2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
DOCUMENT REVISIONS
Sections changed in last revision are identified by a vertical line in the right margin
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
INDEX
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
ATTACHMENTS
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
1.1 SCOPE
The scope of this calculation is to evaluate the loads, perform structural analysis, stability check, and
design of Gravity Isolation Valve Chamber.
1) The Gravity isolation valve chamber has been modelled as concrete structure with cast in situ
concrete. The overall length, breadth and depth of the structure is 1.80 m, 2.80 m and 4.10 m
respectively.
2) This chamber is located in under ground and subjected an earth pressure. The dynamic earth
pressure has been calculated as per Mononobe-Okabe method and considered in the design.
5) The Design of the chamber has been performed in Limite State Method with a crack width of 0.3mm
as per the design basis.
6) The stiffener has been modelled as the length of the chamber is more.
7) The roof of the chamber consist of pre-cast slab. The precast slab has been designed as one way
slab. Also the lifting analysis also performed for pre-cast slab.
8) The weight of butterfly valve is DN 800 Considered the same for design purpose. It is applicable
for Storage Tank 1,2 and Associated Works as per drawing
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
9) The support condition has been assumed as PLATE MAT and necessary Ks value
as per Geotechnical investigation report has been applied.
1 BS 8110-1:1997
Structural use of Concrete: Code of practice for Design and Construction
3 BS 8110-3:1985 Structural use of Concrete: Design charts for Singly Reinforced Beams,
Doubly Reinforced Beams, and Rectangular Columns
4 BS 8007: 1987 Code of practice for Design of Concrete Structures for Retaining Aqueous
Liquids
5 BS 8004: 1986 Code of practice for foundation.
6 BS 6399-3: 1988 Code of Practice for Imposed Roof Loads
7 UBC 97 Uniform Building Code
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
1.5 MATERIALS
Concrete
Characteristic Strength of Cast-In-Situ Concrete (C40) fCU = 40 N/mm2
Specific weight gc = 25 kN/m3
Reinforcement
Yield Strength of High Yield Strength Deformed bars (HYSD)
as per BS code. fy = 460 N/mm2
Soil data
Specific weight (dry) gs = 18 kN/m3 Ref. FRP-G-21-303A
Allowable net pressure of Soil at 7.00 m below Finished Grade Level (FGL),
For Normal Operating Case qsoil net = 200 kN/m2 Ref. FRP-G-21-303A
Engineering works
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2
B
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
MEMBER PROPERTIES
MEMBER SIZE / PLATE THICKNESS
MEMBER
SL.NO MARK THICKNESS / WIDTH DEPTH
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
This load case includes self weight of structure and dead weight of slab, screed etc.
a) Self weight of all main members is generated by STAAD-pro v8i with a gravity multiplier
equal to 1.05.
= 2.36 kN
c) Weight of Roof has been covered in self weight command itself.
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
The total earth pressure resulted from earthquake loading has been calculated using
Mononobe-Okabe method.
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
Structural period T=
Ct =
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
= 15.140 deg
Earth face of wall makes with vertical q= 0.000 deg (Vertical wall)
Slope angle of earth fill b = 0.000 deg (Horizontal backfill)
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
Though there will not be any water in the chamber during operating condition, the water load has
been considered inside the chamber as a accidental case.
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
Load 11 12 31 32 33 34 21 22
Case
DL LL SP DS SL HS PE PO
A Inside - No Water and Outside - No fill
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
Load 11 12 31 32 33 34 21 22
Case
DL LL SP DS SL HS PE PO
A Inside - No Water and Outside - No fill
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
MATERIAL DATA
Characteristic strength of concrete fcu = 40 N/mm2
Characteristic strength of reinforcement fy = 460 N/mm2
Characteristic strength of shear reinf. fyv = 460 N/mm2
GEOMETRY DATA
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
FORCE DATA
Maximum force details for load case 101 to 122
Factored vertical BM
At supports MV, span = 10.776 + 1.579
12.36 kN-m
At spans MV, support = 10.834 + 0.144
11.0 kN-m
Factored horizontal BM
At supports MH, span = 5.781 + 0.021
5.8 kN-m
At spans MH, support = 17.295 + 0.246
17.5 kN-m
A. BENDING DESIGN
Partial Safety Factor for Steel gm = 1.050 (Refer Table 2.2 of BS 8110 Part 1)
Design Strength of Steel fd = Yeild Strength / Partial Safety Factor
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
= 0.95 fy
% of Redistribution assumed = 0%
Ratio = (BM After distribution / BM before) bb = 1
Constant K' = 0.156 (If redistribution < 10%)
K' = 0.402 (bb - 0.4) - 0.18 (bb - 0.4)2 = 0.176 (If redistribution > 10%)
M u
K 2
f cu Bd
K= 0.006
Here K < K', Hence no compression reinforcement are required
k k'
z d 0 .5 0 .25 z d 0 .5 0 .25
0 .9 0 .9
M u ( K K ' ) f cu bd 2
As As '
0 . 95 f y Z 0 . 95 f y ( d d ' )
K ' f cu bd 2
As As '
0 . 95 f y ( d d ' )
Lever arm z= 217.42 mm
Maximum Lever arm zmax = 0.95d
zmax = 208.05 mm
z > z max, Hence Take z = zmax
Netural axis depth x = (d -z) / 0.45 x= 24.33 mm
As = Mu / 0.95 fy z
za = 208.05
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
HENCE OK
Reinforcement Summary
+ X Direction + Z Direction
Parameters
Bottom Top Bottom Top
Design Moment 12.4 11.0 5.8 17.5
dprov 219 219 207 207
k 0.006 0.006 0.003 0.010
k' 0.156 0.156 0.156 0.156
Criteria Case-1 Case-1 Case-1 Case-1
Lever Arm 208.050 208.050 196.650 196.650
Ast, reqd 135.9 120.7 67.5 204.1
Bar dia. & Spacings Y12-200 Y12-200 Y12-200 Y12-200
Ast, prov 565.5 565.5 565.5 565.5
Check Safe Safe Safe Safe
Moment Capacity 51.41 51.41 48.60 48.60
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
Max Sxy 309 211 0.00 -0.03 -0.02 -0.13 0.05 -0.4 -2.2 -2.5
Min Sxy 302 211 0.00 -0.03 -0.02 -0.12 -0.05 -0.3 -2.1 2.5
Max Mx 510 205 0.12 -0.01 0.12 -0.05 0.03 8.7 0.5 1.3
Min Mx 606 205 0.01 -0.02 0.10 -0.15 0.01 -8.8 -5.6 0.1
Max My 906 211 -0.01 0.00 -0.06 -0.07 0.00 7.7 4.8 0.0
Min My 206 211 0.00 -0.11 -0.03 -0.24 0.01 -1.9 -12.8 -0.3
Max Mxy 209 205 0.03 0.01 0.03 -0.14 0.00 -0.6 -3.9 5.9
Min Mxy 202 205 -0.03 0.01 0.03 -0.13 0.00 -0.6 -3.7 -5.9
Un factored vertical BM
At supports MV, span = 8.658 + 1.345
10.00 kN-m
At spans MV, support = 8.775 + 0.136
8.9 kN-m
Un factored horizontal BM
At supports MH, span = 4.777 + 0.032
4.8 kN-m
At spans MH, support = 12.773 + 0.271
13.0 kN-m
2 2
S d1 d1
acr cc
Al Nasr Contracting Company L.L.C, Dubai, U.A.E 2 2 Page
No.2 33 OF 272
ETIHAD WATER & ELECTRICITY, DUBAI.
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
Modulus of elasticity
Ec = 14.0 kN.mm2
Modulus of elasticity of Steel Es = 200.0 kN.mm2
Modulus ratio a= 14.29
% of Reinforcement provided r= 0.258 %
Depth to neutral axis, "x" = (-a.r +((a.r) + 2.a.r) .d
2 0.5
x = 51.95 mm
Lever arm, "z" = (d - x/3) z = 201.68 mm
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
MATERIAL DATA
GEOMETRY DATA
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
FORCE DATA
Maximum force details for load case 101 to 122
Shear Membrane Bending
QX QY SX SY SZ Mx My Mxy
DES Plate LC
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2 kN.m/m kN.m/m kN.m/m
Max Qx 2301 105 0.15 -0.01 0.14 -0.07 0.05 10.7 0.5 1.6
Min Qx 2310 105 -0.15 -0.01 0.15 -0.07 -0.05 10.8 0.6 -1.6
Max Qy 2005 110 0.00 0.08 0.00 -0.26 0.00 -2.8 -6.6 1.4
Min Qy 2006 111 0.00 -0.14 -0.04 -0.32 -0.01 -2.7 -17.2 0.2
Max Sx 2210 105 -0.15 -0.03 0.17 -0.05 -0.04 10.0 -0.2 -2.7
Min Sx 2701 113 -0.11 0.00 -0.10 -0.09 0.01 -8.6 -0.8 0.2
Max Sy 3201 109 -0.01 0.01 0.02 0.00 -0.01 0.8 -0.1 -2.0
Min Sy 2006 111 0.00 -0.14 -0.04 -0.32 -0.01 -2.7 -17.2 0.2
Max Sxy 2102 111 0.01 -0.04 -0.02 -0.17 0.07 -0.4 -3.1 -2.8
Min Sxy 2109 111 -0.01 -0.04 -0.02 -0.17 -0.07 -0.5 -3.2 2.8
Max Mx 2310 105 -0.15 -0.01 0.15 -0.07 -0.05 10.8 0.6 -1.6
Min Mx 2406 105 -0.01 -0.02 0.13 -0.21 -0.01 -10.8 -6.8 -0.1
Max My 2706 111 0.01 0.00 -0.07 -0.10 0.00 9.1 5.8 0.0
Min My 2006 111 0.00 -0.14 -0.04 -0.32 -0.01 -2.7 -17.2 0.2
Max Mxy 2002 105 0.04 0.01 0.04 -0.18 0.00 -0.9 -5.4 7.5
Min Mxy 2009 105 -0.04 0.01 0.04 -0.18 0.00 -0.9 -5.6 -7.6
Factored vertical BM
At supports MV, span = 10.758 + 1.587
12.35 kN-m
At spans MV, support = 10.816 + 0.141
11.0 kN-m
Factored horizontal BM
At supports MH, span = 5.768 + 0.024
5.8 kN-m
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
A. BENDING DESIGN
Partial Safety Factor for Steel gm = 1.050 (Refer Table 2.2 of BS 8110 Part 1)
Design Strength of Steel fd = Yeild Strength / Partial Safety Factor
= 0.95 fy
% of Redistribution assumed = 0%
Ratio = (BM After distribution / BM before) bb = 1
Constant K' = 0.156 (If redistribution < 10%)
K' = 0.402 (bb - 0.4) - 0.18 (bb - 0.4)2 = 0.176 (If redistribution > 10%)
k k'
z d 0 .5 0 .25 z d 0 .5 0 .25
0 . 9 0 .9
M u ( K K ' ) f cu bd 2
As As '
0 . 95 f y Z 0 . 95 f y ( d d ' )
K ' f cu bd 2
As As '
0 . 95 f y ( d d ' )
Lever arm z= 217.42 mm
Maximum Lever arm zmax = 0.95d
zmax = 208.05 mm
z > z max, Hence Take z = zmax
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
Reinforcement Summary
+ X Direction + Z Direction
Parameters
Bottom Top Bottom Top
Design Moment 12.3 11.0 5.8 17.4
dprov 219 219 207 207
k 0.006 0.006 0.003 0.010
k' 0.156 0.156 0.156 0.156
Criteria Case-1 Case-1 Case-1 Case-1
Lever Arm 208.050 208.050 196.650 196.650
Ast, reqd 135.8 120.5 67.4 202.7
Bar dia. & Spacings Y12-200 Y12-200 Y12-200 Y12-200
Ast, prov 565.5 565.5 565.5 565.5
Check Safe Safe Safe Safe
Moment Capacity 51.41 51.41 48.60 48.60
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
Min Qx 2310 205 -0.12 -0.01 0.12 -0.04 -0.03 8.6 0.4 -1.4
Max Qy 2005 208 0.00 0.07 0.00 -0.20 0.00 -2.2 -4.8 1.1
Min Qy 2006 211 0.00 -0.11 -0.03 -0.23 -0.01 -1.8 -12.7 0.2
Max Sx 2210 205 -0.12 -0.02 0.13 -0.03 -0.03 7.9 -0.1 -2.2
Min Sx 2701 209 -0.09 0.00 -0.08 -0.06 0.01 -7.2 -0.7 0.2
Max Sy 3201 207 -0.01 0.01 0.02 0.00 0.00 0.6 0.0 -1.7
Min Sy 2006 211 0.00 -0.11 -0.03 -0.23 -0.01 -1.8 -12.7 0.2
Max Sxy 2102 211 0.00 -0.03 -0.02 -0.12 0.05 -0.3 -2.1 -2.5
Min Sxy 2109 211 0.00 -0.03 -0.02 -0.12 -0.05 -0.3 -2.2 2.5
Max Mx 2310 205 -0.12 -0.01 0.12 -0.04 -0.03 8.6 0.4 -1.4
Min Mx 2406 205 -0.01 -0.02 0.10 -0.15 -0.01 -8.8 -5.6 -0.1
Max My 2706 211 0.01 0.00 -0.06 -0.07 0.00 7.7 4.8 0.0
Min My 2006 211 0.00 -0.11 -0.03 -0.23 -0.01 -1.8 -12.7 0.2
Max Mxy 2002 205 0.03 0.01 0.03 -0.12 0.00 -0.6 -3.6 5.9
Min Mxy 2009 205 -0.03 0.01 0.03 -0.13 0.00 -0.6 -3.8 -5.9
Un factored vertical BM
At supports MV, span = 8.645 + 1.35
10.00 kN-m
At spans MV, support = 8.762 + 0.134
8.9 kN-m
Un factored horizontal BM
At supports MH, span = 4.768 + 0.034
4.8 kN-m
At spans MH, support = 12.716 + 0.243
13.0 kN-m
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 2
S d1 d1
acr cc
2 2 2
Modulus of elasticity
Ec = 14.0 kN.mm2
Modulus of elasticity of Steel Es = 200.0 kN.mm2
Modulus ratio a= 14.29
% of Reinforcement provided r= 0.258 %
Depth to neutral axis, "x" = (-a.r +((a.r)2 + 2.a.r)0.5.d
x = 51.95 mm
Lever arm, "z" = (d - x/3) z = 201.68 mm
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
3 a cr m
Calculated crack width
w
a c min
1 2 cr
h x
w= -0.116 mm
< 0.3mm, Hence OK
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
MATERIAL DATA
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
GEOMETRY DATA
FORCE DATA
Maximum force details for load case 101 to 122
Shear Membrane Bending
QX QY SX SY SZ Mx My Mxy
DES Plate LC
N/mm 2
N/mm 2
N/mm 2
N/mm 2
N/mm 2
kN.m/m kN.m/m kN.m/m
Max Qx 4027 105 0.14 -0.02 0.20 -0.05 0.04 10.5 0.1 -1.2
Min Qx 4021 105 -0.14 -0.02 0.20 -0.05 -0.05 10.6 0.1 1.2
Max Qy 4051 105 -0.11 0.02 0.17 -0.09 -0.02 12.5 2.6 0.4
Min Qy 4004 111 0.00 -0.10 -0.02 -0.27 0.00 -1.9 -10.3 0.0
Max Sx 4034 105 0.00 -0.03 0.22 -0.20 0.00 -4.7 -2.2 0.0
Min Sx 4057 116 -0.10 -0.01 -0.14 -0.10 0.00 -9.9 -1.8 0.1
Max Sy 4127 116 -0.03 -0.01 0.01 -0.01 -0.03 -2.5 -0.3 -0.2
Min Sy 4004 106 0.00 -0.02 0.04 -0.32 0.00 -3.7 -13.2 0.0
Max Sxy 4026 106 0.09 -0.04 0.20 -0.15 0.05 1.2 -2.4 -0.4
Min Sxy 4022 106 -0.09 -0.04 0.20 -0.16 -0.05 1.2 -2.5 0.4
Max Mx 4041 105 -0.13 -0.02 0.19 -0.08 -0.02 13.2 2.6 1.7
Min Mx 4051 116 0.10 -0.01 -0.14 -0.10 0.00 -9.9 -1.8 -0.1
Max My 4051 105 -0.11 0.02 0.17 -0.09 -0.02 12.5 2.6 0.4
Min My 4004 105 0.00 -0.02 0.04 -0.32 0.00 -3.7 -13.2 0.0
Max Mxy 4006 105 0.05 -0.03 0.05 -0.20 0.04 -1.3 -8.6 3.6
Min Mxy 4002 106 -0.05 -0.04 0.05 -0.21 -0.04 -1.4 -8.7 -3.6
Factored vertical BM
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
A. BENDING DESIGN
Partial Safety Factor for Steel gm = 1.050 (Refer Table 2.2 of BS 8110 Part 1)
Design Strength of Steel fd = Yeild Strength / Partial Safety Factor
= 0.95 fy
% of Redistribution assumed = 0%
Ratio = (BM After distribution / BM before) bb = 1
Constant K' = 0.156 (If redistribution < 10%)
K' = 0.402 (bb - 0.4) - 0.18 (bb - 0.4)
2
= 0.176 (If redistribution > 10%)
k k'
z d 0 .5 0 .25 z d 0 .5 0 .25
0 .9 0 .9
M u ( K K ' ) f cu bd 2
As As '
0 . 95 f y Z 0 . 95 f y ( d d ' )
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
K ' f cu bd 2
As As '
0 . 95 f y ( d d ' )
Lever arm z= 217.10 mm
Maximum Lever arm zmax = 0.95d
zmax = 208.05 mm
z > z max, Hence Take z = zmax
Netural axis depth x = (d -z) / 0.45 x= 24.33 mm
As = Mu / 0.95 fy z
za = 208.05
Reinforcement Summary
+ X Direction + Z Direction
Parameters
Bottom Top Bottom Top
Design Moment 14.8 10.0 3.0 13.2
dprov 219 219 207 207
k 0.008 0.005 0.002 0.008
k' 0.156 0.156 0.156 0.156
Criteria Case-1 Case-1 Case-1 Case-1
Lever Arm 208.050 208.050 196.650 196.650
Ast, reqd 163.3 109.5 35.3 153.7
Bar dia. & Spacings Y12-200 Y12-200 Y12-200 Y12-200
Ast, prov 565.5 565.5 565.5 565.5
Check Safe Safe Safe Safe
Moment Capacity 51.41 51.41 48.60 48.60
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
Un factored vertical BM
At supports MV, span = 10.696 + 1.334
12.03 kN-m
At spans MV, support = 8.321 + 0.066
8.4 kN-m
Un factored horizontal BM
At supports MH, span = 2.119 + 0.325
2.4 kN-m
At spans MH, support = 9.501 + 0.024
9.5 kN-m
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 2
S d1 d1
acr cc
2 2 2
Modulus of elasticity
Ec = 14.0 kN.mm2
Modulus of elasticity of Steel Es = 200.0 kN.mm2
Modulus ratio a= 14.29
% of Reinforcement provided r= 0.258 %
Depth to neutral axis, "x" = (-a.r +((a.r)2 + 2.a.r)0.5.d
x = 51.95 mm
Lever arm, "z" = (d - x/3) z = 201.68 mm
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
566 mm2 / m
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
MATERIAL DATA
GEOMETRY DATA
FORCE DATA
Maximum force details for load case 101 to 122
Shear Membrane Bending
QX QY SX SY SZ Mx My Mxy
DES Plate LC
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2 kN.m/m kN.m/m kN.m/m
Max Qx 4221 105 0.14 -0.02 0.19 -0.05 0.04 10.5 0.1 -1.2
Min Qx 4227 105 -0.14 -0.02 0.19 -0.04 -0.04 10.5 0.1 1.2
Max Qy 4251 105 0.11 0.02 0.17 -0.08 0.01 12.5 2.6 -0.4
Min Qy 4204 111 0.00 -0.10 -0.02 -0.26 0.00 -1.8 -9.9 0.0
Max Sx 4234 105 0.00 -0.03 0.22 -0.19 0.00 -4.6 -2.2 0.0
Min Sx 4257 116 0.10 -0.01 -0.14 -0.10 0.00 -9.9 -1.8 -0.1
Max Sy 4327 115 0.03 -0.01 0.01 -0.01 0.03 -2.5 -0.3 0.2
Min Sy 4204 106 0.00 -0.02 0.04 -0.31 0.00 -3.6 -12.7 0.0
Max Sxy 4222 106 0.09 -0.04 0.20 -0.15 0.05 1.2 -2.4 -0.4
Min Sxy 4226 105 -0.09 -0.04 0.20 -0.15 -0.05 1.2 -2.4 0.4
Max Mx 4241 105 0.13 -0.02 0.19 -0.08 0.01 13.1 2.6 -1.7
Min Mx 4251 116 -0.10 -0.01 -0.14 -0.10 -0.01 -9.9 -1.8 0.1
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
Max My 4251 105 0.11 0.02 0.17 -0.08 0.01 12.5 2.6 -0.4
Min My 4204 105 0.00 -0.02 0.04 -0.31 0.00 -3.6 -12.8 0.0
Max Mxy 4202 105 0.05 -0.03 0.05 -0.20 0.03 -1.3 -8.4 3.5
Min Mxy 4206 105 -0.05 -0.03 0.05 -0.20 -0.04 -1.3 -8.3 -3.5
Factored vertical BM
At supports MV, span = 13.139 + 1.659
14.80 kN-m
At spans MV, support = 9.908 + 0.081
10.0 kN-m
Factored horizontal BM
At supports MH, span = 2.599 + 0.407
3.0 kN-m
At spans MH, support = 12.781 + 0.026
12.8 kN-m
A. BENDING DESIGN
Partial Safety Factor for Steel gm = 1.050 (Refer Table 2.2 of BS 8110 Part 1)
Design Strength of Steel fd = Yeild Strength / Partial Safety Factor
= 0.95 fy
% of Redistribution assumed = 0%
Ratio = (BM After distribution / BM before) bb = 1
Constant K' = 0.156 (If redistribution < 10%)
K' = 0.402 (bb - 0.4) - 0.18 (bb - 0.4)2 = 0.176 (If redistribution > 10%)
k k'
z d 0 .5 Al0Nasr
.25 Contracting
Company L.L.C,z Dubai,
d 0U.A.E
.5 0 .25 Page No. 61 OF 272
ETIHAD WATER & ELECTRICITY, DUBAI.
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
k k'
z d 0 .5 0 .25 z d 0 .5 0 .25
0 . 9 0 .9
M u ( K K ' ) f cu bd 2
As As '
0 . 95 f y Z 0 . 95 f y ( d d ' )
K ' f cu bd 2
As As '
0 . 95 f y ( d d ' )
Lever arm z= 217.11 mm
Maximum Lever arm zmax = 0.95d
zmax = 208.05 mm
z > z max, Hence Take z = zmax
Netural axis depth x = (d -z) / 0.45 x= 24.33 mm
As = Mu / 0.95 fy z
za = 208.05
Reinforcement Summary
+ X Direction + Z Direction
Parameters
Bottom Top Bottom Top
Design Moment 14.8 10.0 3.0 12.8
dprov 219 219 207 207
k 0.008 0.005 0.002 0.007
k' 0.156 0.156 0.156 0.156
Criteria Case-1 Case-1 Case-1 Case-1
Lever Arm 208.050 208.050 196.650 196.650
Ast, reqd 162.8 109.9 35.0 149.0
Bar dia. & Spacings Y12-200 Y12-200 Y12-200 Y12-200
Ast, prov 565.5 565.5 565.5 565.5
Check Safe Safe Safe Safe
Moment Capacity 51.41 51.41 48.60 48.60
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
Un factored vertical BM
At supports MV, span = 10.666 + 1.33
12.00 kN-m
At spans MV, support = 8.342 + 0.073
8.4 kN-m
Un factored horizontal BM
At supports MH, span = 2.098 + 0.324
2.4 kN-m
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 2
S d1 d1
acr cc
2 2 2
Modulus of elasticity
Ec = 14.0 kN.mm2
Modulus of elasticity of Steel Es = 200.0 kN.mm2
Modulus ratio a= 14.29
% of Reinforcement provided r= 0.258 %
Depth to neutral axis, "x" = (-a.r +((a.r) + 2.a.r) .d
2 0.5
x = 51.95 mm
Lever arm, "z" = (d - x/3) z = 201.68 mm
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
MATERIAL DATA
Characteristic strength of concrete fcu = 40 N/mm2
Characteristic strength of reinforcement fy = 460 N/mm2
Characteristic strength of shear reinf. fyv = 460 N/mm2
GEOMETRY DATA
Equivalent width of Beam B= 300 mm
Depth of Beam D= 300 mm
Clear cover cc = 75 mm
Dia of Top reinf. d1 = 16 mm
Dia of Bottom reinf. d2 = 16 mm
Effective depth bottom reinf. (Sagging) d= 217 mm
Effective depth at top reinf. (Hogging) d= 217 mm
FORCE DATA
Max force details for Member No. 1572 To 1725
d Fx Fy Fz Mx My Mz
Beam L/C
(m) (kN) (kN) (kN) (kNm) (kNm) (kNm)
Max Fx 1690 112 0.3 10.9 -1.1 -0.5 0.6 -0.1 0.2
Min Fx 10871 105 0.0 -3.1 -2.8 0.3 -0.5 0.6 0.1
Max Fy 9651 105 0.0 -1.8 3.1 -0.4 -0.6 -0.6 0.0
Min Fy 10903 105 0.0 -2.2 -3.0 -0.4 0.6 -0.6 0.0
Max Fz 9694 111 0.0 2.6 -0.4 1.2 -0.3 0.0 -0.3
Min Fz 9651 112 0.0 2.8 -0.3 -1.3 0.3 -0.1 -0.3
Max Mx 1712 105 0.0 7.1 -0.5 -0.4 0.7 0.1 0.1
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
Min Mx 1690 105 0.0 7.8 0.5 -0.4 -0.7 0.1 -0.1
Max My 10868 105 0.3 -1.9 2.9 0.3 0.5 0.7 -1.0
Min My 10831 106 0.3 -1.8 2.9 -0.3 -0.5 -0.7 -1.0
Max Mz 10812 105 0.3 -2.1 -2.9 -0.3 0.5 -0.7 1.0
Min Mz 10831 106 0.3 -1.8 2.9 -0.3 -0.5 -0.7 -1.0
Partial Safety Factor for Steel gm = 1.050 (Refer Table 2.2 of BS 8110 Part 1)
Design Strength of Steel fd = Yield Strength / Partial Safety Factor
= 0.95 fy
% of Redistribution assumed = 0%
Ratio = (BM After distribution / BM before) bb = 1
Constant K' = 0.156 (If redistribution < 10%)
K' = 0.402 (bb - 0.4) - 0.18 (bb - 0.4)2 = 0.176 (If redistribution > 10%)
k k'
z d 0 .5 0 .25 z d 0 .5 0 .25
0 . 9 0 .9
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
M u ( K K ' ) f cu bd 2
As As '
0 . 95 f y Z 0 . 95 f y ( d d ' )
K ' f cu bd 2
As As '
0 . 95 f y ( d d ' )
Lever arm z= 216.57 mm
Maximum Lever arm zmax = 0.95d
zmax = 206.15 mm
z > z max, Hence Take z = zmax
Neutral axis depth x = (d -z) / 0.45 x= 24.11 mm
As = Mu / 0.95 fy z
Design for Main reinforcement for Sagging bending moment at support / Mid Span
Partial Safety Factor for Steel gm = 1.050 (Refer Table 2.2 of BS 8110 Part 1)
Design Strength of Steel fd = Yield Strength / Partial Safety Factor
= 0.95 fy
% of Redistribution assumed = 0%
Ratio = (BM After distribution / BM before) bb = 1
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
k k'
z d 0 .5 0 .25 z d 0 .5 0 .25
0 .9 0 .9
M u ( K K ' ) f cu bd 2
As As '
0 . 95 f y Z 0 . 95 f y ( d d ' )
K ' f cu bd 2
As As '
0 . 95 f y ( d d ' )
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
max 0.8 f cu
Which is the lesser
= 5.000 N/mm2
0 .4 bv S v bv S v ( c )
A sv Asv
0 . 95 f yv 0.95 f yv
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 73 OF 272
ETIHAD WATER & ELECTRICITY, DUBAI.
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
DOCUMENT # 0 .4 b S
ALN-200W2021-C-CAL-163 Rev # 0 v S v ( 24-Nov-22
bDATE c )
A sv v v
Asv
0 . 95 f yv 0.95 f yv
Max. spacing of stirrups shall not exceed 0.75d = 162.75 mm (Cl.3.4.5.5 of BS 8110)
d Fx Fy Fz Mx My Mz
Beam L/C
(m) (kN) (kN) (kN) (kNm) (kNm) (kNm)
Max Fx 1690 212 0.3 7.8 -0.9 -0.3 0.5 0.0 0.2
Min Fx 10871 205 0.0 -2.4 -2.2 0.2 -0.4 0.5 0.0
Max Fy 9651 205 0.0 -1.6 2.4 -0.3 -0.5 -0.4 0.0
Min Fy 10903 205 0.0 -2.0 -2.4 -0.2 0.5 -0.4 0.0
Max Fz 9694 211 0.0 2.1 -0.5 0.9 -0.3 0.0 -0.3
Min Fz 9651 212 0.0 2.2 -0.5 -1.0 0.3 0.0 -0.3
Max Mx 1712 205 0.0 4.8 -0.4 -0.3 0.6 0.1 0.1
Min Mx 1690 205 0.0 5.3 0.4 -0.3 -0.6 0.1 -0.1
Max My 10868 205 0.3 -1.5 2.2 0.2 0.4 0.5 -0.7
Min My 10831 206 0.3 -1.5 2.2 -0.2 -0.4 -0.5 -0.8
Max Mz 10903 205 0.3 -1.2 -2.4 -0.2 0.5 -0.5 0.8
Min Mz 10831 206 0.3 -1.5 2.2 -0.2 -0.4 -0.5 -0.8
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 2
S d1 d1
a cr cc
2 2 2
Overall depth of Beam h= 300 mm
Effective depth of Beam d= 217 mm
Width of Beam b= 300 mm
Modulus of elasticity
Ec = 14.0 kN.mm2
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 2
S d1 d1
a cr cc
2 2 2
Modulus of elasticity
Ec = 14.0 kN.mm2
x = 74.00 mm
Lever arm, "z" = (d - x/3) z = 192.33 mm
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
MATERIAL DATA
Characteristic strength of concrete fcu = 40 N/mm2
Characteristic strength of reinforcement fy = 460 N/mm2
Characteristic strength of shear reinf. fyv = 460 N/mm2
GEOMETRY DATA
Equivalent width of Beam B= 300 mm
Depth of Beam D= 300 mm
Clear cover cc = 75 mm
Dia of Top reinf. d1 = 16 mm
Dia of Bottom reinf. d2 = 16 mm
Effective depth bottom reinf. (Sagging) d= 217 mm
Effective depth at top reinf. (Hogging) d= 217 mm
FORCE DATA
Max force details for Member No. 1572 To 1725
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
d Fx Fy Fz Mx My Mz
Beam L/C
(m) (kN) (kN) (kN) (kNm) (kNm) (kNm)
Max Fx 1690 112 0.3 10.9 -1.1 -0.5 0.6 -0.1 0.2
Min Fx 10871 105 0.0 -3.1 -2.8 0.3 -0.5 0.6 0.1
Max Fy 9651 105 0.0 -1.8 3.1 -0.4 -0.6 -0.6 0.0
Min Fy 10903 105 0.0 -2.2 -3.0 -0.4 0.6 -0.6 0.0
Max Fz 9694 111 0.0 2.6 -0.4 1.2 -0.3 0.0 -0.3
Min Fz 9651 112 0.0 2.8 -0.3 -1.3 0.3 -0.1 -0.3
Max Mx 1712 105 0.0 7.1 -0.5 -0.4 0.7 0.1 0.1
Min Mx 1690 105 0.0 7.8 0.5 -0.4 -0.7 0.1 -0.1
Max My 10868 105 0.3 -1.9 2.9 0.3 0.5 0.7 -1.0
Min My 10831 106 0.3 -1.8 2.9 -0.3 -0.5 -0.7 -1.0
Max Mz 10812 105 0.3 -2.1 -2.9 -0.3 0.5 -0.7 1.0
Min Mz 10831 106 0.3 -1.8 2.9 -0.3 -0.5 -0.7 -1.0
* Horizontal Stiffener will be subjected lateral bending moment. Hence My has been considered.
Partial Safety Factor for Steel gm = 1.050 (Refer Table 2.2 of BS 8110 Part 1)
Design Strength of Steel fd = Yield Strength / Partial Safety Factor
= 0.95 fy
% of Redistribution assumed = 0%
Ratio = (BM After distribution / BM before) bb = 1
Constant K' = 0.156 (If redistribution < 10%)
K' = 0.402 (bb - 0.4) - 0.18 (bb - 0.4) 2 = 0.176 (If redistribution > 10%)
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
K= 0.001
k k'
z d 0 .5 0 .25 z d 0 .5 0 .25
0 .9 0 . 9
M u ( K K ' ) f cu bd 2
As As '
0 . 95 f y Z 0 . 95 f y ( d d ' )
K ' f cu bd 2
As As '
0 . 95 f y ( d d ' )
Design for Main reinforcement for Sagging bending moment at support / Mid Span
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
Partial Safety Factor for Steel gm = 1.050 (Refer Table 2.2 of BS 8110 Part 1)
Design Strength of Steel fd = Yield Strength / Partial Safety Factor
= 0.95 fy
% of Redistribution assumed = 0%
Ratio = (BM After distribution / BM before) bb = 1
Constant K' = 0.156 (If redistribution < 10%)
K' = 0.402 (bb - 0.4) - 0.18 (bb - 0.4)
2 = 0.176 (If redistribution > 10%)
k k'
z d 0 .5 0 .25 z d 0 .5 0 .25
0 .9 0 .9
M u ( K K ' ) f cu bd 2
As As '
0 . 95 f y Z 0 . 95 f y ( d d ' )
K ' f cu bd 2
As As '
0 . 95 f y ( d d ' )
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
zmax = 206.15 mm
z > z max, Hence Take z = zmax
Neutral axis depth x = (d -z) / 0.45 x= 24.11 mm
As = Mu / 0.95 fy z
max 0.8 f cu
Which is the lesser
= 5.000 N/mm2
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 0.5uc < u < (uc +0.4), Minimum links for whole length of beam.
3 (uc+0.4) < u < ucmax, Shear reinforcement is required.
0 .4 bv S v bv S v ( c )
A sv Asv
0 . 95 f yv 0.95 f yv
Max. spacing of stirrups shall not exceed 0.75d = 162.75 mm (Cl.3.4.5.5 of BS 8110)
d Fx Fy Fz Mx My Mz
Beam L/C
(m) (kN) (kN) (kN) (kNm) (kNm) (kNm)
Max Fx 1690 212 0.3 7.8 -0.9 -0.3 0.5 0.0 0.2
Min Fx 10871 205 0.0 -2.4 -2.2 0.2 -0.4 0.5 0.0
Max Fy 9651 205 0.0 -1.6 2.4 -0.3 -0.5 -0.4 0.0
Min Fy 10903 205 0.0 -2.0 -2.4 -0.2 0.5 -0.4 0.0
Max Fz 9694 211 0.0 2.1 -0.5 0.9 -0.3 0.0 -0.3
Min Fz 9651 212 0.0 2.2 -0.5 -1.0 0.3 0.0 -0.3
Max Mx 1712 205 0.0 4.8 -0.4 -0.3 0.6 0.1 0.1
Min Mx 1690 205 0.0 5.3 0.4 -0.3 -0.6 0.1 -0.1
Max My 10868 205 0.3 -1.5 2.2 0.2 0.4 0.5 -0.7
Min My 10831 206 0.3 -1.5 2.2 -0.2 -0.4 -0.5 -0.8
Max Mz 10903 205 0.3 -1.2 -2.4 -0.2 0.5 -0.5 0.8
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
Min Mz 10831 206 0.3 -1.5 2.2 -0.2 -0.4 -0.5 -0.8
2 2
S d1 d1
a cr cc
2 2 2
Overall depth of Beam h= 300 mm
Effective depth of Beam d= 217 mm
Width of Beam b= 300 mm
Modulus of elasticity
Ec = 14.0 kN.mm2
x = 86.56 mm
Lever arm, "z" = (d - x/3) z = 188.15 mm
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 2
S d1 d1
a cr cc
2 2 2
Modulus of elasticity
Ec = 14.0 kN.mm2
x = 86.56 mm
Lever arm, "z" = (d - x/3) z = 188.15 mm
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
= 0.000056
Strain due to stiffening effect of concrete between cracks
For crack widths of 0.2mm e2 = b.(h-x)2/(3.Es.As.(d-x))
= 0.000290
Average strain for calculation of crack width em = e1 - e2
= -0.00023
3 a cr m
Calculated crack width
w
a c min
1 2 cr
h x
w= -0.039 mm
< 0.2mm, Hence OK
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
MATERIAL DATA
GEOMETRY DATA
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
Clear cover cc = 75 mm
Diameter of vertical Outer bar (+X Direction) fvo = 12 mm
Diameter of vertical Inner bar (+X Direction) fvi = 12 mm
Diameter of horizontal Outer bar (+Z Direction) fho = 12 mm
Diameter of horizontal Inner bar (+Z Direction) fhi = 12 mm
Effective depth for X direction reinf. d= 219 mm
Effective depth for Z direction reinf. d' = 207 mm
FORCE DATA
Maximum force details for load case 101 to 122
Shear Membrane Bending
QX QY SX SY SZ Mx My Mxy
DES Plate LC
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2 kN.m/m kN.m/m kN.m/m
Max Qx 178 111 0.28 -0.01 0.00 0.00 0.00 11.4 0.4 0.2
Min Qx 106 111 -0.29 -0.01 0.00 0.00 0.00 11.3 0.3 -0.1
Max Qy 146 106 0.00 0.24 0.00 0.00 0.00 -4.4 5.2 0.1
Min Qy 137 105 0.00 -0.23 0.00 0.00 0.00 -4.3 5.1 0.0
Max Sx 182 101 0.01 0.00 0.00 0.00 0.00 2.7 3.1 3.9
Min Sx 182 101 0.01 0.00 0.00 0.00 0.00 2.7 3.1 3.9
Max Sy 182 101 0.01 0.00 0.00 0.00 0.00 2.7 3.1 3.9
Min Sy 182 101 0.01 0.00 0.00 0.00 0.00 2.7 3.1 3.9
Max Sxy 182 101 0.01 0.00 0.00 0.00 0.00 2.7 3.1 3.9
Min Sxy 182 101 0.01 0.00 0.00 0.00 0.00 2.7 3.1 3.9
Max Mx 178 111 0.28 -0.01 0.00 0.00 0.00 11.4 0.4 0.2
Min Mx 143 105 0.00 0.02 0.00 0.00 0.00 -33.6 -17.3 -0.1
Max My 146 111 0.00 0.21 0.00 0.00 0.00 -2.4 6.4 0.1
Min My 142 105 0.00 0.00 0.00 0.00 0.00 -33.5 -18.4 -0.2
Max Mxy 169 105 0.08 0.10 0.00 0.00 0.00 -7.4 -4.9 7.2
Min Mxy 121 105 -0.08 0.10 0.00 0.00 0.00 -7.8 -5.1 -7.1
Factored vertical BM
At supports MV, span = 11.444 + 0.212
11.66 kN-m
At spans MV, support = 33.625 + 0.123
33.7 kN-m
Factored horizontal BM
At supports MH, span = 6.376 + 0.075
6.5 kN-m
At spans MH, support = 18.376 + 0.158
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
18.5 kN-m
A. BENDING DESIGN
Partial Safety Factor for Steel gm = 1.050 (Refer Table 2.2 of BS 8110 Part 1)
Design Strength of Steel fd = Yeild Strength / Partial Safety Factor
= 0.95 fy
% of Redistribution assumed = 0%
Ratio = (BM After distribution / BM before) bb = 1
Constant K' = 0.156 (If redistribution < 10%)
K' = 0.402 (bb - 0.4) - 0.18 (bb - 0.4)2 = 0.176 (If redistribution > 10%)
k k'
z d 0 .5 0 .25 z d 0 .5 0 .25
0 .9 0 . 9
M u ( K K ' ) f cu bd 2
As As '
0 . 95 f y Z 0 . 95 f y ( d d ' )
K ' f cu bd 2
As As '
0 . 95 f y ( d d ' )
Lever arm z= 217.51 mm
Maximum Lever arm zmax = 0.95d
zmax = 208.05 mm
z > z max, Hence Take z = zmax
Netural axis depth x = (d -z) / 0.45 x= 24.33 mm
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
As = Mu / 0.95 fy z
za = 208.05
Reinforcement Summary
+ X Direction + Z Direction
Parameters
Bottom Top Bottom Top
Design Moment 11.7 33.7 6.5 18.5
dprov 219 219 207 207
k 0.006 0.018 0.004 0.011
k' 0.156 0.156 0.156 0.156
Criteria Case-1 Case-1 Case-1 Case-1
Lever Arm 208.050 208.050 196.650 196.650
Ast, reqd 128.2 371.2 75.1 215.7
Bar dia. & Spacings Y12-200 Y12-200 Y12-200 Y12-200
Ast, prov 565.5 565.5 565.5 565.5
Check Safe Safe Safe Safe
Moment Capacity 51.41 51.41 48.60 48.60
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
Max Qy 146 206 0.0 0.2 0.0 0.0 0.0 -3.3 3.6 0.1
Min Qy 137 205 0.0 -0.2 0.0 0.0 0.0 -3.2 3.5 0.0
Max Sx 182 201 0.0 0.0 0.0 0.0 0.0 1.9 2.2 2.8
Min Sx 182 201 0.0 0.0 0.0 0.0 0.0 1.9 2.2 2.8
Max Sy 182 201 0.0 0.0 0.0 0.0 0.0 1.9 2.2 2.8
Min Sy 182 201 0.0 0.0 0.0 0.0 0.0 1.9 2.2 2.8
Max Sxy 182 201 0.0 0.0 0.0 0.0 0.0 1.9 2.2 2.8
Min Sxy 182 201 0.0 0.0 0.0 0.0 0.0 1.9 2.2 2.8
Max Mx 178 211 0.2 0.0 0.0 0.0 0.0 9.0 0.5 0.1
Min Mx 143 205 0.0 0.0 0.0 0.0 0.0 -24.4 -12.6 -0.1
Max My 146 211 0.0 0.1 0.0 0.0 0.0 -1.6 4.5 0.1
Min My 142 205 0.0 0.0 0.0 0.0 0.0 -24.3 -13.5 -0.1
Max Mxy 169 205 0.1 0.1 0.0 0.0 0.0 -5.5 -3.6 5.2
Min Mxy 121 205 -0.1 0.1 0.0 0.0 0.0 -5.8 -3.8 -5.2
Un factored vertical BM
At supports MV, span = 8.993 + 0.116
9.11 kN-m
At spans MV, support = 24.408 + 0.088
24.5 kN-m
Un factored horizontal BM
At supports MH, span = 4.54 + 0.053
4.6 kN-m
At spans MH, support = 13.455 + 0.113
13.6 kN-m
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 2
S d1 d1
acr cc
2 2 2
Modulus of elasticity
Ec = 14.0 kN.mm2
Modulus of elasticity of Steel Es = 200.0 kN.mm2
Modulus ratio a= 14.29
% of Reinforcement provided r= 0.258 %
Depth to neutral axis, "x" = (-a.r +((a.r) + 2.a.r) .d
2 0.5
x = 51.95 mm
Lever arm, "z" = (d - x/3) z = 201.68 mm
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
= 0.4682
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
MATERIAL DATA
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
GEOMETRY DATA
FORCE DATA
Maximum force details for load case 101 to 122
Shear Membrane Bending
QX QY SX SY SZ Mx My Mxy
DES Plate LC
N/mm 2
N/mm 2
N/mm 2
N/mm 2
N/mm 2
kN.m/m kN.m/m kN.m/m
Max Qx 140 115 0.00 0.00 0.00 0.00 0.00 -19.3 -8.1 0.0
Min Qx 117 111 -0.18 -0.01 0.00 0.00 0.00 -8.6 -3.6 0.5
Max Qy 128 114 -0.06 0.00 0.00 0.00 0.00 -17.1 -7.8 0.1
Min Qy 116 105 -0.14 -0.04 0.00 0.00 0.00 -17.4 -7.2 1.6
Max Sx 141 101 0.00 -0.01 0.00 0.00 0.00 -25.8 -12.9 -0.1
Min Sx 141 101 0.00 -0.01 0.00 0.00 0.00 -25.8 -12.9 -0.1
Max Sy 141 101 0.00 -0.01 0.00 0.00 0.00 -25.8 -12.9 -0.1
Min Sy 141 101 0.00 -0.01 0.00 0.00 0.00 -25.8 -12.9 -0.1
Max Sxy 141 101 0.00 -0.01 0.00 0.00 0.00 -25.8 -12.9 -0.1
Min Sxy 141 101 0.00 -0.01 0.00 0.00 0.00 -25.8 -12.9 -0.1
Max Mx 116 116 -0.13 -0.01 0.00 0.00 0.00 -5.2 -2.6 0.8
Min Mx 141 105 0.00 -0.01 0.00 0.00 0.00 -33.2 -17.8 -0.1
Max My 117 116 -0.15 -0.01 0.00 0.00 0.00 -6.1 -2.5 0.5
Min My 141 105 0.00 -0.01 0.00 0.00 0.00 -33.2 -17.8 -0.1
Max Mxy 116 105 -0.14 -0.04 0.00 0.00 0.00 -17.4 -7.2 1.6
Min Mxy 128 105 -0.05 -0.01 0.00 0.00 0.00 -29.5 -15.8 -0.3
Factored vertical BM
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
A. BENDING DESIGN
Partial Safety Factor for Steel gm = 1.050 (Refer Table 2.2 of BS 8110 Part 1)
Design Strength of Steel fd = Yeild Strength / Partial Safety Factor
= 0.95 fy
% of Redistribution assumed = 0%
Ratio = (BM After distribution / BM before) bb = 1
Constant K' = 0.156 (If redistribution < 10%)
K' = 0.402 (bb - 0.4) - 0.18 (bb - 0.4)
2
= 0.176 (If redistribution > 10%)
k k'
z d 0 .5 0 .25 z d 0 .5 0 .25
0 .9 0 .9
M u ( K K ' ) f cu bd 2
As As '
0 . 95 f y Z 0 . 95 f y ( d d ' )
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 100 OF 272
ETIHAD WATER & ELECTRICITY, DUBAI.
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
K ' f cu bd 2
As As '
0 . 95 f y ( d d ' )
Lever arm z= 318.48 mm
Maximum Lever arm zmax = 0.95d
zmax = 303.05 mm
z > z max, Hence Take z = zmax
Netural axis depth x = (d -z) / 0.45 x= 35.44 mm
As = Mu / 0.95 fy z
za = 303.05
Reinforcement Summary
+ X Direction + Z Direction
Parameters
Bottom Top Bottom Top
Design Moment 5.9 33.3 -2.1 17.8
dprov 319 319 307 307
k 0.001 0.008 -0.001 0.005
k' 0.156 0.156 0.156 0.156
Criteria Case-1 Case-1 Case-1 Case-1
Lever Arm 303.050 303.050 291.650 291.650
Ast, reqd 44.6 251.3 -16.2 140.0
Bar dia. & Spacings Y12-200 Y12-200 Y12-200 Y12-200
Ast, prov 565.5 565.5 565.5 565.5
Check Safe Safe Safe Safe
Moment Capacity 74.89 74.89 72.07 72.07
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 101 OF 272
ETIHAD WATER & ELECTRICITY, DUBAI.
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
Un factored vertical BM
At supports MV, span = -3.682 + 0.565
-3.12 kN-m
At spans MV, support = 24.105 + 0.061
24.2 kN-m
Un factored horizontal BM
At supports MH, span = -1.803 + 0.355
-1.4 kN-m
At spans MH, support = 13.012 + 0.061
13.1 kN-m
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 102 OF 272
ETIHAD WATER & ELECTRICITY, DUBAI.
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
2 2
S d1 d1
acr cc
2 2 2
Modulus of elasticity
Ec = 14.0 kN.mm2
Modulus of elasticity of Steel Es = 200.0 kN.mm2
Modulus ratio a= 14.29
% of Reinforcement provided r= 0.177 %
Depth to neutral axis, "x" = (-a.r +((a.r)2 + 2.a.r)0.5.d
x = 64.17 mm
Lever arm, "z" = (d - x/3) z = 297.61 mm
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 103 OF 272
ETIHAD WATER & ELECTRICITY, DUBAI.
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 104 OF 272
ETIHAD WATER & ELECTRICITY, DUBAI.
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 105 OF 272
ETIHAD WATER & ELECTRICITY, DUBAI.
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 106 OF 272
ETIHAD WATER & ELECTRICITY, DUBAI.
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 107 OF 272
ETIHAD WATER & ELECTRICITY, DUBAI.
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 108 OF 272
ETIHAD WATER & ELECTRICITY, DUBAI.
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 109 OF 272
ETIHAD WATER & ELECTRICITY, DUBAI.
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 110 OF 272
ETIHAD WATER & ELECTRICITY, DUBAI.
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 111 OF 272
ETIHAD WATER & ELECTRICITY, DUBAI.
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 112 OF 272
ETIHAD WATER & ELECTRICITY, DUBAI.
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 113 OF 272
ETIHAD WATER & ELECTRICITY, DUBAI.
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 114 OF 272
ETIHAD WATER & ELECTRICITY, DUBAI.
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 115 OF 272
ETIHAD WATER & ELECTRICITY, DUBAI.
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
The stability check is not applicable for under ground structure as the soil will be filled
around the structure during operating conditions.
However, the filling is considered in only longer direction wall and other three sides are no
soil filling during construction stage. Hence Factor safety is considered 1.05 as this is only
temporary construction stage.
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 116 OF 272
ETIHAD WATER & ELECTRICITY, DUBAI.
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
* Additional Sand Bags must be kept on Base slab during construction stage incase of
back filling only one side.
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 117 OF 272
ETIHAD WATER & ELECTRICITY, DUBAI.
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
Note: The resisting moment due to other long wall and two short wall is not considered in the
calculation conservatively.
a) Dead Load
UDL w = 4.50 kN/m
Bending Moment (w x Lcs 2
/8) = 4.5 x (3100/1000)^2 / 8
= 5.41 kN.m
Shear Force (w x Lcs /2) = 6.98 kN
b) Live Load
Live Load on cover slab = 5.0 kN/m2
Live Load on cover slab for 1.2 m width = 5 x 1.2
= 6.0 kN/m2
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 118 OF 272
ETIHAD WATER & ELECTRICITY, DUBAI.
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
6.0kN/m
3.1
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 119 OF 272
ETIHAD WATER & ELECTRICITY, DUBAI.
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 120 OF 272
ETIHAD WATER & ELECTRICITY, DUBAI.
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
Minimum % of steel required pmin = 0.130 BS 8110: Part 1: 1997 Table 3.25
Min Ast Reqd = ( 0.13 x 1200 x 150 ) / 100
= 234 mm2
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 121 OF 272
ETIHAD WATER & ELECTRICITY, DUBAI.
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
F.O.S = 2.0
Factored Load / hook = 4.36 x 2
= 8.72 kN
Diameter of Lifting Hook = 25 mm
Area of Lifting Hook = PI x 25 x 25 / 4
491 Sq.mm
Tension 60 degree
Shear
(𝑉𝑎/𝑉𝑐)^2+(𝑇𝑎/𝑇𝑐)^2
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 122 OF 272
ETIHAD WATER & ELECTRICITY, DUBAI.
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
= 0.005
< 1, Hence OK
Since the lifting hook has been tied at bottom reinforcement, the concrete cut by
forming cone is not applicable here.
(5𝑊𝐿^4)/384𝐸𝐼
Deflection at mid span =
= 1.669 mm
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 123 OF 272
ETIHAD WATER & ELECTRICITY, DUBAI.
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
6.0 CONCLUSION
The size and the reinforcement provided for the chamber is safe in bending, shear capacity.
The crack width has been checked and are with in permissible limit.
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 124 OF 272
ETIHAD WATER & ELECTRICITY, DUBAI.
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 125 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 126 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 127 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 128 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 129 OF 272
performed in Limite State Method with a crack width of 0.3mm
-cast slab. The precast slab has been designed as one way
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 130 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 131 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 132 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 133 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 134 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 135 OF 272
Ref. FRP-G-21-303A
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 136 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 137 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 138 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 139 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 140 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 141 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 142 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 143 OF 272
(Range between 0.6 to 0.8 Ф)
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 144 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 145 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 146 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 147 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 148 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 149 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 150 OF 272
Long Wall (LW-2)
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 151 OF 272
NVERSION FOR WALL
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 152 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 153 OF 272
MOMENT - MXY
Combination 111)
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 154 OF 272
(Refer Table 2.2 of BS 8110 Part 1)
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 155 OF 272
(Refer Table 3.25 of BS 8110-1)
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 156 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 157 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 158 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 159 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 160 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 161 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 162 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 163 OF 272
MOMENT - MXY
Combination 111)
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 164 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 165 OF 272
(Refer Table 2.2 of BS 8110 Part 1)
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 166 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 167 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 168 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 169 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 170 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 171 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 172 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 173 OF 272
MOMENT - MXY
Combination 111)
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 174 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 175 OF 272
(Refer Table 2.2 of BS 8110 Part 1)
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 176 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 177 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 178 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 179 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 180 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 181 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 182 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 183 OF 272
MOMENT - MXY
Combination 111)
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 184 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 185 OF 272
(Refer Table 2.2 of BS 8110 Part 1)
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 186 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 187 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 188 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 189 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 190 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 191 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 192 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 193 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 194 OF 272
(Refer Table 2.2 of BS 8110 Part 1)
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 195 OF 272
(Refer Table 2.2 of BS 8110 Part 1)
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 196 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 197 OF 272
Which is the lesser
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 198 OF 272
(Cl.3.4.5.5 of BS 8110)
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 199 OF 272
2 2
S d1 d1
a cr cc
2 2 2
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 200 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 201 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 202 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 203 OF 272
(Refer Table 2.2 of BS 8110 Part 1)
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 204 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 205 OF 272
(Refer Table 2.2 of BS 8110 Part 1)
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 206 OF 272
Which is the lesser
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 207 OF 272
(Cl.3.4.5.5 of BS 8110)
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 208 OF 272
2 2
S d1 d1
a cr cc
2 2 2
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 209 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 210 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 211 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 212 OF 272
MOMENT - MXY
Combination 111)
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 213 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 214 OF 272
(Refer Table 2.2 of BS 8110 Part 1)
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 215 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 216 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 217 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 218 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 219 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 220 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 221 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 222 OF 272
MOMENT - MXY
Combination 111)
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 223 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 224 OF 272
(Refer Table 2.2 of BS 8110 Part 1)
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 225 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 226 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 227 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 228 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 229 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 230 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 231 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 232 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 233 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 234 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 235 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 236 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 237 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 238 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 239 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 240 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 241 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 242 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 243 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 244 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 245 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 246 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 247 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 248 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 249 OF 272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. 250 OF 272
ETIHAD WATER & ELECTRICITY, DUBAI.
ATTACHMENT - A
Dhafir Technologies L.L.C.P.O. Box : 91300, Abu Dhabi, UAE Page No. A251 OF A272
ETIHAD WATER & ELECTRICITY, DUBAI.
LOADING
Choose HC 20x120 with 7-9.5mm wire from manufacture catalogue for inner core
Dhafir Technologies L.L.C.P.O. Box : 91300, Abu Dhabi, UAE Page No. A252 OF A272
ETIHAD WATER & ELECTRICITY, DUBAI.
Dhafir Technologies L.L.C.P.O. Box : 91300, Abu Dhabi, UAE Page No. A253 OF A272
ETIHAD WATER & ELECTRICITY, DUBAI.
Dhafir Technologies L.L.C.P.O. Box : 91300, Abu Dhabi, UAE Page No. A254 OF A272
ETIHAD WATER & ELECTRICITY, DUBAI.
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
ATTACHMENT - A
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. A255 OF A272
ETIHAD WATER & ELECTRICITY, DUBAI.
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. A256 OF A272
ETIHAD WATER & ELECTRICITY, DUBAI.
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. A257 OF A272
ETIHAD WATER & ELECTRICITY, DUBAI.
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. A258 OF A272
ETIHAD WATER & ELECTRICITY, DUBAI.
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. A259 OF A272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. A260 OF A272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. A261 OF A272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. A262 OF A272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. A263 OF A272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. A264 OF A272
ETIHAD WATER & ELECTRICITY, DUBAI.
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
ATTACHMENT - B
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. B265 OF B272
ETIHAD WATER & ELECTRICITY, DUBAI.
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. B266 OF B272
ETIHAD WATER & ELECTRICITY, DUBAI.
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. B267 OF B272
ETIHAD WATER & ELECTRICITY, DUBAI.
2 x 10 MIG RCC PRE-STRESSED TANK AND PUMPING STATION AT AL GHAYL NEW WDC
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. B268 OF B272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. B269 OF B272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. B270 OF B272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. B271 OF B272
Al Nasr Contracting Company L.L.C, Dubai, U.A.E Page No. B272 OF B272