You are on page 1of 597

X2 27.SEP.2016 AS-BUILT T.S.PARK J.Y.NA S.H.

BAE
2 06.AUG.2014 ISSUED FOR CONSTRUCTION T.S.PARK J.Y.NA S.H.BAE
1 18.JUN.2014 ISSUED FOR CONSTRUCTION T.S.PARK J.Y.NA S.H.BAE
0 10.DEC.2013 ISSUED FOR CONSTRUCTION T.S.PARK J.Y.NA S.H.BAE
A 28.OCT.2013 ISSUED FOR INFORMATION T.S.PARK J.Y.NA S.H.BAE
REV. DATE DESCRIPTION DESIGNED CHECKED APPROVED

OWNER

PROJECT

JEDDAH SOUTH THERMAL POWER PLANT STAGE-I

ENGINEER

CONTRACTOR

SUBCONTRACTOR VENDOR INTERNAL DOC.NO

N/A

THIS DOCUMENT IS NOT TO BE USED FOR


CONSTRUCTION OR FOR ORDERING MATERIAL UNTIL
CERTIFIED AND DATED.THE CONTRACTOR HHI APPROVAL/CERTIFICATION INFORMATION
CONFIRMS FULLY COMPLIANCE WITH THE O/E’S DOC. NO : TCS-HH-FH-DT-02804
COMMENTS. NO OTHER CHANGES HAD BEEN MADE ON REV. NO : A
THE DOCUMENT. THE CONTRACTOR MAY SUBMIT THE
DOCUMENTS AS “FOR CONSTRUCTION”

DOCUMENT TITLE

CABLE RACK FOUNDATION


CALCULATION SHEET
NO. OF
CONTRACT NO. DOCUMENT NO. REV.
PAGES

31121106/00 00-UBT-C-51-001-001 569 X2


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

TABLE OF CONTENTS

1. DESIGN CRITERIA ………………………………… 6

1.1 General ………………………………… 6


1.2 Design Data ………………………………… 6
1.3 Load Combination ………………………………… 7

2. GENERAL SKETCH ………………………………… 8

2.1 Plan ………………………………… 8


2.2 3D Modeling ………………………………… 9

3. DESIGN LOAD ………………………………… 10

3.1 Dead Load ………………………………… 10


3.2 Live Load ………………………………… 12
3.3 Wind Load ………………………………… 13
3.4 Seismic Load ………………………………… 14
3.5 Temperature Load ………………………………… 15

4. MODULUS OF SUBGRADE REACTION ………………………………… 16

4.1 Calculation Spring Factor ( Pile Type ) ………………………………… 16


4.2 Calculation Spring Factor (Shallow Foundation Type ) ………………………………… 17

5. LOAD COMBINATION ………………………………… 18

5.1 Load Combination for Stability Check ………………………………… 18


5.2 Load Combination for Member Design ………………………………… 18

6. TYPE - F1 ………………………………… 19

6.1 Plan & Section ………………………………… 19


6.2 Stability Cehck ………………………………… 20
6.3 Member Design ………………………………… 24

7. TYPE - F2 ………………………………… 46

7.1 Plan & Section ………………………………… 46


7.2 Stability Cehck ………………………………… 47
7.3 Member Design ………………………………… 52

8. TYPE - F3 & F16 ………………………………… 74

8.1 Plan & Section ………………………………… 74


8.2 Stability Cehck ………………………………… 75
8.3 Member Design ………………………………… 79

Page 2 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

9. TYPE - F4 ………………………………… 101

9.1 Plan & Section ………………………………… 101


9.2 Stability Cehck ………………………………… 102
9.3 Member Design ………………………………… 106

10. TYPE - F5 ………………………………… 128

10.1 Plan & Section ………………………………… 128


10.2 Stability Cehck ………………………………… 129
10.3 Member Design ………………………………… 133

11. TYPE - F6 ………………………………… 155

11.1 Plan & Section ………………………………… 155


11.2 Stability Cehck ………………………………… 156
11.3 Member Design ………………………………… 161

12. TYPE - F7 ………………………………… 183

12.1 Plan & Section ………………………………… 183


12.2 Stability Cehck ………………………………… 184
12.3 Member Design ………………………………… 189

13. TYPE - F8a ………………………………… 211

13.1 Plan & Section ………………………………… 211


13.2 Stability Cehck ………………………………… 212
13.3 Member Design ………………………………… 216

14. TYPE - F9a ………………………………… 238

14.1 Plan & Section ………………………………… 238


14.2 Stability Cehck ………………………………… 239
14.3 Member Design ………………………………… 243

15. TYPE - F10 ………………………………… 265

15.1 Plan & Section ………………………………… 265


15.2 Stability Cehck ………………………………… 266
15.3 Member Design ………………………………… 271

16. TYPE - F11 ………………………………… 293

16.1 Plan & Section ………………………………… 293


16.2 Stability Cehck ………………………………… 294
16.3 Member Design ………………………………… 300

Page 3 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

17. TYPE - F12 ………………………………… 323

17.1 Plan & Section ………………………………… 323


17.2 Stability Cehck ………………………………… 324
17.3 Member Design ………………………………… 330

18. TYPE - F13 ………………………………… 353

18.1 Plan & Section ………………………………… 353


18.2 Stability Cehck ………………………………… 354
18.3 Member Design ………………………………… 358

19. TYPE - F14 ………………………………… 380

19.1 Plan & Section ………………………………… 380


19.2 Stability Cehck ………………………………… 381
19.3 Member Design ………………………………… 385

20. TYPE - F15 ………………………………… 407

20.1 Plan & Section ………………………………… 407


20.2 Stability Cehck ………………………………… 408
20.3 Member Design ………………………………… 412

21. TYPE - F17 ………………………………… 434

21.1 Plan & Section ………………………………… 434


21.2 Stability Cehck ………………………………… 435
21.3 Member Design ………………………………… 439

22. TYPE - F8c ………………………………… 461

22.1 Plan & Section ………………………………… 461


22.2 Stability Cehck ………………………………… 462
22.3 Member Design ………………………………… 466

23. TYPE - F9c ………………………………… 488

23.1 Plan & Section ………………………………… 488


23.2 Stability Cehck ………………………………… 489
23.3 Member Design ………………………………… 493

24. TYPE - F3b ………………………………… 515

24.1 Plan & Section ………………………………… 515


24.2 Stability Cehck ………………………………… 516
24.3 Member Design ………………………………… 520

Page 4 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

25. TYPE - F4c ………………………………… 542

25.1 Plan & Section ………………………………… 542


25.2 Stability Cehck ………………………………… 543
25.3 Member Design ………………………………… 547

Appendix ………………………………… 569

1. Loading Data (Vendor Data)

Page 5 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1. DESIGN CRITERIA

1.1 General

1) Project Name : Jeddah South Project


2) Location : Saudi Arabia
3) Unit : SI Unit (System International)
4) Structure Analysis & Design Software
- MIDAS V800

1.2 Design Data

1) Design Code & Regulation

- ACI 318M-/318RM : General Concrete Design and Specification (American Concrete Institute)
- ASCE 7 : Design Load Combination (American Society of Civil Engineering)
- UBC 97 : Design seismic load (Uniform Building Code)
- Civil Design Criteria (10-TAA-C-35-001-001)

2) Material Property

- Concrete Strength (Compressive Strength at 28days)


· Unit Weight γc = 25 kN/m³

- Design Compression Strength f'c = 37.5 MPa (Cylindrical)

- Modulus of Elastic Ec = 28782 MPa (Ec = 4700 √Fck)

- Reinforcing bar (BS grade 460)


· Yield Strength fy = 420 MPa
· Modulus of Elastic Es = 200000 MPa

- Soil
· Unit Weight γs = 18 kN/m³

- Applied Safety Factor


· Overturning : 2.00
· Sliding : 2.00
· The dead load factor is 0.6 in accordance with ASCE 7, the minimum safety factor of
sliding & overturning shall be 1.0 as per PIP STC01015 'Structural Design Criteria, Clause 4.3.7'.

- Coefficient of Friction
· Steel to Steel : 0.30
· Concrete to Soil : 0.40

- Strength Reduction Factor


· Tension : 0.90
· Shear and Torsion : 0.75

Page 6 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3) Allowable Soil Bearing Capacity

- Normal Operating Case (Long Term) : 150.00 kN/m2


- Emergency Operating Case (Short Term) : 200.00 kN/m2 (33% Increase of Long Term)

- Above values are the target soil bearing capacity after the completion of soil improvement
by stone column or dynamic replacement method.

1.3 Load Combination

- Structures, equipment, and foundations will be designed for the appropriate load combinations from ASCE 7-05,
and any other probable realistic combination of loads. The load combinations shown below are the most
common load combinations but may not cover all possible conditions.
Short term temporary loads such as temperature or test loads do not need to be combined with wind and seismic
loads unless load combination of hydro test is recommended by vendor.
It is not necessary to combine crane loads with wind or seismic loads when the purpose of crane use is the
maintenance of the equipment (Standby-service) in the structures only. Engineering judgment about load
combination of crane load and wind/seismic load will be made to structural design for each case.
Symbols and notation of load combinations are as follow:

▪ D : Dead Load ▪ L : Live Load


▪ F : Fluid Load ▪ T : Temperature Load
▪ H : Earth Pressure Load ▪ W : Wind Load
▪ E : Seismic Load ▪ Lr : Roof Live Load

1) Factored Load Combinations for Ultimate Strength Design

Combinations D L F T H W E Lr
1) D+F 1.40 1.40
2) D + F + T + L + H + Lr 1.20 1.60 1.20 1.20 1.60 0.5
3) D + Lr + L 1.20 1.00 1.6
4) D + Lr ± W 1.20 0.80 1.6
5) D + W + L + Lr 1.20 1.00 1.60 0.5
6) D+E+L 1.20 1.00 1.00
7) D+W+H 0.90 1.60 1.60
8) D+E+H 0.90 1.60 1.00

2) Nominal Load Combinations for Allowable Stress Design and Foundation Stability Check

Combinations D L F T H W E Lr
1) D+F 1.00 1.00
2) D+H+F+L+T 1.00 1.00 1.00 1.00 1.00
3) D + H + F + Lr 1.00 1.00 1.00
4) D + H + F + L + T + Lr 1.00 0.75 1.00 0.75 1.00 1
5) D+H+F+W 1.00 1.00 1.00 1.00 0.75
6) D+H+F+E 1.00 1.00 1.00 0.70
7) D + H + F + W + L + Lr 1.00 0.75 1.00 1.00 0.75 0.75
8) D + H + F + E + L + Lr 1.00 0.75 1.00 1.00 0.525 0.75
9) D+W+H 0.60 1.00 1.00
10) D+E+H 0.60 1.00 0.70

Page 7 of 569
``
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2. GENERAL SKETCH

2.1 Plan

Page 8 of 569
``
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.2 3D Modeling

Cable Common Rack #1 Combine

CableRack #1 Cable Common Rack #1

Cable Common Rack #6

Cable Common Rack #7


CableRack #2

Cable Common Rack #8


CableRack #3

Cable Common Rack #9


CableRack #4

Plan View

ISO View

Page 9 of 569
``
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3. DESIGN LOAD

3.1 Dead Load

1) Self weight

MIDAS GEN program has considered foundation self weight automatically

2) Upper Structure Dead Load

(Refer. to Appendix 1. Loading Data)

- DC -

- DS -

Page 10 of 569
``
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3) Soil Weight

Unit weight of soil γt = 18.0 kN/m³


Height of soil (For Footing) hf1 = 1.00 m
hf2 = 1.90 m
hf3 = 4.80 m
hf4 = 5.60 m
hf5 = 5.70 m
Height of soil (For Girder) hg = 5.70 m
Width of Girder bg = 0.80 m

Wf1 = 18.0 x 1.00 = 18.00 kN/m2


Wf2 = 18.0 x 1.90 = 34.20 kN/m2
Wf3 = 18.0 x 4.80 = 86.40 kN/m2
Wf4 = 18.0 x 5.60 = 100.80 kN/m2
Wf5 = 18.0 x 5.70 = 102.60 kN/m2
Wg = 18.0 x 5.70 x 0.80 = 82.08 kN/m2

Page 11 of 569
``
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3.2 Live Load

1) Upper Structure Live Load

(Refer. to Appendix 1. Loading Data)

2) Minimum Live Load (Refer. To Section 5.5 Live Load, Design Criteria Doc. No. 10-TTA-C-35-001-001.)

: Ground Floor = 5.00 kN/m2

Page 12 of 569
``
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3.3 Wind Load

1) Upper Structure Wind Load

(Refer. to Appendix 1. Loading Data)

Page 13 of 569
``
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3.4 Seismic Load

1) Upper Structure Seismic Load

(Refer. to Appendix 1. Loading Data)

Page 14 of 569
``
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3.5 Temperature Load

1) Upper Structure Temperature Load

(Refer. to Appendix 1. Loading Data)

Page 15 of 569
``
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

4. MODULUS OF SUBGRADE REACTION


- Refer to Geotechnical Investigation report - Main Power Block Area. Doc. No. 10-UT_-C-51-001-001.

4.1 Calculation Spring Factor ( Pile Type )

1) Vertical Spring Constant

Ap x Ep 2827.44 x 287810
Kv = α × = 0.63 x
ℓ 1500
= 339068.17 kgf/cm
= 33907.00 tonf/m/EA = 339070.00 kN/m/EA

where, Ap : cross-section area of pile = 2827.43 cm2


Ep : modulus of elasticity of pile = 287810.00 kgf/cm2
ℓ : length of pile = 1500.00 cm
D : diameter of pile = 60.00 cm
α : 0.031 x (ℓ/D) - 0.15 = 0.625

2) Horizontal Spring Constant

Kh = (1 / 30 x α x Eo) x (Bh / 30) -3/4


= (1 / 30 x 1 x 280) x (121.818 / 30 -3/4
= 3.262 kgf/cm3

K1 = 12EIβ³ / ((1 + βh)³ + 2) = 48407.92 kgf/cm = 4840.792 tonf/m


= 47488.17 kN/m

K2 = k1 * λ/2 = 5986.32 tonf/rad = 58725.77 kN/rad

K3 = k1 * λ/2 = 5986.32 tonf.m/m = 58725.77 kN.m/m

K4 = (4EIβ / (1 + βh)) × ((1 + βh)³ + 0.5) / ((1 + βh)³ + 2)

= 14805.94 tonf.m/rad = 145246.27 kN.m/rad

where, α 1 (Normal Condition)


N : Average N value from depth of the ground which participates to
horizontal resistance of Critical Borehole
= 10
Eo = 28 x N = 28 x 10 = 280 kgf/cm2
I : moment of inertia = 636172.51 cm4

1/β = 247.33 (ASSUME)


4 Kh · D 4 3.262 x
β = =
4·E·I 4 x 287810 x 636172.51
= 0.0040432 cm-1
1/β = 247.328 cm -----> ASSUME OK
Bh = (D / β)^(1 / 2) = 121.82 cm
λ = h+1/β = 247.33 cm

Page 16 of 569
``
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

4.2 Calculation Spring Factor (Shallow Foundation Type )

Kv = 40 x F x qa (Foundation Analysis and Design - Joseph E. Bowles)


= 40 x 3 x 150.0
3
= 18000.0 kN/m

Kh = 1+E10 kN/m3

Where, F : Factors of Safety


qa : Allowable Soil Bearing Capacity

Page 17 of 569
``
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

5. LOAD COMBINATION

5.1 Load Combination for Stability Check

LOAD COM Wind Seismic Temp


Dead Live
CASE X Y X Y + -
1 SLC01 1.00
2 SLC02 1.00 1.00 1.00
3 SLC03 1.00 1.00 1.00
4 SLC04 1.00 1.00
5 SLC05 1.00 1.00
6 SLC06 1.00 0.70
7 SLC07 1.00 0.70
8 SLC08 1.00 0.75 0.75
9 SLC09 1.00 0.75 0.75
10 SLC10 1.00 0.75 0.525
11 SLC11 1.00 0.75 0.525
12 SLC12 0.60 1.00
13 SLC13 0.60 1.00
14 SLC14 0.60 0.70
15 SLC15 0.60 0.70

5.2 Load Combination for Member Design

LOAD COM Wind Seismic Temp


Dead Live
CASE X Y X Y + -
1 ULC01 1.40
2 ULC02 1.20 1.60 1.20
3 ULC03 1.20 1.60 1.20
4 ULC04 1.20 1.00
5 ULC05 1.20 0.80
6 ULC06 1.20 0.80
7 ULC07 1.20 1.00 1.60
8 ULC08 1.20 1.00 1.60
9 ULC09 1.20 1.00 1.00
10 ULC10 1.20 1.00 1.000
11 ULC11 0.90 1.60
12 ULC12 0.90 1.60
13 ULC13 0.90 1.00
14 ULC14 0.90 1.00

- Description
Dead : Foundatoin Self Weight + Upper Structure Dead Load
Live : Floor Live Load + Upper Structure Live Load
Seismic : Seismic Load
Wind : Wind Load
Temp : Temperature Load

Page 18 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

6. TYPE - F1

6.1 Plan & Section

4500

1750
5500

2000
500
1750
700

150

5700

800

4500

Part Dim. Unit weight Total weight


FB 4500 mm
Foundation FH 5500 mm 25 kN/m3 495.00 kN
FD 800 mm
PB 500 mm
Pedestal
PH 700 mm 25 kN/m3 102.38 kN
(2EA)
PD 5850 mm
Soil SD 5700 mm 18 kN/m3 2467.53 kN

Page 19 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

6.2 Stability Check

6.2.1 Soil Bearing Check

LOAD COM Qa Reaction Qu


Check Remark
CASE (kN/m2) (kN) (kN/m2)
1 SLC01 150.000 3238.279 130.84 O.K
Normal Operating
2 SLC02 150.000 3481.316 140.66 O.K
Case (Long Term)
3 SLC03 150.000 3485.737 140.84 O.K
4 SLC04 200.000 3238.279 130.84 O.K
5 SLC05 200.000 3256.253 131.57 O.K
6 SLC06 200.000 3227.046 130.39 O.K
7 SLC07 200.000 3238.404 130.84 O.K
8 SLC08 200.000 3422.215 138.27 O.K
9 SLC09 200.000 3435.695 138.82 O.K Wind & Seismic
10 SLC10 200.000 3413.790 137.93 O.K Case (Shot Term)
11 SLC11 200.000 3422.308 138.28 O.K
12 SLC12 200.000 1942.968 78.50 O.K
13 SLC13 200.000 1960.941 79.23 O.K
14 SLC14 200.000 1931.734 78.05 O.K
15 SLC15 200.000 1943.092 78.51 O.K

6.2.2 Sliding & Overturning Check

1) Load Table (From Steel Structure)


Unit : kN·m
Node Load Case FX FY FZ MX MY
Con'c self weight 0.00 0.00 597.38 0.00 0.00
Dead Soil Weight 0.00 0.00 2467.53 0.00 0.00
Rack Dead 1.18 -8.67 111.92 0.00 5.80
Surcharge 0.00 0.00 120.25 0.00 0.00
Live LL 1.10 -6.69 67.13 0.00 5.39
CB2-05 Sub Total 1.10 -6.69 187.38 0.00 5.39
,CB2-D X -0.28 -0.16 1.11 0.00 -1.37
Wind
Y 0.15 31.19 -187.72 0.00 0.75
X 5.27 0.74 2.24 0.00 24.95
Seismic
Y 0.00 9.96 -63.23 0.00 0.00
+ 0.83 -23.20 4.06 0.00 4.07
Temp
- -0.83 23.20 -4.06 0.00 -4.07
Rack Dead 1.08 9.51 61.45 0.00 5.30
Dead
Sub Total 1.08 9.51 61.45 0.00 5.30
LL 1.00 6.56 57.87 0.00 4.91
Live
Sub Total 1.00 6.56 57.87 0.00 4.91
CB2-04 X -0.29 -0.06 -0.15 0.00 -1.44
Wind
,CB2-D Y 0.47 33.73 205.69 0.00 2.28
X 5.34 -0.96 -18.29 0.00 25.33
Seismic
Y 0.10 9.98 63.40 0.00 0.48
+ 0.89 22.90 -6.27 0.00 4.34
Temp
- -0.89 -22.90 6.27 0.00 -4.34

Page 20 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Sliding Check X-Direction

- Safe Factor of Sliding 2.0 (from Civil Design Criteria)


- Safe Factor of Sliding 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)
- Friction Factor of Concrete to Soil 0.4 (from Civil Design Criteria)

LOAD COM Sliding Force Resisting Friction Safety


Check
CASE (kN) Force (kN) Factor Factor
1 SLC01 0.00 1295.31 0.4 N/A O.K
2 SLC02 3.82 1392.53 0.4 364.6 O.K
3 SLC03 0.39 1394.29 0.4 3612.8 O.K
4 SLC04 0.57 1295.70 0.4 2264.7 O.K
5 SLC05 0.62 1302.50 0.4 2105.8 O.K
6 SLC06 7.43 1290.82 0.4 173.8 O.K
7 SLC07 0.07 1295.36 0.4 19022.2 O.K
8 SLC08 1.15 1369.17 0.4 1192.6 O.K
9 SLC09 2.04 1374.28 0.4 673.3 O.K
10 SLC10 7.15 1365.52 0.4 191.1 O.K
11 SLC11 1.63 1368.92 0.4 840.8 O.K
12 SLC12 0.57 777.57 0.4 1359.1 O.K
13 SLC13 0.62 784.38 0.4 1268.1 O.K
14 SLC14 7.43 772.69 0.4 104.1 O.K
15 SLC15 0.07 777.24 0.4 11413.6 O.K

3) Sliding Check Y-Direction

- Safe Factor of Sliding 2.0 (from Civil Design Criteria)


- Safe Factor of Sliding 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)
- Friction Factor of Concrete to Soil 0.4 (from Civil Design Criteria)

LOAD COM Sliding Force Resisting Friction Safety


Check
CASE (kN) Force (kN) Factor Factor
1 SLC01 0.83 1295.31 0.4 1555.1 O.K
2 SLC02 0.41 1392.53 0.4 3375.9 O.K
3 SLC03 1.00 1394.29 0.4 1388.7 O.K
4 SLC04 0.83 1295.31 0.4 1555.1 O.K
5 SLC05 65.75 1302.50 0.4 19.8 O.K
6 SLC06 0.68 1290.82 0.4 1911.0 O.K
7 SLC07 14.79 1295.36 0.4 87.6 O.K
8 SLC08 0.74 1368.89 0.4 1851.3 O.K
9 SLC09 49.43 1374.28 0.4 27.8 O.K
10 SLC10 0.62 1365.52 0.4 2197.7 O.K
11 SLC11 11.21 1368.92 0.4 122.1 O.K
12 SLC12 0.50 777.19 0.4 1555.1 O.K
13 SLC13 65.42 784.38 0.4 12.0 O.K
14 SLC14 0.34 772.69 0.4 2257.3 O.K
15 SLC15 14.46 777.24 0.4 53.8 O.K

Page 21 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

4) Overturing Check X-Direction

- Safe Factor of Overturning 2.0 (from Civil Design Criteria)


- Safe Factor of Overturning 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)

Overturning Overturning Resisting Resisting


LOAD COM Safety
Moment ARM Moment ARM Check
CASE Factor
(kN·m) (m) (kN·m) (m)
1 SLC01 11.10 6.65 7286.13 Calculated 656.3 O.K
2 SLC02 69.34 6.65 7847.08 Calculated 113.2 O.K
3 SLC03 44.53 6.65 7871.88 Calculated 176.8 O.K
4 SLC04 11.43 6.65 7295.22 Calculated 638.1 O.K
5 SLC05 440.61 6.65 7748.93 Calculated 17.6 O.K
6 SLC06 124.49 6.65 7289.66 Calculated 58.6 O.K
7 SLC07 111.47 6.65 7385.99 Calculated 66.3 O.K
8 SLC08 29.57 6.65 7706.80 Calculated 260.7 O.K
9 SLC09 351.45 6.65 8047.08 Calculated 22.9 O.K
10 SLC10 114.36 6.65 7702.63 Calculated 67.4 O.K
11 SLC11 104.60 6.65 7774.88 Calculated 74.3 O.K
12 SLC12 6.99 6.65 4380.77 Calculated 626.6 O.K
13 SLC13 436.17 6.65 4834.48 Calculated 11.1 O.K
14 SLC14 120.05 6.65 4375.21 Calculated 36.5 O.K
15 SLC15 107.03 6.65 4471.54 Calculated 41.8 O.K

5) Overturing Check Y-Direction

- Safe Factor of Overturning 2.0 (from Civil Design Criteria)


- Safe Factor of Overturning 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)

Overturning Overturning Resisting Resisting


LOAD COM Safety
Moment ARM Moment ARM Check
CASE Factor
(kN·m) (m) (kN·m) (m)
1 SLC01 63.22 6.65 9013.42 Calculated 142.6 O.K
2 SLC02 270.11 6.65 9911.06 Calculated 36.7 O.K
3 SLC03 276.34 6.65 9904.84 Calculated 35.8 O.K
4 SLC04 63.47 6.65 9019.03 Calculated 142.1 O.K
5 SLC05 1198.86 6.65 9373.37 Calculated 7.8 O.K
6 SLC06 89.06 6.65 9023.79 Calculated 101.3 O.K
7 SLC07 322.01 6.65 9091.08 Calculated 28.2 O.K
8 SLC08 96.13 6.65 9563.75 Calculated 99.5 O.K
9 SLC09 947.68 6.65 9829.50 Calculated 10.4 O.K
10 SLC10 115.32 6.65 9567.31 Calculated 83.0 O.K
11 SLC11 290.04 6.65 9617.78 Calculated 33.2 O.K
12 SLC12 38.19 6.65 5413.67 Calculated 141.8 O.K
13 SLC13 1173.58 6.65 5768.01 Calculated 4.9 O.K
14 SLC14 63.77 6.65 5418.42 Calculated 85.0 O.K
15 SLC15 296.73 6.65 5485.72 Calculated 18.5 O.K

Page 22 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

6.2.3 Foundatoin Settlement Check

- Detail settlement check to be included in Soil Improvement Design Report.

Page 23 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

6.3 Member Design

In line with that, this section is focused on seeking where greater or lesser values than (±)ΦMn are using
the stress contour range in MIDAS Program, then adding supplementary rebar where required, checking that the stress
resultant output is not greater or lesser than revised design moment (±)ΦMn any more (where, the sign (+) means
tension stress in bottom and (-) in top of concrete foundation) and verifying no need of reinforcing bar.
The moment and shear force was determined on the basis of critical section.
Case of occurs stress is concentrated, it is unsuitable for use as a design value.
Thus, using the average value of the near stress

6.3.1 Footing THK. 800mm

1. Calculation Result for Member Design - Factored Load Case

- Mxx (Max.)

X
Z

Value
(kN·m/m)
61.93

Page 24 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Mxx (Min.)

X
Z

Value
(kN·m/m)
95.75

Page 25 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Max.)

X
Z

Value
(kN·m/m)
93.15

Page 26 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Min.)

X
Z

Value
(kN·m/m)
121.03

Page 27 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Vxx (ABS Max.)

X
Z

Value
(kN/m)
252.51

Page 28 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Vyy (ABS Max.)

X
Z

Value
(kN/m)
295.92

Page 29 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2. Calculation Result for Crack Check - Unfactored Load Case

- Mxx (Max.)

X
Z

Value
(kN·m/m)
37.98

Page 30 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Mxx (Min.)

X
Z

Value
(kN·m/m)
56.56

Page 31 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Max.)

X
Z

Value
(kN·m/m)
75.12

Page 32 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Min.)

X
Z

Value
(kN·m/m)
73.13

Page 33 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3. Calculation Result Summary

angle of main axis l f i

Factored Condition Unfactored Condition


Mxx Myy Vxx Vyy Mxx Myy
Classification
(kN·m/m) (kN·m/m) (kN/m) (kN/m) (kN·m/m) (kN·m/m)
Bottom 61.93 93.15 37.98 75.12
252.51 295.92
Top 95.75 121.03 56.56 73.13

4. Rebar Design (Bottom Rebar)

1) X Direction

Mu = 61.930 kN·m/m, h = 800 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 37.980 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 252.510 kN/m , d = 717 mm , Φb = 0.90 , βc = 0.78

1.1) Rebar Design


Mu 61.93 x 10 6
Required Rn = = 2
= 0.13 N/mm2
φbd² 0.90 x 1000 x 717

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.13


= 1 - 1 -
420 0.85 x 37.5

= 0.0003

As(req.) = ρ x b x d = 0.0003 x 1000 x 717 = 216


mm²
As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 800 / 2 = 720
mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 717 = 2390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 717 = 2614 mm²
4/3 As(req.) = 4 / 3 x 216 = 288 mm²

Use As = 720 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

Page 34 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 717
= 549 kN > VU = 252.51 kN ∴ NO USE STIRRUP

1.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 37.98 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 71.70 ) = 0.0014
2
k = - ρn + √{ 2ρn +(ρn) } = 0.131
x =kd = 93.7 mm
Icr = b x3 / 3 + n As (d - x) 2 = 3.E+09 mm4
fs = n * Ms / Icr *(d-x) = 55.08 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 1744.24 mm
Rs2 = 300 (280 / fs) = 1525.06 mm
Rs = Min.(Rs1, Rs2) = 1525.1 mm > 200 mm ∴ O.K !

1.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.148
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.08 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 35 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Y Direction

Mu = 93.150 kN·m/m, h = 800 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 75.120 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 295.920 kN/m , d = 717 mm , Φb = 0.90 , βc = 0.78

2.1) Rebar Design


Mu 93.15 x 10 6
Required Rn = = 2
= 0.20 N/mm2
φbd² 0.90 x 1000 x 717

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.20


= 1 - 1 -
420 0.85 x 37.5

= 0.0005

As(req.) = ρ x b x d = 0.0005 x 1000 x 717 = 359 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 800 / 2 = 720 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 717 = 2390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 717 = 2614 mm²
4/3 As(req.) = 4 / 3 x 359 = 479 mm²

Use As = 720 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

2.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 717
= 549 kN > VU = 295.92 kN ∴ NO USE STIRRUP

Page 36 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 75.12 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 71.70 ) = 0.0014
2
k = - ρn + √{ 2ρn +(ρn) } = 0.131
x =kd = 93.7 mm
Icr = b x3 / 3 + n As (d - x) 2 = 3.E+09 mm4
fs = n * Ms / Icr *(d-x) = 108.94 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 789.17 mm
Rs2 = 300 (280 / fs) = 771.06 mm
Rs = Min.(Rs1, Rs2) = 771.1 mm > 200 mm ∴ O.K !

2.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.148
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.16 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 37 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

5. Rebar Design (Top Rebar)

1) X Direction

Mu = 95.750 kN·m/m, h = 800 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 56.560 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 252.510 kN/m , d = 717 mm , Φb = 0.90 , βc = 0.78

1.1) Rebar Design


Mu 95.75 x 10 6
Required Rn = = 2
= 0.21 N/mm2
φbd² 0.90 x 1000 x 717

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.21


= 1 - 1 -
420 0.85 x 37.5

= 0.0005

As(req.) = ρ x b x d = 0.0005 x 1000 x 717 = 359 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 800 / 2 = 720 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 717 = 2390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 717 = 2614 mm²
4/3 As(req.) = 4 / 3 x 359 = 479 mm²

Use As = 720 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

1.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 717
= 549 kN > VU = 252.51 kN ∴ NO USE STIRRUP

Page 38 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 56.56 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 71.70 ) = 0.0014
2
k = - ρn + √{ 2ρn +(ρn) } = 0.131
x =kd = 93.7 mm
Icr = b x3 / 3 + n As (d - x) 2 = 3.E+09 mm4
fs = n * Ms / Icr *(d-x) = 82.03 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 1109.66 mm
Rs2 = 300 (280 / fs) = 1024.08 mm
Rs = Min.(Rs1, Rs2) = 1024.1 mm > 200 mm ∴ O.K !

1.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.148
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.12 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 39 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Y Direction

Mu = 121.030 kN·m/m, h = 800 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 73.130 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 295.920 kN/m , d = 717 mm , Φb = 0.90 , βc = 0.78

2.1) Rebar Design


Mu 121.03 x 10 6
Required Rn = = 2
= 0.26 N/mm2
φbd² 0.90 x 1000 x 717

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.26


= 1 - 1 -
420 0.85 x 37.5

= 0.0006

As(req.) = ρ x b x d = 0.0006 x 1000 x 717 = 431 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 800 / 2 = 720 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 717 = 2390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 717 = 2614 mm²
4/3 As(req.) = 4 / 3 x 431 = 575 mm²

Use As = 720 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

2.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 717
= 549 kN > VU = 295.92 kN ∴ NO USE STIRRUP

Page 40 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 73.13 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 71.70 ) = 0.0014
2
k = - ρn + √{ 2ρn +(ρn) } = 0.131
x =kd = 93.7 mm
Icr = b x3 / 3 + n As (d - x) 2 = 3.E+09 mm4
fs = n * Ms / Icr *(d-x) = 106.06 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 815.75 mm
Rs2 = 300 (280 / fs) = 792.04 mm
Rs = Min.(Rs1, Rs2) = 792.0 mm > 200 mm ∴ O.K !

2.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.148
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.15 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 41 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

6.3.2 Pedestal Design

1. 500 X 700

1) Design Forces
Unit : kN·m
Combinations Part Pu Vux Vuy Mux Muy
I -70.816 9.800 0.924 -11.831 57.330
ULC01
J -142.478 9.800 0.924 -6.426 0.000
I -149.211 42.380 1.536 -19.710 247.923
ULC02
J -210.636 42.380 1.536 -10.724 0.000
I -151.995 9.676 2.160 -27.584 -56.605
ULC03
J -213.420 9.676 2.160 -14.948 0.000
I -116.889 13.370 1.452 -18.582 78.215
ULC04
J -178.314 13.370 1.452 -10.088 0.000
I -60.699 8.400 0.792 -10.141 49.140
ULC05
J -122.124 8.400 0.792 -5.508 0.000
I -288.171 35.888 0.856 -10.980 209.945
ULC06
J -349.596 35.888 0.856 -5.972 0.000
I -116.889 13.370 1.452 -18.582 78.215
ULC07
J -178.314 13.370 1.452 -10.088 0.000
I -571.833 68.346 1.580 -20.259 399.824
ULC08
J -633.258 68.346 1.580 -11.016 0.000
I -124.359 14.060 5.812 -72.038 82.251
ULC09
J -185.784 14.060 5.812 -38.038 0.000
I -198.559 23.160 1.472 -18.859 135.486
ULC10
J -259.984 23.160 1.472 -10.248 0.000
I -7.688 4.590 0.405 -5.186 26.852
ULC11
J -53.757 4.590 0.405 -2.817 0.000
I -462.632 59.566 0.533 -6.863 348.461
ULC12
J -508.701 59.566 0.533 -3.745 0.000
I -15.158 5.280 4.765 -58.642 30.888
ULC13
J -61.227 5.280 4.765 -30.767 0.000
I -89.358 14.380 0.425 -5.463 84.123
ULC14
J -135.427 14.380 0.425 -2.977 0.000
Pu max -7.688 68.346 5.812 -5.186 26.852
Pu min -633.258 68.346 5.812 -11.016 0.000
Applied Loads
Mux max -124.359 68.346 5.812 -72.038 82.251
Muy max -571.833 68.346 5.812 -20.259 399.824

- Description
I : Pedestal Lower
J : Pedestal Top

Page 42 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Rebar Design

Page 43 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3) Pedestal Punching Shear Check

Max. Column Load (Pu) - : 633.26 kN


Compressive strength of con'c : 37.50 Mpa
Yield strength of reinforcement : 420.00 Mpa
con'c cover : 7.50 cm
Strength reduction factor : 0.75

h1 = 80.00 cm = 800.00 mm
PB = 0.50 m = 500.00 mm PL = 0.70 m = 700.00 mm

d = h1 - con'c cover = 717.00 mm

359 700 359 Unit : mm

359
500
359

2
ΦVc = 0.75 x 0.17 x + 1 x fck x b0 x d
βC
= 7162120.47 N = 7162.12 kN
αSd
ΦVc = 0.75 x 0.083 x + 2 x fck x b0 x d
b0
= 10718584.58 N = 10718.58 kN
ΦVc = 0.75 x 0.33 x fck x b0 x d
= 5724739.89 N = 5724.74 kN
βC = 1.40 : Ratio of long side to short side of concentrated load or reaction area
bO = 5268 : Perimeter of critical (mm)
αS = 40 : Interior columns Applied
= 30 : Edge columns
= 20 : Corner columns

ΦVc(MIN) = 5724.74 kN > Vu = 633.26 kN ∴ O.K

Page 44 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

Page 45 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

7. TYPE - F2

7.1 Plan & Section

600

500
400
2000
3000

500
3000

150

1000

500

3000

Part Dim. Unit weight Total weight


FB 3000 mm
Foundation FH 3000 mm 25 kN/m3 112.50 kN
FD 500 mm
PB 400 mm
Pedestal
PH 600 mm 25 kN/m3 20.70 kN
(3EA)
PD 1150 mm
Soil SD 1000 mm 18 kN/m3 149.04 kN

Page 46 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

7.2 Stability Check

7.2.1 Soil Bearing Check

LOAD COM Qa Reaction Qu


Check Remark
CASE (kN/m2) (kN) (kN/m2)
1 SLC01 150.000 427.896 47.54 O.K
Normal Operating
2 SLC02 150.000 618.263 68.70 O.K
Case (Long Term)
3 SLC03 150.000 618.262 68.70 O.K
4 SLC04 200.000 427.896 47.54 O.K
5 SLC05 200.000 438.020 48.67 O.K
6 SLC06 200.000 427.497 47.50 O.K
7 SLC07 200.000 426.615 47.40 O.K
8 SLC08 200.000 570.671 63.41 O.K
9 SLC09 200.000 578.264 64.25 O.K Wind & Seismic
10 SLC10 200.000 570.371 63.37 O.K Case (Shot Term)
11 SLC11 200.000 569.710 63.30 O.K
12 SLC12 200.000 256.738 28.53 O.K
13 SLC13 200.000 266.861 29.65 O.K
14 SLC14 200.000 256.338 28.48 O.K
15 SLC15 200.000 255.457 28.38 O.K

Page 47 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

7.2.2 Sliding & Overturning Check

1) Load Table (From Steel Structure)


Unit : kN·m
Node Load Case FX FY FZ MX MY
Con'c self weight 0.00 0.00 133.20 0.00 0.00
Dead Soil Weight 0.00 0.00 149.04 0.00 0.00
Rack Dead 0.78 -6.63 72.99 0.00 8.23
Surcharge 0.00 0.00 41.40 0.00 0.00
Live LL 1.02 -6.23 41.80 0.00 8.88
CB4-03, Sub Total 1.02 -6.23 83.20 0.00 8.88
CB4-C X 0.00 0.00 0.00 0.00 0.00
Wind
Y -0.71 17.75 -104.02 0.00 0.12
X 6.48 -0.37 3.56 0.00 30.43
Seismic
Y -0.18 5.90 -35.43 0.00 -0.16
+ 2.77 -23.16 -0.02 0.00 13.56
Temp
- -2.77 23.16 0.02 0.00 -13.56
Rack Dead -0.02 5.36 43.93 0.00 4.66
Dead
Sub Total -0.02 5.36 43.93 0.00 4.66
LL 0.15 4.19 70.83 0.00 4.78
Live
Sub Total 0.15 4.19 70.83 0.00 4.78
CB4-02, X 0.00 0.00 0.00 0.00 0.00
Wind
CB4-C Y 0.83 19.32 116.08 0.00 1.96
X 6.32 0.65 5.94 0.00 29.64
Seismic
Y 0.18 5.91 35.63 0.00 0.29
+ 2.77 23.17 0.02 0.00 13.56
Temp
- -2.77 -23.17 -0.02 0.00 -13.56
Rack Dead -3.66 0.00 28.74 0.00 0.00
Dead
Sub Total -3.66 0.00 28.74 0.00 0.00
LL -3.72 0.00 36.34 0.00 0.00
Live
Sub Total -3.72 0.00 36.34 0.00 0.00
CB4-03, X 5.53 0.00 -14.76 0.00 0.00
Wind
CB4-B Y 0.13 3.82 -1.93 -18.68 0.00
X 3.66 0.00 -10.08 0.00 0.00
Seismic
Y 0.27 4.32 -2.02 -20.15 0.00
+ -26.97 -0.35 0.00 1.69 0.00
Temp
- 26.97 0.35 0.00 -1.69 0.00

Page 48 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Sliding Check X-Direction

- Safe Factor of Sliding 2.0 (from Civil Design Criteria)


- Safe Factor of Sliding 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)
- Friction Factor of Concrete to Soil 0.4 (from Civil Design Criteria)

LOAD COM Sliding Force Resisting Friction Safety


Check
CASE (kN) Force (kN) Factor Factor
1 SLC01 2.90 171.16 0.4 58.9 O.K
2 SLC02 3.95 247.31 0.4 62.6 O.K
3 SLC03 19.84 247.30 0.4 12.5 O.K
4 SLC04 2.63 165.25 0.4 62.8 O.K
5 SLC05 2.66 175.21 0.4 65.9 O.K
6 SLC06 8.62 171.00 0.4 19.8 O.K
7 SLC07 2.71 170.65 0.4 62.9 O.K
8 SLC08 2.24 223.84 0.4 100.1 O.K
9 SLC09 1.73 231.31 0.4 133.6 O.K
10 SLC10 6.73 228.15 0.4 33.9 O.K
11 SLC11 1.77 227.88 0.4 128.5 O.K
12 SLC12 3.79 96.79 0.4 25.5 O.K
13 SLC13 1.50 106.74 0.4 71.3 O.K
14 SLC14 9.78 102.54 0.4 10.5 O.K
15 SLC15 1.55 102.18 0.4 65.8 O.K

3) Sliding Check Y-Direction

- Safe Factor of Sliding 2.0 (from Civil Design Criteria)


- Safe Factor of Sliding 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)
- Friction Factor of Concrete to Soil 0.4 (from Civil Design Criteria)

LOAD COM Sliding Force Resisting Friction Safety


Check
CASE (kN) Force (kN) Factor Factor
1 SLC01 1.28 171.16 0.4 134.0 O.K
2 SLC02 3.66 247.31 0.4 67.6 O.K
3 SLC03 2.97 247.30 0.4 83.1 O.K
4 SLC04 1.28 171.16 0.4 134.0 O.K
5 SLC05 39.62 175.21 0.4 4.4 O.K
6 SLC06 1.08 171.00 0.4 158.3 O.K
7 SLC07 10.02 170.65 0.4 17.0 O.K
8 SLC08 2.81 228.27 0.4 81.3 O.K
9 SLC09 27.86 231.31 0.4 8.3 O.K
10 SLC10 2.66 228.15 0.4 85.8 O.K
11 SLC11 5.66 227.88 0.4 40.2 O.K
12 SLC12 0.77 102.70 0.4 134.0 O.K
13 SLC13 40.13 106.74 0.4 2.7 O.K
14 SLC14 0.57 102.54 0.4 180.0 O.K
15 SLC15 10.53 102.18 0.4 9.7 O.K

Page 49 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

4) Overturing Check X-Direction

- Safe Factor of Overturning 2.0 (from Civil Design Criteria)


- Safe Factor of Overturning 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)

Overturning Overturning Resisting Resisting


LOAD COM Safety
Moment ARM Moment ARM Check
CASE Factor
(kN·m) (m) (kN·m) (m)
1 SLC01 14.18 1.65 714.05 Calculated 50.4 O.K
2 SLC02 66.32 1.65 1101.37 Calculated 16.6 O.K
3 SLC03 74.56 1.65 1093.13 Calculated 14.7 O.K
4 SLC04 34.38 1.65 714.05 Calculated 20.8 O.K
5 SLC05 253.32 1.65 976.39 Calculated 3.9 O.K
6 SLC06 80.54 1.65 729.02 Calculated 9.1 O.K
7 SLC07 71.77 1.65 770.48 Calculated 10.7 O.K
8 SLC08 41.21 1.65 971.13 Calculated 23.6 O.K
9 SLC09 205.42 1.65 1167.89 Calculated 5.7 O.K
10 SLC10 75.83 1.65 982.36 Calculated 13.0 O.K
11 SLC11 69.25 1.65 1013.45 Calculated 14.6 O.K
12 SLC12 28.71 1.65 428.43 Calculated 14.9 O.K
13 SLC13 247.65 1.65 690.77 Calculated 2.8 O.K
14 SLC14 74.87 1.65 443.40 Calculated 5.9 O.K
15 SLC15 66.10 1.65 484.86 Calculated 7.3 O.K

5) Overturing Check Y-Direction

- Safe Factor of Overturning 2.0 (from Civil Design Criteria)


- Safe Factor of Overturning 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)

Overturning Overturning Resisting Resisting


LOAD COM Safety
Moment ARM Moment ARM Check
CASE Factor
(kN·m) (m) (kN·m) (m)
1 SLC01 8.84 1.65 724.96 Calculated 82.0 O.K
2 SLC02 54.04 1.65 1086.76 Calculated 20.1 O.K
3 SLC03 56.25 1.65 1084.55 Calculated 19.3 O.K
4 SLC04 53.13 1.65 724.96 Calculated 13.7 O.K
5 SLC05 360.84 1.65 783.00 Calculated 2.17 O.K
6 SLC06 30.74 1.65 733.70 Calculated 23.9 O.K
7 SLC07 107.83 1.65 737.43 Calculated 6.8 O.K
8 SLC08 47.25 1.65 965.95 Calculated 20.4 O.K
9 SLC09 278.03 1.65 1009.47 Calculated 3.6 O.K
10 SLC10 30.46 1.65 972.50 Calculated 31.9 O.K
11 SLC11 88.27 1.65 975.30 Calculated 11.1 O.K
12 SLC12 49.59 1.65 434.98 Calculated 8.8 O.K
13 SLC13 357.31 1.65 493.02 Calculated 1.4 O.K
14 SLC14 27.21 1.65 443.71 Calculated 16.3 O.K
15 SLC15 104.29 1.65 447.45 Calculated 4.3 O.K

Page 50 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

6.2.3 Foundatoin Settlement Check

- Detail settlement check to be included in Soil Improvement Design Report.

Page 51 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

7.3 Member Design

In line with that, this section is focused on seeking where greater or lesser values than (±)ΦMn are using
the stress contour range in MIDAS Program, then adding supplementary rebar where required, checking that the stress
resultant output is not greater or lesser than revised design moment (±)ΦMn any more (where, the sign (+) means
tension stress in bottom and (-) in top of concrete foundation) and verifying no need of reinforcing bar.
The moment and shear force was determined on the basis of critical section.
Case of occurs stress is concentrated, it is unsuitable for use as a design value.
Thus, using the average value of the near stress

7.3.1 Footing THK. 500mm

1. Calculation Result for Member Design - Factored Load Case

- Mxx (Max.)

X
Z

Value
(kN·m/m)
22.30

Page 52 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Mxx (Min.)

X
Z

Value
(kN·m/m)
49.01

Page 53 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Max.)

X
Z

Value
(kN·m/m)
52.24

Page 54 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Min.)

X
Z

Value
(kN·m/m)
29.16

Page 55 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Vxx (ABS Max.)

X
Z

Value
(kN/m)
188.56

Page 56 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Vyy (ABS Max.)

X
Z

Value
(kN/m)
114.25

Page 57 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2. Calculation Result for Crack Check - Unfactored Load Case

- Mxx (Max.)

X
Z

Value
(kN·m/m)
11.72

Page 58 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Mxx (Min.)

X
Z

Value
(kN·m/m)
31.03

Page 59 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Max.)

X
Z

Value
(kN·m/m)
39.11

Page 60 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Min.)

X
Z

Value
(kN·m/m)
16.84

Page 61 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3. Calculation Result Summary

angle of main axis l f i

Factored Condition Unfactored Condition


Mxx Myy Vxx Vyy Mxx Myy
Classification
(kN·m/m) (kN·m/m) (kN/m) (kN/m) (kN·m/m) (kN·m/m)
Bottom 22.30 52.24 11.72 39.11
188.56 114.25
Top 49.01 29.16 31.03 16.84

4. Rebar Design (Bottom Rebar)

1) X Direction

Mu = 22.300 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 11.720 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 188.560 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

1.1) Rebar Design


Mu 22.30 x 10 6
Required Rn = = 2
= 0.14 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.14


= 1 - 1 -
420 0.85 x 37.5

= 0.0003

As(req.) = ρ x b x d = 0.0003 x 1000 x 417 = 126


mm²
As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450
mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 126 = 168 mm²

Use As = 450 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

Page 62 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 188.56 kN ∴ NO USE STIRRUP

1.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 11.72 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 29.61 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 3406.35 mm
Rs2 = 300 (280 / fs) = 2837.25 mm
Rs = Min.(Rs1, Rs2) = 2837.3 mm > 200 mm ∴ O.K !

1.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.04 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 63 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Y Direction

Mu = 52.240 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 39.110 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 114.250 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

2.1) Rebar Design


Mu 52.24 x 10 6
Required Rn = = 2
= 0.33 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.33


= 1 - 1 -
420 0.85 x 37.5

= 0.0008

As(req.) = ρ x b x d = 0.0008 x 1000 x 417 = 334 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 334 = 445 mm²

Use As = 450 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

2.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 114.25 kN ∴ NO USE STIRRUP

Page 64 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 39.11 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 98.80 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 889.46 mm
Rs2 = 300 (280 / fs) = 850.23 mm
Rs = Min.(Rs1, Rs2) = 850.2 mm > 200 mm ∴ O.K !

2.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.15 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 65 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

5. Rebar Design (Top Rebar)

1) X Direction

Mu = 49.010 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 31.030 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 188.560 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

1.1) Rebar Design


Mu 49.01 x 10 6
Required Rn = = 2
= 0.31 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.31


= 1 - 1 -
420 0.85 x 37.5

= 0.0007

As(req.) = ρ x b x d = 0.0007 x 1000 x 417 = 292 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 292 = 389 mm²

Use As = 450 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

1.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 188.56 kN ∴ NO USE STIRRUP

Page 66 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 31.03 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 78.39 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 1169.89 mm
Rs2 = 300 (280 / fs) = 1071.63 mm
Rs = Min.(Rs1, Rs2) = 1071.6 mm > 200 mm ∴ O.K !

1.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.12 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 67 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Y Direction

Mu = 29.160 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 16.840 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 114.250 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

2.1) Rebar Design


Mu 29.16 x 10 6
Required Rn = = 2
= 0.19 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.19


= 1 - 1 -
420 0.85 x 37.5

= 0.0005

As(req.) = ρ x b x d = 0.0005 x 1000 x 417 = 209 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 209 = 279 mm²

Use As = 450 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

2.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 114.25 kN ∴ NO USE STIRRUP

Page 68 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 16.84 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 42.54 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 2313.68 mm
Rs2 = 300 (280 / fs) = 1974.62 mm
Rs = Min.(Rs1, Rs2) = 1974.6 mm > 200 mm ∴ O.K !

2.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.06 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 69 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

7.3.2 Pedestal Design

1. 400 X 600

2) Design Forces
Unit : kN·m
Combinations Part Pu Vux Vuy Mux Muy
I -51.842 7.504 0.028 -6.492 8.630
ULC01
J -61.502 7.504 0.028 -6.524 0.000
I -157.788 40.940 3.540 -33.583 47.081
ULC02
J -166.068 40.940 3.540 -29.512 0.000
I -157.740 14.668 3.108 6.606 -16.868
ULC03
J -166.020 14.668 3.108 3.032 0.000
I -115.266 10.622 0.126 -10.517 12.215
ULC04
J -123.546 10.622 0.126 -10.372 0.000
I -44.436 6.432 0.024 -5.564 7.397
ULC05
J -52.716 6.432 0.024 -5.592 0.000
I -137.300 21.888 0.640 -7.896 25.171
ULC06
J -145.580 21.888 0.640 -7.160 0.000
I -115.266 10.622 0.126 -10.517 12.215
ULC07
J -123.546 10.622 0.126 -10.372 0.000
I -300.994 41.534 1.454 -15.180 47.764
ULC08
J -309.274 41.534 1.454 -13.508 0.000
I -121.206 11.272 6.446 -47.425 12.963
ULC09
J -129.486 11.272 6.446 -40.012 0.000
I -150.896 16.532 0.306 -11.014 19.012
ULC10
J -159.176 16.532 0.306 -10.662 0.000
I -33.606 3.636 0.414 -1.783 4.181
ULC11
J -39.816 3.636 0.414 -2.259 0.000
I -219.334 34.548 0.914 -6.446 39.730
ULC12
J -225.544 34.548 0.914 -5.395 0.000
I -39.546 4.286 5.906 -38.691 4.929
ULC13
J -45.756 4.286 5.906 -31.899 0.000
I -69.236 9.546 0.234 -2.280 10.978
ULC14
J -75.446 9.546 0.234 -2.549 0.000
Pu max -33.606 41.534 6.446 -1.783 4.181
Pu min -309.274 41.534 6.446 -13.508 0.000
Applied Loads
Mux max -121.206 41.534 6.446 -47.425 12.963
Muy max -300.994 41.534 6.446 -15.180 47.764

- Description
I : Pedestal Lower
J : Pedestal Top

Page 70 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Rebar Design

Page 71 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3) Pedestal Punching Shear Check

Max. Column Load (Pu) - : 309.27 kN


Compressive strength of con'c : 37.50 Mpa
Yield strength of reinforcement : 420.00 Mpa
con'c cover : 7.50 cm
Strength reduction factor : 0.75

h1 = 50.00 cm = 500.00 mm
PB = 0.40 m = 400.00 mm PL = 0.60 m = 600.00 mm

d = h1 - con'c cover = 417.00 mm

209 600 209 Unit : mm

209
400
209

2
ΦVc = 0.75 x 0.17 x + 1 x fck x b0 x d
βC
= 2786557.35 N = 2786.56 kN
αSd
ΦVc = 0.75 x 0.083 x + 2 x fck x b0 x d
b0
= 3817611.41 N = 3817.61 kN
ΦVc = 0.75 x 0.33 x fck x b 0 x d
= 2318228.38 N = 2318.23 kN
βC = 1.50 : Ratio of long side to short side of concentrated load or reaction area
bO = 3668 : Perimeter of critical (mm)
αS = 40 : Interior columns Applied
= 30 : Edge columns
= 20 : Corner columns

ΦVc(MIN) = 2318.23 kN > Vu = 309.27 kN ∴ O.K

Page 72 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

Page 73 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

8. TYPE - F3 & F16

8.1 Plan & Section

1800

600
1800

400

150

1000

350

1800

Part Dim. Unit weight Total weight


FB 1800 mm
Foundation FH 1800 mm 25 kN/m3 28.35 kN
FD 350 mm
PB 600 mm
Pedestal
PH 400 mm 25 kN/m3 29.70 kN
(1EA)
PD 4950 mm
Soil SD 1000 mm 18 kN/m3 54 kN

Page 74 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

8.2 Stability Check

8.2.1 Soil Bearing Check

LOAD COM Qa Reaction Qu


Check Remark
CASE (kN/m2) (kN) (kN/m2)
1 SLC01 150.000 203.978 62.96 O.K
Normal Operating
2 SLC02 150.000 306.189 94.50 O.K
Case (Long Term)
3 SLC03 150.000 306.189 94.50 O.K
4 SLC04 200.000 203.978 62.96 O.K
5 SLC05 200.000 256.830 79.27 O.K
6 SLC06 200.000 189.013 58.34 O.K
7 SLC07 200.000 227.089 70.09 O.K
8 SLC08 200.000 280.636 86.62 O.K
9 SLC09 200.000 320.275 98.85 O.K Wind & Seismic
10 SLC10 200.000 269.413 83.15 O.K Case (Shot Term)
11 SLC11 200.000 297.969 91.97 O.K
12 SLC12 200.000 122.387 37.77 O.K
13 SLC13 200.000 175.239 54.09 O.K
14 SLC14 200.000 107.422 33.15 O.K
15 SLC15 200.000 145.498 44.91 O.K

8.2.2 Sliding & Overturning Check

1) Load Table (From Steel Structure)

Unit : kN·m
Node Load Case FX FY FZ MX MY
Con'c self weight 0.00 0.00 58.05 0.00 0.00
Dead Soil Weight 0.00 0.00 54.00 0.00 0.00
Rack Dead 15.42 7.79 91.93 0.00 22.63
Surcharge 0.00 0.00 15.00 0.00 0.00
Live LL 6.24 9.57 87.21 0.00 8.66
Sub Total 6.24 9.57 102.21 0.00 8.66
MD#1-2
X 0.00 0.00 0.00 0.00 0.00
Wind
Y 2.17 16.27 52.85 0.00 2.99
X 14.63 -2.22 -21.38 0.00 37.87
Seismic
Y 1.74 10.64 33.02 0.00 2.44
+ -0.98 21.57 0.00 0.00 -2.49
Temp
- 0.98 -21.57 0.00 0.00 2.49

Page 75 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Sliding Check X-Direction

- Safe Factor of Sliding 2.0 (from Civil Design Criteria)


- Safe Factor of Sliding 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)
- Friction Factor of Concrete to Soil 0.4 (from Civil Design Criteria)

LOAD COM Sliding Force Resisting Friction Safety


Check
CASE (kN) Force (kN) Factor Factor
1 SLC01 0.00 81.59 0.4 N/A O.K
2 SLC02 5.26 122.48 0.4 23.3 O.K
3 SLC03 7.22 122.48 0.4 17.0 O.K
4 SLC04 0.00 81.59 0.4 N/A O.K
5 SLC05 2.17 102.73 0.4 47.3 O.K
6 SLC06 10.24 75.61 0.4 7.4 O.K
7 SLC07 1.22 90.84 0.4 74.7 O.K
8 SLC08 4.68 112.25 0.4 24.0 O.K
9 SLC09 6.31 128.11 0.4 20.3 O.K
10 SLC10 12.36 107.77 0.4 8.7 O.K
11 SLC11 5.59 119.19 0.4 21.3 O.K
12 SLC12 0.00 48.95 0.4 N/A O.K
13 SLC13 2.17 70.10 0.4 32.3 O.K
14 SLC14 10.24 42.97 0.4 4.2 O.K
15 SLC15 1.22 58.20 0.4 47.9 O.K

3) Sliding Check Y-Direction

- Safe Factor of Sliding 2.0 (from Civil Design Criteria)


- Safe Factor of Sliding 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)
- Friction Factor of Concrete to Soil 0.4 (from Civil Design Criteria)

LOAD COM Sliding Force Resisting Friction Safety


Check
CASE (kN) Force (kN) Factor Factor
1 SLC01 7.79 81.59 0.4 10.5 O.K
2 SLC02 38.94 122.48 0.4 3.2 O.K
3 SLC03 4.21 122.48 0.4 29.1 O.K
4 SLC04 7.79 81.59 0.4 10.5 O.K
5 SLC05 24.07 102.73 0.4 4.3 O.K
6 SLC06 6.24 75.61 0.4 12.1 O.K
7 SLC07 15.24 90.84 0.4 6.0 O.K
8 SLC08 14.97 112.25 0.4 7.5 O.K
9 SLC09 27.18 128.11 0.4 4.7 O.K
10 SLC10 13.81 107.77 0.4 7.8 O.K
11 SLC11 20.56 119.19 0.4 5.8 O.K
12 SLC12 4.68 48.95 0.4 10.5 O.K
13 SLC13 20.95 70.10 0.4 3.4 O.K
14 SLC14 3.12 42.97 0.4 13.8 O.K
15 SLC15 12.12 58.20 0.4 4.8 O.K

Page 76 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

4) Overturing Check X-Direction

- Safe Factor of Overturning 2.0 (from Civil Design Criteria)


- Safe Factor of Overturning 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)

Overturning Overturning Resisting Resisting


LOAD COM Safety
Moment ARM Moment ARM Check
CASE Factor
(kN·m) (m) (kN·m) (m)
1 SLC01 22.63 5.30 183.58 Calculated 8.1 O.K
2 SLC02 64.37 5.30 283.26 Calculated 4.4 O.K
3 SLC03 72.05 5.30 275.57 Calculated 3.8 O.K
4 SLC04 22.63 5.30 183.58 Calculated 8.1 O.K
5 SLC05 37.13 5.30 231.15 Calculated 6.2 O.K
6 SLC06 116.88 5.30 183.58 Calculated 1.6 N.G
7 SLC07 30.78 5.30 204.38 Calculated 6.6 O.K
8 SLC08 53.93 5.30 252.57 Calculated 4.7 O.K
9 SLC09 64.81 5.30 288.25 Calculated 4.5 O.K
10 SLC10 124.62 5.30 252.57 Calculated 2.0 O.K
11 SLC11 60.04 5.30 268.17 Calculated 4.5 O.K
12 SLC12 13.58 5.30 110.15 Calculated 8.1 O.K
13 SLC13 28.08 5.30 157.72 Calculated 5.6 O.K
14 SLC14 107.83 5.30 110.15 Calculated 1.0 O.K
15 SLC15 21.73 5.30 130.95 Calculated 6.0 O.K

5) Overturing Check Y-Direction

- Safe Factor of Overturning 2.0 (from Civil Design Criteria)


- Safe Factor of Overturning 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)

Overturning Overturning Resisting Resisting


LOAD COM Safety
Moment ARM Moment ARM Check
CASE Factor
(kN·m) (m) (kN·m) (m)
1 SLC01 41.30 5.30 183.58 Calculated 4.44 O.K
2 SLC02 206.38 5.30 275.57 Calculated 1.3 N.G
3 SLC03 92.03 5.30 389.91 Calculated 4.2 O.K
4 SLC04 41.30 5.30 183.58 Calculated 4.4 O.K
5 SLC05 127.55 5.30 231.15 Calculated 1.8 N.G
6 SLC06 54.77 5.30 191.81 Calculated 3.5 O.K
7 SLC07 80.78 5.30 204.38 Calculated 2.5 O.K
8 SLC08 79.35 5.30 252.57 Calculated 3.2 O.K
9 SLC09 144.03 5.30 288.25 Calculated 2.0 N.G
10 SLC10 89.45 5.30 258.75 Calculated 2.9 O.K
11 SLC11 108.96 5.30 268.17 Calculated 2.5 O.K
12 SLC12 24.78 5.30 110.15 Calculated 4.4 O.K
13 SLC13 111.03 5.30 157.72 Calculated 1.4 O.K
14 SLC14 38.25 5.30 118.38 Calculated 3.1 O.K
15 SLC15 64.26 5.30 130.95 Calculated 2.0 O.K

Page 77 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

8.2.3 Foundatoin Settlement Check

- Detail settlement check to be included in Soil Improvement Design Report.

Page 78 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

8.3 Member Design

In line with that, this section is focused on seeking where greater or lesser values than (±)ΦMn are using
the stress contour range in MIDAS Program, then adding supplementary rebar where required, checking that the stress
resultant output is not greater or lesser than revised design moment (±)ΦMn any more (where, the sign (+) means
tension stress in bottom and (-) in top of concrete foundation) and verifying no need of reinforcing bar.
The moment and shear force was determined on the basis of critical section.
Case of occurs stress is concentrated, it is unsuitable for use as a design value.
Thus, using the average value of the near stress

8.3.1 Footing THK. 350mm

1. Calculation Result for Member Design - Factored Load Case

- Mxx (Max.)

X
Z
Value
(kN·m/m)
32.31

Page 79 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Mxx (Min.)

X
Z

Value
(kN·m/m)
12.62

Page 80 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Max.)

X
Z

Value
(kN·m/m)
32.98

Page 81 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Min.)

X
Z

Value
(kN·m/m)
8.18

Page 82 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Vxx (ABS Max.)

X
Z

Value
(kN/m)
106.29

Page 83 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Vyy (ABS Max.)

X
Z

Value
(kN/m)
93.18

Page 84 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2. Calculation Result for Crack Check - Unfactored Load Case

- Mxx (Max.)

X
Z

Value
(kN·m/m)
22.87

Page 85 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Mxx (Min.)

X
Z

Value
(kN·m/m)
8.81

Page 86 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Max.)

X
Z

Value
(kN·m/m)
23.83

Page 87 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Min.)

X
Z

Value
(kN·m/m)
5.83

Page 88 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3. Calculation Result Summary

angle of main axis l f i

Factored Condition Unfactored Condition


Mxx Myy Vxx Vyy Mxx Myy
Classification
(kN·m/m) (kN·m/m) (kN/m) (kN/m) (kN·m/m) (kN·m/m)
Bottom 32.31 32.98 22.87 23.83
106.29 93.18
Top 12.62 8.18 8.81 5.83

4. Rebar Design (Bottom Rebar)

1) X Direction

Mu = 32.310 kN·m/m, h = 350 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 22.870 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 106.290 kN/m , d = 267 mm , Φb = 0.90 , βc = 0.78

1.1) Rebar Design


Mu 32.31 x 10 6
Required Rn = = 2
= 0.50 N/mm2
φbd² 0.90 x 1000 x 267

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.50


= 1 - 1 -
420 0.85 x 37.5

= 0.0012

As(req.) = ρ x b x d = 0.0012 x 1000 x 267 = 321


mm²
As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 350 / 2 = 315
mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 267 = 890 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 267 = 973 mm²
4/3 As(req.) = 4 / 3 x 321 = 428 mm²

Use As = 428 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

Page 89 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 267
= 204 kN > VU = 106.29 kN ∴ NO USE STIRRUP

1.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 22.87 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 26.70 ) = 0.0038
2
k = - ρn + √{ 2ρn +(ρn) } = 0.205
x =kd = 54.7 mm
Icr = b x3 / 3 + n As (d - x) 2 = 4.E+08 mm4
fs = n * Ms / Icr *(d-x) = 91.43 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 976.26 mm
Rs2 = 300 (280 / fs) = 918.76 mm
Rs = Min.(Rs1, Rs2) = 918.8 mm > 200 mm ∴ O.K !

1.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.248
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.14 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 90 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Y Direction

Mu = 32.980 kN·m/m, h = 350 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 23.830 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 93.180 kN/m , d = 267 mm , Φb = 0.90 , βc = 0.78

2.1) Rebar Design


Mu 32.98 x 10 6
Required Rn = = 2
= 0.51 N/mm2
φbd² 0.90 x 1000 x 267

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.51


= 1 - 1 -
420 0.85 x 37.5

= 0.0012

As(req.) = ρ x b x d = 0.0012 x 1000 x 267 = 321 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 350 / 2 = 315 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 267 = 890 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 267 = 973 mm²
4/3 As(req.) = 4 / 3 x 321 = 428 mm²

Use As = 428 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

2.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 267
= 204 kN > VU = 93.18 kN ∴ NO USE STIRRUP

Page 91 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 23.83 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 26.70 ) = 0.0038
2
k = - ρn + √{ 2ρn +(ρn) } = 0.205
x =kd = 54.7 mm
Icr = b x3 / 3 + n As (d - x) 2 = 4.E+08 mm4
fs = n * Ms / Icr *(d-x) = 95.27 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 929.38 mm
Rs2 = 300 (280 / fs) = 881.75 mm
Rs = Min.(Rs1, Rs2) = 881.7 mm > 200 mm ∴ O.K !

2.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.248
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.15 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 92 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

5. Rebar Design (Top Rebar)

1) X Direction

Mu = 12.620 kN·m/m, h = 350 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 8.810 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 106.290 kN/m , d = 267 mm , Φb = 0.90 , βc = 0.78

1.1) Rebar Design


Mu 12.62 x 10 6
Required Rn = = 2
= 0.20 N/mm2
φbd² 0.90 x 1000 x 267

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.20


= 1 - 1 -
420 0.85 x 37.5

= 0.0005

As(req.) = ρ x b x d = 0.0005 x 1000 x 267 = 134 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 350 / 2 = 315 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 267 = 890 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 267 = 973 mm²
4/3 As(req.) = 4 / 3 x 134 = 179 mm²

Use As = 315 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

1.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 267
= 204 kN > VU = 106.29 kN ∴ NO USE STIRRUP

Page 93 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 8.81 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 26.70 ) = 0.0038
2
k = - ρn + √{ 2ρn +(ρn) } = 0.205
x =kd = 54.7 mm
Icr = b x3 / 3 + n As (d - x) 2 = 4.E+08 mm4
fs = n * Ms / Icr *(d-x) = 35.22 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 2833.52 mm
Rs2 = 300 (280 / fs) = 2385.02 mm
Rs = Min.(Rs1, Rs2) = 2385.0 mm > 200 mm ∴ O.K !

1.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.248
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.06 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 94 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Y Direction

Mu = 8.180 kN·m/m, h = 350 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 5.830 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 93.180 kN/m , d = 267 mm , Φb = 0.90 , βc = 0.78

2.1) Rebar Design


Mu 8.18 x 10 6
Required Rn = = 2
= 0.13 N/mm2
φbd² 0.90 x 1000 x 267

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.13


= 1 - 1 -
420 0.85 x 37.5

= 0.0003

As(req.) = ρ x b x d = 0.0003 x 1000 x 267 = 81 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 350 / 2 = 315 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 267 = 890 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 267 = 973 mm²
4/3 As(req.) = 4 / 3 x 81 = 108 mm²

Use As = 315 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

2.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 267
= 204 kN > VU = 93.18 kN ∴ NO USE STIRRUP

Page 95 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 5.83 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 26.70 ) = 0.0038
2
k = - ρn + √{ 2ρn +(ρn) } = 0.205
x =kd = 54.7 mm
Icr = b x3 / 3 + n As (d - x) 2 = 4.E+08 mm4
fs = n * Ms / Icr *(d-x) = 23.31 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 4377.72 mm
Rs2 = 300 (280 / fs) = 3604.12 mm
Rs = Min.(Rs1, Rs2) = 3604.1 mm > 200 mm ∴ O.K !

2.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.248
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.04 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 96 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

8.3.2 Pedestal Design

1. 400 X 600

1) Design Forces
Unit : kN·m
Combinations Part Pu Vux Vuy Mux Muy
I 130.774 9.604 18.816 47.692 11.045
ULC01
J 121.114 9.604 18.816 26.054 0.000
I 251.628 49.428 24.888 61.741 56.842
ULC02
J 243.348 49.428 24.888 33.120 0.000
I 251.628 2.340 27.240 70.422 -2.691
ULC03
J 243.348 2.340 27.240 39.096 0.000
I 199.302 17.802 22.338 56.631 20.472
ULC04
J 191.022 17.802 22.338 30.942 0.000
I 112.092 8.232 16.128 40.879 9.467
ULC05
J 103.812 8.232 16.128 22.332 0.000
I 83.636 3.528 16.008 40.581 -4.057
ULC06
J 75.356 3.528 16.008 22.172 0.000
I 199.302 17.802 22.338 56.631 20.472
ULC07
J 191.022 17.802 22.338 30.942 0.000
I 142.390 5.718 22.098 56.035 -6.576
ULC08
J 134.110 5.718 22.098 30.622 0.000
I 182.042 16.032 34.958 103.734 18.437
ULC09
J 173.762 16.032 34.958 63.532 0.000
I 171.522 8.632 21.018 53.293 9.927
ULC10
J 163.242 8.632 21.018 29.122 0.000
I 43.974 3.771 3.735 9.479 4.337
ULC11
J 37.764 3.771 3.735 5.184 0.000
I -12.938 19.749 3.495 8.883 -22.711
ULC12
J -19.148 19.749 3.495 4.864 0.000
I 26.714 2.001 16.355 56.582 2.301
ULC13
J 20.504 2.001 16.355 37.774 0.000
I 16.194 5.399 2.415 6.141 -6.209
ULC14
J 9.984 5.399 2.415 3.364 0.000
Pu max 251.628 49.428 34.958 61.741 56.842
Pu min -19.148 49.428 34.958 4.864 0.000
Applied Loads
Mux max 182.042 49.428 34.958 103.734 18.437
Muy max 251.628 49.428 34.958 61.741 56.842

- Description
I : Pedestal Lower
J : Pedestal Top

Page 97 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Rebar Design

Page 98 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3) Pedestal Punching Shear Check

Max. Column Load (Pu) - : 290.37 kN


Compressive strength of con'c : 37.50 Mpa
Yield strength of reinforcement : 420.00 Mpa
con'c cover : 7.50 cm
Strength reduction factor : 0.75

h1 = 35.00 cm = 350.00 mm
PB = 0.40 m = 400.00 mm PL = 0.60 m = 600.00 mm

d = h1 - con'c cover = 267.00 mm

134 600 134 Unit : mm

134
400
134

2
ΦVc = 0.75 x 0.17 x + 1 x fck x b0 x d
βC
= 1492344.95 N = 1492.34 kN
αSd
ΦVc = 0.75 x 0.083 x + 2 x fck x b0 x d
b0
= 1711547.47 N = 1711.55 kN
ΦVc = 0.75 x 0.33 x fck x b 0 x d
= 1241530.67 N = 1241.53 kN
βC = 1.50 : Ratio of long side to short side of concentrated load or reaction area
bO = 3068 : Perimeter of critical (mm)
αS = 40 : Interior columns Applied
= 30 : Edge columns
= 20 : Corner columns

ΦVc(MIN) = 1241.53 kN > Vu = 290.37 kN ∴ O.K

Page 99 of 569
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

Page 100 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

9. TYPE - F4

9.1 Plan & Section

1700

750
3700

2200
400
750
600

150

1000

500

1700

Part Dim. Unit weight Total weight


FB 1700 mm
Foundation FH 3700 mm 25 kN/m3 78.63 kN
FD 500 mm
PB 400 mm
Pedestal
PH 600 mm 25 kN/m3 13.80 kN
(2EA)
PD 1150 mm
Soil SD 1000 mm 18 kN/m3 104.58 kN

Page 101 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

9.2 Stability Check

9.2.1 Soil Bearing Check

LOAD COM Qa Reaction Qu


Check Remark
CASE (kN/m2) (kN) (kN/m2)
1 SLC01 150.000 300.517 47.78 O.K
Normal Operating
2 SLC02 150.000 416.730 66.25 O.K
Case (Long Term)
3 SLC03 150.000 416.730 66.25 O.K
4 SLC04 200.000 300.517 47.78 O.K
5 SLC05 200.000 309.053 49.13 O.K
6 SLC06 200.000 286.472 45.54 O.K
7 SLC07 200.000 300.517 47.78 O.K
8 SLC08 200.000 387.677 61.63 O.K
9 SLC09 200.000 394.078 62.65 O.K Wind & Seismic
10 SLC10 200.000 377.142 59.96 O.K Case (Shot Term)
11 SLC11 200.000 387.677 61.63 O.K
12 SLC12 200.000 180.310 28.67 O.K
13 SLC13 200.000 188.846 30.02 O.K
14 SLC14 200.000 166.265 26.43 O.K
15 SLC15 200.000 180.310 28.67 O.K

9.2.2 Sliding & Overturning Check

1) Load Table (From Steel Structure)


Unit : kN·m
Node Load Case FX FY FZ MX MY
Con'c self weight 0.00 0.00 92.43 0.00 0.00
Dead Soil Weight 0.00 0.00 104.58 0.00 0.00
Rack Dead 7.15 -4.50 48.19 0.00 9.88
Surcharge 0.00 0.00 29.05 0.00 0.00
Live LL 3.31 -3.86 37.22 0.00 4.54
Sub Total 3.31 -3.86 66.27 0.00 4.54
MD#8-1
X 0.00 0.00 0.00 0.00 0.00
Wind
Y -1.42 13.90 -76.28 0.00 -1.92
X 7.25 0.95 -9.87 0.00 18.74
Seismic
Y -1.63 6.12 -36.53 0.00 -2.22
+ -0.96 -20.88 0.00 0.00 -2.47
Temp
- 0.96 20.88 0.00 0.00 2.47
Rack Dead 8.00 4.50 55.32 0.00 11.06
Dead
Sub Total 8.00 4.50 55.32 0.00 11.06
LL 3.34 3.86 49.94 0.00 4.58
Live
Sub Total 3.34 3.86 49.94 0.00 4.58
X 0.00 0.00 0.00 0.00 0.00
MD#8-2 Wind
Y 2.43 14.90 84.82 0.00 3.31
X 7.74 -0.76 -10.20 0.00 19.87
Seismic
Y 1.63 6.11 36.53 0.00 2.22
+ -0.96 20.88 0.00 0.00 -2.47
Temp
- 0.96 -20.88 0.00 0.00 2.47

Page 102 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Sliding Check X-Direction

- Safe Factor of Sliding 2.0 (from Civil Design Criteria)


- Safe Factor of Sliding 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)
- Friction Factor of Concrete to Soil 0.4 (from Civil Design Criteria)

LOAD COM Sliding Force Resisting Friction Safety


Check
CASE (kN) Force (kN) Factor Factor
1 SLC01 0.00 120.21 0.4 N/A O.K
2 SLC02 4.73 166.69 0.4 35.2 O.K
3 SLC03 8.56 166.69 0.4 19.5 O.K
4 SLC04 0.00 120.21 0.4 N/A O.K
5 SLC05 1.00 123.62 0.4 123.1 O.K
6 SLC06 10.49 114.59 0.4 10.9 O.K
7 SLC07 0.00 120.21 0.4 N/A O.K
8 SLC08 4.98 155.07 0.4 31.1 O.K
9 SLC09 5.74 157.63 0.4 27.5 O.K
10 SLC10 12.85 150.86 0.4 11.7 O.K
11 SLC11 4.98 155.07 0.4 31.1 O.K
12 SLC12 0.00 72.12 0.4 N/A O.K
13 SLC13 1.00 75.54 0.4 75.2 O.K
14 SLC14 10.49 66.51 0.4 6.3 O.K
15 SLC15 0.00 72.12 0.4 N/A O.K

3) Sliding Check Y-Direction

- Safe Factor of Sliding 2.0 (from Civil Design Criteria)


- Safe Factor of Sliding 1.0 (SLC 10 ~ SLC12)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)
- Friction Factor of Concrete to Soil 0.4 (from Civil Design Criteria)

LOAD COM Sliding Force Resisting Friction Safety


Check
CASE (kN) Force (kN) Factor Factor
1 SLC01 0.00 120.21 0.4 N/A O.K
2 SLC02 0.00 166.69 0.4 N/A O.K
3 SLC03 0.00 166.69 0.4 N/A O.K
4 SLC04 0.00 120.21 0.4 N/A O.K
5 SLC05 28.80 123.62 0.4 4.3 O.K
6 SLC06 0.13 114.59 0.4 851.4 O.K
7 SLC07 8.57 120.21 0.4 14.0 O.K
8 SLC08 0.00 155.07 0.4 N/A O.K
9 SLC09 21.60 157.63 0.4 7.3 O.K
10 SLC10 0.10 150.86 0.4 1554.7 O.K
11 SLC11 6.42 155.07 0.4 24.2 O.K
12 SLC12 0.00 72.12 0.4 N/A O.K
13 SLC13 28.80 75.54 0.4 2.6 O.K
14 SLC14 0.13 66.51 0.4 495.5 O.K
15 SLC15 8.56 72.12 0.4 8.4 O.K

Page 103 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

4) Overturing Check X-Direction

- Safe Factor of Overturning 2.0 (from Civil Design Criteria)


- Safe Factor of Overturning 1.0 (SLC 10 ~ SLC12)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)

Overturning Overturning Resisting Resisting


LOAD COM Safety
Moment ARM Moment ARM Check
CASE Factor
(kN·m) (m) (kN·m) (m)
1 SLC01 20.94 1.65 255.44 Calculated 12.2 O.K
2 SLC02 41.02 1.65 362.31 Calculated 8.8 O.K
3 SLC03 49.12 1.65 354.22 Calculated 7.2 O.K
4 SLC04 20.94 1.65 255.44 Calculated 12.2 O.K
5 SLC05 93.09 1.65 331.81 Calculated 3.6 O.K
6 SLC06 77.22 1.65 255.44 Calculated 3.3 O.K
7 SLC07 46.11 1.65 280.61 Calculated 6.1 O.K
8 SLC08 36.00 1.65 329.53 Calculated 9.2 O.K
9 SLC09 90.12 1.65 386.80 Calculated 4.3 O.K
10 SLC10 78.21 1.65 329.53 Calculated 4.2 O.K
11 SLC11 54.88 1.65 348.40 Calculated 6.4 O.K
12 SLC12 12.56 1.65 153.26 Calculated 12.2 O.K
13 SLC13 84.71 1.65 229.63 Calculated 2.7 O.K
14 SLC14 68.84 1.65 153.26 Calculated 2.2 O.K
15 SLC15 37.74 1.65 178.44 Calculated 4.7 O.K

5) Overturing Check Y-Direction

- Safe Factor of Overturning 2.0 (from Civil Design Criteria)


- Safe Factor of Overturning 1.0 (SLC 10 ~ SLC12)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)

Overturning Overturning Resisting Resisting


LOAD COM Safety
Moment ARM Moment ARM Check
CASE Factor
(kN·m) (m) (kN·m) (m)
1 SLC01 7.43 1.65 555.54 Calculated 74.7 O.K
2 SLC02 48.24 1.65 797.36 Calculated 16.5 O.K
3 SLC03 48.24 1.65 797.37 Calculated 16.5 O.K
4 SLC04 7.43 1.65 555.54 Calculated 74.7 O.K
5 SLC05 279.98 1.65 619.15 Calculated 2.2 O.K
6 SLC06 34.25 1.65 556.42 Calculated 16.2 O.K
7 SLC07 96.99 1.65 574.72 Calculated 5.9 O.K
8 SLC08 12.21 1.65 711.08 Calculated 58.3 O.K
9 SLC09 216.61 1.65 758.78 Calculated 3.5 O.K
10 SLC10 32.32 1.65 711.73 Calculated 22.0 O.K
11 SLC11 79.38 1.65 725.46 Calculated 9.1 O.K
12 SLC12 4.46 1.65 333.33 Calculated 74.7 O.K
13 SLC13 277.00 1.65 396.94 Calculated 1.4 O.K
14 SLC14 31.28 1.65 334.20 Calculated 10.7 O.K
15 SLC15 94.02 1.65 352.50 Calculated 3.8 O.K

Page 104 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

9.2.3 Foundatoin Settlement Check

- Detail settlement check to be included in Soil Improvement Design Report.

Page 105 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

9.3 Member Design

In line with that, this section is focused on seeking where greater or lesser values than (±)ΦMn are using
the stress contour range in MIDAS Program, then adding supplementary rebar where required, checking that the stress
resultant output is not greater or lesser than revised design moment (±)ΦMn any more (where, the sign (+) means
tension stress in bottom and (-) in top of concrete foundation) and verifying no need of reinforcing bar.
The moment and shear force was determined on the basis of critical section.
Case of occurs stress is concentrated, it is unsuitable for use as a design value.
Thus, using the average value of the near stress

9.3.1 Footing THK. 500mm

1. Calculation Result for Member Design - Factored Load Case

- Mxx (Max.)

X
Z

Value
(kN·m/m)
19.50

Page 106 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Mxx (Min.)

X
Z

Value
(kN·m/m)
83.87

Page 107 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Max.)

X
Z

Value
(kN·m/m)
21.67

Page 108 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Min.)

X
Z

Value
(kN·m/m)
8.86

Page 109 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Vxx (ABS Max.)

X
Z

Value
(kN/m)
123.52

Page 110 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Vyy (ABS Max.)

X
Z

Value
(kN/m)
77.83

Page 111 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2. Calculation Result for Crack Check - Unfactored Load Case

- Mxx (Max.)

X
Z

Value
(kN·m/m)
15.16

Page 112 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Mxx (Min.)

X
Z

Value
(kN·m/m)
67.15

Page 113 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Max.)

X
Z

Value
(kN·m/m)
14.06

Page 114 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Min.)

X
Z

Value
(kN·m/m)
7.32

Page 115 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3. Calculation Result Summary

angle of main axis l f i

Factored Condition Unfactored Condition


Mxx Myy Vxx Vyy Mxx Myy
Classification
(kN·m/m) (kN·m/m) (kN/m) (kN/m) (kN·m/m) (kN·m/m)
Bottom 19.50 21.67 15.16 14.06
123.52 77.83
Top 83.87 8.86 67.15 7.32

4. Rebar Design (Bottom Rebar)

1) X Direction

Mu = 19.500 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 15.160 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 123.520 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

1.1) Rebar Design


Mu 19.50 x 10 6
Required Rn = = 2
= 0.12 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.12


= 1 - 1 -
420 0.85 x 37.5

= 0.0003

As(req.) = ρ x b x d = 0.0003 x 1000 x 417 = 126


mm²
As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450
mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 126 = 168 mm²

Use As = 450 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

Page 116 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 123.52 kN ∴ NO USE STIRRUP

1.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 15.16 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 38.30 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 2590.86 mm
Rs2 = 300 (280 / fs) = 2193.44 mm
Rs = Min.(Rs1, Rs2) = 2193.4 mm > 200 mm ∴ O.K !

1.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.06 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 117 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Y Direction

Mu = 21.670 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 14.060 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 77.830 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

2.1) Rebar Design


Mu 21.67 x 10 6
Required Rn = = 2
= 0.14 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.14


= 1 - 1 -
420 0.85 x 37.5

= 0.0003

As(req.) = ρ x b x d = 0.0003 x 1000 x 417 = 126 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 126 = 168 mm²

Use As = 450 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

2.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 77.83 kN ∴ NO USE STIRRUP

Page 118 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 14.06 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 35.52 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 2808.23 mm
Rs2 = 300 (280 / fs) = 2365.05 mm
Rs = Min.(Rs1, Rs2) = 2365.0 mm > 200 mm ∴ O.K !

2.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.05 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 119 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

5. Rebar Design (Top Rebar)

1) X Direction

Mu = 83.870 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 67.150 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 123.520 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

1.1) Rebar Design


Mu 83.87 x 10 6
Required Rn = = 2
= 0.54 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.54


= 1 - 1 -
420 0.85 x 37.5

= 0.0013

As(req.) = ρ x b x d = 0.0013 x 1000 x 417 = 543 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 543 = 724 mm²

Use As = 724 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

1.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 123.52 kN ∴ NO USE STIRRUP

Page 120 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 67.15 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 169.63 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 439.75 mm
Rs2 = 300 (280 / fs) = 495.20 mm
Rs = Min.(Rs1, Rs2) = 439.8 mm > 200 mm ∴ O.K !

1.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.26 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 121 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Y Direction

Mu = 8.860 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 7.320 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 77.830 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

2.1) Rebar Design


Mu 8.86 x 10 6
Required Rn = = 2
= 0.06 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.06


= 1 - 1 -
420 0.85 x 37.5

= 0.0001

As(req.) = ρ x b x d = 0.0001 x 1000 x 417 = 42 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 42 = 56 mm²

Use As = 450 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

2.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 77.83 kN ∴ NO USE STIRRUP

Page 122 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 7.32 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 18.49 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 5566.59 mm
Rs2 = 300 (280 / fs) = 4542.70 mm
Rs = Min.(Rs1, Rs2) = 4542.7 mm > 200 mm ∴ O.K !

2.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.03 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 123 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

9.3.2 Pedestal Design

1. 400 X 600

1) Design Forces
Unit : kN·m
Combinations Part Pu Vux Vuy Mux Muy
I 77.126 4.802 10.010 25.344 5.522
ULC01
J 67.466 4.802 10.010 13.832 0.000
I 125.816 85.460 10.372 22.000 98.279
ULC02
J 117.536 85.460 10.372 10.072 0.000
I 125.660 14.764 15.028 39.366 -16.979
ULC03
J 117.380 14.764 15.028 22.084 0.000
I 103.328 7.976 11.890 30.070 9.172
ULC04
J 95.048 7.976 11.890 16.396 0.000
I 66.108 4.116 8.580 21.723 4.733
ULC05
J 57.828 4.116 8.580 11.856 0.000
I 5.116 6.996 7.444 18.881 -8.045
ULC06
J -3.164 6.996 7.444 10.320 0.000
I 103.328 7.976 11.890 30.070 9.172
ULC07
J 95.048 7.976 11.890 16.396 0.000
I -18.656 14.248 9.618 24.385 -16.385
ULC08
J -26.936 14.248 9.618 13.324 0.000
I 96.198 7.686 18.060 53.055 8.839
ULC09
J 87.918 7.686 18.060 32.286 0.000
I 77.178 3.356 10.960 27.740 3.859
ULC10
J 68.898 3.356 10.960 15.136 0.000
I 31.356 2.277 2.583 6.525 2.619
ULC11
J 25.146 2.277 2.583 3.555 0.000
I -90.628 19.947 0.311 0.841 -22.939
ULC12
J -96.838 19.947 0.311 0.483 0.000
I 24.226 1.987 8.753 29.511 2.285
ULC13
J 18.016 1.987 8.753 19.445 0.000
I 5.206 2.343 1.653 4.196 -2.694
ULC14
J -1.004 2.343 1.653 2.295 0.000
Pu max 125.816 85.460 18.060 22.000 98.279
Pu min -96.838 85.460 18.060 0.483 0.000
Applied Loads
Mux max 96.198 85.460 18.060 53.055 8.839
Muy max 125.816 85.460 18.060 22.000 98.279

- Description
I : Pedestal Lower
J : Pedestal Top

Page 124 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Rebar Design

Page 125 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3) Pedestal Punching Shear Check

Max. Column Load (Pu) - : 260.32 kN


Compressive strength of con'c : 37.50 Mpa
Yield strength of reinforcement : 420.00 Mpa
con'c cover : 7.50 cm
Strength reduction factor : 0.75

h1 = 50.00 cm = 500.00 mm
PB = 0.40 m = 400.00 mm PL = 0.60 m = 600.00 mm

d = h1 - con'c cover = 417.00 mm

209 600 209 Unit : mm

209
400
209

2
ΦVc = 0.75 x 0.17 x + 1 x fck x b0 x d
βC
= 2786557.35 N = 2786.56 kN
αSd
ΦVc = 0.75 x 0.083 x + 2 x fck x b0 x d
b0
= 3817611.41 N = 3817.61 kN
ΦVc = 0.75 x 0.33 x fck x b 0 x d
= 2318228.38 N = 2318.23 kN
βC = 1.50 : Ratio of long side to short side of concentrated load or reaction area
bO = 3668 : Perimeter of critical (mm)
αS = 40 : Interior columns Applied
= 30 : Edge columns
= 20 : Corner columns

ΦVc(MIN) = 2318.23 kN > Vu = 260.32 kN ∴ O.K

Page 126 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

Page 127 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

10. TYPE - F5

10.1 Plan & Section

3300

500

2300
700

900 1500 900

150

4800

500

3300

Part Dim. Unit weight Total weight


FB 3300 mm
Foundation FH 2300 mm 25 kN/m3 94.88 kN
FD 500 mm
PB 700 mm
Pedestal
PH 500 mm 25 kN/m3 86.63 kN
(2EA)
PD 4950 mm
Soil SD 4800 mm 18 kN/m3 595.296 kN

Page 128 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

10.2 Stability Check

10.2.1 Soil Bearing Check

LOAD COM Qa Reaction Qu


Check Remark
CASE (kN/m2) (kN) (kN/m2)
1 SLC01 150.000 867.078 114.24 O.K
Normal Operating
2 SLC02 150.000 1023.609 134.86 O.K
Case (Long Term)
3 SLC03 150.000 1030.556 135.78 O.K
4 SLC04 200.000 867.078 114.24 O.K
5 SLC05 200.000 782.056 103.04 O.K
6 SLC06 200.000 862.384 113.62 O.K
7 SLC07 200.000 840.013 110.67 O.K
8 SLC08 200.000 987.081 130.05 O.K
9 SLC09 200.000 923.315 121.65 O.K Wind & Seismic
10 SLC10 200.000 983.561 129.59 O.K Case (Shot Term)
11 SLC11 200.000 966.783 127.38 O.K
12 SLC12 200.000 520.247 68.54 O.K
13 SLC13 200.000 435.225 57.34 O.K
14 SLC14 200.000 515.553 67.93 O.K
15 SLC15 200.000 493.182 64.98 O.K

10.2.2 Sliding & Overturning Check

1) Load Table (From Steel Structure)


Unit : kN·m
Node Load Case FX FY FZ MX MY
Con'c self weight 0.00 0.00 181.50 0.00 0.00
Dead Soil Weight 0.00 0.00 595.30 0.00 0.00
Rack Dead -0.31 -5.47 64.43 0.00 3.11
Surcharge 0.00 0.00 34.45 0.00 0.00
Live LL -0.45 -4.46 89.22 0.00 3.17
CB3-04, Sub Total -0.45 -4.46 123.67 0.00 3.17
CB3-C X -0.28 0.21 -1.32 0.00 -1.34
Wind
Y 0.35 21.56 -85.02 0.00 1.17
X 5.63 -0.54 3.78 0.00 25.34
Seismic
Y 0.22 8.39 -36.36 0.00 0.38
+ 2.44 -43.11 -3.47 0.00 11.55
Temp
- -2.44 43.11 3.47 0.00 -11.55
Rack Dead -3.69 0.00 25.85 0.00 0.00
Dead
Sub Total -3.69 0.00 25.85 0.00 0.00
LL -3.56 0.00 36.33 0.00 0.00
Live
Sub Total -3.56 0.00 36.33 0.00 0.00
CB3-04, X 4.04 0.00 12.88 0.00 0.00
Wind
CB3-B Y 0.00 0.00 0.00 0.00 0.00
X 3.78 0.00 -10.48 0.00 0.00
Seismic
Y 0.29 4.58 -2.30 -21.41 0.00
+ -26.95 -0.35 0.00 1.69 0.00
Temp
- 26.95 0.35 0.00 -1.69 0.00

Page 129 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Sliding Check X-Direction

- Safe Factor of Sliding 2.0 (from Civil Design Criteria)


- Safe Factor of Sliding 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)
- Friction Factor of Concrete to Soil 0.4 (from Civil Design Criteria)

LOAD COM Sliding Force Resisting Friction Safety


Check
CASE (kN) Force (kN) Factor Factor
1 SLC01 0.00 346.83 0.4 N/A O.K
2 SLC02 28.52 409.44 0.4 14.4 O.K
3 SLC03 20.51 412.22 0.4 20.1 O.K
4 SLC04 3.76 351.46 0.4 93.4 O.K
5 SLC05 0.35 312.82 0.4 885.9 O.K
6 SLC06 6.58 344.95 0.4 52.4 O.K
7 SLC07 0.36 336.01 0.4 942.6 O.K
8 SLC08 0.18 398.30 0.4 2178.3 O.K
9 SLC09 2.74 369.33 0.4 134.8 O.K
10 SLC10 1.93 393.42 0.4 203.7 O.K
11 SLC11 2.74 386.71 0.4 141.2 O.K
12 SLC12 3.76 212.72 0.4 56.5 O.K
13 SLC13 0.35 174.09 0.4 493.0 O.K
14 SLC14 6.58 206.22 0.4 31.3 O.K
15 SLC15 0.36 197.27 0.4 553.4 O.K

3) Sliding Check Y-Direction

- Safe Factor of Sliding 2.0 (from Civil Design Criteria)


- Safe Factor of Sliding 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)
- Friction Factor of Concrete to Soil 0.4 (from Civil Design Criteria)

LOAD COM Sliding Force Resisting Friction Safety


Check
CASE (kN) Force (kN) Factor Factor
1 SLC01 5.47 346.83 0.4 63.4 O.K
2 SLC02 53.38 409.44 0.4 7.7 O.K
3 SLC03 33.53 412.22 0.4 12.3 O.K
4 SLC04 5.47 346.83 0.4 63.4 O.K
5 SLC05 16.09 312.82 0.4 19.5 O.K
6 SLC06 5.84 344.95 0.4 59.0 O.K
7 SLC07 3.61 336.01 0.4 93.1 O.K
8 SLC08 8.81 394.83 0.4 44.8 O.K
9 SLC09 7.36 369.33 0.4 50.2 O.K
10 SLC10 9.09 393.42 0.4 43.3 O.K
11 SLC11 2.00 386.71 0.4 193.2 O.K
12 SLC12 3.28 208.10 0.4 63.4 O.K
13 SLC13 18.27 174.09 0.4 9.5 O.K
14 SLC14 3.66 206.22 0.4 56.4 O.K
15 SLC15 5.80 197.27 0.4 34.0 O.K

Page 130 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

4) Overturing Check X-Direction

- Safe Factor of Overturning 2.0 (from Civil Design Criteria)


- Safe Factor of Overturning 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)

Overturning Overturning Resisting Resisting


LOAD COM Safety
Moment ARM Moment ARM Check
CASE Factor
(kN·m) (m) (kN·m) (m)
1 SLC01 3.11 5.45 1468.64 Calculated 472.7 O.K
2 SLC02 39.79 5.45 1953.60 Calculated 49.1 O.K
3 SLC03 153.16 5.45 1840.23 Calculated 12.0 O.K
4 SLC04 28.43 5.45 1484.38 Calculated 52.2 O.K
5 SLC05 218.76 5.45 1468.64 Calculated 6.7 O.K
6 SLC06 64.06 5.45 1475.26 Calculated 23.0 O.K
7 SLC07 70.55 5.45 1468.64 Calculated 20.8 O.K
8 SLC08 24.47 5.45 1734.00 Calculated 70.9 O.K
9 SLC09 167.22 5.45 1722.19 Calculated 10.3 O.K
10 SLC10 51.20 5.45 1727.15 Calculated 33.7 O.K
11 SLC11 56.07 5.45 1722.19 Calculated 30.7 O.K
12 SLC12 27.19 5.45 896.92 Calculated 33.0 O.K
13 SLC13 217.52 5.45 881.19 Calculated 4.1 O.K
14 SLC14 62.82 5.45 887.80 Calculated 14.1 O.K
15 SLC15 69.31 5.45 881.19 Calculated 12.7 O.K

5) Overturing Check Y-Direction

- Safe Factor of Overturning 2.0 (from Civil Design Criteria)


- Safe Factor of Overturning 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)

Overturning Overturning Resisting Resisting


LOAD COM Safety
Moment ARM Moment ARM Check
CASE Factor
(kN·m) (m) (kN·m) (m)
1 SLC01 0.00 5.45 1013.40 Calculated N/A O.K
2 SLC02 3.47 5.45 1441.40 Calculated 415.0 O.K
3 SLC03 238.53 5.45 1206.34 Calculated 5.1 O.K
4 SLC04 2.44 5.45 1026.28 Calculated 420.6 O.K
5 SLC05 202.50 5.45 1013.40 Calculated 5.0 O.K
6 SLC06 7.34 5.45 1018.10 Calculated 138.7 O.K
7 SLC07 91.53 5.45 1013.40 Calculated 11.1 O.K
8 SLC08 1.83 5.45 1165.16 Calculated 636.7 O.K
9 SLC09 151.88 5.45 1155.50 Calculated 7.6 O.K
10 SLC10 5.50 5.45 1159.02 Calculated 210.6 O.K
11 SLC11 68.65 5.45 1155.50 Calculated 16.8 O.K
12 SLC12 2.44 5.45 620.92 Calculated 254.5 O.K
13 SLC13 202.50 5.45 608.04 Calculated 3.0 O.K
14 SLC14 7.34 5.45 612.73 Calculated 83.5 O.K
15 SLC15 91.53 5.45 608.04 Calculated 6.6 O.K

Page 131 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

10.2.3 Foundatoin Settlement Check

- Detail settlement check to be included in Soil Improvement Design Report.

Page 132 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

10.3 Member Design

In line with that, this section is focused on seeking where greater or lesser values than (±)ΦMn are using
the stress contour range in MIDAS Program, then adding supplementary rebar where required, checking that the stress
resultant output is not greater or lesser than revised design moment (±)ΦMn any more (where, the sign (+) means
tension stress in bottom and (-) in top of concrete foundation) and verifying no need of reinforcing bar.
The moment and shear force was determined on the basis of critical section.
Case of occurs stress is concentrated, it is unsuitable for use as a design value.
Thus, using the average value of the near stress

10.3.1 Footing THK. 500mm

1. Calculation Result for Member Design - Factored Load Case

- Mxx (Max.)

X
Z

Value
(kN·m/m)
92.60

Page 133 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Mxx (Min.)

X
Z

Value
(kN·m/m)
38.77

Page 134 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Max.)

X
Z

Value
(kN·m/m)
136.26

Page 135 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Min.)

X
Z

Value
(kN·m/m)
82.24

Page 136 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Vxx (ABS Max.)

X
Z

Value
(kN/m)
219.81

Page 137 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Vyy (ABS Max.)

X
Z

Value
(kN/m)
491.18
491.18
158.18
158.18
Average
324.68

Page 138 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2. Calculation Result for Crack Check - Unfactored Load Case

- Mxx (Max.)

X
Z

Value
(kN·m/m)
74.11

Page 139 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Mxx (Min.)

X
Z

Value
(kN·m/m)
35.07

Page 140 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Max.)

X
Z

Value
(kN·m/m)
108.23

Page 141 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Min.)

X
Z

Value
(kN·m/m)
67.77

Page 142 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3. Calculation Result Summary

angle of main axis l f i

Factored Condition Unfactored Condition


Mxx Myy Vxx Vyy Mxx Myy
Classification
(kN·m/m) (kN·m/m) (kN/m) (kN/m) (kN·m/m) (kN·m/m)
Bottom 92.60 136.26 74.11 108.23
219.81 324.68
Top 38.77 82.24 35.07 67.77

4. Rebar Design (Bottom Rebar)

1) X Direction

Mu = 92.600 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 74.110 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 219.810 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

1.1) Rebar Design


Mu 92.60 x 10 6
Required Rn = = 2
= 0.59 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.59


= 1 - 1 -
420 0.85 x 37.5

= 0.0014

As(req.) = ρ x b x d = 0.0014 x 1000 x 417 = 584


mm²
As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450
mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 584 = 779 mm²

Use As = 779 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

Page 143 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 219.81 kN ∴ NO USE STIRRUP

1.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 74.11 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 187.21 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 380.84 mm
Rs2 = 300 (280 / fs) = 448.69 mm
Rs = Min.(Rs1, Rs2) = 380.8 mm > 200 mm ∴ O.K !

1.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.28 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 144 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Y Direction

Mu = 136.260 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 108.230 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 324.680 kN/m , d = 415 mm , Φb = 0.90 , βc = 0.78

2.1) Rebar Design


Mu 136.26 x 10 6
Required Rn = = 2
= 0.88 N/mm2
φbd² 0.90 x 1000 x 415

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.88


= 1 - 1 -
420 0.85 x 37.5

= 0.0021

As(req.) = ρ x b x d = 0.0021 x 1000 x 415 = 872 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 415 = 1383 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 415 = 1513 mm²
4/3 As(req.) = 4 / 3 x 872 = 1163 mm²

Use As = 1163 mm²

∴USE : D 20 @ 200 ( As = 1571.0 mm² ) ∴O.K !

2.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 415
= 318 kN ≤ VU = 324.68 kN ∴ REQUIRED STIRRUP

Page 145 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 108.23 kN.m/m


As = 15.7 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 15.71 / ( 100 x 41.50 ) = 0.0038
2
k = - ρn + √{ 2ρn +(ρn) } = 0.205
x =kd = 85.2 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 178.20 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 409.59 mm
Rs2 = 300 (280 / fs) = 471.39 mm
Rs = Min.(Rs1, Rs2) = 409.6 mm > 200 mm ∴ O.K !

2.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.251
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.28 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 146 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

5. Rebar Design (Top Rebar)

1) X Direction

Mu = 38.770 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 35.070 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 219.810 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

1.1) Rebar Design


Mu 38.77 x 10 6
Required Rn = = 2
= 0.25 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.25


= 1 - 1 -
420 0.85 x 37.5

= 0.0006

As(req.) = ρ x b x d = 0.0006 x 1000 x 417 = 251 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 251 = 335 mm²

Use As = 450 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

1.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 219.81 kN ∴ NO USE STIRRUP

Page 147 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 35.07 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 88.59 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 1013.53 mm
Rs2 = 300 (280 / fs) = 948.18 mm
Rs = Min.(Rs1, Rs2) = 948.2 mm > 200 mm ∴ O.K !

1.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.13 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 148 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Y Direction

Mu = 82.240 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 67.770 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 324.680 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

2.1) Rebar Design


Mu 82.24 x 10 6
Required Rn = = 2
= 0.53 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.53


= 1 - 1 -
420 0.85 x 37.5

= 0.0013

As(req.) = ρ x b x d = 0.0013 x 1000 x 417 = 543 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 543 = 724 mm²

Use As = 724 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

2.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN ≤ VU = 324.68 kN ∴ REQUIRED STIRRUP

Page 149 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 67.77 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 171.20 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 434.01 mm
Rs2 = 300 (280 / fs) = 490.67 mm
Rs = Min.(Rs1, Rs2) = 434.0 mm > 200 mm ∴ O.K !

2.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.26 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 150 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

10.3.2 Pedestal Design

1. 500 X 700

1) Design Forces
Unit : kN·m
Combinations Part Pu Vux Vuy Mux Muy
I 174.094 7.658 0.224 6.309 37.907
ULC01
J 113.456 7.658 0.224 5.502 3.431
I 223.539 65.688 2.008 33.292 325.156
ULC02
J 171.564 65.688 2.008 23.352 5.188
I 231.771 37.776 3.704 22.079 186.991
ULC03
J 179.796 37.776 3.704 6.516 5.437
I 198.243 11.184 0.602 7.184 55.361
ULC04
J 146.268 11.184 0.602 7.896 4.423
I 148.175 6.396 0.424 5.370 31.660
ULC05
J 96.200 6.396 0.424 3.604 2.909
I 79.871 11.428 0.080 6.016 56.569
ULC06
J 27.896 11.428 0.080 5.620 0.844
I 196.147 10.848 1.066 7.108 53.698
ULC07
J 144.172 10.848 1.066 5.672 4.360
I 59.539 24.800 0.058 9.417 122.760
ULC08
J 7.564 24.800 0.058 9.704 0.229
I 196.993 10.864 5.028 58.405 53.777
ULC09
J 145.018 10.864 5.028 33.516 4.385
I 165.093 3.284 0.412 6.167 16.256
ULC10
J 113.118 3.284 0.412 8.206 3.421
I 81.255 3.156 0.770 4.326 15.622
ULC11
J 42.274 3.156 0.770 1.532 1.278
I -55.353 32.492 0.238 4.696 -160.835
ULC12
J -94.334 32.492 0.238 3.518 0.000
I 82.101 3.172 5.324 53.684 15.701
ULC13
J 43.120 3.172 5.324 27.330 1.304
I 50.201 4.408 0.116 1.819 21.820
ULC14
J 11.220 4.408 0.116 2.020 0.339
Pu max 231.771 65.688 5.324 22.079 186.991
Pu min -94.334 65.688 5.324 3.518 0.000
Applied Loads
Mux max 196.993 65.688 5.324 58.405 53.777
Muy max 223.539 65.688 5.324 33.292 325.156

- Description
I : Pedestal Lower
J : Pedestal Top

Page 151 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Rebar Design

Page 152 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3) Pedestal Punching Shear Check

Max. Column Load (Pu) - : 276.21 kN


Compressive strength of con'c : 37.50 Mpa
Yield strength of reinforcement : 420.00 Mpa
con'c cover : 7.50 cm
Strength reduction factor : 0.75

h1 = 50.00 cm = 500.00 mm
PB = 0.50 m = 500.00 mm PL = 0.70 m = 700.00 mm

d = h1 - con'c cover = 417.00 mm

209 700 209 Unit : mm

209
500
209

2
ΦVc = 0.75 x 0.17 x + 1 x fck x b0 x d
βC
= 3216575.13 N = 3216.58 kN
αSd
ΦVc = 0.75 x 0.083 x + 2 x fck x b0 x d
b0
= 3944780.34 N = 3944.78 kN
ΦVc = 0.75 x 0.33 x fck x b 0 x d
= 2571034.10 N = 2571.03 kN
βC = 1.40 : Ratio of long side to short side of concentrated load or reaction area
bO = 4068 : Perimeter of critical (mm)
αS = 40 : Interior columns Applied
= 30 : Edge columns
= 20 : Corner columns

ΦVc(MIN) = 2571.03 kN > Vu = 276.21 kN ∴ O.K

Page 153 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

Page 154 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

11. TYPE - F6

11.1 Plan & Section

2300

700
2300

500

150

4800

500

2300

Part Dim. Unit weight Total weight


FB 2300 mm
Foundation FH 2300 mm 25 kN/m3 66.13 kN
FD 500 mm
PB 700 mm
Pedestal
PH 500 mm 25 kN/m3 43.31 kN
(1EA)
PD 4950 mm
Soil SD 4800 mm 18 kN/m3 426.816 kN

Page 155 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

11.2 Stability Check

11.2.1 Soil Bearing Check

LOAD COM Qa Reaction Qu


Check Remark
CASE (kN/m2) (kN) (kN/m2)
1 SLC01 150.000 620.903 117.37 O.K
Normal Operating
2 SLC02 150.000 696.472 131.66 O.K
Case (Long Term)
3 SLC03 150.000 685.106 129.51 O.K
4 SLC04 200.000 620.903 117.37 O.K
5 SLC05 200.000 719.846 136.08 O.K
6 SLC06 200.000 629.650 119.03 O.K
7 SLC07 200.000 646.281 122.17 O.K
8 SLC08 200.000 673.318 127.28 O.K
9 SLC09 200.000 747.525 141.31 O.K Wind & Seismic
10 SLC10 200.000 679.878 128.52 O.K Case (Shot Term)
11 SLC11 200.000 692.351 130.88 O.K
12 SLC12 200.000 372.542 70.42 O.K
13 SLC13 200.000 471.485 89.13 O.K
14 SLC14 200.000 381.289 72.08 O.K
15 SLC15 200.000 397.920 75.22 O.K

Page 156 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

11.2.2 Sliding & Overturning Check

1) Load Table (From Steel Structure)

Unit : kN·m
Node Load Case FX FY FZ MX MY
Con'c self weight 0.00 0.00 109.44 0.00 0.00
Dead Soil Weight 0.00 0.00 426.82 0.00 0.00
Rack Dead 11.32 7.01 84.65 0.00 19.42
Surcharge 0.00 0.00 24.70 0.00 0.00
Live LL 9.52 5.56 45.19 0.00 17.00
CB3-02, Sub Total 9.52 5.56 69.89 0.00 17.00
CB3-C X -1.49 0.11 0.35 0.00 -2.97
Wind
Y -0.71 22.97 98.94 0.00 0.18
X 21.66 1.00 12.50 0.00 44.32
Seismic
Y -0.57 8.38 36.25 0.00 -0.63
+ 9.41 43.96 5.68 0.00 19.53
Temp
- -9.41 -43.96 -5.68 0.00 -19.53

- Consider Passive Earth Pressure

Coefficient of Passive Earth Pressure kp = 3


Unit Weight of Soil rs = 18.0 kN/m3
Depth of Foundation h1 = 4.8 m
Depth of Foundation h2 = 5.3 m
Width of Foundation (X dir.) bx = 2.3 m
h
Width of Foundation (Y dir.) by = 2.3 m

Pp = 1/2 x kp x rs x h 2 x b

Ppx = ( 0.5 x 3 x 18.0 x 5.3 ^2 x 2.3 )


- ( 0.5 x 3 x 18.0 x 4.8 ^2 x 2.3 ) = 313.61 kN
Ppy = ( 0.5 x 3 x 18.0 x 5.3 ^2 x 2.3 )
- ( 0.5 x 3 x 18.0 x 4.8 ^2 x 2.3 ) = 313.61 kN

Page 157 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Sliding Check X-Direction

- Safe Factor of Sliding 2.0 (from Civil Design Criteria)


- Safe Factor of Sliding 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)
- Friction Factor of Concrete to Soil 0.4 (from Civil Design Criteria)

LOAD COM Sliding Force Resisting Friction Safety


Check
CASE (kN) Force (kN) Factor Factor
1 SLC01 0.00 561.97 0.4 N/A O.K
2 SLC02 18.93 592.19 0.4 31.3 O.K
3 SLC03 0.11 587.65 0.4 5454.7 O.K
4 SLC04 1.49 562.11 0.4 378.0 O.K
5 SLC05 0.71 601.54 0.4 842.3 O.K
6 SLC06 15.16 565.46 0.4 37.3 O.K
7 SLC07 0.40 572.12 0.4 1439.5 O.K
8 SLC08 6.03 583.04 0.4 96.8 O.K
9 SLC09 6.61 612.61 0.4 92.8 O.K
10 SLC10 18.51 585.56 0.4 31.6 O.K
11 SLC11 6.84 590.55 0.4 86.3 O.K
12 SLC12 1.49 462.76 0.4 311.2 O.K
13 SLC13 0.71 502.20 0.4 703.2 O.K
14 SLC14 15.16 466.12 0.4 30.8 O.K
15 SLC15 0.40 472.77 0.4 1189.6 O.K

3) Sliding Check Y-Direction

- Safe Factor of Sliding 2.0 (from Civil Design Criteria)


- Safe Factor of Sliding 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)
- Friction Factor of Concrete to Soil 0.4 (from Civil Design Criteria)

LOAD COM Sliding Force Resisting Friction Safety


Check
CASE (kN) Force (kN) Factor Factor
1 SLC01 7.01 561.97 0.4 80.2 O.K
2 SLC02 56.52 592.19 0.4 10.5 O.K
3 SLC03 31.40 587.65 0.4 18.7 O.K
4 SLC04 7.01 561.97 0.4 80.2 O.K
5 SLC05 29.97 601.54 0.4 20.1 O.K
6 SLC06 7.70 565.46 0.4 73.4 O.K
7 SLC07 12.87 572.12 0.4 44.4 O.K
8 SLC08 11.17 582.93 0.4 52.2 O.K
9 SLC09 28.40 612.61 0.4 21.6 O.K
10 SLC10 11.70 585.56 0.4 50.1 O.K
11 SLC11 15.57 590.55 0.4 37.9 O.K
12 SLC12 4.20 462.62 0.4 110.1 O.K
13 SLC13 27.17 502.20 0.4 18.5 O.K
14 SLC14 4.90 466.12 0.4 95.1 O.K
15 SLC15 10.07 472.77 0.4 47.0 O.K

Page 158 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

4) Overturing Check X-Direction

- Safe Factor of Overturning 2.0 (from Civil Design Criteria)


- Safe Factor of Overturning 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)

Overturning Overturning Resisting Resisting


LOAD COM Safety
Moment ARM Moment ARM Check
CASE Factor
(kN·m) (m) (kN·m) (m)
1 SLC01 19.42 5.45 714.04 Calculated 36.8 O.K
2 SLC02 159.14 5.45 800.94 Calculated 5.0 O.K
3 SLC03 94.84 5.45 865.24 Calculated 9.1 O.K
4 SLC04 19.42 5.45 725.52 Calculated 37.4 O.K
5 SLC05 19.60 5.45 831.72 Calculated 42.4 O.K
6 SLC06 133.06 5.45 724.10 Calculated 5.4 O.K
7 SLC07 19.42 5.45 745.83 Calculated 38.4 O.K
8 SLC08 71.09 5.45 782.93 Calculated 11.0 O.K
9 SLC09 71.22 5.45 862.57 Calculated 12.1 O.K
10 SLC10 156.32 5.45 781.86 Calculated 5.0 O.K
11 SLC11 71.09 5.45 798.16 Calculated 11.2 O.K
12 SLC12 11.65 5.45 439.91 Calculated 37.8 O.K
13 SLC13 11.83 5.45 546.10 Calculated 46.2 O.K
14 SLC14 125.29 5.45 438.48 Calculated 3.5 O.K
15 SLC15 11.65 5.45 460.21 Calculated 39.5 O.K

5) Overturing Check Y-Direction

- Safe Factor of Overturning 2.0 (from Civil Design Criteria)


- Safe Factor of Overturning 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)

Overturning Overturning Resisting Resisting


LOAD COM Safety
Moment ARM Moment ARM Check
CASE Factor
(kN·m) (m) (kN·m) (m)
1 SLC01 38.18 5.45 714.04 Calculated 18.70 O.K
2 SLC02 308.05 5.45 800.94 Calculated 2.6 O.K
3 SLC03 75.00 5.45 1033.99 Calculated 13.8 O.K
4 SLC04 38.79 5.45 714.45 Calculated 18.4 O.K
5 SLC05 163.35 5.45 827.82 Calculated 5.1 O.K
6 SLC06 41.99 5.45 724.10 Calculated 17.3 O.K
7 SLC07 70.16 5.45 743.22 Calculated 10.6 O.K
8 SLC08 61.35 5.45 774.62 Calculated 12.6 O.K
9 SLC09 154.77 5.45 859.65 Calculated 5.6 O.K
10 SLC10 63.75 5.45 781.86 Calculated 12.3 O.K
11 SLC11 84.87 5.45 796.20 Calculated 9.4 O.K
12 SLC12 23.52 5.45 428.83 Calculated 18.2 O.K
13 SLC13 148.07 5.45 542.21 Calculated 3.7 O.K
14 SLC14 26.71 5.45 438.48 Calculated 16.4 O.K
15 SLC15 54.88 5.45 457.61 Calculated 8.3 O.K

Page 159 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

11.2.3 Foundatoin Settlement Check

- Detail settlement check to be included in Soil Improvement Design Report.

Page 160 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

11.3 Member Design

In line with that, this section is focused on seeking where greater or lesser values than (±)ΦMn are using
the stress contour range in MIDAS Program, then adding supplementary rebar where required, checking that the stress
resultant output is not greater or lesser than revised design moment (±)ΦMn any more (where, the sign (+) means
tension stress in bottom and (-) in top of concrete foundation) and verifying no need of reinforcing bar.
The moment and shear force was determined on the basis of critical section.
Case of occurs stress is concentrated, it is unsuitable for use as a design value.
Thus, using the average value of the near stress

11.3.1 Footing THK. 500mm

1. Calculation Result for Member Design - Factored Load Case

- Mxx (Max.)

X
Z

Value
(kN·m/m)
96.07

Page 161 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Mxx (Min.)

X
Z

Value
(kN·m/m)
65.28

Page 162 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Max.)

X
Z

Value
(kN·m/m)
109.49

Page 163 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Min.)

X
Z

Value
(kN·m/m)
77.25

Page 164 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Vxx (ABS Max.)

X
Z

Value
(kN/m)
381.65
223.18
Average
302.42

Page 165 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Vyy (ABS Max.)

X
Z

Value
(kN/m)
383.57
218.14
Average
300.86

Page 166 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2. Calculation Result for Crack Check - Unfactored Load Case

- Mxx (Max.)

X
Z

Value
(kN·m/m)
74.24

Page 167 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Mxx (Min.)

X
Z

Value
(kN·m/m)
50.78

Page 168 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Max.)

X
Z

Value
(kN·m/m)
86.22
48.44
Average
67.33

Page 169 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Min.)

X
Z

Value
(kN·m/m)
61.65

Page 170 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3. Calculation Result Summary

angle of main axis l f i

Factored Condition Unfactored Condition


Mxx Myy Vxx Vyy Mxx Myy
Classification
(kN·m/m) (kN·m/m) (kN/m) (kN/m) (kN·m/m) (kN·m/m)
Bottom 96.07 109.49 74.24 67.33
302.42 300.86
Top 65.28 77.25 50.78 61.65

4. Rebar Design (Bottom Rebar)

1) X Direction

Mu = 96.070 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 74.240 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 302.415 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

1.1) Rebar Design


Mu 96.07 x 10 6
Required Rn = = 2
= 0.61 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.61


= 1 - 1 -
420 0.85 x 37.5

= 0.0015

As(req.) = ρ x b x d = 0.0015 x 1000 x 417 = 626


mm²
As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450
mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 626 = 835 mm²

Use As = 835 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

Page 171 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 302.42 kN ∴ NO USE STIRRUP

1.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 74.24 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 187.54 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 379.85 mm
Rs2 = 300 (280 / fs) = 447.91 mm
Rs = Min.(Rs1, Rs2) = 379.8 mm > 200 mm ∴ O.K !

1.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.28 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 172 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Y Direction

Mu = 109.490 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 67.330 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 300.855 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

2.1) Rebar Design


Mu 109.49 x 10 6
Required Rn = = 2
= 0.70 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.70


= 1 - 1 -
420 0.85 x 37.5

= 0.0017

As(req.) = ρ x b x d = 0.0017 x 1000 x 417 = 709 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 709 = 945 mm²

Use As = 945 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

2.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 300.86 kN ∴ NO USE STIRRUP

Page 173 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 67.33 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 170.08 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 438.07 mm
Rs2 = 300 (280 / fs) = 493.87 mm
Rs = Min.(Rs1, Rs2) = 438.1 mm > 200 mm ∴ O.K !

2.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.26 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 174 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

5. Rebar Design (Top Rebar)

1) X Direction

Mu = 65.280 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 50.780 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 302.415 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

1.1) Rebar Design


Mu 65.28 x 10 6
Required Rn = = 2
= 0.42 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.42


= 1 - 1 -
420 0.85 x 37.5

= 0.0010

As(req.) = ρ x b x d = 0.0010 x 1000 x 417 = 417 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 417 = 556 mm²

Use As = 556 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

1.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 302.42 kN ∴ NO USE STIRRUP

Page 175 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 50.78 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 128.28 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 641.96 mm
Rs2 = 300 (280 / fs) = 654.84 mm
Rs = Min.(Rs1, Rs2) = 642.0 mm > 200 mm ∴ O.K !

1.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.19 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 176 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Y Direction

Mu = 77.250 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 61.650 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 300.855 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

2.1) Rebar Design


Mu 77.25 x 10 6
Required Rn = = 2
= 0.49 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.49


= 1 - 1 -
420 0.85 x 37.5

= 0.0012

As(req.) = ρ x b x d = 0.0012 x 1000 x 417 = 501 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 501 = 668 mm²

Use As = 668 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

2.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 300.86 kN ∴ NO USE STIRRUP

Page 177 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 61.65 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 155.74 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 495.71 mm
Rs2 = 300 (280 / fs) = 539.38 mm
Rs = Min.(Rs1, Rs2) = 495.7 mm > 200 mm ∴ O.K !

2.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.24 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 178 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

11.3.2 Pedestal Design

1. 500 X 700

1) Design Forces
Unit : kN·m
Combinations Part Pu Vux Vuy Mux Muy
I 179.148 9.814 15.848 105.636 48.579
ULC01
J 118.510 9.814 15.848 27.188 3.584
I 232.675 70.060 40.108 272.475 346.797
ULC02
J 180.700 70.060 40.108 73.940 5.464
I 219.043 35.444 17.524 113.812 175.448
ULC03
J 167.068 35.444 17.524 27.068 5.052
I 198.745 13.972 23.104 154.669 69.161
ULC04
J 146.770 13.972 23.104 40.304 4.438
I 153.835 8.500 12.392 82.268 42.075
ULC05
J 101.860 8.500 12.392 20.928 3.080
I 232.707 26.788 13.016 87.877 132.601
ULC06
J 180.732 26.788 13.016 23.448 5.465
I 199.305 14.148 20.720 138.116 70.033
ULC07
J 147.330 14.148 20.720 35.552 4.455
I 357.049 50.724 21.968 149.334 251.084
ULC08
J 305.074 50.724 21.968 40.592 9.225
I 211.245 14.972 44.764 306.206 74.111
ULC09
J 159.270 14.972 44.764 84.624 4.816
I 234.995 22.352 22.534 151.217 110.642
ULC10
J 183.020 22.352 22.534 39.674 5.535
I 83.983 4.469 4.303 28.194 22.122
ULC11
J 45.002 4.469 4.303 6.894 1.361
I 241.727 41.045 5.551 39.411 203.173
ULC12
J 202.746 41.045 5.551 11.934 6.131
I 95.923 5.293 28.347 196.284 26.200
ULC13
J 56.942 5.293 28.347 55.966 1.722
I 119.673 12.673 6.117 41.295 62.731
ULC14
J 80.692 12.673 6.117 11.016 2.440
Pu max 357.049 70.060 44.764 149.334 251.084
Pu min 45.002 70.060 44.764 6.894 1.361
Applied Loads
Mux max 211.245 70.060 44.764 306.206 74.111
Muy max 232.675 70.060 44.764 272.475 346.797

- Description
I : Pedestal Lower
J : Pedestal Top

Page 179 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Rebar Design

Page 180 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3) Pedestal Punching Shear Check

Max. Column Load (Pu) - : 365.11 kN


Compressive strength of con'c : 37.50 Mpa
Yield strength of reinforcement : 420.00 Mpa
con'c cover : 7.50 cm
Strength reduction factor : 0.75

h1 = 50.00 cm = 500.00 mm
PB = 0.50 m = 500.00 mm PL = 0.70 m = 700.00 mm

d = h1 - con'c cover = 417.00 mm

209 700 209 Unit : mm

209
500
209

2
ΦVc = 0.75 x 0.17 x + 1 x fck x b0 x d
βC
= 3216575.13 N = 3216.58 kN
αSd
ΦVc = 0.75 x 0.083 x + 2 x fck x b0 x d
b0
= 3944780.34 N = 3944.78 kN
ΦVc = 0.75 x 0.33 x fck x b 0 x d
= 2571034.10 N = 2571.03 kN
βC = 1.40 : Ratio of long side to short side of concentrated load or reaction area
bO = 4068 : Perimeter of critical (mm)
αS = 40 : Interior columns Applied
= 30 : Edge columns
= 20 : Corner columns

ΦVc(MIN) = 2571.03 kN > Vu = 365.11 kN ∴ O.K

Page 181 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

Page 182 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

12. TYPE - F7

12.1 Plan & Section

3800

1150
3800

1500
600
1150
400

150

4800

500

3800

Part Dim. Unit weight Total weight


FB 3800 mm
Foundation FH 3800 mm 25 kN/m3 180.50 kN
FD 500 mm
PB 600 mm
Pedestal
PH 400 mm 25 kN/m3 89.10 kN
(3EA)
PD 4950 mm
Soil SD 4800 mm 18 kN/m3 1185.408 kN

Page 183 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

12.2 Stability Check

12.2.1 Soil Bearing Check

LOAD COM Qa Reaction Qu


Check Remark
CASE (kN/m2) (kN) (kN/m2)
1 SLC01 150.000 1589.600 110.08 O.K
Normal Operating
2 SLC02 150.000 1756.768 121.66 O.K
Case (Long Term)
3 SLC03 150.000 1756.744 121.66 O.K
4 SLC04 200.000 1589.600 110.08 O.K
5 SLC05 200.000 1598.136 110.67 O.K
6 SLC06 200.000 1612.834 111.69 O.K
7 SLC07 200.000 1588.172 109.98 O.K
8 SLC08 200.000 1714.967 118.77 O.K
9 SLC09 200.000 1721.369 119.21 O.K Wind & Seismic
10 SLC10 200.000 1732.392 119.97 O.K Case (Shot Term)
11 SLC11 200.000 1078.056 74.66 O.K
12 SLC12 200.000 953.760 66.05 O.K
13 SLC13 200.000 962.296 66.64 O.K
14 SLC14 200.000 976.994 67.66 O.K
15 SLC15 200.000 952.332 65.95 O.K

Page 184 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

12.2.2 Sliding & Overturning Check

1) Load Table (From Steel Structure)


Unit : kN·m
Node Load Case FX FY FZ MX MY
Con'c self weight 0.00 0.00 269.60 0.00 0.00
Dead Soil Weight 0.00 0.00 1185.41 0.00 0.00
Rack Dead 4.32 0.00 34.85 0.01 0.00
Surcharge 0.00 0.00 68.60 0.00 0.00
Live LL 3.76 0.00 36.90 0.01 0.00
CB2-05 Sub Total 3.76 0.00 105.50 0.01 0.00
,CB2-A X 2.65 0.00 -3.39 0.00 0.00
Wind
Y 0.00 0.00 0.00 0.00 0.00
X 4.43 0.00 13.13 0.00 0.00
Seismic
Y -0.14 5.45 -2.04 -25.70 0.00
+ 26.95 -0.59 0.01 2.89 0.00
Temp
- -26.95 0.59 -0.01 -2.89 0.00
Rack Dead -7.15 -4.34 47.26 0.00 -9.88
Dead
Sub Total -7.15 -4.34 47.26 0.00 -9.88
LL -3.32 -2.71 30.81 0.00 -4.59
Live
Sub Total -3.32 -2.71 30.81 0.00 -4.59
X 0.00 0.00 0.00 0.00 0.00
MD#8-3 Wind
Y 1.49 13.88 -76.11 0.00 2.09
X 7.22 -0.95 9.87 0.00 18.70
Seismic
Y 1.69 5.87 -35.60 0.00 2.37
+ 0.96 -20.88 0.00 0.00 2.47
Temp
- -0.96 20.88 0.00 0.00 -2.47
Rack Dead -8.00 4.33 52.49 0.00 -11.05
Dead
Sub Total -8.00 4.33 52.49 0.00 -11.05
LL -3.32 2.71 30.85 0.00 -4.58
Live
Sub Total -3.32 2.71 30.85 0.00 -4.58
X 0.00 0.00 0.00 0.00 0.00
MD#8-4 Wind
Y -2.49 14.87 84.65 0.00 -3.48
X 7.60 0.76 10.20 0.00 19.69
Seismic
Y -1.69 5.87 35.60 0.00 -2.37
+ 0.96 20.88 0.00 0.00 2.47
Temp
- -0.96 -20.88 0.00 0.00 -2.47

Page 185 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Sliding Check X-Direction

- Safe Factor of Sliding 2.0 (from Civil Design Criteria)


- Safe Factor of Sliding 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)
- Friction Factor of Concrete to Soil 0.4 (from Civil Design Criteria)

LOAD COM Sliding Force Resisting Friction Safety


Check
CASE (kN) Force (kN) Factor Factor
1 SLC01 10.83 635.84 0.4 58.7 O.K
2 SLC02 14.18 702.71 0.4 49.6 O.K
3 SLC03 42.59 702.70 0.4 16.5 O.K
4 SLC04 8.19 634.48 0.4 77.5 O.K
5 SLC05 11.84 639.25 0.4 54.0 O.K
6 SLC06 2.64 645.13 0.4 244.2 O.K
7 SLC07 10.93 635.27 0.4 58.1 O.K
8 SLC08 11.02 684.97 0.4 62.2 O.K
9 SLC09 13.76 688.55 0.4 50.1 O.K
10 SLC10 2.90 692.96 0.4 239.3 O.K
11 SLC11 8.74 431.22 0.4 49.3 O.K
12 SLC12 3.85 380.15 0.4 98.7 O.K
13 SLC13 7.50 384.92 0.4 51.3 O.K
14 SLC14 6.98 390.80 0.4 56.0 O.K
15 SLC15 6.60 380.93 0.4 57.8 O.K

3) Sliding Check Y-Direction

- Safe Factor of Sliding 2.0 (from Civil Design Criteria)


- Safe Factor of Sliding 1.0 (SLC 10 ~ SLC13)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)
- Friction Factor of Concrete to Soil 0.4 (from Civil Design Criteria)

LOAD COM Sliding Force Resisting Friction Safety


Check
CASE (kN) Force (kN) Factor Factor
1 SLC01 0.00 635.84 0.4 N/A O.K
2 SLC02 0.59 702.71 0.4 1191.6 O.K
3 SLC03 0.59 702.70 0.4 1189.6 O.K
4 SLC04 0.00 635.84 0.4 N/A O.K
5 SLC05 28.75 639.25 0.4 22.2 O.K
6 SLC06 0.14 645.13 0.4 4719.3 O.K
7 SLC07 12.03 635.27 0.4 52.8 O.K
8 SLC08 0.00 685.99 0.4 N/A O.K
9 SLC09 21.56 688.55 0.4 31.9 O.K
10 SLC10 0.10 692.96 0.4 6876.4 O.K
11 SLC11 9.02 431.22 0.4 47.8 O.K
12 SLC12 0.00 381.50 0.4 N/A O.K
13 SLC13 28.75 384.92 0.4 13.4 O.K
14 SLC14 0.14 390.80 0.4 2882.1 O.K
15 SLC15 12.03 380.93 0.4 31.7 O.K

Page 186 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

4) Overturing Check X-Direction

- Safe Factor of Overturning 2.0 (from Civil Design Criteria)


- Safe Factor of Overturning 1.0 (SLC 10 ~ SLC13)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)

Overturning Overturning Resisting Resisting


LOAD COM Safety
Moment ARM Moment ARM Check
CASE Factor
(kN·m) (m) (kN·m) (m)
1 SLC01 23.55 5.45 3019.79 Calculated 128.2 O.K
2 SLC02 206.29 5.45 3289.59 Calculated 16.0 O.K
3 SLC03 44.03 5.45 3451.85 Calculated 78.4 O.K
4 SLC04 38.83 5.45 3019.79 Calculated 77.8 O.K
5 SLC05 52.79 5.45 3248.48 Calculated 61.5 O.K
6 SLC06 123.87 5.45 3041.66 Calculated 24.6 O.K
7 SLC07 38.23 5.45 3090.70 Calculated 80.9 O.K
8 SLC08 50.37 5.45 3222.14 Calculated 64.0 O.K
9 SLC09 60.84 5.45 3393.66 Calculated 55.8 O.K
10 SLC10 114.14 5.45 3238.54 Calculated 28.4 O.K
11 SLC11 40.49 5.45 2067.41 Calculated 51.1 O.K
12 SLC12 29.41 5.45 1811.87 Calculated 61.6 O.K
13 SLC13 43.37 5.45 2040.57 Calculated 47.1 O.K
14 SLC14 114.44 5.45 1833.74 Calculated 16.0 O.K
15 SLC15 28.81 5.45 1882.79 Calculated 65.4 O.K

5) Overturing Check Y-Direction

- Safe Factor of Overturning 2.0 (from Civil Design Criteria)


- Safe Factor of Overturning 1.0 (SLC 10 ~ SLC13)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)

Overturning Overturning Resisting Resisting


LOAD COM Safety
Moment ARM Moment ARM Check
CASE Factor
(kN·m) (m) (kN·m) (m)
1 SLC01 23.63 5.45 2984.89 Calculated 126.3 O.K
2 SLC02 152.19 5.45 3376.88 Calculated 22.2 O.K
3 SLC03 158.30 5.45 3370.77 Calculated 21.3 O.K
4 SLC04 24.81 5.45 2984.90 Calculated 120.3 O.K
5 SLC05 321.14 5.45 3141.49 Calculated 9.8 O.K
6 SLC06 26.51 5.45 3017.70 Calculated 113.8 O.K
7 SLC07 153.78 5.45 3030.99 Calculated 19.7 O.K
8 SLC08 35.61 5.45 3188.97 Calculated 89.6 O.K
9 SLC09 257.85 5.45 3306.42 Calculated 12.8 O.K
10 SLC10 36.88 5.45 3213.58 Calculated 87.1 O.K
11 SLC11 122.89 5.45 2029.59 Calculated 16.5 O.K
12 SLC12 15.36 5.45 1790.94 Calculated 116.6 O.K
13 SLC13 311.69 5.45 1947.54 Calculated 6.3 O.K
14 SLC14 17.06 5.45 1823.75 Calculated 106.9 O.K
15 SLC15 144.33 5.45 1837.04 Calculated 12.7 O.K

Page 187 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

12.2.3 Foundatoin Settlement Check

- Detail settlement check to be included in Soil Improvement Design Report.

Page 188 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

12.3 Member Design

In line with that, this section is focused on seeking where greater or lesser values than (±)ΦMn are using
the stress contour range in MIDAS Program, then adding supplementary rebar where required, checking that the stress
resultant output is not greater or lesser than revised design moment (±)ΦMn any more (where, the sign (+) means
tension stress in bottom and (-) in top of concrete foundation) and verifying no need of reinforcing bar.
The moment and shear force was determined on the basis of critical section.
Case of occurs stress is concentrated, it is unsuitable for use as a design value.
Thus, using the average value of the near stress

12.3.1 Footing THK. 500mm

1. Calculation Result for Member Design - Factored Load Case

- Mxx (Max.)

X
Z

Value
(kN·m/m)
59.93

Page 189 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Mxx (Min.)

X
Z

Value
(kN·m/m)
76.26

Page 190 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Max.)

X
Z

Value
(kN·m/m)
70.32

Page 191 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Min.)

X
Z

Value
(kN·m/m)
40.54

Page 192 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Vxx (ABS Max.)

X
Z

Value
(kN/m)
240.53

Page 193 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Vyy (ABS Max.)

X
Z

Value
(kN/m)
216.94

Page 194 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2. Calculation Result for Crack Check - Unfactored Load Case

- Mxx (Max.)

X
Z

Value
(kN·m/m)
46.71

Page 195 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Mxx (Min.)

X
Z

Value
(kN·m/m)
60.66

Page 196 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Max.)

X
Z

Value
(kN·m/m)
55.52

Page 197 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Min.)

X
Z

Value
(kN·m/m)
32.83

Page 198 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3. Calculation Result Summary

angle of main axis l f i

Factored Condition Unfactored Condition


Mxx Myy Vxx Vyy Mxx Myy
Classification
(kN·m/m) (kN·m/m) (kN/m) (kN/m) (kN·m/m) (kN·m/m)
Bottom 59.93 70.32 46.71 55.52
240.53 216.94
Top 76.26 40.54 60.66 32.83

4. Rebar Design (Bottom Rebar)

1) X Direction

Mu = 59.930 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 46.710 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 240.530 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

1.1) Rebar Design


Mu 59.93 x 10 6
Required Rn = = 2
= 0.38 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.38


= 1 - 1 -
420 0.85 x 37.5

= 0.0009

As(req.) = ρ x b x d = 0.0009 x 1000 x 417 = 376


mm²
As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450
mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 376 = 501 mm²

Use As = 501 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

Page 199 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 240.53 kN ∴ NO USE STIRRUP

1.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 46.71 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 118.00 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 714.23 mm
Rs2 = 300 (280 / fs) = 711.89 mm
Rs = Min.(Rs1, Rs2) = 711.9 mm > 200 mm ∴ O.K !

1.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.18 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 200 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Y Direction

Mu = 70.320 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 55.520 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 216.940 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

2.1) Rebar Design


Mu 70.32 x 10 6
Required Rn = = 2
= 0.45 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.45


= 1 - 1 -
420 0.85 x 37.5

= 0.0011

As(req.) = ρ x b x d = 0.0011 x 1000 x 417 = 459 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 459 = 612 mm²

Use As = 612 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

2.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 216.94 kN ∴ NO USE STIRRUP

Page 201 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 55.52 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 140.25 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 571.14 mm
Rs2 = 300 (280 / fs) = 598.93 mm
Rs = Min.(Rs1, Rs2) = 571.1 mm > 200 mm ∴ O.K !

2.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.21 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 202 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

5. Rebar Design (Top Rebar)

1) X Direction

Mu = 76.260 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 60.660 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 240.530 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

1.1) Rebar Design


Mu 76.26 x 10 6
Required Rn = = 2
= 0.49 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.49


= 1 - 1 -
420 0.85 x 37.5

= 0.0012

As(req.) = ρ x b x d = 0.0012 x 1000 x 417 = 501 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 501 = 668 mm²

Use As = 668 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

1.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 240.53 kN ∴ NO USE STIRRUP

Page 203 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 60.66 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 153.23 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 506.86 mm
Rs2 = 300 (280 / fs) = 548.18 mm
Rs = Min.(Rs1, Rs2) = 506.9 mm > 200 mm ∴ O.K !

1.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.23 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 204 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Y Direction

Mu = 40.540 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 32.830 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 216.940 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

2.1) Rebar Design


Mu 40.54 x 10 6
Required Rn = = 2
= 0.26 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.26


= 1 - 1 -
420 0.85 x 37.5

= 0.0006

As(req.) = ρ x b x d = 0.0006 x 1000 x 417 = 251 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 251 = 335 mm²

Use As = 450 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

2.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 216.94 kN ∴ NO USE STIRRUP

Page 205 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 32.83 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 82.93 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 1095.47 mm
Rs2 = 300 (280 / fs) = 1012.87 mm
Rs = Min.(Rs1, Rs2) = 1012.9 mm > 200 mm ∴ O.K !

2.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.13 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 206 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

12.3.2 Pedestal Design

1. 400 X 600

1) Design Forces
Unit : kN·m
Combinations Part Pu Vux Vuy Mux Muy
I 90.370 0.000 6.048 29.938 3.004
ULC01
J 48.790 0.000 6.048 1.329 1.622
I 136.512 0.708 43.540 215.523 7.001
ULC02
J 100.872 0.708 43.540 2.748 3.496
I 136.488 0.708 21.140 104.643 6.945
ULC03
J 100.848 0.708 21.140 2.747 3.440
I 114.360 0.000 8.944 44.273 3.801
ULC04
J 78.720 0.000 8.944 2.144 2.617
I 74.748 0.000 7.304 36.155 2.485
ULC05
J 39.108 0.000 7.304 1.065 1.300
I 77.460 0.000 5.184 25.661 2.575
ULC06
J 41.820 0.000 5.184 1.139 1.390
I 108.936 0.000 13.184 65.261 3.621
ULC07
J 73.296 0.000 13.184 1.997 2.436
I 114.360 0.000 8.944 44.273 3.801
ULC08
J 78.720 0.000 8.944 2.144 2.617
I 127.490 0.000 13.374 66.201 4.238
ULC09
J 91.850 0.000 13.374 2.502 3.053
I 112.320 5.450 8.804 43.580 52.656
ULC10
J 76.680 5.450 8.804 2.089 25.678
I 45.147 0.000 6.886 34.086 1.501
ULC11
J 18.417 0.000 6.886 0.502 0.612
I 50.571 0.000 2.646 13.098 1.681
ULC12
J 23.841 0.000 2.646 0.649 0.793
I 63.701 0.000 7.076 35.026 2.117
ULC13
J 36.971 0.000 7.076 1.007 1.229
I 48.531 5.450 2.506 12.405 52.669
ULC14
J 21.801 5.450 2.506 0.594 25.691
Pu max 136.512 5.450 43.540 215.523 7.001
Pu min 18.417 5.450 43.540 0.502 0.612
Applied Loads
Mux max 136.512 5.450 43.540 215.523 7.001
Muy max 48.531 5.450 43.540 12.405 52.669

- Description
I : Pedestal Lower
J : Pedestal Top

Page 207 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Rebar Design

Page 208 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3) Pedestal Punching Shear Check

Max. Column Load (Pu) - : 244.94 kN


Compressive strength of con'c : 37.50 Mpa
Yield strength of reinforcement : 420.00 Mpa
con'c cover : 7.50 cm
Strength reduction factor : 0.75

h1 = 50.00 cm = 500.00 mm
PB = 0.40 m = 400.00 mm PL = 0.60 m = 600.00 mm

d = h1 - con'c cover = 417.00 mm

600 209 Unit : mm

209
400

2
ΦVc = 0.75 x 0.17 x + 1 x fck x b0 x d
βC
= 1076486.31 N = 1076.49 kN
αSd
ΦVc = 0.75 x 0.083 x + 2 x fck x b0 x d
b0
= 1776232.09 N = 1776.23 kN
ΦVc = 0.75 x 0.33 x fck x b 0 x d
= 895564.24 N = 895.56 kN
βC = 1.50 : Ratio of long side to short side of concentrated load or reaction area
bO = 1417 : Perimeter of critical (mm)
αS = 40 : Interior columns
= 30 : Edge columns
= 20 : Corner columns Applied

ΦVc(MIN) = 895.56 kN > Vu = 244.94 kN ∴ O.K

Page 209 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

Page 210 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

13. TYPE - F8a

13.1 Plan & Section

2100

800
2100

550

150

1000

500

2100

Part Dim. Unit weight Total weight


FB 2100 mm
Foundation FH 2100 mm 25 kN/m3 55.13 kN
FD 500 mm
PB 800 mm
Pedestal PH 550 mm 25 kN/m3 12.65 kN
1 EA PD 1150 mm
Soil SD 1000 mm 18 kN/m3 63.54 kN

Page 211 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

13.2 Stability Check

13.2.1 Soil Bearing Check

LOAD COM Qa Reaction Qu


Check Remark
CASE (kN/m2) (kN) (kN/m2)
1 SLC01 150.000 312.925 70.96 O.K
Normal Operating
2 SLC02 150.000 466.057 105.68 O.K
Case (Long Term)
3 SLC03 150.000 466.057 105.68 O.K
4 SLC04 200.000 312.925 70.96 O.K
5 SLC05 200.000 204.250 46.32 O.K
6 SLC06 200.000 310.535 70.42 O.K
7 SLC07 200.000 372.603 84.49 O.K
8 SLC08 200.000 427.774 97.00 O.K
9 SLC09 200.000 346.268 78.52 O.K Wind & Seismic
10 SLC10 200.000 425.981 96.59 O.K Case (Shot Term)
11 SLC11 200.000 472.532 107.15 O.K
12 SLC12 200.000 187.755 42.57 O.K
13 SLC13 200.000 79.080 17.93 O.K
14 SLC14 200.000 185.365 42.03 O.K
15 SLC15 200.000 247.433 56.11 O.K

13.2.2 Sliding & Overturning Check

1) Load Table (From Steel Structure)


Unit : kN·m
Node Load Case FX FY FZ MX MY
Con'c self weight 0.00 0.00 67.78 0.00 0.00
Dead Soil Weight 0.00 0.00 63.54 0.00 0.00
Rack Dead 0.36 -11.74 181.61 0.00 3.46
Surcharge 0.00 0.00 19.85 0.00 0.00
Live LL -0.04 -8.73 133.28 0.00 2.06
CBC6-I
Sub Total -0.04 -8.73 153.13 0.00 2.06
,CBC6-
X 0.00 0.00 0.00 0.00 0.00
03 Wind
Y -0.11 34.03 -108.68 0.00 -0.74
X -21.15 0.13 -3.42 0.00 -148.13
Seismic
Y 0.10 -22.34 85.25 0.00 0.70
+ 1.71 -13.61 0.00 0.00 12.11
Temp
- -1.71 13.61 0.00 0.00 -12.11

Page 212 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Sliding Check X-Direction

- Safe Factor of Sliding 2.0 (from Civil Design Criteria)


- Safe Factor of Sliding 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)
- Friction Factor of Concrete to Soil 0.4 (from Civil Design Criteria)

LOAD COM Sliding Force Resisting Friction Safety


Check
CASE (kN) Force (kN) Factor Factor
1 SLC01 0.00 125.17 0.4 N/A O.K
2 SLC02 1.67 186.42 0.4 111.6 O.K
3 SLC03 1.74 186.42 0.4 107.0 O.K
4 SLC04 0.00 125.17 0.4 N/A O.K
5 SLC05 0.11 81.70 0.4 777.6 O.K
6 SLC06 14.80 124.21 0.4 8.4 O.K
7 SLC07 0.07 149.04 0.4 2154.0 O.K
8 SLC08 0.03 171.11 0.4 6419.2 O.K
9 SLC09 0.11 138.51 0.4 1313.5 O.K
10 SLC10 11.13 170.39 0.4 15.3 O.K
11 SLC11 0.03 189.01 0.4 7488.6 O.K
12 SLC12 0.00 75.10 0.4 N/A O.K
13 SLC13 0.11 31.63 0.4 301.1 O.K
14 SLC14 14.80 74.15 0.4 5.0 O.K
15 SLC15 0.07 98.97 0.4 1430.4 O.K

3) Sliding Check Y-Direction

- Safe Factor of Sliding 2.0 (from Civil Design Criteria)


- Safe Factor of Sliding 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)
- Friction Factor of Concrete to Soil 0.4 (from Civil Design Criteria)

LOAD COM Sliding Force Resisting Friction Safety


Check
CASE (kN) Force (kN) Factor Factor
1 SLC01 11.74 125.17 0.4 10.7 O.K
2 SLC02 34.08 186.42 0.4 5.5 O.K
3 SLC03 6.86 186.42 0.4 27.2 O.K
4 SLC04 11.74 125.17 0.4 10.7 O.K
5 SLC05 22.29 81.70 0.4 3.7 O.K
6 SLC06 11.65 124.21 0.4 10.7 O.K
7 SLC07 27.38 149.04 0.4 5.4 O.K
8 SLC08 18.29 171.11 0.4 9.4 O.K
9 SLC09 7.23 138.51 0.4 19.1 O.K
10 SLC10 18.22 170.39 0.4 9.4 O.K
11 SLC11 30.02 189.01 0.4 6.3 O.K
12 SLC12 7.04 75.10 0.4 10.7 O.K
13 SLC13 26.98 31.63 0.4 1.2 O.K
14 SLC14 6.95 74.15 0.4 10.7 O.K
15 SLC15 22.68 98.97 0.4 4.4 O.K

Page 213 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

4) Overturing Check X-Direction

- Safe Factor of Overturning 2.0 (from Civil Design Criteria)


- Safe Factor of Overturning 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)

Overturning Overturning Resisting Resisting


LOAD COM Safety
Moment ARM Moment ARM Check
CASE Factor
(kN·m) (m) (kN·m) (m)
1 SLC01 3.46 1.65 328.57 Calculated 95.1 O.K
2 SLC02 20.44 1.65 489.42 Calculated 23.9 O.K
3 SLC03 5.52 1.65 504.35 Calculated 91.4 O.K
4 SLC04 3.46 1.65 328.57 Calculated 95.1 O.K
5 SLC05 117.56 1.65 329.49 Calculated 2.8 O.K
6 SLC06 5.97 1.65 456.69 Calculated 76.6 O.K
7 SLC07 4.06 1.65 391.23 Calculated 96.4 O.K
8 SLC08 5.00 1.65 449.21 Calculated 89.8 O.K
9 SLC09 90.58 1.65 449.89 Calculated 5.0 O.K
10 SLC10 6.88 1.65 545.29 Calculated 79.2 O.K
11 SLC11 5.45 1.65 496.20 Calculated 91.0 O.K
12 SLC12 2.07 1.65 197.14 Calculated 95.1 O.K
13 SLC13 116.18 1.65 198.06 Calculated 1.7 O.K
14 SLC14 4.58 1.65 325.26 Calculated 71.0 O.K
15 SLC15 2.68 1.65 259.80 Calculated 97.0 O.K

5) Overturing Check Y-Direction

- Safe Factor of Overturning 2.0 (from Civil Design Criteria)


- Safe Factor of Overturning 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)

Overturning Overturning Resisting Resisting


LOAD COM Safety
Moment ARM Moment ARM Check
CASE Factor
(kN·m) (m) (kN·m) (m)
1 SLC01 0.00 1.65 347.95 Calculated N/A O.K
2 SLC02 0.00 1.65 545.59 Calculated N/A O.K
3 SLC03 22.45 1.65 523.13 Calculated 23.3 O.K
4 SLC04 0.00 1.65 347.95 Calculated N/A O.K
5 SLC05 170.26 1.65 347.95 Calculated 2.0 O.K
6 SLC06 2.67 1.65 347.95 Calculated 130.5 O.K
7 SLC07 0.00 1.65 436.41 Calculated N/A O.K
8 SLC08 0.00 1.65 479.34 Calculated N/A O.K
9 SLC09 127.69 1.65 479.34 Calculated 3.8 O.K
10 SLC10 2.00 1.65 479.34 Calculated 239.7 O.K
11 SLC11 0.00 1.65 545.68 Calculated N/A O.K
12 SLC12 0.00 1.65 208.77 Calculated N/A O.K
13 SLC13 170.26 1.65 208.77 Calculated 1.2 O.K
14 SLC14 2.67 1.65 208.77 Calculated 78.3 O.K
15 SLC15 0.00 1.65 297.23 Calculated N/A O.K

Page 214 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

13.2.3 Foundatoin Settlement Check

- Detail settlement check to be included in Soil Improvement Design Report.

Page 215 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

13.3 Member Design

In line with that, this section is focused on seeking where greater or lesser values than (±)ΦMn are using
the stress contour range in MIDAS Program, then adding supplementary rebar where required, checking that the stress
resultant output is not greater or lesser than revised design moment (±)ΦMn any more (where, the sign (+) means
tension stress in bottom and (-) in top of concrete foundation) and verifying no need of reinforcing bar.
The moment and shear force was determined on the basis of critical section.
Case of occurs stress is concentrated, it is unsuitable for use as a design value.
Thus, using the average value of the near stress

13.3.1 Footing THK. 500mm

1. Calculation Result for Member Design - Factored Load Case

- Mxx (Max.)

X
Z

Value
(kN·m/m)
23.96

Page 216 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Mxx (Min.)

X
Z

Value
(kN·m/m)
7.32

Page 217 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Max.)

X
Z

Value
(kN·m/m)
22.40

Page 218 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Min.)

X
Z

Value
(kN·m/m)
3.97

Page 219 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Vxx (ABS Max.)

X
Z

Value
(kN/m)
111.29

Page 220 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Vyy (ABS Max.)

X
Z

Value
(kN/m)
102.42

Page 221 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2. Calculation Result for Crack Check - Unfactored Load Case

- Mxx (Max.)

X
Z

Value
(kN·m/m)
17.55

Page 222 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Mxx (Min.)

X
Z

Value
(kN·m/m)
4.21

Page 223 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Max.)

X
Z

Value
(kN·m/m)
18.11

Page 224 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Min.)

X
Z

Value
(kN·m/m)
6.99

Page 225 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3. Calculation Result Summary

angle of main axis l f i

Factored Condition Unfactored Condition


Mxx Myy Vxx Vyy Mxx Myy
Classification
(kN·m/m) (kN·m/m) (kN/m) (kN/m) (kN·m/m) (kN·m/m)
Bottom 23.96 22.40 17.55 18.11
111.29 102.42
Top 7.32 3.97 4.21 6.99

4. Rebar Design (Bottom Rebar)

1) X Direction

Mu = 23.960 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 17.550 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 111.290 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

1.1) Rebar Design


Mu 23.96 x 10 6
Required Rn = = 2
= 0.15 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.15


= 1 - 1 -
420 0.85 x 37.5

= 0.0004

As(req.) = ρ x b x d = 0.0004 x 1000 x 417 = 167


mm²
As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450
mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 167 = 223 mm²

Use As = 450 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

Page 226 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 111.29 kN ∴ NO USE STIRRUP

1.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 17.55 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 44.33 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 2212.50 mm
Rs2 = 300 (280 / fs) = 1894.73 mm
Rs = Min.(Rs1, Rs2) = 1894.7 mm > 200 mm ∴ O.K !

1.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.07 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 227 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Y Direction

Mu = 22.400 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 18.110 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 102.420 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

2.1) Rebar Design


Mu 22.40 x 10 6
Required Rn = = 2
= 0.14 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.14


= 1 - 1 -
420 0.85 x 37.5

= 0.0003

As(req.) = ρ x b x d = 0.0003 x 1000 x 417 = 126 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 126 = 168 mm²

Use As = 450 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

2.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 102.42 kN ∴ NO USE STIRRUP

Page 228 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 18.11 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 45.75 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 2138.28 mm
Rs2 = 300 (280 / fs) = 1836.15 mm
Rs = Min.(Rs1, Rs2) = 1836.1 mm > 200 mm ∴ O.K !

2.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.07 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 229 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

5. Rebar Design (Top Rebar)

1) X Direction

Mu = 7.320 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 4.210 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 111.290 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

1.1) Rebar Design


Mu 7.32 x 10 6
Required Rn = = 2
= 0.05 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.05


= 1 - 1 -
420 0.85 x 37.5

= 0.0001

As(req.) = ρ x b x d = 0.0001 x 1000 x 417 = 42 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 42 = 56 mm²

Use As = 450 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

1.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 111.29 kN ∴ NO USE STIRRUP

Page 230 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 4.21 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 10.63 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 9817.24 mm
Rs2 = 300 (280 / fs) = 7898.48 mm
Rs = Min.(Rs1, Rs2) = 7898.5 mm > 200 mm ∴ O.K !

1.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.02 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 231 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Y Direction

Mu = 3.970 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 6.990 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 102.420 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

2.1) Rebar Design


Mu 3.97 x 10 6
Required Rn = = 2
= 0.03 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.03


= 1 - 1 -
420 0.85 x 37.5

= 0.0001

As(req.) = ρ x b x d = 0.0001 x 1000 x 417 = 42 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 42 = 56 mm²

Use As = 450 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

2.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 102.42 kN ∴ NO USE STIRRUP

Page 232 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 6.99 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 17.66 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 5838.24 mm
Rs2 = 300 (280 / fs) = 4757.17 mm
Rs = Min.(Rs1, Rs2) = 4757.2 mm > 200 mm ∴ O.K !

2.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.03 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 233 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

13.3.2 Pedestal Design

1. 550 X 800

1) Design Forces
Unit : kN·m
Combinations Part Pu Vux Vuy Mux Muy
I 104.216 0.448 4.424 5.088 2.811
ULC01
J 86.506 0.448 4.424 0.000 2.296
I 146.016 3.172 35.480 40.802 19.820
ULC02
J 130.836 3.172 35.480 0.000 16.172
I 158.016 1.700 22.456 -25.824 -10.575
ULC03
J 142.836 1.700 22.456 0.000 -8.620
I 128.508 0.604 5.492 6.316 3.793
ULC04
J 113.328 0.604 5.492 0.000 3.098
I 73.256 0.688 9.728 11.187 4.311
ULC05
J 58.076 0.688 9.728 0.000 3.520
I 95.008 11.160 3.504 4.030 -69.730
ULC06
J 79.828 11.160 3.504 0.000 -56.896
I 96.364 1.212 17.364 19.969 7.596
ULC07
J 81.184 1.212 17.364 0.000 6.202
I 139.868 22.484 4.916 5.653 -140.487
ULC08
J 124.688 22.484 4.916 0.000 -114.630
I 113.278 0.966 11.112 12.779 -6.003
ULC09
J 98.098 0.966 11.112 0.000 -4.892
I 128.658 12.046 5.312 6.109 -74.125
ULC10
J 113.478 12.046 5.312 0.000 -60.272
I 8.050 0.797 13.555 15.588 4.984
ULC11
J -3.335 0.797 13.555 0.000 4.067
I 51.554 22.899 1.107 1.273 -143.099
ULC12
J 40.169 22.899 1.107 0.000 -116.765
I 24.964 1.381 7.303 8.398 -8.615
ULC13
J 13.579 1.381 7.303 0.000 -7.027
I 40.344 12.461 1.503 1.728 -76.737
ULC14
J 28.959 12.461 1.503 0.000 -62.407
Pu max 158.016 22.899 35.480 -25.824 -10.575
Pu min -3.335 22.899 35.480 0.000 4.067
Applied Loads
Mux max 146.016 22.899 35.480 40.802 19.820
Muy max 51.554 22.899 35.480 1.273 -143.099

- Description
I : Pedestal Lower
J : Pedestal Top

Page 234 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Rebar Design

Page 235 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3) Pedestal Punching Shear Check

Max. Column Load (Pu) - : 357.19 kN


Compressive strength of con'c : 37.50 Mpa
Yield strength of reinforcement : 420.00 Mpa
con'c cover : 7.50 cm
Strength reduction factor : 0.75

h1 = 50.00 cm = 500.00 mm
PB = 0.55 m = 550.00 mm PL = 0.80 m = 800.00 mm

d = h1 - con'c cover = 417.00 mm

209 800 209 Unit : mm

209
550
209

2
ΦVc = 0.75 x 0.17 x + 1 x fck x b0 x d
βC
= 3377599.23 N = 3377.60 kN
αSd
ΦVc = 0.75 x 0.083 x + 2 x fck x b0 x d
b0
= 2714420.90 N = 2714.42 kN
ΦVc = 0.75 x 0.33 x fck x b 0 x d
= 2760638.38 N = 2760.64 kN
βC = 1.45 : Ratio of long side to short side of concentrated load or reaction area
bO = 4368 : Perimeter of critical (mm)
αS = 40 : Interior columns Applied
= 30 : Edge columns
= 20 : Corner columns

ΦVc(MIN) = 2714.42 kN > Vu = 357.19 kN ∴ O.K

Page 236 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

Page 237 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

14. TYPE - F9a

14.1 Plan & Section

3000

800
3000

550

150

1000

500

3000

Part Dim. Unit weight Total weight


FB 3000 mm
Foundation FH 3000 mm 25 kN/m3 112.50 kN
FD 500 mm
PB 800 mm
Pedestal PH 550 mm 25 kN/m3 12.65 kN
1 EA PD 1150 mm
Soil SD 1000 mm 18 kN/m3 146.16 kN

Page 238 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

14.2 Stability Check

14.2.1 Soil Bearing Check

LOAD COM Qa Reaction Qu


Check Remark
CASE (kN/m2) (kN) (kN/m2)
1 SLC01 150.000 375.911 41.77 O.K
Normal Operating
2 SLC02 150.000 482.310 53.59 O.K
Case (Long Term)
3 SLC03 150.000 508.716 56.52 O.K
4 SLC04 200.000 375.911 41.77 O.K
5 SLC05 200.000 351.859 39.10 O.K
6 SLC06 200.000 322.294 35.81 O.K
7 SLC07 200.000 403.785 44.86 O.K
8 SLC08 200.000 465.613 51.73 O.K
9 SLC09 200.000 447.573 49.73 O.K Wind & Seismic
10 SLC10 200.000 425.400 47.27 O.K Case (Shot Term)
11 SLC11 200.000 486.518 54.06 O.K
12 SLC12 200.000 225.547 25.06 O.K
13 SLC13 200.000 201.494 22.39 O.K
14 SLC14 200.000 171.930 19.10 O.K
15 SLC15 200.000 253.420 28.16 O.K

14.2.2 Sliding & Overturning Check

1) Load Table (From Steel Structure)


Unit : kN·m
Node Load Case FX FY FZ MX MY
Con'c self weight 0.00 0.00 125.15 0.00 0.00
Dead Soil Weight 0.00 0.00 146.16 0.00 0.00
Rack Dead 4.19 1.53 104.60 -7.80 0.00
Surcharge 0.00 0.00 42.80 0.00 0.00
Live LL -0.48 4.36 76.80 -22.20 0.00
CBC6-M
Sub Total -0.48 4.36 119.60 -22.20 0.00
,CBC6-
X 24.14 -1.49 64.81 7.59 0.00
02 Wind
Y -4.32 23.32 -24.05 -118.89 0.00
X -27.36 0.79 -76.60 -4.01 0.00
Seismic
Y 5.52 -20.94 39.82 105.65 0.00
+ 22.02 0.37 -13.20 -1.87 0.00
Temp
- -22.02 -0.37 13.20 -1.87 0.00

Page 239 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Sliding Check X-Direction

- Safe Factor of Sliding 2.0 (from Civil Design Criteria)


- Safe Factor of Sliding 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)
- Friction Factor of Concrete to Soil 0.4 (from Civil Design Criteria)

LOAD COM Sliding Force Resisting Friction Safety


Check
CASE (kN) Force (kN) Factor Factor
1 SLC01 0.00 150.36 0.4 N/A O.K
2 SLC02 21.54 192.92 0.4 9.0 O.K
3 SLC03 22.51 203.49 0.4 9.0 O.K
4 SLC04 24.14 176.29 0.4 7.3 O.K
5 SLC05 4.32 140.74 0.4 32.6 O.K
6 SLC06 19.15 128.92 0.4 6.7 O.K
7 SLC07 3.86 161.51 0.4 41.8 O.K
8 SLC08 17.74 205.69 0.4 11.6 O.K
9 SLC09 3.60 179.03 0.4 49.7 O.K
10 SLC10 14.73 170.16 0.4 11.6 O.K
11 SLC11 2.54 194.61 0.4 76.8 O.K
12 SLC12 24.14 116.14 0.4 4.8 O.K
13 SLC13 4.32 80.60 0.4 18.7 O.K
14 SLC14 19.15 68.77 0.4 3.6 O.K
15 SLC15 3.86 101.37 0.4 26.2 O.K

3) Sliding Check Y-Direction

- Safe Factor of Sliding 2.0 (from Civil Design Criteria)


- Safe Factor of Sliding 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)
- Friction Factor of Concrete to Soil 0.4 (from Civil Design Criteria)

LOAD COM Sliding Force Resisting Friction Safety


Check
CASE (kN) Force (kN) Factor Factor
1 SLC01 1.53 150.36 0.4 98.2 O.K
2 SLC02 6.25 192.92 0.4 30.9 O.K
3 SLC03 5.52 203.49 0.4 36.9 O.K
4 SLC04 1.53 150.36 0.4 98.2 O.K
5 SLC05 24.85 140.74 0.4 5.7 O.K
6 SLC06 2.08 128.92 0.4 61.9 O.K
7 SLC07 13.13 161.51 0.4 12.3 O.K
8 SLC08 4.80 186.25 0.4 38.8 O.K
9 SLC09 22.29 179.03 0.4 8.0 O.K
10 SLC10 5.21 170.16 0.4 32.7 O.K
11 SLC11 6.20 194.61 0.4 31.4 O.K
12 SLC12 0.92 90.22 0.4 98.2 O.K
13 SLC13 24.24 80.60 0.4 3.3 O.K
14 SLC14 1.47 68.77 0.4 46.8 O.K
15 SLC15 13.74 101.37 0.4 7.4 O.K

Page 240 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

4) Overturing Check X-Direction

- Safe Factor of Overturning 2.0 (from Civil Design Criteria)


- Safe Factor of Overturning 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)

Overturning Overturning Resisting Resisting


LOAD COM Safety
Moment ARM Moment ARM Check
CASE Factor
(kN·m) (m) (kN·m) (m)
1 SLC01 0.00 1.65 563.87 Calculated N/A O.K
2 SLC02 56.14 1.65 744.07 Calculated 13.3 O.K
3 SLC03 0.00 1.65 800.21 Calculated N/A O.K
4 SLC04 39.84 1.65 661.08 Calculated 16.6 O.K
5 SLC05 36.08 1.65 571.00 Calculated 15.8 O.K
6 SLC06 80.43 1.65 595.46 Calculated 7.4 O.K
7 SLC07 6.38 1.65 605.68 Calculated 95.0 O.K
8 SLC08 29.88 1.65 771.92 Calculated 25.8 O.K
9 SLC09 27.06 1.65 704.37 Calculated 26.0 O.K
10 SLC10 60.32 1.65 722.72 Calculated 12.0 O.K
11 SLC11 4.78 1.65 730.38 Calculated 152.7 O.K
12 SLC12 39.84 1.65 435.53 Calculated 10.9 O.K
13 SLC13 36.08 1.65 345.45 Calculated 9.6 O.K
14 SLC14 80.43 1.65 369.92 Calculated 4.6 O.K
15 SLC15 6.38 1.65 380.13 Calculated 59.6 O.K

5) Overturing Check Y-Direction

- Safe Factor of Overturning 2.0 (from Civil Design Criteria)


- Safe Factor of Overturning 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)

Overturning Overturning Resisting Resisting


LOAD COM Safety
Moment ARM Moment ARM Check
CASE Factor
(kN·m) (m) (kN·m) (m)
1 SLC01 10.33 1.65 563.87 Calculated 54.6 O.K
2 SLC02 62.00 1.65 743.27 Calculated 12.0 O.K
3 SLC03 41.59 1.65 763.68 Calculated 18.4 O.K
4 SLC04 10.33 1.65 671.12 Calculated 65.0 O.K
5 SLC05 203.78 1.65 563.87 Calculated 2.8 O.K
6 SLC06 94.47 1.65 563.87 Calculated 6.0 O.K
7 SLC07 10.33 1.65 703.82 Calculated 68.1 O.K
8 SLC08 32.37 1.65 778.86 Calculated 24.1 O.K
9 SLC09 177.45 1.65 698.42 Calculated 3.9 O.K
10 SLC10 95.48 1.65 698.42 Calculated 7.3 O.K
11 SLC11 32.37 1.65 803.38 Calculated 24.8 O.K
12 SLC12 6.20 1.65 445.58 Calculated 71.9 O.K
13 SLC13 199.64 1.65 338.32 Calculated 1.7 O.K
14 SLC14 90.34 1.65 338.32 Calculated 3.7 O.K
15 SLC15 6.20 1.65 478.27 Calculated 77.2 O.K

Page 241 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

14.2.3 Foundatoin Settlement Check

- Detail settlement check to be included in Soil Improvement Design Report.

Page 242 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

14.3 Member Design

In line with that, this section is focused on seeking where greater or lesser values than (±)ΦMn are using
the stress contour range in MIDAS Program, then adding supplementary rebar where required, checking that the stress
resultant output is not greater or lesser than revised design moment (±)ΦMn any more (where, the sign (+) means
tension stress in bottom and (-) in top of concrete foundation) and verifying no need of reinforcing bar.
The moment and shear force was determined on the basis of critical section.
Case of occurs stress is concentrated, it is unsuitable for use as a design value.
Thus, using the average value of the near stress

14.3.1 Footing THK. 500mm

1. Calculation Result for Member Design - Factored Load Case

- Mxx (Max.)

X
Z

Value
(kN·m/m)
54.34

Page 243 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Mxx (Min.)

X
Z

Value
(kN·m/m)
55.68

Page 244 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Max.)

X
Z

Value
(kN·m/m)
60.00

Page 245 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Min.)

X
Z

Value
(kN·m/m)
50.19

Page 246 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Vxx (ABS Max.)

X
Z

Value
(kN/m)
250.85

Page 247 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Vyy (ABS Max.)

X
Z

Value
(kN/m)
277.69

Page 248 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2. Calculation Result for Crack Check - Unfactored Load Case

- Mxx (Max.)

X
Z

Value
(kN·m/m)
39.19

Page 249 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Mxx (Min.)

X
Z

Value
(kN·m/m)
41.06

Page 250 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Max.)

X
Z

Value
(kN·m/m)
43.33

Page 251 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Min.)

X
Z

Value
(kN·m/m)
36.51

Page 252 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3. Calculation Result Summary

angle of main axis l f i

Factored Condition Unfactored Condition


Mxx Myy Vxx Vyy Mxx Myy
Classification
(kN·m/m) (kN·m/m) (kN/m) (kN/m) (kN·m/m) (kN·m/m)
Bottom 54.34 60.00 39.19 43.33
250.85 277.69
Top 55.68 50.19 41.06 36.51

4. Rebar Design (Bottom Rebar)

1) X Direction

Mu = 54.340 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 39.190 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 250.850 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

1.1) Rebar Design


Mu 54.34 x 10 6
Required Rn = = 2
= 0.35 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.35


= 1 - 1 -
420 0.85 x 37.5

= 0.0008

As(req.) = ρ x b x d = 0.0008 x 1000 x 417 = 334


mm²
As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450
mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 334 = 445 mm²

Use As = 450 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

Page 253 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 250.85 kN ∴ NO USE STIRRUP

1.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 39.19 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 99.00 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 887.26 mm
Rs2 = 300 (280 / fs) = 848.50 mm
Rs = Min.(Rs1, Rs2) = 848.5 mm > 200 mm ∴ O.K !

1.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.15 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 254 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Y Direction

Mu = 60.000 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 43.330 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 277.690 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

2.1) Rebar Design


Mu 60.00 x 10 6
Required Rn = = 2
= 0.38 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.38


= 1 - 1 -
420 0.85 x 37.5

= 0.0009

As(req.) = ρ x b x d = 0.0009 x 1000 x 417 = 376 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 376 = 501 mm²

Use As = 501 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

2.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 277.69 kN ∴ NO USE STIRRUP

Page 255 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 43.33 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 109.46 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 784.57 mm
Rs2 = 300 (280 / fs) = 767.43 mm
Rs = Min.(Rs1, Rs2) = 767.4 mm > 200 mm ∴ O.K !

2.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.17 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 256 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

5. Rebar Design (Top Rebar)

1) X Direction

Mu = 55.680 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 41.060 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 250.850 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

1.1) Rebar Design


Mu 55.68 x 10 6
Required Rn = = 2
= 0.36 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.36


= 1 - 1 -
420 0.85 x 37.5

= 0.0009

As(req.) = ρ x b x d = 0.0009 x 1000 x 417 = 376 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 376 = 501 mm²

Use As = 501 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

1.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 250.85 kN ∴ NO USE STIRRUP

Page 257 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 41.06 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 103.72 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 838.31 mm
Rs2 = 300 (280 / fs) = 809.85 mm
Rs = Min.(Rs1, Rs2) = 809.9 mm > 200 mm ∴ O.K !

1.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.16 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 258 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Y Direction

Mu = 50.190 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 36.510 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 277.690 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

2.1) Rebar Design


Mu 50.19 x 10 6
Required Rn = = 2
= 0.32 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.32


= 1 - 1 -
420 0.85 x 37.5

= 0.0008

As(req.) = ρ x b x d = 0.0008 x 1000 x 417 = 334 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 334 = 445 mm²

Use As = 450 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

2.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 277.69 kN ∴ NO USE STIRRUP

Page 259 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 36.51 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 92.23 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 966.16 mm
Rs2 = 300 (280 / fs) = 910.78 mm
Rs = Min.(Rs1, Rs2) = 910.8 mm > 200 mm ∴ O.K !

2.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.14 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 260 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

14.3.2 Pedestal Design

1. 550 X 800

1) Design Forces
Unit : kN·m
Combinations Part Pu Vux Vuy Mux Muy
I 164.150 2.142 5.866 -6.746 13.383
ULC01
J 146.440 2.142 5.866 0.000 10.920
I 247.740 9.256 30.684 -35.287 57.768
ULC02
J 232.560 9.256 30.684 0.000 47.124
I 279.420 8.368 22.164 25.489 52.259
ULC03
J 264.240 8.368 22.164 0.000 42.636
I 217.500 6.196 4.548 -5.230 38.685
ULC04
J 202.320 6.196 4.548 0.000 31.560
I 88.852 3.028 14.284 16.427 18.914
ULC05
J 73.672 3.028 14.284 0.000 15.432
I 121.460 16.820 8.484 -9.757 -105.095
ULC06
J 106.280 16.820 8.484 0.000 -85.752
I 113.804 8.580 34.076 39.187 53.571
ULC07
J 98.624 8.580 34.076 0.000 43.704
I 179.020 31.116 11.460 -13.179 -194.447
ULC08
J 163.840 31.116 11.460 0.000 -158.664
I 140.900 6.986 22.812 26.234 43.604
ULC09
J 125.720 6.986 22.812 0.000 35.570
I 177.680 14.744 10.068 -11.578 -91.046
ULC10
J 162.500 14.744 10.068 0.000 -74.090
I -38.968 3.761 36.644 42.141 23.489
ULC11
J -50.353 3.761 36.644 0.000 19.164
I 26.248 35.935 8.892 -10.226 -224.529
ULC12
J 14.863 35.935 8.892 0.000 -183.204
I -11.872 2.167 25.380 29.187 13.522
ULC13
J -23.257 2.167 25.380 0.000 11.030
I 24.908 19.563 7.500 -8.625 -121.127
ULC14
J 13.523 19.563 7.500 0.000 -98.630
Pu max 279.420 35.935 36.644 25.489 52.259
Pu min -50.353 35.935 36.644 0.000 19.164
Applied Loads
Mux max -38.968 35.935 36.644 42.141 23.489
Muy max 26.248 35.935 36.644 -10.226 -224.529

- Description
I : Pedestal Lower
J : Pedestal Top

Page 261 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Design Forces

Page 262 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3) Pedestal Punching Shear Check

Max. Column Load (Pu) - : 279.42 kN


Compressive strength of con'c : 37.50 Mpa
Yield strength of reinforcement : 420.00 Mpa
con'c cover : 7.50 cm
Strength reduction factor : 0.75

h1 = 50.00 cm = 500.00 mm
PB = 0.55 m = 550.00 mm PL = 0.80 m = 800.00 mm

d = h1 - con'c cover = 417.00 mm

209 800 209 Unit : mm

209
550
209

2
ΦVc = 0.75 x 0.17 x + 1 x fck x b0 x d
βC
= 3377599.23 N = 3377.60 kN
αSd
ΦVc = 0.75 x 0.083 x + 2 x fck x b0 x d
b0
= 4040157.04 N = 4040.16 kN
ΦVc = 0.75 x 0.33 x fck x b 0 x d
= 2760638.38 N = 2760.64 kN
βC = 1.45 : Ratio of long side to short side of concentrated load or reaction area
bO = 4368 : Perimeter of critical (mm)
αS = 40 : Interior columns Applied
= 30 : Edge columns
= 20 : Corner columns

ΦVc(MIN) = 2760.64 kN > Vu = 279.42 kN ∴ O.K

Page 263 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

Page 264 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

15. TYPE - F10

15.1 Plan & Section

3000

1250
4500

2000
550
1250
800

150

4800

500

3000

Part Dim. Unit weight Total weight


FB 3000 mm
Foundation FH 4500 mm 25 kN/m3 168.75 kN
FD 500 mm
PB 550 mm
Pedestal
PH 800 mm 25 kN/m3 163.35 kN
(3EA)
PD 4950 mm
Soil SD 4800 mm 18 kN/m3 1052.352 kN

Page 265 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

15.2 Stability Check

15.2.1 Soil Bearing Check

LOAD COM Qa Reaction Qu


Check Remark
CASE (kN/m2) (kN) (kN/m2)
1 SLC01 150.000 1553.286 115.06 O.K
Normal Operating
2 SLC02 150.000 1727.685 127.98 O.K
Case (Long Term)
3 SLC03 150.000 1722.394 127.58 O.K
4 SLC04 200.000 1553.286 115.06 O.K
5 SLC05 200.000 1555.483 115.22 O.K
6 SLC06 200.000 1544.304 114.39 O.K
7 SLC07 200.000 1554.618 115.16 O.K
8 SLC08 200.000 1682.101 124.60 O.K
9 SLC09 200.000 1683.749 124.72 O.K Wind & Seismic
10 SLC10 200.000 1675.364 124.10 O.K Case (Shot Term)
11 SLC11 200.000 1061.786 78.65 O.K
12 SLC12 200.000 931.972 69.03 O.K
13 SLC13 200.000 934.169 69.20 O.K
14 SLC14 200.000 922.989 68.37 O.K
15 SLC15 200.000 933.304 69.13 O.K

Page 266 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

15.2.2 Sliding & Overturning Check

1) Load Table (From Steel Structure)


Unit : kN·m
Node Load Case FX FY FZ MX MY
Con'c self weight 0.00 0.00 332.10 0.00 0.00
Dead Soil Weight 0.00 0.00 1052.35 0.00 0.00
Rack Dead 1.97 -2.86 45.16 0.00 17.76
Surcharge 0.00 0.00 60.90 0.00 0.00
Live LL 2.08 -2.05 41.28 0.00 18.13
CB1-02 Sub Total 2.08 -2.05 102.18 0.00 18.13
,CB1-A X 0.00 0.00 0.00 0.00 0.00
Wind
Y 1.26 24.02 -193.40 0.00 2.03
X 17.76 -0.59 8.52 0.00 118.29
Seismic
Y 0.42 7.27 -58.60 0.00 0.71
+ 3.02 -23.74 -0.05 0.00 20.64
Temp
- -3.02 23.74 0.05 0.00 -20.64
Rack Dead 1.78 3.37 83.79 0.00 17.64
Dead
Sub Total 1.78 3.37 83.79 0.00 17.64
LL 2.01 2.00 40.76 0.00 17.97
Live
Sub Total 2.01 2.00 40.76 0.00 17.97
CB1-01 X 0.00 0.00 0.00 0.00 0.00
Wind
,CB1-A Y -1.04 24.55 193.42 0.00 -0.79
X 17.42 -0.11 1.25 0.00 117.68
Seismic
Y -0.35 7.27 58.59 0.00 -0.33
+ 2.94 23.75 0.05 0.00 20.47
TEMP
- -2.94 -23.75 -0.05 0.00 -20.47
Rack Dead -0.18 -0.29 39.88 0.00 -0.46
Dead
Sub Total -0.18 -0.29 39.88 0.00 -0.46
LL 0.59 -0.50 28.82 0.00 2.16
Live
Sub Total 0.59 -0.50 28.82 0.00 2.16
CBC6-N
X -1.87 -0.11 1.93 0.00 -7.26
,CBC6- Wind
Y -1.69 2.94 2.18 0.00 -6.80
03
X 23.77 -0.59 -22.60 0.00 91.94
Seismic
Y 1.72 -3.70 1.91 0.00 6.86
+ -5.14 0.24 2.65 0.00 -17.58
TEMP
- 5.14 -0.24 -2.65 0.00 17.58

Page 267 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Sliding Check X-Direction

- Safe Factor of Sliding 2.0 (from Civil Design Criteria)


- Safe Factor of Sliding 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)
- Friction Factor of Concrete to Soil 0.4 (from Civil Design Criteria)

LOAD COM Sliding Force Resisting Friction Safety


Check
CASE (kN) Force (kN) Factor Factor
1 SLC01 3.57 621.31 0.4 174.0 O.K
2 SLC02 15.62 690.02 0.4 44.2 O.K
3 SLC03 8.84 688.96 0.4 77.9 O.K
4 SLC04 1.70 622.09 0.4 366.6 O.K
5 SLC05 2.10 622.19 0.4 296.8 O.K
6 SLC06 44.83 617.72 0.4 13.8 O.K
7 SLC07 4.82 621.85 0.4 128.9 O.K
8 SLC08 6.73 673.42 0.4 100.0 O.K
9 SLC09 7.03 673.50 0.4 95.8 O.K
10 SLC10 39.08 670.15 0.4 17.2 O.K
11 SLC11 7.65 424.71 0.4 55.5 O.K
12 SLC12 0.27 373.56 0.4 1390.7 O.K
13 SLC13 0.67 373.67 0.4 559.4 O.K
14 SLC14 43.40 369.20 0.4 8.5 O.K
15 SLC15 3.40 373.32 0.4 109.9 O.K

3) Sliding Check Y-Direction

- Safe Factor of Sliding 2.0 (from Civil Design Criteria)


- Safe Factor of Sliding 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)
- Friction Factor of Concrete to Soil 0.4 (from Civil Design Criteria)

LOAD COM Sliding Force Resisting Friction Safety


Check
CASE (kN) Force (kN) Factor Factor
1 SLC01 0.22 621.31 0.4 2815.0 O.K
2 SLC02 0.09 691.07 0.4 8063.1 O.K
3 SLC03 0.58 688.96 0.4 1185.7 O.K
4 SLC04 0.22 621.31 0.4 2815.0 O.K
5 SLC05 51.74 622.19 0.4 12.0 O.K
6 SLC06 0.69 617.72 0.4 901.2 O.K
7 SLC07 7.81 621.85 0.4 79.7 O.K
8 SLC08 0.19 672.84 0.4 3453.0 O.K
9 SLC09 38.44 673.50 0.4 17.5 O.K
10 SLC10 0.87 670.15 0.4 766.4 O.K
11 SLC11 5.41 424.71 0.4 78.6 O.K
12 SLC12 0.13 372.79 0.4 2815.0 O.K
13 SLC13 51.65 373.67 0.4 7.2 O.K
14 SLC14 0.77 369.20 0.4 477.2 O.K
15 SLC15 7.72 373.32 0.4 48.4 O.K

Page 268 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

4) Overturing Check X-Direction

- Safe Factor of Overturning 2.0 (from Civil Design Criteria)


- Safe Factor of Overturning 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)

Overturning Overturning Resisting Resisting


LOAD COM Safety
Moment ARM Moment ARM Check
CASE Factor
(kN·m) (m) (kN·m) (m)
1 SLC01 55.85 5.45 2398.16 Calculated 42.9 O.K
2 SLC02 201.01 5.45 2743.41 Calculated 13.7 O.K
3 SLC03 175.00 5.45 2769.42 Calculated 15.8 O.K
4 SLC04 55.85 5.45 2417.08 Calculated 43.3 O.K
5 SLC05 499.90 5.45 2857.48 Calculated 5.7 O.K
6 SLC06 522.11 5.45 2413.54 Calculated 4.6 O.K
7 SLC07 161.59 5.45 2493.00 Calculated 15.4 O.K
8 SLC08 109.43 5.45 2635.51 Calculated 24.1 O.K
9 SLC09 442.47 5.45 2965.81 Calculated 6.7 O.K
10 SLC10 459.13 5.45 2632.86 Calculated 5.7 O.K
11 SLC11 166.40 5.45 1733.18 Calculated 10.4 O.K
12 SLC12 33.51 5.45 1457.82 Calculated 43.5 O.K
13 SLC13 477.56 5.45 1898.22 Calculated 4.0 O.K
14 SLC14 499.78 5.45 1454.28 Calculated 2.9 O.K
15 SLC15 139.25 5.45 1533.73 Calculated 11.0 O.K

5) Overturing Check Y-Direction

- Safe Factor of Overturning 2.0 (from Civil Design Criteria)


- Safe Factor of Overturning 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)

Overturning Overturning Resisting Resisting


LOAD COM Safety
Moment ARM Moment ARM Check
CASE Factor
(kN·m) (m) (kN·m) (m)
1 SLC01 18.36 5.45 3433.54 Calculated 187.0 O.K
2 SLC02 160.13 5.45 3938.33 Calculated 24.6 O.K
3 SLC03 161.99 5.45 3936.47 Calculated 24.3 O.K
4 SLC04 18.36 5.45 3436.53 Calculated 187.2 O.K
5 SLC05 927.69 5.45 3678.04 Calculated 4.0 O.K
6 SLC06 38.13 5.45 3458.95 Calculated 90.7 O.K
7 SLC07 207.12 5.45 3500.59 Calculated 16.9 O.K
8 SLC08 26.52 5.45 3714.82 Calculated 140.1 O.K
9 SLC09 708.52 5.45 3895.95 Calculated 5.5 O.K
10 SLC10 41.35 5.45 3731.63 Calculated 90.2 O.K
11 SLC11 160.75 5.45 2389.45 Calculated 14.9 O.K
12 SLC12 11.01 5.45 2063.12 Calculated 187.3 O.K
13 SLC13 920.35 5.45 2304.62 Calculated 2.5 O.K
14 SLC14 30.79 5.45 2085.53 Calculated 67.7 O.K
15 SLC15 199.78 5.45 2127.17 Calculated 10.7 O.K

Page 269 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

15.2.3 Foundatoin Settlement Check

- Detail settlement check to be included in Soil Improvement Design Report.

Page 270 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

15.3 Member Design

In line with that, this section is focused on seeking where greater or lesser values than (±)ΦMn are using
the stress contour range in MIDAS Program, then adding supplementary rebar where required, checking that the stress
resultant output is not greater or lesser than revised design moment (±)ΦMn any more (where, the sign (+) means
tension stress in bottom and (-) in top of concrete foundation) and verifying no need of reinforcing bar.
The moment and shear force was determined on the basis of critical section.
Case of occurs stress is concentrated, it is unsuitable for use as a design value.
Thus, using the average value of the near stress

15.3.1 Footing THK. 500mm

1. Calculation Result for Member Design - Factored Load Case

- Mxx (Max.)

X
Z

Value
(kN·m/m)
87.84

Page 271 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Mxx (Min.)

X
Z

Value
(kN·m/m)
44.58

Page 272 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Max.)

X
Z

Value
(kN·m/m)
98.11

Page 273 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Min.)

X
Z

Value
(kN·m/m)
73.64

Page 274 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Vxx (ABS Max.)

X
Z

Value
(kN/m)
351.10
236.11
Average
293.61

Page 275 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Vyy (ABS Max.)

X
Z

Value
(kN/m)
309.31

Page 276 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2. Calculation Result for Crack Check - Unfactored Load Case

- Mxx (Max.)

X
Z

Value
(kN·m/m)
55.91

Page 277 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Mxx (Min.)

X
Z

Value
(kN·m/m)
26.08

Page 278 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Max.)

X
Z

Value
(kN·m/m)
60.32

Page 279 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Min.)

X
Z

Value
(kN·m/m)
60.82

Page 280 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3. Calculation Result Summary

angle of main axis l f i

Factored Condition Unfactored Condition


Mxx Myy Vxx Vyy Mxx Myy
Classification
(kN·m/m) (kN·m/m) (kN/m) (kN/m) (kN·m/m) (kN·m/m)
Bottom 87.84 98.11 55.91 60.32
293.61 309.31
Top 44.58 73.64 26.08 60.82

4. Rebar Design (Bottom Rebar)

1) X Direction

Mu = 87.840 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 55.910 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 293.605 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

1.1) Rebar Design


Mu 87.84 x 10 6
Required Rn = = 2
= 0.56 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.56


= 1 - 1 -
420 0.85 x 37.5

= 0.0013

As(req.) = ρ x b x d = 0.0013 x 1000 x 417 = 543


mm²
As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450
mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 543 = 724 mm²

Use As = 724 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

Page 281 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 293.61 kN ∴ NO USE STIRRUP

1.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 55.91 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 141.24 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 565.85 mm
Rs2 = 300 (280 / fs) = 594.75 mm
Rs = Min.(Rs1, Rs2) = 565.9 mm > 200 mm ∴ O.K !

1.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.21 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 282 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Y Direction

Mu = 98.110 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 60.320 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 309.310 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

2.1) Rebar Design


Mu 98.11 x 10 6
Required Rn = = 2
= 0.63 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.63


= 1 - 1 -
420 0.85 x 37.5

= 0.0015

As(req.) = ρ x b x d = 0.0015 x 1000 x 417 = 626 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 626 = 835 mm²

Use As = 835 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

2.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 309.31 kN ∴ NO USE STIRRUP

Page 283 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 60.32 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 152.38 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 510.78 mm
Rs2 = 300 (280 / fs) = 551.27 mm
Rs = Min.(Rs1, Rs2) = 510.8 mm > 200 mm ∴ O.K !

2.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.23 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 284 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

5. Rebar Design (Top Rebar)

1) X Direction

Mu = 44.580 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 26.080 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 293.605 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

1.1) Rebar Design


Mu 44.58 x 10 6
Required Rn = = 2
= 0.28 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.28


= 1 - 1 -
420 0.85 x 37.5

= 0.0007

As(req.) = ρ x b x d = 0.0007 x 1000 x 417 = 292 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 292 = 389 mm²

Use As = 450 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

1.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 293.61 kN ∴ NO USE STIRRUP

Page 285 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 26.08 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 65.88 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 1427.53 mm
Rs2 = 300 (280 / fs) = 1275.02 mm
Rs = Min.(Rs1, Rs2) = 1275.0 mm > 200 mm ∴ O.K !

1.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.10 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 286 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Y Direction

Mu = 73.640 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 60.820 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 309.310 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

2.1) Rebar Design


Mu 73.64 x 10 6
Required Rn = = 2
= 0.47 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.47


= 1 - 1 -
420 0.85 x 37.5

= 0.0011

As(req.) = ρ x b x d = 0.0011 x 1000 x 417 = 459 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 459 = 612 mm²

Use As = 612 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

2.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 309.31 kN ∴ NO USE STIRRUP

Page 287 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 60.82 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 153.64 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 505.03 mm
Rs2 = 300 (280 / fs) = 546.74 mm
Rs = Min.(Rs1, Rs2) = 505.0 mm > 200 mm ∴ O.K !

2.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.23 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 288 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

15.3.2 Pedestal Design

1. 550 X 800

1) Design Forces
Unit : kN·m
Combinations Part Pu Vux Vuy Mux Muy
I 139.454 4.004 2.758 38.530 19.820
ULC01
J 63.224 4.004 2.758 24.878 2.007
I 185.520 35.200 9.316 121.214 174.240
ULC02
J 120.180 35.200 9.316 75.100 3.815
I 185.640 21.776 2.068 35.801 107.791
ULC03
J 120.300 21.776 2.068 25.564 3.818
I 160.812 5.482 4.444 61.452 27.136
ULC04
J 95.472 5.482 4.444 39.454 3.030
I 119.532 3.432 2.364 33.026 16.988
ULC05
J 54.192 3.432 2.364 21.324 1.720
I -35.188 15.784 3.372 39.639 -78.131
ULC06
J -100.528 15.784 3.372 22.948 0.000
I 160.812 5.482 4.444 61.452 27.136
ULC07
J 95.472 5.482 4.444 39.454 3.030
I -148.628 32.950 6.460 74.679 -163.103
ULC08
J -213.968 32.950 6.460 42.702 0.000
I 169.332 6.072 22.204 267.654 30.056
ULC09
J 103.992 6.072 22.204 157.744 3.301
I 102.212 1.788 4.864 64.241 8.851
ULC10
J 36.872 1.788 4.864 40.164 1.170
I 91.719 2.088 0.900 14.814 10.336
ULC11
J 42.714 2.088 0.900 10.359 1.356
I -217.721 36.344 2.916 28.041 -179.903
ULC12
J -266.726 36.344 2.916 13.607 0.000
I 100.239 2.678 18.660 221.016 13.256
ULC13
J 51.234 2.678 18.660 128.649 1.626
I 33.119 5.182 1.320 17.603 25.651
ULC14
J -15.886 5.182 1.320 11.069 0.000
Pu max 185.640 36.344 22.204 35.801 107.791
Pu min -266.726 36.344 22.204 13.607 0.000
Applied Loads
Mux max 169.332 36.344 22.204 267.654 30.056
Muy max -217.721 36.344 22.204 28.041 -179.903

- Description
I : Pedestal Lower
J : Pedestal Top

Page 289 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Design Forces

Page 290 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3) Pedestal Punching Shear Check

Max. Column Load (Pu) - : 516.12 kN


Compressive strength of con'c : 37.50 Mpa
Yield strength of reinforcement : 420.00 Mpa
con'c cover : 7.50 cm
Strength reduction factor : 0.75

h1 = 50.00 cm = 500.00 mm
PB = 0.55 m = 550.00 mm PL = 0.80 m = 800.00 mm

d = h1 - con'c cover = 417.00 mm

209 800 209 Unit : mm

209
550
209

2
ΦVc = 0.75 x 0.17 x + 1 x fck x b0 x d
βC
= 3377599.23 N = 3377.60 kN
αSd
ΦVc = 0.75 x 0.083 x + 2 x fck x b0 x d
b0
= 2714420.90 N = 2714.42 kN
ΦVc = 0.75 x 0.33 x fck x b 0 x d
= 2760638.38 N = 2760.64 kN
βC = 1.45 : Ratio of long side to short side of concentrated load or reaction area
bO = 4368 : Perimeter of critical (mm)
αS = 40 : Interior columns Applied
= 30 : Edge columns
= 20 : Corner columns

ΦVc(MIN) = 2714.42 kN > Vu = 516.12 kN ∴ O.K

Page 291 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

Page 292 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

16. TYPE - F11

16.1 Plan & Section

3000

800
2000

1000

150

5700

800

3000

Part Dim. Unit weight Total weight


FB 3000 mm
Foundation FH 2000 mm 25 kN/m3 120.00 kN
FD 800 mm
PB 800 mm
Pedestal PH 1000 mm 25 kN/m3 117.00 kN
1 EA PD 5850 mm
Soil SD 5700 mm 18 kN/m3 451.44 kN

Page 293 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

16.2 Stability Check

16.2.1 Pile Capacity Check

1) Vertical Reaction

Qu = 852.96 kN Max Load Combination- SLC10 (1.0D + 0.75L + 0.525EX)

Qa = 1500 kN
∴ Qu = 852.96 < Qa = 1500.00 O.K

2) Horizontal Reaction

Qu = 55.71 kN Max Load Combination- SLC13 (0.6D + 1.0WY)

Qa = 80 kN
∴ Qu = 55.71 < Qa = 80.00 O.K

3) Uplift Reaction

Qu = N/A kN Max Load Combination- N/A

Qa = 300 kN
∴ Qu = N/A > Qa = 300.00 O.K

- Pile No. (The Pile Number is Used Midas Program Analysis)

Page 294 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Max. Reaction for Stability Check

Vetical
Max

Horizontal
Max

- Min. Reaction for Stability Check

Horizontal
Min

Vetical
Min

Page 295 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

4) Reaction Summary

Load Active Reaction (kN) Stability Check


No.
Case Fx Fy SRSS Fz Horizontal Vertical Uplift
2694 SER(max) 3.10 55.58 55.66 803.47 O.K O.K N.A
2697 SER(max) 3.10 55.44 55.53 827.40 O.K O.K N.A
2715 SER(max) 3.15 55.71 55.80 808.46 O.K O.K N.A
2718 SER(max) 3.15 55.58 55.67 801.20 O.K O.K N.A
2736 SER(max) 8.74 30.03 31.28 852.96 O.K O.K N.A
2739 SER(max) 8.74 30.02 31.27 776.35 O.K O.K N.A
2757 SER(max) 8.75 30.26 31.50 849.07 O.K O.K N.A
2760 SER(max) 8.75 30.25 31.49 773.05 O.K O.K N.A
2694 SER(min) -1.66 -4.06 4.39 384.29 O.K O.K N.A
2697 SER(min) -1.66 -4.05 4.37 366.37 O.K O.K N.A
2715 SER(min) -1.62 -3.82 4.15 317.11 O.K O.K N.A
2718 SER(min) -1.62 -3.81 4.14 318.08 O.K O.K N.A
2736 SER(min) -0.15 -0.06 0.16 374.68 O.K O.K N.A
2739 SER(min) -0.15 -0.07 0.16 220.73 O.K O.K N.A
2757 SER(min) -0.15 0.12 0.20 324.85 O.K O.K N.A
2760 SER(min) -0.15 0.13 0.20 217.69 O.K O.K N.A
Max. 55.80 852.96
Min 0.16 217.69
Total SER(MAX) 17.49 111.29
Total SER(MIN) -3.32 -8.11

5) Consider Effect of Group Piles (Refer to Section 3.4.5.9, ACI 336.3R-15.)

Pile Spacing Reduction Factor


8d 1.00
6d 0.70
4d 0.40
3d 0.25 where, d : Pile Diameter

Fx max = 17.49 kN
(Refer to Reaction Summay table)

Fx max = 111.29 kN
(Refer to Reaction Summay table)

X Dir. Y Dir.
Pile No. Distance α Factor Pile No. Distance α Factor
2736 1500 1.88 0.08 2736 g Guide 1.00
2739 g Guide 1.00 2739 g Guide 1.00
SUM. 1.08 SUM. 2.00

Page 296 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

6) Horizontal Reaction Check for Consider Effect of Group Piles

- X Direction

Qu = 17.49 kN

Qa = 140 x 108% = 151 kN


∴ Qu = 17.49 < Qa = 151.38 O.K

- Y Direction

Qu = 111.29 kN

Qa = 140 x 200% = 280 kN


∴ Qu = 111.29 < Qa = 280.00 O.K

Page 297 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

16.2.2 Pile Punching Shear Check

Max. Pile Reaction (Pu) : 1119.04 kN


Max Load Combination- ULC09 (0.9D + 1.6EY)
Compressive strength of con'c : 37.5 Mpa
Yield strength of reinforcement : 420 Mpa
Strength reduction factor : 0.75
con'c cover : 15.0 cm
Footing Thk. (h) : 800 cm = 8000 mm
Pile Dia. : 0.6 m = 600 mm
d = h - con'c cover : 650.0 mm

Unit : mm

2
ΦVc = 0.75 x 0.17 x + 1 x fck x b0 x d
βC
= 5978886.59 N
= 5978.89 kN
αSd
ΦVc = 0.75 x 0.083 x + 2 x fck x b0 x d
b0
= 8388380.09 N
= 8388.38 kN
ΦVc = 0.75 x 0.33 x fck x b0 x d
= 3868691.32 N
= 3868.69 kN
βC = 1.00 : Ratio of long side to short side of concentrated load or reaction area
bO = 3927 : Perimeter of critical (mm)
αS = 40 : Interior columns Applied
= 30 : Edge columns
= 20 : Corner columns

ΦVc(MIN) = 3868.69 kN > Vu = 1119.04 kN ∴ O.K

Page 298 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Max. Vertical Reaction for Member Design

Vertical
Max

16.2.3 Foundatoin Settlement Check

- Detail settlement check to be included in Soil Improvement Design Report.

Page 299 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

16.3 Member Design

In line with that, this section is focused on seeking where greater or lesser values than (±)ΦMn are using
the stress contour range in MIDAS Program, then adding supplementary rebar where required, checking that the stress
resultant output is not greater or lesser than revised design moment (±)ΦMn any more (where, the sign (+) means
tension stress in bottom and (-) in top of concrete foundation) and verifying no need of reinforcing bar.
The moment and shear force was determined on the basis of critical section.
Case of occurs stress is concentrated, it is unsuitable for use as a design value.
Thus, using the average value of the near stress

16.3.1 Footing THK. 800mm

1. Calculation Result for Member Design - Factored Load Case

- Mxx (Max.)

X
Z

Value
(kN·m/m)
126.05

Page 300 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Mxx (Min.)

X
Z

Value
(kN·m/m)
224.31

Page 301 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Max.)

X
Z

Value
(kN·m/m)
43.41

Page 302 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Min.)

X
Z

Value
(kN·m/m)
258.54

Page 303 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Vxx (ABS Max.)

X
Z

Value
(kN/m)
403.33

Page 304 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Vyy (ABS Max.)

X
Z

Value
(kN/m)
854.55
51.85
AVERAGE
453.20

Page 305 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2. Calculation Result for Crack Check - Unfactored Load Case

- Mxx (Max.)

X
Z

Value
(kN·m/m)
92.98

Page 306 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Mxx (Min.)

X
Z

Value
(kN·m/m)
174.47

Page 307 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Max.)

X
Z

Value
(kN·m/m)
32.38

Page 308 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Min.)

X
Z

Value
(kN·m/m)
198.31

Page 309 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3. Calculation Result Summary

angle of main axis l f i

Factored Condition Unfactored Condition


Mxx Myy Vxx Vyy Mxx Myy
Classification
(kN·m/m) (kN·m/m) (kN/m) (kN/m) (kN·m/m) (kN·m/m)
Bottom 126.05 43.41 92.98 32.38
403.33 453.20
Top 224.31 258.54 174.47 198.31

4. Rebar Design (Bottom Rebar)

1) X Direction

Mu = 126.050 kN·m/m, h = 800 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 92.980 kN·m/m, d' = 150 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 403.330 kN/m , d = 640 mm , Φb = 0.90 , βc = 0.78

1.1) Rebar Design


Mu 126.05 x 10 6
Required Rn = = 2
= 0.34 N/mm2
φbd² 0.90 x 1000 x 640

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.34


= 1 - 1 -
420 0.85 x 37.5

= 0.0008

As(req.) = ρ x b x d = 0.0008 x 1000 x 640 = 512


mm²
As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 800 / 2 = 720
mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 640 = 2133 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 640 = 2333 mm²
4/3 As(req.) = 4 / 3 x 512 = 683 mm²

Use As = 720 mm²

∴USE : D 20 @ 200 ( As = 1571.0 mm² ) ∴O.K !

Page 310 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 640
= 490 kN > VU = 403.33 kN ∴ NO USE STIRRUP

1.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 92.98 kN.m/m


As = 15.7 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 15.71 / ( 100 x 64.00 ) = 0.0025
2
k = - ρn + √{ 2ρn +(ρn) } = 0.169
x =kd = 108.2 mm
Icr = b x3 / 3 + n As (d - x) 2 = 4.E+09 mm4
fs = n * Ms / Icr *(d-x) = 98.00 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 710.74 mm
Rs2 = 300 (280 / fs) = 857.16 mm
Rs = Min.(Rs1, Rs2) = 710.7 mm > 200 mm ∴ O.K !

1.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.200
A = 2 x 150 x 1000.00 / 7 = 42857 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.24 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 311 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Y Direction

Mu = 43.410 kN·m/m, h = 800 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 32.380 kN·m/m, d' = 150 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 453.200 kN/m , d = 642 mm , Φb = 0.90 , βc = 0.78

2.1) Rebar Design


Mu 43.41 x 10 6
Required Rn = = 2
= 0.12 N/mm2
φbd² 0.90 x 1000 x 642

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.12


= 1 - 1 -
420 0.85 x 37.5

= 0.0003

As(req.) = ρ x b x d = 0.0003 x 1000 x 642 = 193 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 800 / 2 = 720 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 642 = 2140 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 642 = 2340 mm²
4/3 As(req.) = 4 / 3 x 193 = 257 mm²

Use As = 720 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

2.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 642
= 491 kN > VU = 453.20 kN ∴ NO USE STIRRUP

Page 312 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 32.38 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 64.20 ) = 0.0016
2
k = - ρn + √{ 2ρn +(ρn) } = 0.138
x =kd = 88.3 mm
Icr = b x3 / 3 + n As (d - x) 2 = 2.E+09 mm4
fs = n * Ms / Icr *(d-x) = 52.57 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 1648.98 mm
Rs2 = 300 (280 / fs) = 1597.88 mm
Rs = Min.(Rs1, Rs2) = 1597.9 mm > 200 mm ∴ O.K !

2.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.157
A = 2 x 150 x 1000.00 / 7 = 42857 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.12 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 313 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

5. Rebar Design (Top Rebar)

1) X Direction

Mu = 224.310 kN·m/m, h = 800 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 174.470 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 403.330 kN/m , d = 715 mm , Φb = 0.90 , βc = 0.78

1.1) Rebar Design


Mu 224.31 x 10 6
Required Rn = = 2
= 0.49 N/mm2
φbd² 0.90 x 1000 x 715

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.49


= 1 - 1 -
420 0.85 x 37.5

= 0.0012

As(req.) = ρ x b x d = 0.0012 x 1000 x 715 = 858 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 800 / 2 = 720 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 715 = 2383 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 715 = 2606 mm²
4/3 As(req.) = 4 / 3 x 858 = 1144 mm²

Use As = 1144 mm²

∴USE : D 20 @ 200 ( As = 1571.0 mm² ) ∴O.K !

1.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 715
= 547 kN > VU = 403.33 kN ∴ NO USE STIRRUP

Page 314 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 174.47 kN.m/m


As = 15.7 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 15.71 / ( 100 x 71.50 ) = 0.0022
2
k = - ρn + √{ 2ρn +(ρn) } = 0.161
x =kd = 114.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 4.E+09 mm4
fs = n * Ms / Icr *(d-x) = 164.11 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 460.83 mm
Rs2 = 300 (280 / fs) = 511.84 mm
Rs = Min.(Rs1, Rs2) = 460.8 mm > 200 mm ∴ O.K !

1.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.188
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.25 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 315 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Y Direction

Mu = 258.540 kN·m/m, h = 800 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 198.310 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 453.200 kN/m , d = 715 mm , Φb = 0.90 , βc = 0.78

2.1) Rebar Design


Mu 258.54 x 10 6
Required Rn = = 2
= 0.56 N/mm2
φbd² 0.90 x 1000 x 715

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.56


= 1 - 1 -
420 0.85 x 37.5

= 0.0013

As(req.) = ρ x b x d = 0.0013 x 1000 x 715 = 930 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 800 / 2 = 720 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 715 = 2383 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 715 = 2606 mm²
4/3 As(req.) = 4 / 3 x 930 = 1240 mm²

Use As = 1240 mm²

∴USE : D 20 @ 200 ( As = 1571.0 mm² ) ∴O.K !

2.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 715
= 547 kN > VU = 453.20 kN ∴ NO USE STIRRUP

Page 316 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 198.31 kN.m/m


As = 15.7 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 15.71 / ( 100 x 71.50 ) = 0.0022
2
k = - ρn + √{ 2ρn +(ρn) } = 0.161
x =kd = 114.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 4.E+09 mm4
fs = n * Ms / Icr *(d-x) = 186.54 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 382.89 mm
Rs2 = 300 (280 / fs) = 450.31 mm
Rs = Min.(Rs1, Rs2) = 382.9 mm > 200 mm ∴ O.K !

2.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.188
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.28 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 317 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

16.3.2 Pedestal Design

1. 800 X 1000

1) Design Forces
Unit : kN·m
Combinations Part Pu Vux Vuy Mux Muy
I 677.124 52.178 0.238 3.128 305.241
ULC01
J 513.324 52.178 0.238 1.736 20.143
I 1036.000 114.292 4.020 52.081 668.608
ULC02
J 895.600 114.292 4.020 28.564 35.143
I 1057.072 67.924 2.556 -33.117 397.355
ULC03
J 916.672 67.924 2.556 -18.164 35.970
I 871.732 73.714 0.534 6.932 431.227
ULC04
J 731.332 73.714 0.534 3.808 28.698
I 580.032 44.636 0.348 -4.476 261.121
ULC05
J 439.632 44.636 0.348 -2.440 17.251
I 238.296 133.052 0.580 7.545 778.354
ULC06
J 97.896 133.052 0.580 4.152 3.841
I 871.012 73.538 0.570 -7.383 430.197
ULC07
J 730.612 73.538 0.570 -4.048 28.669
I 187.540 250.370 1.286 16.659 1464.665
ULC08
J 47.140 250.370 1.286 9.136 1.850
I 843.312 65.134 8.606 -109.097 381.034
ULC09
J 702.912 65.134 8.606 -58.752 27.582
I 603.672 145.654 0.724 9.353 852.076
ULC10
J 463.272 145.654 0.724 5.118 18.179
I 279.000 17.662 0.996 -12.891 103.323
ULC11
J 173.700 17.662 0.996 -7.064 6.816
I -404.472 194.494 0.860 11.151 1137.790
ULC12
J -509.772 194.494 0.860 6.120 0.000
I 251.300 9.258 9.032 -114.605 54.159
ULC13
J 146.000 9.258 9.032 -61.768 5.729
I 11.660 89.778 0.298 3.845 525.201
ULC14
J -93.640 89.778 0.298 2.102 0.000
Pu max 1057.072 250.370 9.032 -33.117 397.355
Pu min -509.772 250.370 9.032 6.120 0.000
Applied Loads
Mux max 251.300 250.370 9.032 -114.605 54.159
Muy max 187.540 250.370 9.032 16.659 1464.665

- Description
I : Pedestal Lower
J : Pedestal Top

Page 318 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Rebar Design

Page 319 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3) Pedestal Punching Shear Check

Max. Column Load (Pu) - : 1421.23 kN


Compressive strength of con'c : 37.50 Mpa
Yield strength of reinforcement : 420.00 Mpa
con'c cover : 15.00 cm
Strength reduction factor : 0.75

h1 = 80.00 cm = 800.00 mm
PB = 0.80 m = 800.00 mm PL = 1.00 m = 1000.00 mm

d = h1 - con'c cover = 640.00 mm

320 1000 320 Unit : mm

320
800
320

2
ΦVc = 0.75 x 0.17 x + 1 x fck x b0 x d
βC
= 8003129.65 N = 8003.13 kN
αSd
ΦVc = 0.75 x 0.083 x + 2 x fck x b0 x d
b0
= 9251311.24 N = 9251.31 kN
ΦVc = 0.75 x 0.33 x fck x b 0 x d
= 5975187.30 N = 5975.19 kN
βC = 1.25 : Ratio of long side to short side of concentrated load or reaction area
bO = 6160 : Perimeter of critical (mm)
αS = 40 : Interior columns Applied
= 30 : Edge columns
= 20 : Corner columns

ΦVc(MIN) = 5975.19 kN > Vu = 1421.23 kN ∴ O.K

Page 320 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

Page 321 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

16.3.3 Girder Design

1. 800 X 800

1) Rebar Design

Page 322 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

17. TYPE - F12

17.1 Plan & Section

3000

2000
800

1000

150

5700

800

3000

Part Dim. Unit weight Total weight


FB 3000 mm
Foundation FH 2000 mm 25 kN/m3 120.00 kN
FD 800 mm
PB 1000 mm
Pedestal PH 800 mm 25 kN/m3 234.00 kN
2 EA PD 5850 mm
Soil SD 5700 mm 18 kN/m3 451.44 kN

Page 323 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

17.2 Stability Check

17.2.1 Pile Capacity Check

1) Vertical Reaction

Qu = 952.65 kN Max Load Combination- SLC010 (1.0D + 0.75L + 0.525EX)

Qa = 1500 kN
∴ Qu = 952.65 < Qa = 1500.00 O.K

2) Horizontal Reaction

Qu = 33.61 kN Max Load Combination- SLC13 (0.6D + 1.0WY)

Qa = 80 kN
∴ Qu = 33.61 < Qa = 80.00 O.K

3) Uplift Reaction

Qu = N/A kN Max Load Combination- N/A

Qa = 300 kN
∴ Qu = N/A > Qa = 300.00 O.K

- Pile No. (The Pile Number is Used Midas Program Analysis)

Page 324 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Max. Reaction for Stability Check

Vetical & Horizontal


Max

- Min. Reaction for Stability Check

Horizontal
Min

Vetical
Min

Page 325 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

4) Reaction Summary

Load Active Reaction (kN) Stability Check


No.
Case Fx Fy SRSS Fz Horizontal Vertical Uplift
2786 SER(max) 15.79 33.61 37.14 952.65 O.K O.K N.A
2790 SER(max) 15.79 32.66 36.28 760.19 O.K O.K N.A
2807 SER(max) 10.93 19.76 22.58 826.40 O.K O.K N.A
2811 SER(max) 10.93 22.33 24.86 821.46 O.K O.K N.A
2828 SER(max) 10.18 19.84 22.30 845.13 O.K O.K N.A
2832 SER(max) 10.18 22.51 24.70 829.32 O.K O.K N.A
2849 SER(max) 16.58 33.61 37.48 871.60 O.K O.K N.A
2853 SER(max) 16.58 32.77 36.73 715.06 O.K O.K N.A
2870 SER(max) 7.61 24.86 26.00 767.82 O.K O.K N.A
2874 SER(max) 7.61 25.70 26.80 701.70 O.K O.K N.A
2891 SER(max) 10.31 24.69 26.76 793.39 O.K O.K N.A
2895 SER(max) 10.31 25.71 27.70 660.44 O.K O.K N.A
2786 SER(min) -1.31 -2.05 2.43 378.44 O.K O.K N.A
2790 SER(min) -1.31 -1.66 2.11 94.83 O.K O.K N.A
2807 SER(min) -3.67 0.39 3.69 362.79 O.K O.K N.A
2811 SER(min) -3.67 0.11 3.67 195.25 O.K O.K N.A
2828 SER(min) -2.80 0.23 2.81 337.99 O.K O.K N.A
2832 SER(min) -2.80 0.39 2.82 203.79 O.K O.K N.A
2849 SER(min) -1.27 -1.79 2.19 273.71 O.K O.K N.A
2853 SER(min) -1.27 -1.49 1.96 68.59 O.K O.K N.A
2870 SER(min) -2.28 -0.01 2.28 305.92 O.K O.K N.A
2874 SER(min) -2.28 -0.49 2.33 190.14 O.K O.K N.A
2891 SER(min) -1.54 -0.16 1.55 320.93 O.K O.K N.A
2895 SER(min) -1.54 -0.58 1.65 179.96 O.K O.K N.A
Max. 37.48 952.65
Min 1.55 68.59
Total SER(MAX) 31.59 66.27
Total SER(MIN) -2.61 -3.71

Page 326 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

5) Consider Effect of Group Piles (Refer to Section 3.4.5.9, ACI 336.3R-15.)

Pile Spacing Reduction Factor


8d 1.00
6d 0.70
4d 0.40
3d 0.25 where, d : Pile Diameter

Fx max = 31.59 kN
(Refer to Reaction Summay table)

Fx max = 66.27 kN
(Refer to Reaction Summay table)

X Dir. FDN - 3 Y Dir. FDN - 3


Pile No. Distance α Factor Pile No. Distance α Factor
2786 1500 1.88 0.08 2786 g Guide 1.00
2790 g Guide 1.00 2790 g Guide 1.00
SUM. 1.08 SUM. 2.00

6) Horizontal Reaction Check for Consider Effect of Group Piles

- X Direction

Qu = 31.59 kN

Qa = 140 x 108% = 151 kN


∴ Qu = 31.59 < Qa = 151.38 O.K

- Y Direction

Qu = 66.27 kN

Qa = 140 x 200% = 280 kN


∴ Qu = 66.27 < Qa = 280.00 O.K

Page 327 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

17.2.2 Pile Punching Shear Check

Max. Pile Reaction (Pu) : 1304.71 kN


Max Load Combination- ULC09 (1.2D + 1.0L + 1.0EY)
Compressive strength of con'c : 37.5 Mpa
Yield strength of reinforcement : 420 Mpa
Strength reduction factor : 0.75
Con'c cover : 15.0 cm
Footing Thk. (h) : 800 cm = 8000 mm
Pile Dia. : 0.8 m = 800 mm
d = h - con'c cover : 650.0 mm

Unit : mm

2
ΦVc = 0.75 x 0.17 x + 1 x fck x b0 x d
βC
= 6935508.45 N
= 6935.51 kN
αSd
ΦVc = 0.75 x 0.083 x + 2 x fck x b0 x d
b0
= 8699751.12 N
= 8699.75 kN
ΦVc = 0.75 x 0.33 x fck x b0 x d
= 4487681.94 N
= 4487.68 kN
βC = 1.00 : Ratio of long side to short side of concentrated load or reaction area
bO = 4555 : Perimeter of critical (mm)
αS = 40 : Interior columns Applied
= 30 : Edge columns
= 20 : Corner columns

ΦVc(MIN) = 4487.68 kN > Vu = 1304.71 kN ∴ O.K

Page 328 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Max. Vertical Reaction for Member Design

Vertical
Max

17.2.3 Foundatoin Settlement Check

- Detail settlement check to be included in Soil Improvement Design Report.

Page 329 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

17.3 Member Design

In line with that, this section is focused on seeking where greater or lesser values than (±)ΦMn are using
the stress contour range in MIDAS Program, then adding supplementary rebar where required, checking that the stress
resultant output is not greater or lesser than revised design moment (±)ΦMn any more (where, the sign (+) means
tension stress in bottom and (-) in top of concrete foundation) and verifying no need of reinforcing bar.
The moment and shear force was determined on the basis of critical section.
Case of occurs stress is concentrated, it is unsuitable for use as a design value.
Thus, using the average value of the near stress

17.3.4 Footing THK. 800mm

1. Calculation Result for Member Design - Factored Load Case

- Mxx (Max.)

X
Z

Value
(kN·m/m)
109.65

Page 330 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Mxx (Min.)

X
Z

Value
(kN·m/m)
11.35

Page 331 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Max.)

X
Z

Value
(kN·m/m)
106.90

Page 332 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Min.)

X
Z

Value
(kN·m/m)
19.28

Page 333 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Vxx (ABS Max.)

X
Z

Value
(kN/m)
61.41

Page 334 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Vyy (ABS Max.)

X
Z

Value
(kN/m)
60.72

Page 335 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2. Calculation Result for Crack Check - Unfactored Load Case

- Mxx (Max.)

X
Z

Value
(kN·m/m)
79.91
63.52
AVERAGE
71.72

Page 336 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Mxx (Min.)

X
Z

Value
(kN·m/m)
8.44

Page 337 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Max.)

X
Z

Value
(kN·m/m)
77.04

Page 338 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Min.)

X
Z

Value
(kN·m/m)
14.34

Page 339 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3. Calculation Result Summary

angle of main axis l f i

Factored Condition Unfactored Condition


Mxx Myy Vxx Vyy Mxx Myy
Classification
(kN·m/m) (kN·m/m) (kN/m) (kN/m) (kN·m/m) (kN·m/m)
Bottom 109.65 106.90 71.72 77.04
61.41 60.72
Top 11.35 19.28 8.44 14.34

4. Rebar Design (Bottom Rebar)

1) X Direction

Mu = 109.650 kN·m/m, h = 800 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 71.715 kN·m/m, d' = 150 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 61.410 kN/m , d = 642 mm , Φb = 0.90 , βc = 0.78

1.1) Rebar Design


Mu 109.65 x 10 6
Required Rn = = 2
= 0.30 N/mm2
φbd² 0.90 x 1000 x 642

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.30


= 1 - 1 -
420 0.85 x 37.5

= 0.0007

As(req.) = ρ x b x d = 0.0007 x 1000 x 642 = 450


mm²
As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 800 / 2 = 720
mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 642 = 2140 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 642 = 2340 mm²
4/3 As(req.) = 4 / 3 x 450 = 600 mm²

Use As = 720 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

Page 340 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 642
= 491 kN > VU = 61.41 kN ∴ NO USE STIRRUP

1.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 71.715 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 64.20 ) = 0.0016
2
k = - ρn + √{ 2ρn +(ρn) } = 0.138
x =kd = 88.3 mm
Icr = b x3 / 3 + n As (d - x) 2 = 2.E+09 mm4
fs = n * Ms / Icr *(d-x) = 116.43 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 538.84 mm
Rs2 = 300 (280 / fs) = 721.46 mm
Rs = Min.(Rs1, Rs2) = 538.8 mm > 200 mm ∴ O.K !

1.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.157
A = 2 x 150 x 1000.00 / 7 = 42857 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.27 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 341 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Y Direction

Mu = 106.900 kN·m/m, h = 800 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 77.040 kN·m/m, d' = 150 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 60.720 kN/m , d = 642 mm , Φb = 0.90 , βc = 0.78

2.1) Rebar Design


Mu 106.90 x 10 6
Required Rn = = 2
= 0.29 N/mm2
φbd² 0.90 x 1000 x 642

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.29


= 1 - 1 -
420 0.85 x 37.5

= 0.0007

As(req.) = ρ x b x d = 0.0007 x 1000 x 642 = 450 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 800 / 2 = 720 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 642 = 2140 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 642 = 2340 mm²
4/3 As(req.) = 4 / 3 x 450 = 600 mm²

Use As = 720 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

2.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 642
= 491 kN > VU = 60.72 kN ∴ NO USE STIRRUP

Page 342 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 77.04 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 64.20 ) = 0.0016
2
k = - ρn + √{ 2ρn +(ρn) } = 0.138
x =kd = 88.3 mm
Icr = b x3 / 3 + n As (d - x) 2 = 2.E+09 mm4
fs = n * Ms / Icr *(d-x) = 125.08 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 475.68 mm
Rs2 = 300 (280 / fs) = 671.59 mm
Rs = Min.(Rs1, Rs2) = 475.7 mm > 200 mm ∴ O.K !

2.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.157
A = 2 x 150 x 1000.00 / 7 = 42857 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.29 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 343 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

5. Rebar Design (Top Rebar)

1) X Direction

Mu = 11.350 kN·m/m, h = 800 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 8.440 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 61.410 kN/m , d = 717 mm , Φb = 0.90 , βc = 0.78

1.1) Rebar Design


Mu 11.35 x 10 6
Required Rn = = 2
= 0.02 N/mm2
φbd² 0.90 x 1000 x 717

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.02


= 1 - 1 -
420 0.85 x 37.5

= 0.0000

As(req.) = ρ x b x d = 0.0000 x 1000 x 717 = 0 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 800 / 2 = 720 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 717 = 2390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 717 = 2614 mm²
4/3 As(req.) = 4 / 3 x 0 = 0 mm²

Use As = 720 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

1.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 717
= 549 kN > VU = 61.41 kN ∴ NO USE STIRRUP

Page 344 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 8.44 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 71.70 ) = 0.0014
2
k = - ρn + √{ 2ρn +(ρn) } = 0.131
x =kd = 93.7 mm
Icr = b x3 / 3 + n As (d - x) 2 = 3.E+09 mm4
fs = n * Ms / Icr *(d-x) = 12.24 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 8505.34 mm
Rs2 = 300 (280 / fs) = 6862.77 mm
Rs = Min.(Rs1, Rs2) = 6862.8 mm > 200 mm ∴ O.K !

1.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.148
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.02 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 345 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Y Direction

Mu = 19.280 kN·m/m, h = 800 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 14.340 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 60.720 kN/m , d = 717 mm , Φb = 0.90 , βc = 0.78

2.1) Rebar Design


Mu 19.28 x 10 6
Required Rn = = 2
= 0.04 N/mm2
φbd² 0.90 x 1000 x 717

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.04


= 1 - 1 -
420 0.85 x 37.5

= 0.0001

As(req.) = ρ x b x d = 0.0001 x 1000 x 717 = 72 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 800 / 2 = 720 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 717 = 2390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 717 = 2614 mm²
4/3 As(req.) = 4 / 3 x 72 = 96 mm²

Use As = 720 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

2.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 717
= 549 kN > VU = 60.72 kN ∴ NO USE STIRRUP

Page 346 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 14.34 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 71.70 ) = 0.0014
2
k = - ρn + √{ 2ρn +(ρn) } = 0.131
x =kd = 93.7 mm
Icr = b x3 / 3 + n As (d - x) 2 = 3.E+09 mm4
fs = n * Ms / Icr *(d-x) = 20.80 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 4928.79 mm
Rs2 = 300 (280 / fs) = 4039.17 mm
Rs = Min.(Rs1, Rs2) = 4039.2 mm > 200 mm ∴ O.K !

2.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.148
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.03 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 347 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

17.3.2 Pedestal Design

1. 800 X 1000

1) Design Forces
Unit : kN·m
Combinations Part Pu Vux Vuy Mux Muy
I 279.160 7.616 0.392 5.079 44.554
ULC01
J 115.360 7.616 0.392 2.786 4.527
I 452.528 36.828 2.404 34.759 215.444
ULC02
J 312.128 36.828 2.404 20.696 12.248
I 452.528 4.164 1.700 -18.313 24.359
ULC03
J 312.128 4.164 1.700 -8.368 12.248
I 372.560 15.258 0.346 6.772 89.259
ULC04
J 232.160 15.258 0.346 4.748 9.110
I 239.280 6.528 0.336 4.354 38.189
ULC05
J 98.880 6.528 0.336 2.388 3.880
I 108.360 36.752 0.496 6.442 214.999
ULC06
J -32.040 36.752 0.496 3.540 0.000
I 372.560 15.258 0.346 6.772 89.259
ULC07
J 232.160 15.258 0.346 4.748 9.110
I 110.720 75.706 0.666 10.948 442.880
ULC08
J -29.680 75.706 0.666 7.052 0.000
I 369.130 14.988 20.814 -265.154 87.680
ULC09
J 228.730 14.988 20.814 -143.392 8.975
I 287.310 35.218 0.446 8.067 206.025
ULC10
J 146.910 35.218 0.446 5.458 5.765
I 105.300 0.000 0.000 0.000 4.132
ULC11
J 0.000 0.000 0.000 0.000 0.000
I -156.540 60.448 0.320 4.176 353.621
ULC12
J -261.840 60.448 0.320 2.304 0.000
I 101.870 0.270 21.160 -271.926 3.997
ULC13
J -3.430 0.270 21.160 -148.140 0.000
I 20.050 19.960 0.100 1.295 116.766
ULC14
J -85.250 19.960 0.100 0.710 0.000
Pu max 452.528 75.706 21.160 34.759 215.444
Pu min -261.840 75.706 21.160 2.304 0.000
Applied Loads
Mux max 101.870 75.706 21.160 -271.926 3.997
Muy max 110.720 75.706 21.160 10.948 442.880

- Description
I : Pedestal Lower
J : Pedestal Top

Page 348 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Rebar Design

Page 349 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3) Pedestal Punching Shear Check

Max. Column Load (Pu) - : 694.75 kN


Compressive strength of con'c : 37.50 Mpa
Yield strength of reinforcement : 420.00 Mpa
con'c cover : 64.20 cm
Strength reduction factor : 0.75

h1 = 80.00 cm = 800.00 mm
PB = 0.80 m = 800.00 mm PL = 1.00 m = 1000.00 mm

d = h1 - con'c cover = 642.00 mm

1000 321 Unit : mm

321
800
321

2
ΦVc = 0.75 x 0.17 x + 1 x fck x b0 x d
βC
= 5322552.18 N = 5322.55 kN
αSd
ΦVc = 0.75 x 0.083 x + 2 x fck x b0 x d
b0
= 6712497.83 N = 6712.50 kN
ΦVc = 0.75 x 0.33 x fck x b 0 x d
= 3973851.18 N = 3973.85 kN
βC = 1.25 : Ratio of long side to short side of concentrated load or reaction area
bO = 4084 : Perimeter of critical (mm)
αS = 40 : Interior columns
= 30 : Edge columns Applied
= 20 : Corner columns

ΦVc(MIN) = 3973.85 kN > Vu = 694.75 kN ∴ O.K

Page 350 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

Page 351 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

17.3.3 Girder Design

1. 800 X 800

1) Rebar Design

Page 352 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

18. TYPE - F13

18.1 Plan & Section

1900

600
1700

400

150

1000

500

1900

Part Dim. Unit weight Total weight


FB 1900 mm
Foundation FH 1700 mm 25 kN/m3 40.38 kN
FD 500 mm
PB 600 mm
Pedestal
PH 400 mm 25 kN/m3 6.90 kN
(1EA)
PD 1150 mm
Soil SD 1000 mm 18 kN/m3 49.5 kN

Page 353 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

18.2 Stability Check

18.2.1 Soil Bearing Check

LOAD COM Qa Reaction Qu


Check Remark
CASE (kN/m2) (kN) (kN/m2)
1 SLC01 150.000 190.799 59.07 O.K
Normal Operating
2 SLC02 150.000 264.206 81.80 O.K
Case (Long Term)
3 SLC03 150.000 264.206 81.80 O.K
4 SLC04 200.000 190.799 59.07 O.K
5 SLC05 200.000 149.271 46.21 O.K
6 SLC06 200.000 194.294 60.15 O.K
7 SLC07 200.000 165.784 51.33 O.K
8 SLC08 200.000 245.854 76.12 O.K
9 SLC09 200.000 214.709 66.47 O.K Wind & Seismic
10 SLC10 200.000 248.476 76.93 O.K Case (Shot Term)
11 SLC11 200.000 227.094 70.31 O.K
12 SLC12 200.000 114.479 35.44 O.K
13 SLC13 200.000 72.951 22.59 O.K
14 SLC14 200.000 117.974 36.52 O.K
15 SLC15 200.000 89.465 27.70 O.K

18.2.2 Sliding & Overturning Check

1) Load Table (From Steel Structure)


Unit : kN·m
Node Load Case FX FY FZ MX MY
Con'c self weight 0.00 0.00 47.28 0.00 0.00
Dead Soil Weight 0.00 0.00 49.50 0.00 0.00
Rack Dead -3.01 -11.86 94.02 0.00 5.33
Surcharge 0.00 0.00 14.95 0.00 0.00
Live LL -0.98 -7.14 58.46 0.00 1.76
Sub Total -0.98 -7.14 73.41 0.00 1.76
MD#5-3
X 0.00 0.00 0.00 0.00 0.00
Wind
Y 1.93 16.66 -41.53 0.00 10.76
X 12.06 -2.07 4.99 0.00 60.45
Seismic
Y 1.28 11.80 -35.73 0.00 6.69
+ 0.36 -25.64 0.00 0.00 1.82
Temp
- -0.36 25.64 0.00 0.00 -1.82

Page 354 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Sliding Check X-Direction

- Safe Factor of Sliding 2.0 (from Civil Design Criteria)


- Safe Factor of Sliding 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)
- Friction Factor of Concrete to Soil 0.4 (from Civil Design Criteria)

LOAD COM Sliding Force Resisting Friction Safety


Check
CASE (kN) Force (kN) Factor Factor
1 SLC01 0.00 76.32 0.4 N/A O.K
2 SLC02 0.62 105.68 0.4 170.6 O.K
3 SLC03 1.33 105.68 0.4 79.3 O.K
4 SLC04 0.00 76.32 0.4 N/A O.K
5 SLC05 1.93 59.71 0.4 31.0 O.K
6 SLC06 8.44 77.72 0.4 9.2 O.K
7 SLC07 0.89 66.31 0.4 74.2 O.K
8 SLC08 0.73 98.34 0.4 134.4 O.K
9 SLC09 0.71 85.88 0.4 120.2 O.K
10 SLC10 5.60 99.39 0.4 17.8 O.K
11 SLC11 0.06 90.84 0.4 1477.6 O.K
12 SLC12 0.00 45.79 0.4 N/A O.K
13 SLC13 1.93 29.18 0.4 15.1 O.K
14 SLC14 8.44 47.19 0.4 5.6 O.K
15 SLC15 0.89 35.79 0.4 40.0 O.K

3) Sliding Check Y-Direction

- Safe Factor of Sliding 2.0 (from Civil Design Criteria)


- Safe Factor of Sliding 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)
- Friction Factor of Concrete to Soil 0.4 (from Civil Design Criteria)

LOAD COM Sliding Force Resisting Friction Safety


Check
CASE (kN) Force (kN) Factor Factor
1 SLC01 11.86 76.32 0.4 6.4 O.K
2 SLC02 44.64 105.68 0.4 2.4 O.K
3 SLC03 6.64 105.68 0.4 15.9 O.K
4 SLC04 11.86 76.32 0.4 6.4 O.K
5 SLC05 4.80 59.71 0.4 12.4 O.K
6 SLC06 13.31 77.72 0.4 5.8 O.K
7 SLC07 3.60 66.31 0.4 18.4 O.K
8 SLC08 17.21 98.34 0.4 5.7 O.K
9 SLC09 4.72 85.88 0.4 18.2 O.K
10 SLC10 18.30 99.39 0.4 5.4 O.K
11 SLC11 11.02 90.84 0.4 8.2 O.K
12 SLC12 7.12 45.79 0.4 6.4 O.K
13 SLC13 9.54 29.18 0.4 3.1 O.K
14 SLC14 8.56 47.19 0.4 5.5 O.K
15 SLC15 1.14 35.79 0.4 31.3 O.K

Page 355 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

4) Overturing Check X-Direction

- Safe Factor of Overturning 2.0 (from Civil Design Criteria)


- Safe Factor of Overturning 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)

Overturning Overturning Resisting Resisting


LOAD COM Safety
Moment ARM Moment ARM Check
CASE Factor
(kN·m) (m) (kN·m) (m)
1 SLC01 5.33 1.65 181.26 Calculated 34.0 O.K
2 SLC02 9.49 1.65 252.61 Calculated 26.6 O.K
3 SLC03 7.08 1.65 255.01 Calculated 36.0 O.K
4 SLC04 5.33 1.65 181.26 Calculated 34.0 O.K
5 SLC05 58.72 1.65 181.26 Calculated 3.1 O.K
6 SLC06 61.57 1.65 184.58 Calculated 3.0 O.K
7 SLC07 35.24 1.65 181.26 Calculated 5.1 O.K
8 SLC08 6.64 1.65 234.77 Calculated 35.3 O.K
9 SLC09 46.69 1.65 234.77 Calculated 5.0 O.K
10 SLC10 48.83 1.65 237.26 Calculated 4.9 O.K
11 SLC11 29.08 1.65 234.77 Calculated 8.1 O.K
12 SLC12 3.20 1.65 108.76 Calculated 34.0 O.K
13 SLC13 56.59 1.65 108.76 Calculated 1.9 O.K
14 SLC14 59.44 1.65 112.08 Calculated 1.9 O.K
15 SLC15 33.11 1.65 108.76 Calculated 3.3 O.K

5) Overturing Check Y-Direction

- Safe Factor of Overturning 2.0 (from Civil Design Criteria)


- Safe Factor of Overturning 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)

Overturning Overturning Resisting Resisting


LOAD COM Safety
Moment ARM Moment ARM Check
CASE Factor
(kN·m) (m) (kN·m) (m)
1 SLC01 0.00 1.65 181.75 Calculated N/A O.K
2 SLC02 0.00 1.65 298.24 Calculated N/A O.K
3 SLC03 42.31 1.65 255.92 Calculated 6.1 O.K
4 SLC04 0.00 1.65 181.75 Calculated N/A O.K
5 SLC05 62.79 1.65 181.75 Calculated 2.9 O.K
6 SLC06 0.00 1.65 187.11 Calculated N/A O.K
7 SLC07 34.89 1.65 181.75 Calculated 5.2 O.K
8 SLC08 0.00 1.65 237.38 Calculated N/A O.K
9 SLC09 47.09 1.65 237.38 Calculated 5.0 O.K
10 SLC10 0.00 1.65 241.40 Calculated N/A O.K
11 SLC11 26.17 1.65 237.38 Calculated 9.1 O.K
12 SLC12 0.00 1.65 109.05 Calculated N/A O.K
13 SLC13 62.79 1.65 109.05 Calculated 1.7 O.K
14 SLC14 0.00 1.65 114.41 Calculated N/A O.K
15 SLC15 34.89 1.65 109.05 Calculated 3.1 O.K

Page 356 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

18.2.3 Foundatoin Settlement Check

- Detail settlement check to be included in Soil Improvement Design Report.

Page 357 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

18.3 Member Design

In line with that, this section is focused on seeking where greater or lesser values than (±)ΦMn are using
the stress contour range in MIDAS Program, then adding supplementary rebar where required, checking that the stress
resultant output is not greater or lesser than revised design moment (±)ΦMn any more (where, the sign (+) means
tension stress in bottom and (-) in top of concrete foundation) and verifying no need of reinforcing bar.
The moment and shear force was determined on the basis of critical section.
Case of occurs stress is concentrated, it is unsuitable for use as a design value.
Thus, using the average value of the near stress

18.3.1 Footing THK. 500mm

1. Calculation Result for Member Design - Factored Load Case

- Mxx (Max.)

X
Z

Value
(kN·m/m)
25.73

Page 358 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Mxx (Min.)

X
Z

Value
(kN·m/m)
10.89

Page 359 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Max.)

X
Z

Value
(kN·m/m)
33.45

Page 360 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Min.)

X
Z

Value
(kN·m/m)
9.04

Page 361 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Vxx (ABS Max.)

X
Z

Value
(kN/m)
89.85

Page 362 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Vyy (ABS Max.)

X
Z

Value
(kN/m)
134.90

Page 363 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2. Calculation Result for Crack Check - Unfactored Load Case

- Mxx (Max.)

X
Z

Value
(kN·m/m)
17.21

Page 364 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Mxx (Min.)

X
Z

Value
(kN·m/m)
6.51

Page 365 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Max.)

X
Z

Value
(kN·m/m)
22.92

Page 366 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Min.)

X
Z

Value
(kN·m/m)
3.27

Page 367 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3. Calculation Result Summary

angle of main axis l f i

Factored Condition Unfactored Condition


Mxx Myy Vxx Vyy Mxx Myy
Classification
(kN·m/m) (kN·m/m) (kN/m) (kN/m) (kN·m/m) (kN·m/m)
Bottom 25.73 33.45 17.21 22.92
89.85 134.90
Top 10.89 9.04 6.51 3.27

4. Rebar Design (Bottom Rebar)

1) X Direction

Mu = 25.730 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 17.210 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 89.850 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

1.1) Rebar Design


Mu 25.73 x 10 6
Required Rn = = 2
= 0.16 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.16


= 1 - 1 -
420 0.85 x 37.5

= 0.0004

As(req.) = ρ x b x d = 0.0004 x 1000 x 417 = 167


mm²
As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450
mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 167 = 223 mm²

Use As = 450 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

Page 368 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 89.85 kN ∴ NO USE STIRRUP

1.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 17.21 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 43.47 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 2259.91 mm
Rs2 = 300 (280 / fs) = 1932.17 mm
Rs = Min.(Rs1, Rs2) = 1932.2 mm > 200 mm ∴ O.K !

1.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.07 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 369 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Y Direction

Mu = 33.450 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 22.920 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 134.900 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

2.1) Rebar Design


Mu 33.45 x 10 6
Required Rn = = 2
= 0.21 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.21


= 1 - 1 -
420 0.85 x 37.5

= 0.0005

As(req.) = ρ x b x d = 0.0005 x 1000 x 417 = 209 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 209 = 279 mm²

Use As = 450 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

2.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 134.90 kN ∴ NO USE STIRRUP

Page 370 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 22.92 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 57.90 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 1650.19 mm
Rs2 = 300 (280 / fs) = 1450.81 mm
Rs = Min.(Rs1, Rs2) = 1450.8 mm > 200 mm ∴ O.K !

2.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.09 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 371 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

5. Rebar Design (Top Rebar)

1) X Direction

Mu = 10.890 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 6.510 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 89.850 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

1.1) Rebar Design


Mu 10.89 x 10 6
Required Rn = = 2
= 0.07 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.07


= 1 - 1 -
420 0.85 x 37.5

= 0.0002

As(req.) = ρ x b x d = 0.0002 x 1000 x 417 = 84 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 84 = 112 mm²

Use As = 450 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

1.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 89.85 kN ∴ NO USE STIRRUP

Page 372 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 6.51 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 16.45 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 6282.54 mm
Rs2 = 300 (280 / fs) = 5107.93 mm
Rs = Min.(Rs1, Rs2) = 5107.9 mm > 200 mm ∴ O.K !

1.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.02 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 373 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Y Direction

Mu = 9.040 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 3.270 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 134.900 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

2.1) Rebar Design


Mu 9.04 x 10 6
Required Rn = = 2
= 0.06 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.06


= 1 - 1 -
420 0.85 x 37.5

= 0.0001

As(req.) = ρ x b x d = 0.0001 x 1000 x 417 = 42 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 42 = 56 mm²

Use As = 450 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

2.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 134.90 kN ∴ NO USE STIRRUP

Page 374 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 3.27 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 8.26 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 12693.22 mm
Rs2 = 300 (280 / fs) = 10168.99 mm
Rs = Min.(Rs1, Rs2) = 10169.0 mm > 200 mm ∴ O.K !

2.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.01 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 375 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

18.3.2 Pedestal Design

1. 400 X 600

1) Design Forces
Unit : kN·m
Combinations Part Pu Vux Vuy Mux Muy
I 141.302 16.604 4.214 2.602 19.095
ULC01
J 131.642 16.604 4.214 7.448 0.000
I 214.652 56.424 4.748 5.924 64.888
ULC02
J 206.372 56.424 4.748 11.384 0.000
I 214.652 5.112 5.612 0.562 -5.879
ULC03
J 206.372 5.112 5.612 7.016 0.000
I 179.576 21.372 4.592 2.863 24.578
ULC04
J 171.296 21.372 4.592 8.144 0.000
I 121.116 14.232 3.612 2.230 16.367
ULC05
J 112.836 14.232 3.612 6.384 0.000
I 87.892 0.904 2.068 12.614 1.040
ULC06
J 79.612 0.904 2.068 14.992 0.000
I 179.576 21.372 4.592 2.863 24.578
ULC07
J 171.296 21.372 4.592 8.144 0.000
I 113.128 5.284 1.504 23.630 -6.077
ULC08
J 104.848 5.284 1.504 25.360 0.000
I 184.566 23.442 7.468 77.182 26.958
ULC09
J 176.286 23.442 7.468 68.594 0.000
I 143.846 9.572 3.312 11.025 11.008
ULC10
J 135.566 9.572 3.312 14.834 0.000
I 43.452 4.851 0.828 0.524 5.579
ULC11
J 37.242 4.851 0.828 1.476 0.000
I -22.996 21.805 2.260 21.291 -25.076
ULC12
J -29.206 21.805 2.260 18.692 0.000
I 48.442 6.921 11.232 74.843 7.959
ULC13
J 42.232 6.921 11.232 61.926 0.000
I 7.722 6.949 0.452 8.686 -7.991
ULC14
J 1.512 6.949 0.452 8.166 0.000
Pu max 214.652 56.424 11.232 5.924 64.888
Pu min -29.206 56.424 11.232 18.692 0.000
Applied Loads
Mux max 184.566 56.424 11.232 77.182 26.958
Muy max 214.652 56.424 11.232 5.924 64.888

- Description
I : Pedestal Lower
J : Pedestal Top

Page 376 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Rebar Design

Page 377 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3) Pedestal Punching Shear Check

Max. Column Load (Pu) - : 303.85 kN


Compressive strength of con'c : 37.50 Mpa
Yield strength of reinforcement : 420.00 Mpa
con'c cover : 7.50 cm
Strength reduction factor : 0.75

h1 = 50.00 cm = 500.00 mm
PB = 0.40 m = 400.00 mm PL = 0.60 m = 600.00 mm

d = h1 - con'c cover = 417.00 mm

209 600 209 Unit : mm

209
400
209

2
ΦVc = 0.75 x 0.17 x + 1 x fck x b0 x d
βC
= 2786557.35 N = 2786.56 kN
αSd
ΦVc = 0.75 x 0.083 x + 2 x fck x b0 x d
b0
= 2491875.27 N = 2491.88 kN
ΦVc = 0.75 x 0.33 x fck x b 0 x d
= 2318228.38 N = 2318.23 kN
βC = 1.50 : Ratio of long side to short side of concentrated load or reaction area
bO = 3668 : Perimeter of critical (mm)
αS = 40 : Interior columns Applied
= 30 : Edge columns
= 20 : Corner columns

ΦVc(MIN) = 2318.23 kN > Vu = 303.85 kN ∴ O.K

Page 378 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

Page 379 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

19. TYPE - F14

19.1 Plan & Section

1700

400
1700

600

150

1000

500

1700

Part Dim. Unit weight Total weight


FB 1700 mm
Foundation FH 1700 mm 25 kN/m3 36.13 kN
FD 500 mm
PB 400 mm
Pedestal
PH 600 mm 25 kN/m3 6.90 kN
(1EA)
PD 1150 mm
Soil SD 1000 mm 18 kN/m3 43.38 kN

Page 380 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

19.2 Stability Check

19.2.1 Soil Bearing Check

LOAD COM Qa Reaction Qu


Check Remark
CASE (kN/m2) (kN) (kN/m2)
1 SLC01 150.000 140.497 48.61 O.K
Normal Operating
2 SLC02 150.000 191.652 66.32 O.K
Case (Long Term)
3 SLC03 150.000 191.652 66.32 O.K
4 SLC04 200.000 140.497 48.61 O.K
5 SLC05 200.000 108.654 37.60 O.K
6 SLC06 200.000 137.745 47.66 O.K
7 SLC07 200.000 128.369 44.42 O.K
8 SLC08 200.000 178.863 61.89 O.K
9 SLC09 200.000 154.981 53.63 O.K Wind & Seismic
10 SLC10 200.000 176.799 61.18 O.K Case (Shot Term)
11 SLC11 200.000 169.767 58.74 O.K
12 SLC12 200.000 84.298 29.17 O.K
13 SLC13 200.000 52.456 18.15 O.K
14 SLC14 200.000 81.546 28.22 O.K
15 SLC15 200.000 72.170 24.97 O.K

19.2.2 Sliding & Overturning Check

1) Load Table (From Steel Structure)


Unit : kN·m
Node Load Case FX FY FZ MX MY
Con'c self weight 0.00 0.00 49.93 0.00 0.00
Dead Soil Weight 0.00 0.00 43.38 0.00 0.00
Rack Dead 1.34 -6.73 47.19 0.00 -2.35
Surcharge 0.00 0.00 13.25 0.00 0.00
Live LL 0.85 -4.87 37.90 0.00 -1.49
Sub Total 0.85 -4.87 51.15 0.00 -1.49
MD#2-1
X 0.00 0.00 0.00 0.00 0.00
Wind
Y -1.93 12.76 -31.84 0.00 -10.65
X 5.39 1.39 -3.93 0.00 26.44
Seismic
Y -0.71 5.77 -17.33 0.00 -3.70
+ -0.22 -25.68 0.00 0.00 -1.14
Temp
- 0.22 25.68 0.00 0.00 1.14

Page 381 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Sliding Check X-Direction

- Safe Factor of Sliding 2.0 (from Civil Design Criteria)


- Safe Factor of Sliding 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)
- Friction Factor of Concrete to Soil 0.4 (from Civil Design Criteria)

LOAD COM Sliding Force Resisting Friction Safety


Check
CASE (kN) Force (kN) Factor Factor
1 SLC01 0.00 56.20 0.4 N/A O.K
2 SLC02 0.63 76.66 0.4 122.2 O.K
3 SLC03 1.07 76.66 0.4 71.4 O.K
4 SLC04 0.00 56.20 0.4 N/A O.K
5 SLC05 1.93 43.46 0.4 22.5 O.K
6 SLC06 3.77 55.10 0.4 14.6 O.K
7 SLC07 0.50 51.35 0.4 103.2 O.K
8 SLC08 0.64 71.55 0.4 112.1 O.K
9 SLC09 0.81 61.99 0.4 76.3 O.K
10 SLC10 3.47 70.72 0.4 20.4 O.K
11 SLC11 0.26 67.91 0.4 256.5 O.K
12 SLC12 0.00 33.72 0.4 N/A O.K
13 SLC13 1.93 20.98 0.4 10.9 O.K
14 SLC14 3.77 32.62 0.4 8.7 O.K
15 SLC15 0.50 28.87 0.4 58.0 O.K

3) Sliding Check Y-Direction

- Safe Factor of Sliding 2.0 (from Civil Design Criteria)


- Safe Factor of Sliding 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)
- Friction Factor of Concrete to Soil 0.4 (from Civil Design Criteria)

LOAD COM Sliding Force Resisting Friction Safety


Check
CASE (kN) Force (kN) Factor Factor
1 SLC01 6.73 56.20 0.4 8.3 O.K
2 SLC02 37.29 76.66 0.4 2.1 O.K
3 SLC03 14.07 76.66 0.4 5.5 O.K
4 SLC04 6.73 56.20 0.4 8.3 O.K
5 SLC05 6.02 43.46 0.4 7.2 O.K
6 SLC06 5.76 55.10 0.4 9.6 O.K
7 SLC07 2.70 51.35 0.4 19.1 O.K
8 SLC08 10.39 71.55 0.4 6.9 O.K
9 SLC09 0.82 61.99 0.4 75.5 O.K
10 SLC10 9.66 70.72 0.4 7.3 O.K
11 SLC11 7.36 67.91 0.4 9.2 O.K
12 SLC12 4.04 33.72 0.4 8.3 O.K
13 SLC13 8.72 20.98 0.4 2.4 O.K
14 SLC14 3.07 32.62 0.4 10.6 O.K
15 SLC15 0.00 28.87 0.4 N/A O.K

Page 382 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

4) Overturing Check X-Direction

- Safe Factor of Overturning 2.0 (from Civil Design Criteria)


- Safe Factor of Overturning 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)

Overturning Overturning Resisting Resisting


LOAD COM Safety
Moment ARM Moment ARM Check
CASE Factor
(kN·m) (m) (kN·m) (m)
1 SLC01 0.00 1.65 121.78 Calculated N/A O.K
2 SLC02 1.40 1.65 168.26 Calculated 119.9 O.K
3 SLC03 2.91 1.65 166.75 Calculated 57.2 O.K
4 SLC04 0.00 1.65 121.78 Calculated N/A O.K
5 SLC05 27.07 1.65 135.62 Calculated 5.0 O.K
6 SLC06 27.07 1.65 121.78 Calculated 4.5 O.K
7 SLC07 10.31 1.65 125.19 Calculated 12.1 O.K
8 SLC08 1.05 1.65 155.50 Calculated 147.7 O.K
9 SLC09 21.35 1.65 165.89 Calculated 7.8 O.K
10 SLC10 21.36 1.65 155.50 Calculated 7.3 O.K
11 SLC11 8.78 1.65 158.06 Calculated 18.0 O.K
12 SLC12 0.00 1.65 73.07 Calculated N/A O.K
13 SLC13 27.07 1.65 86.91 Calculated 3.2 O.K
14 SLC14 27.07 1.65 73.07 Calculated 2.7 O.K
15 SLC15 10.31 1.65 76.48 Calculated 7.4 O.K

5) Overturing Check Y-Direction

- Safe Factor of Overturning 2.0 (from Civil Design Criteria)


- Safe Factor of Overturning 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)

Overturning Overturning Resisting Resisting


LOAD COM Safety
Moment ARM Moment ARM Check
CASE Factor
(kN·m) (m) (kN·m) (m)
1 SLC01 0.00 1.65 130.54 Calculated N/A O.K
2 SLC02 0.00 1.65 224.43 Calculated N/A O.K
3 SLC03 42.37 1.65 182.06 Calculated 4.3 O.K
4 SLC04 0.00 1.65 130.54 Calculated N/A O.K
5 SLC05 48.12 1.65 130.54 Calculated 2.7 O.K
6 SLC06 3.95 1.65 130.54 Calculated 33.1 O.K
7 SLC07 16.97 1.65 130.54 Calculated 7.7 O.K
8 SLC08 0.00 1.65 169.18 Calculated N/A O.K
9 SLC09 36.09 1.65 169.18 Calculated 4.7 O.K
10 SLC10 2.96 1.65 169.18 Calculated 57.1 O.K
11 SLC11 12.73 1.65 169.18 Calculated 13.3 O.K
12 SLC12 0.00 1.65 78.32 Calculated N/A O.K
13 SLC13 48.12 1.65 78.32 Calculated 1.6 O.K
14 SLC14 3.95 1.65 78.32 Calculated 19.8 O.K
15 SLC15 16.97 1.65 78.32 Calculated 4.6 O.K

Page 383 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

19.2.3 Foundatoin Settlement Check

- Detail settlement check to be included in Soil Improvement Design Report.

Page 384 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

19.3 Member Design

In line with that, this section is focused on seeking where greater or lesser values than (±)ΦMn are using
the stress contour range in MIDAS Program, then adding supplementary rebar where required, checking that the stress
resultant output is not greater or lesser than revised design moment (±)ΦMn any more (where, the sign (+) means
tension stress in bottom and (-) in top of concrete foundation) and verifying no need of reinforcing bar.
The moment and shear force was determined on the basis of critical section.
Case of occurs stress is concentrated, it is unsuitable for use as a design value.
Thus, using the average value of the near stress

19.3.1 Footing THK. 500mm

1. Calculation Result for Member Design - Factored Load Case

- Mxx (Max.)

X
Z

Value
(kN·m/m)
15.87

Page 385 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Mxx (Min.)

X
Z

Value
(kN·m/m)
5.89

Page 386 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Max.)

X
Z

Value
(kN·m/m)
20.69

Page 387 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Min.)

X
Z

Value
(kN·m/m)
6.82

Page 388 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Vxx (ABS Max.)

X
Z

Value
(kN/m)
57.05

Page 389 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Vyy (ABS Max.)

X
Z

Value
(kN/m)
63.41

Page 390 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2. Calculation Result for Crack Check - Unfactored Load Case

- Mxx (Max.)

X
Z

Value
(kN·m/m)
10.03

Page 391 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Mxx (Min.)

X
Z

Value
(kN·m/m)
4.22

Page 392 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Max.)

X
Z

Value
(kN·m/m)
15.40

Page 393 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Min.)

X
Z

Value
(kN·m/m)
3.91

Page 394 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3. Calculation Result Summary

angle of main axis l f i

Factored Condition Unfactored Condition


Mxx Myy Vxx Vyy Mxx Myy
Classification
(kN·m/m) (kN·m/m) (kN/m) (kN/m) (kN·m/m) (kN·m/m)
Bottom 15.87 20.69 10.03 15.40
57.05 63.41
Top 5.89 6.82 4.22 3.91

4. Rebar Design (Bottom Rebar)

1) X Direction

Mu = 15.870 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 10.030 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 57.050 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

1.1) Rebar Design


Mu 15.87 x 10 6
Required Rn = = 2
= 0.10 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.10


= 1 - 1 -
420 0.85 x 37.5

= 0.0002

As(req.) = ρ x b x d = 0.0002 x 1000 x 417 = 84


mm²
As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450
mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 84 = 112 mm²

Use As = 450 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

Page 395 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 57.05 kN ∴ NO USE STIRRUP

1.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 10.03 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 25.34 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 4011.90 mm
Rs2 = 300 (280 / fs) = 3315.31 mm
Rs = Min.(Rs1, Rs2) = 3315.3 mm > 200 mm ∴ O.K !

1.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.04 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 396 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Y Direction

Mu = 20.690 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 15.400 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 63.410 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

2.1) Rebar Design


Mu 20.69 x 10 6
Required Rn = = 2
= 0.13 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.13


= 1 - 1 -
420 0.85 x 37.5

= 0.0003

As(req.) = ρ x b x d = 0.0003 x 1000 x 417 = 126 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 126 = 168 mm²

Use As = 450 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

2.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 63.41 kN ∴ NO USE STIRRUP

Page 397 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 15.4 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 38.90 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 2547.56 mm
Rs2 = 300 (280 / fs) = 2159.26 mm
Rs = Min.(Rs1, Rs2) = 2159.3 mm > 200 mm ∴ O.K !

2.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.06 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 398 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

5. Rebar Design (Top Rebar)

1) X Direction

Mu = 5.890 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 4.220 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 57.050 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

1.1) Rebar Design


Mu 5.89 x 10 6
Required Rn = = 2
= 0.04 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.04


= 1 - 1 -
420 0.85 x 37.5

= 0.0001

As(req.) = ρ x b x d = 0.0001 x 1000 x 417 = 42 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 42 = 56 mm²

Use As = 450 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

1.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 57.05 kN ∴ NO USE STIRRUP

Page 399 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 4.22 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 10.66 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 9793.53 mm
Rs2 = 300 (280 / fs) = 7879.76 mm
Rs = Min.(Rs1, Rs2) = 7879.8 mm > 200 mm ∴ O.K !

1.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.02 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 400 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Y Direction

Mu = 6.820 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 3.910 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 63.410 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

2.1) Rebar Design


Mu 6.82 x 10 6
Required Rn = = 2
= 0.04 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.04


= 1 - 1 -
420 0.85 x 37.5

= 0.0001

As(req.) = ρ x b x d = 0.0001 x 1000 x 417 = 42 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 42 = 56 mm²

Use As = 450 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

2.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 63.41 kN ∴ NO USE STIRRUP

Page 401 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 3.91 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 9.88 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 10584.87 mm
Rs2 = 300 (280 / fs) = 8504.50 mm
Rs = Min.(Rs1, Rs2) = 8504.5 mm > 200 mm ∴ O.K !

2.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.01 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 402 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

19.3.2 Pedestal Design

1. 400 X 600

1) Design Forces
Unit : kN·m
Combinations Part Pu Vux Vuy Mux Muy
I 75.726 9.436 1.890 -1.117 10.851
ULC01
J 66.066 9.436 1.890 -3.290 0.000
I 125.548 46.696 2.716 -3.449 53.700
ULC02
J 117.268 46.696 2.716 -6.572 0.000
I 125.548 14.936 3.244 -0.105 -17.176
ULC03
J 117.268 14.936 3.244 -3.836 0.000
I 102.808 12.958 2.470 -1.470 14.902
ULC04
J 94.528 12.958 2.470 -4.310 0.000
I 64.908 8.088 1.620 -0.957 9.301
ULC05
J 56.628 8.088 1.620 -2.820 0.000
I 39.436 2.120 0.076 -11.253 -2.438
ULC06
J 31.156 2.120 0.076 -11.340 0.000
I 102.808 12.958 2.470 -1.470 14.902
ULC07
J 94.528 12.958 2.470 -4.310 0.000
I 51.864 7.458 0.618 -22.061 -8.577
ULC08
J 43.584 7.458 0.618 -21.350 0.000
I 98.878 11.568 7.860 31.169 13.303
ULC09
J 90.598 11.568 7.860 22.130 0.000
I 85.478 7.188 1.760 -5.986 8.266
ULC10
J 77.198 7.188 1.760 -8.010 0.000
I 32.967 3.645 0.693 -0.409 4.192
ULC11
J 26.757 3.645 0.693 -1.206 0.000
I -17.977 16.771 2.395 -21.000 -19.287
ULC12
J -24.187 16.771 2.395 -18.246 0.000
I 29.037 2.255 6.083 32.229 2.593
ULC13
J 22.827 2.255 6.083 25.234 0.000
I 15.637 2.125 0.017 -4.926 -2.444
ULC14
J 9.427 2.125 0.017 -4.906 0.000
Pu max 125.548 46.696 7.860 -3.449 53.700
Pu min -24.187 46.696 7.860 -18.246 0.000
Applied Loads
Mux max 29.037 46.696 7.860 32.229 2.593
Muy max 125.548 46.696 7.860 -3.449 53.700

- Description
I : Pedestal Lower
J : Pedestal Top

Page 403 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Rebar Design

Page 404 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3) Pedestal Punching Shear Check

Max. Column Load (Pu) - : 205.44 kN


Compressive strength of con'c : 37.50 Mpa
Yield strength of reinforcement : 420.00 Mpa
con'c cover : 7.50 cm
Strength reduction factor : 0.75

h1 = 50.00 cm = 500.00 mm
PB = 0.40 m = 400.00 mm PL = 0.60 m = 600.00 mm

d = h1 - con'c cover = 417.00 mm

209 600 209 Unit : mm

209
400
209

2
ΦVc = 0.75 x 0.17 x + 1 x fck x b0 x d
βC
= 2786557.35 N = 2786.56 kN
αSd
ΦVc = 0.75 x 0.083 x + 2 x fck x b0 x d
b0
= 3817611.41 N = 3817.61 kN
ΦVc = 0.75 x 0.33 x fck x b 0 x d
= 2318228.38 N = 2318.23 kN
βC = 1.50 : Ratio of long side to short side of concentrated load or reaction area
bO = 3668 : Perimeter of critical (mm)
αS = 40 : Interior columns Applied
= 30 : Edge columns
= 20 : Corner columns

ΦVc(MIN) = 2318.23 kN > Vu = 205.44 kN ∴ O.K

Page 405 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

Page 406 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

20. TYPE - F15

20.1 Plan & Section

2000

850
2500

800
600
850
400

150

1000

500

2000

Part Dim. Unit weight Total weight


FB 2000 mm
Foundation FH 2500 mm 25 kN/m3 62.50 kN
FD 500 mm
PB 600 mm
Pedestal
PH 400 mm 25 kN/m3 13.80 kN
(2EA)
PD 1150 mm
Soil SD 1000 mm 18 kN/m3 81.36 kN

Page 407 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

20.2 Stability Check

20.2.1 Soil Bearing Check

LOAD COM Qa Reaction Qu


Check Remark
CASE (kN/m2) (kN) (kN/m2)
1 SLC01 150.000 274.866 54.97 O.K
Normal Operating
2 SLC02 150.000 382.684 76.54 O.K
Case (Long Term)
3 SLC03 150.000 382.684 76.54 O.K
4 SLC04 200.000 274.866 54.97 O.K
5 SLC05 200.000 222.885 44.58 O.K
6 SLC06 200.000 289.703 57.94 O.K
7 SLC07 200.000 242.218 48.44 O.K
8 SLC08 200.000 355.730 71.15 O.K
9 SLC09 200.000 316.744 63.35 O.K Wind & Seismic
10 SLC10 200.000 366.857 73.37 O.K Case (Shot Term)
11 SLC11 200.000 331.243 66.25 O.K
12 SLC12 200.000 164.920 32.98 O.K
13 SLC13 200.000 112.939 22.59 O.K
14 SLC14 200.000 179.756 35.95 O.K
15 SLC15 200.000 132.271 26.45 O.K

20.2.2 Sliding & Overturning Check

1) Load Table (From Steel Structure)


Unit : kN·m
Node Load Case FX FY FZ MX MY
Con'c self weight 0.00 0.00 76.30 0.00 0.00
Dead Soil Weight 0.00 0.00 81.36 0.00 0.00
Rack Dead -13.44 -7.86 82.33 0.00 -18.51
Surcharge 0.00 0.00 22.60 0.00 0.00
Live LL -6.21 -5.35 61.64 0.00 -8.45
Sub Total -6.21 -5.35 84.24 0.00 -8.45
MD#1-3
X 0.00 0.00 0.00 0.00 0.00
Wind
Y 0.15 14.76 -35.76 0.00 0.21
X 12.45 -2.22 17.26 0.00 32.38
Seismic
Y 1.72 11.14 -35.01 0.00 2.34
+ 0.98 -21.55 0.00 0.00 2.49
Temp
- -0.98 21.55 0.00 0.00 -2.49
Rack Dead -1.34 -3.66 34.87 0.00 -6.83
Dead
Sub Total -1.34 -3.66 34.87 0.00 -6.83
LL -0.85 -2.32 23.58 0.00 -4.32
Live
Sub Total -0.85 -2.32 23.58 0.00 -4.32
X 0.00 0.00 0.00 0.00 0.00
MD#2-3 Wind
Y -2.16 6.02 -16.22 0.00 -11.03
X 5.39 -0.98 3.93 0.00 26.44
Seismic
Y -0.73 3.49 -11.63 0.00 -3.74
+ 0.22 -25.79 0.00 0.00 1.13
TEMP
- -0.22 25.79 0.00 0.00 -1.13

Page 408 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Sliding Check X-Direction

- Safe Factor of Sliding 2.0 (from Civil Design Criteria)


- Safe Factor of Sliding 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)
- Friction Factor of Concrete to Soil 0.4 (from Civil Design Criteria)

LOAD COM Sliding Force Resisting Friction Safety


Check
CASE (kN) Force (kN) Factor Factor
1 SLC01 0.00 109.95 0.4 N/A O.K
2 SLC02 5.86 153.07 0.4 26.1 O.K
3 SLC03 8.26 153.07 0.4 18.5 O.K
4 SLC04 0.00 109.95 0.4 N/A O.K
5 SLC05 2.01 89.15 0.4 44.3 O.K
6 SLC06 12.49 115.88 0.4 9.3 O.K
7 SLC07 0.69 96.89 0.4 139.7 O.K
8 SLC08 5.30 142.29 0.4 26.9 O.K
9 SLC09 6.81 126.70 0.4 18.6 O.K
10 SLC10 4.07 146.74 0.4 36.1 O.K
11 SLC11 4.78 132.50 0.4 27.8 O.K
12 SLC12 0.00 65.97 0.4 N/A O.K
13 SLC13 2.01 45.18 0.4 22.5 O.K
14 SLC14 12.49 71.90 0.4 5.8 O.K
15 SLC15 0.69 52.91 0.4 76.3 O.K

3) Sliding Check Y-Direction

- Safe Factor of Sliding 2.0 (from Civil Design Criteria)


- Safe Factor of Sliding 1.0 (SLC 10 ~ SLC12)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)
- Friction Factor of Concrete to Soil 0.4 (from Civil Design Criteria)

LOAD COM Sliding Force Resisting Friction Safety


Check
CASE (kN) Force (kN) Factor Factor
1 SLC01 11.52 109.95 0.4 9.5 O.K
2 SLC02 66.53 153.07 0.4 2.3 O.K
3 SLC03 28.15 153.07 0.4 5.4 O.K
4 SLC04 11.52 109.95 0.4 9.5 O.K
5 SLC05 9.26 89.15 0.4 9.6 O.K
6 SLC06 13.76 115.88 0.4 8.4 O.K
7 SLC07 1.28 96.89 0.4 75.7 O.K
8 SLC08 17.27 142.29 0.4 8.2 O.K
9 SLC09 1.69 126.70 0.4 74.9 O.K
10 SLC10 18.96 146.74 0.4 7.7 O.K
11 SLC11 9.59 132.50 0.4 13.8 O.K
12 SLC12 6.91 65.97 0.4 9.5 O.K
13 SLC13 13.86 45.18 0.4 3.3 O.K
14 SLC14 9.15 71.90 0.4 7.9 O.K
15 SLC15 3.33 52.91 0.4 15.9 O.K

Page 409 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

4) Overturing Check X-Direction

- Safe Factor of Overturning 2.0 (from Civil Design Criteria)


- Safe Factor of Overturning 1.0 (SLC 10 ~ SLC12)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)

Overturning Overturning Resisting Resisting


LOAD COM Safety
Moment ARM Moment ARM Check
CASE Factor
(kN·m) (m) (kN·m) (m)
1 SLC01 0.00 1.65 387.91 Calculated N/A O.K
2 SLC02 5.60 1.65 547.11 Calculated 97.8 O.K
3 SLC03 0.00 1.65 552.70 Calculated N/A O.K
4 SLC04 0.00 1.65 387.91 Calculated N/A O.K
5 SLC05 65.43 1.65 402.51 Calculated 6.2 O.K
6 SLC06 61.77 1.65 406.46 Calculated 6.6 O.K
7 SLC07 44.44 1.65 391.37 Calculated 8.8 O.K
8 SLC08 0.00 1.65 507.31 Calculated N/A O.K
9 SLC09 49.07 1.65 518.26 Calculated 10.6 O.K
10 SLC10 46.33 1.65 521.22 Calculated 11.3 O.K
11 SLC11 33.33 1.65 509.90 Calculated 15.3 O.K
12 SLC12 0.00 1.65 232.75 Calculated N/A O.K
13 SLC13 65.43 1.65 247.35 Calculated 3.8 O.K
14 SLC14 61.77 1.65 251.29 Calculated 4.1 O.K
15 SLC15 44.44 1.65 236.21 Calculated 5.3 O.K

5) Overturing Check Y-Direction

- Safe Factor of Overturning 2.0 (from Civil Design Criteria)


- Safe Factor of Overturning 1.0 (SLC 10 ~ SLC12)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)

Overturning Overturning Resisting Resisting


LOAD COM Safety
Moment ARM Moment ARM Check
CASE Factor
(kN·m) (m) (kN·m) (m)
1 SLC01 0.00 1.65 293.87 Calculated N/A O.K
2 SLC02 0.00 1.65 492.46 Calculated N/A O.K
3 SLC03 78.11 1.65 414.35 Calculated 5.3 O.K
4 SLC04 0.00 1.65 293.87 Calculated N/A O.K
5 SLC05 86.26 1.65 293.87 Calculated 3.4 O.K
6 SLC06 0.00 1.65 312.41 Calculated N/A O.K
7 SLC07 49.55 1.65 293.87 Calculated 5.9 O.K
8 SLC08 0.00 1.65 384.23 Calculated N/A O.K
9 SLC09 64.70 1.65 384.23 Calculated 5.9 O.K
10 SLC10 0.00 1.65 398.14 Calculated N/A O.K
11 SLC11 37.16 1.65 384.23 Calculated 10.3 O.K
12 SLC12 0.00 1.65 176.32 Calculated N/A O.K
13 SLC13 86.26 1.65 176.32 Calculated 2.0 O.K
14 SLC14 0.00 1.65 194.86 Calculated N/A O.K
15 SLC15 49.55 1.65 176.32 Calculated 3.6 O.K

Page 410 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

20.2.3 Foundatoin Settlement Check

- Detail settlement check to be included in Soil Improvement Design Report.

Page 411 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

20.3 Member Design

In line with that, this section is focused on seeking where greater or lesser values than (±)ΦMn are using
the stress contour range in MIDAS Program, then adding supplementary rebar where required, checking that the stress
resultant output is not greater or lesser than revised design moment (±)ΦMn any more (where, the sign (+) means
tension stress in bottom and (-) in top of concrete foundation) and verifying no need of reinforcing bar.
The moment and shear force was determined on the basis of critical section.
Case of occurs stress is concentrated, it is unsuitable for use as a design value.
Thus, using the average value of the near stress

20.3.1 Footing THK. 500mm

1. Calculation Result for Member Design - Factored Load Case

- Mxx (Max.)

X
Z
Value
(kN·m/m)
30.57

Page 412 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Mxx (Min.)

X
Z

Value
(kN·m/m)
25.10

Page 413 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Max.)

X
Z

Value
(kN·m/m)
40.56

Page 414 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Min.)

X
Z

Value
(kN·m/m)
9.26

Page 415 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Vxx (ABS Max.)

X
Z

Value
(kN/m)
116.71

Page 416 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Vyy (ABS Max.)

X
Z

Value
(kN/m)
158.06

Page 417 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2. Calculation Result for Crack Check - Unfactored Load Case

- Mxx (Max.)

X
Z

Value
(kN·m/m)
21.78

Page 418 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Mxx (Min.)

X
Z

Value
(kN·m/m)
19.02

Page 419 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Max.)

X
Z

Value
(kN·m/m)
29.54

Page 420 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Min.)

X
Z

Value
(kN·m/m)
6.44

Page 421 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3. Calculation Result Summary

angle of main axis l f i

Factored Condition Unfactored Condition


Mxx Myy Vxx Vyy Mxx Myy
Classification
(kN·m/m) (kN·m/m) (kN/m) (kN/m) (kN·m/m) (kN·m/m)
Bottom 30.57 40.56 21.78 29.54
116.71 158.06
Top 25.10 9.26 19.02 6.44

4. Rebar Design (Bottom Rebar)

1) X Direction

Mu = 30.570 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 21.780 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 116.710 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

1.1) Rebar Design


Mu 30.57 x 10 6
Required Rn = = 2
= 0.20 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.20


= 1 - 1 -
420 0.85 x 37.5

= 0.0005

As(req.) = ρ x b x d = 0.0005 x 1000 x 417 = 209


mm²
As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450
mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 209 = 279 mm²

Use As = 450 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

Page 422 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 116.71 kN ∴ NO USE STIRRUP

1.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 21.78 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 55.02 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 1746.38 mm
Rs2 = 300 (280 / fs) = 1526.75 mm
Rs = Min.(Rs1, Rs2) = 1526.7 mm > 200 mm ∴ O.K !

1.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.08 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 423 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Y Direction

Mu = 40.560 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 29.540 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 158.060 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

2.1) Rebar Design


Mu 40.56 x 10 6
Required Rn = = 2
= 0.26 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.26


= 1 - 1 -
420 0.85 x 37.5

= 0.0006

As(req.) = ρ x b x d = 0.0006 x 1000 x 417 = 251 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 251 = 335 mm²

Use As = 450 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

2.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 158.06 kN ∴ NO USE STIRRUP

Page 424 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 29.54 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 74.62 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 1238.36 mm
Rs2 = 300 (280 / fs) = 1125.68 mm
Rs = Min.(Rs1, Rs2) = 1125.7 mm > 200 mm ∴ O.K !

2.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.11 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 425 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

5. Rebar Design (Top Rebar)

1) X Direction

Mu = 25.100 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 19.020 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 116.710 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

1.1) Rebar Design


Mu 25.10 x 10 6
Required Rn = = 2
= 0.16 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.16


= 1 - 1 -
420 0.85 x 37.5

= 0.0004

As(req.) = ρ x b x d = 0.0004 x 1000 x 417 = 167 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 167 = 223 mm²

Use As = 450 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

1.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 116.71 kN ∴ NO USE STIRRUP

Page 426 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 19.02 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 48.05 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 2027.01 mm
Rs2 = 300 (280 / fs) = 1748.30 mm
Rs = Min.(Rs1, Rs2) = 1748.3 mm > 200 mm ∴ O.K !

1.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.07 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 427 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Y Direction

Mu = 9.260 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 6.440 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 158.060 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

2.1) Rebar Design


Mu 9.26 x 10 6
Required Rn = = 2
= 0.06 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.06


= 1 - 1 -
420 0.85 x 37.5

= 0.0001

As(req.) = ρ x b x d = 0.0001 x 1000 x 417 = 42 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 42 = 56 mm²

Use As = 450 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

2.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 158.06 kN ∴ NO USE STIRRUP

Page 428 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 6.44 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 16.27 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 6352.87 mm
Rs2 = 300 (280 / fs) = 5163.45 mm
Rs = Min.(Rs1, Rs2) = 5163.4 mm > 200 mm ∴ O.K !

2.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.02 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 429 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

20.3.2 Pedestal Design

1. 400 X 600

1) Design Forces
Unit : kN·m
Combinations Part Pu Vux Vuy Mux Muy
I 138.362 10.906 21.588 56.508 -12.542
ULC01
J 128.702 10.906 21.588 31.682 0.000
I 258.132 50.544 27.312 69.433 -58.126
ULC02
J 249.852 50.544 27.312 38.024 0.000
I 258.132 1.224 29.664 78.114 1.408
ULC03
J 249.852 1.224 29.664 44.000 0.000
I 205.806 18.918 24.744 64.272 -21.756
ULC04
J 197.526 18.918 24.744 35.816 0.000
I 118.596 9.348 18.504 48.436 -10.750
ULC05
J 110.316 9.348 18.504 27.156 0.000
I 160.876 22.364 20.240 52.824 -25.719
ULC06
J 152.596 22.364 20.240 29.548 0.000
I 205.806 18.918 24.744 64.272 -21.756
ULC07
J 197.526 18.918 24.744 35.816 0.000
I 290.366 44.950 28.216 73.048 -51.693
ULC08
J 282.086 44.950 28.216 40.600 0.000
I 184.426 16.698 39.374 118.966 -19.203
ULC09
J 176.146 16.698 39.374 73.686 0.000
I 238.826 29.558 26.484 68.713 -33.992
ULC10
J 230.546 29.558 26.484 38.256 0.000
I 45.837 3.789 4.068 10.411 -4.357
ULC11
J 39.627 3.789 4.068 5.733 0.000
I 130.397 29.821 7.540 19.188 -34.294
ULC12
J 124.187 29.821 7.540 10.517 0.000
I 24.457 1.569 18.698 65.106 -1.804
ULC13
J 18.247 1.569 18.698 43.603 0.000
I 78.857 14.429 5.808 14.852 -16.593
ULC14
J 72.647 14.429 5.808 8.173 0.000
Pu max 290.366 50.544 39.374 73.048 -51.693
Pu min 18.247 50.544 39.374 43.603 0.000
Applied Loads
Mux max 184.426 50.544 39.374 118.966 -19.203
Muy max 258.132 50.544 39.374 69.433 -58.126

- Description
I : Pedestal Lower
J : Pedestal Top

Page 430 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Rebar Design

Page 431 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3) Pedestal Punching Shear Check

Max. Column Load (Pu) - : 290.37 kN


Compressive strength of con'c : 37.50 Mpa
Yield strength of reinforcement : 420.00 Mpa
con'c cover : 7.50 cm
Strength reduction factor : 0.75

h1 = 50.00 cm = 500.00 mm
PB = 0.40 m = 400.00 mm PL = 0.60 m = 600.00 mm

d = h1 - con'c cover = 417.00 mm

209 600 209 Unit : mm

209
400
209

2
ΦVc = 0.75 x 0.17 x + 1 x fck x b0 x d
βC
= 2786557.35 N = 2786.56 kN
αSd
ΦVc = 0.75 x 0.083 x + 2 x fck x b0 x d
b0
= 3817611.41 N = 3817.61 kN
ΦVc = 0.75 x 0.33 x fck x b 0 x d
= 2318228.38 N = 2318.23 kN
βC = 1.50 : Ratio of long side to short side of concentrated load or reaction area
bO = 3668 : Perimeter of critical (mm)
αS = 40 : Interior columns Applied
= 30 : Edge columns
= 20 : Corner columns

ΦVc(MIN) = 2318.23 kN > Vu = 290.37 kN ∴ O.K

Page 432 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

Page 433 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

21. TYPE - F17

21.1 Plan & Section

3000

1250
4500

2000
600
1250
400

150

1000

800

3000

Part Dim. Unit weight Total weight


FB 3000 mm
Foundation FH 4500 mm 25 kN/m3 270.00 kN
FD 800 mm
PB 600 mm
Pedestal
PH 400 mm 25 kN/m3 13.80 kN
(2EA)
PD 1150 mm
Soil SD 1000 mm 18 kN/m3 234.36 kN

Page 434 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

21.2 Stability Check

21.2.1 Soil Bearing Check

LOAD COM Qa Reaction Qu


Check Remark
CASE (kN/m2) (kN) (kN/m2)
1 SLC01 150.000 671.870 49.77 O.K
Normal Operating
2 SLC02 150.000 845.195 62.61 O.K
Case (Long Term)
3 SLC03 150.000 851.584 63.08 O.K
4 SLC04 200.000 671.870 49.77 O.K
5 SLC05 200.000 686.945 50.88 O.K
6 SLC06 200.000 678.869 50.29 O.K
7 SLC07 200.000 671.768 49.76 O.K
8 SLC08 200.000 804.260 59.57 O.K
9 SLC09 200.000 815.566 60.41 O.K Wind & Seismic
10 SLC10 200.000 809.509 59.96 O.K Case (Shot Term)
11 SLC11 200.000 535.435 39.66 O.K
12 SLC12 200.000 403.122 29.86 O.K
13 SLC13 200.000 418.197 30.98 O.K
14 SLC14 200.000 410.121 30.38 O.K
15 SLC15 200.000 403.020 29.85 O.K

21.2.2 Sliding & Overturning Check

1) Load Table (From Steel Structure)


Unit : kN·m
Node Load Case FX FY FZ MX MY
Con'c self weight 0.00 0.00 283.80 0.00 0.00
Dead Soil Weight 0.00 0.00 234.36 0.00 0.00
Rack Dead 1.04 -8.15 55.95 0.00 5.09
Surcharge 0.00 0.00 65.10 0.00 0.00
Live LL 1.12 -6.13 57.59 0.00 5.48
CB3-04 Sub Total 1.12 -6.13 122.69 0.00 5.48
,CB3-E X -0.27 -0.02 0.14 0.00 -1.32
Wind
Y 0.16 31.45 -200.81 0.00 0.81
X 5.17 -0.86 7.58 0.00 24.50
Seismic
Y 0.00 10.17 -66.63 0.00 0.02
+ -0.32 -23.27 0.44 0.00 -1.57
Temp
- 0.32 23.27 -0.44 0.00 1.57
Rack Dead 0.96 7.94 97.76 0.00 4.70
Dead
Sub Total 0.96 7.94 97.76 0.00 4.70
LL 1.05 5.68 53.83 0.00 5.16
Live
Sub Total 1.05 5.68 53.83 0.00 5.16
CB3-03 X -0.28 -0.08 -0.67 0.00 -1.38
Wind
,CB3-E Y 0.47 33.37 215.89 0.00 2.29
X 5.28 0.20 2.42 0.00 25.02
Seismic
Y 0.09 10.16 66.49 0.00 0.46
+ -0.27 22.73 -3.63 0.00 -1.30
TEMP
- 0.27 -22.73 3.63 0.00 1.30

Page 435 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Sliding Check X-Direction

- Safe Factor of Sliding 2.0 (from Civil Design Criteria)


- Safe Factor of Sliding 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)
- Friction Factor of Concrete to Soil 0.4 (from Civil Design Criteria)

LOAD COM Sliding Force Resisting Friction Safety


Check
CASE (kN) Force (kN) Factor Factor
1 SLC01 0.00 268.75 0.4 N/A O.K
2 SLC02 1.58 338.08 0.4 213.3 O.K
3 SLC03 2.76 340.63 0.4 123.6 O.K
4 SLC04 0.55 268.53 0.4 487.4 O.K
5 SLC05 0.63 274.78 0.4 434.7 O.K
6 SLC06 7.32 271.55 0.4 37.1 O.K
7 SLC07 0.07 268.71 0.4 3905.7 O.K
8 SLC08 1.21 321.54 0.4 264.7 O.K
9 SLC09 2.10 326.23 0.4 155.2 O.K
10 SLC10 7.12 323.80 0.4 45.5 O.K
11 SLC11 1.68 214.17 0.4 127.5 O.K
12 SLC12 0.55 161.03 0.4 292.3 O.K
13 SLC13 0.63 167.28 0.4 264.6 O.K
14 SLC14 7.32 164.05 0.4 22.4 O.K
15 SLC15 0.07 161.21 0.4 2343.2 O.K

3) Sliding Check Y-Direction

- Safe Factor of Sliding 2.0 (from Civil Design Criteria)


- Safe Factor of Sliding 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)
- Friction Factor of Concrete to Soil 0.4 (from Civil Design Criteria)

LOAD COM Sliding Force Resisting Friction Safety


Check
CASE (kN) Force (kN) Factor Factor
1 SLC01 0.21 268.75 0.4 1272.4 O.K
2 SLC02 1.20 338.08 0.4 281.3 O.K
3 SLC03 0.12 340.63 0.4 2818.3 O.K
4 SLC04 0.21 268.75 0.4 1272.4 O.K
5 SLC05 64.61 274.78 0.4 4.3 O.K
6 SLC06 0.68 271.55 0.4 400.5 O.K
7 SLC07 14.02 268.71 0.4 19.2 O.K
8 SLC08 0.55 321.70 0.4 586.1 O.K
9 SLC09 48.07 326.23 0.4 6.8 O.K
10 SLC10 0.90 323.80 0.4 360.2 O.K
11 SLC11 10.21 214.17 0.4 21.0 O.K
12 SLC12 0.13 161.25 0.4 1272.4 O.K
13 SLC13 64.69 167.28 0.4 2.6 O.K
14 SLC14 0.59 164.05 0.4 276.4 O.K
15 SLC15 14.11 161.21 0.4 11.4 O.K

Page 436 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

4) Overturing Check X-Direction

- Safe Factor of Overturning 2.0 (from Civil Design Criteria)


- Safe Factor of Overturning 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)

Overturning Overturning Resisting Resisting


LOAD COM Safety
Moment ARM Moment ARM Check
CASE Factor
(kN·m) (m) (kN·m) (m)
1 SLC01 9.79 1.95 1007.80 Calculated 103.0 O.K
2 SLC02 30.10 1.95 1277.25 Calculated 42.4 O.K
3 SLC03 29.32 1.95 1278.03 Calculated 43.6 O.K
4 SLC04 10.79 1.95 1011.78 Calculated 93.7 O.K
5 SLC05 315.33 1.95 1331.63 Calculated 4.2 O.K
6 SLC06 58.72 1.95 1018.30 Calculated 17.3 O.K
7 SLC07 80.22 1.95 1077.62 Calculated 13.4 O.K
8 SLC08 21.69 1.95 1209.37 Calculated 55.8 O.K
9 SLC09 250.10 1.95 1449.26 Calculated 5.8 O.K
10 SLC10 57.64 1.95 1214.26 Calculated 21.1 O.K
11 SLC11 69.85 1.95 855.63 Calculated 12.3 O.K
12 SLC12 6.88 1.95 608.66 Calculated 88.5 O.K
13 SLC13 311.42 1.95 928.51 Calculated 3.0 O.K
14 SLC14 54.81 1.95 615.18 Calculated 11.2 O.K
15 SLC15 76.31 1.95 674.49 Calculated 8.8 O.K

5) Overturing Check Y-Direction

- Safe Factor of Overturning 2.0 (from Civil Design Criteria)


- Safe Factor of Overturning 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)

Overturning Overturning Resisting Resisting


LOAD COM Safety
Moment ARM Moment ARM Check
CASE Factor
(kN·m) (m) (kN·m) (m)
1 SLC01 15.49 1.95 1485.79 Calculated 95.9 O.K
2 SLC02 75.41 1.95 1945.45 Calculated 25.8 O.K
3 SLC03 73.34 1.95 1947.52 Calculated 26.6 O.K
4 SLC04 16.33 1.95 1486.43 Calculated 91.0 O.K
5 SLC05 794.52 1.95 1755.65 Calculated 2.2 O.K
6 SLC06 15.75 1.95 1506.34 Calculated 95.6 O.K
7 SLC07 194.83 1.95 1543.97 Calculated 7.9 O.K
8 SLC08 24.42 1.95 1795.93 Calculated 73.5 O.K
9 SLC09 608.07 1.95 1997.84 Calculated 3.3 O.K
10 SLC10 23.99 1.95 1810.85 Calculated 75.5 O.K
11 SLC11 152.11 1.95 1244.76 Calculated 8.2 O.K
12 SLC12 10.13 1.95 892.12 Calculated 88.1 O.K
13 SLC13 788.33 1.95 1161.33 Calculated 1.5 O.K
14 SLC14 9.56 1.95 912.02 Calculated 95.4 O.K
15 SLC15 188.64 1.95 949.65 Calculated 5.0 O.K

Page 437 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

21.2.3 Foundatoin Settlement Check

- Detail settlement check to be included in Soil Improvement Design Report.

Page 438 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

21.3 Member Design

In line with that, this section is focused on seeking where greater or lesser values than (±)ΦMn are using
the stress contour range in MIDAS Program, then adding supplementary rebar where required, checking that the stress
resultant output is not greater or lesser than revised design moment (±)ΦMn any more (where, the sign (+) means
tension stress in bottom and (-) in top of concrete foundation) and verifying no need of reinforcing bar.
The moment and shear force was determined on the basis of critical section.
Case of occurs stress is concentrated, it is unsuitable for use as a design value.
Thus, using the average value of the near stress

21.3.1 Footing THK. 800mm

1. Calculation Result for Member Design - Factored Load Case

- Mxx (Max.)

X
Z

Value
(kN·m/m)
59.79

Page 439 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Mxx (Min.)

X
Z

Value
(kN·m/m)
32.36

Page 440 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Max.)

X
Z

Value
(kN·m/m)
66.38

Page 441 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Min.)

X
Z

Value
(kN·m/m)
41.82

Page 442 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Vxx (ABS Max.)

X
Z

Value
(kN/m)
166.39

Page 443 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Vyy (ABS Max.)

X
Z

Value
(kN/m)
191.65

Page 444 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2. Calculation Result for Crack Check - Unfactored Load Case

- Mxx (Max.)

X
Z

Value
(kN·m/m)
34.86

Page 445 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Mxx (Min.)

X
Z

Value
(kN·m/m)
18.28

Page 446 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Max.)

X
Z

Value
(kN·m/m)
38.43

Page 447 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Min.)

X
Z

Value
(kN·m/m)
24.05

Page 448 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3. Calculation Result Summary

angle of main axis l f i

Factored Condition Unfactored Condition


Mxx Myy Vxx Vyy Mxx Myy
Classification
(kN·m/m) (kN·m/m) (kN/m) (kN/m) (kN·m/m) (kN·m/m)
Bottom 59.79 66.38 34.86 38.43
166.39 191.65
Top 32.36 41.82 18.28 24.05

4. Rebar Design (Bottom Rebar)

1) X Direction

Mu = 59.790 kN·m/m, h = 800 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 34.860 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 166.390 kN/m , d = 717 mm , Φb = 0.90 , βc = 0.78

1.1) Rebar Design


Mu 59.79 x 10 6
Required Rn = = 2
= 0.13 N/mm2
φbd² 0.90 x 1000 x 717

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.13


= 1 - 1 -
420 0.85 x 37.5

= 0.0003

As(req.) = ρ x b x d = 0.0003 x 1000 x 717 = 216


mm²
As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 800 / 2 = 720
mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 717 = 2390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 717 = 2614 mm²
4/3 As(req.) = 4 / 3 x 216 = 288 mm²

Use As = 720 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

Page 449 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 717
= 549 kN > VU = 166.39 kN ∴ NO USE STIRRUP

1.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 34.86 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 71.70 ) = 0.0014
2
k = - ρn + √{ 2ρn +(ρn) } = 0.131
x =kd = 93.7 mm
Icr = b x3 / 3 + n As (d - x) 2 = 3.E+09 mm4
fs = n * Ms / Icr *(d-x) = 50.56 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 1917.13 mm
Rs2 = 300 (280 / fs) = 1661.55 mm
Rs = Min.(Rs1, Rs2) = 1661.6 mm > 200 mm ∴ O.K !

1.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.148
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.07 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 450 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Y Direction

Mu = 66.380 kN·m/m, h = 800 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 38.430 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 191.650 kN/m , d = 717 mm , Φb = 0.90 , βc = 0.78

2.1) Rebar Design


Mu 66.38 x 10 6
Required Rn = = 2
= 0.14 N/mm2
φbd² 0.90 x 1000 x 717

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.14


= 1 - 1 -
420 0.85 x 37.5

= 0.0003

As(req.) = ρ x b x d = 0.0003 x 1000 x 717 = 216 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 800 / 2 = 720 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 717 = 2390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 717 = 2614 mm²
4/3 As(req.) = 4 / 3 x 216 = 288 mm²

Use As = 720 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

2.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 717
= 549 kN > VU = 191.65 kN ∴ NO USE STIRRUP

Page 451 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 38.43 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 71.70 ) = 0.0014
2
k = - ρn + √{ 2ρn +(ρn) } = 0.131
x =kd = 93.7 mm
Icr = b x3 / 3 + n As (d - x) 2 = 3.E+09 mm4
fs = n * Ms / Icr *(d-x) = 55.73 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 1721.62 mm
Rs2 = 300 (280 / fs) = 1507.20 mm
Rs = Min.(Rs1, Rs2) = 1507.2 mm > 200 mm ∴ O.K !

2.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.148
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.08 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 452 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

5. Rebar Design (Top Rebar)

1) X Direction

Mu = 32.360 kN·m/m, h = 800 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 18.280 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 166.390 kN/m , d = 717 mm , Φb = 0.90 , βc = 0.78

1.1) Rebar Design


Mu 32.36 x 10 6
Required Rn = = 2
= 0.07 N/mm2
φbd² 0.90 x 1000 x 717

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.07


= 1 - 1 -
420 0.85 x 37.5

= 0.0002

As(req.) = ρ x b x d = 0.0002 x 1000 x 717 = 144 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 800 / 2 = 720 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 717 = 2390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 717 = 2614 mm²
4/3 As(req.) = 4 / 3 x 144 = 192 mm²

Use As = 720 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

1.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 717
= 549 kN > VU = 166.39 kN ∴ NO USE STIRRUP

Page 453 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 18.28 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 71.70 ) = 0.0014
2
k = - ρn + √{ 2ρn +(ρn) } = 0.131
x =kd = 93.7 mm
Icr = b x3 / 3 + n As (d - x) 2 = 3.E+09 mm4
fs = n * Ms / Icr *(d-x) = 26.51 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 3826.04 mm
Rs2 = 300 (280 / fs) = 3168.59 mm
Rs = Min.(Rs1, Rs2) = 3168.6 mm > 200 mm ∴ O.K !

1.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.148
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.04 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 454 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Y Direction

Mu = 41.820 kN·m/m, h = 800 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 24.050 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 191.650 kN/m , d = 717 mm , Φb = 0.90 , βc = 0.78

2.1) Rebar Design


Mu 41.82 x 10 6
Required Rn = = 2
= 0.09 N/mm2
φbd² 0.90 x 1000 x 717

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.09


= 1 - 1 -
420 0.85 x 37.5

= 0.0002

As(req.) = ρ x b x d = 0.0002 x 1000 x 717 = 144 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 800 / 2 = 720 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 717 = 2390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 717 = 2614 mm²
4/3 As(req.) = 4 / 3 x 144 = 192 mm²

Use As = 720 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

2.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 717
= 549 kN > VU = 191.65 kN ∴ NO USE STIRRUP

Page 455 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 24.05 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 71.70 ) = 0.0014
2
k = - ρn + √{ 2ρn +(ρn) } = 0.131
x =kd = 93.7 mm
Icr = b x3 / 3 + n As (d - x) 2 = 3.E+09 mm4
fs = n * Ms / Icr *(d-x) = 34.88 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 2863.13 mm
Rs2 = 300 (280 / fs) = 2408.39 mm
Rs = Min.(Rs1, Rs2) = 2408.4 mm > 200 mm ∴ O.K !

2.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.148
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.05 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 456 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

21.3.2 Pedestal Design

1. 400 X 600

1) Design Forces
Unit : kN·m
Combinations Part Pu Vux Vuy Mux Muy
I 141.134 10.724 2.870 17.315 12.333
ULC01
J 131.474 10.724 2.870 14.014 0.000
I 202.516 45.352 7.480 45.230 52.155
ULC02
J 194.236 45.352 7.480 36.628 0.000
I 202.564 10.232 4.288 25.863 -11.767
ULC03
J 194.284 10.232 4.288 20.932 0.000
I 171.952 14.422 4.600 27.782 16.585
ULC04
J 163.672 14.422 4.600 22.492 0.000
I 120.972 9.192 2.460 14.841 10.571
ULC05
J 112.692 9.192 2.460 12.012 0.000
I -64.004 19.744 2.732 16.506 -22.706
ULC06
J -72.284 19.744 2.732 13.364 0.000
I 171.952 14.422 4.600 27.782 16.585
ULC07
J 163.672 14.422 4.600 22.492 0.000
I -198.000 43.450 5.144 31.112 -49.968
ULC08
J -206.280 43.450 5.144 25.196 0.000
I 166.072 13.762 10.920 65.150 15.826
ULC09
J 157.792 13.762 10.920 52.592 0.000
I 99.992 3.372 4.630 27.977 3.878
ULC10
J 91.712 3.372 4.630 22.652 0.000
I 56.412 5.256 1.431 8.639 6.044
ULC11
J 50.202 5.256 1.431 6.993 0.000
I -313.540 52.616 1.975 11.968 -60.508
ULC12
J -319.750 52.616 1.975 9.697 0.000
I 50.532 4.596 7.751 46.007 5.285
ULC13
J 44.322 4.596 7.751 37.093 0.000
I -15.548 5.794 1.461 8.833 -6.663
ULC14
J -21.758 5.794 1.461 7.153 0.000
Pu max 202.564 52.616 10.920 25.863 -11.767
Pu min -319.750 52.616 10.920 9.697 0.000
Applied Loads
Mux max 166.072 52.616 10.920 65.150 15.826
Muy max -313.540 52.616 10.920 11.968 -60.508

- Description
I : Pedestal Lower
J : Pedestal Top

Page 457 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Rebar Design

Page 458 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Pedestal Punching Shear Check

Max. Column Load (Pu) - : 565.85 kN


Compressive strength of con'c : 37.50 Mpa
Yield strength of reinforcement : 420.00 Mpa
con'c cover : 7.50 cm
Strength reduction factor : 0.75

h1 = 50.00 cm = 500.00 mm
PB = 0.40 m = 400.00 mm PL = 0.60 m = 600.00 mm

d = h1 - con'c cover = 717.00 mm

359 600 359 Unit : mm

359
400
359

2
ΦVc = 0.75 x 0.17 x + 1 x fck x b0 x d
βC
= 6358758.47 N = 6358.76 kN
αSd
ΦVc = 0.75 x 0.083 x + 2 x fck x b0 x d
b0
= 10499927.20 N = 10499.93 kN
ΦVc = 0.75 x 0.33 x fck x b0 x d
= 5290059.57 N = 5290.06 kN
βC = 1.50 : Ratio of long side to short side of concentrated load or reaction area
bO = 4868 : Perimeter of critical (mm)
αS = 40 : Interior columns Applied
= 30 : Edge columns
= 20 : Corner columns

ΦVc(MIN) = 5290.06 kN > Vu = 565.85 kN ∴ O.K

Page 459 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

Page 460 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

22. TYPE - F8c

22.1 Plan & Section

2600

800
2600

550

150

4800

500

2600

Part Dim. Unit weight Total weight


FB 2600 mm
Foundation FH 2600 mm 25 kN/m3 84.50 kN
FD 500 mm
PB 800 mm
Pedestal PH 550 mm 25 kN/m3 54.45 kN
1 EA PD 4950 mm
Soil SD 4800 mm 18 kN/m3 508.032 kN

Page 461 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

22.2 Stability Check

22.2.1 Soil Bearing Check

LOAD COM Qa Reaction Qu


Check Remark
CASE (kN/m2) (kN) (kN/m2)
1 SLC01 150.000 708.764 104.85 O.K
Normal Operating
2 SLC02 150.000 774.543 114.58 O.K
Case (Long Term)
3 SLC03 150.000 784.543 116.06 O.K
4 SLC04 200.000 708.764 104.85 O.K
5 SLC05 200.000 701.668 103.80 O.K
6 SLC06 200.000 719.423 106.42 O.K
7 SLC07 200.000 708.659 104.83 O.K
8 SLC08 200.000 761.848 112.70 O.K
9 SLC09 200.000 756.526 111.91 O.K Wind & Seismic
10 SLC10 200.000 769.843 113.88 O.K Case (Shot Term)
11 SLC11 200.000 761.769 112.69 O.K
12 SLC12 200.000 425.258 62.91 O.K
13 SLC13 200.000 418.162 61.86 O.K
14 SLC14 200.000 435.918 64.48 O.K
15 SLC15 200.000 425.153 62.89 O.K

22.2.2 Sliding & Overturning Check

1) Load Table (From Steel Structure)


Unit : kN·m
Node Load Case FX FY FZ MX MY
Con'c self weight 0.00 0.00 138.95 0.00 0.00
Dead Soil Weight 0.00 0.00 508.03 0.00 0.00
Rack Dead -3.16 0.32 61.78 -1.64 0.00
Surcharge 0.00 0.00 31.60 0.00 0.00
Live LL -1.70 0.22 39.18 -1.13 0.00
CBC6-M
Sub Total -1.70 0.22 70.78 -1.13 0.00
,CBC6-
X 7.42 -0.38 20.09 1.94 0.00
06 Wind
Y -0.36 14.43 -7.10 -73.58 0.00
X 5.62 1.57 15.23 -7.99 0.00
Seismic
Y -0.18 12.65 -0.15 -63.37 0.00
+ -24.14 2.03 -5.00 -10.33 0.00
Temp
- 24.14 -2.03 5.00 10.33 0.00

Page 462 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Sliding Check X-Direction

- Safe Factor of Sliding 2.0 (from Civil Design Criteria)


- Safe Factor of Sliding 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)
- Friction Factor of Concrete to Soil 0.4 (from Civil Design Criteria)

LOAD COM Sliding Force Resisting Friction Safety


Check
CASE (kN) Force (kN) Factor Factor
1 SLC01 0.00 283.51 0.4 N/A O.K
2 SLC02 25.84 309.82 0.4 12.0 O.K
3 SLC03 22.44 313.82 0.4 14.0 O.K
4 SLC04 7.42 291.54 0.4 39.3 O.K
5 SLC05 0.36 280.67 0.4 783.9 O.K
6 SLC06 3.94 287.77 0.4 73.1 O.K
7 SLC07 0.12 283.46 0.4 2308.1 O.K
8 SLC08 4.29 310.77 0.4 72.4 O.K
9 SLC09 1.54 302.61 0.4 196.4 O.K
10 SLC10 1.68 307.94 0.4 183.3 O.K
11 SLC11 1.36 304.71 0.4 223.3 O.K
12 SLC12 7.42 178.14 0.4 24.0 O.K
13 SLC13 0.36 167.26 0.4 467.2 O.K
14 SLC14 3.94 174.37 0.4 44.3 O.K
15 SLC15 0.12 170.06 0.4 1384.7 O.K

3) Sliding Check Y-Direction

- Safe Factor of Sliding 2.0 (from Civil Design Criteria)


- Safe Factor of Sliding 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)
- Friction Factor of Concrete to Soil 0.4 (from Civil Design Criteria)

LOAD COM Sliding Force Resisting Friction Safety


Check
CASE (kN) Force (kN) Factor Factor
1 SLC01 0.32 283.51 0.4 882.8 O.K
2 SLC02 2.57 309.82 0.4 120.6 O.K
3 SLC03 1.48 313.82 0.4 211.7 O.K
4 SLC04 0.32 283.51 0.4 882.8 O.K
5 SLC05 14.75 280.67 0.4 19.0 O.K
6 SLC06 1.42 287.77 0.4 203.1 O.K
7 SLC07 9.18 283.46 0.4 30.9 O.K
8 SLC08 0.49 304.74 0.4 624.9 O.K
9 SLC09 11.31 302.61 0.4 26.8 O.K
10 SLC10 1.31 307.94 0.4 235.1 O.K
11 SLC11 7.13 304.71 0.4 42.8 O.K
12 SLC12 0.19 170.10 0.4 882.8 O.K
13 SLC13 14.62 167.26 0.4 11.4 O.K
14 SLC14 1.29 174.37 0.4 135.3 O.K
15 SLC15 9.05 170.06 0.4 18.8 O.K

Page 463 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

4) Overturing Check X-Direction

- Safe Factor of Overturning 2.0 (from Civil Design Criteria)


- Safe Factor of Overturning 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)

Overturning Overturning Resisting Resisting


LOAD COM Safety
Moment ARM Moment ARM Check
CASE Factor
(kN·m) (m) (kN·m) (m)
1 SLC01 0.00 5.45 921.39 Calculated N/A O.K
2 SLC02 6.50 5.45 1154.22 Calculated 177.6 O.K
3 SLC03 131.57 5.45 1029.15 Calculated 7.8 O.K
4 SLC04 40.46 5.45 947.51 Calculated 23.4 O.K
5 SLC05 9.22 5.45 923.34 Calculated 100.1 O.K
6 SLC06 21.45 5.45 935.25 Calculated 43.6 O.K
7 SLC07 0.14 5.45 922.06 Calculated 6768.8 O.K
8 SLC08 30.34 5.45 1016.93 Calculated 33.5 O.K
9 SLC09 6.92 5.45 998.80 Calculated 144.4 O.K
10 SLC10 16.09 5.45 1007.73 Calculated 62.6 O.K
11 SLC11 0.10 5.45 997.84 Calculated 9766.8 O.K
12 SLC12 40.46 5.45 578.96 Calculated 14.3 O.K
13 SLC13 9.22 5.45 554.79 Calculated 60.1 O.K
14 SLC14 21.45 5.45 566.69 Calculated 26.4 O.K
15 SLC15 0.14 5.45 553.51 Calculated 4063.3 O.K

5) Overturing Check Y-Direction

- Safe Factor of Overturning 2.0 (from Civil Design Criteria)


- Safe Factor of Overturning 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)

Overturning Overturning Resisting Resisting


LOAD COM Safety
Moment ARM Moment ARM Check
CASE Factor
(kN·m) (m) (kN·m) (m)
1 SLC01 3.39 5.45 921.39 Calculated 272.0 O.K
2 SLC02 33.60 5.45 1013.41 Calculated 30.2 O.K
3 SLC03 5.73 5.45 1041.27 Calculated 181.7 O.K
4 SLC04 3.39 5.45 951.52 Calculated 280.9 O.K
5 SLC05 164.83 5.45 921.39 Calculated 5.6 O.K
6 SLC06 14.95 5.45 935.25 Calculated 62.6 O.K
7 SLC07 96.14 5.45 921.39 Calculated 9.6 O.K
8 SLC08 5.14 5.45 1013.00 Calculated 196.9 O.K
9 SLC09 126.23 5.45 990.40 Calculated 7.9 O.K
10 SLC10 13.82 5.45 1000.80 Calculated 72.4 O.K
11 SLC11 74.71 5.45 990.40 Calculated 13.3 O.K
12 SLC12 2.03 5.45 582.97 Calculated 286.8 O.K
13 SLC13 163.47 5.45 552.84 Calculated 3.4 O.K
14 SLC14 13.60 5.45 566.69 Calculated 41.7 O.K
15 SLC15 94.78 5.45 552.84 Calculated 5.8 O.K

Page 464 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

22.2.3 Foundatoin Settlement Check

- Detail settlement check to be included in Soil Improvement Design Report.

Page 465 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

22.3 Member Design

In line with that, this section is focused on seeking where greater or lesser values than (±)ΦMn are using
the stress contour range in MIDAS Program, then adding supplementary rebar where required, checking that the stress
resultant output is not greater or lesser than revised design moment (±)ΦMn any more (where, the sign (+) means
tension stress in bottom and (-) in top of concrete foundation) and verifying no need of reinforcing bar.
The moment and shear force was determined on the basis of critical section.
Case of occurs stress is concentrated, it is unsuitable for use as a design value.
Thus, using the average value of the near stress

22.3.1 Footing THK. 500mm

1. Calculation Result for Member Design - Factored Load Case

- Mxx (Max.)

X
Z

Value
(kN·m/m)
38.03

Page 466 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Mxx (Min.)

X
Z

Value
(kN·m/m)
24.75

Page 467 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Max.)

X
Z

Value
(kN·m/m)
40.66

Page 468 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Min.)

X
Z

Value
(kN·m/m)
27.03

Page 469 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Vxx (ABS Max.)

X
Z

Value
(kN/m)
124.58

Page 470 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Vyy (ABS Max.)

X
Z

Value
(kN/m)
138.71

Page 471 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2. Calculation Result for Crack Check - Unfactored Load Case

- Mxx (Max.)

X
Z

Value
(kN·m/m)
30.37

Page 472 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Mxx (Min.)

X
Z

Value
(kN·m/m)
19.88

Page 473 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Max.)

X
Z

Value
(kN·m/m)
25.15

Page 474 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Min.)

X
Z

Value
(kN·m/m)
15.84

Page 475 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3. Calculation Result Summary

angle of main axis l f i

Factored Condition Unfactored Condition


Mxx Myy Vxx Vyy Mxx Myy
Classification
(kN·m/m) (kN·m/m) (kN/m) (kN/m) (kN·m/m) (kN·m/m)
Bottom 38.03 40.66 30.37 25.15
124.58 138.71
Top 24.75 27.03 19.88 15.84

4. Rebar Design (Bottom Rebar)

1) X Direction

Mu = 38.030 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 30.370 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 124.580 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

1.1) Rebar Design


Mu 38.03 x 10 6
Required Rn = = 2
= 0.24 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.24


= 1 - 1 -
420 0.85 x 37.5

= 0.0006

As(req.) = ρ x b x d = 0.0006 x 1000 x 417 = 251


mm²
As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450
mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 251 = 335 mm²

Use As = 450 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

Page 476 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 124.58 kN ∴ NO USE STIRRUP

1.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 30.37 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 76.72 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 1199.39 mm
Rs2 = 300 (280 / fs) = 1094.92 mm
Rs = Min.(Rs1, Rs2) = 1094.9 mm > 200 mm ∴ O.K !

1.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.12 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 477 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Y Direction

Mu = 40.660 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 25.150 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 138.710 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

2.1) Rebar Design


Mu 40.66 x 10 6
Required Rn = = 2
= 0.26 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.26


= 1 - 1 -
420 0.85 x 37.5

= 0.0006

As(req.) = ρ x b x d = 0.0006 x 1000 x 417 = 251 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 251 = 335 mm²

Use As = 450 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

2.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 138.71 kN ∴ NO USE STIRRUP

Page 478 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 25.15 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 63.53 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 1487.25 mm
Rs2 = 300 (280 / fs) = 1322.17 mm
Rs = Min.(Rs1, Rs2) = 1322.2 mm > 200 mm ∴ O.K !

2.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.10 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 479 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

5. Rebar Design (Top Rebar)

1) X Direction

Mu = 24.750 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 19.880 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 124.580 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

1.1) Rebar Design


Mu 24.75 x 10 6
Required Rn = = 2
= 0.16 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.16


= 1 - 1 -
420 0.85 x 37.5

= 0.0004

As(req.) = ρ x b x d = 0.0004 x 1000 x 417 = 167 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 167 = 223 mm²

Use As = 450 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

1.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 124.58 kN ∴ NO USE STIRRUP

Page 480 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 19.88 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 50.22 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 1931.21 mm
Rs2 = 300 (280 / fs) = 1672.67 mm
Rs = Min.(Rs1, Rs2) = 1672.7 mm > 200 mm ∴ O.K !

1.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.08 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 481 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Y Direction

Mu = 27.030 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 15.840 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 138.710 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

2.1) Rebar Design


Mu 27.03 x 10 6
Required Rn = = 2
= 0.17 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.17


= 1 - 1 -
420 0.85 x 37.5

= 0.0004

As(req.) = ρ x b x d = 0.0004 x 1000 x 417 = 167 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 167 = 223 mm²

Use As = 450 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

2.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 138.71 kN ∴ NO USE STIRRUP

Page 482 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 15.84 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 40.01 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 2471.59 mm
Rs2 = 300 (280 / fs) = 2099.28 mm
Rs = Min.(Rs1, Rs2) = 2099.3 mm > 200 mm ∴ O.K !

2.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.06 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 483 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

22.3.2 Pedestal Design

1. 550 X 800

1) Design Forces
Unit : kN·m
Combinations Part Pu Vux Vuy Mux Muy
I 218.316 0.448 6.622 32.779 4.514
ULC01
J 142.086 0.448 6.622 4.510 2.296
I 301.688 1.180 32.700 161.865 11.889
ULC02
J 236.348 1.180 32.700 7.502 6.048
I 357.560 0.292 10.500 51.975 2.981
ULC03
J 292.220 0.292 10.500 9.275 1.536
I 276.188 0.604 9.066 44.877 6.098
ULC04
J 210.848 0.604 9.066 6.692 3.108
I 167.328 0.688 13.180 65.241 6.934
ULC05
J 101.988 0.688 13.180 3.237 3.528
I 212.720 11.208 3.452 17.087 -112.640
ULC06
J 147.380 11.208 3.452 4.678 -57.160
I 236.588 1.212 24.074 119.166 12.227
ULC07
J 171.248 1.212 24.074 5.435 6.228
I 327.372 22.580 4.618 22.859 -226.919
ULC08
J 262.032 22.580 4.618 8.317 -115.148
I 147.938 0.966 57.676 285.496 -9.704
ULC09
J 82.598 0.966 57.676 2.622 -4.922
I 291.898 12.096 6.606 32.700 -120.387
ULC10
J 226.558 12.096 6.606 7.191 -60.512
I 61.632 0.797 18.032 89.258 8.028
ULC11
J 12.627 0.797 18.032 0.401 4.083
I 152.416 22.995 1.424 7.049 -231.118
ULC12
J 103.411 22.995 1.424 3.282 -117.293
I -27.018 1.381 51.634 255.588 -13.903
ULC13
J -76.023 1.381 51.634 0.000 -7.067
I 116.942 12.511 0.564 3.712 -124.586
ULC14
J 67.937 12.511 0.564 2.156 -62.657
Pu max 357.560 22.995 57.676 51.975 2.981
Pu min -76.023 22.995 57.676 0.000 -7.067
Applied Loads
Mux max 147.938 22.995 57.676 285.496 -9.704
Muy max 152.416 22.995 57.676 7.049 -231.118

- Description
I : Pedestal Lower
J : Pedestal Top

Page 484 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Rebar Design

Page 485 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3) Pedestal Punching Shear Check

Max. Column Load (Pu) - : 364.50 kN


Compressive strength of con'c : 37.50 Mpa
Yield strength of reinforcement : 420.00 Mpa
con'c cover : 7.50 cm
Strength reduction factor : 0.75

h1 = 50.00 cm = 500.00 mm
PB = 0.55 m = 550.00 mm PL = 0.80 m = 800.00 mm

d = h1 - con'c cover = 417.00 mm

209 800 209 Unit : mm

209
550
209

2
ΦVc = 0.75 x 0.17 x + 1 x fck x b0 x d
βC
= 3377599.23 N = 3377.60 kN
αSd
ΦVc = 0.75 x 0.083 x + 2 x fck x b0 x d
b0
= 2714420.90 N = 2714.42 kN
ΦVc = 0.75 x 0.33 x fck x b 0 x d
= 2760638.38 N = 2760.64 kN
βC = 1.45 : Ratio of long side to short side of concentrated load or reaction area
bO = 4368 : Perimeter of critical (mm)
αS = 40 : Interior columns Applied
= 30 : Edge columns
= 20 : Corner columns

ΦVc(MIN) = 2714.42 kN > Vu = 364.50 kN ∴ O.K

Page 486 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

Page 487 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

23. TYPE - F9c

23.1 Plan & Section

3000

800
3000

550

150

4800

500

3000

Part Dim. Unit weight Total weight


FB 3000 mm
Foundation FH 3000 mm 25 kN/m3 112.50 kN
FD 500 mm
PB 800 mm
Pedestal PH 550 mm 25 kN/m3 54.45 kN
1 EA PD 4950 mm
Soil SD 4800 mm 18 kN/m3 701.568 kN

Page 488 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

23.2 Stability Check

23.2.1 Soil Bearing Check

LOAD COM Qa Reaction Qu


Check Remark
CASE (kN/m2) (kN) (kN/m2)
1 SLC01 150.000 936.388 104.04 O.K
Normal Operating
2 SLC02 150.000 1062.209 118.02 O.K
Case (Long Term)
3 SLC03 150.000 1013.021 112.56 O.K
4 SLC04 200.000 936.388 104.04 O.K
5 SLC05 200.000 940.747 104.53 O.K
6 SLC06 200.000 829.536 92.17 O.K
7 SLC07 200.000 938.906 104.32 O.K
8 SLC08 200.000 1012.308 112.48 O.K
9 SLC09 200.000 1015.578 112.84 O.K Wind & Seismic
10 SLC10 200.000 932.169 103.57 O.K Case (Shot Term)
11 SLC11 200.000 1014.197 112.69 O.K
12 SLC12 200.000 561.833 62.43 O.K
13 SLC13 200.000 566.192 62.91 O.K
14 SLC14 200.000 454.981 50.55 O.K
15 SLC15 200.000 564.350 62.71 O.K

23.2.2 Sliding & Overturning Check

1) Load Table (From Steel Structure)


Unit : kN·m
Node Load Case FX FY FZ MX MY
Con'c self weight 0.00 0.00 166.95 0.00 0.00
Dead Soil Weight 0.00 0.00 701.57 0.00 0.00
Rack Dead 6.60 0.02 67.87 -0.11 0.00
Surcharge 0.00 0.00 42.80 0.00 0.00
Live LL 6.01 0.07 58.43 -0.34 0.00
CBC6-M
Sub Total 6.01 0.07 101.23 -0.34 0.00
,CBC6-
X 10.09 0.07 27.94 -0.35 0.00
05 Wind
Y -0.42 9.58 4.36 -48.86 0.00
X -53.31 -5.04 -152.65 25.71 0.00
Seismic
Y 1.78 -10.01 3.60 49.90 0.00
+ 35.51 0.05 24.59 -0.23 0.00
Temp
- -35.51 -0.05 -24.59 -0.23 0.00

Page 489 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Sliding Check X-Direction

- Safe Factor of Sliding 2.0 (from Civil Design Criteria)


- Safe Factor of Sliding 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)
- Friction Factor of Concrete to Soil 0.4 (from Civil Design Criteria)

LOAD COM Sliding Force Resisting Friction Safety


Check
CASE (kN) Force (kN) Factor Factor
1 SLC01 0.00 374.56 0.4 N/A O.K
2 SLC02 41.53 424.88 0.4 10.2 O.K
3 SLC03 29.50 405.21 0.4 13.7 O.K
4 SLC04 10.09 385.73 0.4 38.2 O.K
5 SLC05 0.42 376.30 0.4 886.0 O.K
6 SLC06 37.32 331.81 0.4 8.9 O.K
7 SLC07 1.24 375.56 0.4 302.2 O.K
8 SLC08 12.07 413.30 0.4 34.2 O.K
9 SLC09 4.19 406.23 0.4 97.0 O.K
10 SLC10 23.48 372.87 0.4 15.9 O.K
11 SLC11 5.44 405.68 0.4 74.6 O.K
12 SLC12 10.09 235.91 0.4 23.4 O.K
13 SLC13 0.42 226.48 0.4 533.2 O.K
14 SLC14 37.32 181.99 0.4 4.9 O.K
15 SLC15 1.24 225.74 0.4 181.6 O.K

3) Sliding Check Y-Direction

- Safe Factor of Sliding 2.0 (from Civil Design Criteria)


- Safe Factor of Sliding 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)
- Friction Factor of Concrete to Soil 0.4 (from Civil Design Criteria)

LOAD COM Sliding Force Resisting Friction Safety


Check
CASE (kN) Force (kN) Factor Factor
1 SLC01 0.02 374.56 0.4 17959.1 O.K
2 SLC02 0.13 424.88 0.4 3186.3 O.K
3 SLC03 0.04 405.21 0.4 9633.6 O.K
4 SLC04 0.02 374.56 0.4 17959.1 O.K
5 SLC05 9.60 376.30 0.4 39.2 O.K
6 SLC06 3.51 331.81 0.4 94.6 O.K
7 SLC07 6.98 375.56 0.4 53.8 O.K
8 SLC08 0.07 404.92 0.4 5703.8 O.K
9 SLC09 7.26 406.23 0.4 56.0 O.K
10 SLC10 2.58 372.87 0.4 144.8 O.K
11 SLC11 5.18 405.68 0.4 78.3 O.K
12 SLC12 0.01 224.73 0.4 17959.1 O.K
13 SLC13 9.59 226.48 0.4 23.6 O.K
14 SLC14 3.52 181.99 0.4 51.8 O.K
15 SLC15 6.99 225.74 0.4 32.3 O.K

Page 490 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

4) Overturing Check X-Direction

- Safe Factor of Overturning 2.0 (from Civil Design Criteria)


- Safe Factor of Overturning 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)

Overturning Overturning Resisting Resisting


LOAD COM Safety
Moment ARM Moment ARM Check
CASE Factor
(kN·m) (m) (kN·m) (m)
1 SLC01 0.00 5.45 1404.58 Calculated N/A O.K
2 SLC02 226.31 5.45 1593.31 Calculated 7.0 O.K
3 SLC03 69.65 5.45 1749.97 Calculated 25.1 O.K
4 SLC04 54.98 5.45 1446.49 Calculated 26.3 O.K
5 SLC05 0.00 5.45 1413.44 Calculated N/A O.K
6 SLC06 160.28 5.45 1607.96 Calculated 10.0 O.K
7 SLC07 6.77 5.45 1408.36 Calculated 207.9 O.K
8 SLC08 65.80 5.45 1549.89 Calculated 23.6 O.K
9 SLC09 24.57 5.45 1525.10 Calculated 62.1 O.K
10 SLC10 144.78 5.45 1671.00 Calculated 11.5 O.K
11 SLC11 29.65 5.45 1521.29 Calculated 51.3 O.K
12 SLC12 54.98 5.45 884.65 Calculated 16.1 O.K
13 SLC13 0.00 5.45 851.60 Calculated N/A O.K
14 SLC14 160.28 5.45 1046.13 Calculated 6.5 O.K
15 SLC15 6.77 5.45 846.53 Calculated 125.0 O.K

5) Overturing Check Y-Direction

- Safe Factor of Overturning 2.0 (from Civil Design Criteria)


- Safe Factor of Overturning 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)

Overturning Overturning Resisting Resisting


LOAD COM Safety
Moment ARM Moment ARM Check
CASE Factor
(kN·m) (m) (kN·m) (m)
1 SLC01 0.22 5.45 1404.58 Calculated 6418.8 O.K
2 SLC02 1.41 5.45 1593.31 Calculated 1133.6 O.K
3 SLC03 38.05 5.45 1556.67 Calculated 40.9 O.K
4 SLC04 0.94 5.45 1446.49 Calculated 1538.8 O.K
5 SLC05 101.30 5.45 1411.12 Calculated 13.9 O.K
6 SLC06 160.50 5.45 1441.81 Calculated 9.0 O.K
7 SLC07 0.22 5.45 1481.47 Calculated 6770.1 O.K
8 SLC08 1.29 5.45 1549.89 Calculated 1203.1 O.K
9 SLC09 76.56 5.45 1523.37 Calculated 19.9 O.K
10 SLC10 120.96 5.45 1546.38 Calculated 12.8 O.K
11 SLC11 0.75 5.45 1576.13 Calculated 2108.9 O.K
12 SLC12 0.85 5.45 884.65 Calculated 1037.8 O.K
13 SLC13 101.21 5.45 849.29 Calculated 8.4 O.K
14 SLC14 160.41 5.45 879.98 Calculated 5.5 O.K
15 SLC15 0.13 5.45 919.64 Calculated 7004.4 O.K

Page 491 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

23.2.3 Foundatoin Settlement Check

- Detail settlement check to be included in Soil Improvement Design Report.

Page 492 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

23.3 Member Design

In line with that, this section is focused on seeking where greater or lesser values than (±)ΦMn are using
the stress contour range in MIDAS Program, then adding supplementary rebar where required, checking that the stress
resultant output is not greater or lesser than revised design moment (±)ΦMn any more (where, the sign (+) means
tension stress in bottom and (-) in top of concrete foundation) and verifying no need of reinforcing bar.
The moment and shear force was determined on the basis of critical section.
Case of occurs stress is concentrated, it is unsuitable for use as a design value.
Thus, using the average value of the near stress

23.3.1 Footing THK. 500mm

1. Calculation Result for Member Design - Factored Load Case

- Mxx (Max.)

X
Z

Value
(kN·m/m)
62.66

Page 493 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Mxx (Min.)

X
Z

Value
(kN·m/m)
43.70

Page 494 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Max.)

X
Z

Value
(kN·m/m)
55.14

Page 495 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Min.)

X
Z

Value
(kN·m/m)
25.39

Page 496 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Vxx (ABS Max.)

X
Z

Value
(kN/m)
157.55

Page 497 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Vyy (ABS Max.)

X
Z

Value
(kN/m)
153.76

Page 498 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2. Calculation Result for Crack Check - Unfactored Load Case

- Mxx (Max.)

X
Z

Value
(kN·m/m)
49.22

Page 499 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Mxx (Min.)

X
Z

Value
(kN·m/m)
29.20

Page 500 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Max.)

X
Z

Value
(kN·m/m)
32.66

Page 501 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Min.)

X
Z

Value
(kN·m/m)
16.16

Page 502 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3. Calculation Result Summary

angle of main axis l f i

Factored Condition Unfactored Condition


Mxx Myy Vxx Vyy Mxx Myy
Classification
(kN·m/m) (kN·m/m) (kN/m) (kN/m) (kN·m/m) (kN·m/m)
Bottom 62.66 55.14 49.22 32.66
157.55 153.76
Top 43.70 25.39 29.20 16.16

4. Rebar Design (Bottom Rebar)

1) X Direction

Mu = 62.660 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 49.220 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 157.550 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

1.1) Rebar Design


Mu 62.66 x 10 6
Required Rn = = 2
= 0.40 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.40


= 1 - 1 -
420 0.85 x 37.5

= 0.0010

As(req.) = ρ x b x d = 0.0010 x 1000 x 417 = 417


mm²
As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450
mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 417 = 556 mm²

Use As = 556 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

Page 503 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 157.55 kN ∴ NO USE STIRRUP

1.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 49.22 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 124.34 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 668.25 mm
Rs2 = 300 (280 / fs) = 675.59 mm
Rs = Min.(Rs1, Rs2) = 668.2 mm > 200 mm ∴ O.K !

1.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.19 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 504 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Y Direction

Mu = 55.140 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 32.660 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 153.760 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

2.1) Rebar Design


Mu 55.14 x 10 6
Required Rn = = 2
= 0.35 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.35


= 1 - 1 -
420 0.85 x 37.5

= 0.0008

As(req.) = ρ x b x d = 0.0008 x 1000 x 417 = 334 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 334 = 445 mm²

Use As = 450 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

2.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 153.76 kN ∴ NO USE STIRRUP

Page 505 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 32.66 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 82.50 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 1102.15 mm
Rs2 = 300 (280 / fs) = 1018.14 mm
Rs = Min.(Rs1, Rs2) = 1018.1 mm > 200 mm ∴ O.K !

2.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.12 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 506 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

5. Rebar Design (Top Rebar)

1) X Direction

Mu = 43.700 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 29.200 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 157.550 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

1.1) Rebar Design


Mu 43.70 x 10 6
Required Rn = = 2
= 0.28 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.28


= 1 - 1 -
420 0.85 x 37.5

= 0.0007

As(req.) = ρ x b x d = 0.0007 x 1000 x 417 = 292 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 292 = 389 mm²

Use As = 450 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

1.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 157.55 kN ∴ NO USE STIRRUP

Page 507 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 29.2 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 73.76 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 1254.96 mm
Rs2 = 300 (280 / fs) = 1138.79 mm
Rs = Min.(Rs1, Rs2) = 1138.8 mm > 200 mm ∴ O.K !

1.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.11 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 508 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Y Direction

Mu = 25.390 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 16.160 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 153.760 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

2.1) Rebar Design


Mu 25.39 x 10 6
Required Rn = = 2
= 0.16 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.16


= 1 - 1 -
420 0.85 x 37.5

= 0.0004

As(req.) = ρ x b x d = 0.0004 x 1000 x 417 = 167 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 167 = 223 mm²

Use As = 450 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

2.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 153.76 kN ∴ NO USE STIRRUP

Page 509 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 16.16 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 40.82 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 2418.93 mm
Rs2 = 300 (280 / fs) = 2057.71 mm
Rs = Min.(Rs1, Rs2) = 2057.7 mm > 200 mm ∴ O.K !

2.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.06 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 510 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

23.3.2 Pedestal Design

1. 550 X 800

1) Design Forces
Unit : kN·m
Combinations Part Pu Vux Vuy Mux Muy
I 218.316 0.448 6.622 32.779 4.514
ULC01
J 142.086 0.448 6.622 4.510 2.296
I 301.688 1.180 32.700 161.865 11.889
ULC02
J 236.348 1.180 32.700 7.502 6.048
I 357.560 0.292 10.500 51.975 2.981
ULC03
J 292.220 0.292 10.500 9.275 1.536
I 276.188 0.604 9.066 44.877 6.098
ULC04
J 210.848 0.604 9.066 6.692 3.108
I 167.328 0.688 13.180 65.241 6.934
ULC05
J 101.988 0.688 13.180 3.237 3.528
I 212.720 11.208 3.452 17.087 -112.640
ULC06
J 147.380 11.208 3.452 4.678 -57.160
I 236.588 1.212 24.074 119.166 12.227
ULC07
J 171.248 1.212 24.074 5.435 6.228
I 327.372 22.580 4.618 22.859 -226.919
ULC08
J 262.032 22.580 4.618 8.317 -115.148
I 147.938 0.966 57.676 285.496 -9.704
ULC09
J 82.598 0.966 57.676 2.622 -4.922
I 291.898 12.096 6.606 32.700 -120.387
ULC10
J 226.558 12.096 6.606 7.191 -60.512
I 61.632 0.797 18.032 89.258 8.028
ULC11
J 12.627 0.797 18.032 0.401 4.083
I 152.416 22.995 1.424 7.049 -231.118
ULC12
J 103.411 22.995 1.424 3.282 -117.293
I -27.018 1.381 51.634 255.588 -13.903
ULC13
J -76.023 1.381 51.634 0.000 -7.067
I 116.942 12.511 0.564 3.712 -124.586
ULC14
J 67.937 12.511 0.564 2.156 -62.657
Pu max 357.560 22.995 57.676 51.975 2.981
Pu min -76.023 22.995 57.676 0.000 -7.067
Applied Loads
Mux max 147.938 22.995 57.676 285.496 -9.704
Muy max 152.416 22.995 57.676 7.049 -231.118

- Description
I : Pedestal Lower
J : Pedestal Top

Page 511 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Design Forces

Page 512 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3) Pedestal Punching Shear Check

Max. Column Load (Pu) - : 479.23 kN


Compressive strength of con'c : 37.50 Mpa
Yield strength of reinforcement : 420.00 Mpa
con'c cover : 7.50 cm
Strength reduction factor : 0.75

h1 = 50.00 cm = 500.00 mm
PB = 0.55 m = 550.00 mm PL = 0.80 m = 800.00 mm

d = h1 - con'c cover = 417.00 mm

209 800 209 Unit : mm

209
550
209

2
ΦVc = 0.75 x 0.17 x + 1 x fck x b0 x d
βC
= 3377599.23 N = 3377.60 kN
αSd
ΦVc = 0.75 x 0.083 x + 2 x fck x b0 x d
b0
= 4040157.04 N = 4040.16 kN
ΦVc = 0.75 x 0.33 x fck x b 0 x d
= 2760638.38 N = 2760.64 kN
βC = 1.45 : Ratio of long side to short side of concentrated load or reaction area
bO = 4368 : Perimeter of critical (mm)
αS = 40 : Interior columns Applied
= 30 : Edge columns
= 20 : Corner columns

ΦVc(MIN) = 2760.64 kN > Vu = 479.23 kN ∴ O.K

Page 513 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

Page 514 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

24. TYPE - F3b

24.1 Plan & Section

2300

600
2300

400

150

4800

350

2300

Part Dim. Unit weight Total weight


FB 2300 mm
Foundation FH 2300 mm 25 kN/m3 46.29 kN
FD 350 mm
PB 600 mm
Pedestal
PH 400 mm 25 kN/m3 29.70 kN
(1EA)
PD 4950 mm
Soil SD 4800 mm 18 kN/m3 436.32 kN

Page 515 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

24.2 Stability Check

24.2.1 Soil Bearing Check

LOAD COM Qa Reaction Qu


Check Remark
CASE (kN/m2) (kN) (kN/m2)
1 SLC01 150.000 604.235 114.22 O.K
Normal Operating
2 SLC02 150.000 716.696 135.48 O.K
Case (Long Term)
3 SLC03 150.000 716.696 135.48 O.K
4 SLC04 200.000 604.235 114.22 O.K
5 SLC05 200.000 657.088 124.21 O.K
6 SLC06 200.000 589.271 111.39 O.K
7 SLC07 200.000 627.346 118.59 O.K
8 SLC08 200.000 688.581 130.17 O.K
9 SLC09 200.000 728.220 137.66 O.K Wind & Seismic
10 SLC10 200.000 677.358 128.04 O.K Case (Shot Term)
11 SLC11 200.000 705.914 133.44 O.K
12 SLC12 200.000 362.541 68.53 O.K
13 SLC13 200.000 415.394 78.52 O.K
14 SLC14 200.000 347.577 65.70 O.K
15 SLC15 200.000 385.652 72.90 O.K

24.2.2 Sliding & Overturning Check

1) Load Table (From Steel Structure)

Unit : kN·m
Node Load Case FX FY FZ MX MY
Con'c self weight 0.00 0.00 75.99 0.00 0.00
Dead Soil Weight 0.00 0.00 436.32 0.00 0.00
Rack Dead 15.42 7.79 91.93 0.00 22.63
Surcharge 0.00 0.00 25.25 0.00 0.00
Live LL 6.24 9.57 87.21 0.00 8.66
Sub Total 6.24 9.57 112.46 0.00 8.66
MD#1-2
X 0.00 0.00 0.00 0.00 0.00
Wind
Y 2.17 16.27 52.85 0.00 2.99
X 14.63 -2.22 -21.38 0.00 37.87
Seismic
Y 1.74 10.64 33.02 0.00 2.44
+ -0.98 21.57 0.00 0.00 -2.49
Temp
- 0.98 -21.57 0.00 0.00 2.49

Page 516 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Sliding Check X-Direction

- Safe Factor of Sliding 2.0 (from Civil Design Criteria)


- Safe Factor of Sliding 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)
- Friction Factor of Concrete to Soil 0.4 (from Civil Design Criteria)

LOAD COM Sliding Force Resisting Friction Safety


Check
CASE (kN) Force (kN) Factor Factor
1 SLC01 0.00 241.69 0.4 N/A O.K
2 SLC02 5.26 286.68 0.4 54.5 O.K
3 SLC03 7.22 286.68 0.4 39.7 O.K
4 SLC04 0.00 241.69 0.4 N/A O.K
5 SLC05 2.17 262.84 0.4 121.0 O.K
6 SLC06 10.24 235.71 0.4 23.0 O.K
7 SLC07 1.22 250.94 0.4 206.4 O.K
8 SLC08 4.68 275.43 0.4 58.8 O.K
9 SLC09 6.31 291.29 0.4 46.2 O.K
10 SLC10 12.36 270.94 0.4 21.9 O.K
11 SLC11 5.59 282.37 0.4 50.5 O.K
12 SLC12 0.00 145.02 0.4 N/A O.K
13 SLC13 2.17 166.16 0.4 76.5 O.K
14 SLC14 10.24 139.03 0.4 13.6 O.K
15 SLC15 1.22 154.26 0.4 126.9 O.K

3) Sliding Check Y-Direction

- Safe Factor of Sliding 2.0 (from Civil Design Criteria)


- Safe Factor of Sliding 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)
- Friction Factor of Concrete to Soil 0.4 (from Civil Design Criteria)

LOAD COM Sliding Force Resisting Friction Safety


Check
CASE (kN) Force (kN) Factor Factor
1 SLC01 7.79 241.69 0.4 31.0 O.K
2 SLC02 38.94 286.68 0.4 7.4 O.K
3 SLC03 4.21 286.68 0.4 68.1 O.K
4 SLC04 7.79 241.69 0.4 31.0 O.K
5 SLC05 24.07 262.84 0.4 10.9 O.K
6 SLC06 6.24 235.71 0.4 37.8 O.K
7 SLC07 15.24 250.94 0.4 16.5 O.K
8 SLC08 14.97 275.43 0.4 18.4 O.K
9 SLC09 27.18 291.29 0.4 10.7 O.K
10 SLC10 13.81 270.94 0.4 19.6 O.K
11 SLC11 20.56 282.37 0.4 13.7 O.K
12 SLC12 4.68 145.02 0.4 31.0 O.K
13 SLC13 20.95 166.16 0.4 7.9 O.K
14 SLC14 3.12 139.03 0.4 44.5 O.K
15 SLC15 12.12 154.26 0.4 12.7 O.K

Page 517 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

4) Overturing Check X-Direction

- Safe Factor of Overturning 2.0 (from Civil Design Criteria)


- Safe Factor of Overturning 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)

Overturning Overturning Resisting Resisting


LOAD COM Safety
Moment ARM Moment ARM Check
CASE Factor
(kN·m) (m) (kN·m) (m)
1 SLC01 22.63 5.30 694.87 Calculated 30.7 O.K
2 SLC02 64.37 5.30 831.89 Calculated 12.9 O.K
3 SLC03 72.05 5.30 824.20 Calculated 11.4 O.K
4 SLC04 22.63 5.30 694.87 Calculated 30.7 O.K
5 SLC05 37.13 5.30 755.65 Calculated 20.4 O.K
6 SLC06 120.62 5.30 694.87 Calculated 5.8 O.K
7 SLC07 30.78 5.30 721.45 Calculated 23.4 O.K
8 SLC08 53.93 5.30 791.87 Calculated 14.7 O.K
9 SLC09 64.81 5.30 837.45 Calculated 12.9 O.K
10 SLC10 127.42 5.30 791.87 Calculated 6.2 O.K
11 SLC11 60.04 5.30 811.80 Calculated 13.5 O.K
12 SLC12 13.58 5.30 416.92 Calculated 30.7 O.K
13 SLC13 28.08 5.30 477.70 Calculated 17.0 O.K
14 SLC14 111.57 5.30 416.92 Calculated 3.7 O.K
15 SLC15 21.73 5.30 443.50 Calculated 20.4 O.K

5) Overturing Check Y-Direction

- Safe Factor of Overturning 2.0 (from Civil Design Criteria)


- Safe Factor of Overturning 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)

Overturning Overturning Resisting Resisting


LOAD COM Safety
Moment ARM Moment ARM Check
CASE Factor
(kN·m) (m) (kN·m) (m)
1 SLC01 41.30 5.30 694.87 Calculated 16.82 O.K
2 SLC02 206.38 5.30 824.20 Calculated 4.0 O.K
3 SLC03 92.03 5.30 938.54 Calculated 10.2 O.K
4 SLC04 41.30 5.30 694.87 Calculated 16.8 O.K
5 SLC05 127.55 5.30 755.65 Calculated 5.9 O.K
6 SLC06 58.51 5.30 703.11 Calculated 12.0 O.K
7 SLC07 80.78 5.30 721.45 Calculated 8.9 O.K
8 SLC08 79.35 5.30 791.87 Calculated 10.0 O.K
9 SLC09 144.03 5.30 837.45 Calculated 5.8 O.K
10 SLC10 92.26 5.30 798.04 Calculated 8.7 O.K
11 SLC11 108.96 5.30 811.80 Calculated 7.5 O.K
12 SLC12 24.78 5.30 416.92 Calculated 16.8 O.K
13 SLC13 111.03 5.30 477.70 Calculated 4.3 O.K
14 SLC14 41.99 5.30 425.16 Calculated 10.1 O.K
15 SLC15 64.26 5.30 443.50 Calculated 6.9 O.K

Page 518 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

24.2.3 Foundatoin Settlement Check

- Detail settlement check to be included in Soil Improvement Design Report.

Page 519 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

24.3 Member Design

In line with that, this section is focused on seeking where greater or lesser values than (±)ΦMn are using
the stress contour range in MIDAS Program, then adding supplementary rebar where required, checking that the stress
resultant output is not greater or lesser than revised design moment (±)ΦMn any more (where, the sign (+) means
tension stress in bottom and (-) in top of concrete foundation) and verifying no need of reinforcing bar.
The moment and shear force was determined on the basis of critical section.
Case of occurs stress is concentrated, it is unsuitable for use as a design value.
Thus, using the average value of the near stress

24.3.1 Footing THK. 350mm

1. Calculation Result for Member Design - Factored Load Case

- Mxx (Max.)

X
Z

Value
(kN·m/m)
66.18

Page 520 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Mxx (Min.)

X
Z

Value
(kN·m/m)
32.54

Page 521 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Max.)

X
Z

Value
(kN·m/m)
67.88

Page 522 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Min.)

X
Z

Value
(kN·m/m)
35.13

Page 523 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Vxx (ABS Max.)

X
Z

Value
(kN/m)
164.75
211.88
Average
188.32

Page 524 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Vyy (ABS Max.)

X
Z

Value
(kN/m)
234.86
141.59
Average
188.23

Page 525 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2. Calculation Result for Crack Check - Unfactored Load Case

- Mxx (Max.)

X
Z

Value
(kN·m/m)
50.19
26.57
Average
38.38

Page 526 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Mxx (Min.)

X
Z

Value
(kN·m/m)
25.53

Page 527 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Max.)

X
Z

Value
(kN·m/m)
52.12
34.02
Average
43.07

Page 528 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Min.)

X
Z

Value
(kN·m/m)
28.12

Page 529 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3. Calculation Result Summary

angle of main axis l f i

Factored Condition Unfactored Condition


Mxx Myy Vxx Vyy Mxx Myy
Classification
(kN·m/m) (kN·m/m) (kN/m) (kN/m) (kN·m/m) (kN·m/m)
Bottom 66.18 67.88 38.38 43.07
188.32 188.23
Top 32.54 35.13 25.53 28.12

4. Rebar Design (Bottom Rebar)

1) X Direction

Mu = 66.180 kN·m/m, h = 350 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 38.380 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 188.315 kN/m , d = 267 mm , Φb = 0.90 , βc = 0.78

1.1) Rebar Design


Mu 66.18 x 10 6
Required Rn = = 2
= 1.03 N/mm2
φbd² 0.90 x 1000 x 267

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 1.03


= 1 - 1 -
420 0.85 x 37.5

= 0.0025

As(req.) = ρ x b x d = 0.0025 x 1000 x 267 = 668


mm²
As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 350 / 2 = 315
mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 267 = 890 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 267 = 973 mm²
4/3 As(req.) = 4 / 3 x 668 = 891 mm²

Use As = 891 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

Page 530 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 267
= 204 kN > VU = 188.32 kN ∴ NO USE STIRRUP

1.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 38.38 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 26.70 ) = 0.0038
2
k = - ρn + √{ 2ρn +(ρn) } = 0.205
x =kd = 54.7 mm
Icr = b x3 / 3 + n As (d - x) 2 = 4.E+08 mm4
fs = n * Ms / Icr *(d-x) = 153.43 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 505.97 mm
Rs2 = 300 (280 / fs) = 547.47 mm
Rs = Min.(Rs1, Rs2) = 506.0 mm > 200 mm ∴ O.K !

1.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.248
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.24 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 531 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Y Direction

Mu = 67.880 kN·m/m, h = 350 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 43.070 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 188.225 kN/m , d = 267 mm , Φb = 0.90 , βc = 0.78

2.1) Rebar Design


Mu 67.88 x 10 6
Required Rn = = 2
= 1.06 N/mm2
φbd² 0.90 x 1000 x 267

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 1.06


= 1 - 1 -
420 0.85 x 37.5

= 0.0026

As(req.) = ρ x b x d = 0.0026 x 1000 x 267 = 695 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 350 / 2 = 315 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 267 = 890 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 267 = 973 mm²
4/3 As(req.) = 4 / 3 x 695 = 927 mm²

Use As = 927 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

2.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 267
= 204 kN > VU = 188.23 kN ∴ NO USE STIRRUP

Page 532 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 43.07 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 26.70 ) = 0.0038
2
k = - ρn + √{ 2ρn +(ρn) } = 0.205
x =kd = 54.7 mm
Icr = b x3 / 3 + n As (d - x) 2 = 4.E+08 mm4
fs = n * Ms / Icr *(d-x) = 172.18 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 430.45 mm
Rs2 = 300 (280 / fs) = 487.86 mm
Rs = Min.(Rs1, Rs2) = 430.5 mm > 200 mm ∴ O.K !

2.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.248
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.27 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 533 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

5. Rebar Design (Top Rebar)

1) X Direction

Mu = 32.540 kN·m/m, h = 350 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 25.530 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 188.315 kN/m , d = 267 mm , Φb = 0.90 , βc = 0.78

1.1) Rebar Design


Mu 32.54 x 10 6
Required Rn = = 2
= 0.51 N/mm2
φbd² 0.90 x 1000 x 267

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.51


= 1 - 1 -
420 0.85 x 37.5

= 0.0012

As(req.) = ρ x b x d = 0.0012 x 1000 x 267 = 321 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 350 / 2 = 315 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 267 = 890 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 267 = 973 mm²
4/3 As(req.) = 4 / 3 x 321 = 428 mm²

Use As = 428 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

1.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 267
= 204 kN > VU = 188.32 kN ∴ NO USE STIRRUP

Page 534 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 25.53 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 26.70 ) = 0.0038
2
k = - ρn + √{ 2ρn +(ρn) } = 0.205
x =kd = 54.7 mm
Icr = b x3 / 3 + n As (d - x) 2 = 4.E+08 mm4
fs = n * Ms / Icr *(d-x) = 102.06 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 855.01 mm
Rs2 = 300 (280 / fs) = 823.03 mm
Rs = Min.(Rs1, Rs2) = 823.0 mm > 200 mm ∴ O.K !

1.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.248
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.16 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 535 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Y Direction

Mu = 35.130 kN·m/m, h = 350 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 28.120 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 188.225 kN/m , d = 267 mm , Φb = 0.90 , βc = 0.78

2.1) Rebar Design


Mu 35.13 x 10 6
Required Rn = = 2
= 0.55 N/mm2
φbd² 0.90 x 1000 x 267

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.55


= 1 - 1 -
420 0.85 x 37.5

= 0.0013

As(req.) = ρ x b x d = 0.0013 x 1000 x 267 = 348 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 350 / 2 = 315 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 267 = 890 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 267 = 973 mm²
4/3 As(req.) = 4 / 3 x 348 = 464 mm²

Use As = 464 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

2.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 267
= 204 kN > VU = 188.23 kN ∴ NO USE STIRRUP

Page 536 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 28.12 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 26.70 ) = 0.0038
2
k = - ρn + √{ 2ρn +(ρn) } = 0.205
x =kd = 54.7 mm
Icr = b x3 / 3 + n As (d - x) 2 = 4.E+08 mm4
fs = n * Ms / Icr *(d-x) = 112.42 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 758.99 mm
Rs2 = 300 (280 / fs) = 747.23 mm
Rs = Min.(Rs1, Rs2) = 747.2 mm > 200 mm ∴ O.K !

2.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.248
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.18 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 537 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

24.3.2 Pedestal Design

1. 400 X 600

1) Design Forces
Unit : kN·m
Combinations Part Pu Vux Vuy Mux Muy
I 162.694 9.604 18.816 119.193 47.540
ULC01
J 121.114 9.604 18.816 26.054 4.026
I 278.988 49.428 24.888 156.316 244.669
ULC02
J 243.348 49.428 24.888 33.120 8.089
I 278.988 2.340 27.240 173.934 11.583
ULC03
J 243.348 2.340 27.240 39.096 8.089
I 226.662 17.802 22.338 141.515 88.120
ULC04
J 191.022 17.802 22.338 30.942 6.350
I 139.452 8.232 16.128 102.166 40.748
ULC05
J 103.812 8.232 16.128 22.332 3.451
I 110.996 3.528 16.008 101.412 17.464
ULC06
J 75.356 3.528 16.008 22.172 2.505
I 226.662 17.802 22.338 141.515 88.120
ULC07
J 191.022 17.802 22.338 30.942 6.350
I 169.750 5.718 22.098 140.007 28.304
ULC08
J 134.110 5.718 22.098 30.622 4.458
I 209.402 16.032 34.958 236.574 79.358
ULC09
J 173.762 16.032 34.958 63.532 5.776
I 198.882 8.632 21.018 133.161 42.728
ULC10
J 163.242 8.632 21.018 29.122 5.426
I 64.494 3.771 3.735 23.672 18.666
ULC11
J 37.764 3.771 3.735 5.184 1.255
I 7.582 19.749 3.495 22.164 97.758
ULC12
J -19.148 19.749 3.495 4.864 0.000
I 47.234 2.001 16.355 118.731 9.905
ULC13
J 20.504 2.001 16.355 37.774 0.682
I 36.714 5.399 2.415 15.318 26.725
ULC14
J 9.984 5.399 2.415 3.364 0.332
Pu max 278.988 49.428 34.958 156.316 244.669
Pu min -19.148 49.428 34.958 4.864 0.000
Applied Loads
Mux max 209.402 49.428 34.958 236.574 79.358
Muy max 278.988 49.428 34.958 156.316 244.669

- Description
I : Pedestal Lower
J : Pedestal Top

Page 538 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Rebar Design

Page 539 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3) Pedestal Punching Shear Check

Max. Column Load (Pu) - : 288.50 kN


Compressive strength of con'c : 37.50 Mpa
Yield strength of reinforcement : 420.00 Mpa
con'c cover : 7.50 cm
Strength reduction factor : 0.75

h1 = 35.00 cm = 350.00 mm
PB = 0.40 m = 400.00 mm PL = 0.60 m = 600.00 mm

d = h1 - con'c cover = 267.00 mm

134 600 134 Unit : mm

134
400
134

2
ΦVc = 0.75 x 0.17 x + 1 x fck x b0 x d
βC
= 1492344.95 N = 1492.34 kN
αSd
ΦVc = 0.75 x 0.083 x + 2 x fck x b0 x d
b0
= 1711547.47 N = 1711.55 kN
ΦVc = 0.75 x 0.33 x fck x b 0 x d
= 1241530.67 N = 1241.53 kN
βC = 1.50 : Ratio of long side to short side of concentrated load or reaction area
bO = 3068 : Perimeter of critical (mm)
αS = 40 : Interior columns Applied
= 30 : Edge columns
= 20 : Corner columns

ΦVc(MIN) = 1241.53 kN > Vu = 288.50 kN ∴ O.K

Page 540 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

Page 541 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

25. TYPE - F4b

25.1 Plan & Section

2200

900
4000

2200
500
900
700

150

4800

500

2200

Part Dim. Unit weight Total weight


FB 2200 mm
Foundation FH 4000 mm 25 kN/m3 110.00 kN
FD 500 mm
PB 500 mm
Pedestal
PH 700 mm 25 kN/m3 86.63 kN
(2EA)
PD 4950 mm
Soil SD 4800 mm 18 kN/m3 699.84 kN

Page 542 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

25.2 Stability Check

25.2.1 Soil Bearing Check

LOAD COM Qa Reaction Qu


Check Remark
CASE (kN/m2) (kN) (kN/m2)
1 SLC01 150.000 999.977 113.63 O.K
Normal Operating
2 SLC02 150.000 1127.640 128.14 O.K
Case (Long Term)
3 SLC03 150.000 1127.640 128.14 O.K
4 SLC04 200.000 999.977 113.63 O.K
5 SLC05 200.000 1008.513 114.60 O.K
6 SLC06 200.000 985.932 112.04 O.K
7 SLC07 200.000 999.977 113.63 O.K
8 SLC08 200.000 1095.724 124.51 O.K
9 SLC09 200.000 1102.126 125.24 O.K Wind & Seismic
10 SLC10 200.000 1085.190 123.32 O.K Case (Shot Term)
11 SLC11 200.000 1095.724 124.51 O.K
12 SLC12 200.000 599.986 68.18 O.K
13 SLC13 200.000 608.522 69.15 O.K
14 SLC14 200.000 585.941 66.58 O.K
15 SLC15 200.000 599.986 68.18 O.K

25.2.2 Sliding & Overturning Check

1) Load Table (From Steel Structure)


Unit : kN·m
Node Load Case FX FY FZ MX MY
Con'c self weight 0.00 0.00 196.63 0.00 0.00
Dead Soil Weight 0.00 0.00 699.84 0.00 0.00
Rack Dead 7.15 -4.50 48.19 0.00 9.88
Surcharge 0.00 0.00 40.50 0.00 0.00
Live LL 3.31 -3.86 37.22 0.00 4.54
Sub Total 3.31 -3.86 77.72 0.00 4.54
MD#8-1
X 0.00 0.00 0.00 0.00 0.00
Wind
Y -1.42 13.90 -76.28 0.00 -1.92
X 7.25 0.95 -9.87 0.00 18.74
Seismic
Y -1.63 6.12 -36.53 0.00 -2.22
+ -0.96 -20.88 0.00 0.00 -2.47
Temp
- 0.96 20.88 0.00 0.00 2.47
Rack Dead 8.00 4.50 55.32 0.00 11.06
Dead
Sub Total 8.00 4.50 55.32 0.00 11.06
LL 3.34 3.86 49.94 0.00 4.58
Live
Sub Total 3.34 3.86 49.94 0.00 4.58
X 0.00 0.00 0.00 0.00 0.00
MD#8-2 Wind
Y 2.43 14.90 84.82 0.00 3.31
X 7.74 -0.76 -10.20 0.00 19.87
Seismic
Y 1.63 6.11 36.53 0.00 2.22
+ -0.96 20.88 0.00 0.00 -2.47
Temp
- 0.96 -20.88 0.00 0.00 2.47

Page 543 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Sliding Check X-Direction

- Safe Factor of Sliding 2.0 (from Civil Design Criteria)


- Safe Factor of Sliding 1.0 (SLC 12 ~ SLC15)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)
- Friction Factor of Concrete to Soil 0.4 (from Civil Design Criteria)

LOAD COM Sliding Force Resisting Friction Safety


Check
CASE (kN) Force (kN) Factor Factor
1 SLC01 0.00 399.99 0.4 N/A O.K
2 SLC02 4.73 451.06 0.4 95.4 O.K
3 SLC03 8.56 451.06 0.4 52.7 O.K
4 SLC04 0.00 399.99 0.4 N/A O.K
5 SLC05 1.00 403.41 0.4 401.8 O.K
6 SLC06 10.49 394.37 0.4 37.6 O.K
7 SLC07 0.00 399.99 0.4 N/A O.K
8 SLC08 4.98 438.29 0.4 88.0 O.K
9 SLC09 5.74 440.85 0.4 76.9 O.K
10 SLC10 12.85 434.08 0.4 33.8 O.K
11 SLC11 4.98 438.29 0.4 87.9 O.K
12 SLC12 0.00 239.99 0.4 N/A O.K
13 SLC13 1.00 243.41 0.4 242.4 O.K
14 SLC14 10.49 234.38 0.4 22.3 O.K
15 SLC15 0.00 239.99 0.4 N/A O.K

3) Sliding Check Y-Direction

- Safe Factor of Sliding 2.0 (from Civil Design Criteria)


- Safe Factor of Sliding 1.0 (SLC 10 ~ SLC12)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)
- Friction Factor of Concrete to Soil 0.4 (from Civil Design Criteria)

LOAD COM Sliding Force Resisting Friction Safety


Check
CASE (kN) Force (kN) Factor Factor
1 SLC01 0.00 399.99 0.4 N/A O.K
2 SLC02 0.00 451.06 0.4 N/A O.K
3 SLC03 0.00 451.06 0.4 N/A O.K
4 SLC04 0.00 399.99 0.4 N/A O.K
5 SLC05 28.80 403.41 0.4 14.0 O.K
6 SLC06 0.13 394.37 0.4 2930.2 O.K
7 SLC07 8.57 399.99 0.4 46.7 O.K
8 SLC08 0.00 438.29 0.4 N/A O.K
9 SLC09 21.60 440.85 0.4 20.4 O.K
10 SLC10 0.10 434.08 0.4 4473.4 O.K
11 SLC11 6.42 438.29 0.4 68.3 O.K
12 SLC12 0.00 239.99 0.4 N/A O.K
13 SLC13 28.80 243.41 0.4 8.5 O.K
14 SLC14 0.13 234.38 0.4 1746.2 O.K
15 SLC15 8.56 239.99 0.4 28.0 O.K

Page 544 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

4) Overturing Check X-Direction

- Safe Factor of Overturning 2.0 (from Civil Design Criteria)


- Safe Factor of Overturning 1.0 (SLC 10 ~ SLC12)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)

Overturning Overturning Resisting Resisting


LOAD COM Safety
Moment ARM Moment ARM Check
CASE Factor
(kN·m) (m) (kN·m) (m)
1 SLC01 20.94 5.45 1099.98 Calculated 52.5 O.K
2 SLC02 66.27 5.45 1255.77 Calculated 19.0 O.K
3 SLC03 81.64 5.45 1240.40 Calculated 15.2 O.K
4 SLC04 20.94 5.45 1099.98 Calculated 52.5 O.K
5 SLC05 121.39 5.45 1202.96 Calculated 9.9 O.K
6 SLC06 120.60 5.45 1099.98 Calculated 9.1 O.K
7 SLC07 56.84 5.45 1135.87 Calculated 20.0 O.K
8 SLC08 54.94 5.45 1205.30 Calculated 21.9 O.K
9 SLC09 130.28 5.45 1282.54 Calculated 9.8 O.K
10 SLC10 129.69 5.45 1205.30 Calculated 9.3 O.K
11 SLC11 81.87 5.45 1232.22 Calculated 15.1 O.K
12 SLC12 12.56 5.45 659.99 Calculated 52.5 O.K
13 SLC13 113.01 5.45 762.97 Calculated 6.8 O.K
14 SLC14 112.23 5.45 659.99 Calculated 5.9 O.K
15 SLC15 48.47 5.45 695.88 Calculated 14.4 O.K

5) Overturing Check Y-Direction

- Safe Factor of Overturning 2.0 (from Civil Design Criteria)


- Safe Factor of Overturning 1.0 (SLC 10 ~ SLC12)
(from Section 4.3.7 Foundations. PIP STC01015 Structural Design Criteria)

Overturning Overturning Resisting Resisting


LOAD COM Safety
Moment ARM Moment ARM Check
CASE Factor
(kN·m) (m) (kN·m) (m)
1 SLC01 24.55 5.45 2016.65 Calculated 82.2 O.K
2 SLC02 159.34 5.45 2392.81 Calculated 15.0 O.K
3 SLC03 159.34 5.45 2392.81 Calculated 15.0 O.K
4 SLC04 24.55 5.45 2016.65 Calculated 82.2 O.K
5 SLC05 417.98 5.45 2092.99 Calculated 5.0 O.K
6 SLC06 56.00 5.45 2019.54 Calculated 36.1 O.K
7 SLC07 150.49 5.45 2039.67 Calculated 13.6 O.K
8 SLC08 40.31 5.45 2213.44 Calculated 54.9 O.K
9 SLC09 335.39 5.45 2270.69 Calculated 6.8 O.K
10 SLC10 63.90 5.45 2215.60 Calculated 34.7 O.K
11 SLC11 134.77 5.45 2230.70 Calculated 16.6 O.K
12 SLC12 14.73 5.45 1209.99 Calculated 82.2 O.K
13 SLC13 408.16 5.45 1286.33 Calculated 3.2 O.K
14 SLC14 46.18 5.45 1212.87 Calculated 26.3 O.K
15 SLC15 140.67 5.45 1233.01 Calculated 8.8 O.K

Page 545 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

9.2.3 Foundatoin Settlement Check

- Detail settlement check to be included in Soil Improvement Design Report.

Page 546 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

25.3 Member Design

In line with that, this section is focused on seeking where greater or lesser values than (±)ΦMn are using
the stress contour range in MIDAS Program, then adding supplementary rebar where required, checking that the stress
resultant output is not greater or lesser than revised design moment (±)ΦMn any more (where, the sign (+) means
tension stress in bottom and (-) in top of concrete foundation) and verifying no need of reinforcing bar.
The moment and shear force was determined on the basis of critical section.
Case of occurs stress is concentrated, it is unsuitable for use as a design value.
Thus, using the average value of the near stress

25.3.1 Footing THK. 500mm

1. Calculation Result for Member Design - Factored Load Case

- Mxx (Max.)

X
Z

Value
(kN·m/m)
45.64

Page 547 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Mxx (Min.)

X
Z

Value
(kN·m/m)
212.40

Page 548 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Max.)

X
Z

Value
(kN·m/m)
48.13

Page 549 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Min.)

X
Z

Value
(kN·m/m)
38.41

Page 550 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Vxx (ABS Max.)

X
Z

Value
(kN/m)
268.78

Page 551 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Vyy (ABS Max.)

X
Z

Value
(kN/m)
124.17

Page 552 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2. Calculation Result for Crack Check - Unfactored Load Case

- Mxx (Max.)

X
Z

Value
(kN·m/m)
38.40

Page 553 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Mxx (Min.)

X
Z

Value
(kN·m/m)
162.73

Page 554 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Max.)

X
Z

Value
(kN·m/m)
37.98

Page 555 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- Myy (Min.)

X
Z

Value
(kN·m/m)
32.01

Page 556 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3. Calculation Result Summary

angle of main axis l f i

Factored Condition Unfactored Condition


Mxx Myy Vxx Vyy Mxx Myy
Classification
(kN·m/m) (kN·m/m) (kN/m) (kN/m) (kN·m/m) (kN·m/m)
Bottom 45.64 48.13 38.40 37.98
268.78 124.17
Top 212.40 38.41 162.73 32.01

4. Rebar Design (Bottom Rebar)

1) X Direction

Mu = 45.640 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 38.400 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 268.780 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

1.1) Rebar Design


Mu 45.64 x 10 6
Required Rn = = 2
= 0.29 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.29


= 1 - 1 -
420 0.85 x 37.5

= 0.0007

As(req.) = ρ x b x d = 0.0007 x 1000 x 417 = 292


mm²
As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450
mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 292 = 389 mm²

Use As = 450 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

Page 557 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 268.78 kN ∴ NO USE STIRRUP

1.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 38.4 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 97.00 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 909.37 mm
Rs2 = 300 (280 / fs) = 865.95 mm
Rs = Min.(Rs1, Rs2) = 866.0 mm > 200 mm ∴ O.K !

1.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.15 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 558 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Y Direction

Mu = 48.130 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 37.980 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 124.170 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

2.1) Rebar Design


Mu 48.13 x 10 6
Required Rn = = 2
= 0.31 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.31


= 1 - 1 -
420 0.85 x 37.5

= 0.0007

As(req.) = ρ x b x d = 0.0007 x 1000 x 417 = 292 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 292 = 389 mm²

Use As = 450 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

2.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 124.17 kN ∴ NO USE STIRRUP

Page 559 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 37.98 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 95.94 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 921.50 mm
Rs2 = 300 (280 / fs) = 875.53 mm
Rs = Min.(Rs1, Rs2) = 875.5 mm > 200 mm ∴ O.K !

2.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.15 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 560 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

5. Rebar Design (Top Rebar)

1) X Direction

Mu = 212.400 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 162.730 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 268.780 kN/m , d = 413 mm , Φb = 0.90 , βc = 0.78

1.1) Rebar Design


Mu 212.40 x 10 6
Required Rn = = 2
= 1.39 N/mm2
φbd² 0.90 x 1000 x 413

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 1.39


= 1 - 1 -
420 0.85 x 37.5

= 0.0034

As(req.) = ρ x b x d = 0.0034 x 1000 x 413 = 1403 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 413 = 1375 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 413 = 1504 mm²
4/3 As(req.) = 4 / 3 x 1403 = 1871 mm²

Use As = 1504 mm²

∴USE : D 25 @ 200 ( As = 2454.5 mm² ) ∴O.K !

1.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 413
= 316 kN > VU = 268.78 kN ∴ NO USE STIRRUP

Page 561 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 162.73 kN.m/m


As = 24.5 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 24.545 / ( 100 x 41.25 ) = 0.0060
2
k = - ρn + √{ 2ρn +(ρn) } = 0.25
x =kd = 103.1 mm
Icr = b x3 / 3 + n As (d - x) 2 = 2.E+09 mm4
fs = n * Ms / Icr *(d-x) = 175.33 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 419.35 mm
Rs2 = 300 (280 / fs) = 479.09 mm
Rs = Min.(Rs1, Rs2) = 419.3 mm > 200 mm ∴ O.K !

1.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.320
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.29 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 562 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Y Direction

Mu = 38.410 kN·m/m, h = 500 mm , b = 1000 mm , fy = 420 N/mm2


Ms = 32.010 kN·m/m, d' = 75 mm , Φs = 0.75 , f'c = 37.5 N/mm2
Vu = 124.170 kN/m , d = 417 mm , Φb = 0.90 , βc = 0.78

2.1) Rebar Design


Mu 38.41 x 10 6
Required Rn = = 2
= 0.25 N/mm2
φbd² 0.90 x 1000 x 417

0.85 x f'c 2 x Rn
ρ = 1 - 1 -
fy 0.85 x f'c

0.85 x 37.5 2 x 0.25


= 1 - 1 -
420 0.85 x 37.5

= 0.0006

As(req.) = ρ x b x d = 0.0006 x 1000 x 417 = 251 mm²


As(temp.) = 0 x b x h / 2 = 0.0018 x 1000 x 500 / 2 = 450 mm²
(One Side)
As(min.) = 1.4 / fy x b x d = 1.4 / 420 x 1000 x 417 = 1390 mm²
As(min.) = 0.25 x fc / fy x b x d
= 0.25 x 37.5 / 420 x 1000 x 417 = 1520 mm²
4/3 As(req.) = 4 / 3 x 251 = 335 mm²

Use As = 450 mm²

∴USE : D 16 @ 200 ( As = 1005.5 mm² ) ∴O.K !

2.2) Shear Check

ΦVc = Φs x 1/6 x f'c x b x d


= 0.75 x 1/6 x 37.5 x 1000 x 417
= 319 kN > VU = 124.17 kN ∴ NO USE STIRRUP

Page 563 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2.3) Check Maximum Reinforcement Spacing

Ms = Maximum Moment at service loads = 32.01 kN.m/m


As = 10.1 cm2/m
Ec = 28782 MPa
Es = 200000 MPa
n = Es /Ec = 7
ρ = As / bd = 10.055 / ( 100 x 41.70 ) = 0.0024
2
k = - ρn + √{ 2ρn +(ρn) } = 0.168
x =kd = 69.9 mm
Icr = b x3 / 3 + n As (d - x) 2 = 1.E+09 mm4
fs = n * Ms / Icr *(d-x) = 80.86 N/mm2
Rs1 = 380 (280 / fs) - 2.5 * Cc = 1128.34 mm
Rs2 = 300 (280 / fs) = 1038.82 mm
Rs = Min.(Rs1, Rs2) = 1038.8 mm > 200 mm ∴ O.K !

2.4) Crack Width Calculation

R = (H - χ) / (H - χ - d') = 1.197
A = 2 x 75 x 1000.00 / 7 = 21429 mm2
W = 1.08 x R x fs x ³√(dc x A) x 0.00001
= 0.12 mm < Wa ( 0.30 ) mm ∴ O.K !

Page 564 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

25.3.2 Pedestal Design

1. 500 X 700

1) Design Forces
Unit : kN·m
Combinations Part Pu Vux Vuy Mux Muy
I 100.104 4.564 4.214 26.655 22.592
ULC01
J 39.466 4.564 4.214 5.796 1.194
I 135.319 83.428 5.408 30.018 412.969
ULC02
J 83.344 83.428 5.408 3.248 2.520
I 135.163 16.808 10.076 65.136 83.200
ULC03
J 83.188 16.808 10.076 15.260 2.516
I 116.653 6.622 6.932 43.861 32.779
ULC04
J 64.678 6.622 6.932 9.548 1.956
I 85.803 3.912 3.612 22.847 19.364
ULC05
J 33.828 3.912 3.612 4.968 1.023
I 153.515 15.808 5.612 35.531 78.250
ULC06
J 101.540 15.808 5.612 7.752 3.071
I 116.653 6.622 6.932 43.861 32.779
ULC07
J 64.678 6.622 6.932 9.548 1.956
I 252.077 30.414 10.932 69.229 150.549
ULC08
J 200.102 30.414 10.932 15.116 6.051
I 123.403 7.512 1.962 6.480 37.184
ULC09
J 71.428 7.512 1.962 3.232 2.160
I 141.913 10.992 7.912 50.092 54.410
ULC10
J 89.938 10.992 7.912 10.928 2.720
I 64.352 2.124 2.709 17.136 10.514
ULC11
J 25.371 2.124 2.709 3.726 0.767
I 199.776 25.916 6.709 42.504 128.284
ULC12
J 160.795 25.916 6.709 9.294 4.862
I 71.102 3.014 2.261 20.246 14.919
ULC13
J 32.121 3.014 2.261 9.054 0.971
I 89.612 6.494 3.689 23.367 32.145
ULC14
J 50.631 6.494 3.689 5.106 1.531
Pu max 252.077 83.428 10.932 69.229 150.549
Pu min 25.371 83.428 10.932 3.726 0.767
Applied Loads
Mux max 252.077 83.428 10.932 69.229 150.549
Muy max 135.319 83.428 10.932 30.018 412.969

- Description
I : Pedestal Lower
J : Pedestal Top

Page 565 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

2) Rebar Design

Page 566 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3) Pedestal Punching Shear Check

Max. Column Load (Pu) - : 304.01 kN


Compressive strength of con'c : 37.50 Mpa
Yield strength of reinforcement : 420.00 Mpa
con'c cover : 7.50 cm
Strength reduction factor : 0.75

h1 = 50.00 cm = 500.00 mm
PB = 0.50 m = 500.00 mm PL = 0.70 m = 700.00 mm

d = h1 - con'c cover = 417.00 mm

209 700 209 Unit : mm

209
500
209

2
ΦVc = 0.75 x 0.17 x + 1 x fck x b0 x d
βC
= 3216575.13 N = 3216.58 kN
αSd
ΦVc = 0.75 x 0.083 x + 2 x fck x b0 x d
b0
= 3944780.34 N = 3944.78 kN
ΦVc = 0.75 x 0.33 x fck x b 0 x d
= 2571034.10 N = 2571.03 kN
βC = 1.40 : Ratio of long side to short side of concentrated load or reaction area
bO = 4068 : Perimeter of critical (mm)
αS = 40 : Interior columns Applied
= 30 : Edge columns
= 20 : Corner columns

ΦVc(MIN) = 2571.03 kN > Vu = 304.01 kN ∴ O.K

Page 567 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

Page 568 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

APPENDIX

1. Loading Data (Vendor Data)

Page 569 of 569


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

1. Loading Data (Vendor Data)


Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- CABLE RACK#1 -

X
Position FX (kN) FY (kN) FZ (kN)
Load MX (kN·m) MY (kN·m) MZ (kN·m)
GRID Height(Z) Node EAST+ NORTH+ Vertical
3 DS 1.575581 5.318 52.749 0.000 -9.666 0.000
3 DC -0.05144 1.742 -1.207 0.000 -3.642 0.002
3 LL 2.982558 3.863 29.205 0.000 -18.363 0.000
3 TL(+) 2.658607 20.025 0.964 0.000 6.600 0.000
CB1-02 CB1-D EL+100200
3 TL(-) -2.6586 -20.025 -0.964 0.000 -6.600 0.000
3 WLY(Steel) -1.863504 22.873 178.437 0.000 6.346 0.005
3 ELX(Steel) -15.07298 -1.400 -7.568 0.000 -36.696 0.000
3 ELY(Steel) 0.278889 -6.959 -51.620 0.000 -1.056 -0.001
4 DS 1.81889 -5.319 55.013 0.000 -10.210 0.000
4 DC 2.466256 -2.043 33.612 0.000 -9.073 0.002
4 LL 3.138815 -3.837 29.082 0.000 -18.774 0.000
4 TL(+) 2.620617 -20.037 1.046 0.000 6.701 0.000
CB1-01 CB1-D EL+100200
4 TL(-) -2.62061 20.037 -1.046 0.000 -6.701 0.000
4 WLY(Steel) 1.602257 23.554 -178.857 0.000 -5.001 0.005
4 ELX(Steel) -14.942458 0.965 -3.193 0.000 -37.120 0.000
4 ELY(Steel) -0.196787 -7.000 51.732 0.000 0.643 -0.001
5 DS -0.411007 4.620 52.090 0.000 -2.836 0.000
5 DC -0.185429 1.542 -1.194 0.000 -1.280 0.000
5 LL -0.60218 4.495 51.016 0.000 -4.155 0.000
5 TL(+) 0.232159 19.729 -0.958 0.000 1.602 0.000
CB1-02 CB1-C EL+100200
5 TL(-) -0.232158 -19.729 0.958 0.000 -1.602 0.000
5 WLY(Steel) -0.043842 30.971 259.076 0.000 -0.297 -0.002
5 ELX(Steel) -3.960631 0.318 3.892 0.000 -25.355 0.000
5 ELY(Steel) 0.012294 -8.918 -74.402 0.000 0.083 0.001
6 DS -0.41191 -4.636 54.303 0.000 -2.842 0.000
6 DC -0.192258 -1.726 38.221 0.000 -1.326 0.000
6 LL -0.602999 -4.515 51.086 0.000 -4.161 0.000
6 TL(+) 0.231927 -19.716 -1.052 0.000 1.600 0.000
CB1-01 CB1-C EL+100200
6 TL(-) -0.231926 19.716 1.052 0.000 -1.600 0.000
6 WLY(Steel) 0.077044 31.239 -258.490 0.000 0.526 -0.002
6 ELX(Steel) -3.967919 -0.626 6.795 0.000 -25.405 0.000
6 ELY(Steel) -0.021886 -8.904 74.241 0.000 -0.149 0.001
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

7 DS -0.410622 5.120 57.472 0.000 -2.833 0.000


7 DC -0.185512 2.442 4.495 0.000 -1.280 0.000
7 LL -0.601392 5.054 57.291 0.000 -4.150 0.000
7 TL(+) -0.162019 19.814 0.038 0.000 -1.118 0.000
CB1-02 CB1-B EL+100200
7 TL(-) 0.162019 -19.814 -0.038 0.000 1.118 0.000
7 WLY(Steel) -0.044486 30.324 246.492 0.000 -0.301 -0.002
7 ELX(Steel) -3.963729 -0.338 -4.070 0.000 -25.376 0.000
7 ELY(Steel) 0.012392 -8.796 -72.092 0.000 0.084 0.001
8 DS -0.411474 -5.112 59.972 0.000 -2.839 0.000
8 DC -0.191808 -1.480 39.946 0.000 -1.323 0.000
8 LL -0.602158 -5.105 57.820 0.000 -4.155 0.000
8 TL(+) -0.162264 -19.808 -0.038 0.000 -1.120 0.000
CB1-01 CB1-B EL+100200
8 TL(-) 0.162263 19.808 0.038 0.000 1.120 0.000
8 WLY(Steel) 0.077612 30.657 -246.645 0.000 0.530 -0.002
8 ELX(Steel) -3.970443 0.439 -4.734 0.000 -25.422 0.000
8 ELY(Steel) -0.02196 -8.801 72.148 0.000 -0.150 0.001
9 DS -0.91325 2.109 43.149 0.000 -10.461 0.000
9 DC -0.880842 0.487 -2.094 0.000 -5.687 0.001
9 LL -1.888049 1.861 37.527 0.000 -16.479 0.000
9 TL(+) -2.745048 21.581 -0.044 0.000 -18.767 0.000
CB1-02 CB1-A EL+100200
9 TL(-) 2.745041 -21.581 0.044 0.000 18.767 0.000
9 WLY(Steel) 1.144183 21.838 175.821 0.000 1.849 -0.003
9 ELX(Steel) -16.140946 0.539 7.745 0.000 -107.536 0.000
9 ELY(Steel) -0.377805 -6.607 -53.269 0.000 -0.643 0.001
10 DS -0.836211 -2.099 44.671 0.000 -10.301 0.000
10 DC -0.778967 -0.963 31.501 0.000 -5.740 0.001
10 LL -1.824599 -1.815 37.051 0.000 -16.335 0.000
10 TL(+) -2.673977 -21.588 0.044 0.000 -18.613 0.000
CB1-01 CB1-A EL+100200
10 TL(-) 2.67397 21.588 -0.044 0.000 18.613 0.000
10 WLY(Steel) -0.949264 22.323 -175.834 0.000 -0.721 -0.003
10 ELX(Steel) -15.839575 0.102 1.132 0.000 -106.977 0.000
10 ELY(Steel) 0.314864 -6.607 53.261 0.000 0.303 0.001
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- CABLE RACK#2 -

Position FX (kN) FY (kN) FZ (kN)


Load MX (kN·m) MY (kN·m) MZ (kN·m)
GRID Height(Z) Node EAST+ NORTH+ Vertical
3 DS 4.035213 6.194 49.728 0.000 -8.816 -0.001
3 DC 3.918937 2.375 32.246 0.000 -7.842 -0.013
3 LL 5.636951 4.832 29.940 0.000 -15.325 -0.002
3 TL(+) 5.908128 21.358 1.599 0.000 11.514 0.001
CB2-05 CB2-F EL+100200 3 TL(-) -5.908113 -21.358 -1.599 0.000 -11.514 -0.001
3 WLX(Steel) -0.957232 -0.041 -0.215 0.000 -1.923 0.000
3 WLY(Steel) -3.929909 20.678 120.070 0.000 6.998 0.012
3 ELX(Steel) -17.891154 -0.477 -1.750 0.000 -34.940 0.000
3 ELY(Steel) 0.794631 -6.783 -39.667 0.000 -1.335 -0.002
4 DS 4.579178 -6.126 49.442 0.000 -8.548 -0.001
4 DC -0.475753 -2.070 -1.011 0.000 -4.318 -0.013
4 LL 6.310827 -4.702 29.182 0.000 -14.986 -0.002
4 TL(+) 5.556839 -21.337 1.304 0.000 11.302 0.001
CB2-04 CB2-F EL+100200 4 TL(-) -5.556824 21.337 -1.304 0.000 -11.302 -0.001
4 WLX(Steel) -0.999122 0.047 -0.273 0.000 -2.035 0.000
4 WLY(Steel) 3.061278 23.512 -132.359 0.000 -0.358 0.012
4 ELX(Steel) -17.893875 1.144 -6.883 0.000 -35.837 0.000
4 ELY(Steel) -0.918404 -6.819 39.747 0.000 0.457 -0.002
5 DS -0.630689 5.520 52.542 0.000 -3.089 -0.001
5 DC -0.451552 2.158 38.751 0.000 -2.212 0.000
5 LL -1.005475 5.599 52.585 0.000 -4.925 -0.001
5 TL(+) 0.337169 21.145 0.361 0.000 1.651 0.000
CB2-05 CB2-E EL+100200 5 TL(-) -0.337168 -21.145 -0.361 0.000 -1.651 0.000
5 WLX(Steel) -0.252155 -0.020 -0.121 0.000 -1.236 0.000
5 WLY(Steel) 0.142144 29.419 185.010 0.000 0.702 -0.002
5 ELX(Steel) -4.775477 1.001 8.615 0.000 -22.625 0.001
5 ELY(Steel) 0.00008 -9.251 -60.161 0.000 -0.001 0.001
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

6 DS -0.56132 -5.185 50.142 0.000 -2.752 -0.001


6 DC -0.424589 -1.775 -1.637 0.000 -2.081 0.000
6 LL -0.915397 -5.139 48.740 0.000 -4.487 -0.001
6 TL(+) 0.287178 -20.670 -3.214 0.000 1.408 0.000
CB2-04 CB2-E EL+100200 6 TL(-) -0.287177 20.670 3.214 0.000 -1.408 0.000
6 WLX(Steel) -0.265677 -0.071 0.601 0.000 -1.302 0.000
6 WLY(Steel) 0.420451 31.456 -198.699 0.000 2.055 -0.002
6 ELX(Steel) -4.844847 0.067 0.203 0.000 -22.962 0.001
6 ELY(Steel) -0.088322 -9.235 60.022 0.000 -0.431 0.001
7 DS -0.627652 6.044 60.222 0.000 -3.074 -0.001
7 DC -0.449061 1.840 41.525 0.000 -2.200 0.000
7 LL -1.001217 6.078 61.029 0.000 -4.904 -0.001
7 TL(+) -0.755217 21.087 3.694 0.000 -3.702 0.000
CB2-05 CB2-D EL+100200 7 TL(-) 0.755215 -21.087 -3.694 0.000 3.702 0.000
7 WLX(Steel) -0.253268 -0.147 -1.005 0.000 -1.241 0.000
7 WLY(Steel) 0.138615 28.350 170.651 0.000 0.685 -0.002
7 ELX(Steel) -4.786923 -0.671 2.040 0.000 -22.681 0.001
7 ELY(Steel) 0.000822 -9.057 -57.478 0.000 0.002 0.001
8 DS -0.557617 -5.832 53.511 0.000 -2.734 -0.001
8 DC -0.425437 -2.810 2.354 0.000 -2.085 0.000
8 LL -0.910426 -5.965 52.605 0.000 -4.463 -0.001
8 TL(+) -0.805583 -20.818 -5.703 0.000 -3.946 0.000
CB2-04 CB2-D EL+100200 8 TL(-) 0.80558 20.818 5.703 0.000 3.946 0.000
8 WLX(Steel) -0.266841 -0.054 0.134 0.000 -1.307 0.000
8 WLY(Steel) 0.423698 30.667 -186.991 0.000 2.070 -0.002
8 ELX(Steel) -4.85742 0.875 -16.629 0.000 -23.024 0.001
8 ELY(Steel) -0.08926 -9.072 57.639 0.000 -0.436 0.001
9 DS 0.306708 3.526 44.822 0.000 -1.727 -0.001
9 DC -0.164773 1.442 28.855 0.000 -1.842 0.000
9 LL 0.371936 4.199 44.565 0.000 -2.891 -0.001
9 TL(+) -2.163083 39.193 -3.116 0.000 -10.265 0.001
CB2-05 CB2-C EL+100200 9 TL(-) 2.163077 -39.193 3.116 0.000 10.265 -0.001
9 WLX(Steel) -0.261744 0.187 1.188 0.000 -1.261 0.000
9 WLY(Steel) 0.309638 20.443 78.813 0.000 1.028 -0.001
9 ELX(Steel) -5.117431 -0.287 -1.136 0.000 -23.291 0.002
9 ELY(Steel) -0.170871 -7.178 -30.138 0.000 -0.282 0.000
10 DS -6.543822 -4.142 48.652 0.000 -11.321 0.001
10 DC -1.527774 -1.160 1.897 0.000 -3.274 -0.002
10 LL -8.487203 -4.903 77.628 0.000 -15.037 -0.001
10 TL(+) -8.365432 -39.958 5.076 0.000 -17.370 -0.009
CB2-04 CB2-C EL+100200 10 TL(-) 8.36541 39.958 -5.076 0.000 17.370 0.009
10 WLX(Steel) -1.379202 0.099 -0.308 0.000 -2.765 -0.001
10 WLY(Steel) -0.565916 21.929 -91.484 0.000 0.326 0.002
10 ELX(Steel) -20.080066 -1.652 15.539 0.000 -40.943 0.066
10 ELY(Steel) 0.471325 -7.117 30.036 0.000 0.453 -0.001
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

11 DS 2.673137 0.002 22.357 -0.011 0.000 0.000


11 DC 1.255384 0.002 18.311 -0.010 0.000 0.000
11 LL 3.415206 0.004 35.322 -0.021 0.000 0.000
11 TL(+) 24.502503 0.537 0.000 -2.628 0.000 0.000
CB2-05 CB2-B EL+100200
11 TL(-) -24.502438 -0.537 0.000 2.628 0.000 0.000
11 WLX(Steel) -3.693124 -0.001 -12.215 0.005 0.000 0.000
11 ELX(Steel) -4.061233 0.000 -11.962 0.002 0.000 0.000
11 ELY(Steel) -0.073973 -5.728 -0.015 27.131 0.000 -0.001
12 DS 3.633086 0.001 29.944 -0.003 0.000 0.000
12 DC 1.439245 0.001 16.058 -0.003 0.000 0.000
12 LL 5.073866 0.001 45.429 -0.005 0.000 0.000
12 TL(+) 25.256488 -0.091 -0.001 0.445 0.000 0.000
CB2-02 CB2-B EL+100200
12 TL(-) -25.256421 0.091 0.001 -0.445 0.000 0.000
12 WLX(Steel) -11.503507 0.000 -35.454 0.001 0.000 0.000
12 ELX(Steel) -5.657697 0.000 -16.016 0.001 0.000 0.000
12 ELY(Steel) -0.61129 -5.728 -9.308 27.145 0.000 -0.001
13 DS 2.1467 -0.003 18.596 0.015 0.000 0.000
13 DC 1.189216 -0.002 13.935 0.012 0.000 0.000
13 LL 2.223358 -0.005 22.757 0.026 0.000 0.000
13 TL(+) 25.251336 -0.446 0.000 2.184 0.000 0.000
CB2-01 CB2-B EL+100200
13 TL(-) -25.251269 0.446 0.000 -2.184 0.000 0.000
13 WLX(Steel) -5.540651 0.001 -16.988 -0.006 0.000 0.000
13 ELX(Steel) -3.199575 0.000 -9.559 -0.002 0.000 0.000
13 ELY(Steel) 0.688454 -5.730 9.323 27.155 0.000 -0.001
14 DS -2.673136 0.001 24.080 -0.006 0.000 0.000
14 DC -1.255383 0.000 7.599 -0.002 0.000 0.000
14 LL -3.415204 0.002 33.542 -0.010 0.000 0.000
14 TL(+) -24.502503 0.537 0.011 -2.628 0.000 0.000
CB2-05 CB2-A EL+100200
14 TL(-) 24.502437 -0.537 -0.011 2.628 0.000 0.000
14 WLX(Steel) -2.406903 0.001 3.085 -0.003 0.000 0.000
14 ELX(Steel) -4.026684 0.000 11.932 -0.002 0.000 0.000
14 ELY(Steel) 0.124577 -4.958 -1.854 23.367 0.000 0.007
15 DS -3.633087 0.001 32.520 -0.005 0.000 0.000
15 DC -1.439246 0.000 11.760 -0.002 0.000 0.000
15 LL -5.073868 0.002 50.351 -0.007 0.000 0.000
15 TL(+) -25.256489 -0.091 -0.030 0.445 0.000 0.000
CB2-02 CB2-A EL+100200
15 TL(-) 25.256421 0.091 0.030 -0.445 0.000 0.000
15 WLX(Steel) -10.063866 0.000 21.038 0.000 0.000 0.000
15 ELX(Steel) -5.649875 0.000 16.096 -0.001 0.000 0.000
15 ELY(Steel) 0.56201 -4.956 -1.382 23.369 0.000 0.007
16 DS -2.1467 -0.002 16.440 0.011 0.000 0.000
16 DC -1.189216 -0.001 10.638 0.004 0.000 0.000
16 LL -2.223358 -0.004 19.614 0.017 0.000 0.000
16 TL(+) -25.251336 -0.446 0.019 2.184 0.000 0.000
CB2-01 CB2-A EL+100200
16 TL(-) 25.251269 0.446 -0.019 -2.184 0.000 0.000
16 WLX(Steel) -4.904749 -0.001 11.846 0.003 0.000 0.000
16 ELX(Steel) -3.174817 -0.001 9.508 0.003 0.000 0.000
16 ELY(Steel) -0.689778 -4.955 3.237 23.362 0.000 0.007
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- CABLE RACK#3 -

Position FX (kN) FY (kN) FZ (kN)


Load MX (kN·m) MY (kN·m) MZ (kN·m)
GRID Height(Z) Node EAST+ NORTH+ Vertical
3 DS 3.919561 6.167 48.461 0.000 -8.749 -0.001
3 DC -0.038142 2.133 -0.640 0.000 -3.253 0.011
3 LL 5.811073 4.733 29.501 0.000 -14.865 -0.001
3 TL(+) 6.136473 21.292 1.649 0.000 12.291 0.001
CB3-04 CB3-F EL+100200 3 TL(-) -6.136456 -21.292 -1.649 0.000 -12.291 -0.001
3 WLX(Steel) -0.991683 -0.029 -0.220 0.000 -2.046 0.000
3 WLY(Steel) -4.192871 19.880 117.704 0.000 6.424 0.010
3 ELX(Steel) -18.740285 -0.777 -5.748 0.000 -37.913 0.001
3 ELY(Steel) 0.787054 -6.777 -39.942 0.000 -1.193 -0.002
4 DS 4.734672 -6.150 50.926 0.000 -8.595 -0.001
4 DC 5.012104 -2.360 32.227 0.000 -6.079 0.011
4 LL 6.376746 -4.723 29.638 0.000 -14.607 -0.002
4 TL(+) 5.756377 -21.266 1.307 0.000 12.024 0.001
CB3-03 CB3-F EL+100200 4 TL(-) -5.756361 21.266 -1.307 0.000 -12.024 -0.001
4 WLX(Steel) -1.03424 0.035 -0.276 0.000 -2.162 0.000
4 WLY(Steel) 3.371971 22.415 -129.982 0.000 0.329 0.010
4 ELX(Steel) -19.001273 0.461 -3.298 0.000 -38.802 0.001
4 ELY(Steel) -0.923857 -6.823 40.023 0.000 0.270 -0.002
5 DS -0.656658 5.536 51.641 0.000 -3.216 -0.001
5 DC -0.287155 1.876 -0.779 0.000 -1.407 0.000
5 LL -1.016813 5.572 52.350 0.000 -4.981 -0.001
5 TL(+) 0.291056 21.151 0.396 0.000 1.425 0.000
CB3-04 CB3-E EL+100200 5 TL(-) -0.291055 -21.151 -0.396 0.000 -1.425 0.000
5 WLX(Steel) -0.243932 -0.021 -0.123 0.000 -1.196 0.000
5 WLY(Steel) 0.148764 28.589 182.556 0.000 0.735 -0.002
5 ELX(Steel) -4.703482 0.785 6.893 0.000 -22.273 0.001
5 ELY(Steel) -0.004143 -9.250 -60.575 0.000 -0.022 0.001
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

6 DS -0.595349 -5.212 51.439 0.000 -2.918 -0.001


6 DC -0.276325 -2.008 37.435 0.000 -1.354 0.000
6 LL -0.956497 -5.163 48.941 0.000 -4.688 -0.001
6 TL(+) 0.24156 -20.660 -3.300 0.000 1.185 0.000
CB3-03 CB3-E EL+100200 6 TL(-) -0.24156 20.660 3.300 0.000 -1.185 0.000
6 WLX(Steel) -0.256947 -0.072 0.611 0.000 -1.259 0.000
6 WLY(Steel) 0.425906 30.337 -196.260 0.000 2.081 -0.002
6 ELX(Steel) -4.801547 -0.178 2.196 0.000 -22.749 0.001
6 ELY(Steel) -0.085207 -9.235 60.443 0.000 -0.416 0.001
7 DS -0.653659 6.166 60.090 0.000 -3.202 -0.001
7 DC -0.287478 2.768 5.078 0.000 -1.408 0.000
7 LL -1.012405 6.313 62.931 0.000 -4.960 -0.001
7 TL(+) -0.801162 21.077 3.696 0.000 -3.927 0.000
CB3-04 CB3-D EL+100200 7 TL(-) 0.80116 -21.077 -3.696 0.000 3.927 0.000
7 WLX(Steel) -0.245069 -0.147 -1.015 0.000 -1.201 0.000
7 WLY(Steel) 0.144996 27.563 168.444 0.000 0.716 -0.002
7 ELX(Steel) -4.716867 -0.722 1.099 0.000 -22.338 0.001
7 ELY(Steel) -0.003412 -9.120 -58.455 0.000 -0.018 0.001
8 DS -0.591619 -5.755 54.062 0.000 -2.900 -0.001
8 DC -0.272614 -1.763 37.686 0.000 -1.336 0.000
8 LL -0.951504 -5.732 50.725 0.000 -4.664 -0.001
8 TL(+) -0.851058 -20.823 -5.757 0.000 -4.169 0.000
CB3-03 CB3-D EL+100200 8 TL(-) 0.851056 20.823 5.757 0.000 4.169 0.000
8 WLX(Steel) -0.258135 -0.055 0.149 0.000 -1.265 0.000
8 WLY(Steel) 0.429447 29.591 -184.795 0.000 2.099 -0.002
8 ELX(Steel) -4.813854 0.851 -15.937 0.000 -22.810 0.001
8 ELY(Steel) -0.086147 -9.135 58.602 0.000 -0.420 0.001
9 DS 0.601009 3.583 51.467 0.000 -1.356 -0.001
9 DC -0.317422 1.388 7.108 0.000 -1.468 0.000
9 LL 0.404836 4.051 81.110 0.000 -2.879 -0.001
9 TL(+) -2.215722 39.193 -3.158 0.000 -10.501 0.001
CB3-04 CB3-C EL+100200 9 TL(-) 2.215716 -39.193 3.158 0.000 10.501 -0.001
9 WLX(Steel) -0.253254 0.187 1.197 0.000 -1.221 0.000
9 WLY(Steel) 0.321019 19.596 77.292 0.000 1.067 -0.001
9 ELX(Steel) -5.115954 0.488 3.435 0.000 -23.038 0.002
9 ELY(Steel) -0.200443 -7.628 -33.054 0.000 -0.341 0.000
10 DS -6.757959 -4.335 44.890 0.000 -11.760 0.001
10 DC -3.532967 -2.034 32.065 0.000 -5.891 0.001
10 LL -8.655439 -5.051 41.078 0.000 -15.458 0.000
10 TL(+) -8.557523 -39.964 5.166 0.000 -17.753 -0.010
CB3-02 CB3-C EL+100200 10 TL(-) 8.5575 39.964 -5.166 0.000 17.753 0.010
10 WLX(Steel) -1.35198 0.101 -0.322 0.000 -2.702 -0.001
10 WLY(Steel) -0.649232 20.878 -89.948 0.000 0.164 0.002
10 ELX(Steel) -19.688065 -0.906 11.359 0.000 -40.290 -0.019
10 ELY(Steel) 0.516154 -7.619 32.959 0.000 0.571 -0.001
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

11 DS 2.528628 0.000 20.861 -0.002 0.000 0.000


11 DC 0.826869 0.000 2.638 -0.001 0.000 0.000
11 LL 3.238322 0.000 33.031 -0.004 0.000 0.000
11 TL(+) 24.501876 0.314 0.000 -1.536 0.000 0.000
CB3-04 CB3-B EL+100200
11 TL(-) -24.501811 -0.314 0.000 1.536 0.000 0.000
11 WLX(Steel) -3.674772 0.000 -11.707 0.001 0.000 0.000
11 ELX(Steel) -3.432921 0.000 -9.531 0.000 0.000 0.000
11 ELY(Steel) -0.2625 -4.162 -2.095 19.467 0.000 -0.010
12 DS 2.964583 0.000 25.439 0.000 0.000 0.000
12 DC 1.530365 0.000 10.126 0.000 0.000 0.000
12 LL 3.540127 0.000 33.038 0.000 0.000 0.000
12 TL(+) 25.257412 -0.314 0.000 1.537 0.000 0.000
CB3-01 CB3-B EL+100200
12 TL(-) -25.257345 0.314 0.000 -1.537 0.000 0.000
12 WLX(Steel) -7.066665 0.000 -21.818 0.000 0.000 0.000
12 ELX(Steel) -4.611677 0.000 -13.399 0.000 0.000 0.000
12 ELY(Steel) 0.2714 -4.160 2.095 19.469 0.000 -0.010
13 DS -2.528624 0.000 23.093 0.000 0.000 0.000
13 DC -0.826865 0.000 12.962 0.000 0.000 0.000
13 LL -3.238314 0.000 33.037 -0.001 0.000 0.000
13 TL(+) -24.501876 0.314 0.000 -1.536 0.000 0.000
CB3-04 CB3-A EL+100200
13 TL(-) 24.50181 -0.314 0.000 1.536 0.000 0.000
13 WLX(Steel) -2.42525 0.000 2.552 0.000 0.000 0.000
13 ELX(Steel) -3.382937 0.000 9.531 0.000 0.000 0.000
13 ELY(Steel) 0.295887 -5.811 -3.152 27.541 0.000 -0.003
14 DS -2.964587 0.000 24.574 -0.001 0.000 0.000
14 DC -1.530368 0.000 19.275 0.000 0.000 0.000
14 LL -3.540135 0.000 33.032 -0.002 0.000 0.000
14 TL(+) -25.257412 -0.314 0.000 1.537 0.000 0.000
CB3-01 CB3-A EL+100200
14 TL(-) 25.257345 0.314 0.000 -1.537 0.000 0.000
14 WLX(Steel) -5.956514 0.000 12.662 0.000 0.000 0.000
14 ELX(Steel) -4.604407 0.000 13.399 0.000 0.000 0.000
14 ELY(Steel) -0.304786 -5.809 3.152 27.540 0.000 -0.003
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- CABLE RACK#4 -

Position FX (kN) FY (kN) FZ (kN)


Load MX (kN·m) MY (kN·m) MZ (kN·m)
GRID Height(Z) Node EAST+ NORTH+ Vertical
3 DS 0.753223 6.152 48.988 0.000 -13.962 -0.001
3 DC 2.979883 1.715 22.743 0.000 -7.021 -0.003
3 LL 1.932364 5.016 31.373 0.000 -21.437 -0.001
3 TL(+) 3.878173 21.349 0.998 0.000 7.172 0.000
CB4-03 CB4-F EL+100200
3 TL(-) -3.878163 -21.349 -0.998 0.000 -7.172 0.000
3 WLY(Steel) -2.953216 18.463 107.022 0.000 7.925 0.007
3 ELX(Steel) -20.242306 -1.129 -3.266 0.000 -37.309 -0.001
3 ELY(Steel) 0.52845 -5.860 -33.123 0.000 -1.294 -0.002
4 DS 3.695854 -5.775 48.092 0.000 -11.057 -0.001
4 DC -0.514404 -1.560 -0.499 0.000 -3.658 -0.003
4 LL 5.45682 -4.258 26.645 0.000 -17.792 -0.001
4 TL(+) 3.814657 -21.357 1.024 0.000 7.256 0.000
CB4-02 CB4-F EL+100200
4 TL(-) -3.814647 21.357 -1.024 0.000 -7.256 0.000
4 WLY(Steel) 1.844715 21.026 -119.642 0.000 -1.880 0.007
4 ELX(Steel) -19.29868 1.616 -6.681 0.000 -37.086 -0.001
4 ELY(Steel) -0.460223 -5.909 33.314 0.000 0.885 -0.002
5 DS -1.444001 5.319 50.922 0.000 -7.064 -0.005
5 DC -0.418724 1.721 31.369 0.000 -2.051 0.000
5 LL -1.947608 5.460 52.059 0.000 -9.528 -0.006
5 TL(+) -0.118117 20.961 -0.958 0.000 -0.579 0.000
CB4-03 CB4-E EL+100200
5 TL(-) 0.118117 -20.961 0.958 0.000 0.579 0.000
5 WLY(Steel) 0.315635 27.846 176.325 0.000 1.544 0.001
5 ELX(Steel) -5.728942 0.553 5.372 0.000 -27.293 -0.001
5 ELY(Steel) -0.029499 -8.415 -53.701 0.000 -0.144 0.000
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

6 DS -0.8558 -5.403 51.919 0.000 -4.205 -0.005


6 DC -0.397371 -1.505 -0.926 0.000 -1.948 0.000
6 LL -1.216497 -5.398 50.393 0.000 -5.976 -0.006
6 TL(+) -0.117539 -20.943 -1.063 0.000 -0.576 0.000
CB4-02 CB4-E EL+100200
6 TL(-) 0.117539 20.943 1.063 0.000 0.576 0.000
6 WLY(Steel) 0.18596 29.604 -190.116 0.000 0.914 0.001
6 ELX(Steel) -5.597392 -0.507 4.629 0.000 -26.654 -0.001
6 ELY(Steel) -0.001917 -8.402 53.586 0.000 -0.010 0.000
7 DS -1.444661 5.312 50.709 0.000 -7.067 -0.005
7 DC -0.416348 1.652 34.661 0.000 -2.040 0.000
7 LL -1.947652 4.751 46.342 0.000 -9.529 -0.006
7 TL(+) -1.212793 21.056 -0.020 0.000 -5.943 0.000
CB4-03 CB4-D EL+100200
7 TL(-) 1.212789 -21.056 0.020 0.000 5.943 0.000
7 WLY(Steel) 0.313183 32.878 210.204 0.000 1.532 0.001
7 ELX(Steel) -5.74388 -0.600 -5.344 0.000 -27.366 -0.001
7 ELY(Steel) -0.029034 -10.042 -65.418 0.000 -0.142 0.000
8 DS -0.853162 -6.586 63.226 0.000 -4.192 -0.005
8 DC -0.398229 -2.202 1.706 0.000 -1.952 0.000
8 LL -1.212565 -7.425 68.552 0.000 -5.956 -0.006
8 TL(+) -1.212273 -21.062 0.019 0.000 -5.940 0.000
CB4-02 CB4-D EL+100200
8 TL(-) 1.21227 21.062 -0.019 0.000 5.940 0.000
8 WLY(Steel) 0.187854 34.768 -225.258 0.000 0.923 0.001
8 ELX(Steel) -5.61194 0.322 -3.350 0.000 -26.725 -0.001
8 ELY(Steel) -0.002347 -10.014 65.167 0.000 -0.012 0.000
9 DS -0.270898 4.650 41.729 0.000 -5.354 -0.011
9 DC -0.434276 1.380 24.627 0.000 -2.132 0.001
9 LL -0.931276 5.667 37.999 0.000 -8.072 -0.019
9 TL(+) -2.51739 21.058 -0.020 0.000 -12.331 -0.001
CB4-03 CB4-C EL+100200
9 TL(-) 2.517383 -21.058 0.020 0.000 12.331 0.001
9 WLY(Steel) -0.645665 16.140 94.564 0.000 0.109 0.093
9 ELX(Steel) -5.894705 0.332 3.239 0.000 -27.667 -0.003
9 ELY(Steel) 0.161536 -5.368 -32.213 0.000 0.141 -0.027
10 DS 0.419443 -3.669 40.215 0.000 -2.280 -0.011
10 DC -0.400531 -1.201 -0.281 0.000 -1.959 0.001
10 LL -0.133589 -3.813 64.392 0.000 -4.349 -0.019
10 TL(+) -2.514719 -21.061 0.020 0.000 -12.326 -0.001
CB4-02 CB4-C EL+100200
10 TL(-) 2.514712 21.061 -0.020 0.000 12.326 0.001
10 WLY(Steel) 0.751535 17.567 -105.523 0.000 1.779 0.093
10 ELX(Steel) -5.747821 -0.588 5.402 0.000 -26.947 0.083
10 ELY(Steel) -0.166967 -5.371 32.387 0.000 -0.260 -0.027
11 DS 2.680671 0.000 21.730 -0.002 0.000 0.000
11 DC 0.645903 0.000 4.395 0.000 0.000 0.000
11 LL 3.385349 0.000 33.033 -0.003 0.000 0.000
11 TL(+) 24.514852 0.314 0.000 -1.536 0.000 0.000
CB4-03 CB4-B EL+100200 11 TL(-) -24.514786 -0.314 0.000 1.536 0.000 0.000
11 WLX(Steel) -5.031488 0.000 -13.421 0.001 0.000 0.000
11 WLY(Steel) 0.117142 3.469 1.756 -16.986 0.000 -0.006
11 ELX(Steel) -3.32723 0.000 -9.160 0.000 0.000 0.000
11 ELY(Steel) -0.241558 -3.927 -1.838 18.314 0.000 -0.009
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

12 DS 3.086205 0.000 26.948 0.001 0.000 0.000


12 DC 1.111866 0.000 2.601 0.000 0.000 0.000
12 LL 3.540166 0.000 33.036 0.000 0.000 0.000
12 TL(+) 25.257112 -0.314 0.000 1.537 0.000 0.000
CB4-01 CB4-B EL+100200 12 TL(-) -25.257045 0.314 0.000 -1.537 0.000 0.000
12 WLX(Steel) -8.421785 0.000 -23.575 -0.001 0.000 0.000
12 WLY(Steel) -0.120684 3.470 -1.756 -16.994 0.000 -0.007
12 ELX(Steel) -4.195055 0.000 -11.851 0.000 0.000 0.000
12 ELY(Steel) 0.248959 -3.925 1.838 18.315 0.000 -0.009
13 DS -2.680672 0.000 24.336 0.000 0.000 0.000
13 DC -0.645906 0.000 7.755 0.000 0.000 0.000
13 LL -3.385358 0.000 33.035 -0.001 0.000 0.000
13 TL(+) -24.514852 0.314 0.000 -1.536 0.000 0.000
CB4-03 CB4-A EL+100200 13 TL(-) 24.514786 -0.314 0.000 1.536 0.000 0.000
13 WLX(Steel) -3.417917 0.000 4.266 0.000 0.000 0.000
13 WLY(Steel) -0.117662 1.012 0.448 -4.961 0.000 -0.012
13 ELX(Steel) -3.302092 0.000 9.160 0.000 0.000 0.000
13 ELY(Steel) 0.241316 -5.411 -2.696 25.584 0.000 -0.002
14 DS -3.086203 0.000 25.358 -0.001 0.000 0.000
14 DC -1.111863 0.000 17.650 0.000 0.000 0.000
14 LL -3.540156 0.000 33.033 -0.002 0.000 0.000
14 TL(+) -25.257112 -0.314 0.000 1.537 0.000 0.000
CB4-01 CB4-A EL+100200 14 TL(-) 25.257045 0.314 0.000 -1.537 0.000 0.000
14 WLX(Steel) -6.98161 0.000 14.419 0.000 0.000 0.000
14 WLY(Steel) 0.121205 1.010 -0.448 -4.958 0.000 -0.012
14 ELX(Steel) -4.186713 0.000 11.851 0.000 0.000 0.000
14 ELY(Steel) -0.248717 -5.410 2.696 25.582 0.000 -0.002
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- MD#1-1 -

Y
4
2
3
X 1

Position FX (kN) FY (kN) FZ (kN)


Load MX (kN·m) MY (kN·m) MZ (kN·m)
GRID Height(Z) Node EAST+ NORTH+ Vertical
1 DS -4.150692 4.208 41.963 0.000 -5.763 0.000
1 DC -9.286681 3.585 44.548 0.000 -12.849 0.000
1 LL -6.21303 9.572 87.211 0.000 -8.612 0.000
1 TL(+) 0.976365 21.574 0.000 0.000 2.488 0.000
EL+100200
1 TL(-) -0.976362 -21.574 0.000 0.000 -2.488 0.000
1 WLY(Steel) -0.152102 14.757 35.762 0.000 -0.206 -0.020
1 ELX(Steel) -12.617393 -2.220 -17.262 0.000 -32.600 0.000
1 ELY(Steel) 1.734399 -10.621 -33.016 0.000 2.435 0.031
2 DS -4.516374 -4.208 44.030 0.000 -6.372 0.000
2 DC -10.904837 -3.585 47.898 0.000 -16.260 0.000
2 LL -6.241098 -9.572 87.211 0.000 -8.655 0.000
2 TL(+) 0.979726 -21.574 0.000 0.000 2.493 0.000
EL+100200
2 TL(-) -0.979723 21.574 0.000 0.000 -2.493 0.000
2 WLY(Steel) 2.172007 16.273 -52.853 0.000 2.987 -0.020
2 ELX(Steel) -14.628353 2.220 -21.378 0.000 -37.868 0.000
2 ELY(Steel) -1.736629 -10.640 33.016 0.000 -2.439 0.031
3 DS 4.150659 3.633 37.782 0.000 5.667 0.000
3 DC 9.286304 4.231 44.552 0.000 12.848 0.000
3 LL 6.21303 5.349 61.638 0.000 8.453 0.000
3 TL(+) -0.976365 21.553 0.000 0.000 -2.488 0.000
EL+100200
3 TL(-) 0.976363 -21.553 0.000 0.000 2.488 0.000
3 WLY(Steel) 0.152102 14.760 35.762 0.000 0.205 0.020
3 ELX(Steel) -12.448405 2.219 17.262 0.000 -32.380 0.000
3 ELY(Steel) -1.723721 -11.139 -35.014 0.000 -2.340 -0.032
4 DS 4.516407 -3.633 41.006 0.000 6.070 0.000
4 DC 10.905215 -4.231 62.442 0.000 13.916 0.000
4 LL 6.241098 -5.349 61.638 0.000 8.496 0.000
4 TL(+) -0.979725 -21.553 0.000 0.000 -2.494 0.000
EL+100200
4 TL(-) 0.979723 21.553 0.000 0.000 2.494 0.000
4 WLY(Steel) -2.172008 16.270 -52.853 0.000 -2.986 0.020
4 ELX(Steel) -14.455828 -2.218 21.378 0.000 -37.645 0.000
4 ELY(Steel) 1.725951 -11.133 35.014 0.000 2.343 -0.032
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- SP#1 -

Y 4
2
3
X 1

Position FX (kN) FY (kN) FZ (kN)


Load MX (kN·m) MY (kN·m) MZ (kN·m)
GRID Height(Z) Node EAST+ NORTH+ Vertical
1 DS -5.405133 3.792 39.893 0.000 -7.499 0.000
1 DC -10.770272 3.766 44.549 0.000 -14.898 0.000
1 LL -8.69103 5.722 66.104 0.000 -12.112 0.000
1 TL(+) 0.958769 21.564 0.000 0.000 2.469 0.000
EL+100200
1 TL(-) -0.958767 -21.564 0.000 0.000 -2.469 0.000
1 WLY(Steel) -0.198231 15.728 38.186 0.000 -0.270 -0.037
1 ELX(Steel) -12.502125 -2.105 -17.358 0.000 -32.757 0.000
1 ELY(Steel) 2.020635 -10.615 -33.473 0.000 2.802 0.039
2 DS -5.42064 -3.792 42.600 0.000 -7.591 0.000
2 DC -11.674183 -3.766 51.168 0.000 -16.725 0.000
2 LL -7.904333 -5.722 66.104 0.000 -10.901 0.000
2 TL(+) 0.872361 -21.564 0.000 0.000 2.336 0.000
EL+100200
2 TL(-) -0.872359 21.564 0.000 0.000 -2.336 0.000
2 WLY(Steel) 2.720278 17.323 -56.497 0.000 3.711 -0.037
2 ELX(Steel) -12.533191 2.105 -21.025 0.000 -34.786 0.000
2 ELY(Steel) -1.960461 -10.628 33.473 0.000 -2.709 0.039
3 DS 5.405089 3.788 39.505 0.000 7.425 0.000
3 DC 10.77007 3.944 44.551 0.000 14.897 0.000
3 LL 8.69103 5.699 66.034 0.000 11.902 0.000
3 TL(+) -0.95877 21.543 0.000 0.000 -2.469 0.000
EL+100200
3 TL(-) 0.958767 -21.543 0.000 0.000 2.469 0.000
3 WLY(Steel) 0.198231 15.731 38.186 0.000 0.270 0.037
3 ELX(Steel) -12.503122 2.163 17.358 0.000 -32.758 0.000
3 ELY(Steel) -2.020793 -10.921 -34.279 0.000 -2.780 -0.040
4 DS 5.420684 -3.788 43.123 0.000 7.241 0.000
4 DC 11.674385 -3.943 55.452 0.000 15.453 0.000
4 LL 7.904333 -5.699 66.034 0.000 10.692 0.000
4 TL(+) -0.872361 -21.543 0.000 0.000 -2.336 0.000
EL+100200
4 TL(-) 0.872358 21.543 0.000 0.000 2.336 0.000
4 WLY(Steel) -2.720278 17.320 -56.497 0.000 -3.711 0.037
4 ELX(Steel) -16.067891 -2.162 21.025 0.000 -40.217 0.000
4 ELY(Steel) 1.960619 -10.931 34.279 0.000 2.688 -0.040
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- SP#2 & SP#3 -

Y
4
2
3
X 1

Position FX (kN) FY (kN) FZ (kN)


Load MX (kN·m) MY (kN·m) MZ (kN·m)
GRID Height(Z) Node EAST+ NORTH+ Vertical
1 DS -5.453735 3.787 40.172 0.000 -7.635 0.000
1 DC -10.993249 3.756 45.834 0.000 -15.521 0.000
1 LL -8.691299 5.709 66.104 0.000 -12.112 0.000
1 TL(+) 0.958799 21.566 0.000 0.000 2.469 0.000
EL+100200
1 TL(-) -0.958797 -21.566 0.000 0.000 -2.469 0.000
1 WLY(Steel) -0.19818 15.732 38.186 0.000 -0.270 -0.037
1 ELX(Steel) -12.933964 -2.129 -17.720 0.000 -33.897 0.000
1 ELY(Steel) 2.006695 -10.615 -33.468 0.000 2.764 0.039
2 DS -5.800009 -3.787 42.385 0.000 -8.114 0.000
2 DC -11.778799 -3.756 49.884 0.000 -16.606 0.000
2 LL -8.71492 -5.709 66.104 0.000 -12.148 0.000
2 TL(+) 0.961988 -21.566 0.000 0.000 2.473 0.000
EL+100200
2 TL(-) -0.961986 21.566 0.000 0.000 -2.473 0.000
2 WLY(Steel) 2.94693 17.319 -56.497 0.000 4.060 -0.037
2 ELX(Steel) -13.879395 2.129 -20.544 0.000 -36.390 0.000
2 ELY(Steel) -2.007842 -10.635 33.468 0.000 -2.765 0.039
3 DS 5.453735 3.783 40.249 0.000 7.423 0.000
3 DC 10.993249 3.929 47.976 0.000 14.884 0.000
3 LL 8.691299 5.685 66.034 0.000 11.902 0.000
3 TL(+) -0.9588 21.545 0.000 0.000 -2.469 0.000
EL+100200
3 TL(-) 0.958797 -21.545 0.000 0.000 2.469 0.000
3 WLY(Steel) 0.19818 15.734 38.186 0.000 0.270 0.037
3 ELX(Steel) -12.934037 2.128 17.720 0.000 -33.897 0.000
3 ELY(Steel) -2.006841 -10.921 -34.164 0.000 -2.780 -0.040
4 DS 5.800009 -3.783 42.462 0.000 7.902 0.000
4 DC 11.778799 -3.929 52.026 0.000 15.969 0.000
4 LL 8.71492 -5.685 66.034 0.000 11.938 0.000
4 TL(+) -0.961988 -21.545 0.000 0.000 -2.474 0.000
EL+100200
4 TL(-) 0.961985 21.545 0.000 0.000 2.474 0.000
4 WLY(Steel) -2.94693 17.316 -56.497 0.000 -4.059 0.037
4 ELX(Steel) -13.879546 -2.127 20.544 0.000 -36.390 0.000
4 ELY(Steel) 2.007988 -10.941 34.164 0.000 2.782 -0.040
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- SP#4 -

Y 4
2
3
X 1

Position FX (kN) FY (kN) FZ (kN)


Load MX (kN·m) MY (kN·m) MZ (kN·m)
GRID Height(Z) Node EAST+ NORTH+ Vertical
1 DS -5.050031 3.837 41.426 0.000 -6.798 0.000
1 DC -10.893185 3.948 51.402 0.000 -14.375 0.000
1 LL -7.810126 5.723 66.104 0.000 -10.757 0.000
1 TL(+) 0.861334 21.564 0.000 0.000 2.319 0.000
EL+100200
1 TL(-) -0.861332 -21.564 0.000 0.000 -2.319 0.000
1 WLY(Steel) -0.181286 15.732 38.186 0.000 -0.244 -0.037
1 ELX(Steel) -11.837902 -2.111 -18.231 0.000 -32.694 0.000
1 ELY(Steel) 1.949315 -10.957 -34.372 0.000 2.675 0.040
2 DS -5.751096 -3.838 42.106 0.000 -7.977 0.000
2 DC -11.554384 -3.948 48.601 0.000 -15.980 0.000
2 LL -8.714668 -5.723 66.104 0.000 -12.148 0.000
2 TL(+) 0.961958 -21.564 0.000 0.000 2.473 0.000
EL+100200
2 TL(-) -0.961956 21.564 0.000 0.000 -2.473 0.000
2 WLY(Steel) 2.946904 17.319 -56.497 0.000 4.059 -0.037
2 ELX(Steel) -13.447534 2.111 -20.180 0.000 -35.250 0.000
2 ELY(Steel) -2.018112 -10.991 34.372 0.000 -2.781 0.040
3 DS 5.049986 3.755 40.092 0.000 7.002 0.000
3 DC 10.89298 3.762 47.118 0.000 15.648 0.000
3 LL 7.810126 5.700 66.034 0.000 10.548 0.000
3 TL(+) -0.861335 21.543 0.000 0.000 -2.319 0.000
EL+100200
3 TL(-) 0.861333 -21.543 0.000 0.000 2.319 0.000
3 WLY(Steel) 0.181286 15.735 38.186 0.000 0.244 0.037
3 ELX(Steel) -14.903223 2.161 18.231 0.000 -37.399 0.000
3 ELY(Steel) -1.949183 -10.575 -33.424 0.000 -2.688 -0.039
4 DS 5.751141 -3.755 41.717 0.000 7.904 0.000
4 DC 11.554589 -3.762 48.599 0.000 15.981 0.000
4 LL 8.714668 -5.700 66.034 0.000 11.938 0.000
4 TL(+) -0.961957 -21.543 0.000 0.000 -2.473 0.000
EL+100200
4 TL(-) 0.961955 21.543 0.000 0.000 2.473 0.000
4 WLY(Steel) -2.946903 17.316 -56.497 0.000 -4.060 0.037
4 ELX(Steel) -13.448463 -2.160 20.180 0.000 -35.251 0.000
4 ELY(Steel) 2.01798 -10.597 33.424 0.000 2.794 -0.039
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- MD#2 -

4
X 2
3
1

Position FX (kN) FY (kN) FZ (kN)


Load MX (kN·m) MY (kN·m) MZ (kN·m)
GRID Height(Z) Node EAST+ NORTH+ Vertical
1 DS -0.766441 4.048 29.735 0.000 1.341 0.003
1 DC -0.57807 2.687 17.458 0.000 1.012 0.002
1 LL -0.850674 4.873 37.905 0.000 1.489 0.003
1 TL(+) 0.223415 25.682 0.000 0.000 1.141 -0.002
EL+100200
1 TL(-) -0.223414 -25.682 0.000 0.000 -1.141 0.002
1 WLY(Steel) -1.934337 12.758 31.843 0.000 -10.652 -0.021
1 ELX(Steel) -5.388342 -1.394 -3.933 0.000 -26.443 -0.015
1 ELY(Steel) 0.710872 -5.770 -17.326 0.000 3.700 0.007
2 DS -0.100065 -4.048 37.458 0.000 0.235 0.003
2 DC -0.099008 -2.687 30.314 0.000 0.229 0.002
2 LL -0.134483 -4.873 49.583 0.000 0.314 0.003
2 TL(+) -0.172487 -25.682 -0.616 0.000 2.077 -0.002
EL+100200
2 TL(-) 0.172486 25.682 0.616 0.000 -2.077 0.002
2 WLY(Steel) 3.832281 13.755 -41.412 0.000 6.173 -0.006
2 ELX(Steel) -11.125555 1.405 -13.167 0.000 -18.461 -0.020
2 ELY(Steel) -1.34221 -5.663 16.341 0.000 -2.191 0.002
3 DS 0.763721 2.301 20.951 0.000 3.893 0.003
3 DC 0.576113 1.355 13.922 0.000 2.936 0.002
3 LL 0.84775 2.323 23.580 0.000 4.321 0.003
3 TL(+) -0.221803 25.786 0.000 0.000 -1.130 -0.002
EL+100200
3 TL(-) 0.221803 -25.786 0.000 0.000 1.130 0.002
3 WLY(Steel) -2.164704 6.017 16.218 0.000 -11.031 -0.010
3 ELX(Steel) -5.387317 0.985 3.933 0.000 -26.439 -0.017
3 ELY(Steel) 0.733067 -3.490 -11.627 0.000 3.736 0.004
4 DS 0.102785 -2.300 15.270 0.000 0.527 0.003
4 DC 0.100965 -1.355 11.085 0.000 0.517 0.002
4 LL 0.137407 -2.323 17.998 0.000 0.703 0.003
4 TL(+) 0.170875 -25.786 0.616 0.000 0.870 -0.002
EL+100200
4 TL(-) -0.170875 25.786 -0.616 0.000 -0.870 0.002
4 WLY(Steel) 0.26676 7.098 -24.498 0.000 1.352 -0.010
4 ELX(Steel) -1.323802 -0.995 13.167 0.000 -5.046 -0.019
4 ELY(Steel) -0.101729 -3.747 12.612 0.000 -0.516 0.003
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- MD#5 -

4
X 2 3

Position FX (kN) FY (kN) FZ (kN)


Load MX (kN·m) MY (kN·m) MZ (kN·m)
GRID Height(Z) Node EAST+ NORTH+ Vertical
1 DS -0.920588 4.243 35.433 0.000 -4.692 -0.003
1 DC -2.080384 3.790 35.553 0.000 -10.604 -0.007
1 LL -0.972485 9.416 69.116 0.000 -4.957 -0.003
1 TL(+) 0.357821 25.589 0.000 0.000 1.826 -0.001
EL+100200
1 TL(-) -0.357821 -25.589 0.000 0.000 -1.826 0.001
1 WLY(Steel) 2.200461 9.855 24.984 0.000 11.213 0.011
1 ELX(Steel) -12.264683 -1.225 -4.993 0.000 -60.724 -0.036
1 ELY(Steel) -1.330048 -8.461 -26.129 0.000 -6.778 -0.007
2 DS -0.201767 -4.242 30.998 0.000 -1.032 -0.003
2 DC -0.360201 -3.790 32.731 0.000 -1.843 -0.007
2 LL -0.218537 -9.416 65.529 0.000 -1.117 -0.003
2 TL(+) 0.666486 -25.589 -0.302 0.000 3.398 -0.001
EL+100200
2 TL(-) -0.666486 25.589 0.302 0.000 -3.398 0.001
2 WLY(Steel) -0.339498 11.473 -37.859 0.000 -1.722 0.011
2 ELX(Steel) -2.93642 1.240 -16.261 0.000 -13.216 -0.042
2 ELY(Steel) 0.243036 -8.626 27.186 0.000 1.234 -0.007
3 DS 0.923761 5.391 41.376 0.000 -1.644 -0.003
3 DC 2.087969 6.470 52.647 0.000 -3.682 -0.007
3 LL 0.975815 7.138 58.458 0.000 -1.756 -0.003
3 TL(+) -0.356464 25.643 0.000 0.000 -1.817 -0.001
EL+100200
3 TL(-) 0.356464 -25.643 0.000 0.000 1.817 0.001
3 WLY(Steel) 1.928487 16.659 41.528 0.000 10.764 0.021
3 ELX(Steel) -12.060715 2.069 4.993 0.000 -60.451 -0.034
3 ELY(Steel) -1.276927 -11.800 -35.735 0.000 -6.686 -0.013
4 DS 0.198594 -5.392 49.320 0.000 -0.493 -0.003
4 DC 0.352616 -6.470 62.669 0.000 -0.867 -0.007
4 LL 0.215207 -7.139 69.095 0.000 -0.549 -0.003
4 TL(+) -0.667843 -25.643 0.302 0.000 -1.081 -0.001
EL+100200
4 TL(-) 0.667843 25.643 -0.302 0.000 1.081 0.001
4 WLY(Steel) -3.78945 18.395 -57.552 0.000 -6.374 0.006
4 ELX(Steel) -23.193385 -2.084 16.261 0.000 -40.544 -0.045
4 ELY(Steel) 2.363939 -11.674 34.678 0.000 4.092 -0.003
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- COMMON RACK#6 -

Position FX (kN) FY (kN) FZ (kN)


Load MX (kN·m) MY (kN·m) MZ (kN·m)
GRID Height(Z) Node EAST+ NORTH+ Vertical
1 DS 2.007669 -0.062 21.094 0.318 0.000 0.001
1 DC 1.212193 0.083 11.207 -0.423 0.000 0.000
1 LL 1.858583 0.066 18.192 -0.338 0.000 0.001
1 TL(+) 27.601079 1.703 3.927 -8.686 0.000 0.001
CBC6-N CBC6-06 EL+100200 1 TL(-) -27.601006 -1.703 -3.927 8.686 0.000 -0.001
1 WLX(Steel) 8.171385 0.068 21.915 -0.346 0.000 -0.002
1 WLY(Steel) 0.254741 9.540 2.905 -48.656 0.000 0.015
1 ELX(Steel) -6.020542 -5.018 -17.086 25.590 0.000 0.008
1 ELY(Steel) 0.198331 -9.970 0.353 49.714 0.000 -0.007
2 DS -1.873364 0.210 32.005 -1.069 0.000 0.000
2 DC -1.286381 0.111 29.777 -0.569 0.000 -0.001
2 LL -1.696491 0.222 39.179 -1.133 0.000 0.000
2 TL(+) -24.141082 2.026 -5.000 -10.330 0.000 0.001
CBC6-M CBC6-06 EL+100200 2 TL(-) 24.141018 -2.026 5.000 10.330 0.000 -0.001
2 WLX(Steel) 7.423128 -0.380 -20.094 1.938 0.000 -0.001
2 WLY(Steel) -0.35802 14.428 7.096 -73.581 0.000 0.018
2 ELX(Steel) -5.622861 -1.566 15.228 7.987 0.000 0.013
2 ELY(Steel) 0.175446 -12.648 -0.150 63.368 0.000 -0.016
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

3 DS -0.079361 0.000 17.376 0.000 -0.173 -0.001


3 DC 0.13034 0.000 -4.859 0.000 0.121 -0.001
3 LL -0.050369 0.000 -1.153 0.000 -0.172 -0.002
3 TL(+) -3.403529 0.000 1.009 0.000 -13.484 0.000
CBC6-L CBC6-06 EL+100200 3 TL(-) 3.40352 0.000 -1.009 0.000 13.483 0.000
3 WLX(Steel)-1.030594 0.000 -1.826 0.000 -0.614 0.000
3 WLY(Steel) 0.020856 0.000 0.736 0.000 0.009 0.024
3 ELX(Steel) 0.150258 0.000 1.853 0.000 -0.469 0.016
3 ELY(Steel)-0.013382 0.000 0.534 0.000 0.000 -0.024
4 DS 4.437807 -0.062 55.751 0.319 0.000 0.001
4 DC 2.163114 0.083 12.119 -0.424 0.000 0.000
4 LL 6.011074 0.067 58.427 -0.340 0.000 0.000
4 TL(+) 35.513979 0.046 24.594 -0.233 0.000 0.001
CBC6-N CBC6-05 EL+100200 4 TL(-) -35.513885 -0.046 -24.594 0.233 0.000 -0.001
4 WLX(Steel)10.087222 0.068 27.937 -0.348 0.000 -0.001
4 WLY(Steel)-0.424718 9.581 4.359 -48.864 0.000 0.015
4 ELX(Steel)-53.309869 -5.042 -152.646 25.706 0.000 0.008
4 ELY(Steel) 1.775424 -10.008 3.596 49.902 0.000 -0.011
5 DS -3.361879 0.211 58.026 -1.074 0.000 0.000
5 DC -1.367091 0.112 43.461 -0.572 0.000 0.000
5 LL -3.38503 0.223 89.062 -1.138 0.000 0.000
5 TL(+) -18.002879 0.370 -23.277 -1.884 0.000 0.000
CBC6-M CBC6-05 EL+100200 5 TL(-) 18.002831 -0.370 23.277 1.884 0.000 0.000
5 WLX(Steel) 9.377793 -0.382 -24.751 1.948 0.000 -0.001
5 WLY(Steel) -2.783805 14.494 31.993 -73.910 0.000 0.017
5 ELX(Steel) -48.609215 -1.573 128.247 8.026 0.000 0.013
5 ELY(Steel) 2.458418 -12.700 -15.709 63.624 0.000 -0.014
6 DS -0.375289 0.000 76.838 0.000 -0.584 -0.001
6 DC -0.549189 0.000 43.948 0.000 -0.979 -0.001
6 LL -0.258567 0.000 87.480 0.000 -0.447 -0.002
6 TL(+) -5.163526 0.000 -0.843 0.000 -15.370 0.000
CBC6-L CBC6-05 EL+100200 6 TL(-) 5.163512 0.000 0.843 0.000 15.370 0.000
6 WLX(Steel) -0.596469 0.000 -3.199 0.000 0.290 0.000
6 WLY(Steel) -0.356655 0.000 41.711 0.000 -0.847 0.024
6 ELX(Steel) 3.992644 0.000 19.713 0.000 -0.079 0.016
6 ELY(Steel) -0.06444 0.000 -20.441 0.000 0.201 -0.024
7 DS -0.123319 19.817 193.796 0.000 -0.876 0.000
7 DC -0.050883 17.455 172.862 0.000 -0.361 0.000
7 LL -0.327147 28.987 291.344 0.000 -2.323 0.000
7 TL(+) -2.742427 19.322 -8.780 0.000 -19.472 0.000
CBC6-K CBC6-04 EL+100200 7 TL(-) 2.74242 -19.322 8.780 0.000 19.472 0.000
7 WLX(Steel) 0.69191 -0.108 -0.450 0.000 4.912 0.000
7 WLY(Steel) -0.470302 110.412 427.619 0.000 -3.330 -0.003
7 ELX(Steel) -9.141987 8.577 28.415 0.000 -62.557 0.007
7 ELY(Steel) 0.185864 -71.938 -268.062 0.000 1.313 0.002
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

8 DS -0.191377 5.694 80.078 0.000 -2.262 0.000


8 DC -0.298593 4.953 70.894 0.000 -2.120 0.000
8 LL -0.269895 7.746 111.555 0.000 -4.229 0.000
8 TL(+) -6.15109 14.601 3.480 0.000 -43.673 0.000
CBC6-J CBC6-04 EL+100200 8 TL(-) 6.151074 -14.601 -3.480 0.000 43.673 0.000
8 WLX(Steel) 0.682423 0.348 1.205 0.000 4.845 0.000
8 WLY(Steel) -0.330089 8.486 62.710 0.000 -2.338 -0.002
8 ELX(Steel) -9.06355 -2.543 -6.715 0.000 -62.280 0.005
8 ELY(Steel) 0.020422 -3.093 -29.032 0.000 0.142 0.001
9 DS 0.112364 6.298 93.197 0.000 1.701 0.000
9 DC 0.280109 5.444 82.399 0.000 1.989 0.000
9 LL 0.006566 8.727 133.281 0.000 2.359 0.000
9 TL(+) 1.706121 13.608 0.000 0.000 12.113 0.000
CBC6-I CBC6-04 EL+100200
9 TL(-) -1.706116 -13.608 0.000 0.000 -12.113 0.000
9 WLY(Steel) 0.240837 31.995 145.368 0.000 1.706 0.001
9 ELX(Steel) -21.156238 -0.275 -3.427 0.000 -148.139 0.005
9 ELY(Steel) -0.100476 -19.965 -85.254 0.000 -0.712 -0.001
10 DS -0.112364 6.298 93.197 0.000 -1.701 0.000
10 DC -0.280109 5.444 82.399 0.000 -1.989 0.000
10 LL -0.006566 8.727 133.281 0.000 -2.359 0.000
10 TL(+) -1.706121 13.608 0.000 0.000 -12.113 0.000
CBC6-H CBC6-04 EL+100200
10 TL(-) 1.706116 -13.608 0.000 0.000 12.113 0.000
10 WLY(Steel) -0.202532 37.785 163.650 0.000 -1.435 -0.001
10 ELX(Steel) -21.156238 0.275 3.427 0.000 -148.139 0.005
10 ELY(Steel) 0.100476 -19.965 -85.254 0.000 0.712 0.001
11 DS 0.004935 5.092 75.410 0.000 0.939 0.000
11 DC 0.191115 4.536 69.108 0.000 1.357 0.000
11 LL -0.171273 6.745 103.775 0.000 1.096 0.000
11 TL(+) 3.088365 13.610 0.141 0.000 21.927 0.000
CBC6-G CBC6-04 EL+100200
11 TL(-) -3.088356 -13.610 -0.141 0.000 -21.927 0.000
11 WLY(Steel) 0.181051 28.061 124.417 0.000 1.282 0.001
11 ELX(Steel) -24.982155 -0.267 -3.370 0.000 -175.303 0.005
11 ELY(Steel) -0.092637 -18.243 -78.031 0.000 -0.656 -0.001
12 DS -0.044066 19.890 183.887 0.000 -0.313 0.000
12 DC -0.044823 18.205 170.019 0.000 -0.318 0.000
12 LL -0.075985 28.956 273.497 0.000 -0.539 0.000
12 TL(+) -0.150138 21.900 -0.304 0.000 -1.066 0.000
CBC6-F CBC6-04 EL+100200
12 TL(-) 0.150137 -21.900 0.304 0.000 1.066 0.000
12 WLY(Steel) -0.038985 60.792 263.991 0.000 -0.276 0.000
12 ELX(Steel) -25.061639 -0.041 -0.355 0.000 -175.588 0.008
12 ELY(Steel) 0.017906 -36.843 -155.553 0.000 0.127 0.000
13 DS 0.038558 4.362 64.980 0.000 -0.630 0.000
13 DC -0.146779 3.762 57.996 0.000 -1.042 0.000
13 LL 0.246544 5.393 84.185 0.000 -0.562 0.000
13 TL(+) -2.938225 13.611 0.163 0.000 -20.861 0.000
CBC6-E CBC6-04 EL+100200
13 TL(-) 2.938217 -13.611 -0.163 0.000 20.861 0.000
13 WLY(Steel) -0.156956 23.788 107.512 0.000 -1.112 -0.001
13 ELX(Steel) -24.98107 0.289 3.725 0.000 -175.295 0.005
13 ELY(Steel) 0.081697 -15.937 -69.690 0.000 0.579 0.001
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

14 DS 0.383294 3.986 52.001 0.000 3.621 0.001


14 DC 0.104001 3.107 42.765 0.000 0.738 0.000
14 LL 1.023889 4.571 58.751 0.000 9.573 0.003
14 TL(+) 2.341057 14.182 1.874 0.000 16.618 0.001
CBC6-D CBC6-04 EL+100200 14 TL(-) -2.341051 -14.182 -1.874 0.000 -16.618 -0.001
14 WLX(Steel) 2.041523 -0.091 0.148 0.000 14.500 -0.002
14 WLY(Steel) 2.111202 24.364 98.819 0.000 14.927 0.019
14 ELX(Steel) -4.355873 1.365 3.549 0.000 -28.863 0.007
14 ELY(Steel) -2.006837 -17.905 -71.748 0.000 -14.199 -0.015
15 DS 0.54985 0.000 81.357 0.000 3.902 0.003
15 DC 0.08258 0.000 68.610 0.000 0.585 0.001
15 LL 1.474992 0.000 100.917 0.000 10.468 0.006
15 TL(+) 0.754386 0.000 -0.479 0.000 5.353 0.001
CBC6-N CBC6-04 EL+100200 15 TL(-) -0.754384 0.000 0.479 0.000 -5.353 -0.001
15 WLX(Steel) 2.044904 0.000 1.442 0.000 14.511 -0.003
15 WLY(Steel) 2.059881 0.081 22.397 0.000 14.618 0.067
15 ELX(Steel) -4.165695 0.000 -3.264 0.000 -28.533 0.001
15 ELY(Steel) -1.971432 -0.145 -7.886 0.000 -13.990 -0.046
16 DS 1.412866 -0.134 55.236 0.000 5.773 -0.009
16 DC 0.202374 -0.162 22.024 0.000 0.842 0.000
16 LL 3.352683 0.125 43.449 0.000 14.565 -0.025
16 TL(+) 2.014241 0.656 -0.088 0.000 5.529 0.000
CBC6-M CBC6-04 EL+100200 16 TL(-) -2.014236 -0.656 0.088 0.000 -5.529 0.000
16 WLX(Steel) 6.408654 -0.402 3.307 0.000 24.133 0.010
16 WLY(Steel) 3.825061 3.124 36.610 0.000 18.425 -0.044
16 ELX(Steel) -11.208173 0.383 -7.743 0.000 -44.022 -0.010
16 ELY(Steel) -4.09224 -2.601 -27.443 0.000 -18.605 0.024
17 DS 1.419651 -0.561 35.443 0.000 5.758 -0.008
17 DC 0.207166 -0.058 4.342 0.000 0.847 0.000
17 LL 3.642864 -1.591 6.421 0.000 14.984 -0.024
17 TL(+) -2.748962 0.228 0.491 0.000 -8.199 0.000
CBC6-L CBC6-04 EL+100200 17 TL(-) 2.748954 -0.228 -0.491 0.000 8.199 0.000
17 WLX(Steel) 6.668818 0.418 -6.251 0.000 24.461 0.008
17 WLY(Steel) 4.476516 -2.101 2.998 0.000 19.411 -0.039
17 ELX(Steel) -12.002831 -0.266 13.198 0.000 -45.113 -0.010
17 ELY(Steel) -4.664226 3.282 0.885 0.000 -19.457 0.020
18 DS -0.003913 0.229 30.341 0.000 -0.131 0.001
18 DC 0.183459 0.063 9.543 0.000 0.587 0.000
18 LL -0.587423 0.504 28.818 0.000 -2.158 0.000
18 TL(+) 5.144152 -0.240 2.646 0.000 17.576 0.001
CBC6-N CBC6-03 EL+100200 18 TL(-) -5.144138 0.240 -2.646 0.000 -17.575 -0.001
18 WLX(Steel) 1.873775 0.107 1.930 0.000 7.259 -0.001
18 WLY(Steel) 1.688808 -2.941 2.183 0.000 6.804 0.013
18 ELX(Steel) -23.766172 0.589 -22.598 0.000 -91.936 0.009
18 ELY(Steel) -1.721645 3.700 1.911 0.000 -6.861 -0.007
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

19 DS -0.112211 0.470 36.660 0.000 -0.310 0.001


19 DC 0.164532 0.388 19.145 0.000 0.560 0.000
19 LL -0.535551 0.721 42.535 0.000 -2.085 0.001
19 TL(+) 0.178855 -0.655 -1.557 0.000 3.559 0.001
CBC6-M CBC6-03 EL+100200 19 TL(-) -0.178855 0.655 1.557 0.000 -3.559 -0.001
19 WLX(Steel) 1.720921 -0.042 -0.737 0.000 7.042 -0.001
19 WLY(Steel) 1.515015 0.494 -2.462 0.000 6.555 0.015
19 ELX(Steel) -21.893832 0.871 12.972 0.000 -89.282 0.010
19 ELY(Steel) -1.562044 0.198 11.128 0.000 -6.633 -0.008
20 DS -0.018976 0.000 93.340 0.000 -0.134 -0.001
20 DC 0.038742 0.000 75.769 0.000 0.275 -0.001
20 LL -0.182461 0.000 131.238 0.000 -1.293 -0.001
20 TL(+) 0.116321 0.000 -0.808 0.000 0.830 -0.001
CBC6-L CBC6-03 EL+100200 20 TL(-) -0.116321 0.000 0.808 0.000 -0.830 0.001
20 WLX(Steel) 0.664676 0.000 -0.659 0.000 4.723 0.000
20 WLY(Steel) 0.661602 2.144 -7.035 0.000 4.692 -0.016
20 ELX(Steel) -8.39711 0.000 4.640 0.000 -59.620 0.000
20 ELY(Steel) -0.655379 0.000 19.723 0.000 -4.648 0.009
21 DS -0.127914 -21.699 198.455 0.000 -0.908 0.000
21 DC -0.057625 -19.174 173.991 0.000 -0.409 0.000
21 LL -0.3405 -32.198 287.072 0.000 -2.417 0.000
21 TL(+) -2.788492 -24.627 7.130 0.000 -19.798 0.000
CBC6-K CBC6-03 EL+100200 21 TL(-) 2.788484 24.626 -7.130 0.000 19.798 0.000
21 WLX(Steel) 0.678205 -0.072 -0.016 0.000 4.815 0.000
21 WLY(Steel) 0.420665 114.057 -341.775 0.000 2.978 -0.003
21 ELX(Steel) -8.999799 8.759 -21.532 0.000 -61.626 -0.008
21 ELY(Steel) -0.482231 -79.821 265.963 0.000 -3.417 0.002
22 DS -0.177874 -4.807 79.013 0.000 -2.167 0.000
22 DC -0.282618 -4.074 68.442 0.000 -2.007 0.000
22 LL -0.236221 -6.338 104.902 0.000 -3.990 0.000
22 TL(+) -6.161363 -12.545 -2.521 0.000 -43.746 0.000
CBC6-J CBC6-03 EL+100200 22 TL(-) 6.161346 12.545 2.521 0.000 43.745 0.000
22 WLX(Steel) 0.682214 0.393 -1.255 0.000 4.844 0.000
22 WLY(Steel) 0.161902 8.170 -34.569 0.000 1.144 -0.002
22 ELX(Steel) -9.021989 -3.056 9.508 0.000 -62.028 -0.005
22 ELY(Steel) -0.314783 -3.423 30.185 0.000 -2.232 0.001
23 DS 0.097186 -6.298 97.059 0.000 1.594 0.000
23 DC 0.262178 -5.444 84.551 0.000 1.862 0.000
23 LL -0.035541 -8.727 133.281 0.000 2.061 0.000
23 TL(+) 1.706018 -13.608 0.000 0.000 12.113 0.000
CBC6-I CBC6-03 EL+100200
23 TL(-) -1.706014 13.608 0.000 0.000 -12.113 0.000
23 WLY(Steel) -0.105063 34.029 -108.675 0.000 -0.742 0.001
23 ELX(Steel) -21.14874 0.135 -3.415 0.000 -148.128 -0.005
23 ELY(Steel) 0.098849 -22.340 85.254 0.000 0.700 -0.001
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

24 DS -0.097186 -6.298 97.059 0.000 -1.594 0.000


24 DC -0.262178 -5.444 84.551 0.000 -1.862 0.000
24 LL 0.035541 -8.727 133.281 0.000 -2.061 0.000
24 TL(+) -1.706018 -13.608 0.000 0.000 -12.113 0.000
CBC6-H CBC6-03 EL+100200
24 TL(-) 1.706014 13.608 0.000 0.000 12.113 0.000
24 WLY(Steel) 0.066759 40.487 -126.957 0.000 0.471 -0.001
24 ELX(Steel) -21.14874 -0.135 3.415 0.000 -148.128 -0.005
24 ELY(Steel) -0.098849 -22.340 85.254 0.000 -0.700 0.001
25 DS -0.001893 -5.172 79.466 0.000 0.890 0.000
25 DC 0.181053 -4.632 71.778 0.000 1.286 0.000
25 LL -0.194285 -6.934 105.491 0.000 0.934 0.000
25 TL(+) 3.088374 -13.630 0.235 0.000 21.927 0.000
CBC6-G CBC6-03 EL+100200
25 TL(-) -3.088366 13.630 -0.235 0.000 -21.927 0.000
25 WLY(Steel) -0.092766 30.199 -95.689 0.000 -0.656 0.001
25 ELX(Steel) -24.973763 0.118 -3.191 0.000 -175.285 -0.005
25 ELY(Steel) 0.09215 -20.407 77.939 0.000 0.653 -0.001
26 DS -0.04377 -19.717 191.222 0.000 -0.311 0.000
26 DC -0.043976 -17.998 173.717 0.000 -0.312 0.000
26 LL -0.07344 -28.546 271.691 0.000 -0.521 0.000
26 TL(+) -0.150134 -21.857 -0.509 0.000 -1.066 0.000
CBC6-F CBC6-03 EL+100200
26 TL(-) 0.150133 21.857 0.509 0.000 1.066 0.000
26 WLY(Steel) 0.017929 59.383 -185.859 0.000 0.127 0.000
26 ELX(Steel) -25.047737 0.050 -0.427 0.000 -175.565 -0.008
26 ELY(Steel) -0.017929 -40.774 155.754 0.000 -0.127 0.000
27 DS 0.046236 -4.454 67.785 0.000 -0.575 0.000
27 DC -0.13659 -3.873 59.482 0.000 -0.970 0.000
27 LL 0.268438 -5.613 84.275 0.000 -0.407 0.000
27 TL(+) -2.938243 -13.634 0.274 0.000 -20.862 0.000
CBC6-E CBC6-03 EL+100200
27 TL(-) 2.938235 13.634 -0.274 0.000 20.861 0.000
27 WLY(Steel) 0.089727 25.802 -84.632 0.000 0.634 -0.001
27 ELX(Steel) -24.97268 -0.149 3.618 0.000 -175.278 -0.005
27 ELY(Steel) -0.081189 -17.815 69.582 0.000 -0.575 0.001
28 DS 0.074698 -3.532 62.188 0.000 1.438 0.001
28 DC 0.098802 -2.847 49.598 0.000 0.702 0.000
28 LL 0.254502 -3.794 71.420 0.000 4.129 0.003
28 TL(+) 2.085821 -13.072 -1.355 0.000 14.812 0.001
CBC6-D CBC6-03 EL+100200 28 TL(-) -2.085816 13.072 1.355 0.000 -14.812 -0.001
28 WLX(Steel) 2.519093 -0.368 3.846 0.000 17.880 -0.002
28 WLY(Steel) -3.191625 26.489 -75.389 0.000 -22.598 0.019
28 ELX(Steel) -4.920832 2.041 -10.939 0.000 -32.903 -0.003
28 ELY(Steel) 2.217432 -19.766 67.227 0.000 15.694 -0.015
29 DS 0.080878 0.000 69.538 0.000 -0.038 -0.003
29 DC 0.400364 0.000 38.963 0.000 0.671 -0.002
29 LL -0.511689 0.000 67.471 0.000 -1.128 -0.007
29 TL(+) 4.717426 0.000 0.573 0.000 15.201 0.000
CBC6-N CBC6-02 EL+100200 29 TL(-) -4.717413 0.000 -0.573 0.000 -15.201 0.000
29 WLX(Steel) -0.354271 0.000 5.406 0.000 2.454 0.006
29 WLY(Steel) -0.380195 0.000 -8.507 0.000 -1.214 -0.062
29 ELX(Steel) 1.567162 0.000 -6.807 0.000 -1.069 -0.011
29 ELY(Steel) 0.208208 0.000 17.415 0.000 1.055 0.034
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

30 DS 2.204541 1.531 59.268 -7.803 0.000 -0.006


30 DC 1.986859 0.000 45.333 -0.001 0.000 -0.001
30 LL -0.484276 4.355 76.802 -22.200 0.000 -0.016
30 TL(+) 22.02319 0.367 -13.203 -1.872 0.000 0.000
CBC6-M CBC6-02 EL+100200 30 TL(-) -22.023131 -0.367 13.203 1.872 0.000 0.000
30 WLX(Steel) 24.144091 -1.489 64.806 7.590 0.000 0.007
30 WLY(Steel) -4.322031 23.318 -24.052 -118.895 0.000 -0.048
30 ELX(Steel) -27.357205 0.788 -76.596 -4.014 0.000 -0.010
30 ELY(Steel) 5.520423 -20.941 39.820 105.647 0.000 0.025
31 DS -6.099325 -1.574 67.594 8.023 0.000 -0.004
31 DC -2.95858 -0.031 33.315 0.156 0.000 0.000
31 LL -8.753649 -4.459 66.388 22.730 0.000 -0.012
31 TL(+) -31.033368 0.456 12.288 -2.326 0.000 0.000
CBC6-L CBC6-02 EL+100200 31 TL(-) 31.033285 -0.456 -12.288 2.326 0.000 0.000
31 WLX(Steel) 25.052689 1.889 -73.069 -9.629 0.000 0.012
31 WLY(Steel) -4.5191 8.512 32.262 -43.423 0.000 -0.045
31 ELX(Steel) -29.520236 -2.675 89.047 13.637 0.000 -0.010
31 ELY(Steel) 4.322623 -12.993 -21.310 65.126 0.000 0.027
32 DS -0.068016 0.000 20.921 0.000 -0.039 -0.003
32 DC -0.301168 0.000 -5.545 0.000 -0.423 -0.002
32 LL -0.0476 0.000 -0.506 0.000 0.024 -0.006
32 TL(+) 3.557857 0.000 0.897 0.000 13.717 0.000
CBC6-N CBC6-01 EL+100200 32 TL(-) -3.557847 0.000 -0.897 0.000 -13.717 0.000
32 WLX(Steel) -1.520189 0.000 -0.205 0.000 -1.230 0.006
32 WLY(Steel) -0.029909 1.237 2.133 0.000 -0.029 -0.061
32 ELX(Steel) 1.18083 0.000 -0.028 0.000 0.851 -0.011
32 ELY(Steel) -0.074769 0.000 -0.380 0.000 -0.092 0.033
33 DS 2.515948 1.849 42.430 -8.287 0.000 -0.006
33 DC 1.733742 0.021 31.524 -0.034 0.000 -0.001
33 LL 1.818791 5.228 39.437 -23.523 0.000 -0.015
33 TL(+) 24.03462 -1.614 -5.041 7.108 0.000 0.000
CBC6-M CBC6-01 EL+100200 33 TL(-) -24.034556 1.614 5.041 -7.108 0.000 0.000
33 WLX(Steel) 9.862177 -1.836 32.261 8.119 0.000 0.008
33 WLY(Steel) 0.17411 25.494 5.874 -121.250 0.000 -0.048
33 ELX(Steel) -8.496816 1.028 -26.887 -4.385 0.000 -0.011
33 ELY(Steel) 0.371896 -23.793 1.472 109.944 0.000 0.023
34 DS -2.474386 -1.566 28.812 7.982 0.000 -0.010
34 DC -1.55614 -0.031 22.290 0.158 0.000 0.000
34 LL -1.770507 -4.435 18.634 22.614 0.000 -0.030
34 TL(+) -27.746268 -1.203 4.043 6.134 0.000 0.000
CBC6-L CBC6-01 EL+100200 34 TL(-) 27.746194 1.203 -4.043 -6.134 0.000 0.000
34 WLX(Steel) 9.617951 1.879 -31.692 -9.583 0.000 0.011
34 WLY(Steel) -0.203908 10.027 -0.034 -44.842 0.000 -0.048
34 ELX(Steel) -8.537793 -2.662 26.469 13.576 0.000 -0.010
34 ELY(Steel) 0.16892 -12.955 1.948 64.939 0.000 0.035
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

-MD#7 -

4
2
X
3
1

Position FX (kN) FY (kN) FZ (kN)


Load MX (kN·m) MY (kN·m) MZ (kN·m)
GRID Height(Z) Node EAST+ NORTH+ Vertical
1 DS -4.150681 4.188 41.963 0.000 -5.763 0.000
1 DC -9.286201 2.667 44.550 0.000 -12.848 0.000
1 LL -6.213044 9.572 87.211 0.000 -8.612 0.000
1 TL(+) 0.976367 21.574 0.000 0.000 2.488 0.000
EL+100200
1 TL(-) -0.976364 -21.574 0.000 0.000 -2.488 0.000
1 WLY(Steel) -0.14682 14.696 35.569 0.000 -0.198 -0.019
1 ELX(Steel) -12.616422 -1.771 -17.255 0.000 -32.595 0.000
1 ELY(Steel) 1.315352 -9.166 -27.776 0.000 1.815 0.024
2 DS -4.365068 -4.188 43.529 0.000 -6.061 0.000
2 DC -5.002631 -2.667 24.300 0.000 -6.922 0.000
2 LL -6.241048 -9.572 87.211 0.000 -8.655 0.000
2 TL(+) 0.979722 -21.574 0.000 0.000 2.493 0.000
EL+100200
2 TL(-) -0.979719 21.574 0.000 0.000 -2.493 0.000
2 WLY(Steel) 2.166718 16.209 -52.659 0.000 2.979 -0.019
2 ELX(Steel) -9.754052 1.772 -13.458 0.000 -25.084 0.000
2 ELY(Steel) -1.316727 -9.187 27.776 0.000 -1.817 0.024
3 DS 4.15068 3.562 37.782 0.000 5.667 0.000
3 DC 9.286201 2.663 44.550 0.000 12.848 0.000
3 LL 6.213044 5.349 61.638 0.000 8.453 0.000
3 TL(+) -0.976367 21.553 0.000 0.000 -2.488 0.000
EL+100200
3 TL(-) 0.976365 -21.553 0.000 0.000 2.488 0.000
3 WLY(Steel) 0.14682 14.698 35.569 0.000 0.198 0.019
3 ELX(Steel) -12.447474 1.770 17.255 0.000 -32.375 0.000
3 ELY(Steel) -1.315364 -8.661 -26.890 0.000 -1.816 -0.024
4 DS 4.365068 -3.562 39.347 0.000 5.964 0.000
4 DC 5.002631 -2.663 24.300 0.000 6.922 0.000
4 LL 6.241048 -5.349 61.638 0.000 8.496 0.000
4 TL(+) -0.979721 -21.553 0.000 0.000 -2.494 0.000
EL+100200
4 TL(-) 0.979718 21.553 0.000 0.000 2.494 0.000
4 WLY(Steel) -2.166718 16.206 -52.659 0.000 -2.979 0.019
4 ELX(Steel) -9.585314 -1.771 13.458 0.000 -24.864 0.000
4 ELY(Steel) 1.316739 -8.683 26.890 0.000 1.819 -0.024
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- MD#8 -

Y 4
2
3
X 1

Position FX (kN) FY (kN) FZ (kN)


Load MX (kN·m) MY (kN·m) MZ (kN·m)
GRID Height(Z) Node EAST+ NORTH+ Vertical
1 DS -2.866919 2.526 27.940 0.000 -3.952 0.000
1 DC -4.286869 1.977 20.251 0.000 -5.931 0.000
1 LL -3.309818 3.862 37.223 0.000 -4.540 0.000
1 TL(+) 0.956418 20.876 0.000 0.000 2.466 0.000
EL+100200
1 TL(-) -0.956416 -20.876 0.000 0.000 -2.466 0.000
1 WLY(Steel) -1.424639 13.901 76.279 0.000 -1.924 -0.003
1 ELX(Steel) -7.25232 -0.946 -9.867 0.000 -18.739 0.001
1 ELY(Steel) 1.629936 -6.121 -36.527 0.000 2.221 0.003
2 DS -3.008465 -2.527 31.023 0.000 -4.151 0.000
2 DC -4.992683 -1.977 24.299 0.000 -6.907 0.000
2 LL -3.335087 -3.857 49.940 0.000 -4.580 0.000
2 TL(+) 0.958297 -20.876 0.000 0.000 2.469 0.000
EL+100200
2 TL(-) -0.958294 20.876 0.000 0.000 -2.469 0.000
2 WLY(Steel) 2.428759 14.900 -84.815 0.000 3.305 -0.003
2 ELX(Steel) -7.738152 0.755 -10.199 0.000 -19.866 0.000
2 ELY(Steel) -1.630573 -6.114 36.527 0.000 -2.222 0.003
3 DS 2.863965 2.359 27.007 0.000 3.946 0.000
3 DC 4.287325 1.977 20.249 0.000 5.932 0.000
3 LL 3.324808 2.708 30.808 0.000 4.591 0.000
3 TL(+) -0.956574 20.876 0.000 0.000 -2.466 0.000
EL+100200
3 TL(-) 0.956571 -20.876 0.000 0.000 2.466 0.000
3 WLY(Steel) 1.489761 13.878 76.115 0.000 2.094 0.004
3 ELX(Steel) -7.220701 0.947 9.867 0.000 -18.698 0.001
3 ELY(Steel) -1.685726 -5.867 -35.600 0.000 -2.368 -0.003
4 DS 3.011419 -2.358 28.189 0.000 4.144 0.000
4 DC 4.992227 -1.977 24.301 0.000 6.906 0.000
4 LL 3.320097 -2.713 30.851 0.000 4.580 0.000
4 TL(+) -0.958141 -20.876 0.000 0.000 -2.469 0.000
EL+100200
4 TL(-) 0.958139 20.876 0.000 0.000 2.468 0.000
4 WLY(Steel) -2.493881 14.874 -84.651 0.000 -3.476 0.004
4 ELX(Steel) -7.601205 -0.756 10.199 0.000 -19.688 0.000
4 ELY(Steel) 1.686364 -5.866 35.600 0.000 2.369 -0.003
Doc No : 00-UBT-C-51-001-001
Cable Rack Foundation Calculation Sheet Rev No : X2

- MD#9 -

Y
4
2
3
X
1

Position FX (kN) FY (kN) FZ (kN)


Load MX (kN·m) MY (kN·m) MZ (kN·m)
GRID Height(Z) Node EAST+ NORTH+ Vertical
1 DS -2.866919 2.526 27.940 0.000 -3.952 0.000
1 DC -4.284366 0.899 20.250 0.000 -5.927 0.000
1 LL -3.309818 3.862 37.223 0.000 -4.540 0.000
1 TL(+) 2.922069 62.645 0.133 0.000 7.536 0.000
EL+100200
1 TL(-) -0.956413 -20.876 0.000 0.000 -2.466 0.000
1 WLY(Steel) -1.423383 13.889 76.238 0.000 -1.921 -0.003
1 ELX(Steel) -6.167258 -0.286 -7.127 0.000 -15.886 -0.002
1 ELY(Steel) 0.93291 -4.624 -26.153 0.000 1.264 0.002
2 DS -3.008465 -2.527 31.023 0.000 -4.151 0.000
2 DC -0.002375 -0.899 0.000 0.000 -0.004 0.000
2 LL -3.335087 -3.857 49.940 0.000 -4.580 0.000
2 TL(+) 2.821726 -62.606 -0.133 0.000 7.267 0.001
EL+100200
2 TL(-) -0.958292 20.876 0.000 0.000 -2.469 0.000
2 WLY(Steel) 2.427503 14.889 -84.774 0.000 3.302 -0.003
2 ELX(Steel) -5.105432 0.889 -6.745 0.000 -12.958 -0.002
2 ELY(Steel) -0.933396 -4.616 26.153 0.000 -1.265 0.002
3 DS 2.863965 2.359 27.007 0.000 3.946 0.000
3 DC 4.284411 0.899 20.250 0.000 5.928 0.000
3 LL 3.324808 2.708 30.808 0.000 4.591 0.000
3 TL(+) -2.816963 62.608 -0.133 0.000 -7.261 0.000
EL+100200
3 TL(-) 0.956569 -20.876 0.000 0.000 2.466 0.000
3 WLY(Steel) 1.490996 13.874 76.108 0.000 2.098 0.004
3 ELX(Steel) -6.135656 0.286 7.127 0.000 -15.845 -0.002
3 ELY(Steel) -0.97452 -4.375 -25.262 0.000 -1.374 -0.002
4 DS 3.011419 -2.358 28.189 0.000 4.144 0.000
4 DC 0.00233 -0.899 0.000 0.000 0.004 0.000
4 LL 3.320097 -2.713 30.851 0.000 4.580 0.000
4 TL(+) -2.926833 -62.647 0.133 0.000 -7.543 0.000
EL+100200
4 TL(-) 0.958136 20.876 0.000 0.000 2.468 0.000
4 WLY(Steel) -2.495116 14.871 -84.644 0.000 -3.479 0.004
4 ELX(Steel) -4.968232 -0.889 6.745 0.000 -12.779 -0.002
4 ELY(Steel) 0.975006 -4.374 25.262 0.000 1.375 -0.002