You are on page 1of 101

X0 27.SEP.2016 AS BUILT K.H.PARK H.K.LEE S.H.

BAE
0 18.FEB.2014 ISSUED FOR CONSTRUCTION K.H.PARK H.K.LEE S.H.BAE
A 15.NOV.2013 ISSUED FOR INFORMATION K.H.PARK H.K.LEE S.H.BAE
REV. DATA DESCRIPTION DESIGNED CHECKED APPROVED

OWNER

PROJECT

JEDDAH SOUTH THERMAL POWER PLANT STAGE-I

ENGINEER

CONTRACTOR

SUBCONTRACTOR VENDOR INTERNAL DOC.NO

N/A

THIS DOCUMENT IS NOT TO BE USED FOR


CONSTRUCTION OR FOR ORDERING MATERIAL UNTIL
CERTIFIED AND DATED.THE CONTRACTOR HHI APPROVAL/CERTIFICATION INFORMATION
CONFIRMS FULLY COMPLIANCE WITH THE O/E’S DOC. NO : TCS-HH-FH-DT-03206
COMMENTS. NO OTHER CHANGES HAD BEEN MADE ON
REV. NO : A
THE DOCUMENT. THE CONTRACTOR MAY SUBMIT THE
DOCUMENTS AS “FOR CONSTRUCTION”

DOCUMENT TITLE

TR COMPOUND FOUNDATION
CALCULATION SHEET

CONTRACT NO. DOCUMENT NO NO. OF PAGES REV.

31121106/00 00-UBF-C-51-001-001 101 X0


Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

TABLE OF CONTENTS

1. DESIGN CRITERIA……………………………………………………………… 3

1.1 GENERAL…………………………………………………………………… 3
1.2 MATERIAL SPECIFICATION……………………………………………… 3
1.3 DESIGN DATA……………………………………………………………… 3
1.5 DESIGN DATA……………………………………………………………… 4

2. DESIGN DATA…………………………………………………………………… 5

2.1 DESIGN DIMENSION……………………………………………………… 5


2.2 SOIL INFORMATION……………………………………………………… 6

3. DESIGN LOAD…………………………………………………………………… 7

3.1 DEAD LOAD………………………………………………………………… 7


3.2 LIVE LOAD………………………………………………………………… 10
3.3 EARTH PRESSURE LOAD………………………………………………… 11
3.4 WIND LOAD………………………………………………………………… 12
3.5 SEISMIC LOAD………………………………………………………………17

4. LOAD COMBINATION………………………………………………………… 20

4.1 LOAD COMBINATIONS FOR STABILITY CHECK………………………20


4.2 LOAD COMBINATIONS FOR MEMBER DESIGN…………………………21

5. STABILITY CHECK………………………………………………………………21

5.1 DESIGN LOAD FOR STABILITY CHECK…………………………………21


5.2 CALCULATION OF COMBINED LOAD……………………………………22
5.3 CHECK OF SOIL BEARING CAPACITY……………………………………23
5.4 SLIDING CHECK…………………………………………………………… 24
5.5 OVERTURNING CHECK……………………………………………………25

6. STRUCTURE ANALYSIS……………………………………………………… 26

6.1 3D SHELL MODELING………………………………………………………26


6.2 CALCULATION OF SPRING CONSTANT…………………………………26
6.3 CALCULATION OF INPUT LOAD & LOAD DISTRIBUTION……………27

7. MEMBER DESIGN……………………………………………………………… 32

7.1 RESULT OF ANALYSIS (MEMBER FORCE)………………………………32


7.2 MEMBER CHECK……………………………………………………………54

8. REBAR SKETCH…………………………………………………………………90

※ Appendix A : Vendor Print


※ Appendix B : Transformer Dike Volume Check
※ Appendix C : Program Analysis Data

Page 2 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

1. DESIGN CRITERIA

1.1 GENERAL

(1) Project Name : Jeddah South Thermal Power Plants Stage-1


(2) Client : Saudi Electricity Company
(3) Project Location : 70 km to the south of the city of Jeddah in the Kingdom of Saudi Arabia

- ACI 318 : Building Code Requirements for Structural Concrete


- ASCE7-02 : Design Load Combination (American Society of Civil Engineering)
- 00-TAA-C-35-001-001 : Civil Design Criteria For Onshore

1.2 MATERIAL SPECIFICATION

- Concrete Strength (Compressive Strength at 28days) (Refer to clause 4.1 of 00-TAA-C-35-001-001)


· Unit Weight : γc = 25 kN/m³
· Compressive Strength : f'c = 37.5 MPa (Cylindrical)
· Modulus of Elastic : Ec = 4700 √f'c = 28782 MPa

- Reinforcing bar (ASTM A615/A615M grade 60) (Refer to clause 4.2 of 00-TAA-C-35-001-001)
· Yield Strength : fy = 420 MPa
· Modulus of Elastic : Es = 200000 MPa

- Soil (Refer to clause 5.2 of 00-TAA-C-35-001-001)


· Unit Weight of Soil : γt = 19.0 kN/m³

1.3 DESIGN DATA

- Applied Safety Factor (Refer to clause 6.6.2 of 00-TAA-C-35-001-001)


· Soil Bearing Capacity : 3.00
· Overturning : 2.00
· Sliding : 2.00

- Coefficient of Friction (Refer to clause 6.6.2 of 00-TAA-C-35-001-001)


· Concrete to Soil : 0.40

- Strength Reduction Factor (Refer to clause 6.1 of 00-TAA-C-35-001-001)


· Tension : 0.90
· Shear and Torsion : 0.75

Page 3 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

1.4 LOAD COMBINATION

1) Normal Load Combinations for Stability Check

Load
Load Factor Remark
Combinations
L/C-1 1.0D + 1.0L + 1.0H Normal Operation
L/C-2 1.0D + 1.0W + 1.0H Empty Load + Wind Load
L/C-3 1.0D + 0.7S + 1.0H Empty Load + Seismic Load
L/C-4 1.0D + 0.75L + 0.7W + 1.0H Operation Load + Wind Load
L/C-5 1.0D + 0.75L + 0.525S + 1.0H Operation Load + Seismic Load

2) Factored Load Combination for Member Design

Load
Load Factor Remark
Combinations
L/C-21 1.2D + 1.6L + 1.6H Normal Operation
L/C-22 0.9D + 1.6W + 1.6H Empty Load + Wind Load
L/C-23 0.9D + 1.0S + 1.6H Empty Load + Seismic Load
L/C-24 1.2D + 1.0L + 1.6W + 1.6H Operation Load + Wind Load
L/C-25 1.2D + 1.0L + 1.0S + 1.6H Operation Load + Seismic Load
L/C-26 1.4D + 1.6H Test Only
※ Notations
D : Dead load
L : Live Load
H : Earth Pressure load
W : Wind Load
S : Seismic Load

1.5 DESIGN DATA

-Each compound tank shall accommodate total quantity & maximum runoff quantity as follows.
Total
Reference KKS Oily Water Drainage Volume (m³) Waste Drainage Quantity (m³/s)
Area Volume (m
NO. F/F Deluge Lube Oil ³) F/F Deluge Runoff
GROUP#1 11BAT01GT001 19.00 86.69 194.00 299.69 0.03 0.14 0.18
STG TR 11BBT01GT001 19.00 41.41 58.40 118.81 0.03 0.07 0.10
Area 11BBT02GT001 19.00 38.01 43.20 100.21 0.03 0.06 0.10
GROUP#2 12BAT01GT001 19.00 86.69 194.00 299.69 0.03 0.14 0.18
STG TR 12BBT01GT001 19.00 41.41 58.40 118.81 0.03 0.07 0.10
Area 12BBT02GT001 19.00 38.01 43.20 100.21 0.03 0.06 0.10
GROUP#3 13BAT01GT001 19.00 86.69 194.00 299.69 0.03 0.14 0.18
STG TR 13BBT01GT001 19.00 41.41 58.40 118.81 0.03 0.07 0.10
Area 13BBT02GT001 19.00 38.01 43.20 100.21 0.03 0.06 0.10
GROUP#4 14BAT01GT001 19.00 86.69 194.00 299.69 0.03 0.14 0.18
STG TR 14BBT01GT001 19.00 41.41 58.40 118.81 0.03 0.07 0.10
Area 14BBT02GT001 19.00 38.01 43.20 100.21 0.03 0.06 0.10

Page 4 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

2. DESIGN DATA

2.1 DESIGN DIMENSION

Y [Unit : m]
38.30

X 4.625 2.70 4.325 4.825 2.90 4.675 2.175 6.65 4.025


0.25

0.25

0.45

0.45
0.45 Dike 2 ⑤ 0.45
2.55

2.10

5.025
0.25 Dike 1 ② Fire Wall 1 ⑧
P3
4.39

4.04
Dike 1 ⓛ

Fire Wall 1 ⑦

Fire Wall 2 ⑨

Fire Wall 2 ⑩
P1 P2
16.35

15.85

14.74
6.00

6.40

22.80

23.70
5.46

5.41

P4 2.05 P5 2.20
0.25 Dike 1 ③ Dike 1 ④
3.035
4.35
4.80

0.45 Base Point 'O' Dike 2 ⑥ 0.45


0.25

0.25

0.45

0.45
11.65 12.40 12.85
24.55 13.75

PLAN

[Unit : m]
X

0.30 0.30
Z 0.25
Fire Wall 2

Fire Wall 2

Fire Wall 1
Fire Wall 1

11.60
8.35
CAT UAT GUT
0.20 0.20
Dike 1

Dike 1

P1 P2 P3
1.10
Dike 2

Dike 2

0.40 Bottom Slab 1 ⑪ 1.80


0.75 Gravel : 0.30
Grating : 0.032 Bottom Slab 2 ⑫ 0.45
H-beam

SECTION

Page 5 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

※Section Plan Size


Section Size Distance from O
Section Remark
X-Dir. (m) Y-Dir. (m) Height (m) Xo (m) Yo (m)
ⓛ 0.25 16.35 1.30 0.125 12.975
② 11.65 0.25 1.30 6.075 21.025
③ 11.65 0.25 1.30 6.075 4.925
④ 12.40 0.25 1.30 18.35 4.925
⑤ 12.85 0.45 1.30 31.425 23.475
⑥ 12.85 0.45 1.30 31.425 0.225
⑦ 0.25 16.35 9.65 12.025 12.975
⑧ 12.40 0.25 9.65 18.35 21.025
⑨ 0.45 23.70 13.60 24.775 11.85
⑩ 0.45 23.70 13.60 38.075 11.85
⑪ 24.55 16.35 0.40 12.275 12.975
⑫ 13.75 23.70 0.45 31.425 11.85
P1 2.70 6.00 1.30 6.225 13.51
P2 2.90 6.40 1.30 18.425 13.66
P3 6.65 14.74 2.00 30.50 10.855
P4 2.05 5.46 1.30 6.225 7.78
P5 2.20 5.41 1.30 18.425 7.755

※Equipment Size
Approximately Dimension of Equipment
Item
X-direction, (m) Y-direction, (m) Height, (m)
CAT 11.75 6.70 6.71
UAT 9.46 6.80 6.99
GUT 14.40 10.20 10.26

2.2 SOIL INFORMATION

- Support Area & Gravity of Foundation

A = 24.55 x 16.35 + 13.75 x 23.70 = 727.27 m²

Cx = ( 24.55 x 16.35 x 12.28 + 13.75 x 23.70 x 31.43 ) / 727.27 = 20.86 m

Cy = ( 24.55 x 16.35 x 12.98 + 13.75 x 23.70 x 11.85 ) / 727.27 = 12.47 m

- Moment of Inertia & Minimum Section Modulus

Ix = 24.55 x 16.35 ³ / 12 + 401.39 x 0.50 ²


+ 13.75 x 23.70 ³ / 12 + 325.88 x -0.62 ² = 24422.80 m4

Iy = 16.35 x 24.55 ³ / 12 + 401.39 x -8.58 ²


+ 23.70 x 13.75 ³ / 12 + 325.88 x 10.57 ² = 91251.67 m4

Zx = Ix / Cymax = 24422.80 / 12.47 = 1958.38 m3


Zy = Iy / Cxmax = 91251.67 / 20.86 = 4375.37 m3

- Allowable Soil Bearing Capacity

Qallow = 150.00 kN/m²

Page 6 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

3. DESIGN LOAD

3.1 DEAD LOAD

1) Foundation Weight

- Concrete Weight, Wc

Section ⓛ = 0.25 x 16.35 x 1.30 x 25.00 = 132.84 kN


Section ② = 11.65 x 0.25 x 1.30 x 25.00 = 94.66 kN
Section ③ = 11.65 x 0.25 x 1.30 x 25.00 = 94.66 kN
Section ④ = 12.40 x 0.25 x 1.30 x 25.00 = 100.75 kN
Section ⑤ = 12.85 x 0.45 x 1.30 x 25.00 = 187.93 kN
Section ⑥ = 12.85 x 0.45 x 1.30 x 25.00 = 187.93 kN
Section ⑦ = 0.25 x 16.35 x 9.65 x 25.00 = 986.11 kN
Section ⑧ = 12.40 x 0.25 x 9.65 x 25.00 = 747.88 kN
Section ⑨ = 0.45 x 23.70 x 13.60 x 25.00 = 3626.10 kN
Section ⑩ = 0.45 x 23.70 x 13.60 x 25.00 = 3626.10 kN
Section ⑪ = 24.55 x 16.35 x 0.40 x 25.00 = 4013.93 kN
Section ⑫ = 13.75 x 23.70 x 0.45 x 25.00 = 3666.09 kN
Pedestal P1 = 2.70 x 6.00 x 1.30 x 25.00 = 526.50 kN
Pedestal P2 = 2.90 x 6.40 x 1.30 x 25.00 = 603.20 kN
Pedestal P3 = 6.65 x 14.74 x 2.00 x 25.00 = 4901.05 kN
Pedestal P4 = 2.05 x 5.46 x 1.30 x 25.00 = 363.77 kN
Pedestal P5 = 2.20 x 5.41 x 1.30 x 25.00 = 386.82 kN
SUM = 24246.31 kN

- Fluid Weight, Wf

CAT(P1) Area = ( 184.65 - 16.20 ) x 1.30 x 10.00 = 2189.88 kN


UAT(P2) Area = ( 196.54 - 18.56 ) x 1.30 x 10.00 = 2313.74 kN
GUT(P3) Area = ( 292.98 - 98.02 ) x 2.00 x 10.00 = 3899.18 kN
SUM = 8402.80 kN

- Gravel,Grating,H-beam Weight, Wg

CAT(P1) Area = ( 184.65 - 16.20 ) x 11.50 = 1937.20 kN


UAT(P2) Area = ( 196.54 - 18.56 ) x 11.50 = 2046.77 kN
GUT(P3) Area = ( 292.98 - 98.02 ) x 11.50 = 2242.03 kN
SUM = 6226.00 kN

- Total Weight, Wt = 24246.31 + 8402.80 + 6226.00 = 38875.11 kN

2) Eqiupment Weight

- CAT = 165000 kg = 1617.00 kN


- UAT = 198000 kg = 1940.40 kN
- GUT = 623000 kg = 6105.40 kN
- GUT = 32000 kg = 313.60 kN

Page 7 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

3) Eccentric Load

- Eccentric Moment due to Dead Load ( X-dir.)

*Mey = Weight x Xc ( Dist. from C.G )

ㆍEccentric Moment Due to Wc

Section ⓛ = 132.84 x -20.73 = -2753.95 kN.m


Section ② = 94.66 x -14.78 = -1399.09 kN.m
Section ③ = 94.66 x -14.78 = -1399.09 kN.m
Section ④ = 100.75 x -2.51 = -252.46 kN.m
Section ⑤ = 187.93 x 10.57 = 1986.29 kN.m
Section ⑥ = 187.93 x 10.57 = 1986.29 kN.m
Section ⑦ = 986.11 x -8.83 = -8708.09 kN.m
Section ⑧ = 747.88 x -2.51 = -1873.99 kN.m
Section ⑨ = 3626.10 x 3.92 = 14211.56 kN.m
Section ⑩ = 3626.10 x 17.22 = 62438.69 kN.m
Section ⑪ = 4013.93 x -8.58 = -34442.52 kN.m
Section ⑫ = 3666.09 x 10.57 = 38747.83 kN.m
Section P1 = 526.50 x -14.63 = -7703.09 kN.m
Section P2 = 603.20 x -2.43 = -1466.23 kN.m
Section P3 = 4901.05 x 9.64 = 47266.91 kN.m
Section P4 = 363.77 x -14.63 = -5322.27 kN.m
Section P5 = 386.82 x -2.43 = -940.25 kN.m
SUM = ####### kN.m

ㆍEccentric Moment Due to Wf

CAT(P1) Area = 2189.88 x -14.80 = -32399.71 kN.m


UAT(P2) Area = 2313.74 x -2.51 = -5815.77 kN.m
GUT(P3) Area = 3899.18 x 12.64 = 49285.98 kN.m
SUM = 11070.50 kN.m

ㆍEccentric Moment Due to Wg

CAT(P1) Area = 1937.20 x -14.80 = -28661.28 kN.m


UAT(P2) Area = 2046.77 x -2.51 = -5144.72 kN.m
GUT(P3) Area = 2242.03 x 12.64 = 28339.44 kN.m
SUM = -5466.56 kN.m

- Eccentric Moment due to Equipment Load ( X-dir.)

*Mey = Weight x Xc ( Dist. from C.G )

ㆍEccentric Moment Due to Equipment

CAT = 1617.00 x -14.63 = -23657.94 kN.m


UAT = 1940.40 x -2.43 = -4716.64 kN.m
GUT = 6419.00 x 9.64 = 61906.39 kN.m
SUM = 33531.81 kN.m

Page 8 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

- Eccentric Moment due to Dead Load ( Y-dir.)

*Mex = Weight x Yc ( Dist. from C.G )

ㆍEccentric Moment Due to Wc

Section ⓛ = 132.84 x -0.50 = -66.97 kN.m


Section ② = 94.66 x -8.55 = -809.70 kN.m
Section ③ = 94.66 x 7.55 = 714.27 kN.m
Section ④ = 100.75 x 7.55 = 760.25 kN.m
Section ⑤ = 187.93 x -11.00 = -2068.01 kN.m
Section ⑥ = 187.93 x 12.25 = 2301.39 kN.m
Section ⑦ = 986.11 x -0.50 = -497.09 kN.m
Section ⑧ = 747.88 x -8.55 = -6397.39 kN.m
Section ⑨ = 3626.10 x 0.62 = 2251.48 kN.m
Section ⑩ = 3626.10 x 0.62 = 2251.48 kN.m
Section P1 = 526.50 x -1.04 = -547.08 kN.m
Section P2 = 603.20 x -1.19 = -717.26 kN.m
Section P3 = 4901.05 x 1.62 = 7919.65 kN.m
Section ⑪ = 4013.93 x -0.50 = -2023.39 kN.m
Section ⑫ = 3666.09 x 0.62 = 2276.31 kN.m
SUM = 5347.93 kN.m

ㆍEccentric Moment Due to Wf

CAT(P1) Area = 2189.88 x -0.45 = -991.23 kN.m


UAT(P2) Area = 2313.74 x -0.43 = -1001.06 kN.m
GUT(P3) Area = 3899.18 x 0.12 = 470.42 kN.m
SUM = -1521.87 kN.m

ㆍEccentric Moment Due to Wg

CAT(P1) Area = 1937.20 x -0.45 = -876.86 kN.m


UAT(P2) Area = 2046.77 x -0.43 = -885.55 kN.m
GUT(P3) Area = 2242.03 x 0.12 = 270.49 kN.m
SUM = -1491.92 kN.m

- Eccentric Moment due to Equipment Load ( Y-dir.)

*Mex = Weight x Yc ( Dist. from C.G )

ㆍEccentric Moment Due to Equipment

CAT = 1617.00 x -1.04 = -1680.21 kN.m


UAT = 1940.40 x -1.04 = -2016.25 kN.m
GUT = 6419.00 x 1.62 = 10372.52 kN.m
SUM = 6676.05 kN

Page 9 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

3.2 LIVE LOAD

1) Live Load

- Distributed Load LL = 2.50 kN/m²

- Distributed Area CAT(P1) Area = 11.65 x 15.85 = 184.65 m2


UAT(P2) Area = 12.40 x 15.85 = 196.54 m2
GUT(P3) Area = 12.85 x 22.80 = 292.98 m2

- Concentrated LoadCAT(P1) Area = 2.50 x 184.65 = 461.63 kN


UAT(P2) Area = 2.50 x 196.54 = 491.35 kN
GUT(P3) Area = 2.50 x 292.98 = 732.45 kN
SUM = 1685.43 kN

2) Eccentric Load

- Eccentric Moment due to Live Load ( X-dir.)

*Mey = Weight x Xc ( Dist. from C.G )

CAT(P1) Area = 461.63 x -14.78 = -6823.26 kN.m


UAT(P2) Area = 491.35 x -2.51 = -1231.20 kN.m
GUT(P3) Area = 732.45 x 10.57 = 7741.44 kN.m
SUM = -313.02 kN

- Eccentric Moment due to Live Load ( Y-dir.)

*Mex = Weight x Yc ( Dist. from C.G )

CAT(P1) Area = 461.63 x -0.50 = -232.70 kN.m


UAT(P2) Area = 491.35 x -0.50 = -247.69 kN.m
GUT(P3) Area = 732.45 x 0.62 = 454.78 kN.m
SUM = -25.61 kN

Page 10 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

3.3 EARTH PRESSURE LOAD

- φ : Internal Friction Angle = 30.0 ˚


- Ko : Coefficient of Earth Pressure at Rest = 1 - SIN 30.0 ˚ = 0.50

q0 (Surcharge Load)
= 12.00 kN/m²

(H1)
2.00
0.40
0.20 (H4)

1) Surcharge Load, (Ps0)

Ps0 = Ko x q0 = 0.50 x 12.00 = 6.00 kN/m²

2) Not considering ground water, (Ps1)

Ps1 = Ko x γsat x H1 = 0.50 x 19.00 x 2.00 = 19.00 kN/m²

Page 11 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

3.4 WIND LOAD

Fw = (qz x G x Cf) x Af
where, - qz : velocity pressure at height 'Z'
= 0.613 x Kz x Kzt x Kd x V² x I (N/m²)
and, - V : basic wind speed = 42.00 m/sec
- I : important factor = 1.15 (for category III)
- Kd : wind directionality factor
*for solid sign = 0.90
*for Chimneys, Tanks, and Similar Structures
· Round = 0.95
· Square = 0.90
- Kzt : topographic factor
= (1 + K1 x K2 x K3)² = 1.00
- Kz : velocity pressure exposure coefficient (See 'ASCE 7-05 Table 6-3')
· The exposure category : D
- G : gust effect factor = 0.85
- Cf : force coefficient
*ASCE7-05 Figure 6-20 : Force coefficient, Cf (for Solid freestanding walls)
Clearance Aspect Ratio
Ratio ≤ 0.05 0.1 0.2 0.5 1.0 2.0 4.0 5.0 10.0 20.0 30.0 45.0 ≥
1.00 1.80 1.70 1.65 1.55 1.45 1.40 1.35 1.35 1.30 1.30 1.30 1.30
*ASCE7-05 Figure 6-21 : Force coefficient, Cf
(for Chimney, Tanks, Rooftop equipment & Similar Str.)
h/D 1 7 25 Cross Section & Type of Surface
0.7 0.8 0.9 Round Rough (D'/D=0.02)
Cf
1.3 1.4 2.0 Square (wind normal to face)
where, h : height of equipment
D : diameter of equipment
- Af : surface area

1) Wind Load for Fire Wall 1

- X-Direction
*Aspect Ratio = 1.00 / 8.55 = 0.12 , ∴ Cf = 1.69
( h : height of wall = 8.55 m , w : width of wall = 1.00 m )

H ΔH qz Cf Af Hw Arm Mw
(m) (m) (kN/m²) (m²) (kN) (m) (kN·m)
0.00 ~ 4.60 4.60 1.15 1.69 4.60 7.62 2.30 17.54
4.60 ~ 6.10 1.50 1.21 1.69 1.50 2.61 5.35 13.95
6.10 ~ 7.60 1.50 1.25 1.69 1.50 2.70 6.85 18.52
7.60 ~ 8.55 0.95 1.30 1.69 0.95 1.77 8.08 14.32

Total 8.55 14.71 64.32


- Wind Force at Bottom of Wall Hw = 14.71 kN
- Wind Moment at Bottom of Wall Mw = 64.32 kN·m
- Wind Moment at Bottom of Foundation Mwf = 64.32 + ( 14.71 x 1.70 ) = 89.32 kN·m

Page 12 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

- Y-Direction
*Aspect Ratio = 12.65 / 8.55 = 1.48 , ∴ Cf = 1.43
( h : height of wall = 8.55 m , w : width of wall = 12.65 m )

H ΔH qz Cf Af Hw Arm Mw
(m) (m) (kN/m²) (m²) (kN) (m) (kN·m)
0.00 ~ 4.60 4.60 1.15 1.43 58.19 81.31 2.30 187.01
4.60 ~ 6.10 1.50 1.21 1.43 18.98 27.80 5.35 148.73
6.10 ~ 7.60 1.50 1.25 1.43 18.98 28.83 6.85 197.49
7.60 ~ 8.55 0.95 1.30 1.43 12.02 18.91 8.08 152.71

Total 108.16 156.85 685.93


- Wind Force at Top of Foundation Hw = 156.85 kN
- Wind Moment at Top of Foundation Mw = 685.93 kN·m
- Wind Moment at Bottom of Foundation Mwf = 685.93 + ( 156.85 x 1.70 ) = 952.58 kN·m

2) Wind Load for Fire Wall 2

- X-Direction
*Aspect Ratio = 23.70 / 11.80 = 2.01 , ∴ Cf = 1.40
( h : height of wall = 11.80 m , w : width of wall = 23.70 m )

H ΔH qz Cf Af Hw Arm Mw
(m) (m) (kN/m²) (m²) (kN) (m) (kN·m)
0.00 ~ 4.60 4.60 1.15 1.40 4.60 6.31 2.30 14.51
4.60 ~ 6.10 1.50 1.21 1.40 1.50 2.16 5.35 11.54
6.10 ~ 7.60 1.50 1.25 1.40 1.50 2.24 6.85 15.32
7.60 ~ 9.10 1.50 1.30 1.40 1.50 2.32 8.35 19.35
9.10 ~ 11.80 2.70 1.37 1.40 2.70 4.39 10.45 45.84

Total 11.80 17.41 106.56


- Wind Force at Bottom of Wall Hw = 17.41 kN
- Wind Moment at Bottom of Wall Mw = 106.56 kN·m
- Wind Moment at Bottom of Foundation Mwf = 106.56 + ( 17.41 x 1.70 ) = 136.15 kN·m

Page 13 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

3) Wind Load for CAT ( P1 )

- X-Direction
*h / D = 6.71 / 11.75 = 0.57 , ∴ Cf = 0.69
( h : height of equipment = 6.71 m , D : width of equipment = 11.75 m )

H ΔH qz Cf Af Hw Arm Mw
(m) (m) (kN/m²) (m²) (kN) (m) (kN·m)
0.00 ~ 4.60 4.60 1.15 0.69 4.60 3.12 2.30 7.18
4.60 ~ 6.10 1.50 1.21 0.69 1.50 1.07 5.35 5.71
6.10 ~ 6.71 0.61 1.25 0.69 0.61 0.45 6.41 2.88

Total 4.64 15.78


- Wind Force at Top of Pedestal Hw = 4.64 kN
- Wind Moment at Top of Pedestal Mw = 15.78 kN·m
- Wind Moment at Bottom of Pedestal Mwp = 15.78 + ( 4.64 x 1.30 ) = 21.81 kN·m
- Wind Moment at Bottom of Foundation Mwf = 15.78 + ( 4.64 x 1.70 ) = 23.67 kN·m

- Y-Direction
*h / D = 6.71 / 6.70 = 1.00 , ∴ Cf = 0.70
( h : height of equipment = 6.71 m , D : width of equipment = 6.70 m )

H ΔH qz Cf Af Hw Arm Mw
(m) (m) (kN/m²) (m²) (kN) (m) (kN·m)
0.00 ~ 4.60 4.60 1.15 0.70 4.60 3.16 2.30 7.26
4.60 ~ 6.10 1.50 1.21 0.70 1.50 1.08 5.35 5.77
6.10 ~ 6.71 0.61 1.25 0.70 0.61 0.45 6.41 2.91

Total 4.69 15.94


- Wind Force at Top of Pedestal Hw = 4.69 kN
- Wind Moment at Top of Pedestal Mw = 15.94 kN·m
- Wind Moment at Bottom of Pedestal Mwp = 15.94 + ( 4.69 x 1.30 ) = 22.04 kN·m
- Wind Moment at Bottom of Foundation Mwf = 15.94 + ( 4.69 x 1.70 ) = 23.91 kN·m

Page 14 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

4) Wind Load for UAT ( P2 )

- X-Direction
*h / D = 6.99 / 9.46 = 0.74 , ∴ Cf = 0.70
( h : height of equipment = 6.99 m , D : width of equipment = 9.46 m )

H ΔH qz Cf Af Hw Arm Mw
(m) (m) (kN/m²) (m²) (kN) (m) (kN·m)
0.00 ~ 4.60 4.60 1.15 0.70 4.60 3.14 2.30 7.21
4.60 ~ 6.10 1.50 1.21 0.70 1.50 1.07 5.35 5.74
6.10 ~ 6.99 0.89 1.25 0.70 0.89 0.66 6.55 4.32

Total 4.87 17.26


- Wind Force at Top of Pedestal Hw = 4.87 kN
- Wind Moment at Top of Pedestal Mw = 17.26 kN·m
- Wind Moment at Bottom of Pedestal Mwp = 17.26 + ( 4.87 x 1.30 ) = 23.59 kN·m
- Wind Moment at Bottom of Foundation Mwf = 17.26 + ( 4.87 x 1.70 ) = 25.54 kN·m

- Y-Direction
*h / D = 6.99 / 6.80 = 1.03 , ∴ Cf = 0.70
( h : height of equipment = 6.99 m , D : width of equipment = 6.80 m )

H ΔH qz Cf Af Hw Arm Mw
(m) (m) (kN/m²) (m²) (kN) (m) (kN·m)
0.00 ~ 4.60 4.60 1.15 0.70 4.60 3.16 2.30 7.26
4.60 ~ 6.10 1.50 1.21 0.70 1.50 1.08 5.35 5.78
6.10 ~ 6.99 0.89 1.25 0.70 0.89 0.66 6.55 4.35

Total 4.90 17.38


- Wind Force at Top of Pedestal Hw = 4.90 kN
- Wind Moment at Top of Pedestal Mw = 17.38 kN·m
- Wind Moment at Bottom of Pedestal Mwp = 17.38 + ( 4.90 x 1.30 ) = 23.76 kN·m
- Wind Moment at Bottom of Foundation Mwf = 17.38 + ( 4.90 x 1.70 ) = 25.72 kN·m

Page 15 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

5) Wind Load for GUT ( P3 )

- X-Direction
*h / D = 10.26 / 14.40 = 0.71 , ∴ Cf = 0.70
( h : height of equipment = 10.26 m , D : width of equipment = 14.40 m )

H ΔH qz Cf Af Hw Arm Mw
(m) (m) (kN/m²) (m²) (kN) (m) (kN·m)
0.00 ~ 4.60 4.60 1.15 0.70 4.60 3.13 2.30 7.21
4.60 ~ 6.10 1.50 1.21 0.70 1.50 1.07 5.35 5.73
6.10 ~ 7.60 1.50 1.25 0.70 1.50 1.11 6.85 7.61
7.60 ~ 9.10 1.50 1.30 0.70 1.50 1.15 8.35 9.61
9.10 ~ 10.26 1.16 1.37 0.70 1.16 0.94 9.68 9.06

Total 7.40 39.22


- Wind Force at Top of Pedestal Hw = 7.40 kN
- Wind Moment at Top of Pedestal Mw = 39.22 kN·m
- Wind Moment at Bottom of Pedestal Mwp = 39.22 + ( 7.40 x 2.00 ) = 54.02 kN·m
- Wind Moment at Bottom of Foundation Mwf = 39.22 + ( 7.40 x 2.45 ) = 57.36 kN·m

- Y-Direction
*h / D = 10.26 / 10.20 = 1.01 , ∴ Cf = 0.70
( h : height of equipment = 10.26 m , D : width of equipment = 10.20 m )

H ΔH qz Cf Af Hw Arm Mw
(m) (m) (kN/m²) (m²) (kN) (m) (kN·m)
0.00 ~ 4.60 4.60 1.15 0.70 4.60 3.16 2.30 7.26
4.60 ~ 6.10 1.50 1.21 0.70 1.50 1.08 5.35 5.77
6.10 ~ 7.60 1.50 1.25 0.70 1.50 1.12 6.85 7.66
7.60 ~ 9.10 1.50 1.30 0.70 1.50 1.16 8.35 9.68
9.10 ~ 10.26 1.16 1.37 0.70 1.16 0.94 9.68 9.12

Total 7.45 39.49


- Wind Force at Top of Pedestal Hw = 7.45 kN
- Wind Moment at Top of Pedestal Mw = 39.49 kN·m
- Wind Moment at Bottom of Pedestal Mwp = 39.49 + ( 7.45 x 2.00 ) = 54.40 kN·m
- Wind Moment at Bottom of Foundation Mwf = 39.49 + ( 7.45 x 2.45 ) = 57.76 kN·m

6) Load Summary

X-direction Y-direction
Load
Fx Mpy Mfy Fy Mpx Mfx
Case
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
Fire Wall 1 14.71 - 89.32 156.85 - -952.58
Fire Wall 2 17.41 - 136.15 - - -
CAT ( P1 ) 4.64 21.81 23.67 4.69 -22.04 -23.91
UAT ( P2 ) 4.87 23.59 25.54 4.90 -23.76 -25.72
GUT ( P3 ) 7.40 54.02 57.36 7.45 -54.40 -57.76
∑ 49.03 99.43 332.04 173.89 -100.20 -1059.96

Page 16 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

3.5 SEISMIC LOAD

- Seismic Zone : 2A ( Z = 0.15 )

- Soil Profile Type : Sd

- Importance Factor, I : 1.25

1) Seismic Load for CAT

- Base Shear Force


: V = { ( Cv x I ) / ( R x T ) } x W = 0.594 W
Vmax. = { ( 3 x Ca x I ) / R } x W = 0.237 W → Use Vs = 0.237 W
Vmin. = ( 0.11 x Ca x I ) x W = 0.030 W
where, Cv : Seismic coefficient = 0.32
Ca : Seismic coefficient = 0.22
R : Numerical coefficient representative = 2.90
T : Elastic fundamental period of the structure
· T = Ct x hn 3/4 = 0.232 sec
hn : height from base to highest level = 8.01 m
Ct : Numerical coefficient = 0.0488 (for all other building)

- Seismic Shear Force

Ve = 0.237 x W = 0.237 x 1617.00 = 383.34 kN

- Seismic Moment at Top of Pedestal

Me = 383.34 x 2/3 x 6.71 = 1714.81 kN.m

- Seismic Moment at Bottom of Pedestal

Mep = 383.34 x 1.30 + 1714.81 = 2213.15 kN.m

- Seismic Moment at Bottom of Foundation

Mef = 383.34 x 1.70 + 1714.81 = 2366.49 kN.m

Page 17 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

2) Seismic Load for UAT

- Base Shear Force


: V = { ( Cv x I ) / ( R x T ) } x W = 0.579 W
Vmax. = { ( 3 x Ca x I ) / R } x W = 0.237 W → Use Vs = 0.237 W
Vmin. = ( 0.11 x Ca x I ) x W = 0.030 W
where, Cv : Seismic coefficient = 0.32
Ca : Seismic coefficient = 0.22
R : Numerical coefficient representative = 2.90
T : Elastic fundamental period of the structure
· T = Ct x hn 3/4 = 0.238 sec
hn : height from base to highest level = 8.29 m
Ct : Numerical coefficient = 0.0488 (for all other building)

- Seismic Shear Force

Ve = 0.237 x W = 0.237 x 1940.40 = 460.01 kN

- Seismic Moment at Top of Pedestal

Me = 460.01 x 2/3 x 6.99 = 2143.64 kN.m

- Seismic Moment at Bottom of Pedestal

Mep = 460.01 x 1.30 + 2143.64 = 2741.65 kN.m

- Seismic Moment at Bottom of Foundation

Mef = 460.01 x 1.70 + 2143.64 = 2925.65 kN.m

Page 18 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

3) Seismic Load for GUT

- Base Shear Force


: V = { ( Cv x I ) / ( R x T ) } x W = 0.431 W
Vmax. = { ( 3 x Ca x I ) / R } x W = 0.237 W → Use Vs = 0.237 W
Vmin. = ( 0.11 x Ca x I ) x W = 0.030 W
where, Cv : Seismic coefficient = 0.32
Ca : Seismic coefficient = 0.22
R : Numerical coefficient representative = 2.90
T : Elastic fundamental period of the structure
· T = Ct x hn 3/4 = 0.32 sec
hn : height from base to highest level = 12.26 m
Ct : Numerical coefficient = 0.0488 (for all other building)

- Seismic Shear Force

Ve = 0.237 x W = 0.237 x 6419.00 = 1521.75 kN

- Seismic Moment at Top of Pedestal

Me = 1521.75 x 2/3 x 10.26 = 10408.74 kN.m

- Seismic Moment at Bottom of Pedestal

Mep = 1521.75 x 2.00 + 10408.74 = 13452.23 kN.m

- Seismic Moment at Bottom of Foundation

Mef = 1521.75 x 2.45 + 10408.74 = 14137.02 kN.m

4) Load Summary

X-direction Y-direction
Load
Fx Mpy Mfy Fy Mpx Mfx
Case
(kN) (kN.m) (kN.m) (kN) (kN.m) (kN.m)
CAT ( P1 ) 383.34 2213.15 2366.49 383.34 -2213.15 -2366.49
UAT ( P2 ) 460.01 2741.65 2925.65 460.01 -2741.65 -2925.65
GUT ( P3 ) 1521.75 13452.23 14137.02 1521.75 -13452.23 -14137.02
∑ 2365.09 18407.04 19429.16 2365.09 -18407.04 -19429.16

Page 19 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

4. LOAD COMBINATION

※ Legend

- DL : Dead Load
- EL : Equipment Load
- LL : Live Load
- WLX : Wind Load in X-direction
- WLY : Wind Load in Y-direction
- SLX : Seismic Load in X-direction
- SLY : Seismic Load in Y-direction
- H : Earth Pressure Laod

4.1 LOAD COMBINATIONS FOR STABILITY CHECK

Load
Load Factor Remark
Comb.
L/C-1 1.00 DL + 1.00 EL + 1.00 LL + 1.00 H Normal Operation
L/C-2 1.00 DL + 1.00 EL + 1.00 WLX + 1.00 H Empty with Wind X-direction
L/C-3 1.00 DL + 1.00 EL - 1.00 WLX + 1.00 H Empty with Wind -X-direction
L/C-4 1.00 DL + 1.00 EL + 1.00 WLY + 1.00 H Empty with Wind Y-direction
L/C-5 1.00 DL + 1.00 EL - 1.00 WLY + 1.00 H Empty with Wind -Y-direction
L/C-6 1.00 DL + 1.00 EL + 0.70 SLX + 1.00 H Empty with Seismic X-direction
L/C-7 1.00 DL + 1.00 EL - 0.70 SLX + 1.00 H Empty with Seismic -X-direction
L/C-8 1.00 DL + 1.00 EL + 0.70 SLY + 1.00 H Empty with Seismic Y-direction
L/C-9 1.00 DL + 1.00 EL - 0.70 SLY + 1.00 H Empty with Seismic -Y-direction
L/C-10 1.00 DL + 1.00 EL + 0.75 LL + 0.75 WLX + 1.00 H Operation with Wind X-direction
L/C-11 1.00 DL + 1.00 EL + 0.75 LL - 0.75 WLX + 1.00 H Operation with Wind -X-direction
L/C-12 1.00 DL + 1.00 EL + 0.75 LL + 0.75 WLY + 1.00 H Operation with Wind Y-direction
L/C-13 1.00 DL + 1.00 EL + 0.75 LL - 0.75 WLY + 1.00 H Operation with Wind -Y-direction
L/C-14 1.00 DL + 1.00 EL + 0.75 LL + 0.53 SLX + 1.00 H Operation with Seismic X-direction
L/C-15 1.00 DL + 1.00 EL + 0.75 LL - 0.53 SLX + 1.00 H Operation with Seismic -X-direction
L/C-16 1.00 DL + 1.00 EL + 0.75 LL + 0.53 SLY + 1.00 H Operation with Seismic Y-direction
L/C-17 1.00 DL + 1.00 EL + 0.75 LL - 0.53 SLY + 1.00 H Operation with Seismic -Y-direction

Page 20 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

4.2 LOAD COMBINATIONS FOR MEMBER DESIGN

Load
Load Factor Remark
Comb.
L/C-U1 1.20 DL + 1.20 EL + 1.60 LL + 1.60 H Normal Operation
L/C-U2 0.90 DL + 0.90 EL + 1.60 WLX + 1.60 H Empty with Wind X-direction
L/C-U3 0.90 DL + 0.90 EL - 1.60 WLX + 1.60 H Empty with Wind -X-direction
L/C-U4 0.90 DL + 0.90 EL + 1.60 WLY + 1.60 H Empty with Wind Y-direction
L/C-U5 0.90 DL + 0.90 EL - 1.60 WLY + 1.60 H Empty with Wind -Y-direction
L/C-U6 0.90 DL + 0.90 EL + 1.00 SLX + 1.60 H Empty with Seismic X-direction
L/C-U7 0.90 DL + 0.90 EL - 1.00 SLX + 1.60 H Empty with Seismic -X-direction
L/C-U8 0.90 DL + 0.90 EL + 1.00 SLY + 1.60 H Empty with Seismic Y-direction
L/C-U9 0.90 DL + 0.90 EL - 1.00 SLY + 1.60 H Empty with Seismic -Y-direction
L/C-U10 1.20 DL + 1.20 EL + 1.00 LL + 1.60 WLX + 1.60 H Operation with Wind X-direction
L/C-U11 1.20 DL + 1.20 EL + 1.00 LL - 1.60 WLX + 1.60 H Operation with Wind -X-direction
L/C-U12 1.20 DL + 1.20 EL + 1.00 LL + 1.60 WLY + 1.60 H Operation with Wind Y-direction
L/C-U13 1.20 DL + 1.20 EL + 1.00 LL - 1.60 WLY + 1.60 H Operation with Wind -Y-direction
L/C-U14 1.20 DL + 1.20 EL + 1.00 LL + 1.00 SLX + 1.60 H Operation with Seismic X-direction
L/C-U15 1.20 DL + 1.20 EL + 1.00 LL - 1.00 SLX + 1.60 H Operation with Seismic -X-direction
L/C-U16 1.20 DL + 1.20 EL + 1.00 LL + 1.00 SLY + 1.60 H Operation with Seismic Y-direction
L/C-U17 1.20 DL + 1.20 EL + 1.00 LL - 1.00 SLY + 1.60 H Operation with Seismic -Y-direction
L/C-U18 1.40 DL + 1.40 EL + 1.60 H Test Only

5. STABILITY CHECK

5.1 DESIGN LOAD FOR STABILITY CHECK

Horizontal Vertical Moment at Bottom of FDN Eccentric Moment


Load
Fx Fy Fz Mfx Mfy Mex Mey
Case
(kN) (kN) (kN) (kN.m) (kN.m) (kN.m) (kN.m)
DL - - 38875.11 - - 2334.14 105980.48
EL - - 9976.40 - - 6676.05 33531.81
LL - - 1685.43 - - -25.61 -313.02
WLX 49.03 - - - 332.04 - -
WLY - 173.89 - -1059.96 - - -
SLX 2365.09 - - - 19429.16 - -
SLY - 2365.09 - -19429.16 - - -
H - - - - - - -

Page 21 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

5.2 CALCULATION OF COMBINED LOAD

Horizontal Vertical Moment at Bottom of FDN Eccentric Moment


Load
∑Fx ∑Fy ∑Fz ∑Mfx ∑Mfy ∑Mex ∑Mey
Comb.
(kN) (kN) (kN) (kN.m) (kN.m) (kN.m) (kN.m)
L/C-1 - - 50536.95 - - 8984.58 139199.28
L/C-2 49.03 - 48851.51 - 332.04 9010.19 139512.30
L/C-3 -49.03 - 48851.51 - -332.04 9010.19 139512.30
L/C-4 - 173.89 48851.51 -1059.96 - 9010.19 139512.30
L/C-5 - -173.89 48851.51 1059.96 - 9010.19 139512.30
L/C-6 1655.57 - 48851.51 - 13600.41 9010.19 139512.30
L/C-7 -1655.57 - 48851.51 - -13600.41 9010.19 139512.30
L/C-8 - 1655.57 48851.51 -13600.41 - 9010.19 139512.30
L/C-9 - -1655.57 48851.51 13600.41 - 9010.19 139512.30
L/C-10 36.77 - 50115.59 - 249.03 8990.99 139277.53
L/C-11 -36.77 - 50115.59 - -249.03 8990.99 139277.53
L/C-12 - 130.42 50115.59 -794.97 - 8990.99 139277.53
L/C-13 - -130.42 50115.59 794.97 - 8990.99 139277.53
L/C-14 1241.67 - 50115.59 - 10200.31 8990.99 139277.53
L/C-15 -1241.67 - 50115.59 - -10200.31 8990.99 139277.53
L/C-16 - 1241.67 50115.59 -10200.31 - 8990.99 139277.53
L/C-17 - -1241.67 50115.59 10200.31 - 8990.99 139277.53

Page 22 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

5.3 CHECK OF SOIL BEARING CAPACITY

1) Allowable Soil Bearing Capacity

- Qa = 150.00 kN/m²

2) Supported Area & Minimum Section Modulus

- A = 727.27 m²
- Zx = 1958.38 m³
- Zy = 4375.37 m³

4) Soil Bearing Capacity Check

- Qmax./min. = ∑Fz / A ± ∑Mtfx / Zx ± ∑Mtfy / Zy

*In short-term case, increasing factor of allowable stress = 33 %


Load ∑Fz ∑Mtfx ∑Mtfy Qmax. Qmin. Qa
Check
Comb. (kN) (kN.m) (kN.m) (kN/m²) (kN/m²) (kN/m²)
L/C-1 50536.95 8984.58 139199.28 105.89 33.09 150.00 O.K !
L/C-2 48851.51 9010.19 139844.34 103.73 30.61 199.50 O.K !
L/C-3 48851.51 9010.19 139180.26 103.58 30.76 199.50 O.K !
L/C-4 48851.51 7950.23 139512.30 103.12 31.23 199.50 O.K !
L/C-5 48851.51 10070.15 139512.30 104.20 30.14 199.50 O.K !
L/C-6 48851.51 9010.19 153112.71 106.77 27.58 199.50 O.K !
L/C-7 48851.51 9010.19 125911.88 100.55 33.79 199.50 O.K !
L/C-8 48851.51 -4590.22 139512.30 101.40 32.94 199.50 O.K !
L/C-9 48851.51 22610.60 139512.30 110.60 23.74 199.50 O.K !
L/C-10 50115.59 8990.99 139526.56 105.39 32.43 199.50 O.K !
L/C-11 50115.59 8990.99 139028.50 105.28 32.54 199.50 O.K !
L/C-12 50115.59 8196.01 139277.53 104.93 32.89 199.50 O.K !
L/C-13 50115.59 9785.96 139277.53 105.74 32.08 199.50 O.K !
L/C-14 50115.59 8990.99 149477.84 107.66 30.15 199.50 O.K !
L/C-15 50115.59 8990.99 129077.22 103.00 34.82 199.50 O.K !
L/C-16 50115.59 -1209.32 139277.53 101.36 36.46 199.50 O.K !
L/C-17 50115.59 19191.29 139277.53 110.54 27.28 199.50 O.K !
where, Mtf = Mf + Me

Page 23 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

5.4 SLIDING CHECK

- Sliding Force : Hsx = ∑Fx , Hsy = ∑Fy


- Resistance Force : Hr = μ x ∑Fz
- Friction Coefficien : μ = 0.40 (Soil to Concrete)
- S.F (Safety Factor) : 2.00

Load ∑Fz Hr Hsx Hsy Ratio


S.F Check
Comb. (kN) (kN) (kN) (kN) Hr/Hsx Hr/Hsy
L/C-1 50536.95 20214.78 - - ∞ ∞ 2.00 O.K !
L/C-2 48851.51 19540.61 49.03 - 398.58 ∞ 2.00 O.K !
L/C-3 48851.51 19540.61 -49.03 - 398.58 ∞ 2.00 O.K !
L/C-4 48851.51 19540.61 - 173.89 ∞ 112.37 2.00 O.K !
L/C-5 48851.51 19540.61 - -173.89 ∞ 112.37 2.00 O.K !
L/C-6 48851.51 19540.61 1655.57 - 11.80 ∞ 2.00 O.K !
L/C-7 48851.51 19540.61 -1655.57 - 11.80 ∞ 2.00 O.K !
L/C-8 48851.51 19540.61 - 1655.57 ∞ 11.80 2.00 O.K !
L/C-9 48851.51 19540.61 - -1655.57 ∞ 11.80 2.00 O.K !
L/C-10 50115.59 20046.24 36.77 - 545.19 ∞ 2.00 O.K !
L/C-11 50115.59 20046.24 -36.77 - 545.19 ∞ 2.00 O.K !
L/C-12 50115.59 20046.24 - 130.42 ∞ 153.70 2.00 O.K !
L/C-13 50115.59 20046.24 - -130.42 ∞ 153.70 2.00 O.K !
L/C-14 50115.59 20046.24 1241.67 - 16.14 ∞ 2.00 O.K !
L/C-15 50115.59 20046.24 -1241.67 - 16.14 ∞ 2.00 O.K !
L/C-16 50115.59 20046.24 - 1241.67 ∞ 16.14 2.00 O.K !
L/C-17 50115.59 20046.24 - -1241.67 ∞ 16.14 2.00 O.K !

Page 24 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

5.5 OVERTURNING CHECK

- Overturning Moment : Mox = ∑Mtfx , Moy = ∑Mtfy


- Resistance Moment : Mrx = ∑Fz x Cy , Mry = ∑Fz x Cx
- C.G of Foundation : Cx = 20.86 m , Cy = 12.47 m
- S.F (Safety Factor) : 2.00

Load Mrx Mrx Mox Moy Ratio


S.F Check
Comb. (kN.m) (kN.m) (kN.m) (kN.m) Mrx/Mox Mry/Moy
L/C-1 630241.62 1053986.29 8984.58 139199.28 70.15 7.57 2.00 O.K !
L/C-2 609222.76 1018835.35 9010.19 139844.34 67.61 7.29 2.00 O.K !
L/C-3 609222.76 1018835.35 9010.19 139180.26 67.61 7.32 2.00 O.K !
L/C-4 609222.76 1018835.35 7950.23 139512.30 76.63 7.30 2.00 O.K !
L/C-5 609222.76 1018835.35 10070.15 139512.30 60.50 7.30 2.00 O.K !
L/C-6 609222.76 1018835.35 9010.19 153112.71 67.61 6.65 2.00 O.K !
L/C-7 609222.76 1018835.35 9010.19 125911.88 67.61 8.09 2.00 O.K !
L/C-8 609222.76 1018835.35 -4590.22 139512.30 132.72 7.30 2.00 O.K !
L/C-9 609222.76 1018835.35 22610.60 139512.30 26.94 7.30 2.00 O.K !
L/C-10 624986.91 1045198.55 8990.99 139526.56 69.51 7.49 2.00 O.K !
L/C-11 624986.91 1045198.55 8990.99 139028.50 69.51 7.52 2.00 O.K !
L/C-12 624986.91 1045198.55 8196.01 139277.53 76.25 7.50 2.00 O.K !
L/C-13 624986.91 1045198.55 9785.96 139277.53 63.87 7.50 2.00 O.K !
L/C-14 624986.91 1045198.55 8990.99 149477.84 69.51 6.99 2.00 O.K !
L/C-15 624986.91 1045198.55 8990.99 129077.22 69.51 8.10 2.00 O.K !
L/C-16 624986.91 1045198.55 -1209.32 139277.53 516.81 7.50 2.00 O.K !
L/C-17 624986.91 1045198.55 19191.29 139277.53 32.57 7.50 2.00 O.K !

Page 25 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

6. STRUCTURE ANALYSIS

6.1 3D SHELL MODELING

2) Property of Section

Thickness
Section Element Material Remark
(m)
Dike 1 Shell 0.25 Concrete
Dike 2 Shell 0.45 Concrete
Fire Wall 1 Shell 0.25 Concrete
Fire Wall 2 Shell 0.30 Concrete
Bottom Slab 1 Shell 0.40 Concrete
Bottom Slab 2 Shell 0.45 Concrete

6.2 CALCULATION OF SPRING CONSTANT

Ks = 40 x F.S x qa = 40 x 3 x 150.00 = 18000.00 kN/m³

Where, - F.S : Factor of safety = 3


- Qu : Allowable soil bearing capacity = 150.00 kN/m²

Page 26 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

6.3 CALCULATION OF INPUT LOAD & LOAD DISTRIBUTION

1) Dead Load, D

- Bottom Slab & Dike & Fire Wall weight is inputted by program selfweight function automatically.

- Pedestal Weight & Equipment Weight, Wd

*Wd = Hp x γc + E / Ap
Wd1 = 1.30 x 25.00 + 1617.00 / 16.20 = 132.31 kN/m²
Wd2 = 1.30 x 25.00 + 1940.40 / 18.56 = 137.05 kN/m²
Wd4 = 1.30 x 25.00 = 32.50 kN/m² (Apply to P4 Area)
Wd5 = 1.30 x 25.00 = 32.50 kN/m² (Apply to P5 Area)
*Wd = Hp x γc
Wd3 = 2.00 x 25.00 = 50.00 kN/m²
*Wd = E / Lp
Wd3 = 6105.40 / 56.08 = 108.87 kN/m
Wd3 = 313.60 / 17.10 = 18.34 kN/m
*SAP Modeling Input Loading

Page 27 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

- Fluid Weight & Gravel + Grating + H-beam

*Ws = Hw x γw + ∑H(Gravel+Grating+H-beam) x ∑γ(Gravel+Grating+H-beam)


Ws1 = 0.97 x 10.00 + 11.50 = 21.18 kN/m²
Ws2 = 0.97 x 10.00 + 11.50 = 21.18 kN/m²
Ws3 = 1.67 x 10.00 + 11.50 = 28.18 kN/m²

2) Live Load, L

- Distribution Load = 2.50 kN/m² (Concrete slab - Non-traffic Area )


- Distribution Area
A1 (CAT Area) = 11.90 x 16.35 = 194.57 m²
A2 (UAT Area) = 12.40 x 15.85 = 196.54 m²
A3 (GUT Area) = 12.85 x 23.70 = 304.55 m²
- Total Live load
Lt1 (CAT Area) = 2.50 x 194.57 = 486.41 kN
Lt2 (UAT Area) = 2.50 x 196.54 = 491.35 kN
Lt3 (GUT Area) = 2.50 x 304.55 = 761.36 kN
- Applied Live Load
L1 (CAT Area) = 194.57 / 70 ea = 2.78 kN/node
L2 (UAT Area) = 196.54 / 68 ea = 2.89 kN/node
L3 (GUT Area) = 304.55 / 90 ea = 3.38 kN/node

Z
L1 L1+L2 L2+L3 L3

Ws1 Wd1 Ws1 Wd2 Wd2 Wd2

Wd3 Wd3 Wd3

Page 28 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

3) Earth Pressure Load, H

(1) Surcharge Load, (Ps0) (2) Not considering ground water, (Ps1)

6.00 kN/m² 19.00 kN/m²

4) Wind Load, W

(1) Wind Load at Fire Wall 1

- for X-direction
·Pf = ∑Hw / ∑Af = 14.71 / 8.55 = 1.72 kN/m²

- for Y-direction
·Pf = ∑Hw / ∑Af = 156.85 / 108.16 = 1.45 kN/m²

X Y
kN/m²

kN/m²
Fire Wall 1

Fire Wall 1

Z Z
1.45

1.72

(2) Wind Load at Fire Wall 2

- for X-direction
·Pf = ∑Hw / ∑Af = 17.41 / 11.80 = 1.48 kN/m²

X
kN/m²

Fire Wall 2

Z
1.48

Page 29 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

(3) Wind Load at P1

- for X-direction

* Working Moment at Bottom of foundation, (Mfy) = 23.67 kN·m


* Modulus of section, (Zy) = 6.00 x 2.70 ² / 6 = 7.29 m3

· Qmax & Qmin = My / Zy = 23.67 / 7.29 = ± 3.25 kN/m²

- for Y-direction

* Working Moment at Bottom of foundation, (Mfx) =


23.91 kN·m
* Modulus of section, (Zx) = 2.70 x 6.00 ² / 6 = 16.20 m3

· Qmax & Qmin = Mx / Zx = 23.91 / 16.20 = ± 1.48 kN/m²

(4) Wind Load at P2

- for X-direction

* Working Moment at Bottom of foundation, (Mfy) =


25.54 kN·m
* Modulus of section, (Zy) = 6.40 x 2.90 ² / 6 = 8.97 m3

· Qmax & Qmin = My / Zy = 25.54 / 8.97 = ± 2.85 kN/m²

- for Y-direction

* Working Moment at Bottom of foundation, (Mfx) = 25.72 kN·m


* Modulus of section, (Zx) = 2.90 x 6.40 ² / 6 = 19.80 m3

· Qmax & Qmin = Mx / Zx = 25.72 / 19.80 = ± 1.30 kN/m²

(5) Wind Load at P3

- for X-direction

* Working Moment at Bottom of foundation, (Mfy) = 57.36 kN·m


* Modulus of section, (Zy) = 14.74 x 6.65 ² / 6 = 108.64 m3

· Qmax & Qmin = My / Zy = 57.36 / 108.64 = ± 0.53 kN/m²

- for Y-direction

* Working Moment at Bottom of foundation, (Mfx) =57.76 kN·m


* Modulus of section, (Zx) = 6.65 x 14.74 ² / 6 = 240.80 m3

· Qmax & Qmin = Mx / Zx = 57.76 / 240.80 = ± 0.24 kN/m²

Page 30 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

5) Seismic Load, (E)

(1) Seismic Load at P1

- for X-direction

* Working Moment at Bottom of foundation, (Mfy) = 2366.49 kN·m


* Modulus of section, (Zy) = 6.00 x 2.70 ² / 6 = 7.29 m3

· Qmax & Qmin = My / Zy = 2366.49 / 7.29 = ± 324.62 kN/m²

- for Y-direction

* Working Moment at Bottom of foundation, (Mfx) = 2366.49 kN·m


* Modulus of section, (Zx) = 2.70 x 6.00 ² / 6 = 16.20 m3

· Qmax & Qmin = Mx / Zx = 2366.49 / 16.20 = ± 146.08 kN/m²

(2) Seismic Load at P2

- for X-direction

* Working Moment at Bottom of foundation, (Mfy) = 2925.65 kN·m


* Modulus of section, (Zy) = 6.40 x 2.90 ² / 6 = 8.97 m3

· Qmax & Qmin = My / Zy = 2925.65 / 8.97 = ± 326.14 kN/m²

- for Y-direction

* Working Moment at Bottom of foundation, (Mfx) = 2925.65 kN·m


* Modulus of section, (Zx) = 2.90 x 6.40 ² / 6 = 19.80 m3

· Qmax & Qmin = Mx / Zx = 2925.65 / 19.80 = ± 147.78 kN/m²

(3) Seismic Load at P3

- for X-direction

* Working Moment at Bottom of foundation, (Mfy) = 14137.02 kN·m


* Modulus of section, (Zy) = 14.74 x 6.65 ² / 6 = 108.64 m3

· Qmax & Qmin = My / Zy = 14137.02 / 108.64 = ± 130.13 kN/m²

- for Y-direction

* Working Moment at Bottom of foundation, (Mfx) = 14137.02 kN·m


* Modulus of section, (Zx) = 6.65 x 14.74 ² / 6 = 240.80 m3

· Qmax & Qmin = Mx / Zx = 14137.02 / 240.80 = ± 58.71 kN/m²

Page 31 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

7. MEMBER DESIGN

7.1 RESULT OF ANALYSIS (MEMBER FORCE)

1) Dike 1

(1) Shear Force Diagram

Max. Shear Force


Section / Case Remark
V13 (Hori.-Dir.) V23 (Vert.-Dir.)
Positive Value 59.00 kN 73.00 kN
Dike 1
Negative Value 61.00 kN 78.00 kN

Page 32 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

(2) Moment Diagram for Strength Design

Max. Bending Moment


Section / Case Remark
M11 (Hori.-Dir.) M22 (Vert.-Dir.)
Positive Value 80.00 kN 130.00 kN
Dike 1
Negative Value 70.00 kN 120.00 kN

Page 33 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

(3) Moment Diagram for Crack Check

Max. Bending Moment


Section / Case Remark
M11 (Hori.-Dir.) M22 (Vert.-Dir.)
Positive Value 56.00 kN 85.00 kN
Dike 1
Negative Value 44.00 kN 70.00 kN

Page 34 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

2) Dike 2

(1) Shear Force Diagram

Max. Shear Force


Section / Case Remark
V13 (Hori.-Dir.) V23 (Vert.-Dir.)
Positive Value 95.00 kN 101.00 kN
Dike 2
Negative Value 99.00 kN 119.00 kN

Page 35 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

(2) Moment Diagram for Strength Design

Max. Bending Moment


Section / Case Remark
M11 (Hori.-Dir.) M22 (Vert.-Dir.)
Positive Value 150.00 kN 220.00 kN
Dike 2
Negative Value 120.00 kN 210.00 kN

Page 36 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

(3) Moment Diagram for Crack Check

Max. Bending Moment


Section / Case Remark
M11 (Hori.-Dir.) M22 (Vert.-Dir.)
Positive Value 100.00 kN 150.00 kN
Dike 2
Negative Value 79.00 kN 130.00 kN

Page 37 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

3) Fire Wall 1

(1) Shear Force Diagram

Max. Shear Force


Section / Case Remark
V13 (Hori.-Dir.) V23 (Vert.-Dir.)
Positive Value 39.00 kN 36.00 kN
Fire Wall 1
Negative Value 39.00 kN 36.00 kN

Page 38 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

(2) Moment Diagram for Strength Design

Max. Bending Moment


Section / Case Remark
M11 (Hori.-Dir.) M22 (Vert.-Dir.)
Positive Value 68.00 kN 83.00 kN
Section / Case
Negative Value 69.00 kN 83.00 kN

Page 39 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

(3) Moment Diagram for Crack Check

Max. Bending Moment


Section / Case Remark
M11 (Hori.-Dir.) M22 (Vert.-Dir.)
Positive Value 42.00 kN 52.00 kN
Section / Case
Negative Value 52.00 kN 52.00 kN

Page 40 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

4) Fire Wall 2

(1) Shear Force Diagram

Max. Shear Force


Section / Case Remark
V13 (Hori.-Dir.) V23 (Vert.-Dir.)
Positive Value 95.00 kN 101.00 kN
Fire Wall 2
Negative Value 99.00 kN 119.00 kN

Page 41 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

(2) Moment Diagram for Strength Design

Critcal Area Critcal Area

Critcal Area
Critcal Area

*Normal Area
Max. Bending Moment
Section / Case Remark
M11 (Hori.-Dir.) M22 (Vert.-Dir.)
Positive Value 85.00 kN 140.00 kN
Fire Wall 2
Negative Value 76.00 kN 130.00 kN
* Critical Area
Max. Bending Moment
Section / Case Remark
M11 (Hori.-Dir.) M22 (Vert.-Dir.)
Positive Value 112.00 kN 210.00 kN
Fire Wall 2
Negative Value 127.00 kN 230.00 kN

Page 42 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

(3) Moment Diagram for Crack Check

Critcal Area Critcal Area

Critcal Area Critcal Area

*Normal Area
Max. Bending Moment
Section / Case Remark
M11 (Hori.-Dir.) M22 (Vert.-Dir.)
Positive Value 50.00 kN 85.00 kN
Fire Wall 2
Negative Value 44.00 kN 85.00 kN
* Critical Area
Max. Bending Moment
Section / Case Remark
M11 (Hori.-Dir.) M22 (Vert.-Dir.)
Positive Value 85.00 kN 130.00 kN
Fire Wall 2
Negative Value 50.00 kN 120.00 kN

Page 43 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

5) Bottom Slab 1

(1) Shear Force Diagram

Max. Shear Force


Section / Case Remark
V13 (X-Dir.) V23 (Y-Dir.)
Positive Value 124.00 kN 94.00 kN
Bottom Slab 1
Negative Value 119.00 kN 145.00 kN

Page 44 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

(2) Moment Diagram for Strength Design

Max. Bending Moment


Section / Case Remark
M11 (X-Dir.) M22 (Y-Dir.)
Positive Value 89.00 kN 65.00 kN
Bottom Slab 1
Negative Value 142.00 kN 76.00 kN

Page 45 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

(3) Moment Diagram for Crack Check

Max. Bending Moment


Section / Case Remark
M11 (X-Dir.) M22 (Y-Dir.)
Positive Value 65.00 kN 51.00 kN
Bottom Slab 1
Negative Value 105.00 kN 58.00 kN

Page 46 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

6) Bottom Slab 2

(1) Shear Force Diagram

Max. Shear Force


Section / Case Remark
V13 (X-Dir.) V23 (Y-Dir.)
Positive Value 145.00 kN 102.00 kN
Bottom Slab 2
Negative Value 118.00 kN 117.00 kN

Page 47 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

(2) Moment Diagram for Strength Design

Max. Bending Moment


Section / Case Remark
M11 (X-Dir.) M22 (Y-Dir.)
Positive Value 244.00 kN 112.00 kN
Bottom Slab 2
Negative Value 127.00 kN 126.00 kN

Page 48 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

(3) Moment Diagram for Crack Check

Max. Bending Moment


Section / Case Remark
M11 (X-Dir.) M22 (Y-Dir.)
Positive Value 177.00 kN 80.00 kN
Bottom Slab 2
Negative Value 79.00 kN 77.00 kN

Page 49 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

7) P3

(1) Shear Force Diagram

Max. Shear Force


Section / Case Remark
V13 (X-Dir.) V23 (Y-Dir.)
Positive Value 130.00 kN 102.00 kN
P3
Negative Value 128.00 kN 122.00 kN

Page 50 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

(2) Moment Diagram for Strength Design

Max. Bending Moment


Section / Case Remark
M11 (X-Dir.) M22 (Y-Dir.)
Positive Value 185.00 kN 54.00 kN
P3
Negative Value 283.00 kN 132.00 kN

Page 51 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

(3) Moment Diagram for Crack Check

Max. Bending Moment


Section / Case Remark
M11 (X-Dir.) M22 (Y-Dir.)
Positive Value 142.00 kN 48.00 kN
P3
Negative Value 173.00 kN 92.00 kN

Page 52 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

8) Summary of Member Force Result

For Strength Design For Serviceability


Shear force Bending Moment Bending Moment
Location
V13 V23 M11 M22 M11 M22
(kN) (kN) (kN.m) (kN.m) (kN.m) (kN.m)
Inner 59.00 61.00 80.00 130.00 56.00 85.00
Dike 1
Outer 73.00 78.00 70.00 120.00 44.00 70.00
Inner 95.00 101.00 150.00 220.00 100.00 150.00
Dike 2
Outer 99.00 119.00 120.00 210.00 79.00 130.00
Inner 39.00 36.00 68.00 83.00 42.00 52.00
Fire Wall 1
Outer 39.00 36.00 69.00 83.00 52.00 52.00
Fire Wall 2 Inner 95.00 101.00 85.00 140.00 50.00 85.00
(Normal Area) Outer 99.00 119.00 76.00 130.00 44.00 85.00
Fire Wall 2 Inner 95.00 101.00 112.00 210.00 85.00 130.00
(Critical Area) Outer 99.00 119.00 127.00 230.00 50.00 120.00
Top 124.00 94.00 89.00 65.00 65.00 51.00
Bottom Slab 1
Bottom 119.00 145.00 142.00 76.00 105.00 58.00
Top 145.00 102.00 244.00 112.00 177.00 80.00
Bottom Slab 2
Bottom 118.00 117.00 127.00 126.00 79.00 77.00
Top 130.00 102.00 185.00 54.00 142.00 48.00
P3
Bottom 128.00 122.00 283.00 132.00 173.00 92.00

Page 53 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

7.2 MEMBER CHECK

7.2.1 MEMBER DESIGN FOR DIKE 1

1) Dike 1 : Horizontal Re-bar

Mu Mo Vu f'c fy φ φ h b d cover
(kN.m) (kN) (kN) (MPa) (MPa) (Shear) (Bending) (mm) (mm) (mm) (mm)
80.00 56.00 78.00 37.5 420 0.75 0.90 250 1000 175 75
where, Mu : factored bending moment
Mo : non-factored bending moment
Vu : factored shear force
f'c : compressive strength of concrete
fy : yield strength of reinforcing bar
φ : strength reduction factor

- Rebar Check

Mu 80.00 x 10 6
Required Rn = = = 2.90 MPa
Φb x b x d 2
0.90 x 1000 x 175 2
0.85 x fck 2 x Rn
ρ= x 1 - 1 -
fy 0.85 x fck
0.85 x 38 2 x 2.90
= x 1 - 1 - = 0.0073
420 0.85 x 38
As(req.) = ρ x b x d
= 0.0073 x 1000 x 175 = 1271 mm²
As(temp.) = 0.0018 x b x h / 2
= 0.0018 x 1000 x 250 / 2 = 225 mm²
As(min.1) = 1.4 / fy x b x d
= 1.4 / 420 x 1000 x 175 = 583 mm²
As(min.2) = 0.25 x √fck / fy x b x d
= 0.25 x √ 38 / 420 x 1000 x 175 = 638 mm²
4/3 As(req.) = 4 / 3 x 1271 = 1695 mm²
Selected As = Max[As(req.) , As(temp.) , Min{4/3As(req.) , Max(As(min.1) , As(min.2))}] = 1271 mm²

∴ USE : D 20 @ 150 ( As = 2095 mm² ) ∴ O.K

- Beam Shear Check

ΦVc = Φs x 1/6 x √fck x b x d


= 0.75 x 1/6 x √ 38 x 1000 x 175
= 133.96 kN > Vu = 78.00 kN ∴ O.K

Page 54 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

- Crack Check

ㆍCalculated stress in reinforcement at service load

fs = Mo / ( As x j x d )
= 56.00 x 10 6 / ( 2094.67 x 0.889 x 175 ) = 171.85 MPa

where, n = Es / Ec = 200000 / 28782 = 7


ρ = As / ( b x d ) = 2095 / ( 1000 x 175 ) = 0.012
k = - n x ρ + ( n x ρ ) 2 +2 x n x ρ
= - 7 x 0.012 + ( 7 x 0.012 ) 2 + 2 x 7 x 0.012 = 0.3331
j = 1 - k / 3 = 1 - 0.3331 / 3 = 0.889

ㆍCreak width check

ω = 0.076 x βc x fs x ( dc x A ) 1/3 x 10 -3
1/3 -3
= 0.076 x 1.2 x 24.92 x ( 3.35 x 39.53 ) x 10 = 0.012 in.
= 0.29 mm

where, dc : Clear cover from the nearest surface in tension


= d' + db / 2 = 75 + 20 / 2 = 85.00 mm = 3.35 in.
A : Effective tension area
= 2 x dc x s = 2 x 85.00 x 150.00 = 25500. mm2 = 39.53 in2.
βc : Ratio of distance between neutral axis and tension face to distance between
neutral axis and centroid of reinforcing steel = 1.2
fs : Calculated stress in reinforcement at service load = 171.85 MPa = 24.92 ksi
( 1 MPa = 0.145 ksi )
∴ Crack Width (ω) = 0.294 mm < Allowable Crack Width (ω) = 0.300 mm ∴ O.K
( Exposure Condition : Air or Soil )

Page 55 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

2) Dike 1 : Vertical Re-bar

Mu Mo Vu f'c fy φ φ h b d cover
(kN.m) (kN) (kN) (MPa) (MPa) (Shear) (Bending) (mm) (mm) (mm) (mm)
130.00 85.00 78.00 37.5 420 0.75 0.90 250 1000 175 75
where, Mu : factored bending moment
Mo : non-factored bending moment
Vu : factored shear force
f'c : compressive strength of concrete
fy : yield strength of reinforcing bar
φ : strength reduction factor

- Rebar Check

Mu 130.00 x 10 6
Required Rn = = = 4.72 MPa
Φb x b x d 2 0.90 x 1000 x 175 2
0.85 x fck 2 x Rn
ρ= x 1 - 1 -
fy 0.85 x fck
0.85 x 38 2 x 4.72
= x 1 - 1 - = 0.0122
420 0.85 x 38
As(req.) = ρ x b x d
= 0.0122 x 1000 x 175 = 2138 mm²
As(temp.) = 0.0018 x b x h / 2
= 0.0018 x 1000 x 250 / 2 = 225 mm²
As(min.1) = 1.4 / fy x b x d
= 1.4 / 420 x 1000 x 175 = 583 mm²
As(min.2) = 0.25 x √fck / fy x b x d
= 0.25 x √ 38 / 420 x 1000 x 175 = 638 mm²
4/3 As(req.) = 4 / 3 x 2138 = 2851 mm²
Selected As = Max[As(req.) , As(temp.) , Min{4/3As(req.) , Max(As(min.1) , As(min.2))}] = 2138 mm²

∴ USE : D 25 @ 150 ( As = 3273 mm² ) ∴ O.K

- Beam Shear Check

ΦVc = Φs x 1/6 x √fck x b x d


= 0.75 x 1/6 x √ 38 x 1000 x 175
= 133.96 kN > Vu = 78.00 kN ∴ O.K

Page 56 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

- Crack Check

ㆍCalculated stress in reinforcement at service load

fs = Mo / ( As x j x d )
= 85.00 x 10 6 / ( 3272.67 x 0.8679 x 175 ) = 171.00 MPa

where, n = Es / Ec = 200000 / 28782 = 7


ρ = As / ( b x d ) = 3273 / ( 1000 x 175 ) = 0.0187
k = - n x ρ + ( n x ρ ) 2 +2 x n x ρ
= - 7 x 0.0187 + ( 7 x 0.0187 2 + 2 x 7 x 0.0187 = 0.3962
j = 1 - k / 3 = 1 - 0.3962 / 3 = 0.8679

ㆍCreak width check

ω = 0.076 x βc x fs x ( dc x A ) 1/3 x 10 -3
1/3 -3
= 0.076 x 1.2 x 24.80 x ( 3.44 x 40.69 ) x 10 = 0.012 in.
= 0.30 mm

where, dc : Clear cover from the nearest surface in tension


= d' + db / 2 = 75 + 25 / 2 = 87.50 mm = 3.44 in.
A : Effective tension area
= 2 x dc x s = 2 x 87.50 x 150.00 = 26250. mm2 = 40.69 in2.
βc : Ratio of distance between neutral axis and tension face to distance between
neutral axis and centroid of reinforcing steel = 1.2
fs : Calculated stress in reinforcement at service load = 171.00 MPa = 24.80 ksi
( 1 MPa = 0.145 ksi )
∴ Crack Width (ω) = 0.298 mm < Allowable Crack Width (ω) = 0.300 mm ∴ O.K
( Exposure Condition : Air or Soil )

Page 57 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

7.2.2 MEMBER DESIGN FOR DIKE 2

1) Dike 2 : Horizontal Re-bar

Mu Mo Vu f'c fy φ φ h b d cover
(kN.m) (kN) (kN) (MPa) (MPa) (Shear) (Bending) (mm) (mm) (mm) (mm)
150.00 100.00 119.00 37.5 420 0.75 0.90 450 1000 375 75
where, Mu : factored bending moment
Mo : non-factored bending moment
Vu : factored shear force
f'c : compressive strength of concrete
fy : yield strength of reinforcing bar
φ : strength reduction factor

- Rebar Check

Mu 150.00 x 10 6
Required Rn = = = 1.19 MPa
Φb x b x d 2 0.90 x 1000 x 375 2
0.85 x fck 2 x Rn
ρ= x 1 - 1 -
fy 0.85 x fck
0.85 x 38 2 x 1.19
= x 1 - 1 - = 0.0029
420 0.85 x 38
As(req.) = ρ x b x d
= 0.0029 x 1000 x 375 = 1079 mm²
As(temp.) = 0.0018 x b x h / 2
= 0.0018 x 1000 x 450 / 2 = 405 mm²
As(min.1) = 1.4 / fy x b x d
= 1.4 / 420 x 1000 x 375 = 1250 mm²
As(min.2) = 0.25 x √fck / fy x b x d
= 0.25 x √ 38 / 420 x 1000 x 375 = 1367 mm²
4/3 As(req.) = 4 / 3 x 1079 = 1439 mm²
Selected As = Max[As(req.) , As(temp.) , Min{4/3As(req.) , Max(As(min.1) , As(min.2))}] = 1367 mm²

∴ USE : D 20 @ 150 ( As = 2095 mm² ) ∴ O.K

- Beam Shear Check

ΦVc = Φs x 1/6 x √fck x b x d


= 0.75 x 1/6 x √ 38 x 1000 x 375
= 287.05 kN > Vu = 119.00 kN ∴ O.K

Page 58 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

- Crack Check

ㆍCalculated stress in reinforcement at service load

fs = Mo / ( As x j x d )
= 100.00 x 10 6 / ( 2094.67 x 0.9192 x 375 ) = 138.50 MPa

where, n = Es / Ec = 200000 / 28782 = 7


ρ = As / ( b x d ) = 2095 / ( 1000 x 375 ) = 0.0056
k = - n x ρ + ( n x ρ ) 2 +2 x n x ρ
= - 7 x 0.0056 + ( 7 x 0.0056 2 + 2 x 7 x 0.0056 = 0.2425
j = 1 - k / 3 = 1 - 0.2425 / 3 = 0.9192

ㆍCreak width check

ω = 0.076 x βc x fs x ( dc x A ) 1/3 x 10 -3
1/3 -3
= 0.076 x 1.2 x 20.09 x ( 3.35 x 39.53 ) x 10 = 0.009 in.
= 0.24 mm

where, dc : Clear cover from the nearest surface in tension


= d' + db / 2 = 75 + 20 / 2 = 85.00 mm = 3.35 in.
A : Effective tension area
= 2 x dc x s = 2 x 85.00 x 150.00 = 25500. mm2 = 39.53 in2.
βc : Ratio of distance between neutral axis and tension face to distance between
neutral axis and centroid of reinforcing steel = 1.2
fs : Calculated stress in reinforcement at service load = 138.50 MPa = 20.09 ksi
( 1 MPa = 0.145 ksi )
∴ Crack Width (ω) = 0.237 mm < Allowable Crack Width (ω) = 0.300 mm ∴ O.K
( Exposure Condition : Air or Soil )

Page 59 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

2) Dike 2 : Vertical Re-bar

Mu Mo Vu f'c fy φ φ h b d cover
(kN.m) (kN) (kN) (MPa) (MPa) (Shear) (Bending) (mm) (mm) (mm) (mm)
220.00 150.00 119.00 37.5 420 0.75 0.90 450 1000 375 75
where, Mu : factored bending moment
Mo : non-factored bending moment
Vu : factored shear force
f'c : compressive strength of concrete
fy : yield strength of reinforcing bar
φ : strength reduction factor

- Rebar Check

Mu 220.00 x 10 6
Required Rn = = = 1.74 MPa
Φb x b x d 2
0.90 x 1000 x 375 2
0.85 x fck 2 x Rn
ρ= x 1 - 1 -
fy 0.85 x fck
0.85 x 38 2 x 1.74
= x 1 - 1 - = 0.0043
420 0.85 x 38
As(req.) = ρ x b x d
= 0.0043 x 1000 x 375 = 1597 mm²
As(temp.) = 0.0018 x b x h / 2
= 0.0018 x 1000 x 450 / 2 = 405 mm²
As(min.1) = 1.4 / fy x b x d
= 1.4 / 420 x 1000 x 375 = 1250 mm²
As(min.2) = 0.25 x √fck / fy x b x d
= 0.25 x √ 38 / 420 x 1000 x 375 = 1367 mm²
4/3 As(req.) = 4 / 3 x 1597 = 2129 mm²
Selected As = Max[As(req.) , As(temp.) , Min{4/3As(req.) , Max(As(min.1) , As(min.2))}] = 1597 mm²

∴ USE : D 25 @ 150 ( As = 3273 mm² ) ∴ O.K

- Beam Shear Check

ΦVc = Φs x 1/6 x √fck x b x d


= 0.75 x 1/6 x √ 38 x 1000 x 375
= 287.05 kN > Vu = 119.00 kN ∴ O.K

Page 60 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

- Crack Check

ㆍCalculated stress in reinforcement at service load

fs = Mo / ( As x j x d )
= 150.00 x 10 6 / ( 3272.67 x 0.9024 x 375 ) = 135.45 MPa

where, n = Es / Ec = 200000 / 28782 = 7


ρ = As / ( b x d ) = 3273 / ( 1000 x 375 ) = 0.0087
k = - n x ρ + ( n x ρ ) 2 +2 x n x ρ
= - 7 x 0.0087 + ( 7 x 0.0087 2 + 2 x 7 x 0.0087 = 0.2929
j = 1 - k / 3 = 1 - 0.2929 / 3 = 0.9024

ㆍCreak width check

ω = 0.076 x βc x fs x ( dc x A ) 1/3 x 10 -3
1/3 -3
= 0.076 x 1.2 x 19.64 x ( 3.44 x 40.69 ) x 10 = 0.009 in.
= 0.24 mm

where, dc : Clear cover from the nearest surface in tension


= d' + db / 2 = 75 + 25 / 2 = 87.50 mm = 3.44 in.
A : Effective tension area
= 2 x dc x s = 2 x 87.50 x 150.00 = 26250. mm2 = 40.69 in2.
βc : Ratio of distance between neutral axis and tension face to distance between
neutral axis and centroid of reinforcing steel = 1.2
fs : Calculated stress in reinforcement at service load = 135.45 MPa = 19.64 ksi
( 1 MPa = 0.145 ksi )
∴ Crack Width (ω) = 0.236 mm < Allowable Crack Width (ω) = 0.300 mm ∴ O.K
( Exposure Condition : Air or Soil )

Page 61 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

7.2.3 MEMBER DESIGN FOR FIRE WALL 1

1) Fire Wall 1 : Horizontal Re-bar

Mu Mo Vu f'c fy φ φ h b d cover
(kN.m) (kN) (kN) (MPa) (MPa) (Shear) (Bending) (mm) (mm) (mm) (mm)
69.00 52.00 39.00 37.5 420 0.75 0.90 300 1000 240 60
where, Mu : factored bending moment
Mo : non-factored bending moment
Vu : factored shear force
f'c : compressive strength of concrete
fy : yield strength of reinforcing bar
φ : strength reduction factor

- Rebar Check

Mu 69.00 x 10 6
Required Rn = = = 1.33 MPa
Φb x b x d 2 0.90 x 1000 x 240 2
0.85 x fck 2 x Rn
ρ= x 1 - 1 -
fy 0.85 x fck
0.85 x 38 2 x 1.33
= x 1 - 1 - = 0.0032
420 0.85 x 38
As(req.) = ρ x b x d
= 0.0032 x 1000 x 240 = 778 mm²
As(temp.) = 0.0018 x b x h / 2
= 0.0018 x 1000 x 300 / 2 = 270 mm²
As(min.1) = 1.4 / fy x b x d
= 1.4 / 420 x 1000 x 240 = 800 mm²
As(min.2) = 0.25 x √fck / fy x b x d
= 0.25 x √ 38 / 420 x 1000 x 240 = 875 mm²
4/3 As(req.) = 4 / 3 x 778 = 1037 mm²
Selected As = Max[As(req.) , As(temp.) , Min{4/3As(req.) , Max(As(min.1) , As(min.2))}] = 875 mm²

∴ USE : D 16 @ 150 ( As = 1341 mm² ) ∴ O.K

- Beam Shear Check

ΦVc = Φs x 1/6 x √fck x b x d


= 0.75 x 1/6 x √ 38 x 1000 x 240
= 183.71 kN > Vu = 39.00 kN ∴ O.K

Page 62 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

- Crack Check

ㆍCalculated stress in reinforcement at service load

fs = Mo / ( As x j x d )
= 52.00 x 10 6 / ( 1340.67 x 0.9192 x 240 ) = 175.82 MPa

where, n = Es / Ec = 200000 / 28782 = 7


ρ = As / ( b x d ) = 1341 / ( 1000 x 240 ) = 0.0056
k = - n x ρ + ( n x ρ ) 2 +2 x n x ρ
= - 7 x 0.0056 + ( 7 x 0.0056 2 + 2 x 7 x 0.0056 = 0.2425
j = 1 - k / 3 = 1 - 0.2425 / 3 = 0.9192

ㆍCreak width check

ω = 0.076 x βc x fs x ( dc x A ) 1/3 x 10 -3
1/3 -3
= 0.076 x 1.2 x 25.50 x ( 2.68 x 31.62 ) x 10 = 0.010 in.
= 0.26 mm

where, dc : Clear cover from the nearest surface in tension


= d' + db / 2 = 60 + 16 / 2 = 68.00 mm = 2.68 in.
A : Effective tension area
= 2 x dc x s = 2 x 68.00 x 150.00 = 20400. mm2 = 31.62 in2.
βc : Ratio of distance between neutral axis and tension face to distance between
neutral axis and centroid of reinforcing steel = 1.2
fs : Calculated stress in reinforcement at service load = 175.82 MPa = 25.50 ksi
( 1 MPa = 0.145 ksi )
∴ Crack Width (ω) = 0.259 mm < Allowable Crack Width (ω) = 0.300 mm ∴ O.K
( Exposure Condition : Air or Soil )

Page 63 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

2) Fire Wall 1 : Vertical Re-bar

Mu Mo Vu f'c fy φ φ h b d cover
(kN.m) (kN) (kN) (MPa) (MPa) (Shear) (Bending) (mm) (mm) (mm) (mm)
83.00 52.00 39.00 37.5 420 0.75 0.90 300 1000 240 60
where, Mu : factored bending moment
Mo : non-factored bending moment
Vu : factored shear force
f'c : compressive strength of concrete
fy : yield strength of reinforcing bar
φ : strength reduction factor

- Rebar Check

Mu 83.00 x 10 6
Required Rn = = = 1.60 MPa
Φb x b x d 2
0.90 x 1000 x 240 2
0.85 x fck 2 x Rn
ρ= x 1 - 1 -
fy 0.85 x fck
0.85 x 38 2 x 1.60
= x 1 - 1 - = 0.0039
420 0.85 x 38
As(req.) = ρ x b x d
= 0.0039 x 1000 x 240 = 940 mm²
As(temp.) = 0.0018 x b x h / 2
= 0.0018 x 1000 x 300 / 2 = 270 mm²
As(min.1) = 1.4 / fy x b x d
= 1.4 / 420 x 1000 x 240 = 800 mm²
As(min.2) = 0.25 x √fck / fy x b x d
= 0.25 x √ 38 / 420 x 1000 x 240 = 875 mm²
4/3 As(req.) = 4 / 3 x 940 = 1253 mm²
Selected As = Max[As(req.) , As(temp.) , Min{4/3As(req.) , Max(As(min.1) , As(min.2))}] = 940 mm²

∴ USE : D 16 @ 150 ( As = 1341 mm² ) ∴ O.K

- Beam Shear Check

ΦVc = Φs x 1/6 x √fck x b x d


= 0.75 x 1/6 x √ 38 x 1000 x 240
= 183.71 kN > Vu = 39.00 kN ∴ O.K

Page 64 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

- Crack Check

ㆍCalculated stress in reinforcement at service load

fs = Mo / ( As x j x d )
= 52.00 x 10 6 / ( 1340.67 x 0.9192 x 240 ) = 175.82 MPa

where, n = Es / Ec = 200000 / 28782 = 7


ρ = As / ( b x d ) = 1341 / ( 1000 x 240 ) = 0.0056
k = - n x ρ + ( n x ρ ) 2 +2 x n x ρ
= - 7 x 0.0056 + ( 7 x 0.0056 2 + 2 x 7 x 0.0056 = 0.2425
j = 1 - k / 3 = 1 - 0.2425 / 3 = 0.9192

ㆍCreak width check

ω = 0.076 x βc x fs x ( dc x A ) 1/3 x 10 -3
1/3 -3
= 0.076 x 1.2 x 25.50 x ( 2.68 x 31.62 ) x 10 = 0.010 in.
= 0.26 mm

where, dc : Clear cover from the nearest surface in tension


= d' + db / 2 = 60 + 16 / 2 = 68.00 mm = 2.68 in.
A : Effective tension area
= 2 x dc x s = 2 x 68.00 x 150.00 = 20400. mm2 = 31.62 in2.
βc : Ratio of distance between neutral axis and tension face to distance between
neutral axis and centroid of reinforcing steel = 1.2
fs : Calculated stress in reinforcement at service load = 175.82 MPa = 25.50 ksi
( 1 MPa = 0.145 ksi )
∴ Crack Width (ω) = 0.259 mm < Allowable Crack Width (ω) = 0.300 mm ∴ O.K
( Exposure Condition : Air or Soil )

Page 65 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

7.2.4 MEMBER DESIGN FOR FIRE WALL 2

1) Fire Wall 2 (Normal Area) : Horizontal Re-bar

Mu Mo Vu f'c fy φ φ h b d cover
(kN.m) (kN) (kN) (MPa) (MPa) (Shear) (Bending) (mm) (mm) (mm) (mm)
85.00 50.00 119.00 37.5 420 0.75 0.90 300 1000 240 60
where, Mu : factored bending moment
Mo : non-factored bending moment
Vu : factored shear force
f'c : compressive strength of concrete
fy : yield strength of reinforcing bar
φ : strength reduction factor

- Rebar Check

Mu 85.00 x 10 6
Required Rn = = = 1.64 MPa
Φb x b x d 2 0.90 x 1000 x 240 2
0.85 x fck 2 x Rn
ρ= x 1 - 1 -
fy 0.85 x fck
0.85 x 38 2 x 1.64
= x 1 - 1 - = 0.0040
420 0.85 x 38
As(req.) = ρ x b x d
= 0.0040 x 1000 x 240 = 963 mm²
As(temp.) = 0.0018 x b x h / 2
= 0.0018 x 1000 x 300 / 2 = 270 mm²
As(min.1) = 1.4 / fy x b x d
= 1.4 / 420 x 1000 x 240 = 800 mm²
As(min.2) = 0.25 x √fck / fy x b x d
= 0.25 x √ 38 / 420 x 1000 x 240 = 875 mm²
4/3 As(req.) = 4 / 3 x 963 = 1284 mm²
Selected As = Max[As(req.) , As(temp.) , Min{4/3As(req.) , Max(As(min.1) , As(min.2))}] = 963 mm²

∴ USE : D 16 @ 150 ( As = 1341 mm² ) ∴ O.K

- Beam Shear Check

ΦVc = Φs x 1/6 x √fck x b x d


= 0.75 x 1/6 x √ 38 x 1000 x 240
= 183.71 kN > Vu = 119.00 kN ∴ O.K

Page 66 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

ㆍCalculated stress in reinforcement at service load

fs = Mo / ( As x j x d )
= 50.00 x 10 6 / ( 1340.67 x 0.9192 x 240 ) = 169.06 MPa

where, n = Es / Ec = 200000 / 28782 = 7


ρ = As / ( b x d ) = 1341 / ( 1000 x 240 ) = 0.0056
k = - n x ρ + ( n x ρ ) 2 +2 x n x ρ
= - 7 x 0.0056 + ( 7 x 0.0056 2 + 2 x 7 x 0.0056 = 0.2425
j = 1 - k / 3 = 1 - 0.2425 / 3 = 0.9192

ㆍCreak width check

ω = 0.076 x βc x fs x ( dc x A ) 1/3 x 10 -3
1/3 -3
= 0.076 x 1.2 x 24.52 x ( 2.68 x 31.62 ) x 10 = 0.010 in.
= 0.25 mm

where, dc : Clear cover from the nearest surface in tension


= d' + db / 2 = 60 + 16 / 2 = 68.00 mm = 2.68 in.
A : Effective tension area
= 2 x dc x s = 2 x 68.00 x 150.00 = 20400. mm2 = 31.62 in2.
βc : Ratio of distance between neutral axis and tension face to distance between
neutral axis and centroid of reinforcing steel = 1.2
fs : Calculated stress in reinforcement at service load = 169.06 MPa = 24.52 ksi
( 1 MPa = 0.145 ksi )
∴ Crack Width (ω) = 0.249 mm < Allowable Crack Width (ω) = 0.300 mm ∴ O.K
( Exposure Condition : Air or Soil )

Page 67 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

2) Fire Wall 2 (Normal Area) : Vertical Re-bar

Mu Mo Vu f'c fy φ φ h b d cover
(kN.m) (kN) (kN) (MPa) (MPa) (Shear) (Bending) (mm) (mm) (mm) (mm)
140.00 85.00 119.00 37.5 420 0.75 0.90 300 1000 240 60
where, Mu : factored bending moment
Mo : non-factored bending moment
Vu : factored shear force
f'c : compressive strength of concrete
fy : yield strength of reinforcing bar
φ : strength reduction factor

- Rebar Check

Mu 140.00 x 10 6
Required Rn = = = 2.70 Mpa
Φb x b x d 2 0.90 x 1000 x 240 2
0.85 x fck 2 x Rn
ρ= x 1 - 1 -
fy 0.85 x fck
0.85 x 38 2 x 2.70
= x 1 - 1 - = 0.0067
420 0.85 x 38
As(req.) = ρ x b x d
= 0.0067 x 1000 x 240 = 1615 mm²
As(temp.) = 0.0018 x b x h / 2
= 0.0018 x 1000 x 300 / 2 = 270 mm²
As(min.1) = 1.4 / fy x b x d
= 1.4 / 420 x 1000 x 240 = 800 mm²
As(min.2) = 0.25 x √fck / fy x b x d
= 0.25 x √ 38 / 420 x 1000 x 240 = 875 mm²
4/3 As(req.) = 4 / 3 x 1615 = 2153 mm²
Selected As = Max[As(req.) , As(temp.) , Min{4/3As(req.) , Max(As(min.1) , As(min.2))}] = 1615 mm²

∴ USE : D 20 @ 150 ( As = 2095 mm² ) ∴ O.K

- Beam Shear Check

ΦVc = Φs x 1/6 x √fck x b x d


= 0.75 x 1/6 x √ 38 x 1000 x 240
= 183.71 kN > Vu = 119.00 kN ∴ O.K

Page 68 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

- Crack Check

ㆍCalculated stress in reinforcement at service load

fs = Mo / ( As x j x d )
= 85.00 x 10 6 / ( 2094.67 x 0.9024 x 240 ) = 187.37 MPa

where, n = Es / Ec = 200000 / 28782 = 7


ρ = As / ( b x d ) = 2095 / ( 1000 x 240 ) = 0.0087
k = - n x ρ + ( n x ρ ) 2 +2 x n x ρ
= - 7 x 0.0087 + ( 7 x 0.0087 2 + 2 x 7 x 0.0087 = 0.2929
j = 1 - k / 3 = 1 - 0.2929 / 3 = 0.9024

ㆍCreak width check

ω = 0.076 x βc x fs x ( dc x A ) 1/3 x 10 -3
1/3 -3
= 0.076 x 1.2 x 27.18 x ( 2.76 x 32.55 ) x 10 = 0.011 in.
= 0.28 mm

where, dc : Clear cover from the nearest surface in tension


= d' + db / 2 = 60 + 20 / 2 = 70.00 mm = 2.76 in.
A : Effective tension area
= 2 x dc x s = 2 x 70.00 x 150.00 = 21000. mm2 = 32.55 in2.
βc : Ratio of distance between neutral axis and tension face to distance between
neutral axis and centroid of reinforcing steel = 1.2
fs : Calculated stress in reinforcement at service load = 187.37 MPa = 27.18 ksi
( 1 MPa = 0.145 ksi )
∴ Crack Width (ω) = 0.282 mm < Allowable Crack Width (ω) = 0.300 mm ∴ O.K
( Exposure Condition : Air or Soil )

Page 69 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

3) Fire Wall 2 (Critical Area) : Horizontal Re-bar

Mu Mo Vu f'c fy φ φ h b d cover
(kN.m) (kN) (kN) (MPa) (MPa) (Shear) (Bending) (mm) (mm) (mm) (mm)
127.00 85.00 119.00 37.5 420 0.75 0.90 300 1000 240 60
where, Mu : factored bending moment
Mo : non-factored bending moment
Vu : factored shear force
f'c : compressive strength of concrete
fy : yield strength of reinforcing bar
φ : strength reduction factor

- Rebar Check

Mu 127.00 x 10 6
Required Rn = = = 2.45 MPa
Φb x b x d 2 0.90 x 1000 x 240 2
0.85 x fck 2 x Rn
ρ= x 1 - 1 -
fy 0.85 x fck
0.85 x 38 2 x 2.45
= x 1 - 1 - = 0.0061
420 0.85 x 38
As(req.) = ρ x b x d
= 0.0061 x 1000 x 240 = 1459 mm²
As(temp.) = 0.0018 x b x h / 2
= 0.0018 x 1000 x 300 / 2 = 270 mm²
As(min.1) = 1.4 / fy x b x d
= 1.4 / 420 x 1000 x 240 = 800 mm²
As(min.2) = 0.25 x √fck / fy x b x d
= 0.25 x √ 38 / 420 x 1000 x 240 = 875 mm²
4/3 As(req.) = 4 / 3 x 1459 = 1945 mm²
Selected As = Max[As(req.) , As(temp.) , Min{4/3As(req.) , Max(As(min.1) , As(min.2))}] = 1459 mm²

∴ USE : D 20 @ 150 ( As = 2095 mm² ) ∴ O.K

- Beam Shear Check

ΦVc = Φs x 1/6 x √fck x b x d


= 0.75 x 1/6 x √ 38 x 1000 x 240
= 183.71 kN > Vu = 119.00 kN ∴ O.K

Page 70 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

ㆍCalculated stress in reinforcement at service load

fs = Mo / ( As x j x d )
= 85.00 x 10 6 / ( 2094.67 x 0.9024 x 240 ) = 187.37 MPa

where, n = Es / Ec = 200000 / 28782 = 7


ρ = As / ( b x d ) = 2095 / ( 1000 x 240 ) = 0.0087
k = - n x ρ + ( n x ρ ) 2 +2 x n x ρ
= - 7 x 0.0087 + ( 7 x 0.0087 2 + 2 x 7 x 0.0087 = 0.2929
j = 1 - k / 3 = 1 - 0.2929 / 3 = 0.9024

ㆍCreak width check

ω = 0.076 x βc x fs x ( dc x A ) 1/3 x 10 -3
1/3 -3
= 0.076 x 1.2 x 27.18 x ( 2.76 x 32.55 ) x 10 = 0.011 in.
= 0.28 mm

where, dc : Clear cover from the nearest surface in tension


= d' + db / 2 = 60 + 20 / 2 = 70.00 mm = 2.76 in.
A : Effective tension area
= 2 x dc x s = 2 x 70.00 x 150.00 = 21000. mm2 = 32.55 in2.
βc : Ratio of distance between neutral axis and tension face to distance between
neutral axis and centroid of reinforcing steel = 1.2
fs : Calculated stress in reinforcement at service load = 187.37 MPa = 27.18 ksi
( 1 MPa = 0.145 ksi )
∴ Crack Width (ω) = 0.282 mm < Allowable Crack Width (ω) = 0.300 mm ∴ O.K
( Exposure Condition : Air or Soil )

Page 71 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

2) Fire Wall 2 (Critical Area) : Vertical Re-bar

Mu Mo Vu f'c fy φ φ h b d cover
(kN.m) (kN) (kN) (MPa) (MPa) (Shear) (Bending) (mm) (mm) (mm) (mm)
230.00 130.00 119.00 37.5 420 0.75 0.90 300 1000 240 60
where, Mu : factored bending moment
Mo : non-factored bending moment
Vu : factored shear force
f'c : compressive strength of concrete
fy : yield strength of reinforcing bar
φ : strength reduction factor

- Rebar Check

Mu 230.00 x 10 6
Required Rn = = = 4.44 Mpa
Φb x b x d 2 0.90 x 1000 x 240 2
0.85 x fck 2 x Rn
ρ= x 1 - 1 -
fy 0.85 x fck
0.85 x 38 2 x 4.44
= x 1 - 1 - = 0.0114
420 0.85 x 38
As(req.) = ρ x b x d
= 0.0114 x 1000 x 240 = 2742 mm²
As(temp.) = 0.0018 x b x h / 2
= 0.0018 x 1000 x 300 / 2 = 270 mm²
As(min.1) = 1.4 / fy x b x d
= 1.4 / 420 x 1000 x 240 = 800 mm²
As(min.2) = 0.25 x √fck / fy x b x d
= 0.25 x √ 38 / 420 x 1000 x 240 = 875 mm²
4/3 As(req.) = 4 / 3 x 2742 = 3656 mm²
Selected As = Max[As(req.) , As(temp.) , Min{4/3As(req.) , Max(As(min.1) , As(min.2))}] = 2742 mm²

∴ USE : D 25 @ 150 ( As = 3273 mm² ) ∴ O.K

- Beam Shear Check

ΦVc = Φs x 1/6 x √fck x b x d


= 0.75 x 1/6 x √ 38 x 1000 x 240
= 183.71 kN > Vu = 119.00 kN ∴ O.K

Page 72 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

- Crack Check

ㆍCalculated stress in reinforcement at service load

fs = Mo / ( As x j x d )
= 130.00 x 10 6 / ( 3272.67 x 0.8831 x 240 ) = 187.43 MPa

where, n = Es / Ec = 200000 / 28782 = 7


ρ = As / ( b x d ) = 3273 / ( 1000 x 240 ) = 0.0136
k = - n x ρ + ( n x ρ ) 2 +2 x n x ρ
= - 7 x 0.0136 + ( 7 x 0.0136 2 + 2 x 7 x 0.0136 = 0.3508
j = 1 - k / 3 = 1 - 0.3508 / 3 = 0.8831

ㆍCreak width check

ω = 0.076 x βc x fs x ( dc x A ) 1/3 x 10 -3
1/3 -3
= 0.076 x 1.2 x 27.18 x ( 2.85 x 33.71 ) x 10 = 0.011 in.
= 0.29 mm

where, dc : Clear cover from the nearest surface in tension


= d' + db / 2 = 60 + 25 / 2 = 72.50 mm = 2.85 in.
A : Effective tension area
= 2 x dc x s = 2 x 72.50 x 150.00 = 21750. mm2 = 33.71 in2.
βc : Ratio of distance between neutral axis and tension face to distance between
neutral axis and centroid of reinforcing steel = 1.2
fs : Calculated stress in reinforcement at service load = 187.43 MPa = 27.18 ksi
( 1 MPa = 0.145 ksi )
∴ Crack Width (ω) = 0.289 mm < Allowable Crack Width (ω) = 0.300 mm ∴ O.K

Page 73 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

7.2.5 MEMBER DESIGN FOR BOTTOM SLAB 1

1) Bottom Slab 1 : Top Re-bar

Mu Mo Vu f'c fy φ φ h b d cover
(kN.m) (kN) (kN) (MPa) (MPa) (Shear) (Bending) (mm) (mm) (mm) (mm)
89.00 65.00 145.00 37.5 420 0.75 0.90 400 1000 325 75
where, Mu : factored bending moment
Mo : non-factored bending moment
Vu : factored shear force
f'c : compressive strength of concrete
fy : yield strength of reinforcing bar
φ : strength reduction factor

- Rebar Check

Mu 89.00 x 10 6
Required Rn = = = 0.94 MPa
Φb x b x d 2 0.90 x 1000 x 325 2
0.85 x fck 2 x Rn
ρ= x 1 - 1 -
fy 0.85 x fck
0.85 x 38 2 x 0.94
= x 1 - 1 - = 0.0023
420 0.85 x 38
As(req.) = ρ x b x d
= 0.0023 x 1000 x 325 = 736 mm²
As(temp.) = 0.0018 x b x h / 2
= 0.0018 x 1000 x 400 / 2 = 360 mm²
As(min.1) = 1.4 / fy x b x d
= 1.4 / 420 x 1000 x 325 = 1083 mm²
As(min.2) = 0.25 x √fck / fy x b x d
= 0.25 x √ 38 / 420 x 1000 x 325 = 1185 mm²
4/3 As(req.) = 4 / 3 x 736 = 981 mm²
Selected As = Max[As(req.) , As(temp.) , Min{4/3As(req.) , Max(As(min.1) , As(min.2))}] = 981 mm²

∴ USE : D 16 @ 150 ( As = 1341 mm² ) ∴ O.K

- Beam Shear Check

ΦVc = Φs x 1/6 x √fck x b x d


= 0.75 x 1/6 x √ 38 x 1000 x 325
= 248.78 kN > Vu = 145.00 kN ∴ O.K

Page 74 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

ㆍCalculated stress in reinforcement at service load

fs = Mo / ( As x j x d )
= 65.00 x 10 6 / ( 1340.67 x 0.9292 x 325 ) = 160.55 MPa

where, n = Es / Ec = 200000 / 28782 = 7


ρ = As / ( b x d ) = 1341 / ( 1000 x 325 ) = 0.0041
k = - n x ρ + ( n x ρ ) 2 +2 x n x ρ
= - 7 x 0.0041 + ( 7 x 0.0041 2 + 2 x 7 x 0.0041 = 0.2125
j = 1 - k / 3 = 1 - 0.2125 / 3 = 0.9292

ㆍCreak width check

ω = 0.076 x βc x fs x ( dc x A ) 1/3 x 10 -3
1/3 -3
= 0.076 x 1.2 x 23.29 x ( 3.27 x 38.60 ) x 10 = 0.011 in.
= 0.27 mm

where, dc : Clear cover from the nearest surface in tension


= d' + db / 2 = 75 + 16 / 2 = 83.00 mm = 3.27 in.
A : Effective tension area
= 2 x dc x s = 2 x 83.00 x 150.00 = 24900. mm2 = 38.60 in2.
βc : Ratio of distance between neutral axis and tension face to distance between
neutral axis and centroid of reinforcing steel = 1.2
fs : Calculated stress in reinforcement at service load = 160.55 MPa = 23.29 ksi
( 1 MPa = 0.145 ksi )
∴ Crack Width (ω) = 0.271 mm < Allowable Crack Width (ω) = 0.300 mm ∴ O.K
( Exposure Condition : Air or Soil )

Page 75 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

2) Bottom Slab 1 : Bottom Re-bar

Mu Mo Vu f'c fy φ φ h b d cover
(kN.m) (kN) (kN) (MPa) (MPa) (Shear) (Bending) (mm) (mm) (mm) (mm)
142.00 105.00 145.00 37.5 420 0.75 0.90 400 1000 325 75
where, Mu : factored bending moment
Mo : non-factored bending moment
Vu : factored shear force
f'c : compressive strength of concrete
fy : yield strength of reinforcing bar
φ : strength reduction factor

- Rebar Check

Mu 142.00 x 10 6
Required Rn = = = 1.49 Mpa
Φb x b x d 2 0.90 x 1000 x 325 2
0.85 x fck 2 x Rn
ρ= x 1 - 1 -
fy 0.85 x fck
0.85 x 38 2 x 1.49
= x 1 - 1 - = 0.0036
420 0.85 x 38
As(req.) = ρ x b x d
= 0.0036 x 1000 x 325 = 1185 mm²
As(temp.) = 0.0018 x b x h / 2
= 0.0018 x 1000 x 400 / 2 = 360 mm²
As(min.1) = 1.4 / fy x b x d
= 1.4 / 420 x 1000 x 325 = 1083 mm²
As(min.2) = 0.25 x √fck / fy x b x d
= 0.25 x √ 38 / 420 x 1000 x 325 = 1185 mm²
4/3 As(req.) = 4 / 3 x 1185 = 1580 mm²
Selected As = Max[As(req.) , As(temp.) , Min{4/3As(req.) , Max(As(min.1) , As(min.2))}] = 1185 mm²

∴ USE : D 20 @ 150 ( As = 2095 mm² ) ∴ O.K

- Beam Shear Check

ΦVc = Φs x 1/6 x √fck x b x d


= 0.75 x 1/6 x √ 38 x 1000 x 325
= 248.78 kN > Vu = 145.00 kN ∴ O.K

Page 76 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

- Crack Check

ㆍCalculated stress in reinforcement at service load

fs = Mo / ( As x j x d )
= 105.00 x 10 6 / ( 2094.67 x 0.9141 x 325 ) = 168.74 MPa

where, n = Es / Ec = 200000 / 28782 = 7


ρ = As / ( b x d ) = 2095 / ( 1000 x 325 ) = 0.0064
k = - n x ρ + ( n x ρ ) 2 +2 x n x ρ
= - 7 x 0.0064 + ( 7 x 0.0064 2 + 2 x 7 x 0.0064 = 0.2578
j = 1 - k / 3 = 1 - 0.2578 / 3 = 0.9141

ㆍCreak width check

ω = 0.076 x βc x fs x ( dc x A ) 1/3 x 10 -3
1/3 -3
= 0.076 x 1.2 x 24.47 x ( 3.35 x 39.53 ) x 10 = 0.011 in.
= 0.29 mm

where, dc : Clear cover from the nearest surface in tension


= d' + db / 2 = 75 + 20 / 2 = 85.00 mm = 3.35 in.
A : Effective tension area
= 2 x dc x s = 2 x 85.00 x 150.00 = 25500. mm2 = 39.53 in2.
βc : Ratio of distance between neutral axis and tension face to distance between
neutral axis and centroid of reinforcing steel = 1.2
fs : Calculated stress in reinforcement at service load = 168.74 MPa = 24.47 ksi
( 1 MPa = 0.145 ksi )
∴ Crack Width (ω) = 0.289 mm < Allowable Crack Width (ω) = 0.300 mm ∴ O.K
( Exposure Condition : Air or Soil )

Page 77 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

7.2.6 MEMBER DESIGN FOR BOTTOM SLAB 2

1) Bottom Slab 2 : Top Re-bar

Mu Mo Vu f'c fy φ φ h b d cover
(kN.m) (kN) (kN) (MPa) (MPa) (Shear) (Bending) (mm) (mm) (mm) (mm)
283.00 177.00 145.00 37.5 420 0.75 0.90 450 1000 375 75
where, Mu : factored bending moment
Mo : non-factored bending moment
Vu : factored shear force
f'c : compressive strength of concrete
fy : yield strength of reinforcing bar
φ : strength reduction factor

- Rebar Check

Mu 283.00 x 10 6
Required Rn = = = 2.24 MPa
Φb x b x d 2 0.90 x 1000 x 375 2
0.85 x fck 2 x Rn
ρ= x 1 - 1 -
fy 0.85 x fck
0.85 x 38 2 x 2.24
= x 1 - 1 - = 0.0055
420 0.85 x 38
As(req.) = ρ x b x d
= 0.0055 x 1000 x 375 = 2072 mm²
As(temp.) = 0.0018 x b x h / 2
= 0.0018 x 1000 x 450 / 2 = 405 mm²
As(min.1) = 1.4 / fy x b x d
= 1.4 / 420 x 1000 x 375 = 1250 mm²
As(min.2) = 0.25 x √fck / fy x b x d
= 0.25 x √ 38 / 420 x 1000 x 375 = 1367 mm²
4/3 As(req.) = 4 / 3 x 2072 = 2763 mm²
Selected As = Max[As(req.) , As(temp.) , Min{4/3As(req.) , Max(As(min.1) , As(min.2))}] = 2072 mm²

∴ USE : D 25 @ 150 ( As = 3273 mm² ) ∴ O.K

- Beam Shear Check

ΦVc = Φs x 1/6 x √fck x b x d


= 0.75 x 1/6 x √ 38 x 1000 x 375
= 287.05 kN > Vu = 145.00 kN ∴ O.K

Page 78 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

ㆍCalculated stress in reinforcement at service load

fs = Mo / ( As x j x d )
= 177.00 x 10 6 / ( 3272.67 x 0.9024 x 375 ) = 159.83 MPa

where, n = Es / Ec = 200000 / 28782 = 7


ρ = As / ( b x d ) = 3273 / ( 1000 x 375 ) = 0.0087
k = - n x ρ + ( n x ρ ) 2 +2 x n x ρ
= - 7 x 0.0087 + ( 7 x 0.0087 2 + 2 x 7 x 0.0087 = 0.2929
j = 1 - k / 3 = 1 - 0.2929 / 3 = 0.9024

ㆍCreak width check

ω = 0.076 x βc x fs x ( dc x A ) 1/3 x 10 -3
1/3 -3
= 0.076 x 1.2 x 23.18 x ( 3.44 x 40.69 ) x 10 = 0.011 in.
= 0.28 mm

where, dc : Clear cover from the nearest surface in tension


= d' + db / 2 = 75 + 25 / 2 = 87.50 mm = 3.44 in.
A : Effective tension area
= 2 x dc x s = 2 x 87.50 x 150.00 = 26250. mm2 = 40.69 in2.
βc : Ratio of distance between neutral axis and tension face to distance between
neutral axis and centroid of reinforcing steel = 1.2
fs : Calculated stress in reinforcement at service load = 159.83 MPa = 23.18 ksi
( 1 MPa = 0.145 ksi )
∴ Crack Width (ω) = 0.279 mm < Allowable Crack Width (ω) = 0.300 mm ∴ O.K
( Exposure Condition : Air or Soil )

Page 79 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

2) Bottom Slab 2 : Bottom Re-bar

Mu Mo Vu f'c fy φ φ h b d cover
(kN.m) (kN) (kN) (MPa) (MPa) (Shear) (Bending) (mm) (mm) (mm) (mm)
127.00 79.00 145.00 37.5 420 0.75 0.90 450 1000 375 75
where, Mu : factored bending moment
Mo : non-factored bending moment
Vu : factored shear force
f'c : compressive strength of concrete
fy : yield strength of reinforcing bar
φ : strength reduction factor

- Rebar Check

Mu 127.00 x 10 6
Required Rn = = = 1.00 Mpa
Φb x b x d 2 0.90 x 1000 x 375 2
0.85 x fck 2 x Rn
ρ= x 1 - 1 -
fy 0.85 x fck
0.85 x 38 2 x 1.00
= x 1 - 1 - = 0.0024
420 0.85 x 38
As(req.) = ρ x b x d
= 0.0024 x 1000 x 375 = 911 mm²
As(temp.) = 0.0018 x b x h / 2
= 0.0018 x 1000 x 450 / 2 = 405 mm²
As(min.1) = 1.4 / fy x b x d
= 1.4 / 420 x 1000 x 375 = 1250 mm²
As(min.2) = 0.25 x √fck / fy x b x d
= 0.25 x √ 38 / 420 x 1000 x 375 = 1367 mm²
4/3 As(req.) = 4 / 3 x 911 = 1215 mm²
Selected As = Max[As(req.) , As(temp.) , Min{4/3As(req.) , Max(As(min.1) , As(min.2))}] = 1215 mm²

∴ USE : D 16 @ 150 ( As = 1341 mm² ) ∴ O.K

- Beam Shear Check

ΦVc = Φs x 1/6 x √fck x b x d


= 0.75 x 1/6 x √ 38 x 1000 x 375
= 287.05 kN > Vu = 145.00 kN ∴ O.K

Page 80 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

- Crack Check

ㆍCalculated stress in reinforcement at service load

fs = Mo / ( As x j x d )
= 79.00 x 10 6 / ( 1340.67 x 0.9335 x 375 ) = 168.33 MPa

where, n = Es / Ec = 200000 / 28782 = 7


ρ = As / ( b x d ) = 1341 / ( 1000 x 375 ) = 0.0036
k = - n x ρ + ( n x ρ ) 2 +2 x n x ρ
= - 7 x 0.0036 + ( 7 x 0.0036 2 + 2 x 7 x 0.0036 = 0.1994
j = 1 - k / 3 = 1 - 0.1994 / 3 = 0.9335

ㆍCreak width check

ω = 0.076 x βc x fs x ( dc x A ) 1/3 x 10 -3
1/3 -3
= 0.076 x 1.2 x 24.41 x ( 3.27 x 38.60 ) x 10 = 0.011 in.
= 0.28 mm

where, dc : Clear cover from the nearest surface in tension


= d' + db / 2 = 75 + 16 / 2 = 83.00 mm = 3.27 in.
A : Effective tension area
= 2 x dc x s = 2 x 83.00 x 150.00 = 24900. mm2 = 38.60 in2.
βc : Ratio of distance between neutral axis and tension face to distance between
neutral axis and centroid of reinforcing steel = 1.2
fs : Calculated stress in reinforcement at service load = 168.33 MPa = 24.41 ksi
( 1 MPa = 0.145 ksi )
∴ Crack Width (ω) = 0.284 mm < Allowable Crack Width (ω) = 0.300 mm ∴ O.K
( Exposure Condition : Air or Soil )

Page 81 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

3) P3 : Top Re-bar

Mu Mo Vu f'c fy φ φ h b d cover
(kN.m) (kN) (kN) (MPa) (MPa) (Shear) (Bending) (mm) (mm) (mm) (mm)
185.00 142.00 130.00 37.5 420 0.75 0.90 2000 1000 1925 75
where, Mu : factored bending moment
Mo : non-factored bending moment
Vu : factored shear force
f'c : compressive strength of concrete
fy : yield strength of reinforcing bar
φ : strength reduction factor

- Rebar Check

Mu 185.00 x 10 6
Required Rn = = = 0.06 Mpa
Φb x b x d 2 0.90 x 1000 x 1925 2
0.85 x fck 2 x Rn
ρ= x 1 - 1 -
fy 0.85 x fck
0.85 x 38 2 x 0.06
= x 1 - 1 - = 0.0001
420 0.85 x 38
As(req.) = ρ x b x d
= 0.0001 x 1000 x 1925 = 255 mm²
As(temp.) = 0.0018 x b x h / 2
= 0.0018 x 1000 x 2000 / 2 = 1800 mm²
As(min.1) = 1.4 / fy x b x d
= 1.4 / 420 x 1000 x 1925 = 6417 mm²
As(min.2) = 0.25 x √fck / fy x b x d
= 0.25 x √ 38 / 420 x 1000 x 1925 = 7017 mm²
4/3 As(req.) = 4 / 3 x 255 = 340 mm²
Selected As = Max[As(req.) , As(temp.) , Min{4/3As(req.) , Max(As(min.1) , As(min.2))}] = 1800 mm²

∴ USE : D 25 @ 200 ( As = 2455 mm² ) ∴ O.K

- Beam Shear Check

ΦVc = Φs x 1/6 x √fck x b x d


= 0.75 x 1/6 x √ 38 x 1000 x 1925
= 1473.52 kN > Vu = 130.00 kN ∴ O.K

Page 82 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

4) : Bottom Re-bar

Mu Mo Vu f'c fy φ φ h b d cover
(kN.m) (kN) (kN) (MPa) (MPa) (Shear) (Bending) (mm) (mm) (mm) (mm)
283.00 173.00 130.00 37.5 420 0.75 0.90 2000 1000 1925 75
where, Mu : factored bending moment
Mo : non-factored bending moment
Vu : factored shear force
f'c : compressive strength of concrete
fy : yield strength of reinforcing bar
φ : strength reduction factor

- Rebar Check

Mu 283.00 x 10 6
Required Rn = = = 0.08 Mpa
Φb x b x d 2 0.90 x 1000 x 1925 2
0.85 x fck 2 x Rn
ρ= x 1 - 1 -
fy 0.85 x fck
0.85 x 38 2 x 0.08
= x 1 - 1 - = 0.0002
420 0.85 x 38
As(req.) = ρ x b x d
= 0.0002 x 1000 x 1925 = 390 mm²
As(temp.) = 0.0018 x b x h / 2
= 0.0018 x 1000 x 2000 / 2 = 1800 mm²
As(min.1) = 1.4 / fy x b x d
= 1.4 / 420 x 1000 x 1925 = 6417 mm²
As(min.2) = 0.25 x √fck / fy x b x d
= 0.25 x √ 38 / 420 x 1000 x 1925 = 7017 mm²
4/3 As(req.) = 4 / 3 x 390 = 520 mm²
Selected As = Max[As(req.) , As(temp.) , Min{4/3As(req.) , Max(As(min.1) , As(min.2))}] = 1800 mm²

∴ USE : D 25 @ 150 ( As = 3273 mm² ) ∴ O.K

- Beam Shear Check

ΦVc = Φs x 1/6 x √fck x b x d


= 0.75 x 1/6 x √ 38 x 1000 x 1925
= 1473.52 kN > Vu = 130.00 kN ∴ O.K

Page 83 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

7.2.7 MEMBER DESIGN FOR PEDESTAL

1) P1: Vertical Re-bar

- Design Load of Pedestal


Horizontal Vertical Moment at
Force Force Bottom of Pedestal
Load Case Remark
Fx Fy Fy Mpx Mpy
kN kN kN kN.m kN.m
DL - - 526.50 - -
EL - - 1617.00 - -
LL - - - - -
WLX 4.64 - - - 21.81
WLY - 4.69 - -22.04 -
SLX 383.34 - - - 2213.15
SLY - 383.34 - -2213.15 -

- Total Working Load and Design & Member Force


Load ∑Fuz ∑Mupx ∑Mupy Tux Tuy
Remark
Combination (kN) (kN.m) (kN.m) kN/ea kN/ea
L/C-1 2572.20 - - -29.91 -29.91
L/C-2 1929.15 - 34.90 -22.43 -22.43
L/C-3 1929.15 - -34.90 -22.43 -22.43
L/C-4 1929.15 -35.26 - -22.43 -22.43
L/C-5 1929.15 35.26 - -22.43 -22.43
L/C-6 1929.15 - 2213.15 -22.40 -22.43
L/C-7 1929.15 - -2213.15 -22.40 -22.43
L/C-8 1929.15 -2213.15 - -22.43 -22.40
L/C-9 1929.15 2213.15 - -22.43 -22.40
L/C-10 2572.20 - 34.90 -29.91 -29.91
L/C-11 2572.20 - -34.90 -29.91 -29.91
L/C-12 2572.20 -35.26 - -29.91 -29.91
L/C-13 2572.20 35.26 - -29.91 -29.91
L/C-14 2572.20 - 2213.15 -29.88 -29.91
L/C-15 2572.20 - -2213.15 -29.88 -29.91
L/C-16 2572.20 -2213.15 - -29.91 -29.88
L/C-17 2572.20 2213.15 - -29.91 -29.88
L/C-18 3000.90 - - -34.89 -34.89

Page 84 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

- Member Check

ㆍNumber of Vertical Re-bar


For X-direction, Nx = (Dx - 2 x d') / Sv = 12.75 → 14 ea (one-face)
For Y-direction, Ny = (Dy - 2 x d') / Sv = 29.25 → 31 ea (one-face)
Total quantity, Nt = 86 ea

Where, Dx : width of pedestal for X-direction = 2700 mm


Dy : width of pedestal for Y-direction = 6000 mm
d' : concrete cover depth = 75 mm
Dx : design spacing of rebar = 200 mm

ㆍMax. tension force, Tumax


For X-direction,
Tux = ∑Mupy / Zymin. - ∑Fuz / Nt = -22.40 kN/ea (Tension is not occured.)
For Y-direction,
Tuy = ∑Mupx / Zxmin. - ∑Fuz / Nt = -22.40 kN/ea (Tension is not occured.)

Where, Zxmin. = (Dx - 2 x d') x Ny = 79050 mm


Zymin. = (Dy - 2 x d') x Nx = 81900 mm

ㆍAsreq. = Tumax / ( φ x fy) = 0.00 / ( 0.90 x 420 ) = 0.00 mm²/ea

ㆍTotal As = - x 86 ea = 0 mm

∴USE : 86 ea - D 16 ( As = 17295 mm² ) ∴ O.K


(Total)

Page 85 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

2) P2: Vertical Re-bar

- Design Load of Pedestal


Horizontal Vertical Moment at
Force Force Bottom of Pedestal
Load Case Remark
Fx Fy Fy Mpx Mpy
kN kN kN kN.m kN.m
DL - - 603.20 - -
EL - - 1940.40 - -
LL - - - - -
WLX 4.87 - - - 23.59
WLY - 4.90 - -23.76 -
SLX 460.01 - - - 2741.65
SLY - 460.01 - -2741.65 -

- Total Working Load and Design & Member Force


Load ∑Fuz ∑Mupx ∑Mupy Tux Tuy
Remark
Combination (kN) (kN.m) (kN.m) kN/ea kN/ea
L/C-1 - - 3052.32 0.03 -
L/C-2 7.79 - 2289.24 -0.06 -0.08
L/C-3 -7.79 - 2289.24 0.11 0.08
L/C-4 - 7.84 2289.24 0.02 0.00
L/C-5 - -7.84 2289.24 0.02 0.00
L/C-6 460.01 - 2289.24 -4.98 -5.00
L/C-7 -460.01 - 2289.24 5.02 5.00
L/C-8 - 460.01 2289.24 0.02 0.01
L/C-9 - -460.01 2289.24 0.02 0.01
L/C-10 7.79 - 3052.32 -0.05 -0.08
L/C-11 -7.79 - 3052.32 0.12 0.08
L/C-12 - 7.84 3052.32 0.03 0.00
L/C-13 - -7.84 3052.32 0.03 0.00
L/C-14 460.01 - 3052.32 -4.97 -5.00
L/C-15 -460.01 - 3052.32 5.03 5.00
L/C-16 - 460.01 3052.32 0.03 0.01
L/C-17 - -460.01 3052.32 0.03 0.01
L/C-18 - - 3561.04 0.04 -

Page 86 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

- Member Check

ㆍNumber of Vertical Re-bar


For X-direction, Nx = (Dx - 2 x d') / Sv = 13.75 → 15 ea (one-face)
For Y-direction, Ny = (Dy - 2 x d') / Sv = 31.25 → 33 ea (one-face)
Total quantity, Nt = 92 ea

Where, Dx : width of pedestal for X-direction = 2900 mm


Dy : width of pedestal for Y-direction = 6400 mm
d' : concrete cover depth = 75 mm
Dx : design spacing of rebar = 200 mm

ㆍMax. tension force, Tumax


For X-direction,
Tux = ∑Mupy / Zymin. - ∑Fuz / Nt = 5.03 kN/ea
For Y-direction,
Tuy = ∑Mupx / Zxmin. - ∑Fuz / Nt = 5.00 kN/ea

Where, Zxmin. = (Dx - 2 x d') x Ny = 90750 mm


Zymin. = (Dy - 2 x d') x Nx = 93750 mm

ㆍAsreq. = Tumax / ( φ x fy) = 5032.65 / ( 0.90 x 420 ) = 13.31 mm²/ea

ㆍTotal As = 13.31 x 92 ea = 1225 mm

∴USE : 92 ea - D 16 ( As = 18501 mm² ) ∴ O.K


(Total)

Page 87 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

3) P3: Vertical Re-bar

- Design Load of Pedestal


Horizontal Vertical Moment at
Force Force Bottom of Pedestal
Load Case Remark
Fx Fy Fy Mpx Mpy
kN kN kN kN.m kN.m
DL - - 4901.05 - -
EL - - 6419.00 - -
LL - - - - -
WLX 7.40 - - - 54.02
WLY - 7.45 - -54.40 -
SLX 1521.75 - - - 13452.23
SLY - 1521.75 - ####### -

- Total Working Load and Design & Member Force


Load ∑Fuz ∑Mupx ∑Mupy Tux Tuy
Remark
Combination (kN) (kN.m) (kN.m) kN/ea kN/ea
L/C-1 - - 13584.06 0.03 -
L/C-2 11.84 - 10188.05 -0.04 -0.06
L/C-3 -11.84 - 10188.05 0.08 0.06
L/C-4 - 11.93 10188.05 0.02 0.00
L/C-5 - -11.93 10188.05 0.02 0.00
L/C-6 1521.75 - 10188.05 -7.16 -7.18
L/C-7 -1521.75 - 10188.05 7.20 7.18
L/C-8 - 1521.75 10188.05 0.02 0.00
L/C-9 - -1521.75 10188.05 0.02 0.00
L/C-10 11.84 - 13584.06 -0.03 -0.06
L/C-11 -11.84 - 13584.06 0.08 0.06
L/C-12 - 11.93 13584.06 0.03 0.00
L/C-13 - -11.93 13584.06 0.03 0.00
L/C-14 1521.75 - 13584.06 -7.15 -7.18
L/C-15 -1521.75 - 13584.06 7.21 7.18
L/C-16 - 1521.75 13584.06 0.03 0.00
L/C-17 - -1521.75 13584.06 0.03 0.00
L/C-18 - - 15848.07 0.03 -

Page 88 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

- Member Check

ㆍNumber of Vertical Re-bar


For X-direction, Nx = (Dx - 2 x d') / Sv = 32.5 → 34 ea (one-face)
For Y-direction, Ny = (Dy - 2 x d') / Sv = 72.95 → 74 ea (one-face)
Total quantity, Nt = 212 ea

Where, Dx : width of pedestal for X-direction = 6650 mm


Dy : width of pedestal for Y-direction = 14740 mm
d' : concrete cover depth = 75 mm
Dx : design spacing of rebar = 200 mm

ㆍMax. tension force, Tumax


For X-direction,
Tux = ∑Mupy / Zymin. - ∑Fuz / Nt = 7.21 kN/ea
For Y-direction,
Tuy = ∑Mupx / Zxmin. - ∑Fuz / Nt = 7.18 kN/ea

Where, Zxmin. = (Dx - 2 x d') x Ny = 481000 mm


Zymin. = (Dy - 2 x d') x Nx = 496060 mm

ㆍAsreq. = Tumax / ( φ x fy) = 7205.43 / ( 0.90 x 420 ) = 19.06 mm²/ea

ㆍTotal As = 19.06 x 212 ea = 4041 mm

∴USE : 212 ea - D 16 ( As = 42633 mm² ) ∴ O.K


(Total)

Page 89 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

8. REBAR SKETCH

Fire Wall 2 (Normal Area)


D16 @ 150
( Fire Wall 1: Vertical)
Fire Wall 1

D16 @ 150
D25 @ 150 ( Fire Wall 1: Horizontal)
( Dike 1: Vertical)
Dike 1

Dike 1

P1 P2

Bottom Slab 1 Dike 2

D20 @ 150
D20 @ 150 ( Bottom Slab 1: Bottom)
( Dike 1: Horizontal)

D16 @ 150
( Bottom Slab 1: Top)

CAT & UAT AREA SECTION

Page 90 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

D20 @ 150
( Fire Wall 2: Vertical)
(Normal Area)

Fire Wall 2 (Normal Area)


D16 @ 150
( Fire Wall 2: Horizontal)
Fire Wall 2 (Normal Area)

8.60
(Normal Area) D25 @ 150
( Fire Wall 2: Vertical)
(Critical Area)

D25 @ 150 D20 @ 150


( Dike 2: Vertical) ( Fire Wall 2: Horizontal)
(Critical Area)

(Critical Area)
Fire Wall 2
3.00
D20 @ 150
( Dike 2: Horizontal) D25 @ 200
( P3: Top)

P3
Dike 2
Dike 2

Dike 2

2.00

Bottom Slab 2

D25 @ 150 D16 @ 150


( Bottom Slab 2: Top) ( Bottom Slab 2: Bottom)

GUT AREA SECTION

Page 91 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

One Side : 31 ea - D 16 One Side : 33 ea - D 16


Total : 86 ea - D 16 Total : 92 ea - D 16

P1 P2

One Side : 74 ea - D 16
Total : 212 ea - D 16

P3

Page 92 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

※ Appendix A : Vendor Print

Page 93 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

Page 94 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

Page 95 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

Page 96 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

Page 97 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

※ Appendix B : Transformer Dike Volume Check

-Each transformer dike size has been designed with following volume check.

Required Volume Net Volume Dike Design


Equipment Oily Water Drainage Volume (m³) Toal Req. Dike Req. Min. Min.Floor
T.O.C
F/F Deluge Lube Oil Volume Width (m) Length (m) Exclu.(m2) Net D (m) Net V (m3) Result D (m) Elevation
GUT 19.00 86.69 194.00 299.69 12.85 22.80 98.00 1.50 310.02 OK 1.95 100.20 98.25
UAT 19.00 41.41 58.40 118.81 15.70 12.30 40.50 0.69 119.04 OK 1.14 100.20 99.06
CAT 19.00 38.01 43.20 100.21 15.70 11.50 37.40 0.62 101.64 OK 1.07 100.20 99.13

• Design Basis for Sizing TR Dike


Lube Oil + Duluge + Firefighting Water + 120 mm (H) Free board < Dike Accomabable Volume + Gravel Immersed Volume
- Deluge : The maximum design discharge of fixed fire suppression systems operating for a maximum of 10 minutes
- Firefighting Water : The maximum expected number of fire hose lines (500-gpm minimum) operating for a maximum of 10-minutes.

• Design Input Factors


- Gravel Thickness : 0.30
- Gravel Void Ratio : 0.30
- Grating Thickness : 0.032

Page 98 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

※ Appendix C : Program Analysis Data

File P:\TR COMPOUND.$2k was saved on 9-19-14 at 15:03:44

TABLE: "AREA LOADS - SURFACE PRESSURE"


Area=2281 LoadPat=H Face=Top Pressure=1 JtPattern=H
Area=3713 LoadPat=H Face=Top Pressure=1 JtPattern=H
Area=3714 LoadPat=H Face=Top Pressure=1 JtPattern=H
.
.
.
Area=11532 LoadPat=H Face=Top Pressure=1 JtPattern=H
Area=11533 LoadPat=H Face=Top Pressure=1 JtPattern=H
Area=11534 LoadPat=H Face=Top Pressure=1 JtPattern=H

TABLE: "AREA LOADS - UNIFORM"


Area=3631 LoadPat=DEAD CoordSys=GLOBAL Dir=Gravity UnifLoad=13.5
Area=3632 LoadPat=DEAD CoordSys=GLOBAL Dir=Gravity UnifLoad=13.5
Area=3633 LoadPat=DEAD CoordSys=GLOBAL Dir=Gravity UnifLoad=13.5
.
.
.
Area=11516 LoadPat=Wx CoordSys=Local Dir=3 UnifLoad=1.48
Area=11517 LoadPat=Wx CoordSys=Local Dir=3 UnifLoad=1.48
Area=11518 LoadPat=Wx CoordSys=Local Dir=3 UnifLoad=1.48

TABLE: "AREA SPRING ASSIGNMENTS"


Area=3631 Type=Simple Stiffness=18000 SimpleType="Compression Only"
Face=Top Dir1Type="Normal To Face" NormalDir=Inward
Area=3632 Type=Simple Stiffness=18000 SimpleType="Compression Only"
Face=Top Dir1Type="Normal To Face" NormalDir=Inward
.
.
.
Area=7446 Type=Simple Stiffness=18000 SimpleType="Compression Only"
Face=Top Dir1Type="Normal To Face" NormalDir=Inward
Area=7447 Type=Simple Stiffness=18000 SimpleType="Compression Only"
Face=Top Dir1Type="Normal To Face" NormalDir=Inward

TABLE: "CASE - STATIC 1 - LOAD ASSIGNMENTS"


Case=DEAD LoadType="Load pattern" LoadName=DEAD LoadSF=1
Case=L LoadType="Load pattern" LoadName=L LoadSF=1
Case=Wx LoadType="Load pattern" LoadName=Wx LoadSF=1
Case=Wy LoadType="Load pattern" LoadName=Wy LoadSF=1
Case=Sx LoadType="Load pattern" LoadName=Sx LoadSF=1
Case=Sy LoadType="Load pattern" LoadName=Sy LoadSF=1

Page 99 of 101
Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

Case=H LoadType="Load pattern" LoadName=H LoadSF=1

TABLE: "COMBINATION DEFINITIONS"


ComboName=COMB101 ComboType="Linear Add" AutoDesign=No CaseName=DEAD
ScaleFactor=1 SteelDesign=None ConcDesign=None AlumDesign=None ColdDesign=None
ComboName=COMB101 CaseName=L ScaleFactor=1
ComboName=COMB101 CaseName=H ScaleFactor=1
ComboName=COMB102 ComboType="Linear Add" AutoDesign=No CaseName=DEAD
ScaleFactor=1 SteelDesign=None ConcDesign=None AlumDesign=None ColdDesign=None
ComboName=COMB102 CaseName=Wx ScaleFactor=1
ComboName=COMB102 CaseName=H ScaleFactor=1
.
.
.
ComboName=MENVE CaseName=COMB216 ScaleFactor=1
ComboName=MENVE CaseName=COMB217 ScaleFactor=1
ComboName=MENVE CaseName=COMB218 ScaleFactor=1

TABLE: "JOINT LOADS - FORCE"


Joint=4746 LoadPat=L CoordSys=GLOBAL F1=0 F2=0 F3=-2.78 M1=0 M2=0 M3=0
Joint=4746 LoadPat=L CoordSys=GLOBAL F1=0 F2=0 F3=-2.91 M1=0 M2=0 M3=0
Joint=4747 LoadPat=L CoordSys=GLOBAL F1=0 F2=0 F3=-2.78 M1=0 M2=0 M3=0
.
.
.
Joint=10711 LoadPat=L CoordSys=GLOBAL F1=0 F2=0 F3=-3.41 M1=0 M2=0 M3=0
Joint=10712 LoadPat=L CoordSys=GLOBAL F1=0 F2=0 F3=-3.41 M1=0 M2=0 M3=0
Joint=10713 LoadPat=L CoordSys=GLOBAL F1=0 F2=0 F3=-3.41 M1=0 M2=0 M3=0

TABLE: "FRAME LOADS - DISTRIBUTED"

Frame=21 LoadPat=DEAD CoordSys=GLOBAL Type=Force Dir=Gravity DistType=RelDis


RelDistA=0 RelDistB=1 AbsDistA=0 AbsDistB=0.61 FOverLA=108.87 FOverLB=108.87
Frame=22 LoadPat=DEAD CoordSys=GLOBAL Type=Force Dir=Gravity DistType=RelDis
RelDistA=0 RelDistB=1 AbsDistA=0 AbsDistB=0.61 FOverLA=108.87 FOverLB=108.87
Frame=23 LoadPat=DEAD CoordSys=GLOBAL Type=Force Dir=Gravity DistType=RelDis
RelDistA=0 RelDistB=1 AbsDistA=0 AbsDistB=0.35 FOverLA=108.87 FOverLB=108.87
.
.
.
Frame=121 LoadPat=DEAD CoordSys=GLOBAL Type=Force Dir=Gravity DistType=RelD
RelDistA=0 RelDistB=1 AbsDistA=0 AbsDistB=0.95 FOverLA=18.34 FOverLB=18.34
Frame=122 LoadPat=DEAD CoordSys=GLOBAL Type=Force Dir=Gravity DistType=RelD
RelDistA=0 RelDistB=1 AbsDistA=0 AbsDistB=0.95 FOverLA=18.34 FOverLB=18.34
Frame=123 LoadPat=DEAD CoordSys=GLOBAL Type=Force Dir=Gravity DistType=RelD
RelDistA=0 RelDistB=1 AbsDistA=0 AbsDistB=0.95 FOverLA=18.34 FOverLB=18.34

Page 100 of 101


Doc No : 00-UBF-C-51-001-001
TR COMPOUND FOUNDATION Rev No : X0

TABLE: "JOINT PATTERN ASSIGNMENTS"


Joint=17 Pattern=H Value=24.05
Joint=18 Pattern=H Value=24.05
Joint=19 Pattern=H Value=24.05
.
.
.
Joint=10711 Pattern=H Value=-6.04999
Joint=10712 Pattern=H Value=-6.04999
Joint=10713 Pattern=H Value=-6.04999

END TABLE DATA

Page 101 of 101