 YOKE PL
0539 4 PL40 III-S 22.97 28847.1 187.2 SHEAR PL
0549 8 PL40 III-S 2.95 7407.6 51 RING PL
0540 4 PL40 III-S 16.29 20455.4 133.5 SHEAR PL
0541 4 PL40 III-S 16.29 20455 133.5 SHEAR PL
Total PL40 III-S 792.01 248691 1617.3
0542 12 PL30 III-S 10.21 28852.4 253 CONE PL
Total PL30 III-S 122.52 28852.4 253
0570 8 PL25 III-S 0.92 1449.6 16.1 FLG PL
0571 8 PL25 III-S 0.85 1338.6 14.9 FLG PL
0572 8 PL25 III-S 0.78 1227.6 13.7 FLG PL
0573 8 PL25 III-S 0.63 990.1 11 FLG PL
0574 8 PL25 III-S 0.6 944.7 10.5 FLG PL
0575 8 PL25 III-S 0.59 931.1 10.4 FLG PL
0576 8 PL25 III-S 0.59 927 10.3 FLG PL
0577 8 PL25 III-S 0.59 924.5 10.3 FLG PL
0578 8 PL25 III-S 0.56 883.5 9.9 FLG PL
0562 48 PL25 III-S 0.61 5720.9 63.8 STIFF PL
0563 48 PL25 III-S 0.61 5699.2 63.6 STIFF PL
0552 4 PL25 III-S 0.63 493.6 5.5 WEB PL
0544 4 PL25 III-S 0.97 760.7 8.4 WEB PL
0543 4 PL25 III-S 0.97 760.7 8.4 WEB PL
0545 4 PL25 III-S 0.9 703.8 7.8 WEB PL
0546 4 PL25 III-S 0.9 703.8 7.8 WEB PL
0547 4 PL25 III-S 0.82 646.9 7.2 WEB PL
0548 4 PL25 III-S 0.82 646.9 7.2 WEB PL
0550 4 PL25 III-S 0.66 517.4 5.8 WEB PL
0555 4 PL25 III-S 0.64 501.8 5.6 WEB PL
0558 4 PL25 III-S 0.63 492.2 5.5 WEB PL
0557 4 PL25 III-S 0.63 492.3 5.5 WEB PL
0560 4 PL25 III-S 0.61 477.6 5.3 WEB PL
0553 4 PL25 III-S 0.63 493.6 5.5 WEB PL
0551 4 PL25 III-S 0.66 517.4 5.8 WEB PL
0554 4 PL25 III-S 0.64 501.8 5.6 WEB PL

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 140
Customer PTTEP Phase weight 637999.2
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description PILE CLUSTER AT EL.(-)145500 Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0556 4 PL25 III-S 0.63 492.3 5.5 WEB PL
0559 4 PL25 III-S 0.63 492.2 5.5 WEB PL
0561 4 PL25 III-S 0.61 477.6 5.3 WEB PL
Total PL25 III-S 159.04 31209.4 347.7
0564 2 PL20 III-S 10.58 3315.4 45 SKIRTPL
0565 1 PL20 III-S 9.66 1657.7 22.5 SKIRTPL
0566 2 PL20 III-S 10.58 3315.4 45 SKIRTPL
0567 1 PL20 III-S 9.76 1657.7 22.5 SKIRTPL
0568 1 PL20 III-S 9.66 1657.7 22.5 SKIRTPL
0569 1 PL20 III-S 9.76 1657.7 22.5 SKIRTPL
Total PL20 III-S 81.16 13261.5 180.2

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 145
Customer PTTEP Phase weight 3576407.3
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description PILE MAKE UP Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0581 12 ø2438.4x60 III-S 20000 844631 1838.5 PILE
0582 4 ø2438.4x60 III-S 19000 267466 582.2 PILE
0583 8 ø2438.4x60 III-S 18000 506779 1103.1 PILE
0584 12 ø2438.4x60 III-S 2000 84463.1 183.9 PILE
Total ø2438.4x60 III-S 484000 1703339 3707.7
0579 12 ø2438.4x50 III-S 28000 989546 2573.9 PILE
0580 12 ø2438.4x50 III-S 25000 883523 2298.1 PILE
Total ø2438.4x50 III-S 636000 1873069 4872

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 150
Customer PTTEP Phase weight 16628.1
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description UPENDING PADEYE Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0592 1 PL80 III-S 1.24 776.5 2.9 MAIN PL
0591 1 PL80 III-S 1.24 776.5 2.9 MAIN PL
0593 1 PL80 III-S 1.23 775.3 2.9 MAIN PL
0594 1 PL80 III-S 1.23 775.3 2.9 MAIN PL
Total PL80 III-S 4.94 3103.6 11.6
0590 1 PL60 III-S 2.16 1018.6 5 BTM RING PL
0587 1 PL60 III-S 2.16 1018.6 5 BTM RING PL
0589 1 PL60 III-S 2.16 1018.6 5 BTM RING PL
0588 1 PL60 III-S 2.16 1018.6 5 BTM RING PL
0586 2 PL60 III-S 1.95 1837.1 9.2 TOP RING PL
0585 2 PL60 III-S 1.95 1837.1 9.2 TOP RING PL
0597 1 PL60 III-S 0.73 343.8 1.7 MIDDLE RING
0599 1 PL60 III-S 0.73 343.8 1.7 MIDDLE RING
0604 1 PL60 III-S 0.72 337.5 1.7 MIDDLE RING
0600 1 PL60 III-S 0.73 343.8 1.7 MIDDLE RING
0598 1 PL60 III-S 0.73 343.8 1.7 MIDDLE RING
0601 1 PL60 III-S 0.74 347.5 1.7 MIDDLE RING
0603 1 PL60 III-S 0.72 337.5 1.7 MIDDLE RING
0602 1 PL60 III-S 0.74 347.5 1.7 MIDDLE RING
0595 8 PL60 III-S 0.55 2060.4 10.5 CHEEK PL
Total PL60 III-S 26.65 12554.2 62.9
0596 8 PL30 III-S 0.31 590.2 5.8 SPACER PL
0605 8 PL30 III-S 0.2 380.1 3.9 SPACER PL
Total PL30 III-S 4.12 970.3 9.7

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 160
Customer PTTEP Phase weight 25054.4
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description CASING GUIDS Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0606 132 ø500x10 III-1 519 8278.6 107.6 BARREL
0607 132 ø500x10 III-1 75 1196.3 15.6 BARREL
Total ø500x10 III-1 78408 9475 123.2
0608 12 ø406x9.5 III-1 484 539.9 7.4 TUBULAR
0609 12 ø406x9.5 III-1 390 435 6 TUBULAR
Total ø406x9.5 III-1 10495 974.9 13.4
0610 96 ø273x9.3 III-1 374 2172.8 30.8 TUBULAR
0611 12 ø273x9.3 III-1 293 212.8 3 TUBULAR
Total ø273x9.3 III-1 39445 2385.6 33.8
0647 1 PL12 III-1 0.79 74.1 1.6 CONE PL
0612 1 PL12 III-1 0.79 74.1 1.6 CONE PL
0646 1 PL12 III-1 0.79 74.1 1.6 CONE PL
0613 1 PL12 III-1 0.79 74.1 1.6 CONE PL
0645 1 PL12 III-1 0.79 74.1 1.6 CONE PL
0614 1 PL12 III-1 0.79 74.1 1.6 CONE PL
0644 1 PL12 III-1 0.79 74.1 1.6 CONE PL
0615 1 PL12 III-1 0.79 74.1 1.6 CONE PL
0643 1 PL12 III-1 0.79 74.1 1.6 CONE PL
0616 1 PL12 III-1 0.79 74.1 1.6 CONE PL
0642 1 PL12 III-1 0.79 74.1 1.6 CONE PL
0617 1 PL12 III-1 0.79 74.1 1.6 CONE PL
0641 1 PL12 III-1 0.79 74.1 1.6 CONE PL
0640 1 PL12 III-1 0.79 74.1 1.6 CONE PL
0639 1 PL12 III-1 0.79 74.1 1.6 CONE PL
0638 1 PL12 III-1 0.79 74.1 1.6 CONE PL
0637 1 PL12 III-1 0.79 74.1 1.6 CONE PL
0636 1 PL12 III-1 0.79 74.1 1.6 CONE PL
0635 1 PL12 III-1 0.79 74.1 1.6 CONE PL
0634 1 PL12 III-1 0.79 74.1 1.6 CONE PL
0633 1 PL12 III-1 0.79 74.1 1.6 CONE PL
0632 1 PL12 III-1 0.79 74.1 1.6 CONE PL
0631 1 PL12 III-1 0.79 74.1 1.6 CONE PL
0630 1 PL12 III-1 0.79 74.1 1.6 CONE PL
0629 1 PL12 III-1 0.79 74.1 1.6 CONE PL
0628 1 PL12 III-1 0.79 74.1 1.6 CONE PL
0627 1 PL12 III-1 0.79 74.1 1.6 CONE PL
0626 1 PL12 III-1 0.79 74.1 1.6 CONE PL

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 160
Customer PTTEP Phase weight 25054.4
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description CASING GUIDS Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0625 1 PL12 III-1 0.79 74.1 1.6 CONE PL
0624 1 PL12 III-1 0.79 74.1 1.6 CONE PL
0623 1 PL12 III-1 0.79 74.1 1.6 CONE PL
0622 1 PL12 III-1 0.79 74.1 1.6 CONE PL
0621 1 PL12 III-1 0.79 74.1 1.6 CONE PL
0620 1 PL12 III-1 0.79 74.1 1.6 CONE PL
0619 1 PL12 III-1 0.79 74.1 1.6 CONE PL
0618 1 PL12 III-1 0.79 74.1 1.6 CONE PL
0876 264 PL12 III-1 0.21 5224.6 124.9 FLG PL
Total PL12 III-1 83.76 7891.1 183.8
0676 1 PL10 III-1 0.24 19 0.5 CONE PL
0678 1 PL10 III-1 0.24 19 0.5 CONE PL
0675 1 PL10 III-1 0.24 19 0.5 CONE PL
0679 1 PL10 III-1 0.24 19 0.5 CONE PL
0674 1 PL10 III-1 0.24 19 0.5 CONE PL
0680 1 PL10 III-1 0.24 19 0.5 CONE PL
0673 1 PL10 III-1 0.24 19 0.5 CONE PL
0681 1 PL10 III-1 0.24 19 0.5 CONE PL
0672 1 PL10 III-1 0.24 19 0.5 CONE PL
0682 1 PL10 III-1 0.24 19 0.5 CONE PL
0671 1 PL10 III-1 0.24 19 0.5 CONE PL
0683 1 PL10 III-1 0.24 19 0.5 CONE PL
0670 1 PL10 III-1 0.24 19 0.5 CONE PL
0684 1 PL10 III-1 0.24 19 0.5 CONE PL
0669 1 PL10 III-1 0.24 19 0.5 CONE PL
0685 1 PL10 III-1 0.24 19 0.5 CONE PL
0668 1 PL10 III-1 0.24 19 0.5 CONE PL
0686 1 PL10 III-1 0.24 19 0.5 CONE PL
0667 1 PL10 III-1 0.24 19 0.5 CONE PL
0687 1 PL10 III-1 0.24 19 0.5 CONE PL
0666 1 PL10 III-1 0.24 19 0.5 CONE PL
0688 1 PL10 III-1 0.24 19 0.5 CONE PL
0665 1 PL10 III-1 0.24 19 0.5 CONE PL
0689 1 PL10 III-1 0.24 19 0.5 CONE PL
0664 1 PL10 III-1 0.24 19 0.5 CONE PL
0690 1 PL10 III-1 0.24 19 0.5 CONE PL
0663 1 PL10 III-1 0.24 19 0.5 CONE PL

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 160
Customer PTTEP Phase weight 25054.4
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description CASING GUIDS Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0691 1 PL10 III-1 0.24 19 0.5 CONE PL
0662 1 PL10 III-1 0.24 19 0.5 CONE PL
0692 1 PL10 III-1 0.24 19 0.5 CONE PL
0661 1 PL10 III-1 0.24 19 0.5 CONE PL
0693 1 PL10 III-1 0.24 19 0.5 CONE PL
0660 1 PL10 III-1 0.24 19 0.5 CONE PL
0694 1 PL10 III-1 0.24 19 0.5 CONE PL
0659 1 PL10 III-1 0.24 19 0.5 CONE PL
0695 1 PL10 III-1 0.24 19 0.5 CONE PL
0658 1 PL10 III-1 0.24 19 0.5 CONE PL
0696 1 PL10 III-1 0.24 19 0.5 CONE PL
0657 1 PL10 III-1 0.24 19 0.5 CONE PL
0697 1 PL10 III-1 0.24 19 0.5 CONE PL
0656 1 PL10 III-1 0.24 19 0.5 CONE PL
0698 1 PL10 III-1 0.24 19 0.5 CONE PL
0655 1 PL10 III-1 0.24 19 0.5 CONE PL
0699 1 PL10 III-1 0.24 19 0.5 CONE PL
0654 1 PL10 III-1 0.24 19 0.5 CONE PL
0700 1 PL10 III-1 0.24 19 0.5 CONE PL
0653 1 PL10 III-1 0.24 19 0.5 CONE PL
0701 1 PL10 III-1 0.24 19 0.5 CONE PL
0652 1 PL10 III-1 0.24 19 0.5 CONE PL
0702 1 PL10 III-1 0.24 19 0.5 CONE PL
0651 1 PL10 III-1 0.24 19 0.5 CONE PL
0703 1 PL10 III-1 0.24 19 0.5 CONE PL
0650 1 PL10 III-1 0.24 19 0.5 CONE PL
0704 1 PL10 III-1 0.24 19 0.5 CONE PL
0649 1 PL10 III-1 0.24 19 0.5 CONE PL
0705 1 PL10 III-1 0.24 19 0.5 CONE PL
0648 1 PL10 III-1 0.24 19 0.5 CONE PL
0706 1 PL10 III-1 0.24 19 0.5 CONE PL
0677 1 PL10 III-1 0.24 19 0.5 CONE PL
0707 1 PL10 III-1 0.24 19 0.5 CONE PL
0708 1 PL10 III-1 0.24 19 0.5 CONE PL
0709 1 PL10 III-1 0.24 19 0.5 CONE PL
0710 1 PL10 III-1 0.24 19 0.5 CONE PL
0711 1 PL10 III-1 0.24 19 0.5 CONE PL

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 160
Customer PTTEP Phase weight 25054.4
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description CASING GUIDS Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0712 1 PL10 III-1 0.24 19 0.5 CONE PL
0713 1 PL10 III-1 0.24 19 0.5 CONE PL
0714 1 PL10 III-1 0.24 19 0.5 CONE PL
0715 1 PL10 III-1 0.24 19 0.5 CONE PL
0716 1 PL10 III-1 0.24 19 0.5 CONE PL
0717 1 PL10 III-1 0.24 19 0.5 CONE PL
0718 1 PL10 III-1 0.24 19 0.5 CONE PL
0719 1 PL10 III-1 0.24 19 0.5 CONE PL
0720 1 PL10 III-1 0.24 19 0.5 CONE PL
0721 1 PL10 III-1 0.24 19 0.5 CONE PL
0722 1 PL10 III-1 0.24 19 0.5 CONE PL
0723 1 PL10 III-1 0.24 19 0.5 CONE PL
0724 1 PL10 III-1 0.24 19 0.5 CONE PL
0725 1 PL10 III-1 0.24 19 0.5 CONE PL
0726 1 PL10 III-1 0.24 19 0.5 CONE PL
0727 1 PL10 III-1 0.24 19 0.5 CONE PL
0728 1 PL10 III-1 0.24 19 0.5 CONE PL
0729 1 PL10 III-1 0.24 19 0.5 CONE PL
0730 1 PL10 III-1 0.24 19 0.5 CONE PL
0731 1 PL10 III-1 0.24 19 0.5 CONE PL
0732 1 PL10 III-1 0.24 19 0.5 CONE PL
0733 1 PL10 III-1 0.24 19 0.5 CONE PL
0734 1 PL10 III-1 0.24 19 0.5 CONE PL
0735 1 PL10 III-1 0.24 19 0.5 CONE PL
0736 1 PL10 III-1 0.24 19 0.5 CONE PL
0737 1 PL10 III-1 0.24 19 0.5 CONE PL
0738 1 PL10 III-1 0.24 19 0.5 CONE PL
0739 1 PL10 III-1 0.24 19 0.5 CONE PL
0740 1 PL10 III-1 0.24 19 0.5 CONE PL
0741 1 PL10 III-1 0.24 19 0.5 CONE PL
0742 1 PL10 III-1 0.24 19 0.5 CONE PL
0743 1 PL10 III-1 0.24 19 0.5 CONE PL
0744 1 PL10 III-1 0.24 19 0.5 CONE PL
0745 1 PL10 III-1 0.24 19 0.5 CONE PL
0746 1 PL10 III-1 0.24 19 0.5 CONE PL
0747 1 PL10 III-1 0.24 19 0.5 CONE PL
0748 1 PL10 III-1 0.24 19 0.5 CONE PL

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 160
Customer PTTEP Phase weight 25054.4
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description CASING GUIDS Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0749 1 PL10 III-1 0.24 19 0.5 CONE PL
0750 1 PL10 III-1 0.24 19 0.5 CONE PL
0751 1 PL10 III-1 0.24 19 0.5 CONE PL
0752 1 PL10 III-1 0.24 19 0.5 CONE PL
0753 1 PL10 III-1 0.24 19 0.5 CONE PL
0754 1 PL10 III-1 0.24 19 0.5 CONE PL
0755 1 PL10 III-1 0.24 19 0.5 CONE PL
0756 1 PL10 III-1 0.24 19 0.5 CONE PL
0757 1 PL10 III-1 0.24 19 0.5 CONE PL
0758 1 PL10 III-1 0.24 19 0.5 CONE PL
0759 1 PL10 III-1 0.24 19 0.5 CONE PL
0760 1 PL10 III-1 0.24 19 0.5 CONE PL
0761 1 PL10 III-1 0.24 19 0.5 CONE PL
0762 1 PL10 III-1 0.24 19 0.5 CONE PL
0763 1 PL10 III-1 0.24 19 0.5 CONE PL
0764 1 PL10 III-1 0.24 19 0.5 CONE PL
0765 1 PL10 III-1 0.24 19 0.5 CONE PL
0766 1 PL10 III-1 0.24 19 0.5 CONE PL
0767 1 PL10 III-1 0.24 19 0.5 CONE PL
0768 1 PL10 III-1 0.24 19 0.5 CONE PL
0769 1 PL10 III-1 0.24 19 0.5 CONE PL
0770 1 PL10 III-1 0.24 19 0.5 CONE PL
0771 1 PL10 III-1 0.24 19 0.5 CONE PL
0772 1 PL10 III-1 0.24 19 0.5 CONE PL
0773 1 PL10 III-1 0.24 19 0.5 CONE PL
0774 1 PL10 III-1 0.24 19 0.5 CONE PL
0775 1 PL10 III-1 0.24 19 0.5 CONE PL
0776 1 PL10 III-1 0.24 19 0.5 CONE PL
0777 1 PL10 III-1 0.24 19 0.5 CONE PL
0778 1 PL10 III-1 0.24 19 0.5 CONE PL
0779 1 PL10 III-1 0.24 19 0.5 CONE PL
0780 1 PL10 III-1 0.24 19 0.5 CONE PL
0781 1 PL10 III-1 0.24 19 0.5 CONE PL
0782 1 PL10 III-1 0.24 19 0.5 CONE PL
0783 1 PL10 III-1 0.24 19 0.5 CONE PL
0784 1 PL10 III-1 0.24 19 0.5 CONE PL
0785 1 PL10 III-1 0.24 19 0.5 CONE PL

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 160
Customer PTTEP Phase weight 25054.4
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description CASING GUIDS Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0786 1 PL10 III-1 0.24 19 0.5 CONE PL
0787 1 PL10 III-1 0.24 19 0.5 CONE PL
0788 1 PL10 III-1 0.24 19 0.5 CONE PL
0789 1 PL10 III-1 0.24 19 0.5 CONE PL
0790 1 PL10 III-1 0.24 19 0.5 CONE PL
0791 1 PL10 III-1 0.24 19 0.5 CONE PL
0792 1 PL10 III-1 0.24 19 0.5 CONE PL
0793 1 PL10 III-1 0.24 19 0.5 CONE PL
0794 1 PL10 III-1 0.24 19 0.5 CONE PL
0795 1 PL10 III-1 0.24 19 0.5 CONE PL
0796 1 PL10 III-1 0.24 19 0.5 CONE PL
0797 1 PL10 III-1 0.24 19 0.5 CONE PL
0798 1 PL10 III-1 0.24 19 0.5 CONE PL
0799 1 PL10 III-1 0.24 19 0.5 CONE PL
0800 1 PL10 III-1 0.24 19 0.5 CONE PL
0801 1 PL10 III-1 0.24 19 0.5 CONE PL
0802 1 PL10 III-1 0.24 19 0.5 CONE PL
0803 1 PL10 III-1 0.24 19 0.5 CONE PL
0804 1 PL10 III-1 0.24 19 0.5 CONE PL
0805 1 PL10 III-1 0.24 19 0.5 CONE PL
0806 1 PL10 III-1 0.24 19 0.5 CONE PL
0807 1 PL10 III-1 0.24 19 0.5 CONE PL
0808 1 PL10 III-1 0.24 19 0.5 CONE PL
0809 1 PL10 III-1 0.24 19 0.5 CONE PL
0810 1 PL10 III-1 0.24 19 0.5 CONE PL
0811 1 PL10 III-1 0.24 19 0.5 CONE PL
0812 1 PL10 III-1 0.24 19 0.5 CONE PL
0813 1 PL10 III-1 0.24 19 0.5 CONE PL
0814 1 PL10 III-1 0.24 19 0.5 CONE PL
0815 1 PL10 III-1 0.24 19 0.5 CONE PL
0816 1 PL10 III-1 0.24 19 0.5 CONE PL
0817 1 PL10 III-1 0.24 19 0.5 CONE PL
0818 1 PL10 III-1 0.24 19 0.5 CONE PL
0819 1 PL10 III-1 0.24 19 0.5 CONE PL
0820 1 PL10 III-1 0.24 19 0.5 CONE PL
0821 1 PL10 III-1 0.24 19 0.5 CONE PL
0822 1 PL10 III-1 0.24 19 0.5 CONE PL

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 160
Customer PTTEP Phase weight 25054.4
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description CASING GUIDS Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0823 1 PL10 III-1 0.24 19 0.5 CONE PL
0824 1 PL10 III-1 0.24 19 0.5 CONE PL
0825 1 PL10 III-1 0.24 19 0.5 CONE PL
0826 1 PL10 III-1 0.24 19 0.5 CONE PL
0827 1 PL10 III-1 0.24 19 0.5 CONE PL
0828 1 PL10 III-1 0.24 19 0.5 CONE PL
0829 1 PL10 III-1 0.24 19 0.5 CONE PL
0830 1 PL10 III-1 0.24 19 0.5 CONE PL
0831 1 PL10 III-1 0.24 19 0.5 CONE PL
0832 1 PL10 III-1 0.24 19 0.5 CONE PL
0833 1 PL10 III-1 0.24 19 0.5 CONE PL
0834 1 PL10 III-1 0.24 19 0.5 CONE PL
0835 1 PL10 III-1 0.24 19 0.5 CONE PL
0836 1 PL10 III-1 0.24 19 0.5 CONE PL
0837 1 PL10 III-1 0.24 19 0.5 CONE PL
0838 1 PL10 III-1 0.24 19 0.5 CONE PL
0839 1 PL10 III-1 0.24 19 0.5 CONE PL
0840 1 PL10 III-1 0.24 19 0.5 CONE PL
0841 1 PL10 III-1 0.24 19 0.5 CONE PL
0842 1 PL10 III-1 0.24 19 0.5 CONE PL
0843 1 PL10 III-1 0.24 19 0.5 CONE PL
0844 1 PL10 III-1 0.24 19 0.5 CONE PL
0845 1 PL10 III-1 0.24 19 0.5 CONE PL
0846 1 PL10 III-1 0.24 19 0.5 CONE PL
0847 1 PL10 III-1 0.24 19 0.5 CONE PL
0848 1 PL10 III-1 0.24 19 0.5 CONE PL
0849 1 PL10 III-1 0.24 19 0.5 CONE PL
0850 1 PL10 III-1 0.24 19 0.5 CONE PL
0851 1 PL10 III-1 0.24 19 0.5 CONE PL
0852 1 PL10 III-1 0.24 19 0.5 CONE PL
0853 1 PL10 III-1 0.24 19 0.5 CONE PL
0854 1 PL10 III-1 0.24 19 0.5 CONE PL
0855 1 PL10 III-1 0.24 19 0.5 CONE PL
0856 1 PL10 III-1 0.24 19 0.5 CONE PL
0857 1 PL10 III-1 0.24 19 0.5 CONE PL
0858 1 PL10 III-1 0.24 19 0.5 CONE PL
0859 1 PL10 III-1 0.24 19 0.5 CONE PL

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 160
Customer PTTEP Phase weight 25054.4
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description CASING GUIDS Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0860 1 PL10 III-1 0.24 19 0.5 CONE PL
0861 1 PL10 III-1 0.24 19 0.5 CONE PL
0862 1 PL10 III-1 0.24 19 0.5 CONE PL
0863 1 PL10 III-1 0.24 19 0.5 CONE PL
0864 1 PL10 III-1 0.24 19 0.5 CONE PL
0865 1 PL10 III-1 0.24 19 0.5 CONE PL
0866 1 PL10 III-1 0.24 19 0.5 CONE PL
0867 1 PL10 III-1 0.24 19 0.5 CONE PL
0868 1 PL10 III-1 0.24 19 0.5 CONE PL
0869 1 PL10 III-1 0.24 19 0.5 CONE PL
0870 1 PL10 III-1 0.24 19 0.5 CONE PL
0871 1 PL10 III-1 0.24 19 0.5 CONE PL
0872 1 PL10 III-1 0.24 19 0.5 CONE PL
0873 1 PL10 III-1 0.24 19 0.5 CONE PL
0874 1 PL10 III-1 0.24 19 0.5 CONE PL
0875 1 PL10 III-1 0.24 19 0.5 CONE PL
Total PL10 III-1 55.18 4327.9 119.2

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 170
Customer PTTEP Phase weight 25913.6
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description HYDROSTATIC INTERNAL RING Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0877 36 PL35 III-S 0.69 6776.3 55.7 RING PL
Total PL35 III-S 24.67 6776.3 55.7
0878 24 PL25 III-S 0.4 1905.9 21.8 RING PL
0879 24 PL25 III-S 0.4 1894.8 21.7 RING PL
0880 36 PL25 III-S 0.32 2288.5 26.3 RING PL
0881 6 PL25 III-S 0.32 373 4.3 RING PL
0882 6 PL25 III-S 0.31 370.2 4.3 RING PL
Total PL25 III-S 34.82 6832.5 78.4
0883 42 PL25 III-1 0.18 1450.1 17.6 RING PL
0884 216 PL25 III-1 0.15 6545.4 79.7 RING PL
0885 108 PL25 III-1 0.15 3240.1 39.4 RING PL
0886 36 PL25 III-1 0.15 1069.2 13 RING PL
Total PL25 III-1 62.69 12304.9 149.8

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 180
Customer PTTEP Phase weight 57792.2
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description LAUNCH CRADLE INTERNAL RINBlasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0900 4 PL50 III-S 0.41 678.1 4.6 FLG PL
0901 44 PL50 III-S 0.4 7377.5 50.1 FLG PL
0902 4 PL50 III-S 0.4 663.3 4.5 FLG PL
0904 8 PL50 III-S 0.39 1297 8.8 FLG PL
0887 4 PL50 III-S 1.27 1987.7 11.7 RING STIFF P
0889 4 PL50 III-S 1.26 1975.3 11.6 STIFF PL
0891 20 PL50 III-S 1.26 9858.8 58 RING STIFF P
0893 4 PL50 III-S 1.25 1955.8 11.5 RING STIFF P
0898 4 PL50 III-S 1.23 1927.3 11.3 STIFF PL
0895 4 PL50 III-S 1.23 1924 11.3 RING STIFF P
Total PL50 III-S 74.14 29644.7 183.5
0899 12 PL30 III-S 0.42 1221.6 12.4 FLG PL
0903 4 PL30 III-S 0.4 389.4 4 FLG PL
0888 12 PL30 III-S 1.27 3584.4 33.3 STIFF PL
0890 12 PL30 III-S 1.26 3555.6 33 STIFF PL
0892 40 PL30 III-S 1.26 11830.6 109.8 RING STIFF P
0894 12 PL30 III-S 1.25 3520.5 32.7 RING STIFF P
0896 4 PL30 III-S 1.23 1154.4 10.7 RING STIFF P
0897 10 PL30 III-S 1.23 2890.9 26.8 STIFF PL
Total PL30 III-S 119.3 28147.4 262.6

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 190
Customer PTTEP Phase weight 261287.1
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description LAUNCH CRADLE ARRANGEMENBlasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0905 2 PL40 III-S 293.33 180511 1150.2 SHEEL PL
Total PL40 III-S 586.65 180511 1150.2
0906 550 PL30 III-S 0.62 80776.3 750.2 INTERNAL ST
Total PL30 III-S 343.02 80776.3 750.2

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 200
Customer PTTEP Phase weight 30462.8
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description CLOSER PLATE Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0908 4 PL50 III-S 2.4 3770.9 20.3 CLOSURE PL
0911 4 PL50 III-S 2 3147.7 17 CLOSURE PL
Total PL50 III-S 17.63 6918.6 37.4
0907 4 PL35 III-S 5.3 5826.6 43.6 DIAPHRAGM
0909 4 PL35 III-S 2.4 2639.6 20 DIAPHRAGM
0910 4 PL35 III-S 0.39 426.9 4.5 CAP PL
0912 4 PL35 III-S 0.13 146.7 1.5 CAP PL
0948 24 PL35 III-S 0.03 227.4 2.5 FLG PL
0947 24 PL35 III-S 0.03 227.4 2.5 FLG PL
0950 24 PL35 III-S 0.03 168.6 1.9 FLG PL
0949 24 PL35 III-S 0.03 168.6 1.9 FLG PL
Total PL35 III-S 35.8 9831.8 78.4
0935 2 PL25 III-S 2.19 859 9.5 SLEEVE PL
0934 2 PL25 III-S 2.19 859 9.5 SLEEVE PL
0940 1 PL25 III-S 0.94 184.1 2.1 SLEEVE PL
0939 1 PL25 III-S 0.94 184.1 2.1 SLEEVE PL
0942 1 PL25 III-S 0.93 181.6 2.1 SLEEVE PL
0941 1 PL25 III-S 0.93 181.6 2.1 SLEEVE PL
0943 3 PL25 III-S 0.91 537.4 6.2 SLEEVE PL
0944 1 PL25 III-S 0.91 179.1 2.1 SLEEVE PL
0946 2 PL25 III-S 0.8 313.9 3.6 SLEEVE PL
0945 2 PL25 III-S 0.8 313.9 3.6 SLEEVE PL
0930 3 PL25 III-S 0.4 233.2 2.6 WEB PL
0929 5 PL25 III-S 0.4 388.6 4.3 WEB PL
0937 2 PL25 III-S 0.32 126.6 1.4 ROLLED PL
0936 2 PL25 III-S 0.32 126.6 1.4 ROLLED PL
0913 8 PL25 III-S 0.21 337.5 4 CAP PL
0914 2 PL25 III-S 0.21 84.4 1 CAP PL
0915 4 PL25 III-S 0.18 140.2 1.7 CAP PL
0931 24 PL25 III-S 0.13 628.8 7.3 WEB PL
0932 24 PL25 III-S 0.13 617 7.2 WEB PL
0918 48 PL25 III-S 0.19 1789.7 20.4 WEB PL
0926 48 PL25 III-S 0.13 1267.7 14.7 WEB PL
0923 24 PL25 III-S 0.03 153.8 2.2 FLG PL
0922 24 PL25 III-S 0.03 153.8 2.2 FLG PL
0951 48 PL25 III-S 0.03 254.8 3.6 FLG PL
0920 12 PL25 III-S 0.03 80.4 1.1 FLG PL

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 200
Customer PTTEP Phase weight 30462.8
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description CLOSER PLATE Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0919 12 PL25 III-S 0.03 80.4 1.1 FLG PL
0921 24 PL25 III-S 0.03 157.2 2.2 FLG PL
Total PL25 III-S 53.06 10414.5 121
0925 2 PL20 III-S 1.69 532.1 7.2 WEB PL
0924 2 PL20 III-S 1.69 532.1 7.2 WEB PL
0916 2 PL20 III-S 0.77 242.4 3.2 WEB PL
0917 2 PL20 III-S 0.77 242.4 3.2 WEB PL
0928 12 PL20 III-S 0.13 242.3 3.5 WEB PL
0927 12 PL20 III-S 0.13 242.3 3.5 WEB PL
0933 24 PL20 III-S 0.13 484.6 6.9 WEB PL
0938 48 PL20 III-S 0.1 779.9 11.2 WEB PL
Total PL20 III-S 21 3298 45.8

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 210
Customer PTTEP Phase weight 10448.0
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description BOATLANDING Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0952 2 ø762x30 III-1 1750 1895.5 8.4 TUBULAR
Total ø762x30 III-1 3500 1895.5 8.4
0953 1 ø750x25 III-1 1088 486.2 2.6 TUBULAR
0954 1 ø750x25 III-1 1088 486.2 2.6 TUBULAR
0955 1 ø750x25 III-1 852 380.7 2 TUBULAR
0956 1 ø750x25 III-1 852 380.7 2 TUBULAR
Total ø750x25 III-1 3879 1733.9 9.1
0957 2 ø660x30 III-1 1250 1165.3 5.2 TUBULAR
Total ø660x30 III-1 2500 1165.3 5.2
0958 2 ø500x20 III-1 1037 491 3.3 TUBULAR
0959 2 ø500x20 III-1 780 369.2 2.5 TUBULAR
Total ø500x20 III-1 3633 860.2 5.7
0961 1 ø457x15.9 III-1 3183 550.6 4.6 BRACING
0960 1 ø457x15.9 III-1 3183 550.6 4.6 BRACING
0962 1 ø457x15.9 III-1 2694 466 3.9 BRACING
0963 1 ø457x15.9 III-1 2694 466 3.9 BRACING
Total ø457x15.9 III-1 11755 2033.2 16.9
0964 1 ø406x25.4 III-1 1250 298 1.6 TUBULAR
0965 1 ø406x25.4 III-1 1000 238.4 1.3 TUBULAR
Total ø406x25.4 III-1 2250 536.4 2.9
0968 2 PL50 III-1 0.63 498 2.8 BASE PL
Total PL50 III-1 1.27 498 2.8
0975 2 PL25 III-1 0.43 168.3 1.8 CAP PL
Total PL25 III-1 0.86 168.3 1.8
0972 1 PL20 III-1 0.97 152.1 2 CONE PL
0971 1 PL20 III-1 0.97 152.1 2 CONE PL
0974 1 PL20 III-1 0.97 152.1 2 CONE PL
0973 1 PL20 III-1 0.97 152.1 2 CONE PL
0970 1 PL20 III-1 0.98 154 2 CONE PL
0969 1 PL20 III-1 0.98 154 2 CONE PL
0976 2 PL20 III-1 0.94 301.4 3.9 HALF CLAMP
0967 2 PL20 III-1 0.16 49.2 0.8 HALF FLG PL
0984 4 PL20 III-1 0.07 44.5 0.7 FLG PL
Total PL20 III-1 8.31 1311.6 17.6
0980 2 PL15 III-1 0.05 12.3 0.3 STIFF PL
0981 2 PL15 III-1 0.05 12.3 0.3 STIFF PL
0983 2 PL15 III-1 0.04 9.5 0.2 STIFF PL

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 210
Customer PTTEP Phase weight 10448.0
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description BOATLANDING Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0987 4 PL15 III-1 0.02 8.1 0.2 STIFF PL
0979 2 PL15 III-1 0.07 16.4 0.3 FIXED HINGE
0978 2 PL15 III-1 0.07 16.4 0.3 FIXED HINGE
0982 2 PL15 III-1 0.06 14.1 0.3 STIFF PL
0985 2 PL15 III-1 0.01 2 0 STIFF PL
0986 2 PL15 III-1 0.01 2 0 STIFF PL
Total PL15 III-1 0.79 93 1.9
0977 2 PL12 III-1 0.17 31.7 0.7 CAP PL
Total PL12 III-1 0.34 31.7 0.7
0966 8 PL8 III-1 0.24 121 3.9 SHIM PL
Total PL8 III-1 1.95 121 3.9

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
TECHNIP
www.bocad.be
Marks list from:14.10.2013 Cut-off list
Project 65110 Phase 215
Customer PTTEP Phase weight 5214.5
Object JACKET Revision Rev.B1
Site WP6 Delivery -
Description LEG PARTITION Blasting -
Proj.Resp EEO Galvanization -
Department Primary painting . .
Draftman TCB Final painting . .

Mark Qty Profile Material Length Area Tot Wgt Tot Surf. Notice
mm m2 kg m²
0988 4 PL25 III-S 2.77 2172.9 22.7 DIAPHRAGM
0989 8 PL25 III-S 0.4 631.3 7.2 WEB PL
0994 8 PL25 III-S 0.18 275 3.5 FLG PL
0990 8 PL25 III-S 0.32 506.6 5.8 WEB PL
0995 8 PL25 III-S 0.14 219.5 2.8 FLG PL
0991 48 PL25 III-S 0.08 744 9 WEB PL
0992 16 PL25 III-S 0.07 224 2.7 WEB PL
0996 16 PL25 III-S 0.03 82.2 1.1 FLG PL
0997 48 PL25 III-S 0.03 260 3.6 FLG PL
0993 16 PL25 III-S 0.03 99.3 1.3 WEB PL
Total PL25 III-S 26.56 5214.5 59.8

Total 8950757 35062

10/23/2013P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08-


STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-STR-MTO-2001-B1
WP6JacketMTO&CuttingPlan\Spreadsheets\/Tabelle1 100
PTTEP INTERNATIONAL LIMITED

ATTACHMENT 5: JACKET DRAWINGS

Basic Engineering Study for Zawtika Project Phase 1B Document: MM-ZTK-1B-WP6-STR-MTO-2001


P:\65110-Basic Engineering study for Zawtika Project Phase 1B\08- Revision: B1
STRUCTURAL\REPORT_DOCUMENT\Material Take Off\MM-ZTK-1B-WP6-
STR-MTO-2001-B1 WP6JacketMTO&CuttingPlan\Report\MM-ZTK-1B-WP6- Date: 24-Oct-13