THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
ASH
ASH
ASH
PROJECTS DEPARTMENT
LEADS
LEADS
LEADS
ALL
ALL
ALL
BI-10-02399
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
G
E
DISCIPLINE
ENGINEER
ALL LEADS
DATE: 12/28/16
PROJECT
ENGINEER PROJECT PROPOSAL NARRATIVE
A M ALMATROOK
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY
DATE:
CONSTRUCTION
12/28/16
RE-ISSUED FOR 100% PROJECT
AGENCY
SHAHZAD YAZDANI PROPOSAL
DATE: 12/28/16
OPERATIONS
ALI H GHAMDI
12/28/16
ADDENDUM 4
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
PREPARED BY:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
MUSTANG-HDP,
OF THIS DRAWING IS COVERED, FOR ALL
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
TABLE OF CONTENTS
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
10-02399-
10-02399-
4.2
0001
0001
12/18/16
DATE
G
E
DISCIPLINE
ENGINEER
4.6 RECEIPT PIPELINE AND CONNECTIONS ......................................................................... 44
ALL LEADS
4.7 YANBU’ DISTRIBUTION HUB TANK FARM AND SUPPORT INFRASTRUCTURE ..................... 50
DATE: 12/28/16
PROJECT
ENGINEER 4.8 YANBU TO JIDDAH PIPELINE 1 & 2 SUPPORT INFRASTRUCTURE ..................................... 69
A M ALMATROOK
4.9 PUMPS AND MOTORS FOR THE YANBU TO JIDDAH PIPELINE........................................... 71
DATE: 12/28/16
CERTIFIED 4.10 PUMP OPERATIONS FOR THE YANBU TO JIDDAH PIPELINE ............................................. 78
AMR EL SHARKAWY
DATE:
12/28/16 4.11 PIPELINE CONNECTION FROM GRASSROOTS-YANBU ARAMCO REFINERY ....................... 78
CONSTRUCTION
AGENCY 4.12 PIPELINE CONNECTION FROM SAMREF REFINERY....................................................... 79
SHAHZAD YAZDANI
4.13 PIPELINE CONNECTION FROM YASREF REFINERY ....................................................... 83
DATE: 12/28/16
OPERATIONS 4.14 PIPELINE CONNECTION FROM YANBU REFINERY TERMINAL ........................................... 86
ALI H GHAMDI
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG 4.22 OVERALL SITE DEVELOPMENT AND FACILITIES: .............................................. 190
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
10-02399-
10-02399-
0001
12/18/16
DATE
G
E
DISCIPLINE
ENGINEER
5.13. FIRE WATER UTILITY WATER PUMP SHELTER .................................................. 273
ALL LEADS
5.14. CHEMICAL SHELTER ............................................................................................ 273
DATE: 12/28/16
PROJECT
ENGINEER 5.15. REMOTE I/O BUILDINGS (2 UNITS) ...................................................................... 277
A M ALMATROOK
5.16. IDAS SHELTER (2 UNITS)...................................................................................... 280
DATE: 12/28/16
CERTIFIED 5.17. OPERATION BUILDING ......................................................................................... 283
AMR EL SHARKAWY
DATE:
12/28/16 SECTION 6.0 – MATERIALS REQUIREMENT ...................................................................... 288
CONSTRUCTION
AGENCY SECTION 7.0 – HIGH COMMISSION FOR INDUSTRIAL SECURITY ................................... 288
SHAHZAD YAZDANI
SECTION 8.0 – VALUE PRACTICES / WORKSHOPS .......................................................... 289
DATE: 12/28/16
OPERATIONS SECTION 9.0 – OTHER ENGINEERING STUDIES / ASSESSMENTS / ANALYSIS ............. 289
ALI H GHAMDI
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
ASH
ASH
ASH
1.1 PREFACE
LEADS
LEADS
LEADS
ALL
ALL
ALL
The purpose of the proposed facilities is to efficiently meet the Kingdom’s refined
product demand in Makkah Province through the construction of the Yanbu Distribution
Hub (YDH). This project will aggregate refined product from the three local refineries
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
(SAMREF, YASREF, and Yanbu Terminal) to facilitate shipment via two connecting
pipelines: the (a) Yanbu to Jiddah pipeline and the (b) Yanbu to Central Region pipeline,
which are two additional Budget Items under development.
DESCRIPTION
The Yanbu-Jiddah Pipeline, BI-10-02155, initially included the Yanbu to Jiddah pipeline
scope, NJBP scope, YDH scope, and the SSSP-5 supply pipeline scope. As the scope
for BI-10-2155 increased, it was decided to split and segregate the pipelines scope from
the in-plant scope.
BI-10-02399, Additional Capacity – North Jiddah Bulk Plant, has been introduced to the
2016-2018 Business Plan to handle the below major scope elements from BI-10-2155:
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
12/18/16
G
E
DISCIPLINE
ENGINEER The three refineries in the Yanbu area currently deliver product to the Western Region of
ALL LEADS Saudi Arabia via truck loading, marine vessel loading, and pipeline deliveries to
DATE: 12/28/16 Madinah. Projected product demand growth in the central and western regions will
PROJECT
ENGINEER require that additional infrastructure be built to meet these higher demands. With
A M ALMATROOK currently over 900 MBD of refining capacity, Yanbu has been identified as the refined
DATE: 12/28/16 product origin hub to supply Jiddah and the Central Region.
CERTIFIED
AMR EL SHARKAWY
12/28/16
The 2040 demand forecasts identify the following demand gaps to be supplied by YDH:
DATE:
CONSTRUCTION
AGENCY 576 MBD on the Yanbu to North Jiddah (YNJ-1/2) pipelines (to be constructed as part
SHAHZAD YAZDANI
of this budget item, BI-10-02155); and,
DATE: 12/28/16
OPERATIONS 400 MBD on the Yanbu to Central Region pipeline (future construction, BI-10-02167).
ALI H GHAMDI
This document, the “Project Proposal Narrative” (PPN), is intended to describe the
EDSD
overall scope for YDH project. CONTRACTOR shall read this document and its
attachments carefully and determine all the Materials, Equipment and other
DATE:
requirements of the entire project for supply, installation and successful commissioning
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
The PPN shall be treated as construction scope of work. It provides overall requirements
(DCC) NO. _____________________
of the systems in a comprehensive way and is not intended to cover the work in detail.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG This document (PPN) describes the overall and major equipment, material and the work
SAY
SAY
SAY
ASH
ASH
ASH
commissioning support, and hand over the project to SAUDI ARAMCO, on time, in a full
operating condition in compliance with the relevant SAUDI ARAMCO standards,
LEADS
LEADS
LEADS
ALL
ALL
ALL
The term “Provide” used in the document in different sections by various engineering
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
facilities/ project safely and make it operational and deliver the expected results.
Any equipment/system/materials and efforts that are missing, not fully covered in this
document, but are required to complete the systems shall be identified by
CONTRACTOR during the bidding process and shall be provided.
CONTRACTOR shall conduct field surveys & testing and other engineering studies
workshops and best practices required for the project.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
CONTRACTOR shall address all project proposal comments which were closed and
0001
0001
reflected in drawings during the detail design and construction phases as applicable.
12/28/16
12/14/16
12/18/16
DATE
CONTRACTOR shall address and consider in the detail design package all the
recommendations outlined in various studies and submitted proposals to relevant
authorities for setting up YDH.
NO.
REV
G
E
DISCIPLINE
ENGINEER
CONTRACTOR shall be responsible to produce a detail design package based on
ALL LEADS Project Proposal Package using a SAUDI ARAMCO approved engineering design
DATE: 12/28/16 office; CONTRACTOR shall be responsible for the correctness of all the engineering
PROJECT
ENGINEER
drawings, documents produced by the design office also for the drawings & documents
A M ALMATROOK
provided by vendors. Approval of above drawings and documents by SAUDI ARAMCO
DATE: 12/28/16
does not relieve CONTRACTOR of the responsibility of correct design, right
CERTIFIED equipment, proper installation, testing & commissioning.
AMR EL SHARKAWY
12/28/16
CONTRACTOR shall have full responsibility for the detail design and engineering of all
DATE:
CONSTRUCTION
required items, elements and systems necessary for the complete, functional and safe
AGENCY operation of the entire scope of equipment and systems. The design criteria and
SHAHZAD YAZDANI
contract documents included are not all-inclusive and represent minimum
DATE: 12/28/16 requirements. Any additional elements or items required to achieve the correct and
OPERATIONS
safe operation of the system shall be engineered, designed, and shall be in place,
ALI H GHAMDI
complete and functional.
12/28/16
CONTRACTOR shall review and approve Vendor and SUBCONTRACTOR drawings,
DATE:
CONTROL NUMBER
VERIFICATION
design, specifications and other documents for conformity to this Contract and institute
EDSD
effective internal control for prompt receipt, review, approval, and return of such
documents. CONTRACTOR shall incorporate all such applicable Vendor and
DATE:
ARAMCO.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Royal Commission (YRC) for setting up YDH facility and its operation.
SAY
SAY
SAY
CONTRACTOR shall systematically check his design and drawings to ensure they
ENGG CERT
ASH
ASH
comply with the Scope of Work, relevant SAUDI ARAMCO, YRC standards and
ASH
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall consider the SAUDI ARAMCO Design and Engineering Standards
as per the cut-off date of September 2016. CONTRACTOR shall meet all the
requirements of the Mandatory SAUDI ARAMCO Engineering Requirements (MSAERs),
YRC, SAMREF, YASREF and Marafiq standards.
DESCRIPTION
Contractor shall use the latest edition, revision, addenda, errata of the applicable local
and international codes and standards, unless otherwise explicitly specified.
In case of conflict between requirements mentioned in different documents, the most
stringent interpretation shall be followed.
The following are the latest applicable Design and Engineering Standards and
international Codes and Standards, available for the project design.
10-02399-
JO/EWO
10-02399-
10-02399-
Any changes during execution of the project will be informed by SAUDI ARAMCO.
0001
0001
0001
12/18/16
DATE
G
E
Buildings
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Equipment
OF THIS DRAWING IS COVERED, FOR ALL
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG SAES-B-058 Emergency Shutdown, Isolation and Depressurizing
SAY
SAY
SAY
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
SAES-B-070 Fire and Safety Requirements for Bulk Plants, Air Fueling
Terminals and sulfur Handling Facilities
SAES-D-109 Design of Small Metallic Storage Tank
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
10-02399-
10-02399-
Piping
0001
0001
0001
12/18/16
DATE
Coatings
SAES-J-002 List of Inspectable Instruments
NO.
REV
G
E
DISCIPLINE
SAES-J-003 Instrumentation – Basic Design Criteria
ENGINEER
ALL LEADS
SAES-J-200 Pressure
DATE: 12/28/16
SAES-J-300 Level
PROJECT
ENGINEER
SAES-J-400 Temperature
A M ALMATROOK SAES-J-505 Combustible Gas and Hydrogen Sulfide in Air Detection
DATE: 12/28/16 Systems
CERTIFIED
AMR EL SHARKAWY
SAES-J-600 Pressure Relief Devices
DATE:
12/28/16 SAES-J-601 Emergency Shutdown and Isolation Systems
CONSTRUCTION SAES-J-604 Protective and Condition Monitoring Equipment for
AGENCY
SHAHZAD YAZDANI Rotating Machinery
DATE: 12/28/16 SAES-J-700 Control Valves
OPERATIONS
SAES-J-801 Control Buildings
ALI H GHAMDI
SAES-J-605 Surge Relief Protection System
12/28/16
DATE:
SAES-J-902 Electrical Systems for Instrumentation
CONTROL NUMBER
VERIFICATION
Facilities
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Centers
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG SAES-K-100 SAUDI ARAMCO Mechanical (HVAC) Code
SAY
SAY
SAY
ASH
ASH
Systems
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
12/18/16
DATE
G
E
DISCIPLINE
SAES-O-203 Security Gate
ENGINEER
ALL LEADS
SAES-O-204 Security Lighting
DATE: 12/28/16
SAES-O-205 Integrated Security System
PROJECT
ENGINEER
SAES-O-206 Security Devices
A M ALMATROOK SAES-O-207 Power Supply for Security System
DATE: 12/28/16 SAES-O-208 Communication for security system
CERTIFIED
AMR EL SHARKAWY
SAES-O-209 Security Door
DATE:
12/28/16 SAES-O-210 Security Lock
CONSTRUCTION SAES-O-211 Identification Card
AGENCY
SHAHZAD YAZDANI SAES-O-212 Security Information Protection
DATE: 12/28/16 SAES-P-100 Basic Power System Design Criteria
OPERATIONS
SAES-P-101 Regulated Vendors List for Electrical Equipment
ALI H GHAMDI
SAES-P-103 UPS and DC system
12/28/16
DATE:
SAES-P-104 Wiring Methods and Materials
CONTROL NUMBER
VERIFICATION
SAES-P-111 Grounding
SAES-P-113 Motors and Generators
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG SAES-P-123 Lighting
SAY
SAY
SAY
ASH
ASH
concrete structures
LEADS
LEADS
LEADS
ALL
ALL
ALL
Machinery
SAES-Q-009 Concrete Retaining Walls
SAES-Q-010 Cement Based, Non-Shrink Grout for Structural and
DESCRIPTION
Equipment Grouting
SAES-Q-011 Epoxy Grout for Machinery Support
SAES-Q-012 Criteria for Design and Construction of Precast and
Pre stressed Concrete Structures
SAES-R-004 Building Design & Finishing Guidelines
SAES-S-010 Sanitary Sewers
SAES-S-020 Oily Water Drainage Systems
SAES-S-030 Storm Water Drainage Systems
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
12/18/16
DATE
G
E
DISCIPLINE
SAES-T-151 D.C. Power Systems
ENGINEER
ALL LEADS
SAES-T-492 VHF/UHF Land-Mobile and Fixed Radio Communication
DATE: 12/28/16
SAES-T-493 Digital Trunked Radio System
PROJECT
ENGINEER
SAES-T-494 Very Small Aperture Terminal (VSAT) Network Design
A M ALMATROOK SAES-T-556 Circuit Quality and Performance
DATE: 12/28/16 SAES-T-566 Plant Demilitarized Zone (DMZ) Architecture
CERTIFIED
AMR EL SHARKAWY
SAES-T-603 Safeguards and Warning Devices
DATE:
12/28/16 SAES-T-624 Telecommunications – OSP Fiber Optics
CONSTRUCTION SAES-T-625 Inter and Intra-Building Fiber Optic Communications
AGENCY
SHAHZAD YAZDANI Cables
DATE: 12/28/16 SAES-T-628 Underground Cable
OPERATIONS
SAES-T-629 Telecommunications – Buried Cable and Wire
ALI H GHAMDI
SAES-T-631 Communications Cable Terminals
12/28/16
DATE:
SAES-T-632 Communications Cable Splicing
CONTROL NUMBER
VERIFICATION
Towers
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG SAES-T-911 Telecommunications Conduit System Design
SAY
SAY
SAY
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
12/18/16
DATE
Royalty/Custody Transfers
SAES-Z-001 Process Control System
NO.
REV
G
E
DISCIPLINE
SAES-Z-002 Technically Acceptable Process Automation Systems
ENGINEER
ALL LEADS
SAES-Z-008 Terminal Management System
DATE: 12/28/16
SAES-Z-010 Process Automation Networks Connectivity
PROJECT
ENGINEER
SAES-Z-020 Design and Installation of Fiber Optic Cables Systems for
A M ALMATROOK Process Control Networks
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY
1.4.2 SAUDI ARAMCO Inspection Requirements
12/28/16
DATE:
175-000003 Instructions & Explanations of Inspection Requirements
CONSTRUCTION
AGENCY 175-321900 Pressure Vessels
SHAHZAD YAZDANI
175-343100 Panels and Cabinets for Outdoor Area
DATE: 12/28/16
OPERATIONS 175-013100 Fabricated Carbon Steel Piping
ALI H GHAMDI 175-019800 Auxiliary Piping for Mechanical Equipment
DATE:
12/28/16 175-022500 Flanges, Spectacle Plates, Spacers & Blinds
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Motors to 500 HP
C
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG 175-171300 Galvanic Anodes: Aluminum, Magnesium, or Zinc for
SAY
SAY
SAY
Cathodic Protection
ENGG CERT
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
Systems
12/14/16
12/18/16
DATE
G
E
DISCIPLINE
175-343100 Control Panels
ENGINEER
ALL LEADS
175-345100 Monitoring Systems Vibration, Axial position and
DATE: 12/28/16
bearing Temperatures
PROJECT
ENGINEER
175-347600 Cable: Instrumentation
A M ALMATROOK
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG 04-SAMSS-048 Valve Inspection and Testing Requirements
SAY
SAY
SAY
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
System (APCS-6)
09-SAMSS-060 Packaging Requirements for Coatings
09-SAMSS-067 Qualification Requirements for Internal Coating Systems
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
10-02399-
10-02399-
0001
0001
12/18/16
DATE
G
E
DISCIPLINE
16-SAMSS-502 Metal-Enclosed Metal-Clad Low Voltage Switchgear
ENGINEER
ALL LEADS
Assemblies
DATE: 12/28/16
16-SAMSS-503 Indoor Control gear-Low Voltage
PROJECT
ENGINEER
16-SAMSS-504 Indoor Metal-Clad Switchgear: 1 to 38 KV
A M ALMATROOK 16-SAMSS-512 Outdoor Switchrack – Low Voltage
DATE: 12/28/16 16-SAMSS-513 Power System Automation Components
CERTIFIED
AMR EL SHARKAWY
16-SAMSS-518 Low Voltage Panel boards
DATE:
12/28/16 16-SAMSS-519 Indoor Switchboards-Low Voltage
CONSTRUCTION 16-SAMSS-520 Cable Bus
AGENCY
SHAHZAD YAZDANI 17-SAMSS-004 Conventional (Tap Adjustable) Rectifiers for Cathodic
DATE: 12/28/16 protection
OPERATIONS
17-SAMSS-005 Cathodic Protection phase controlled Rectifiers
ALI H GHAMDI
17-SAMSS-006 Galvanic Anodes for Cathodic Protection
12/28/16
DATE:
17-SAMSS-007 Impressed Current Anodes for Cathodic Protection
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
Motors to 500 HP
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG 17-SAMSS-511 Stationary Storage Batteries
SAY
SAY
SAY
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Hydrocarbon Fires
23-SAMSS-010 Distributed Control Systems
23-SAMSS-050 Terminal Management System
23-SAMSS-701 Industrial Ethernet Switch Specifications
26-SAMSS-084 Turbo Compressor oil 46
27 SAMSS-011 Fire, Smoke, and Combination Fire-Smoke Dampers
31-SAMSS-003 Reciprocating Compressors for Air or Gas Service
31-SAMSS-004 Centrifugal Pumps
10-02399-
JO/EWO
10-02399-
31-SAMSS-009
0001
0001
0001
Offshore Service
12/14/16
12/18/16
DATE
G
E
DISCIPLINE
32-SAMSS-004 Manufacture of Pressure Vessels
ENGINEER
ALL LEADS
32-SAMSS-005 Manufacture of Atmospheric Tanks
DATE: 12/28/16
32-SAMSS-013 Lubrication, Shaft Sealing and Control Oil Systems
PROJECT
ENGINEER
32-SAMSS-030 Manufacture of Small Metallic Atmospheric Storage
A M ALMATROOK Tanks
DATE: 12/28/16 32-SAMSS-038 manufacture of Skid Mounted units
CERTIFIED
AMR EL SHARKAWY
34-SAMSS-117 Turbine Flow Meters in Liquid Service
DATE:
12/28/16 34-SAMSS-118 Positive Displacement Meters
CONSTRUCTION 34-SAMSS-119 Bi-Directional Meter Prover
AGENCY
SHAHZAD YAZDANI 34-SAMSS-120 Uni-Directional Meter Prover
DATE: 12/28/16 34-SAMSS-121 Small Volume Prover
OPERATIONS
34-SAMSS-167 Truck Loading Metering Systems
ALI H GHAMDI
34-SAMSS-319 Radar Tank Gauging Equipment
12/28/16
DATE:
34-SAMSS-514 Combustible Gas and Hydrogen Sulfide Monitors
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
Instruments
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Types
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG 34-SAMSS-623 Programmable Controller Based ESD Systems
SAY
SAY
SAY
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
DATE: 12/28/16
OPERATIONS
SAEP-1152 Approval procedure for Ready-Mixed concrete mix
ALI H GHAMDI design
DATE:
12/28/16 SAEP-1624 Preparation of System Design Document
SAEP-1630 Preparation of Integration Test Procedure
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG AA-036024-001 Roof framing plan sunshade type-I, community
SAY
SAY
SAY
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
AB-036521 Bridge Weld and Typical Brace Seal Welded and Socket
12/14/16
12/18/16
DATE
G
E
DISCIPLINE
AC-036950 Instrument Symbols
ENGINEER
ALL LEADS
AE-036137 Truck Loading Bottom Specification
DATE: 12/28/16
AE-036175 Details of Heavy Welding Boss for Threaded
PROJECT
ENGINEER
Connections to Vessels and Lines
A M ALMATROOK AE-036451 Pre-Heat Levels for Welding Carbon Steel
DATE: 12/28/16 AE-036141 Truck loading or unloading – general arrangement
CERTIFIED
AMR EL SHARKAWY
SA-2693 Safety Instruction Sheet – Tanks
DATE:
12/28/16 AB-036402 Details Cast Iron Catch Basin with Side inlet s
CONSTRUCTION AE-036470 RIP-RAP Slope Protection Detail
AGENCY
SHAHZAD YAZDANI AC-036078 Details Cast Iron Catch Basin without Side inlets
DATE: 12/28/16 AC-036489 Traffic Control Devices
OPERATIONS
AC-036680 SAUDI ARAMCO Security and General Purpose
ALI H GHAMDI
Fencing-Footing Details
12/28/16
DATE:
AB-036677 SAUDI ARAMCO Security and General Purpose Fencing
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG 1.4.6 SAUDI ARAMCO Library Drawings (SALD)
SAY
SAY
SAY
ENGG CERT
Lines Details
LEADS
LEADS
LEADS
ALL
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
G
E
DISCIPLINE
ENGINEER
NMR - 7902 Pumps
ALL LEADS
DATE: 12/28/16
1.4.8 SAUDI ARAMCO Construction Safety Manual and Safety Handbook
PROJECT
ENGINEER
A M ALMATROOK All work is to be carried out in accordance with the SAUDI ARAMCO
DATE: 12/28/16
CERTIFIED
Construction Safety Manual and the minimum behavioral safety standards
AMR EL SHARKAWY detailed in the SAUDI ARAMCO Safety Handbook. Furthermore, the project
12/28/16 shall provide Safety and Hazard Identification Plans (HIP) for Loss Prevention
DATE:
CONSTRUCTION
AGENCY
approval.
SHAHZAD YAZDANI
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG G.I.298.010 Administration Procedure of Contractor Camps/Parks
SAY
SAY
SAY
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
This project is within YRC jurisdictions and CONTRACTOR shall adhere to all
DESCRIPTION
YRC applicable standards. For full list of applicable standards See Appendix 9.
10-02399-
10-02399-
0001
0001
0001
Appendix 10.
12/28/16
12/14/16
12/18/16
DATE
DISCIPLINE
ENGINEER
Junction Box and Cable Installation Std
ALL LEADS Marked up P&ID - Tie-ins
DATE: 12/28/16 MOV’s Purchase Specs - Sample
PROJECT
ENGINEER P&ID Legend & Details
A M ALMATROOK
SAMREF Approved Manufacturer List (AML)
DATE: 12/28/16
CERTIFIED SAMREF Piping Class
AMR EL SHARKAWY
Eqp. & Inst. Tag number Req. Form
12/28/16
DATE:
CONSTRUCTION
AGENCY 1.4.12 INTERNATIONAL CODES AND STANDARDS
SHAHZAD YAZDANI
12/28/16
AISC Steel Construction Manual-13th Edition
DATE:
ACI American Concrete Institute
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG API 546 Brushless synchronous machines-500KVA and larger
SAY
SAY
SAY
ASH
ASH
API 676
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
12/18/16
DATE
G
E
DISCIPLINE
ASME B73.1 Specification for End suction horizontal Centrifugal
ENGINEER
ALL LEADS
Pumps for chemical Process
DATE: 12/28/16
API – MPMS API Manual of Petroleum Measurement Standards
PROJECT
ENGINEER
(MPMS)
A M ALMATROOK API, RP 2000 Safety Relief Valve Sizing
DATE: 12/28/16 API-RP 686 Recommended Practices for machinery Installation and
CERTIFIED
AMR EL SHARKAWY
Installation Design
DATE:
12/28/16 B30.10 Hooks
CONSTRUCTION B30.17 Overhead and Gantry Cranes (Top Running Bridge
AGENCY
SHAHZAD YAZDANI Single Girder, Under Hung Hoist)
DATE: 12/28/16 HST-4M Performance Standard for Overhead Electric Wire Rope
OPERATIONS
Hoists
ALI H GHAMDI
12/28/16
DATE:
American National Standards Institute (ANSI)/National Electrical Manufacturers
CONTROL NUMBER
VERIFICATION
Association (NEMA)
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Association (NFPA)
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG ANSI / NFPA 70 National Electric Codes
SAY
SAY
SAY
ASH
ASH
Spray Systems
LEADS
LEADS
LEADS
ALL
ALL
ALL
Appurtenances
NFPA 30 Flammable and Combustible Liquids Code
DESCRIPTION
10-02399-
10-02399-
0001
0001
12/18/16
DATE
G
E
DISCIPLINE
ASHRAE Handbook Fundamentals
ENGINEER
ALL LEADS
INSTRUMENT, SYSTEMS AND AUTOMATION SOCIETY (ISA)
DATE: 12/28/16
PROJECT
ENGINEER
A M ALMATROOK
ISA S5.1 Instrumentation Symbols and Identification
DATE: 12/28/16
CERTIFIED International Organization for Standardization
AMR EL SHARKAWY
12/28/16
DATE: ISO 9000 Quality Systems – Model for Quality Assurance in
CONSTRUCTION
AGENCY Design/Development, Production, Installation and Servicing.
SHAHZAD YAZDANI
DATE: 12/28/16
OPERATIONS
International Electro -Technical Commissions (IEC)
ALI H GHAMDI
12/28/16
IEC 61000-6-2 Generic Standards – Immunity for Industrial
DATE:
Environments
CONTROL NUMBER
VERIFICATION
DATE:
SMACNA
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Flexible, 3rd Edition
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
LEADS
ALL
Association (AWWA)
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
G
E
A M ALMATROOK
API Manual of Petroleum Measurement Standards (MPMS)
DATE: 12/28/16 API Recommended Practice 2003-1998, Protection Against Ignitions Arising
CERTIFIED
AMR EL SHARKAWY
Out of Static, Lighting and Stray Currents
DATE:
12/28/16 API Recommended Practice 2610-1194, Design, Construction, Operation,
CONSTRUCTION
AGENCY
Maintenance and Inspection of Terminal, Tank Facilities
SHAHZAD YAZDANI
American Society of Civil Engineers (ASCE) Publication 7- 05 Standards -
DATE: 12/28/16
OPERATIONS
Minimum Design Loads for Buildings and Other Structures
ALI H GHAMDI API Recommended Practice 1004, Bottom Loading and Vapor Recovery
12/28/16
DATE: MC 306 Tank Motor Vehicles (to be used in conjunction with U.S. Department
CONTROL NUMBER
VERIFICATION
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG 1.5 LIST OF ABBREVIATIONS AND ACRONYMS
SAY
SAY
SAY
Process
ENGG CERT
ASH
ASH
ASH
BBL Barrels
BPD Barrels per day
LEADS
LEADS
LEADS
ALL
ALL
ALL
DO Diesel oil
DPK Dual purpose kerosene
MB 1000 barrel
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
TELECOM
ARS Automatic Route Selection
AUTH Authorization Code
10-02399-
JO/EWO
10-02399-
10-02399-
0001
BI Budget Item
0001
0001
BS Base Station
CAT Category
12/28/16
12/14/16
12/18/16
DATE
G
E
DB Decibel
DISCIPLINE
ENGINEER
DDF Digital Distribution Frame
ALL LEADS DHCP Dynamic Host Configuration Protocol
DATE: 12/28/16 DWS Dispatcher Work Station
PROJECT
ENGINEER
EADS European Aeronautic Defense and Space Company
A M ALMATROOK
EARP Ethernet Address Resolution Protocol
DATE: 12/28/16
EIA Electronic Industries Alliance
CERTIFIED EMS Electronic Marker System
AMR EL SHARKAWY
ETSI European Telecommunications Standards Institute
12/28/16
DATE: FAT Factory Acceptance Test
CONSTRUCTION
AGENCY
FDP Fiber Distribution Panel
SHAHZAD YAZDANI FMR Field Material Request
DATE: 12/28/16 FOC Fiber Optic Cable
OPERATIONS FSD Functional Specification Document
ALI H GHAMDI FSF Facility Security Forces
DATE:
12/28/16 GI General Instructions
GPS Global Positioning System
CONTROL NUMBER
VERIFICATION
IF Interfaces
C
IL Insertion Loss
(DCC) NO. _____________________
IP Internet Protocol
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG ISDN Integrated Services Digital Network
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
12/18/16
DATE
G
E
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG SAPMT SAUDI ARAMCO Project Management Team
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
12/18/16
DATE
G
E
SI System International
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________ 10-02399- ALL
E 12/14/16 0001 RE-ISSUED FOR 100% PROJECT PROPOSAL LEADS ASH SAY AHG
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS, 10-02399- ALL
F 12/18/16 RE-ISSUED FOR 100% PROJECT PROPOSAL LEADS ASH SAY AHG
AGENCY
BY: 0001
ALL LEADS
PROJECT
DATE: 12/28/16
BY DRAWING COMPLETION CERTIFICATE
ENGINEER
DATE: 12/28/16
ENGINEER
12/28/16
DATE: 12/28/16
ALI H GHAMDI
DISCIPLINE
12/28/16
CERTIFIED
10-02399- ALL
AMR EL SHARKAWY
OPERATIONS
CONSTRUCTION
A M ALMATROOK
12/28/16 RE-ISSUED FOR 100% PROJECT PROPOSAL ASH AHG
SHAHZAD YAZDANI
(DCC) NO. _____________________ G 0001 LEADS SAY
DATE:
YANBU
PROJECT
Saudi Aramco 2616-ENG (03/99)
TIS
UPS
TMS
WAN
SAUDI ARABIA
Wide Area Network
X40
JO / EWO:
Truck Identification System
A
Terminal Management System
10-02399-0001
DRAWING NO.
GEN-E0102
24
Of
290
SHT.NO.
G
EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (03/99)
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
This project is located near the city of Yanbu and the Yanbu area refineries. This plot of
land is approximately 2 km2 in size and is located east of the SAUDI ARAMCO Yanbu
Refinery (YR), adjacent to the east side of King Abdulaziz Road, and within the Yanbu
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
This project requires Land Use Permits (LUP) for both the work areas in and around
NJBP and YDH, including: YDH plant, MARAFIQ to YDH corridor for Electrical & FO
cables, Yanbu refinery/YDH Interconnecting pipelines corridor, SAMREF/YDH
Interconnecting pipeline corridor, Access road for YDH and Temporary Construction
Facility
10-02399-
10-02399-
0001
3.1 The Project Proposal Narrative with all its attachments and drawings shall be the basis
0001
0001
and serve the purpose of defining the overall scope of this project.
12/28/16
12/14/16
12/18/16
DATE
3.2 In addition, the SAUDI ARAMCO engineering procedures, practices, and general
instructions are also considered as part of the design basis for the development of
NO.
REV
G
E
DATE: 12/28/16
3.3 Any conflict between various design basis documents shall be highlighted to SAUDI
PROJECT
ENGINEER
ARAMCO for their review and resolution.
A M ALMATROOK
DATE: 12/28/16 3.4 This document shall be read in conjunction with relevant contract documents.
CERTIFIED
AMR EL SHARKAWY
12/28/16
3.5 CONTRACTOR shall prepare detail design package as per latest Saudi Aramco
DATE:
CONSTRUCTION
Engineering Standards, procedures and material specifications. Yanbu Royal
AGENCY
Commission standards & guidelines shall be considered for the detail design package.
SHAHZAD YAZDANI
DATE: 12/28/16
OPERATIONS 3.6 CONTRACTOR shall prepare the earthquake resistant design and detailing per
ALI H GHAMDI requirements of AISC-341, Seismic Design Manual of AISC, ACI-318 and ASCE-05.
DATE:
12/28/16 Geotech report of the project shall be utilized for the determination of Seismic Design
CONTROL NUMBER
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
ASH
ASH
ASH
Section 4 is included in this PPN to provide design basis and an overall picture of the total
project associated with BI-10-02399. This is specifically intended to provide CONTRACTOR
LEADS
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall commit dedicated manpower, equipment and all necessary resources to
DESCRIPTION
CONTRACTOR shall assign a dedicated full-time team to work on the Yanbu Distribution Hub
for the entire project duration which includes but not limited to the engineering design office
and construction site office. The team shall be located in the same floor as the SAUDI
ARAMCO PMT assigned offices.
CONTRACTOR shall abide by the conditions of Royal Commission permit listed in the
Acceptance letter under Appendix-16.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
The proposed facilities shall interface with the related budget items (BI’s) and other
components of this BI. Work for this project shall be coordinated with the respective
NO.
REV
G
E
DATE: 12/28/16
4.2 INTERFACES WITH OTHER BI’s
CERTIFIED
AMR EL SHARKAWY
Related Budget Items
12/28/16
DATE:
CONSTRUCTION
AGENCY
4.2.1 BI-10-02155, Yanbu – Jiddah Refined Product Pipeline
SHAHZAD YAZDANI This project shall construct refined product pipelines to deliver products from
DATE: 12/28/16 Yanbu to the North Jiddah Bulk Plant. The current scope transports 576 MBD
OPERATIONS
of refined petroleum products. These pipeline systems will deliver Diesel,
ALI H GHAMDI
Kerosene, Premium 91, and Premium 95 Gasoline designated for the Makkah
12/28/16
DATE: province.
CONTROL NUMBER
VERIFICATION
The project must consider the origin pipeline pump station and origin storage
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Yanbu into the central region of Saudi Arabia. The current scope transports
SAY
SAY
SAY
400 MBD of refined petroleum product to a bulk plant destination in the central
region.
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
LEADS
The project must consider the origin pipeline pump station and origin storage
ALL
ALL
ALL
tank requirements into the facility design. Additional storage tanks at YDH shall
be constructed as part of this pipeline project.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
This project expands the Yanbu Refinery to increase Western Region’s refined
products supply and increase the integration between the refinery and
chemicals to maximize profitability.
The refined product production resulting from this project will be a significant
amount of product supply for YDH.
10-02399-
10-02399-
0001
0001
0001
12/18/16
(ULSD, PG91, and PG95) from the YASREF Refinery to the Yanbu Refinery.
The proposed pipeline route shall follow the Royal Commission Corridor
NO.
REV
G
E
This project has very complicated interfaces as listed below; it is highly recommended
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
CONTRACTOR shall consider the interfaces when studying the Project Risk
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG CONTRACTOR shall consider all the relevant Reservation forms and interface
SAY
SAY
SAY
packages used in the Project Proposal package for the detail design.
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
This BI also provides for The YNJ-1/2 Pipeline System to transport 576 MBD of refined
product from YDH to the NJBP. This pipeline system will deliver Diesel, Kerosene,
Premium 91, and Premium 95 Gasoline designated for the Makkah province.
DESCRIPTION
10-02399-
10-02399-
0001
0001
12/28/16
12/14/16
12/18/16
The existing bulk plant at North Jiddah shall be upgraded and expanded to
DATE
G
E
DISCIPLINE
ENGINEER
ALL LEADS
DATE: 12/28/16
PROJECT
ENGINEER
A M ALMATROOK
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY
12/28/16
DATE:
CONSTRUCTION
AGENCY
Figure 1. Project boundaries for BI-10-02155 and BI-10-02399
SHAHZAD YAZDANI
DATE: 12/28/16
OPERATIONS 4.3.1 Refinery Connections:
ALI H GHAMDI
Appendix 2 contains all reservation forms, 90% comment logs, documents and
drawings related to the interfaces with MARAFIQ, Yanbu Royal Commissioning,
EDSD
Yanbu NGL, Yanbu refinery, SAMREF, and YASREF. The drawings included in
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
YDH shall construct multiple pipelines to tie into the tank farm of each respective
OF THIS DRAWING IS COVERED, FOR ALL
refinery. The tie-in location shall be downstream of any tankage and booster
(DCC) NO. _____________________
pumps within the respective refinery tank farm and YRT discharge lines from
terminal ship pump.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG YASREF
SAY
SAY
SAY
YDH shall receive PG 91/95 and DO products from the YASREF via two
ENGG CERT
ASH
ASH
ASH
pipelines. Part of the pipeline supply from YASREF to YDH will be provided by
BI-10-00043, for the supply of clean transportation fuel to Yanbu refinery. Two (2)
LEADS
LEADS
LEADS
ALL
ALL
ALL
pipelines (one for DO and one for PG 91/95) between YASREF & Yanbu refinery
shall be provided under BI-10-00043. This project will tie-in to the isolation valve
downstream provided on the pipeline and shall be the connecting points for the
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
A. Instrumentation:
The YDH control system shall be interfaced to YASREF control system to
have READ ONLY access to the data points such as the CMS, EIV status
and Pump status. The data is to be exchanged via plant DMZ through PI
system at both the facilities.
Contractor shall provide new fiber optic cable from YASREF to YDH for the
data exchange. The interface is shown in preliminary block # IN-A00001.004
10-02399-
JO/EWO
10-02399-
10-02399-
Contractor shall coordinate with Refinery Control System Vendor for the
0001
0001
0001
interface requirements.
12/28/16
12/18/16
DATE
A00001.004
NO.
REV
G
E
B. Telecom
DISCIPLINE
ENGINEER Provide 12 core Fiber optic cable from Yanbu Distribution Hub to YASREF
ALL LEADS Central Control Building (CCB).
DATE: 12/28/16
PROJECT
Provide VOIP hotline in YASREF Central Control Building (CCB)
ENGINEER
A M ALMATROOK SAMREF
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY
YDH shall receive PG 91/95, DO, and DPK from the SAMREF refinery via three
12/28/16 pipelines extending from the SAMREF tank farm to YDH product receiving
DATE:
CONSTRUCTION
manifolds. The SAMREF supply connection to YDH shall be downstream of
AGENCY existing export pumps. And the required new metering skids shall be installed
SHAHZAD YAZDANI
at SAMREF. These tie-ins will be taken from the SAMREF export lines going to
DATE: 12/28/16
their terminal near to the fence at King Fahad Road (RC Corridor). All new
OPERATIONS
equipment shall also be installed at space available adjacent to the tie-ins.
ALI H GHAMDI
12/28/16
DATE: The interface scope with SAMREF is described as following:
CONTROL NUMBER
VERIFICATION
A. Piping:
EDSD
BY:
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG B. Instrumentation:
SAY
SAY
SAY
Provide and install Three (3) custody metering skids PG91/95, DO and DPK
with a prover PG91/95 and DO, and a separate prover for DPK, the skid shall
ENGG CERT
ASH
ASH
ASH
ALL
ALL
PLC cabinet and MSC cabinet. A vendor supplied metering shelter shall be
provided to house these cabinets.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
10-02399-
10-02399-
0001
0001
0001
control room. The HMI station at OMS control room will be updated with the
new instrumentation added by BI-10-02399.
12/28/16
12/14/16
12/18/16
DATE
The new ESD valves added by BI-10-02399 at the battery limit of SAMREF
facility shall be integrated to existing ESD system. The contractor shall
provide new junction boxes and cables. The ESD marshalling cabinet
NO.
REV
G
E
DISCIPLINE
OMMRS01 shall be used to terminate ESD cables at OMS Rack-room.
ENGINEER
ALL LEADS The contractor shall provide junction boxes and field homerun cables as
DATE: 12/28/16 indicated in block diagram# IN-A00001.007
PROJECT
ENGINEER The YDH control system shall be interfaced to SAMREF control system to
A M ALMATROOK have READ ONLY access to the data points such as the CMS, EIV status
DATE: 12/28/16 and Pump status and tank status. The data is to be exchanged via plant DMZ
CERTIFIED
AMR EL SHARKAWY
through PI system at both the facilities. New fiber optic cable is to be laid from
12/28/16
SAMREF to YDH for the data exchange.
DATE:
CONSTRUCTION Contractor shall install MOV-1111/2/3/4, MOV-1211/12, and MOV-
AGENCY
SHAHZAD YAZDANI
1311/12/13/14/15/16/17/18 as shown in P &ID and Piping Plan #PI-
A00435/36/37/38. Provide and install Junction boxes and lay homerun cable
DATE: 12/28/16
OPERATIONS IC-0116/117/124/125 up to new DCS Marshalling Cabinet in located in
ALI H GHAMDI
metering shelter.
DATE:
12/28/16 Contractor shall provide and install ZV-1112/1212/1312 and install cable IC-
0133 from ESD junction box to existing ESD marshalling cabinet OMRS01.
CONTROL NUMBER
VERIFICATION
Contractor shall utilize existing cable tray to run home cable from junction to
EDSD
Drawing Description
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG IN-A00001.009 SAMREF CUSTODY METERING SKIDS
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
C. Telecom
Provide 12 core Fiber optic cable from Yanbu Distribution Hub to SAMREF
new Metering Shelter.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
Provide 12 core Fiber optic cable from SAMREF new Metering Shelter to
OMS Control Room.
12/28/16
12/14/16
12/18/16
DATE
D. Electrical:
E
DISCIPLINE
ENGINEER
ALL LEADS Electrical Scope in SAMREF, Refer to GEN-E0103.
DATE: 12/28/16
PROJECT
ENGINEER E. Structural:
A M ALMATROOK LSTK contractor shall perform required geotechnical investigation inside
DATE: 12/28/16 SAMREF refinery during detailed design.
CERTIFIED
AMR EL SHARKAWY All necessary structures and foundations for MOV’s and metering skids.
12/28/16
DATE:
CONSTRUCTION Yanbu Refinery
AGENCY
SHAHZAD YAZDANI
YDH shall receive PG 91/95, DO, and DPK from the Yanbu Refinery Terminal
DATE: 12/28/16
OPERATIONS through three pipelines extending from YRT through Yanbu refinery tank farm
ALI H GHAMDI
to YDH. The Yanbu refinery supply connection to YDH shall be downstream of
12/28/16 existing marine loading pumps. These pumps will take suction from ship pump.
DATE:
The required new metering skids shall be installed at YDH.
CONTROL NUMBER
VERIFICATION
EDSD
Provisions shall be provided in the receiving manifold for the future connection
of PG 91/95, DO & DPK from Yanbu grass root refinery.
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
A. Piping:
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Construct 4 tie-ins with YR pipelines, including MOVs, and ZVs.
SAY
SAY
SAY
ASH
ASH
ASH
B. Instrumentation:
LEADS
Contractor shall provide and install Motor Operated and Electrohydraulic ESD
LEADS
LEADS
ALL
ALL
ALL
valves at the battery limit of Yanbu Refinery, MOVs shall also be provide at
the tie-in locations.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
Contractor shall provide and install new homerun cables from valves up to
the existing SIH-1590 (Satellite Instrument House) in tank farm area. SIH-
1590 is expanded under BI-10-00043, the project shall coordinate with BI-10-
00043 to reserve the space in the cabinets required by this BI. All new EIVs
DESCRIPTION
0001
0001
12/18/16
DATE
G
E
system to YDH provides View only signals related to product transfer. The
DISCIPLINE
ENGINEER data points shall be the status of product pumps and EIVs such as running,
ALL LEADS stopped, tripped etc. The requirements of data from Yanbu Refinery shall be
DATE: 12/28/16 further evaluated during detailed design in coordination with YDH and YREF
PROJECT
ENGINEER operations.
A M ALMATROOK
The interface shall be through PI system installed at both the facility, DMZ
DATE: 12/28/16
CERTIFIED
shall be used in order to make the data exchange highly secured. Contractor
AMR EL SHARKAWY shall provide fiber cables between YREF and YDH. The possible option of
DATE:
12/28/16 interfacing both the facilities shall be further evaluated during detailed design.
CONSTRUCTION
AGENCY
Contractor shall provide and install new junction boxes, branch cables,
SHAHZAD YAZDANI homerun cables for instruments added by this BI.
DATE: 12/28/16 The field installation shall be as per P & IDs VA-247876/877 and VA-
OPERATIONS
234308.015/020/027 and Piping Plans PI-A00403.004, VA-236952.001, VA-
ALI H GHAMDI
236952.002, VA-236956.001, VA-236956.002 and VA-236960.002
12/28/16
DATE:
Contractor shall run homerun cables from Junction boxes to SIH-1590
CONTROL NUMBER
VERIFICATION
utilizing existing cable trays. Refer drawing VA-549870.001 for cable routing.
EDSD
Reference Drawings:
DATE:
BY:
Drawing Description
REVISIONCERTIFICATION
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
Drawing Description
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
C. Telecom
Provide two (2) 24-core Fiber optic cable from Yanbu Distribution Hub to
Yanbu Refinery Admin Bldg 1401 for IT Communications.
Provide one (1) 48-core Fiber optic cable from Yanbu Distribution Hub to
Yanbu Refinery Admin Bldg 1401 for Process/Instrumentation
Communications.
Provide hotline circuits in Operation Bldg. at Yanbu Distribution Hub to
10-02399-
JO/EWO
0001
0001
12/18/16
DATE
G
E
DATE: 12/28/16 Provide the TETRA Radio system in Yanbu Distribution Hub to connect in the
PROJECT
ENGINEER
existing SCN in Yanbu NGL.
A M ALMATROOK Provide Transmission connectivity for SDH equipment in Riyadh Refinery.
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY
12/28/16 D. Electrical:
DATE:
CONSTRUCTION Provide and Install four 480V, 3phase, 3wire MOVs Panels feeding from
AGENCY
YANBU refinery existing Substation No. 7, 8 and 9.
SHAHZAD YAZDANI
DATE: 12/28/16 Empty spaces of existing MCCs in Substation No. 7, 8 and 9 shall be utilized
OPERATIONS to feed MOVs Panels.
ALI H GHAMDI
Run and terminate power cables for MOV.
12/28/16
DATE:
Provide Grounding to new MOV panels from existing YANBU refinery
CONTROL NUMBER
VERIFICATION
Grounding network.
EDSD
Provide task/area lighting for new equipment from existing nearby lighting
Panels.
DATE:
BY:
E. Structural:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG All necessary structures and foundations for MOV’s and Pipe Supports.
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
THE CONTRACTOR shall coordinate with Saudi Aramco and MARAFIQ for
the portion of works under MARAFIQ scope and insure correct interface of all
discipline’s i.e. Civil, Electrical, Protection, Communication, etc.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
THE CONTRACTOR shall utilize existing spare breaker EA06 & EB04 of GIS
to feed power to Yanbu Distribution Hub (YDH). (Refer sketch # SK-A10011,
SK-A10013 & SK-A10014)
THE CONTRACTOR shall provide one (1) metering panel to accommodate
two (2) revenue meters & two check meters for YDH feeders-1 & 2. (Refer
sketch # SK-A10013 & SK-A10014)
THE CONTRACTOR shall provide Four (4) protection relay panel to
accommodate line differential relays & directional relays for YDH feeders-1 &
10-02399-
10-02399-
10-02399-
0001
0001
0001
THE CONTRACTOR shall provide one (1) 125VDC Power Panel to supply
power to new relay panels. (Refer sketch # SK-A10012)
12/28/16
12/14/16
12/18/16
DATE
THE CONTRACTOR shall provide two (2) fiber optic patch panel to be install
in Substation 9I. (Refer sketch # SK-A10014)
NO.
REV
G
E
DISCIPLINE
THE CONTRACTOR shall design, supply, install, test and assist with
ENGINEER commissioning of two run, 3x1/C- 630 mm2, 115kV cables of 3.85km in
ALL LEADS
length, from MARAFIQ Substation #9I to YDH. (Refer sketch # SK-A10010 &
DATE: 12/28/16
PROJECT
SK-A10015)
ENGINEER
A M ALMATROOK
THE CONTRACTOR shall provide termination kits, including connectors, at
DATE: 12/28/16
the MARAFIQ end and at the Saudi Aramco 115kV GIS end. THE
CERTIFIED CONTRACTOR shall coordinate with MARAFIQ and Saudi Aramco for
AMR EL SHARKAWY
termination at the MARAFIQ end.
12/28/16
DATE: THE CONTRACTOR shall confirm MARAFIQ protection and metering
CONSTRUCTION
AGENCY requirements and reflect accordingly within the Detail Design Drawings.
SHAHZAD YAZDANI Development of protection, control, fire alarm, communication, etc., interface
DATE: 12/28/16 drawings shall be THE CONTRACTOR responsibility including purchase,
OPERATIONS
installation, termination and testing of the required cabling.
ALI H GHAMDI
12/28/16
THE CONTRACTOR shall assist MARAFIQ as required with Manpower, and
DATE:
test equipment, as necessary to complete MARAFIQ 115kV and Saudi
CONTROL NUMBER
VERIFICATION
by all relevant parties including POD, PID, MARAFIQ, etc. and be included
DATE:
within the Project Test Results binders maintained and developed by THE
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
OF THIS DRAWING IS COVERED, FOR ALL
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Agreement between MARAFIQ & Saudi Aramco. Initial communication has
SAY
SAY
SAY
been established to finalize the scope segregation between Saudi Aramco &
MARAFIQ. Proposed interface requirements are as followed:
ENGG CERT
ASH
ASH
ASH
- MARAFIQ confirmed to reserve the existing Two (2) spare GIS Bays:
LEADS
LEADS
LEADS
ALL
=EB04 and =EA06 for Saudi Aramco YDH project. MARAFIQ requested
ALL
ALL
combine metering panels for 2 feeders of YDH. Each YDH feeders shall
have a separate revenue meters and will be accommodated in this panel.
Reserved available floor space for this panel. New Panel to be tagged as:
=E+MP05 115KV Service Cable/Revenue Metering panel.
- Protection Scope- Primary Protection: Two (2) new Relay Panels are
required based on ABB relays. Reserved available floor spaces for these
two panels. New panels to be tagged as: =EB04+R1 and =EA06+R1
115kV Service Line Aramco- YDH/ Primary Protection.
10-02399-
JO/EWO
10-02399-
- Protection Scope- Back Up Protection: Two (2) new relay Panels are
10-02399-
0001
0001
0001
12/18/16
DATE
G
E
Bus Bar/BF Protection of GIS Bay EA06 & EA04 are already pre-wired.
DISCIPLINE
ENGINEER - DC System scope: Existing 125V DC Distribution Panel has not enough
ALL LEADS
spare breakers for new DC scope. MARAFIQ requested to provide new
DATE: 12/28/16
PROJECT DC panel same manufacturer than existing panels “Riyadh Factory For
ENGINEER
A M ALMATROOK
Panelboard” Available floor space for this new DC panel. New Panel to be
DATE: 12/28/16 tagged as: 125V DCDB 125V Main DCDB No. 3.
CERTIFIED
AMR EL SHARKAWY
- AC System scope: Existing 220V AC Distribution Panel has required spare
12/28/16 breakers for new AC scope. THE CONTRACTOR to utilize existing spare
DATE:
CONSTRUCTION breakers from 220V AC Distribution Panel No. 1, 2 & 3. Note: There is No
AGENCY
SHAHZAD YAZDANI
480V AC panel available in MARAFIQ Substation.
DATE: 12/28/16 - Power Cable Routing in Basement: MARAFIQ requested as minimum to
OPERATIONS follow the same cable routing design in the basement:
ALI H GHAMDI
- Cable trays have to be heavy duty 600mmx150mm for cable transition to
12/28/16
DATE: the wall.
CONTROL NUMBER
VERIFICATION
- Cable structural support shall be Unistrut type similar design that existing
ones.
DATE:
BY:
General:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG - MARAFIQ requested Saudi Aramco to provide the SOW Narrative for
SAY
SAY
SAY
review.
ENGG CERT
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
B. Telecom:
THE CONTRACTOR shall design, supply, install, test and assist with
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
commissioning of two (2) x 2 run 12C Single Mode Fiber Optic Cables run
along with each power feeder cable from MARAFIQ Substation #9I to YDH.
(Refer sketch # SK-A10010 & ELA10130-001-003). Each of the two (2) fiber
run will have one 12 core fiber for Control and one 12 core fiber for
DESCRIPTION
Communication connectivity.
The fiber patch panel in Substation #91 shall be wall type and in YDH the
fiber patch panel shall be rack mounted type.
C. Instrumentation:
THE CONTRACTOR shall provide and install the following for Water
metering system with MARAFIQ:
10-02399-
JO/EWO
10-02399-
10-02399-
UTILITY WATER
0001
0001
0001
- Provide metering skid for utility water system as indicated in the drawing
12/28/16
12/18/16
DATE
G
E
DISCIPLINE
- Supplied field instruments shall be as per MARAFIQ standard and from
ENGINEER
ALL LEADS
approved vendors list.
DATE: 12/28/16
- Provide and install Junction boxes and branch cabling.
PROJECT
ENGINEER
- Provide and install RTU with GPRS Communication Gateway. Integrate
A M ALMATROOK the RTU with existing MARAFIQ SCADA.
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY SANITARY WATER
DATE:
12/28/16 - Provide metering skid for Sanitary water system as indicated in the
CONSTRUCTION
AGENCY
drawing INA00001-011, the skid shall be provided with field instruments
SHAHZAD YAZDANI such as Electromagnetic flowmeter, Pressure transmitters and
DATE: 12/28/16 Temperature transmitters.
OPERATIONS
- Supplied field instruments shall be as per MARAFIQ standard and from
ALI H GHAMDI
12/28/16
approved vendors list.
DATE:
- Provide and install Junction boxes and branch cabling.
CONTROL NUMBER
VERIFICATION
D. Civil:
REVISIONCERTIFICATION
THE CONTRACTOR shall provide and install the following for Water systems
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
with MARAFIQ.
(DCC) NO. _____________________
UTILITY WATER
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG - Provide connection of Utility Water at the approved tie-in point for Potable
SAY
SAY
SAY
ASH
ASH
- Contractor shall coordinate with MARAFIQ for the time to make the
LEADS
LEADS
LEADS
ALL
ALL
ALL
- Provided with pipes, fittings and flanges for a proper connection and leave
the connection uncovered until a water test verifies there are not spills at
the joint of tie in point.
DESCRIPTION
10-02399-
10-02399-
operation.
0001
0001
0001
- Provided with pipes, fittings and flanges for a proper connection and leave
12/28/16
12/14/16
12/18/16
the connection uncovered until a water test verifies there are not spills at
DATE
G
E
DISCIPLINE 114.
ENGINEER
ALL LEADS
DATE: 12/28/16
Yanbu NGL & Yanbu Royal Commissioning
PROJECT
ENGINEER
A M ALMATROOK
Refer to Appendix 2 for reservation forms and drawings.
DATE: 12/28/16
CERTIFIED Storage Tanks and Piping
AMR EL SHARKAWY
12/28/16
DATE: The interface point shall be at the flange face at each respective product
CONSTRUCTION
AGENCY
header line downstream of any tankage, booster pumps, process piping, and
SHAHZAD YAZDANI measurement equipment downstream of YDH Receipt Header Line as outlined
DATE: 12/28/16 below.
OPERATIONS
ALI H GHAMDI
12/28/16
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG dedicated receipt and delivery of product (2-PG91, 2-PG95, 2-DO, 2-
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
supply pipelines to each tank in that respective service including the T&I
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
12/18/16
Two separate red and green color dye injection systems shall be installed in
DATE
YDH facility. The dye injection must inject dye at the inlet header of storage
tanks (at the downstream of receiving manifold) so that a single skid of green
NO.
REV
G
E
dye and single skid for red dye can provide adequate coloration for PG-91 and
DISCIPLINE
ENGINEER PG-95 from all the source. The color dye injection system shall be a complete
ALL LEADS vendor skid with tank and injection pumps.
DATE: 12/28/16
PROJECT
ENGINEER The scope for the color dye injection Skid is outlined in PFD VA247835-001
A M ALMATROOK and P&IDs VA247891-001. CONTRACTOR shall develop a detailed P&ID after
DATE: 12/28/16 vendor information during detail design.
CERTIFIED
AMR EL SHARKAWY
The scope for Filtration Skid is outlined in PFD VA-247843.001 and P&IDs VA-
EDSD
information during detail design and CONTRACTOR shall make sure the
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Conductivity enhancer injection skid shall be provided at YDH to enhance
SAY
SAY
SAY
ASH
ASH
ASH
storage tanks from receiving manifold. Provision shall also be provided for
injection to the suction of the booster pumps in view of conductivity reduced in
LEADS
LEADS
LEADS
ALL
ALL
ALL
The scope for the conductivity enhancer injection Skid is outlined in PFD
VA247835-001 and P&IDs VA247892-001. CONTRACTOR shall develop a
detailed P&ID after receiving vendor information during detail design.
DESCRIPTION
The scope for the static dissipative additive injection Skid is outlined in PFD
JO/EWO
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
G
E
DISCIPLINE
ENGINEER TMS with Distributed Control System (DCS) shall be provided for the control
ALL LEADS
and logic functions required to operate YDH. The TMS-DCS shall also be
DATE: 12/28/16
PROJECT
interfaced with subsystems such as the Emergency Shutdown System (ESD),
ENGINEER
Vibration Monitoring System (VMS), Radar Tank Gauging System (RTG), Fire
A M ALMATROOK
& Gas Detection System (FDS), and Custody Monitoring System (CMS) and
DATE: 12/28/16
CERTIFIED
other Third party controls within YDH. All the relevant communication, process
AMR EL SHARKAWY parameters and status shall be interlinked between Yanbu, YASREF, SAMREF
DATE:
12/28/16 refineries, MARAFIQ & YDH.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
4.3.2 Yanbu to Jiddah Pipeline
DATE: 12/28/16
OPERATIONS The YNJ-1/2 pipeline system shall tie-in with YDH at downstream of shipper
ALI H GHAMDI pump after the PCVs. The battery limit will be the tie-in flange provided by YDH
12/28/16 in the scraper launcher lateral line for YNJ-1 / YNJ-2 and the flanges provided
DATE:
in the delivery manifold for the central region pipeline. As YDH is a greenfield
CONTROL NUMBER
VERIFICATION
development, the planning of both the YNJ-1/2 pipeline system and YDH shall
EDSD
consider each other in the design as well as future plans for the facilities within
YDH.
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
4.3.2.1 Mechanical
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG The project construction interface point shall be a flange connection at the
SAY
SAY
SAY
pipeline scraper launcher. The design interface point shall be at the tank outlet
flange because the system hydraulic modelling shall be included in the scope
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
4.3.2.2 Electrical
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
YDH 480V systems shall provide power to the panel board located at the
Scraper Launcher area within YDH battery limit. The 480V panel board shall
be provided by BI-10-02155.
DESCRIPTION
10-02399-
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
G
E
DATE: 12/28/16 There are no anticipated interfaces for the building scope at YDH.
PROJECT
ENGINEER
DATE: 12/28/16
OPERATIONS
ALI H GHAMDI 4.3.3 Yanbu to Central Region Pipeline
12/28/16
DATE:
CONTROL NUMBER
The pipeline system shall tie-in with YDH at each respective product header
VERIFICATION
line downstream of any tankage and upstream of the pipeline booster pumps.
EDSD
The detailed planning of the pipeline connection shall occur at a future date
when the project plan is initiated and further developed. At this time, YDH shall
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
4.3.4 Communications / IT
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
ASH
ASH
Corporate IT, data centers, mobile radio and security. The project shall provide
LEADS
ALL
ALL
Maintenance Building for Pipeline FOC patch panel provided under BI-
10-2155
The YDH Package shall reserve duct bank at Engineering and
Maintenance Building for Pipeline FOC cable provided under BI-10-
2155
The process automation traffic shall be transmitted through dedicated
fiber strands, PDN segregated from the corporate IT data network.
The IT and security systems traffic shall be transmitted through the
corporate IT data network. PDN should meet SAEP-99 as a minimum
10-02399-
JO/EWO
10-02399-
10-02399-
requirement.
0001
0001
0001
12/18/16
DATE
G
E
A M ALMATROOK Electrical
DATE: 12/28/16
CERTIFIED The electrical interface includes a 115 kV power connection with GIS at
AMR EL SHARKAWY
MARAFIQ’s Substation #9I, which is located about 3.85 km away from the
12/28/16
DATE: proposed YDH. Refer to Cable Routing drawing EL-A10150.001,EL-
CONSTRUCTION
AGENCY A10130.001-004.
SHAHZAD YAZDANI
DATE: 12/28/16
OPERATIONS
ALI H GHAMDI Non-Electrical Utilities
12/28/16
DATE:
CONTROL NUMBER
This BI will also interface with MARAFIQ utilities. The scope development
VERIFICATION
C
Sanitary sewer
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
ASH
ASH
ASH
All pipelines, power cables and fiber optic cables connecting YDH to the
previously mentioned interfaces (SAMREF, YASREF, YR, MARAFIQ and
LEADS
LEADS
LEADS
ALL
ALL
ALL
This project shall coordinate construction activities with the respective refineries,
pipeline construction, OSPAS and Domestic Sales & Logistics (DS&LD) departments.
Scheduling for refinery shutdowns and other critical operations shall be developed
during the detail design and shall be included in the Project Execution Plan. Pre-
commissioning, shutdown, commissioning and startup procedures shall be
implemented in such a manner that disruptions to continuing refinery operations are
minimized. All shutdowns shall be coordinated with related companies and
departments for review and scheduling of work. Any changes in approved T&I
10-02399-
JO/EWO
10-02399-
10-02399-
0001
12/28/16
12/18/16
DATE
A. GENERAL
NO.
REV
G
E
DISCIPLINE
ENGINEER
The demolition activities in this project will be limited to the demolition required
ALL LEADS for tie-in to the existing piping in:
DATE: 12/28/16
PROJECT
Yanbu refinery for the terminal unloading line and existing pump
ENGINEER
headers.
A M ALMATROOK
SAMREF for the product pipeline tie-in.
DATE: 12/28/16
CERTIFIED MARAFIQ tie-in points for utilities (water supply, sanitary and oily water)
AMR EL SHARKAWY
12/28/16
DATE:
CONSTRUCTION
AGENCY CONTRACTOR shall identify the required demolitions for tie-in during detail
SHAHZAD YAZDANI
design and construction.
DATE: 12/28/16
OPERATIONS
ALI H GHAMDI B. PIPING
12/28/16
DATE:
CONTRACTOR shall be responsible for demolishing the following facility
CONTROL NUMBER
VERIFICATION
components:
EDSD
YANBU REFINERY
DATE:
length) for new tie-in connection for Product pipelines from YR Terminal per
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
To install new feed line for Gasoline(PG91/PG95) to YDH ,Tie-in at the 18”
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG E)to be taken at Yanbu Refinery near Pump Station-C
SAY
SAY
SAY
To install new feed line for Kerosene (DPK) to YDH, Tie-in at the 20”
common header of Kerosene loading and Transfer pumps(V25-P22 A/B/C)
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
SAMREF REFINERY
These tie-ins are required to transfer products from SAMREF to YDH from
existing product export pumps (DO, PG 91, 95 & DPK) at the SAMREF
refinery.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
YASREF REFINERY
G
E
DISCIPLINE
BI-10-00043 inside the Yanbu refinery
ENGINEER
ALL LEADS
These tie-ins are required to transfer products from YASREF to YDH from
DATE: 12/28/16
PROJECT
ENGINEER existing product export pumps (DO & PG 91,95) at the YASREF refinery.
A M ALMATROOK
DATE: 12/28/16
CERTIFIED
NEW GRASS ROOT YANBU REFINERY
AMR EL SHARKAWY
DATE:
12/28/16 It is future refinery, at present there is no interface scope.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
DATE: 12/28/16
OPERATIONS
ALI H GHAMDI
General Requirement:
12/28/16
DATE:
CONTROL NUMBER
Tie-in connections:
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
CONTRACTOR shall assist SAUDI ARAMCO to isolate product lines & re-
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG commission each system to be tied into.
SAY
SAY
SAY
ASH
ASH
ASH
procedures and sequences for tie-ins to existing facilities and to new facilities.
The tie-in procedures are to be submitted fourteen (14) days in advance of the
LEADS
LEADS
LEADS
ALL
ALL
ALL
C. CIVIL
10-02399-
10-02399-
0001
0001
0001
asphalt road and paving and or concrete paving in location where pipelines
redundant in open cut road crossings are to be installed.
12/28/16
12/14/16
12/18/16
DATE
CONTRACTOR shall provide civil and structural drawings for all the required
NO.
REV
G
E
road crossings and fence penetration for laying the product pipelines, electrical
DISCIPLINE
ENGINEER
& instrument cables.
ALL LEADS
DATE: 12/28/16
PROJECT
CONTRACTOR shall determine other demolition activities during detail design
ENGINEER
stage, which have not been included in this demolition scope.
A M ALMATROOK
DATE: 12/28/16
CERTIFIED Roads that are demolished for the above reasons will be backfilling following
AMR EL SHARKAWY
SAES-A-114 and reinstated after the under pavement work is completed.
12/28/16
DATE: Work shall be in accordance with SAES-Q-006 clause 6, Pavement
CONSTRUCTION
AGENCY Reconstruction after trenching.
SHAHZAD YAZDANI
DATE: 12/28/16
OPERATIONS
ALI H GHAMDI 4.6 Receipt Pipeline and Connections
12/28/16
DATE:
A. GENERAL
CONTROL NUMBER
VERIFICATION
EDSD
CONTRACTOR shall design and install the product receiving station in YDH
including, but not limited to the following facilities:
DATE:
BY:
Four product receiving and distribution manifolds, one each for PG 95,
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG pipelines from YASREF
SAY
SAY
SAY
ASH
ASH
ASH
pipelines from Yanbu Refinery Terminal (YRT) via Yanbu Refinery (YR)
LEADS
LEADS
ALL
ALL
ALL
The receipt manifolds shall be sized for the maximum flow rate of a single
refinery supply and the manifold is not expected to receive the same
product from two sources simultaneously. The manifolds shall be
connected to all the three product sources at the upstream and to
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
Process interlocks to the manifold valves to receive the product from one
source at a time. Provision for connecting the future GR refinery shall be
12/28/16
12/14/16
12/18/16
DATE
The product and slop manifolds shall be of 30” size and for each manifold
NO.
REV
G
E
DISCIPLINE CONTRACTOR shall provide the provision for extension in future. Each of
ENGINEER
ALL LEADS the manifold inlet and outlet lines shall be equipped with motor operated
DATE: 12/28/16 valves and the segregation of the batches between PG 95 and PG 91 shall
PROJECT
ENGINEER
be through a batch management system. Manifold inlet lines shall also be
A M ALMATROOK
equipped with ZV.
DATE: 12/28/16
CERTIFIED Conductivity enhancer injection skid shall be installed to inject the chemical
AMR EL SHARKAWY
for enhancement of conductivity of DPK. The additives shall be injected to
12/28/16
DATE: the main line from DPK receiving manifold to DPK storage tanks and also to
CONSTRUCTION
AGENCY
DPK main line from DPK storage tanks to booster pumps. Details of
SHAHZAD YAZDANI Conductivity enhancer injection skid shall be finalized after vendor
DATE: 12/28/16 information during detail design.
OPERATIONS
ALI H GHAMDI Static Dissipative Additive (SDA) injection skid shall be installed to inject the
12/28/16
DATE: chemical to reduce the static charge of DO. The additives shall be injected
CONTROL NUMBER
to the main line from the DO receiving manifold to the DO storage tanks.
VERIFICATION
EDSD
DPK shall also be installed at YDH for YRT products. Each metering skid
REVISIONCERTIFICATION
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Red and green dye injection skids shall be installed at YDH for the coloring
SAY
SAY
SAY
of PG 95 and PG 91 products from all sources. The red and green dye shall
ENGG CERT
ASH
ASH
be injected to the main line from the PG-95/91 receiving manifold to the
ASH
LEADS
LEADS
ALL
ALL
ALL
All eight inbound pipelines from all 3 sources (SAMREF, YASREF & YR)
shall be protected for surge relief and will relief into surge relief tank at
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
YDH. Each inlet line shall have two SRVs with its isolation valves and a
thermal relief valve.
DESCRIPTION
The scope for the product receiving station is outlined in PFD VA-
247835.001 & VA-247949.001 and P&IDs VA-247891.001 to VA-
247897.001 & VA-247929.001.
B. INSTRUMENTATION
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
G
E
DISCIPLINE
ENGINEER
ALL LEADS
THE CONTRACTOR shall provide and install cable IC-0956 from
DATE: 12/28/16
Conductivity Enhancer Injection Skid controller to DCS, the
PROJECT connection to Skid controller shall be over Modbus Serial. For
ENGINEER
details refer block diagram IN-A00001.010
A M ALMATROOK
DATE: 12/28/16
CERTIFIED THE CONTRACTOR shall provide and install cable IC-0957 from
AMR EL SHARKAWY SDA Injection Skid controller to DCS, the connection to Skid
DATE:
12/28/16 controller shall be over Modbus Serial. For details refer block
CONSTRUCTION diagram IN-A00001.010
AGENCY
SHAHZAD YAZDANI
DATE: 12/28/16
THE CONTRACTOR shall provide and install field instruments for
OPERATIONS Gasoline P95/91 at receiving manifold as indicated in P & ID# VA-
ALI H GHAMDI 247894.001 and Block Diagram IN-A00002.017
12/28/16
DATE:
THE CONTRACTOR shall provide and install branch cables from
CONTROL NUMBER
VERIFICATION
BY:
A00002.017.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
G
E
DISCIPLINE
Block Diagram IN-A00002.019.
ENGINEER THE CONTRACTOR shall provide and install custody metering
ALL LEADS
skids X40-U-0014A/B/C for Gasoline-P91/95, DO & DPK and
DATE: 12/28/16
PROJECT
provers X40-U-0014D/E inside YDH facility at the location indicated
ENGINEER in facility plot plan. The skids shall be vendor supplied, cable
A M ALMATROOK
between field instrument, junction boxes and marshaling cabinet
DATE: 12/28/16 shall be vendor supplied.
CERTIFIED
AMR EL SHARKAWY
THE CONTRACTOR/SKID VENDOR shall supply and install
12/28/16
DATE: metering shelter to house metering and control cabinets. Contractor
CONSTRUCTION
AGENCY shall integrate metering shelter F & G to DCS system.
SHAHZAD YAZDANI
Refer block diagram IN-A00001.003 for YDH CMS overview and IN-
DATE: 12/28/16
OPERATIONS
A 00002.020 metering MOVs. The preliminary custody metering
ALI H GHAMDI
design is indicated in P &IDs VA-247886-001 to VA247890-001.
DATE:
12/28/16 THE CONTRACTOR/VENDOR shall provide and install cables
CONTROL NUMBER
vendor to LSTK.
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
(DCC) NO. _____________________
All branch cables shall be through conduit and homerun cables shall
run on the cables trays provided on pipe sleepers.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Communications with all third party control system shall be
SAY
SAY
SAY
redundant.
ENGG CERT
ASH
ASH
ASH
Reference drawings:
LEADS
Drawing # Description
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
12/28/16
12/14/16
12/18/16
DATE
C. FIRE PROTECTION
NO.
REV
DISCIPLINE (GEN-E0103).
ENGINEER
ALL LEADS
DATE: 12/28/16
D. COMMUNICATION
PROJECT
ENGINEER
A M ALMATROOK
CONTRACTOR shall provide FO cable infrastructure to be installed
DATE: 12/28/16
for Metering System connectivity to YASREF Control System,
CERTIFIED SAMREF Control System, and YRT Control System All terminations
AMR EL SHARKAWY
will be done on proposed 12-core fiber patch panels except for
12/28/16
DATE: Yanbu Refinery where 48-core fiber will be used.
CONSTRUCTION
AGENCY
CONTRACTOR shall provide one (1) analog telephone each inside
SHAHZAD YAZDANI
YASREF Control System, SAMREF Control System, and YRT
DATE: 12/28/16
OPERATIONS
Control System to be connected to existing Saudi Aramco
ALI H GHAMDI
Telephone Network via the proposed network of YDH.
12/28/16 Drawing # Description
DATE:
CO-A10002
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
E. CIVIL
C
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG CONTRACTOR shall provide Oily water system to collect oily water
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
F. PIPING
DESCRIPTION
Apart from original scope, LSTK contractor to refer below two Project
Scoping paper for revision due to changes in surge sytem.
o Refer to Project Scoping Paper (GEN-E0103) and its
Appendix-3 & 4 for changes due to surge system for scope of
work in SAMREF refinery.
10-02399-
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
G
E
DISCIPLINE
connecting eight pipelines carrying PG95/PG91/DO & DPK near
ENGINEER battery limit of YDH/RC corridor on west side of plot(Refer Plot plan
ALL LEADS
DATE: 12/28/16
No.PI-A00001-001)
PROJECT
ENGINEER
This manifold connected to all the three product sources on the
A M ALMATROOK upstream side of the facility to respective storage tanks on the
DATE: 12/28/16 downstream side of the facility.
CERTIFIED
AMR EL SHARKAWY
Pipelines at Receipt manifold provided with structural
DATE:
12/28/16 supports/Operating platforms to operate control valves/ZVs/PZVs &
CONSTRUCTION Isolation valves.
AGENCY
SHAHZAD YAZDANI The Product and slop manifold shall be provided with future
DATE: 12/28/16 connections with Isolation valves.
OPERATIONS
The pipeline for three custody metering skids each is dedicated for
ALI H GHAMDI
12/28/16
PG95/PG91, DO and DPK, also two provers shall be provided near
DATE:
Receipt manifold.
CONTROL NUMBER
VERIFICATION
Pipeline for Red and Green dye injection skids shall be installed at
EDSD
YDH for product identification for products received from all source
refineries
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
metering skid.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
The piping layout for Receipt manifold, Custody metering skids are
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Piping layout for Dye injection, SDA & Conductivity enhancer skid
SAY
SAY
SAY
are mainly small bore lines, which to be carried during detail design.
ENGG CERT
ASH
ASH
ASH
CONTRACTOR shall design and install the product receiving manifold in YDH
LEADS
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
listed in DCL.
0001
0001
12/18/16
DATE
G
E
Yanbu’ distribution hub tank farm and support infrastructure consists of the
following facilities:
DATE:
BY:
REVISIONCERTIFICATION
GENERAL
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Slop System
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Surge Relief System
SAY
SAY
SAY
ASH
Metering System
LEADS
LEADS
LEADS
ALL
ALL
ALL
NON-ELECTRICAL UTILITIES
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
A. GENERAL
10-02399-
0001
0001
distribution hub (YDH) and is not included in this scope of THE CONTRACTOR;
however CONTRACTOR shall provide automatic tank dewatering system, the
12/28/16
12/14/16
12/18/16
DATE
G
E
DISCIPLINE
ENGINEER
ALL LEADS
The product split, the type and the capacities for the tanks to be constructed in
Yanbu’ distribution hub are summarized in the table below.
DATE: 12/28/16
PROJECT
ENGINEER Tank Size-
A M ALMATROOK
Total Capacity
Working Number Design Design MDMT
DATE: 12/28/16 Tank Type Working
Volume m³ of Tanks Pressure Temp. (⁰C) (⁰C)
CERTIFIED Volume m³ (MB)
AMR EL SHARKAWY (MB)
12/28/16 External
DATE:
PG 91 27,658 (174) 3 82,974 (522) Atm 75 0
CONSTRUCTION Floating roof
AGENCY
SHAHZAD YAZDANI
Internal
DPK 40,228 (253) 1 Atm 75 0
EDSD
Floating roof
121,552 (764.5)
Internal
DATE:
Floating roof
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
Internal
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Floating Roof
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Note: The tank capacities are provided to meet the 85% of nominal volume
SAY
SAY
SAY
ASH
ASH
ASH
Slop System
LEADS
LEADS
LEADS
ALL
ALL
ALL
Slop system shall be consisting of two slop tanks (by others) and two slop pumps
(one operating, one spare) with necessary instrumentation and piping. Two slop
tanks each of 13,514 m³ (85 MB) working capacity shall be provided to handle the
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
intermix products from the pipeline, slops from the oily water treatment and surge
relief tank. The design parameters for the slop tank shall be as follows:
DESCRIPTION
Total Capacity,
Tank Size- Working Number of Working Design Design MDMT
Tank Type
Volume m3 (MB) Tanks Volume, m3 Pressure Temp. (⁰C) (⁰C)
(MB)
Internal
Slop 13514 (85) 2 27028 (170) Atm 75 0
Floating roof
10-02399-
JO/EWO
10-02399-
10-02399-
0001
along with product storage tanks and is not included in this scope of The
CONTRACTOR; however CONTRACTOR shall provide tank dewatering system,
12/28/16
12/14/16
12/18/16
DATE
the required instrumentation and piping requirements as specified in the piping and
instrumentation sections of this document. Refer to Appendix 6 for YDH Storage
NO.
REV
G
E
12/28/16 The following is a general scope narrative for the surge relief system:
DATE:
CONTROL NUMBER
VERIFICATION
CONTRACTOR shall design and install surge relief systems at YDH for the YNJ-1
EDSD
& YNJ-2 pipelines per surge requirement from BI-10-02155 and for all the inbound
pipelines from each source. A surge relief system consisting of a SRVs, surge
DATE:
relief tank (by others) and pumps & its associated piping & instrumentation shall be
BY:
installed. The surge tank pump will transfer the surge volume to the slop tank.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Refer to Project Scoping Paper (GEN-E0104) for the changes in surge system of
(DCC) NO. _____________________
YR / YDH.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
Similarly, like surge relief system at YDH, surge system shall also be provided at
SAMREF as detailed in Project Scoping Paper (GEN-E0103).
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
The CONTRACTOR shall provide a DPK filtration system to filter the off spec DPK
from the tanks. The DPK filtration is proposed to be a complete vendor skid with
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
circulation pumps, pre filters and after filters. Normally, the filtration skid circulates
into the same product tanks or to an empty DPK tank as per the operation
requirement. . The DPK filtration skids shall be sized to handle a capacity of 45 to
200 MBD and will be a completely vendor designed skid.
DESCRIPTION
The preliminary scope for Filtration Skid is outlined in PFD VA-247843.001 and
P&IDs VA-247915.001. CONTRACTOR shall develop detailed P&ID after vendor
information during detail design and CONTRACTOR shall make sure the design
shall meet the requirement of SAES-A-302 Aviation fuel quality assurance design
requirement.
B. NON-ELECTRICAL UTILITIES
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
The MARAFIQ battery limit will be the tie-in point at the RC corridor for potable
water and sanitary waste water. MARAFIQ will be supplying the required quantity
12/28/16
12/14/16
12/18/16
DATE
of potable water and YDH will be discharging the industrial waste and sanitary
waste water to MARAFIQ network. CONTRACTOR shall make sure that the
NO.
REV
receipt and discharge from / to MARAFIQ network is provided with the metering
G
E
DATE: 12/28/16
PROJECT The non-electrical utility systems include, but are not limited to:
Utility water system
ENGINEER
A M ALMATROOK
DATE: 12/28/16
Sanitary sewer
CERTIFIED Storm water drainage
AMR EL SHARKAWY
Fire protection system
12/28/16
DATE:
CONSTRUCTION
AGENCY
Utility water system
SHAHZAD YAZDANI
DATE: 12/28/16 CONTRACTOR shall provide utility water tank for the storage and supply of utility
OPERATIONS water. The utility water tank and pressure equipment pumps shall be separated
ALI H GHAMDI from the Fire protection water tanks and equipment.
12/28/16
DATE:
Utility water shall be provided from the MARAFIQ sweet water main. Adequate
CONTROL NUMBER
VERIFICATION
metering system per the requirement of MARAFIQ will be provided for the metering
EDSD
Utility water will be supplied to the buildings, eyewash / safety showers, and YNJ-1
REVISIONCERTIFICATION
& YNJ-2 pipeline scraper launchers through utility water pumps (one operating,
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
one spare).
C
CONTRACTOR shall provide Metering system required for the receipt of utility
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG water per the requirement of MARAFIQ. The scope for the utility water system is
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall install two (2) oily water lift stations in Yanbu’ distribution hub
to facilitate the gravity drain of oily water from all sources.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
Oily water discharge from all identified sources shall be routed to the oily water lift
stations.
DESCRIPTION
The rainfall water within the tank farm dikes is considered contaminated water and
it will be collected by an oily water pipe system towards the oily water lift stations.
In addition to the oily water drains from catch basins in the process area and storm
water inside of the tank dike, Oily water & DO storage tanks, sump shall also
receive flammable tank dewatering, pure hydrocarbon drains from process areas,
and pumps. The details of hydrocarbon drain network are specified below under
utilities section.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
Before water entering into the lift stations, the water shall pass through a sand
0001
0001
separator /trap which properly designed will retain sand particles from the sump
12/28/16
pumps
12/14/16
12/18/16
DATE
Each oily water lift station shall be provided with two pumps for normal flow (one
NO.
REV
G
E
operating, one spare) and two pumps for maximum flow (one operating, one
DISCIPLINE
ENGINEER
spare). The normal flow pumps will discharge to an oily water treatment system
ALL LEADS whereas the maximum flow pump shall discharge to the Evaporation pond.
DATE: 12/28/16
PROJECT
ENGINEER
The details of the oily water lift station, instrumentation and details of pumps are
A M ALMATROOK
outlined in instrumentation and mechanical sections below.
DATE: 12/28/16
CERTIFIED CONTRACTOR shall provide an Oily water treatment system for the treatment of
AMR EL SHARKAWY
oily water. The oily water treatment system shall be of a complete vendor skid
12/28/16
DATE: design and the treatment system shall receive the effluent from the oily water sump
CONSTRUCTION
AGENCY
via normal flow pump.
SHAHZAD YAZDANI
DATE: 12/28/16 CONTRACTOR shall route the effluent from normal flow pumps to an equalization
OPERATIONS tank which will discharge into the CPI Oily water treatment.
ALI H GHAMDI
DATE:
12/28/16 The oily water treatment system shall receive the effluent from the normal flow
pump and the dewatered effluent from the product storage tanks. Before oily water
CONTROL NUMBER
VERIFICATION
entering into the oily water treatment unit, it shall pass through an equalization
EDSD
tank.
DATE:
BY:
The oily water treatment system shall be of a complete vendor skid design. The
REVISIONCERTIFICATION
oily water treatment system shall consist of but is not limited to an oily water
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
equalization tank, CPI separator, water break tank, two effluent water pumps (one
C
operating, one spare), two skimmed oil pumps (one operating, one spare) and
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG transfer the recovered oil to the slop tank while effluent water to be transferred to
SAY
SAY
SAY
ASH
ASH
ASH
The detail for the skid is outlined in mechanical section below. CONTRACTOR
LEADS
shall provide the pump to transfer the recovered oil to the slop tank while effluent
LEADS
LEADS
ALL
ALL
ALL
The scope for the oily water system is outlined in PFD VA-247846.001 & VA-
247848.001 and P&IDs VA-247921.001 to VA-247923.001 CONTRACTOR shall
develop detailed P&ID after vendor information during detail design.
DESCRIPTION
CONTRACTOR shall make sure that a separate drain network Drains from the
product tanks, manifolds, scraper launchers and pump stations will be routed to
the oily water lift stations in a separated network from the other oily water
resources.
10-02399-
10-02399-
0001
0001
0001
Utility water shall be provided from the MARAFIQ sweet water main. Adequate
metering system per the requirement of MARAFIQ will be provided for the
12/28/16
12/14/16
12/18/16
metering of utility water inflow. CONTRACTOR shall provide utility water tank
DATE
for the storage and supply of utility water. Utility water will be supplied to
eyewash / safety showers, YNJ-1 & YNJ-2 pipeline scraper launchers and to
NO.
REV
G
E
the buildings through utility water pumps (one operating, one spare).
DISCIPLINE
ENGINEER
ALL LEADS CONTRACTOR shall provide Metering system required for the receipt of utility
DATE: 12/28/16 water per the requirement of MARAFIQ. The scope for the utility water system
PROJECT
ENGINEER is outlined in PFD VA-247847.001 and P&IDs VA-247924.001, 002.
A M ALMATROOK
12/28/16
Instrumentation for the collection and discharge of sewage from the buildings to
DATE:
the MARAFIQ network.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
Sewage discharged from buildings will be routed to a common sump and
DATE: 12/28/16 transported by two lift pumps (one operating, one spare) to the MARAFIQ
OPERATIONS
sewage water network.
ALI H GHAMDI
12/28/16
DATE: Sanitary sewage pipes from Operator shelters in the tank farm area will be
CONTROL NUMBER
discharged to the sanitary lift station near the Main Gate. The present location
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
for the metering of discharge effluent. The scope for the sanitary system is
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
The drainage system considers an adequate and consistent finish floor slope
towards channels and catch basins. Channels will be sloped properly to
conduct the storm water and discharge to MARAFIQ channels network.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
Evaporation pond
10-02399-
10-02399-
0001
Provide Two (2) evaporation ponds for waste oily water sewage and one (1)
0001
0001
evaporation pond for hydro test and contaminated storm water. The
12/28/16
12/18/16
DATE
accommodate about 2.0 meter deep oily water waste. Provide 0.6m minimum
free board.
NO.
REV
G
E
DISCIPLINE
ENGINEER
Provide 300mm thick marl capping bed inside evaporation pond includes 60mil
ALL LEADS rough surface HDPE (UV Resistant) liner above the marl capping.
DATE: 12/28/16
PROJECT
ENGINEER Provide 150 mm thick reinforced concrete Splash.
A M ALMATROOK
DATE: 12/28/16 Slop tanks will be emptied through Slop Tank Pumps (X40-G-0022 A/B) to
OPERATIONS
product tanks. These pumps shall be of Vertical Can Type due to low NPSH
ALI H GHAMDI
available as per hydraulic calculations. Pumps shall be in accordance with 31-
12/28/16
DATE:
SAMSS-004. Reference shall be made to datasheet no. RE-E00105 in Index-G
CONTROL NUMBER
VERIFICATION
Apart from above following sets of pumps shall also be provided as part of YDH
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Tank Farm and Support structure. Reference shall be made to Index-G for
OF THIS DRAWING IS COVERED, FOR ALL
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Utility Water Pumps (X40-G-0030 A/B) for eyewash, safety showers and
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
No. RE-E00112
LEADS
ALL
ALL
ALL
CPI Separator Skim Oil Pumps (X40-G-0025 A/B) – Datasheet No. RE-
E00108 and effluent water pumps (X40-G-0026 A/B) – Datasheet No.
DESCRIPTION
In addition to above, Surge Relief & Oily Water Pumps are required for
SAMREF surge system as detailed in Document No. GEN-E0103.
MISCELLANEOUS REQUIREMENTS
10-02399-
10-02399-
0001
0001
12/28/16
12/14/16
12/18/16
G
E
DISCIPLINE
ENGINEER
ALL LEADS CONTRACTOR shall be responsible for producing equipment
DATE: 12/28/16 datasheet, SIS sheets, Noise Datasheets in accordance with SAUDI
PROJECT
ENGINEER ARAMCO standard forms and datasheets.
A M ALMATROOK
DATE: 12/28/16 All pumps will be procured by CONTRACTOR from SAUDI ARAMCO
CERTIFIED
AMR EL SHARKAWY approved manufacturer for each Commodity Classification Code (CCC).
DATE:
12/28/16 SAUDI ARAMCO will provide the list of approved manufacturers after
CONSTRUCTION
AGENCY
award of Contract.
SHAHZAD YAZDANI
DATE: 12/28/16 CONTRACTOR shall prepare Material Requisition Package for all the
OPERATIONS
pumps and shall obtain approvals from relevant SAUDI ARAMCO
ALI H GHAMDI
12/28/16
Departments before issuing to Vendors.
DATE:
CONTROL NUMBER
VERIFICATION
Material take-offs have been prepared for reference only and will not be
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
Technical quotations obtained from vendors will list all exceptions and
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG will make a statement to that effect.
SAY
SAY
SAY
ENGG CERT
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Supply of Commissioning and Start-up spares and first fill of all the
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
12/18/16
DATE
G
E
DISCIPLINE
602/603), Operation and Instruction Manuals of CONTRACTOR
ENGINEER
ALL LEADS
supplied material in electronic format (Latest Acrobat Reader).
DATE: 12/28/16
PROJECT
ENGINEER
CONTRACTOR will provide critical spare parts for CONTRACTOR
A M ALMATROOK supplied items in accordance with SAEP-3101. Contractor will develop
DATE: 12/28/16 list of critical plant equipment spares and identification.
CERTIFIED
AMR EL SHARKAWY
SR NO
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
X40-D-0014
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
ASH
ASH
ASH
4 X40-U-0XX1 1 MONORAIL
LEADS
LEADS
LEADS
ALL
ALL
ALL
SR NO
EQUIPMENT TAG NO. QTY SERVICE
10-02399-
10-02399-
0001
0001
0001
12/18/16
INJECTION SKID
DATE
G
E
PACKAGE
DISCIPLINE
ENGINEER
ALL LEADS 5 1 CONDUCTIVITY ENHANCER
X40-U-0005
DATE: 12/28/16 INJECTION SKID
PROJECT
ENGINEER
6 1 STATIC DISSIPATIVE ADDITIVE
A M ALMATROOK X40-U-0011
DATE: 12/28/16
INJECTION SKID
CERTIFIED
AMR EL SHARKAWY
12/28/16
DATE:
CONSTRUCTION
Below are the reference documents for all Mechanical Static equipment
AGENCY and Packages.
SHAHZAD YAZDANI
DATE: 12/28/16
REFERENCE DOCUMENTS:
OPERATIONS
ALI H GHAMDI
TECHNICAL SPECIFICATION:
12/28/16
DATE:
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
EQE00018008 TECHNICAL SPECIFICATION FOR DROP ARM BARRIER
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
DATA SHEETS:
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
EQE00051002 (X40-U-0021)
EQE00052002 DATASHEET FOR OVERHEAD CRANE FOR GIS ROOM (X40-U-0024)
NO.
REV
G
E
DISCIPLINE
DATASHEET FOR OVERHEAD CRANE FOR ENGG. & MAINTENANCE
ENGINEER EQE00053002 BUILDING (X40-U-0025)
ALL LEADS
A M ALMATROOK
CONTRACTOR shall supply spreader bars, shackles, and slings for the lifting
VERIFICATION
of equipment.
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
sheet or P&IDs) and fireproofing (where specified on the data sheet or P&IDs).
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG All skid packages design shall be vendor proven design. Skid packages shall
SAY
SAY
SAY
be suitable for the specific application by meeting all the process design
requirements and environmental, safety and Industry standards.
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
LEADS
ALL
ALL
ALL
E. INSTRUMENTATION
mentioned below:
10-02399-
10-02399-
0001
0001
0001
Provide and install fieldbus cables from RTG level transmitters to RTG
junction boxes through conduit.
12/28/16
12/14/16
12/18/16
DATE
Provide and install RTG fieldbus homerun cables between RTG junction
boxes and Field Communication Units located in Rack room of Operation
NO.
REV
G
E
building.
DISCIPLINE
ENGINEER
ALL LEADS Refer block diagram IN-A00001.005 for fieldbus cabling and FCU
DATE: 12/28/16
assignments. The assignment shown is preliminary and shall be finalized
PROJECT during detail design phase.
ENGINEER
A M ALMATROOK All RTG components inside the rack room shall be supplied within a
DATE: 12/28/16 cabinet. The RTG shall be interfaced to DCS over industry standard open
CERTIFIED
AMR EL SHARKAWY
protocols.
12/28/16
DATE:
CONSTRUCTION
AGENCY
Product Storage & Slop Tanks Field Instrumentation
SHAHZAD YAZDANI
DATE: 12/28/16 Provide and install field instruments in the tank farm area as per P & IDs
OPERATIONS VA-247898.001 to VA-247911.001 and for slop tanks P & ID VA-247912/
ALI H GHAMDI VA-247913 and block diagrams IN-A00002.001/002/003/004.
12/28/16
DATE: Provide and install branch cables from field instruments to junction boxes.
CONTROL NUMBER
VERIFICATION
A00002.001/002/003/004.
DATE:
Provide and install homerun cables from field junction boxes to DCS/ESD
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
ASH
ASH
ASH
CONTRACTOR shall
LEADS
LEADS
LEADS
ALL
ALL
ALL
Provide and install field junction box X40-AJB-2032 & X40-EAJB-X032 lay
homerun cable IC-0773,IC-0950 from JB to RIB-2.
Provide and install cables between IRP panels located in substation XXX1
to RIB-2 DCS/ESD remote I/O cabinets.
DESCRIPTION
DPK Filtration Skid vendor shall provide and install field instruments as
indicated in P &IDs VA-247915 as per block diagram IN-A00002.022
DPK Filtration Skid vendor shall provide and install junction boxes.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
Contractor shall provide and install homerun cables from skid junction
boxes to DCS marshaling cabinet located in RIB-2. The cables laying shall
12/28/16
12/14/16
12/18/16
DATE
G
E
XXX2. Provide and install homerun cables DCS marshaling cabinet located
DISCIPLINE
ENGINEER in RIB-2 to MCC. The cables laying shall be as per block diagram IN-
ALL LEADS
A00002.022.
DATE: 12/28/16
PROJECT
ENGINEER
Field instruments for all the skids to be included
A M ALMATROOK Oily Water Collection and Treatment system
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY
Contractor shall provide and install field instruments as indicated in P &IDs
12/28/16 VA-247921, VA-247922 & VA-247923 and as per block diagram IN-
DATE:
CONSTRUCTION
A00002.011, IN-A00002.012 & IN-A00002.021
AGENCY
SHAHZAD YAZDANI Provide and install branch cables from field instruments to junction boxes.
DATE: 12/28/16
OPERATIONS
Provide and install junction boxes as per block diagrams IN-A00002.011,
ALI H GHAMDI
IN-A00002.012 & IN-A00002.021
DATE:
12/28/16 Provide and install homerun cables from field junction boxes to DCS/ESD
marshalling cabinets located in Rack room of Operations Building and
CONTROL NUMBER
VERIFICATION
Provide and install cables between MCC IRP to DCS/ESD cabinets located
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Utilities
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG a) Utility Water/Waste Water/Sanitary water
SAY
SAY
SAY
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Reference drawings
Drawing # Description
IN-A00001 System Block Diagrams
IN-A00002 Instrument Block Diagrams
10-02399-
JO/EWO
10-02399-
10-02399-
0001
12/18/16
DATE
G
E
A M ALMATROOK
IN-A00004 Equipment Layouts
DATE: 12/28/16 IN-A00003 Cable Routing Plan
CERTIFIED
AMR EL SHARKAWY
IN-D00005 Cable and Conduit Schedule
12/28/16
DATE:
CONSTRUCTION
AGENCY
F. PIPING
SHAHZAD YAZDANI
DATE: 12/28/16 Piping plans have been developed showing the conceptual routing of all
OPERATIONS major pipes with proper configuration in order to meet process objectives.
ALI H GHAMDI Pipe supports, platform and elevated structures shown in this submittal are
DATE:
12/28/16 preliminary. All major instruments such as MOVs, ZVs, PZVs and control
valves are located.
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
C
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG The Detail Design contractor shall develop further details of the Piping Plan
SAY
SAY
SAY
ASH
ASH
ASH
The preliminary stress analysis has been done for only the critical lines
connected to pump systems. Any re-adjustment of the pipe routing if
LEADS
LEADS
LEADS
ALL
ALL
ALL
All the Facility shall be design & constructed with adequate space to
facilitate operation and maintenance and with minimum spacing
requirement as per SAUDI ARAMCO standards.
DESCRIPTION
10-02399-
10-02399-
0001
All New piping (Only 2” & above) from Source refinery to receipt manifold,
0001
0001
12/18/16
Pumps, OWS lift station, DPK Filtration skid, Dye-in skid, Drain vessel,
DATE
G
E
the Project P&IDs and Piping plan As per DCL list located in Appendix
DISCIPLINE
ENGINEER 13.2.2.)
ALL LEADS
DATE: 12/28/16
Line sizes 1.5” & below are not considered in during the Project Proposal,
PROJECT MTO will be factored for small bore lines for estimation purpose.
ENGINEER
A M ALMATROOK Only Preliminary stress analysis done for lines connected to tanks and
DATE: 12/28/16 pumps as part of design verification.
CERTIFIED
AMR EL SHARKAWY
During detail desing all large bore and critical lines to be stress analyse and
12/28/16 requried special and spring support to be provided.
DATE:
CONSTRUCTION
AGENCY Future space considered for extension of sleepers in Pipe way & Pipe
SHAHZAD YAZDANI
trench.
DATE: 12/28/16
OPERATIONS The requirement of surge tank, surge skid, surge tank pump are tentatively
ALI H GHAMDI shown in SAMREF and Yanbu refinery overall plot plan Yanbu refinery. The
DATE:
12/28/16 location & feasibility study to be carry after confirmation from client.
CONTROL NUMBER
VERIFICATION
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
CONTRACTOR shall implement and comply with all the requirements below, in
(DCC) NO. _____________________
full.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG CONTRACTOR shall perform Piping Design, Procurement, Fabrication,
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
and standards.
CONTRACTOR shall complete the design calculations in support of the
construction drawings and all other necessary calculations/documents.
DESCRIPTION
10-02399-
10-02399-
0001
0001
12/18/16
G
E
ENGINEER
ALL LEADS CONTRACTOR shall perform all Piping works in accordance with SAUDI
DATE: 12/28/16
ARAMCO Engineering Standard SAES-L-310, SAES-L-350 other
PROJECT
ENGINEER
applicable SAUDI ARAMCO Standards and Specifications and the
A M ALMATROOK
American Society of Mechanical Engineers (ASME) Code ASME B31.4.
DATE: 12/28/16 CONTRACTOR shall carry out all piping work in close liaison with the
CERTIFIED
AMR EL SHARKAWY
SAUDI ARAMCO Representative to meet the project requirements.
DATE:
12/28/16
CONTRACTOR shall be responsible for verifying all dimensions, angles,
CONSTRUCTION
AGENCY
and elevations prior to fabrication and installation.
SHAHZAD YAZDANI
CONTRACTOR shall provide all necessary vehicles for transportation of
DATE: 12/28/16
OPERATIONS
personnel, utilities equipment and materials to and from the job site.
ALI H GHAMDI CONTRACTOR shall be responsible for the security and protection of all
DATE:
12/28/16 equipment, tools and materials at the job site until installation is complete
and accepted by SAUDI ARAMCO.
CONTROL NUMBER
VERIFICATION
Materials that are removed from the job site shall be hauled back to the
EDSD
materials storage yard. Any of the materials left at the end of the job shall
DATE:
ARAMCO.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
OF THIS DRAWING IS COVERED, FOR ALL
CONTRACTOR shall provide all labor and support equipment including, but
C
CONTRACTOR shall field verify all the dimensions and elevations shown
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG on drawings prior to start of any fabrication, erection and installation.
SAY
SAY
SAY
ASH
ASH
ASH
SAEP-351.
CONTRACTOR shall follow all safety precautions required by SAUDI
LEADS
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
CONTRACTOR shall fabricate and install field pipe supports, dummy legs,
guides, saddles, slide bearing plates, shoes and shims.
12/28/16
12/14/16
12/18/16
DATE
CONTRACTOR shall provide high point vent and low point drain at suitable
locations shall be provided in piping system.
NO.
REV
G
E
DATE: 12/28/16
CONTRACTOR shall design and construct the Facility with adequate space
CERTIFIED to facilitate operation and maintenance and with minimum spacing
AMR EL SHARKAWY
requirement as per SAUDI ARAMCO standard. Layout shall allow crane
12/28/16
DATE: access for equipment from relevant sides.
CONSTRUCTION
AGENCY Detailed design package shall be prepared with use of 3D modeling
SHAHZAD YAZDANI
software (PDS).
DATE: 12/28/16
OPERATIONS CONTRACTOR shall design and construct all piperacks, pipe bridges, pipe
ALI H GHAMDI supports and concrete pipe sleepers. CONTRACTOR shall consider all
DATE:
12/28/16 relevant loads in his design. Structural steel shall be galvanized. Material
shall be as per 12-SAMSS-007.
CONTROL NUMBER
VERIFICATION
designing piperacks.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG fabrication and construction of piping works for North Jiddah Bulk Plant
SAY
SAY
SAY
Expansion.
ENGG CERT
ASH
ASH
ASH
CONTRACTOR shall ensure that all piping materials shall conform to the
SAUDI ARAMCO piping specification SAES-L-105 together with project
LEADS
LEADS
LEADS
ALL
ALL
ALL
WELDING WORK
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
G
E
complete the Piping work, including radiography and other NDT methods
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG meet the Aramco requirements.
SAY
SAY
SAY
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
LEADS
ALL
10-02399-
10-02399-
0001
specified in SAES-B-067.
0001
0001
12/18/16
DATE
G
E
DISCIPLINE
ENGINEER
ALL LEADS Special Requirements:
DATE: 12/28/16
PROJECT
ENGINEER Prior to start of construction, CONTRACTOR shall perform field verification
A M ALMATROOK of all existing hazards that may jeopardize the safety of personnel and
DATE: 12/28/16 property.
CERTIFIED
AMR EL SHARKAWY
DATE:
12/28/16 CONTRACTOR shall submit Loss Prevention Program and Hazard
CONSTRUCTION Identification Plan for SAUDI ARAMCO approval no later than thirty (30)
AGENCY
SHAHZAD YAZDANI
days after the effective date of the contract.
DATE: 12/28/16
OPERATIONS
Prior to start of construction activities, CONTRACTOR shall identify the
ALI H GHAMDI
existing pipeway/pipe culverts to be extend in SAMREF/YASREF & submit
12/28/16
DATE: safe execution plan to SAUDI ARAMCO representative to work nearer to
CONTROL NUMBER
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG work and return all SAUDI ARAMCO supplied materials to a location
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
accordance with G.I. 430. 001 “Waste Management” and Cat-3 EIA report.
ALL
ALL
A. GENERAL
CONTRACTOR shall design and install the YNJ-1 & YNJ-2 support infrastructure
including, but not limited to the following facilities:
JO/EWO
10-02399-
10-02399-
0001
0001
12/18/16
DATE
The battery limit will be the tie-in flange (downstream of gate valves) provided by
YDH in the scraper launcher lateral line for YNJ-1 / YNJ-2. The 20” gate valve for
YNJ-1 and 24” gate valve for YNJ-2 are in scope of this BI. Utility Water supply
NO.
REV
G
E
DISCIPLINE from YDH shall also be provided for YNJ-1 & YNJ-2 pipeline scrapers and
ENGINEER
ALL LEADS accordingly drain from YNJ-1 & YNJ-2 pipeline scrapers shall also be received into
DATE: 12/28/16
oily water lift station.
PROJECT
ENGINEER
A M ALMATROOK
The following are the interfaces with BI-10-02155 and CONTRACTOR shall re-
DATE: 12/28/16
confirm the tie-in conditions with BI-10-02155 during detail design.
CERTIFIED
AMR EL SHARKAWY
a) Pipelines (YNJ-1 & YNJ-2):
12/28/16
DATE:
CONSTRUCTION
2 Nos. pipelines, one of 20” ND (YNJ-1) and the other of 24” ND (YNJ-2) of
AGENCY
SHAHZAD YAZDANI following specs:
DATE: 12/28/16
Pipeline Material = API 5L Gr.X65
OPERATIONS
ALI H GHAMDI Flange Rating = 900#
12/28/16
DATE: MAOP = 15513.2 kPag (2250 PSIG)
CONTROL NUMBER
VERIFICATION
Design Temperature = 60 °C
EDSD
DATE:
BY:
b) Utilities:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
- Utility water supply from YDH to YNJ-1/2 pipeline scraper launchers via two
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
4” flange connections.
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG - Drain from YNJ-1/2 pipeline scrapers to YDH via two 4” flange connections
SAY
SAY
SAY
The scope for the YNJ-1 & YNJ-2 support infrastructure is outlined in PFDs VA-
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
B. PIPING
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
The scope of work includes design and construction of two pipelines ,YNJ-1
& 2 inside battery limit of YDH, but not limited to, the following activities:
YNJ-1 20” Gasoline Pipeline & YNJ-2 24” DO/DPK Pipeline:
DESCRIPTION
The design and installation of YNJ-1 20” Gasoline Pipeline & YNJ-2 24”
DO/DPK Pipeline from Gasoline & DO/DPK Shipper pump to Scraper
Launcher Facility constructed under BI-10-02155. Design and Installation of
the Scraper launcher shall be the part of BI-10-02155 YDH Scope will start
at a flange upstream of the Scraper launcher.
Interface requirements shall be accordingly coordinated with pipeline
project BI-10-02155. Following are the interface connections.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
12/18/16
G
E
DISCIPLINE
Reference Dwg: As per DCL no.GEN-D0001.
ENGINEER
ALL LEADS
General Requirement for Piping
DATE: 12/28/16
PROJECT
ENGINEER
A M ALMATROOK
CONTRACTOR scope of work includes design and construction of two
DATE: 12/28/16
pipelines ,YNJ-1 & 2 inside battery limit of YDH ,but not limited to the
CERTIFIED following activities:
AMR EL SHARKAWY
12/28/16
DATE:
CONSTRUCTION
YNJ-1 20” Gasoline Pipeline & YNJ-2 24” DO/DPK Pipeline:
AGENCY
SHAHZAD YAZDANI
DATE: 12/28/16 CONTRACTOR shall design and install YNJ-1 20” Gasoline Pipeline &
OPERATIONS YNJ-2 24” DO/DPK Pipeline from Gasoline & DO/DPK Shipper pump to
ALI H GHAMDI Scraper Launcher Facility constructed under BI-10-02155. Design and
DATE:
12/28/16 Installation of Scraper launcher shall be the part of BI-10-02155; YDH
Scope will start at a flange upstream of Scraper launcher.
CONTROL NUMBER
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG h. Utility water connection.
SAY
SAY
SAY
ENGG CERT
ASH
ASH
ALL
ALL
Standards.
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
A. GENERAL
NO.
REV
G
E
CONTRACTOR shall design and install the booster and shipper pumps for YNJ-1
DISCIPLINE
ENGINEER and YNJ-2 pipelines including, but not limited to the following facilities:
ALL LEADS
DATE: 12/28/16
Three (3) booster pumps for YNJ-1 pipeline
PROJECT
ENGINEER Three (3) shipper pumps for YNJ-1 pipeline
A M ALMATROOK
Three (3) booster pumps for YNJ-2 pipeline
DATE: 12/28/16
CERTIFIED
Three (3) shipper pumps for YNJ-2 pipeline
AMR EL SHARKAWY Pumps associated automation, control and safety shutdown requirements.
12/28/16
DATE:
CONSTRUCTION CONTRACTOR shall design and install three (3) booster pumps for YNJ-1 and
AGENCY
SHAHZAD YAZDANI
YNJ-2.Pumps shall be electric motor and fixed speed with spillback to tank being
emptied. The motors shall be sized to accommodate the pump loads for the full
DATE: 12/28/16
OPERATIONS spectrum of the pump curve. The pumps shall be fitted with all necessary
ALI H GHAMDI
instrumentation to protect the pump (including seal leak detection) and prevent
12/28/16 overpressure.
DATE:
CONTROL NUMBER
VERIFICATION
CONTRACTOR shall design and install three (3) shipper pumps for YNJ-1 and
EDSD
YNJ-2. Pumps shall be electric motor driven and fixed speed. The motors shall be
sized to accommodate the pump loads for the full spectrum of the pump curve. The
DATE:
pumps shall be fitted with all necessary instrumentation to protect the pump
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
The following design parameters are established for the pipeline booster pumps.
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
LEADS
ALL
The following design parameters are established for the pipeline shipper pumps.
Rated flow Diff. Pressure Design Temp
Service Product No. of pumps
DESCRIPTION
The scope for the YNJ-1 & YNJ-2 pumps is outlined in PFDs VA-247844.001 &
VA-247845.001 and P&IDs VA-247917.001 to VA-247920.002.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
G
E
DISCIPLINE
ENGINEER
ALL LEADS
Gasoline booster pumps shall be in accordance with 31-SAMSS-004 and shall be
of Vertical Can type centrifugal pumps (API VS6 or VS7) due to low NPSH
DATE: 12/28/16
PROJECT availability. These pumps are provided to meet the high NPSHR of shipper pumps.
ENGINEER
Pumps will be limited to maximum of 1800 RPM. Pump materials, mechanical
A M ALMATROOK
seals shall be in accordance with SAES-G-005. Reference shall be made to
DATE: 12/28/16
CERTIFIED
datasheet no. RE-E00103 included in Index-G.
AMR EL SHARKAWY
DATE:
12/28/16 DIESEL/DPK BOOSTER PUMPS (X40-G-0018 A/B/C)
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
Diesel/DPK booster pumps shall be in accordance with 31-SAMSS-004 and shall
be of between bearings, horizontal split casing type Centrifugal pumps (API BB1).
DATE: 12/28/16
OPERATIONS These pumps are provided to meet the high NPSHR of shipper pumps. Pump
ALI H GHAMDI materials, mechanical seals shall be in accordance with SAES-G-005. Reference
12/28/16 shall be made to datasheet no. RE-E00101 included in Index-G.
DATE:
CONTROL NUMBER
VERIFICATION
MISCELLANEOUS REQUIREMENTS
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
C
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Material take-offs have been prepared for reference only and will not be
considered as contractual documents and cannot be used as a basis for
any change order.
10-02399-
JO/EWO
10-02399-
10-02399-
Technical quotations obtained from vendors will list all exceptions and
0001
0001
0001
12/18/16
DATE
G
E
DISCIPLINE
CONTRACTOR shall be responsible for Technical Bid Evaluation,
ENGINEER
ALL LEADS
placing the Purchase Order to technically approved Vendors.
DATE: 12/28/16
PROJECT
ENGINEER
CONTRACTOR shall be responsible for review and approval of NMRs
A M ALMATROOK 601, 602 and 603.
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY
Inspection and Testing of CONTRACTOR supplied materials will be
DATE:
12/28/16 performed as per applicable SAUDI ARAMCO Inspection Requirement
CONSTRUCTION form A-175. CONTRACTOR will arrange with his sub suppliers to
AGENCY
SHAHZAD YAZDANI comply with these requirements by stating on all sub suppliers’
DATE: 12/28/16 purchase order SAUDI ARAMCO’s intention to inspect material.
OPERATIONS
ALI H GHAMDI
Equipment installation and Commissioning & Pre-commissioning shall
12/28/16
DATE:
be in accordance with approved Vendor’s installation and
CONTROL NUMBER
VERIFICATION
commissioning procedures.
EDSD
and first fill of all the lubricants and chemicals is in the scope of
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG CONTRACTOR will provide all Non Material Requirement (NMR-
SAY
SAY
SAY
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Shipper pumps shall be provided with forced type lubrication system i-e lube oil
skids will be provided in accordance with applicable SAUDI ARAMCO Standards.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
Each shipper pump will also have a Vibration Monitoring System in accordance
with applicable SAUDI ARAMCO Standards.
12/28/16
12/14/16
12/18/16
DATE
G
E
DISCIPLINE
ENGINEER Diesel/DPK Shipper pumps shall be in accordance with 31-SAMSS-004 and shall
ALL LEADS be of between bearing, vertical split casing design centrifugal pumps (API BB5).
DATE: 12/28/16 Pump materials, mechanical seals shall also be in accordance with SAES-G-005.
PROJECT
ENGINEER Reference shall be made to datasheet no. RE-E00102 included in Index-G.
A M ALMATROOK
DATE: 12/28/16 Shipper pumps will be provided with forced type lubrication system i-e lube oil
CERTIFIED
AMR EL SHARKAWY
skids will be provided in accordance with applicable SAUDI ARAMCO Standards.
12/28/16
Each shipper pump will also have Vibration Monitoring System in accordance with
DATE:
applicable SAUDI ARAMCO Standards
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
DATE: 12/28/16
MISCELLANEOUS REQUIREMENTS
OPERATIONS
ALI H GHAMDI
Reference shall be made to technical specifications for pumps included
12/28/16
DATE:
in Index-A for further details of these pumps.
CONTROL NUMBER
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG ARAMCO standard forms and datasheets.
SAY
SAY
SAY
ENGG CERT
LEADS
LEADS
ALL
award of Contract.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
Material take-offs have been prepared for reference only and will not be
considered as contractual documents and cannot be used as a basis for
any change order.
Technical quotations obtained from vendors will list all exceptions and
/or, additions to applicable project Drawings and SAUDI ARAMCO
Specifications. If there is no exception to specifications, CONTRACTOR
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
12/18/16
DATE
G
E
DATE: 12/28/16
PROJECT Inspection and Testing of CONTRACTOR supplied materials will be
ENGINEER
A M ALMATROOK
performed as per applicable SAUDI ARAMCO Inspection Requirement
DATE: 12/28/16 form A-175. CONTRACTOR will arrange with his sub suppliers to
AMR EL SHARKAWY
CERTIFIED
comply with these requirements by stating on all sub suppliers’
12/28/16 purchase order SAUDI ARAMCO’s intention to inspect material.
DATE:
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
Equipment installation and Commissioning & Pre-commissioning shall
DATE: 12/28/16 be in accordance with approved Vendor’s installation and
OPERATIONS commissioning procedures.
ALI H GHAMDI
12/28/16
DATE: Supply of Commissioning & Pre-commissioning and Start-up spares
CONTROL NUMBER
VERIFICATION
and first fill of all the lubricants and chemicals is in the scope of
EDSD
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
C. INSTRUMENTATION
CONTRACTOR shall perform the following activities at the pump shipper and
booster pump stations.
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
G
E
DISCIPLINE
ENGINEER Provide and install branch cables from field instruments to field
ALL LEADS junction boxes as indicated in block diagrams IN-
DATE: 12/28/16 A00002.005/006/007/008.
PROJECT
ENGINEER
Provide and install homerun cables from field junction boxes to
A M ALMATROOK
remote instrument buildings as indicated in IN-
DATE: 12/28/16
CERTIFIED A00002.005/006/007/008.
AMR EL SHARKAWY
Provide and install cables from DCS/ESD IRP panels located in
12/28/16
DATE: Substations to RIBs as indicated in IN-A00002.005/006/007/008.
CONSTRUCTION
AGENCY Provide and install vibration and bearing temperature junction boxes
SHAHZAD YAZDANI
as per block diagram IN-A00001.006
DATE: 12/28/16
OPERATIONS Provide homerun cables from junction boxes to VMS Marshaling
ALI H GHAMDI Cabinets and system racks located in respective RIBs.
12/28/16
DATE:
VMS system shall be connected to DCS via Modbus TCP/IP and
CONTROL NUMBER
Reference drawings:
DATE:
BY:
REVISIONCERTIFICATION
Drawing # Description
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
Drawing # Description
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
D. ELECTRICAL
CONTRACTOR shall utilize the one line diagrams attached to this package
to develop the detail design package for utilization within purchase orders
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
induction motors shall be such that to achieve power factor equal or greater
than 0.95.
NO.
REV
G
E
DISCIPLINE
Shipper pump motors power supply shall be from 13.8kV switchgear (Refer
ENGINEER to drawing # EL-A10008). Auxiliary loads for these main pumps shall be
ALL LEADS
from 480V control gears (refer to drawing # EL-A10014 to EL-A10017).
DATE: 12/28/16
PROJECT
ENGINEER
Booster pump motors power supply shall be from 4.16kV switchgear (Refer
A M ALMATROOK
to drawing # EL-A10011). Auxiliary loads for these main pumps shall be
DATE: 12/28/16
from 480V control gears (refer to drawing # EL-A00014 to EL-A00017).
CERTIFIED
AMR EL SHARKAWY CONTRACTOR shall design, supply, install, test, pre-commission and
12/28/16 provide assistance in commissioning and integrated testing to insure fully
DATE:
CONSTRUCTION operational systems. All Electrical Control Panels and Stop-Start Stations
AGENCY
shall have Push-to-Test Multi-Cluster LED’s for indication.
SHAHZAD YAZDANI
DATE: 12/28/16 CONTRACTOR shall design, supply and install and test Local Control Push
OPERATIONS Button Stations appropriate for the areas of installation, Install control
ALI H GHAMDI cables and conduits between control stations and the Interposing relay
DATE:
12/28/16 panels or Control gear.
CONTROL NUMBER
VERIFICATION
motors where the engineering documents indicate motor space heaters are
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
motor space heater contactor. Contact shall be closed when the main motor
circuit contactor is de-energized. This is in accordance with SAES-P-116
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG and shall be provided, installed, tested, pre commissioned, and with
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Equipment and Skids and the parent equipment, field instruments, etc. and
CONTRACTOR shall develop Wiring Interconnection Drawings, based on
Actual Vendor Certified NMR 602 Drawings and NMR 603 Manuals, to
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
10-02399-
10-02399-
0001
0001
0001
A. GENERAL
12/28/16
12/14/16
12/18/16
CONTRACTOR shall ensure the pump operation of the YNJ-1 and YNJ-2 pipelines
DATE
G
E
Three (3) Booster and Three (3) shipper pumps shall be designed for YNJ-1 and
DISCIPLINE
ENGINEER YNJ-2. (Fourth pump shall be installed in phase-2) Pumps shall be electric motor
ALL LEADS
and fixed speed with spillback to tank being emptied.
DATE: 12/28/16 The pipeline booster and shipper pumps shall be controlled locally from YDH but
PROJECT
ENGINEER CONTRACTOR shall provide viewing capabilities to OSPAS. Pump start-up
A M ALMATROOK philosophy shall be based on the start-up of a single shipper pump at a time and
DATE: 12/28/16 not two or more shipper pumps simultaneously. CONTRACTOR shall co-ordinate
CERTIFIED
AMR EL SHARKAWY
with BI-10-02155 for the operation philosophy required by the pipeline prior to
12/28/16
detail design and construction.
DATE:
CONSTRUCTION
AGENCY The scope for the YNJ-1 & YNJ-2 pumps’ operation is outlined in PFDs VA-
SHAHZAD YAZDANI
247844.001 & VA-247845.001 and P&IDs VA-247917.001 to VA-247920.002.
DATE: 12/28/16
OPERATIONS
ALI H GHAMDI
4.11 Pipeline Connection from Grassroots-Yanbu Aramco Refinery
12/28/16
DATE: A. GENERAL
CONTROL NUMBER
VERIFICATION
CONTRACTOR shall provide provision in the receiving manifolds for the future
EDSD
connections of PG 91/95, DO & DPK from Yanbu grass root refinery. A valve with a
DATE:
same size as of manifold (30”) shall be kept as provision in each of the product
BY:
manifold.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
The scope for the pipeline connections from Yanbu Grass root refinery is outlined
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG B. PIPING
SAY
SAY
SAY
All pumps are located centrally with respective storage tanks, so that the pressure
ENGG CERT
ASH
ASH
ASH
reduction due to pipe length from tank outlet to pump inlet is minimized to meet
process requirement.
LEADS
LEADS
LEADS
ALL
ALL
ALL
Pumps are grouped to permit economical pipe routing with free space for future
pumps & possible extension of main pipe header for future expansion.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
Space for laydown areas has been considered for all pump bays which will be
required for pump maintenance purpose.
DESCRIPTION
The layout of pump suction-discharge lines, associated header lines & the
provision for future connection in PG95/PG91, DO, DPK shall be provided as per
branch connections with isolation valves with blinds as per piping plan (Ref. DCL
No GEN-D0001 )
CONTRACTOR shall provide branch connection with isolation valves with blind per
piping plan (Ref. Piping Plan listed in DCL No GEN-D0001) for future connection in
PG95/PG91, DO, DPK and Slop manifold
10-02399-
JO/EWO
10-02399-
10-02399-
0001
Based on surge study, it is proposed to add new Surge tank & associated facilities
0001
0001
inside SAMREF refinery, this has been shown as preliminary information in overall
12/28/16
plot plan. Exact location and feasibility study to be conducted after confirmation
12/14/16
12/18/16
DATE
during detail design phase. No piping plan and MTO considered in 90% submittal.
NO.
REV
G
E
DISCIPLINE
ENGINEER
4.12 Pipeline Connection from SAMREF Refinery
ALL LEADS
A M ALMATROOK
Refer to Project Scoping Paper (GEN-E0103) for details of SAMREF scope of
DATE: 12/28/16
work.
CERTIFIED
AMR EL SHARKAWY
B. PIPING
12/28/16
DATE:
CONSTRUCTION
AGENCY
YDH shall receive PG 91/95, DO, and DPK from the SAMREF refinery via three
SHAHZAD YAZDANI pipelines extending from the SAMREF tank farm to YDH product receiving
DATE: 12/28/16 manifolds.
OPERATIONS
ALI H GHAMDI In addition to orginal scope, LSKT Contacator to refer Project Scoping Paper
DATE:
12/28/16 (GEN-E0103) and its Appendix-3 & 4 for changes due to surge system for scope
of work in SAMREF refinery.
CONTROL NUMBER
VERIFICATION
EDSD
installed at SAMREF.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
The main interface connection between this BI-10-02399 and others is at the
C
existing headers itself, i.e., from the SAMREF export lines going to their
(DCC) NO. _____________________
terminal near to the fence at King Fahad Road (RC Corridor. Inside plant,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG piping team will bring the connection to battery limit where inside plant piping
SAY
SAY
SAY
ASH
ASH
ASH
The tie-in details and routing of three pipelines are shown in piping plans, Tie-
in Index as per DCL No GEN-D0001. The drawings mentioned here are only
LEADS
LEADS
LEADS
ALL
ALL
ALL
New metering skid to be installed inside SAMREF refinery. (Ref. Plot plan
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
Based on surge study, new Surge tank & associated facilities inside SAMREF
DESCRIPTION
refinery were added, exact location and feasibility study to be conducted after
confirmation during detail design phase.
C. PIPELINE
C.01 PURPOSE
The following design basis has been established for YDH to be constructed by this
project.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
Three product pipelines shall be constructed from SAMREF refinery to YDH receipt
manifolds. These pipelines shall handle diesel, DPK/kerosene and gasoline. The
NO.
REV
G
E
gasoline pipeline shall transfer both PG91 and PG95 products in a batching
DISCIPLINE
ENGINEER operation.
ALL LEADS
A M ALMATROOK The main interface connection between this BI-10-02399 and SAMREF is at the
DATE: 12/28/16 existing lines (SAMREF to Marine Terminal). Inside plant piping team will bring the
CERTIFIED connection to battery limit where inside plant piping and these 3 SAMREF - YDH
AMR EL SHARKAWY
12/28/16
pipelines interfaces
DATE:
CONSTRUCTION
AGENCY C.04 PRODUCT PIPELINE CORRIDOR
SHAHZAD YAZDANI
DATE: 12/28/16 1. The pipeline to be constructed for this project shall be routed through
OPERATIONS
existing RC pipeline corridors. Pipeline route from SAMREF is through
ALI H GHAMDI
pipeline corridor at BB Avenue, going to the 4th street corridor and
12/28/16
DATE: to the pipeline corridor in between King Abdul-Aziz road and Haul road of
CONTROL NUMBER
for flexibility.
DATE:
BY:
2. CONTRACTOR shall verify and comply with the Pipeline route according to
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
the Overall Pipeline route DWG PP-A00005.001, the attached route and
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
the new pipelines will be routed within YRC corridor boundaries during the
detail design.Few locations may not fit within the corridor limits and the
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG CONTRACTOR shall raise it to SARAMCO during the development of the
SAY
SAY
SAY
design. ..
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
*Other Flow conditions are shown in the Line Designation Table see PID00442
sheet 001 to 002 and PID00442 sheet 001 to 003.
The three (3) 30” pipelines will cross eleven (11) roads as follow:
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
G
E
DISCIPLINE A00130.001
ENGINEER
ALL LEADS
2 #2-Main Berth Access Road Thrust Boring 21 PP-
DATE: 12/28/16
A00131.001
PROJECT 3 #3-Causeway Road and piping Thrust Boring 45 PP-
ENGINEER
Corridor A00131.002
A M ALMATROOK
4 #4-NGL Main Facilities Thrust Boring 23 PP-
DATE: 12/28/16
CERTIFIED A00132.001
AMR EL SHARKAWY 5 #5-NGL Plant Entrance Road Thrust Boring 37 PP-
DATE:
12/28/16 A00133.001
CONSTRUCTION
AGENCY
6 #6-Access Road to Diners Thrust Boring 34 PP-
SHAHZAD YAZDANI A00134.001
DATE: 12/28/16 7 #7- Al Mishani Street (Haul Road) Thrust Boring 25 PP-
OPERATIONS A00135.001
ALI H GHAMDI 8 #8-Approach Road(From/To Thrust Boring 47 PP-
DATE:
12/28/16 YASREF) A00136.001
9 #9-Approach Road(From/To YR) Thrust Boring 46 PP-
CONTROL NUMBER
VERIFICATION
A00137.001
EDSD
A00139.001
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Thrust boring procedure shall be done by the approved SAUDI ARAMCO Thrust boring
(DCC) NO. _____________________
contractor and pipe shall be coated as per SAES-H-002 Para. 5.1.2. and 5.4.4.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
CONTRACTOR shall conduct site survey to finalize the pipeline routing proposed
during detailed design.
ENGG CERT
ASH
ASH
ASH
CONTRACTOR shall provide all adequate civil /structural arrangements for road
LEADS
LEADS
LEADS
ALL
ALL
ALL
crossings as proposed in pipeline drawings this shall include but not limited to soil
excavation, backfilling, concrete lining, dewatering if required and detour for open cut
road crossings.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
CONTRACTOR shall discuss and coordinate with thrust boring CONTRACTOR for the
required spacing. The spacing will be reviewed, concurred and approved by SAUDI
ARAMCO and YRC.
CONTRACTOR shall verify and provide insulation gasket and set of flanges installation
for above & underground transitions at road crossings and interface points (between
Piping and Pipeline) inside the refineries in accordance with SAUDI ARAMCO Standard
requirements for cathodic protection.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
CONTRACTOR shall review the proposed road crossing techniques and prepare a
12/28/16
complete construction packages and seek approval from SAUDI ARAMCO, YRC and
12/14/16
12/18/16
DATE
G
E
CONTRACTOR may consider thrust boring utilizing Micro-Tunneling Method (MTM) for
DISCIPLINE
ENGINEER
pipeline road crossings, wherever it entails time and safety advantages to the project..
ALL LEADS
DATE: 12/28/16 SAMREF pipeline drawings submitted to YRC for road crossings are attached under
PROJECT
ENGINEER Appendix 2.
A M ALMATROOK
F. CIVIL
VERIFICATION
EDSD
Refer to Project Scoping Paper (GEN-E0103) for details of SAMREF surge system.
DATE:
BY:
E. Telecom
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG 4.13 Pipeline Connection from YASREF Refinery
SAY
SAY
SAY
A. GENERAL
ENGG CERT
ASH
ASH
ASH
YDH is designed to receive gasoline and diesel products from the YASREF
LEADS
LEADS
LEADS
ALL
ALL
ALL
refinery via two pipelines. The pipeline connection will be downstream of the
YASREF pumps to utilize the pump as the pressure source to move the product
into a full tank at YDH. YDH pipeline connection shall not interfere with the transfer
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
operation of product flowing from YASREF to Yanbu as per the project BI-10-
00043, Yanbu Refinery Clean Fuels – YASREF Interface.
CONTRACTOR shall design and install the two product pipelines from YASREF
DESCRIPTION
and their connections into YDH receiving manifolds including, but not limited to the
following facilities:
10-02399-
10-02399-
0001
0001
0001
Two pipelines (one for DO and one for PG 95/91) along with metering skids at
YASREF shall be provided under BI-10-00043. This project will tie-in to the
12/28/16
12/14/16
12/18/16
downstream of the metering skid and isolation valve (outside YASREF battery limit,
DATE
inside the Yanbu refinery ) to utilize the existing export pumps and new metering
skids provided by BI-10-00043, for the supply to YDH. The tie-in locations to the
NO.
REV
G
E
pipeline will be inside the Yanbu refinery and BI-10-00043 will provide a manual
DISCIPLINE
ENGINEER valve on both pipelines for tie-ins to YDH. CONTRACTOR shall co-ordinate with
ALL LEADS BI-10-00043 for the tie-in location before detail design.
DATE: 12/28/16
PROJECT
ENGINEER CONTRACTOR shall design and install two product pipelines each of 30” size for
A M ALMATROOK PG95/PG91 and DO. Tie-ins will be taken accordingly in the 30” pipeline to YR
DATE: 12/28/16 under BI-10-00043 scope. Two custody metering skids to be installed under BI-10-
CERTIFIED
AMR EL SHARKAWY
00043 shall be interfaced with YDH.
12/28/16
DATE:
The scope for the YASREF pipelines and their connections into YDH receiving
CONSTRUCTION
AGENCY manifolds is outlined in PFD VA-247833.001 and P&IDs VA-247876.001 & VA-
SHAHZAD YAZDANI
247877.001.
DATE: 12/28/16
OPERATIONS
B. PIPING
ALI H GHAMDI
12/28/16
DATE: YDH shall receive PG 91/95 and DO products from the YASREF via two pipelines.
CONTROL NUMBER
The pipeline supply to YDH will connect to the pipeline provided by BI-10-00043.
VERIFICATION
EDSD
The location of Tie in connection of PG91/95 (Tie-in No. V25-023) & DO (Tie-in No.
DATE:
V25-025) from YASREF will be taken near the entrance of YR or inside the YR.
BY:
The exact location will be decided during detail design stage & co-ordination with
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
BI-10-00043.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
The tie-in details and routing of two pipelines are shown in PIB00451.001 & piping
plan dwg no. PI-A00403.004 located in DCL no GEN-D0001. The drawing
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG mentioned here are only for reference.
SAY
SAY
SAY
The dye injection skid & associated facilities for YASREF product pipeline for
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Based on surge study, new Surge lines & associated facilities were added inside
YANBU refinery, exact location and feasibility study to be conducted after
confirmation during detail design phase.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
C. PIPELINE
DESCRIPTION
C.01 PURPOSE
The following design basis has been established for YDH to be constructed by this
project.
The two new 30-inch product pipelines shall tie-in to the existing YASREF refinery
lines going to the YDH receipt manifolds The pipeline shall handle diesel and
10-02399-
JO/EWO
10-02399-
10-02399-
0001
gasoline. The gasoline pipeline shall transfer both PG91 and PG 95 products in a
0001
0001
batching operation. A 30-inch Pipeline for the surge will be routed and constructed
12/28/16
from YANBU refinery parallel with these 2 new pipelines till the interface in YDH.
12/14/16
12/18/16
NO. DATE
REV
G
E
12/28/16
DATE: C.04 PRODUCT PIPELINE CORRIDOR
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI The pipeline to be constructed for this project shall be routed through new pipeline
DATE: 12/28/16 corridors. Pipeline route from YANBU refinery is through a thrust boring starting
OPERATIONS from inside YANBU refinery and going to cross SSD fence, Haul Road, King
ALI H GHAMDI Abdulaziz Road and Shareh Al-Awel to YDH. Each product pipeline is
12/28/16 approximately 500 meter long from YANBU to the new Yanbu Distribution Hub.
DATE:
CONTROL NUMBER
CONTRACTOR shall verify and comply with the Pipeline route according to the
Overall Pipeline route DWG PP-A00005.001, the attached route and cross sections
DATE:
BY:
under Appendix-13.The CONTRACTOR shall ensure that the new pipelines will be
REVISIONCERTIFICATION
routed within YRC corridor boundaries during the detail design.Few locations may
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
not fit within the corridor limits and the CONTRACTOR shall raise it to SARAMCO
C
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG C.05 PIPELINE PARAMETERS
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
*Other Flow conditions are shown in the Line Designation Table see PID0450
sheet 001 to 002.
The two (2) pipelines and 30inch surge pipeline will cross Three (3) roads as
follows:
10-02399-
JO/EWO
10-02399-
0001
0001
12/18/16
DATE
G
E
DATE: 12/28/16
CERTIFIED CONTRACTOR shall provide all adequate civil /structural arrangements for road
AMR EL SHARKAWY crossings as proposed in pipeline drawings this shall include but not limited to soil
DATE:
12/28/16 excavation, backfilling, concrete lining, dewatering if required.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI CONTRACTOR shall conduct detailed geotechnical investigation at road crossing
DATE: 12/28/16
location to assess soil condition to determine methodology to be used for thrust boring
OPERATIONS option.
ALI H GHAMDI
DATE:
12/28/16 CONTRACTOR shall discuss and coordinate with thrust boring CONTRACTOR for the
required spacing. The spacing will be reviewed, concurred and approved by
CONTROL NUMBER
VERIFICATION
CONTRACTOR shall verify and provide insulation gasket and set of flanges
DATE:
BY:
installation for above and underground transitions at road crossings and interface
points (between Piping and Pipeline) inside the refineries in accordance with SAUDI
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
CONTRACTOR shall review the proposed road crossing techniques and prepare a
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG complete construction packages and seek approval from SAUDI ARAMCO, YRC and
SAY
SAY
SAY
ASH
ASH
ASH
CONTRACTOR may consider thrust boring utilizing Micro-Tunneling Method (MTM) for
pipeline road crossings, wherever it entails time and safety advantages to the project..
LEADS
LEADS
LEADS
ALL
ALL
ALL
D. INSTRUMENTATION
DESCRIPTION
10-02399-
10-02399-
0001
Contractor shall provide new fiber optic cable from YASREF to YDH for the
0001
0001
12/18/16
DATE
Contractor shall coordinate with Refinery Control System Vendor for the
interface requirements.
NO.
REV
G
E
DISCIPLINE
ENGINEER
F. Telecom
ALL LEADS
12/28/16
DATE: YDH is designed to receive PG 91, PG 95, Diesel, and Kerosene from the Yanbu
CONSTRUCTION
AGENCY
Refinery Terminal. Three pipelines will connect into the Yanbu Refinery Terminal
SHAHZAD YAZDANI offload pipelines at a location just upstream of the Existing Aramco refinery tank
DATE: 12/28/16 farm to utilize the vessel offload pump as the primary pressure source and the
OPERATIONS existing marine loading & transfer pumps as booster pumps to move the product
ALI H GHAMDI into a full tank at YDH. The new connections shall be designed not to interfere with
DATE:
12/28/16 the current vessel offload operations
CONTROL NUMBER
VERIFICATION
CONTRACTOR shall design and install the three product pipelines each of 24” size
EDSD
from Yanbu Refinery Terminal (YRT) through Yanbu Refinery (YR) and their
connections into YDH receiving manifolds including, but not limited to the following
DATE:
BY:
facilities:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
OF THIS DRAWING IS COVERED, FOR ALL
(DCC) NO. _____________________
Three product pipelines each for PG95/91, DO and DPK from YR to YDH
Connections in YDH receiving manifolds for three product pipelines from YRT
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Fire water system connection
SAY
SAY
SAY
YDH shall receive PG 91/95, DO, and DPK from the Yanbu Refinery Terminal
ENGG CERT
ASH
ASH
ASH
through three pipelines extending from Yanbu refinery tank farm to YDH. The
interface to the terminal unloading lines will be at Yanbu refinery tank farm. The
LEADS
LEADS
LEADS
ALL
ALL
ALL
primary source for the supply of products to YDH shall be the pumps on the ship
and the existing marine loading & transfer pumps shall be used as booster pumps
to move the product into a full tank at YDH.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
CONTRACTOR shall design and install three product pipelines each of 24” size for
PG95/PG91, DPK and DO. These pipelines will be connected at the discharge of
existing marine loading & transfer pumps. Pump suction side shall be connected to
DESCRIPTION
new lines that are tied into existing lines coming from YRT. Accordingly, tie-ins will
be taken from the existing pipes at existing pump suction & discharge side and
existing pipes coming from YRT.
B. PIPING
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
YDH shall receive PG 91/95, DO, and DPK from the Yanbu Refinery Terminal
12/28/16
12/14/16
12/18/16
through three pipelines extending from Yanbu refinery tank farm to YDH. The
DATE
interface to the terminal unloading lines will be at Yanbu refinery tank farm.
NO.
REV
G
E
The primary source for the supply of products to YDH shall be by utilizing the
DISCIPLINE
ENGINEER
existing pumps installed at Yanbu Refinery Tank farm near to available space
ALL LEADS towards YRT fence to feed to YDH.
DATE: 12/28/16
PROJECT
ENGINEER To install new feed line for Gasoline (PG91/PG95) to YDH, tie-in at the 18”
A M ALMATROOK common header of Gasoline loading and Transfer pumps (V25-P-P17 A-E)
DATE: 12/28/16
to be taken at Yanbu Refinery near Pump Station-C.
CERTIFIED
AMR EL SHARKAWY
DATE:
12/28/16 To install new feed line for Kerosene (DPK) to YDH, Tie-in at the 20”
CONSTRUCTION
AGENCY
common header of Kerosene loading and Transfer pumps (V25-P22 A/B/C)
SHAHZAD YAZDANI to be taken at Yanbu Refinery near Pump Station-B.
DATE: 12/28/16
OPERATIONS To install new feed line for Diesel(DO) to YDH ,Tie-in at the 20”MDO
ALI H GHAMDI common header of Diesel loading and Transfer Pumps(V25-P24-A/B/C) to
DATE:
12/28/16 be taken at Yanbu Refinery near Pump Station-B.
CONTROL NUMBER
VERIFICATION
The Layout of feed lines from existing header lines to Interface connection
EDSD
with pipeline near YR battery limit, refer to section C.03 for detailed
DATE:
description.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG C. PIPELINE
SAY
SAY
SAY
C.01 PURPOSE
ENGG CERT
ASH
ASH
ASH
The following design basis has been established for YDH to be constructed by this
LEADS
LEADS
LEADS
ALL
ALL
ALL
project.
Three product pipelines shall be constructed from YANBU refinery terminal to YDH
receipt manifolds. The pipeline shall handle diesel, both grades of gasoline, and
DPK/kerosene. The gasoline pipeline shall transfer both PG91 and PG 95 products
DESCRIPTION
in a batching operation.
The main interface connection between this BI-10-02399 and others is at the
existing headers itself and not elsewhere. Inside plant piping team will bring the
connection to battery limit where inside plant piping and these 3 YR - YDH
pipelines interfaces.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
12/28/16
The pipeline to be constructed for this project shall be routed through new pipeline
12/14/16
12/18/16
DATE
corridors. Pipeline route from YANBU refinery is through Thrust Boring starting
from inside YANBU refinery and going to cross existing SSD fence, Haul Road,
NO.
REV
G
E
King Abdulaziz Road and Shareh Al-Awel to YDH. Each product pipeline is
DISCIPLINE
ENGINEER
approximately 500 meter long from YANBU to the new Yanbu Distribution Hub.
ALL LEADS Each pipeline shall be design to have Vertical U-Loops for flexibility.
DATE: 12/28/16
PROJECT
ENGINEER CONTRACTOR shall verify and comply with the Pipeline route according to the
A M ALMATROOK Overall Pipeline route DWG PP-A00005.001, the attached route and cross sections
DATE: 12/28/16 under Appendix-13.The CONTRACTOR shall ensure that the new pipelines will be
CERTIFIED routed within YRC corridor boundaries during the detail design.Few locations may
AMR EL SHARKAWY
not fit within the corridor limits and the CONTRACTOR shall raise it to SARAMCO
12/28/16
DATE: during the development of the design. , the attached preliminary route and cross
CONSTRUCTION
AGENCY sections along the corridor.The CONTRACTOR shall ensure that the new pipelines
SHAHZAD YAZDANI route will be within RC corridor boundaries.
DATE: 12/28/16
OPERATIONS C.05 PIPELINE PARAMETERS
ALI H GHAMDI
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
*Other Flow conditions are shown in the Line Designation Table see PID00402
sheet 001 to 004.
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
The three (3) pipelines and 30 inch surge pipeline will cross three (3) roads as
follow:
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
Road
2 #11-Shareh Al-Awel Thrust Boring 126 PP-A00139.001
3 #12-Haul Road Thrust Boring 69 PP-A00150.001
(Yanbu Refinery
CONTRACTOR shall conduct site survey to finalize the pipeline routing proposed
during detailed design.
CONTRACTOR shall provide all adequate civil /structural arrangements for road
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
crossings as proposed in pipeline drawings this shall include but not limited to soil
excavation, backfilling, concrete lining, dewatering if required.
12/28/16
12/14/16
12/18/16
DATE
G
E
option.
DISCIPLINE
ENGINEER
ALL LEADS CONTRACTOR shall discuss and coordinate with thrust boring CONTRACTOR for the
DATE: 12/28/16 required spacing. The spacing will be reviewed, concurred and approved by SAUDI
PROJECT
ENGINEER ARAMCO and YRC.
A M ALMATROOK
DATE: 12/28/16 CONTRACTOR shall verify and provide insulation gasket and set of flanges
CERTIFIED
AMR EL SHARKAWY
installation for above & underground transitions at road crossings and interface points
12/28/16
(between Piping and Pipeline) inside the refineries in accordance with SAUDI
DATE:
ARAMCO STANDARD requirements for cathodic protection.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
CONTRACTOR can consider thrust boring thru the Micro-Tunneling Method (MTM) for
DATE: 12/28/16 pipeline road crossings, wherever it entails cost, time and safety advantages to the
OPERATIONS
project with previous SAUDI ARAMCO approval.
ALI H GHAMDI
12/28/16
DATE: SAMREF pipeline drawings submitted to YRC for road crossings to be attached.
CONTROL NUMBER
VERIFICATION
D. INSTRUMENTATION
EDSD
DATE:
CONTRACTOR shall provide and install field instruments, Motor Operated and
BY:
Electrohydraulic ESD valves at the battery limit of Yanbu Refinery, MOVs shall also be
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
CONTRACTOR shall provide and install new homerun cables from valves up to the
existing SIH-1590 (Satellite Instrument House) in tank farm area. SIH-1590 is
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG expanded under BI-10-00043, the project shall coordinate with BI-10-00043 shall to
SAY
SAY
SAY
reserve the space required by this BI. All new EIVs will be connected to new ESD
Marshalling Cabinet provided by BI-10-00043. BI-10-02399 will provide required input-
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
All non-ESD instruments will be connected to new DCS Marshalling Cabinet provided
by BI-10-00043. BI-10-02399 will provide required input-output modules to integrate to
DCS system provided under BI-10-00043.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
New instrumentation provided under BI-10-02399 will be controlled from YR tank farm
control room and the HMIs at tank farm control room will be updated accordingly.
In addition to this, BI-10-02399 shall interface Yanbu Refinery TCFR control system to
YDH provides View only signals related to product transfer. The data points shall be
the status of product pumps and EIVs such as running, stopped, tripped etc. The
requirements of data from Yanbu Refinery shall be further evaluated during Detail
design phase in coordination with YDH and YREF operations.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
The interface shall be through PI system installed at both the facility, DMZ shall be
12/28/16
used in order to make the data exchange highly secured. Contractor shall provide fiber
12/14/16
12/18/16
DATE
G
E
DATE: 12/28/16
OPERATIONS
ALI H GHAMDI CONTRACTOR shall provide and install cables between IRP panels located in
12/28/16 substation to SIH-1590 Building.
DATE:
CONTROL NUMBER
VERIFICATION
CONTRACTOR shall run homerun cables from Junction boxes to SIH-1590 utilizing
EDSD
Reference Drawings:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Drawing# Description
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
Drawing# Description
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Refer to Project Scoping Paper (GEN-E0104) for details of changes in YR/YDH surge
DESCRIPTION
system.
G. ELECTRICAL
Yanbu’ Refinery shall supply all electrical power and connections required for
MOVs and other miscellaneous loads. Total electrical loads anticipated are about
10kVA Four (4) 480V, 100A, 3Ph, 3W, 60Hz Outdoor Power Panel (NEMA 4X)
shall be provided to feed power to MOVs and other miscellaneous loads. (Refer to
drawing # EL-A10111).
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
feed new MOV power panels (Refer drawing # VA-240892-001, VA-240893.002 &
VA-240894.002).
NO.
REV
G
E
DISCIPLINE
ENGINEER
CONTRACTOR shall Provide Lighting and Grounding system in compliance with
ALL LEADS SAUDI ARAMCO Standards by utilizing existing system.
DATE: 12/28/16
PROJECT
ENGINEER
A M ALMATROOK H. Telecom
DATE: 12/28/16
CERTIFIED For FOC cable road crossing, refer to Appendix 2
AMR EL SHARKAWY
12/28/16
DATE: 4.15 ELECTRICAL
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI A. GENERAL
DATE: 12/28/16
OPERATIONS Electrical General Requirements
ALI H GHAMDI
12/28/16
DATE:
CONTRACTOR shall implement and comply with all the requirements as stated but
CONTROL NUMBER
VERIFICATION
assistance and Final Integrated Testing, with New and Existing Systems, for all the
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
ARAMCO under this BI / Project, as required for a Fully Functional and Operational
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Facility.
SAY
SAY
SAY
ENGG CERT
ASH
ASH
CONTRACTOR shall include MARAFIQ on the Engineering Review Cycle for any
ASH
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall comply with Yanbu Royal Commission (YRC) Standards and
regulations for any scope related to YRC and MARAFIQ.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
CONTRACTOR shall comply with SAMREF and YASREF refineries Standards and
regulations for any scope related to these refineries.
DESCRIPTION
10-02399-
10-02399-
0001
0001
12/28/16
12/18/16
DATE
G
E
DISCIPLINE
for batteries (UPS & DC) shall be operational prior to site delivery at a temperature
ENGINEER
ALL LEADS
concurred by the battery manufacturer. All electric equipment that requires space
DATE: 12/28/16
heater or anti condensation shall be provided with safe space heating arrangement
PROJECT
ENGINEER
to prevent moisture absorption and damage to equipment; temporary power
A M ALMATROOK requirements shall be arranged by THE CONTRACTOR.
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY
CONTRACTOR shall provide an Equipment Preservation Plan to SAUDI ARAMCO
DATE:
12/28/16 a Minimum of 90 days prior to site delivery of any major electrical equipment or
CONSTRUCTION electronic or battery systems and temperature sensitive equipment arrival on the
AGENCY
SHAHZAD YAZDANI project site or delivery to an off-site storage warehouse/location for SAUDI
DATE: 12/28/16 ARAMCO Projects Inspection Acceptance.
OPERATIONS
ALI H GHAMDI
CONTRACTOR shall be responsible for the proper function and safe operation of
12/28/16
DATE:
all the equipment and systems. The design criteria and contract documents
CONTROL NUMBER
VERIFICATION
included are not all-inclusive and represent minimum requirements. Any additional
EDSD
elements or items required to achieve the correct and safe operation of the system
shall be engineered, designed, supplied and installed in place to render a complete
DATE:
BY:
functional system.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
CONTRACTOR shall utilize the Metric System measurement in all documents and
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
ASH
ASH
design, specifications and other documents for conformity to this Contract and
ASH
institute effective internal control for prompt receipt, review, approval and return of
LEADS
LEADS
LEADS
ALL
ALL
ALL
such documents. CONTRACTOR shall incorporate all such applicable Vendor and
Subcontractor information in THE CONTRACTOR’S submittals to SAUDI
ARAMCO.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
equipment Certified NMR 602 & NMR 603 data) shall include all necessary plans,
elevations, arrangements, sections, profiles, views and details of all facilities.
The Project SOW as conveyed herein and the documents and drawings provided
with this Scope of Work document are Coherent and NOT to be utilized separately.
Any item mentioned in this document and not indicated on drawings or indicated on
drawings or not mentioned in other documents provided with this PPN, shall be of
like effect as if indicated or mentioned in both and vice versa.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
CONTRACTOR shall check and verify all Sub-Contractor and Vendor design and
12/28/16
drawings provided comply with the Scope of Work, and documents provided with
12/14/16
12/18/16
DATE
this Scope, relevant SAUDI ARAMCO and International Standards and are in
keeping with “Good Engineering Practices”.
NO.
REV
G
E
DISCIPLINE
ENGINEER
ALL LEADS
CONTRACTOR shall comply with SAUDI ARAMCO Standards and seek SAUDI
DATE: 12/28/16
ARAMCO advice for any potential Waivers. CONTRACTOR shall prepare such
PROJECT
ENGINEER
Waivers as per SAEP-302, as required by SAUDI ARAMCO.
A M ALMATROOK
DATE: 12/28/16 CONTRACTOR shall note that “CLOUDS” on the drawings indicate a HOLD point
CERTIFIED
AMR EL SHARKAWY
due to unavailability of information or indicates a REQUIRED Tie-in from Existing
DATE:
12/28/16 Equipment and Systems into New Equipment and Systems. This Tie-in is part of
CONSTRUCTION CONTRACTOR Scope including any Software Supply, Upgrade and / or
AGENCY
SHAHZAD YAZDANI modifications of Existing software.
DATE: 12/28/16
OPERATIONS
CONTRACTOR shall verify the power source of all equipment supplied under this
ALI H GHAMDI
project by installing a Label on or near each equipment or device receiving power.
12/28/16
DATE:
Switchgear, Controlgear, Power Panels, Motors, Receptacles, Light Switches,
CONTROL NUMBER
VERIFICATION
each Light, HVAC Panel, Communication Cabinet, Security Cabinet, Fire Alarm
EDSD
Panel, etc. shall have a Phenolic Label with Black text on a White background
attached with stainless steel screws identifying the upstream power source. For
DATE:
BY:
example, for each Receptacle, Light Switch and Light, the label shall indicate the
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
Upstream Panelboard Number and Circuit Breaker Number and indicate if a GFCI
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
circuit.
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG SAUDI ARAMCO requires new power sub-distribution systems to be
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
powering the receptacle with a 5mA trip or an Equipment Protection Device with
nominal 30mA trip and shall label the receptacle with the panelboard number,
circuit breaker number and indicate on the label “Fed from GFCI MCCB”. The label
DESCRIPTION
shall be phenolic with Black text on a White background attached with stainless
steel screws. Receptacles with integral ground fault protection are NOT
acceptable.
10-02399-
10-02399-
shall be provided in the applicable electrical equipment room and with a metal book
0001
0001
0001
case within each room in which an NMR is provided. These shall be provided
12/28/16
12/18/16
DATE
CONTRACTOR shall use Premium efficiency motors for all the motor less than
NO.
REV
G
E
DISCIPLINE
500HP.
ENGINEER
ALL LEADS
DATE: 12/28/16
CONTRACTOR shall carry out all Electrical work in close liaison with the SAPMT
PROJECT
ENGINEER
to meet the project requirements.
A M ALMATROOK
DATE: 12/28/16 CONTRACTOR scope shall include but not be limited to Detail Design,
CERTIFIED
AMR EL SHARKAWY
procurement, supply, deliver / store, install, test, pre-commission, commissioning
DATE:
12/28/16 assistance and Final Integrated Testing, with New and Existing Systems, including
CONSTRUCTION required ETAP studies, Plant Distribution system, Plant & buildings internal &
AGENCY
SHAHZAD YAZDANI external Lighting System, Plant & Buildings Grounding & Lightning System,
DATE: 12/28/16 Security & Fence Lighting System, Plant & Buildings Fire Alarm System,
OPERATIONS
Emergency Power supply System by installing Generators, UPS power supply
ALI H GHAMDI
System for Plant operations, Security operations and Communication operations,
12/28/16
DATE:
DC system for Substation switchgear protection, Complete Substation with
CONTROL NUMBER
VERIFICATION
the Buildings and for all External Lights (except substation exterior & fence lighting)
attached to the buildings,115kV cable routing, Interfacing with 115kV GIS at
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
Protection(CP).
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Electrical Studies
SAY
SAY
SAY
ENGG CERT
ASH
ASH
CONTRACTOR shall perform and validate all the Electrical studies as per SAES-
ASH
P-100 and obtain SAUDI ARAMCO approval in order to finalize and freeze the long
LEADS
LEADS
LEADS
ALL
ALL
ALL
lead electrical items to facilitate timely procurement. The purpose of the electrical
studies is to verify the ability of the plant electrical power distribution components
are adequately sized and perform as designed during normal steady state
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
operation, with stand allowable transients and isolate faulty sections during faults.
Following Electrical studies shall be perform as a minimum but not limited to:
DESCRIPTION
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
G
E
of the detailed design engineering phase. These load values are intended only for
VERIFICATION
DATE:
CONTRACTOR shall define jointly with Saudi Aramco the electrical substation ID
BY:
number.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Total power demand for the proposed YDH facility is estimated to be 46 MVA, with
SAY
SAY
SAY
a first phase of approximately 23.0 MVA by 2019. Adequate spare space at all
ENGG CERT
ASH
ASH
proposed shipper pumps for Yanbu to Central Region pipeline planned from this
LEADS
LEADS
LEADS
ALL
ALL
ALL
facility. The power system shall be suitable to start larger shipper pumps without
any voltage drop impact when started direct on line. For detailed electrical load list
refer to document # CAL- EL121.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
Electrical Load Summary – Estimation electrical load include the demand load till
2040.
DESCRIPTION
10-02399-
10-02399-
The normal power supply to the proposed facility shall be from ‘MARAFIQ’s
0001
0001
0001
Substation # 9I’ which is located about 3.85km from YDH facility fence. Two (2)
115 kV feeder from the GIS at MARAFIQ’s Substation #9I, shall be used to supply
12/28/16
12/14/16
12/18/16
DATE
G
E
DISCIPLINE CONTRACTOR shall coordinate with MARAFIQ and implement the connection
ENGINEER
ALL LEADS
agreement requirements between MARAFIQ & SAUDI ARAMCO during detail
DATE: 12/28/16 design & construction phase of the project.
PROJECT
ENGINEER
A M ALMATROOK MARAFIQ substation is connected to a reliable and strong grid point, the SSBB
DATE: 12/28/16 115 kV substation of Yanbu-II power plant (by 2018 this new power plant will be
CERTIFIED
AMR EL SHARKAWY available to generate 800 MW electricity, a strong reliable power source of this
DATE:
12/28/16 region).
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI Two (2) new substations (Receiving & Utility Substation) shall be built at YDH to
DATE: 12/28/16 receive & distribute the power within YDH.
OPERATIONS
ALI H GHAMDI
12/28/16
Receiving Substation shall house 115kV Gas Insulated Circuit Breaker bay, 13.8kV
DATE:
& 480V Metal Clad Switchgear and 480V Controlgear as main electrical equipment
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
study, Two (2), 4.2MVar, 13.8kV, 3Ph, 60Hz MV Automatic Capacitor Bank is
(DCC) NO. _____________________
required to achieve power factor above 0.95 at PCC. It shall be further evaluated
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG with different scenarios and options to maintain pf 0.95 at PCC as per SAES-P-100
SAY
SAY
SAY
requirement.
ENGG CERT
ASH
ASH
ASH
Utility Substation shall house 4.16kV & 480V Metal Clad Switchgear and 480V
LEADS
LEADS
LEADS
ALL
ALL
ALL
Refer to Document Control Log (GEN-D0001) for the Overall Electrical System
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
Power is stepped down from 115kV to 13.8kV and from 13.8kV to 4.16kV, 480V
DESCRIPTION
and 400V by installing appropriate Power and Pad Mounted Transformers, refers
to Key Single Line Diagram EL-A10006.
LV MCC, Switchracks and local panels for power supply to auxiliary pump motors,
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
12/28/16
12/18/16
DATE
provided to power the critical loads and all vital service loads and infrastructure in
order to enable safe shutdown of the facility in the event of loss of Utility Power.
NO.
REV
G
E
DISCIPLINE
Generator shall be provided with an acoustic enclosure suitable for outdoor
ENGINEER
ALL LEADS
environment.
DATE: 12/28/16
PROJECT
ENGINEER
Dry type transformers, sub distribution power panels, lighting control panel, control
A M ALMATROOK wiring, power receptacles, indoor/outdoor lighting, and grounding, for all buildings.
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY
Additionally, existing MV and LV power networks associated with Yanbu area
DATE:
12/28/16 refineries (Yanbu Terminal, SAMREF & YASREF) will be utilized for any new loads
CONSTRUCTION to be added in the respective facilities. Refer to Appendix 2 Interface packages.
AGENCY
SHAHZAD YAZDANI
APPROVAL/CERTIFICATION REQUIREMENTS,
CONTRACTOR shall apply optimization techniques in the following areas, but not
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
limited to:
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Substation equipment layout arrangement and building dimensions.
SAY
SAY
SAY
ASH
ASH
ASH
Optimize the GIS room layout and dimensions based on latest vendor data.
Power and distribution transformer sizing, and loading factors.
LEADS
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
DISCIPLINE
ENGINEER
ALL LEADS Electrical Detailed Description
DATE: 12/28/16
PROJECT
ENGINEER CONTRACTOR scope shall include but not be limited to Detail Design,
A M ALMATROOK
procurement, supply, deliver / store, install, test, pre-commission, commissioning
DATE: 12/28/16
CERTIFIED assistance and Final Integrated Testing, for the following items but is not limited to:
AMR EL SHARKAWY
12/28/16
DATE: One (1) Lot 115kV, 1250A, 3Ph, 3W, 60Hz, Gas Insulated Switchgear in receiving
CONSTRUCTION
AGENCY substation as well as the Gas Insulated Bus (GIB) in GIS Room (Refer to drawing #
SHAHZAD YAZDANI
EL-A10007 & EL-A10005).
DATE: 12/28/16
OPERATIONS
ALI H GHAMDI One (1) 13.8kV, 3000A, 3Ph, 3W, 60Hz, metal clad switchgear in receiving
DATE:
12/28/16 substation (Refer to drawing # EL-A10008).
CONTROL NUMBER
VERIFICATION
Two (2), 4.2MVar, 13.8kV, 3Ph, 60Hz, Outdoor type, detuned switched capacitor
EDSD
EL-A10001.002).
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
One (1) 4.16kV, 1200A, 3Ph, 3W, 60Hz, metal clad switchgear in utility substation
OF THIS DRAWING IS COVERED, FOR ALL
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG One (1) 480V, 1600A, 3Ph, 3W, 60Hz, metal clad switchgear in receiving
SAY
SAY
SAY
ASH
ASH
ASH
One (1) 480V, 1600A, 3Ph, 3W, 60Hz, metal clad switchgear in utility substation
LEADS
LEADS
LEADS
ALL
ALL
ALL
One (1) 4.16kV, 1200A, 3Ph, 3W, 60Hz, controlgear in utility substation (Refer to
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
drawing # EL-A10010).
One (1) 4.16kV, 1200A, 3Ph, 3W, 60Hz, controlgear in utility substation (Refer to
DESCRIPTION
drawing # EL-A10011).
Two (2) 480V, 800A, 3Ph, 3W, 60Hz, controlgear in receiving substation (Refer to
drawing # EL-A10014 to EL-A10015).
Two (2) 480V, 800A, 3Ph, 3W, 60Hz, controlgear in utility substation (Refer to
drawing # EL-A10016 to EL-A10017).
10-02399-
JO/EWO
10-02399-
10-02399-
One (1) 400V, 1250A, 3Ph, 4W, 60Hz, switchboard in E & M building (Refer to
0001
0001
0001
drawing # EL-A10018).
12/28/16
12/14/16
12/18/16
DATE
One (1) 480V, 600A, 3Ph, 3W, 60Hz, emergency controlgear in Security Support
building (Refer to drawing # EL-A10020).
NO.
REV
G
E
DISCIPLINE
ENGINEER
ALL LEADS
Three (3) 480V, 100A, 3Ph, 3W, 60Hz, switchracks, strategically located inside
DATE: 12/28/16
YDH to feed power to tank farms auxiliary motors, area lighting power panels,
PROJECT
ENGINEER
MOVs power panels, Cathodic Protection power panels and other facilities loads
A M ALMATROOK (Refer to drawing # EL-A10021 to EL-A10023).
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY
Two (2) 50/66.6 MVA OA/FA, 115kV/13.8kV, power transformer located at
DATE:
12/28/16 receiving substation feeding 13.8kV switchgear (Refer to drawing # EL-A10006).
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI Two (2) 3.75/4.68 MVA OA/FA, 13.8kV/4.16kV, power transformer located at utility
DATE: 12/28/16 substation feeding 4.16kV switchgear (Refer to drawing #EL-A10006).
OPERATIONS
ALI H GHAMDI
Two (2) 1.5 MVA, 13.8kV/0.48kV, power transformer located at receiving
12/28/16
DATE:
substation feeding 480V switchgear (Refer to drawing #EL-A10006).
CONTROL NUMBER
VERIFICATION
EDSD
Two (2) 1.5 MVA, 13.8kV/0.48kV, power transformer located at utility substation
feeding 480V switchgear (Refer to drawing #EL-A10006).
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
drawing #EL-A10006)
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
One (1) 1000 KVA, 13.8kV/0.4kV, pad mounted transformer strategically located
ENGG CERT
ASH
ASH
inside YDH to feed power to switchboard in E & M building (Refer to drawing #EL-
ASH
A10006).
LEADS
LEADS
LEADS
ALL
ALL
ALL
One (1) Skid mounted Diesel Generator Set, self-contained, sound attenuated
container with motorized louvers, complete with lighting, Fire Alarm and grounding
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
for the container. The Emergency Diesel Generator 160kW, 400V, 3Ph, 4W, 60Hz,
200kVA, 0.8 PF, complete with day oil tank, Fuel system, Cooling system, exhaust
system along with Generator controls/protection and generator circuit breaker at
DESCRIPTION
One (1) Skid mounted Diesel Generator Set, self-contained, sound attenuated
container with motorized louvers, complete with lighting, Fire Alarm and grounding
for the container. The Emergency Diesel Generator 400kW, 480V, 3Ph, 3W, 60Hz,
500kVA, 0.8 PF, complete with day oil tank, Fuel system, Cooling system, exhaust
system along with Generator controls/protection and generator circuit breaker at
Generator (Refer to drawing# EL-A10020).
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
One (1), 400V, 400A, 3Ph, 4W, 60Hz Automatic Transfer Switch (Refer to
12/28/16
drawing# EL-A10019).
12/14/16
12/18/16
DATE
One (1), 480V, 600A, 3Ph, 3W, 60Hz Automatic Transfer Switch (Refer to
NO.
REV
G
E
DISCIPLINE
drawing# EL-A10020).).
ENGINEER
ALL LEADS
DATE: 12/28/16
CONTRACTOR shall design Local Control Push Button Stations appropriate for
PROJECT
ENGINEER
the areas of installation, Install control cables and conduits between control
A M ALMATROOK stations and the Interposing relay panels or MCC.
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY
Convenience Outlets: 480 VAC welding receptacles shall be installed at locations
DATE:
12/28/16 where mobile welding sets or power water wash equipment use is required. In
CONSTRUCTION addition, 230 VAC convenience outlets shall be placed throughout the plant at all
AGENCY
SHAHZAD YAZDANI location where hand tools would be required for maintenance and inside the
DATE: 12/28/16 buildings.
OPERATIONS
ALI H GHAMDI
UPS & DC System
12/28/16
DATE:
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
UPS power supply system shall be provided for the E & M Building loads,
(DCC) NO. _____________________
Operation building loads, RIO building loads, main Security Support building loads,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Tank Farm and other field Instrument Loads. Integrated AC UPS & DC Systems
SAY
SAY
SAY
c/w respective distribution panels to power critical loads such as Control, ESD,
ENGG CERT
ASH
ASH
separate room within the E & M Building for Telecommunication Loads. Batteries
LEADS
LEADS
LEADS
ALL
ALL
ALL
for 4 hour back up installed in a separate room within the Security Support Building
for Security Loads.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
One (1) 5kVA, Input voltage 400V 3Ph 3W 60Hz, Output voltage 230 1Ph 2W
60Hz (X40- UPS-001).
One (1) 10kVA, Input voltage 400V 3Ph 3W 60Hz, Output voltage 230 1Ph 2W
10-02399-
JO/EWO
10-02399-
10-02399-
60Hz (X40-UPS-010).
0001
0001
0001
12/28/16
One (1) 20kVA, Input voltage 480V 3Ph 3W 60Hz, Output voltage 400V 3Ph 4W
12/14/16
12/18/16
DATE
60Hz (X40-UPS-002).
NO.
REV
G
E
DISCIPLINE
Three (3) 10kVA, Input voltage 480V 3Ph 3W 60Hz, Output voltage 230 1Ph 2W
ENGINEER
ALL LEADS
60Hz (X40-UPS-007, X40-UPS-008 & X40-UPS-009).
DATE: 12/28/16
PROJECT
ENGINEER
One (1) 45kVA, Input voltage 400V 3Ph 3W 60Hz, Output voltage 400V 3Ph 4W
A M ALMATROOK 60Hz (X40-UPS-003).
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY
Two (2) 25kVA, Input voltage 480V 3Ph 3W 60Hz, Output voltage 230 1Ph 2W,
DATE:
12/28/16 60Hz (X40-UPS-004 & X40-UPS-005).
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI CONTRACTOR shall provide complete battery set, battery chargers, DC
DATE: 12/28/16 distribution panels required for 125VDC system as per one line diagram #EL-
OPERATIONS
A10029, EL-A10030 & EL-A10033) for receiving & utility substation. Each DC
ALI H GHAMDI
Power System shall include two (2) rectifier battery chargers and two set of
12/28/16
DATE:
batteries, battery racks and battery monitoring system. Ratings are as follows:
CONTROL NUMBER
VERIFICATION
EDSD
One (1) 125 VDC, 300A Output, 480V, 3Ph, 60 Hz Input (X40-BC-001 & X40-BC-
002).
DATE:
BY:
One (1) 125 VDC, 250A Output, 480V, 3Ph, 60 Hz Input (X40-BC-003 & X40-BC-
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
004).
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
One (1) -48 VDC, 320A Output, 480V, 3Ph, 60 Hz Input (X40-BC-005 & X40-BC-
(DCC) NO. _____________________
006).
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
procurement, supply, deliver / store, install and test for Cables (power & control),
Cable bus & Cable Tray but not limited to:
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
About 3.85kM 115kV cabling from MARAFIQ Substation #9I to receiving substation
115kV Gas Insulated Switchgear (GIS) at YDH. Thrust Boring or Horizontal
Direction Drilling (HDD) cables installation method shall be used to cross main
DESCRIPTION
highway as per Royal Commission (RC) & MARAFIQ Guidelines. (Refer sketch
SK-A10010.001)
13.8kV cabling from new 13.8kV Switchgear located inside the Receiving
Substation to Utility Substation power transforms, Pad Mounted Looped
Transformers & Shipper Pumps. (Refer drawing # EL-A10103 sheet 001 to 004)
4.16kV cabling from new 4.16kV Switchgear located inside the Utility Substation to
10-02399-
JO/EWO
10-02399-
10-02399-
Controlgear & Booster Pumps. (Refer drawing # EL-A10103 sheet 001 to 004.
0001
0001
0001
12/28/16
Buried Power and control cabling to all MV and LV loads. (Refer drawing # EL-
12/14/16
12/18/16
DATE
G
E
DISCIPLINE
Cable Bus from Power Transformers to respective Switchgears at the receiving &
ENGINEER
ALL LEADS
utility substation. (Refer drawing # EL-A10001 & EL-A10002)
DATE: 12/28/16
PROJECT
ENGINEER
Cable trays shall be provided inside receiving, utility substation and E & M building.
A M ALMATROOK (Refer drawing # EL-A10042, EL-A10043 & EL-A10044)
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY
Lighting System
12/28/16
DATE:
CONSTRUCTION CONTRACTOR scope shall include but not be limited to Detail Design,
AGENCY
SHAHZAD YAZDANI procurement, supply, deliver / store, install & test for lighting system.
DATE: 12/28/16
OPERATIONS
The Lighting designs for this project shall be in accordance with IESNA RP-7
ALI H GHAMDI
(practice for Industrial Lighting) and as supplemented by SAES-P-123. The lighting
12/28/16
DATE:
system shall be designed for energy efficient operation.
CONTROL NUMBER
VERIFICATION
EDSD
CONTRACTOR shall design following types of lighting but not limited to; Buildings
interior & exterior lighting, Area Lighting, Security Fence Lighting, Street Lighting,
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
CONTRACTOR shall provide interior & exterior lighting for the below listed
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG A10050, EL-A10054, EL-A10057, EL-A10060, EL-A10063, EL-A10066, EL-
SAY
SAY
SAY
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Receiving Substation
Utility Substation
E & M Building
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
CONTRACTOR shall provide outdoor plant and fence lighting. (Refer drawing #
NO.
REV
G
E
EL-A10101)
DISCIPLINE
ENGINEER
ALL LEADS
CONTRACTOR shall provide tank lighting including cables, conduits, junction box,
DATE: 12/28/16
PROJECT cable trays etc. CONTRACTOR shall coordinate with Tank Package Contractor for
ENGINEER
A M ALMATROOK
the location of Tank lighting and develop detail design drawings as required.
DATE: 12/28/16
CERTIFIED Grounding & Lightning Protection System
AMR EL SHARKAWY
12/28/16
DATE:
CONSTRUCTION CONTRACTOR scope shall include but not be limited to Detail Design,
AGENCY
SHAHZAD YAZDANI
procurement, supply, deliver / store, install & test for grounding system as required
DATE: 12/28/16
for the new Facilities in accordance with IEEE 142 and shall meet the requirements
OPERATIONS of ANSI/NFPA 70 (NEC) and ANSI C2, as supplemented or amended by SAES-P-
ALI H GHAMDI
111 and SAES-J-902. Intrinsically Safe Systems shall be grounded in accordance
12/28/16
DATE: with certification requirements and SAES-J-903. Calculations of allowable and
CONTROL NUMBER
VERIFICATION
actual step & touch potentials for Substations shall be done in accordance with
EDSD
IEEE 80.
DATE:
BY:
CONTRACTOR shall extend existing Plant Ground grid at YASREF, SAMREF and
REVISIONCERTIFICATION
Yanbu Refineries to bond the new electrical equipment, tanks, fence post,
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
structural steel, etc. Grounding system shall utilize buried copper wire loops and
(DCC) NO. _____________________
grounding rods for perimeter grids around the transformers, substation building and
all other electrical equipment.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
ASH
ASH
yards, E&M Building, operation room, control building, security support buildings,
ASH
shelters, other supporting buildings and overall plant grounding. (Refer drawing #
LEADS
LEADS
LEADS
ALL
ALL
ALL
& EL-A10102 )
CONTRACTOR shall provide and install additional ground rods and ground grid as
DESCRIPTION
required to ensure that the ground resistance does not exceed safe values as
defined in IEEE 80 to comply with SAES-P-111.
10-02399-
10-02399-
0001
0001
12/18/16
DATE
G
E
DISCIPLINE
ENGINEER
ALL LEADS
CONTRACTOR shall prepare Cathodic Protection Specialist (CPS)
DATE: 12/28/16
CONTRACTOR scope of work. The CPS CONTRACTOR scope shall include one
PROJECT
ENGINEER
complete package for the entire YDH underground pipeline & tanks Cathodic
A M ALMATROOK Protection. The complete CP system shall be in full compliance of SAES-X-400,
DATE: 12/28/16 SAES-X-500 & SAES-X-600. For scope description refer to document # EL-
CERTIFIED
AMR EL SHARKAWY
E10067007.
12/28/16
DATE:
CONSTRUCTION The CPS CONTRACTOR scope of work shall include but not limited to prepare a
AGENCY
SHAHZAD YAZDANI detailed design package comprising of CP drawings, layouts, installations details,
DATE: 12/28/16 detail material take offs, specifications, testing, pre-commissioning &
OPERATIONS
commissioning procedure, calculations for required voltage, amperage and life
ALI H GHAMDI
expectancy of anode, No of anodes, material type of anodes, weight of anodes,
12/28/16
DATE:
spacing between the anodes, minimum current density and consumption rate of
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
CONTRACTOR scope shall include but not be limited to Detail Design duly
OF THIS DRAWING IS COVERED, FOR ALL
store, install & test for complete, microprocessor-based addressable fire detection
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG and alarm system, featuring intelligent spot, linear beam detectors using multi-
SAY
SAY
SAY
ASH
ASH
capability, with reliable peer-to-peer communication. The Fire Alarm System for
ASH
LEADS
LEADS
ALL
ALL
ALL
The Fire Alarm system shall include but not limited to the following: Fire Alarm
control panel, multi spectrum flame detectors, beam detectors, automatic and
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
annunciators, network cards, along with RGS conduits, wires and accessories
required to furnish a complete operational system. All fire alarm system devices
and components shall be from one Manufacturer to avoid last minute compatibility
issues. All components employed in the Fire Alarm system and the Fire Protection
System shall be UL listed.
CONTRACTOR shall provide Fire Detection & Alarm System for Receiving
Substation, Utility Substation, all other buildings and shelters (Refer drawing # EL-
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
12/28/16
12/18/16
DATE
Shipper pumps areas. Fire detection shall be cross zoned such that two detector
units must detect fire in order to activate an automatic fire suppression system.
NO.
REV
G
E
DISCIPLINE
ENGINEER
ALL LEADS
CONTRACTOR shall coordinate & finalize interface requirements with Tank
DATE: 12/28/16
Package Contractor for the Linear Heat Detection System for the external floating
PROJECT
ENGINEER
roof tanks. Linear Heat Detection System shall be interface with the nearest Fire
A M ALMATROOK Alarm Control Panel provided by CONTRACTOR (Refer drawing # EL-A10149 &
DATE: 12/28/16 EL-E10068).
CERTIFIED
AMR EL SHARKAWY
DATE:
12/28/16 Power System Automation (PSA)
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI CONTRACTOR scope shall include but not be limited to Detail Design,
DATE: 12/28/16 procurement, supply, deliver / store, install, test, pre-commission, commissioning
OPERATIONS
assistance and Final Integrated Testing for Power System Automation (PSA) at
ALI H GHAMDI
YDH Receiving Substation. Information of Receiving Substation shall be linked to
12/28/16
DATE:
Power System Automation (PSA). (Refer document # EL-A10031 & EL-E10039)
CONTROL NUMBER
VERIFICATION
EDSD
assistance and Final Integrated Testing for Power System Automation (PSA) at
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG CONTRACTOR shall consider electrical interface to YDH control system as per
SAY
SAY
SAY
following:
Interposing relay cabinet shall be provided in substation to control booster,
ENGG CERT
ASH
ASH
ASH
shipper and other utility pumps. Homerun cables between substation and
LEADS
LEADS
LEADS
ALL
ALL
ALL
respective RIB shall be laid. The pump status and control signals shall be
integrated to the remote I/O’s provided in the RIBs.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
PSA Server shall be interfaced to DCS via OPC or other open industry
standard protocol.
DESCRIPTION
10-02399-
10-02399-
0001
0001
12/18/16
systems. All Electrical Control Panels and Stop-Start Stations shall have Push-to-
DATE
G
E
DISCIPLINE
CONTRACTOR shall design, supply and install and test Local Control Push Button
ENGINEER
ALL LEADS
Stations appropriate for the areas of installation, Install control cables and conduits
DATE: 12/28/16
between control stations and the Interposing relay panels or Controlgear.
PROJECT
ENGINEER
A M ALMATROOK CONTRACTOR shall design, supply and install and test Interposing Relay Panels
DATE: 12/28/16 within the NEW Substations. The Interposing Relay Panels shall have separate
CERTIFIED
AMR EL SHARKAWY relays for start and stop commands and other signals as per instrument ILD’s.
DATE:
12/28/16 Refer to Instrumentation Section for interface details. If additional relay panels are
CONSTRUCTION required, CONTRACTOR shall design provide and install and place into service.
AGENCY
SHAHZAD YAZDANI
DATE: 12/28/16 CONTRACTOR shall design, provide, install, and test control/signal cables
OPERATIONS
between Interposing relay panels and Controlgear and Instrument marshaling
ALI H GHAMDI
cabinets.
12/28/16
DATE:
CONTROL NUMBER
VERIFICATION
Control Panels & Power Associated with Skids and Vendor Packages
EDSD
skids such as Dye Injection skids, DPK Filtration skids, Conductivity Enhancer
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Injection skids, Custody Metering skids, Static, Dissipative Agent Injection skids,
C
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Detail Design development.
SAY
SAY
SAY
ENGG CERT
ASH
ASH
CONTRACTOR shall supply any and all cabling required for Equipment, Skids and
ASH
Vendor Package integration and install and test and pre-commission and support
LEADS
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall be responsible for the supply, installation, and testing, pre-
commission and provide commissioning assistance for any other control panels
and systems not mentioned herein and are part of the mechanical, instrument or
DESCRIPTION
CONTRACTOR shall be responsible for the interconnection between the skids and
the parent equipment, and field instruments, Substations and Control Rooms and
shall develop interconnection wiring and piping drawings to SAUDI ARAMCO
SACS standards for input in to IPlant. The drawings shall be submitted to SAUDI
ARAMCO for acceptance.
10-02399-
JO/EWO
10-02399-
0001
0001
12/18/16
DATE
assistance in commissioning the Oily Water Lift station control panels for Normal
Flow and Maximum Flow. The Oily Water Lift Station Control panel shall have two
NO.
REV
G
E
independent power supply sources with auto transfer facility built into the local
DISCIPLINE
ENGINEER control panel, to provide a continuous source of power to the lift station. The
ALL LEADS
Control Panel shall be in full compliance with SAES-S-020.
DATE: 12/28/16
PROJECT
ENGINEER
A M ALMATROOK
The enclosures shall be of dead front construction and shall have two doors and
DATE: 12/28/16
two compartments that are separated by a barrier. One compartment shall house
CERTIFIED the motor starter package and the other shall house the controls for liquid level and
AMR EL SHARKAWY
12/28/16
alarms. The doors shall overlap to prevent them from being opened with the pump
motor disconnect devices in the “ON” position. The starters shall be complete with
DATE:
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
Start / Stop Push Buttons, Start / Stop Indications, local remote control and
DATE: 12/28/16
indications; HOA switches etc. The starters shall be provided with dry run
OPERATIONS protection relay to prevent the motors from dry run.
ALI H GHAMDI
12/28/16
DATE: CONTRACTOR shall be responsible for the design, supply, installation, and test,
CONTROL NUMBER
panels and systems not mentioned herein and are part of the mechanical,
EDSD
Electrical and electronic equipment and associated wiring in Oily Water Lift Station
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
systems shall be suitable for the electrical area classification in accordance with
C
SAES-B-068, SAES-P-100 and NFPA 70 (NEC) and the Detail Design developed
Electrical Area Classification Drawings.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
assistance in commissioning the sanitary lift station control panels. The Sanitary
ALL
ALL
ALL
Lift Station Control Panel shall have two independent power supply sources with
auto transfer facility built into the panel, to provide a continuous source of power to
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
the lift station. The Control Panel shall be in full compliance with SAES-S-010.
The enclosure shall be of dead front construction and shall have two doors and two
DESCRIPTION
compartments that are separated by a barrier. One compartment shall house the
motor starter package and the other shall house the controls for liquid level and
alarms. The doors shall overlap to prevent them from being opened with the pump
motor disconnect devices in the “ON” position. The starters shall be complete with
Start / Stop Push Buttons, Start / Stop Indications, local remote control &
indications; HOA switches etc. The starters shall be provided with dry run
protection relay to prevent the motors from dry run.
10-02399-
Electrical and electronic equipment and associated wiring in Oily Water Lift Station
JO/EWO
10-02399-
10-02399-
0001
0001
0001
systems shall be suitable for the electrical area classification in accordance with
SAES-B-068, SAES-P-100 and NFPA 70 (NEC) and the Detail Design developed
12/28/16
12/14/16
12/18/16
DATE
G
E
DATE: 12/28/16
be wired to a terminal block in the low voltage compartment of the Switchgear
CERTIFIED Feeder or Controlgear bucket, as applicable, for connection to a 24VAC control
AMR EL SHARKAWY
circuit (panel shall be designed and provided by THE CONTRACTOR) of a
12/28/16
DATE:
remotely mounted motor space heater contactor. Contact shall be closed when the
CONSTRUCTION
AGENCY main motor circuit contactor is de-energized. This is in accordance with SAES-P-
SHAHZAD YAZDANI
116 and shall be provided, installed, tested, pre commissioned, and with
DATE: 12/28/16
OPERATIONS commissioning assistance, by THE CONTRACTOR.
ALI H GHAMDI
DATE:
12/28/16 Interconnection Wiring
CONTROL NUMBER
VERIFICATION
Skids and the parent equipment, field instruments, etc. and CONTRACTOR shall
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
602 Drawings and NMR 603 Manuals, to SAUDI ARAMCO standards and submit
OF THIS DRAWING IS COVERED, FOR ALL
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Electrical Area Classification
SAY
SAY
SAY
ENGG CERT
ASH
ASH
detailed design phase and obtain SAUDI ARAMCO Approval. Equipment installed
LEADS
LEADS
LEADS
ALL
ALL
ALL
in Bulk Plant area will be rated according to area classification layout drawings
(Refer to drawing #EL-A10003). Attached drawings shall be used only as guide
actual drawings shall be developed by THE CONTRACTOR.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
CONTRACTOR shall design all the Electrical rooms, battery rooms, UPS rooms,
based on the actual Vendor information as per the SAUDI ARAMCO Direct Charge
NMR as available from SAPMT; under no circumstances the sizes shall fall short of
required spaces and clearances, to avoid future delays and expensive rework due
to SAUDI ARAMCO inspection group objections.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
Buildings where Battery rooms are provided shall comply with all requirements of
12/28/16
SAES-P-103, Battery rooms shall be provided with an eye wash facility with
12/14/16
12/18/16
DATE
potable water connection & drain, and the drain shall be through acid neutralization
pit. The ventilation system shall be 100% redundant. Only direct driven exhaust
NO.
REV
G
E
DISCIPLINE
fans shall be used. An interlock with the ventilation system shall be provided to
ENGINEER
ALL LEADS
stop the high-rate battery charging if the exhaust fan stops.
DATE: 12/28/16
PROJECT
ENGINEER
CONTRACTOR scope shall include but not be limited to Detail Design,
A M ALMATROOK procurement, supply, deliver / store, install & test for Fire Stops wherever
DATE: 12/28/16 cable/conduit/cable trays pass through fire rated walls, Floor or Ceiling. The Fire
CERTIFIED
AMR EL SHARKAWY
Stops shall be in compliance with UL and SAES-U-101.
12/28/16
DATE:
CONSTRUCTION CONTRACTOR scope shall include but not be limited to Detail Design,
AGENCY
SHAHZAD YAZDANI procurement, supply, deliver / store, install & test for lighting fixtures, receptacles,
DATE: 12/28/16 lighting panels, power panels, lighting circuits, power circuits and grounding for the
OPERATIONS
following buildings but not limited to:
ALI H GHAMDI
12/28/16
DATE:
Receiving Substation, Utility Power Substation, Engineering & Maintenance (E &
CONTROL NUMBER
VERIFICATION
Shelters, Musalla, Security Gate House, Security Support Building, Security Guard
Houses, RIO Building, IDAS Shelter, X-Ray Building, FSF Building & Foam Skid
DATE:
BY:
Building.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
commissioning assistance for ALL Buildings under this scope of work to include but
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG not be limited to following electrical equipment:
SAY
SAY
SAY
ENGG CERT
Power Panels
ASH
ASH
ASH
Power Circuits
LEADS
Lighting Panels
LEADS
LEADS
ALL
ALL
ALL
Lighting Circuits
Fire Alarm Detection
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
Disconnect Switches
Sockets / Receptacles
Dry Type Transformers
Control Panels
DESCRIPTION
Grounding
All in accordance with the detailed design Lighting Layouts, Power Layouts, Panel
Schedules, Fire Alarm Layouts and Grounding Layouts. Refer to project proposal
drawings as per DCL # GEN-D0001 for Lighting, Power, Grounding, Fire Alarm
Layouts, Panel schedules and Electrical One Line Diagrams of respective
buildings.
10-02399-
10-02399-
0001
0001
0001
Reference Documents attached to this PPN include but are NOT limited to the
12/28/16
12/14/16
12/18/16
DATE
G
E
DISCIPLINE
ENGINEER
Electrical One Line Diagrams
ALL LEADS Protection & Metering Diagrams
DATE: 12/28/16 Electrical Area Classification
PROJECT
ENGINEER
Substation Equipment Layouts
A M ALMATROOK Lighting Layouts
DATE: 12/28/16 Power Layouts
CERTIFIED Grounding Layouts
AMR EL SHARKAWY
Lightning Protection Layouts
12/28/16
DATE: Fire Detection & Alarm Layouts
CONSTRUCTION
AGENCY Fire Detection & Alarm Riser Diagrams
SHAHZAD YAZDANI Substation Automation Block Diagram
DATE: 12/28/16 Input / Output List for PSA & SCADA
OPERATIONS Panelboard Schedules
ALI H GHAMDI Cable Routing Layouts
DATE:
12/28/16 Cable Tray Layouts
Equipment Data Sheets
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG General Electrical Notes and Symbols
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Lighting, Grounding
Cable Routing Layouts
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
Panelboard Schedules
Major Equipment Specifications with Purchase Requisitions Development
Buildings, Area, Access Road, Tanks Lighting Layouts
Fire Alarm Detection Layouts, Riser Diagrams, Cause & Effect Logic
DESCRIPTION
0001
0001
Equipment Datasheets
Material Take-Off
12/28/16
12/14/16
12/18/16
DATE
ETAP Studies including Load Flow, Short Circuit, Relay Coordination, Arc
Flash
NO.
REV
G
E
DISCIPLINE
ETAP GPR & Ground Grid Calculations
ENGINEER
ALL LEADS
Switching Transient Analysis, Transient Recovery Voltage (TRV) evaluation
DATE: 12/28/16 and Insulation Coordination studies
PROJECT
ENGINEER Lightning Protection Studies
A M ALMATROOK Calculations including Lighting LUX, Cable sizing, Transformer sizing, Battery
DATE: 12/28/16 Charger sizing, UPS sizing, Switchgear, Controlgear and Generator Sizing
CERTIFIED
AMR EL SHARKAWY Smart Plant Electrical Outputs
DATE:
12/28/16
3D Model.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI Detailed Design drawings shall include all necessary plans, elevations, arrangements,
DATE: 12/28/16
sections, profiles, views and details of all facilities.
OPERATIONS
ALI H GHAMDI
CONTRACTOR shall incorporate ALL Vendor NMR’s into the IFC package as vendor
DATE:
data becomes available and shall insure drawings utilized for construction have NMR
BY:
602 and NMR 603 data incorporated within, prior to site construction execution. Note
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
that this is critical path prior to pouring Concrete for Substation Floors, Precast Walls,
OF THIS DRAWING IS COVERED, FOR ALL
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Electrical Scope at Physical Interface Points with Pipelines & Refineries
SAY
SAY
SAY
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall provide, install, test and terminate a 480V power cable to the
Scraper Launcher Area Power Panelboard. The Panelboard will be provided and
installed within the Scraper Launcher Area by BI-10-02155. (Refer drawing # EL-A10014
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
sht. 001)
Electrical interfaces include power connection of 480V used to power the pipeline scraper
DESCRIPTION
launcher facilities loads inside YDH perimeter fence. One (1) 480V, 150A, 3Ph, 3W, 60Hz
Outdoor Power Panel shall be provided by BI 10-02155 (Yanbu - North Jiddah Products
Pipelines).
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
There is no physical interface within the facility; will be utilize the pipeline provided by BI-
00043. Therefore no electrical load has been anticipated.
NO.
REV
G
E
DISCIPLINE
ENGINEER
ALL LEADS SAMREF Refinery Connection:
DATE: 12/28/16
PROJECT
ENGINEER Electrical Scope in SAMREF, Refer to GEN-E0103.
A M ALMATROOK
DATE: 12/28/16
Yanbu Refinery Connection:
CERTIFIED
AMR EL SHARKAWY
DATE:
12/28/16 Yanbu Refinery shall supply all electrical power and connections required MOVs and
CONSTRUCTION
AGENCY
other miscellaneous loads. Total electrical loads anticipated are about 10kVA.
SHAHZAD YAZDANI
DATE: 12/28/16 CONTRACTOR scope shall include but not be limited to Detail Design, procurement,
OPERATIONS
supply, deliver / store, install & test for Four (4 nos.) 480V, 100A, 3Ph, 3W, 60Hz Outdoor
ALI H GHAMDI
12/28/16
Power Panel (NEMA 4X) with all cables, conduits, supports structures and other required
DATE:
accessories to feed power to MOVs and other miscellaneous loads (refer to drawing #
CONTROL NUMBER
VERIFICATION
EL-A10111).
EDSD
and supply; install Four (4nos.) 100AF new circuit breakers to feed new MOV power
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
panels, including feeder cables, conduits and other required accessories. (Refer Drawing
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG CONTRACTOR shall provide Grounding to new equipment from existing YANBU
SAY
SAY
SAY
ASH
ASH
ASH
CONTRACTOR shall provide task lighting for new equipment from existing lighting
LEADS
LEADS
LEADS
ALL
ALL
ALL
Panels
CONTRACTOR shall coordinate with SAUDI ARAMCO and MARAFIQ for the portion of
works under MARAFIQ scope and insure correct interface of all discipline’s i.e. Civil,
DESCRIPTION
CONTRACTOR shall utilize existing spare breaker EA06 & EB04 of GIS to feed power to
YDH. (Refer sketch # SK-A10011, SK-A10013 & SK-A10014)
10-02399-
JO/EWO
10-02399-
10-02399-
CONTRACTOR shall provide one (1) metering panel to accommodate two (2) revenue
0001
0001
0001
meters & two check meters for YDH feeders-1 & 2. (Refer sketch # SK-A10013 & SK-
12/28/16
12/14/16
12/18/16
A10014). The supplied meters shall be smart type meters and shall comply the MARAFIQ
DATE
standard. Refer Doc-ELE10069-002 for Technical specification and details for these
meters.
NO.
REV
G
E
DISCIPLINE
ENGINEER
ALL LEADS
CONTRACTOR shall provide Four (4) protection relay panel to accommodate line
DATE: 12/28/16
differential relays & directional relays for YDH feeders-1 & 2. (Refer sketch # SK-A10013
PROJECT
ENGINEER
& SK-A10014)
A M ALMATROOK
DATE: 12/28/16 CONTRACTOR shall provide one (1) 125VDC Power Panel to supply power to new relay
CERTIFIED
AMR EL SHARKAWY panels. (Refer sketch # SK-A10012)
12/28/16
DATE:
CONSTRUCTION CONTRACTOR shall provide two (2) fiber optic patch panel to be install in Substation 9I.
AGENCY
SHAHZAD YAZDANI (Refer sketch # SK-A10014)
DATE: 12/28/16
OPERATIONS CONTRACTOR shall design, supply, install, test and assist with commissioning of two
ALI H GHAMDI
run, 3x1/C- 630 mm2, 115kV cables of 3.85km in length, from MARAFIQ Substation #9I to
12/28/16
DATE: YDH. (Refer sketch # SK-A10010 & SK-A10015)
CONTROL NUMBER
VERIFICATION
EDSD
CONTRACTOR shall design, supply, install, test and assist with commissioning of two (2)
run 12C Single Mode Fiber Optic Cables run along with each power feeder cable from
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
CONTRACTOR shall provide termination kits, including connectors, at the MARAFIQ end
(DCC) NO. _____________________
and at the SAUDI ARAMCO 115kV GIS end. CONTRACTOR shall coordinate with
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG MARAFIQ and SAUDI ARAMCO for termination at the MARAFIQ end.
SAY
SAY
SAY
ENGG CERT
ASH
ASH
CONTRACTOR shall confirm MARAFIQ protection and metering requirements and reflect
ASH
accordingly within the Detail Design Drawings. Development of protection, control, fire
LEADS
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall assist MARAFIQ as required with Manpower, and test equipment,
as necessary to complete MARAFIQ 115kV and SAUDI ARAMCO 115kV Interface
Testing including Protection, Metering, Controls, etc. including wiring interface drawing
DESCRIPTION
development. Test Results shall be signed by all relevant parties including POD, PID,
MARAFIQ, etc. and be included within the Project Test Results binders maintained and
developed by CONTRACTOR as per SAEP-122.
10-02399-
10-02399-
0001
0001
followed:
12/28/16
12/14/16
12/18/16
DATE
MARAFIQ confirmed to reserve the existing Two (2) spare GIS Bays: =EB04
and =EA06 for SAUDI ARAMCO YDH project.
NO.
REV
G
E
DISCIPLINE
ENGINEER
ALL LEADS MARAFIQ confirmed these 2 Spare GIS are already pre-wired to the local
DATE: 12/28/16 control panel =EB04+S and =EA06+S.
PROJECT
ENGINEER
A M ALMATROOK A new metering panel is required, same model and configuration than existing
DATE: 12/28/16 metering panels. This new metering panel shall be the combine metering
CERTIFIED
AMR EL SHARKAWY panels for 2 feeders of YDH. Each YDH feeders shall have a separate
DATE:
12/28/16 revenue meters and will be accommodated in this panel. Reserved available
CONSTRUCTION
AGENCY
floor space for this panel. New Panel to be tagged as: =E+MP05 115KV
SHAHZAD YAZDANI Service Cable/Revenue Metering panel.
DATE: 12/28/16
OPERATIONS
ALI H GHAMDI
Protection Scope- Primary Protection: Two (2) new Relay Panels are required
12/28/16 based on ABB relays. Reserved available floor spaces for these two panels.
DATE:
New panels to be tagged as: =EB04+R1 and =EA06+R1 115kV Service Line
CONTROL NUMBER
VERIFICATION
Protection Scope- Back Up Protection: Two (2) new relay Panels are required
DATE:
BY:
based on Siemens relays. Available floor spaces for these 2 panels. New
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG MARAFIQ confirmed that existing Relay Panels =E+BB1 and =E+BB4 for Bus
SAY
SAY
SAY
Bar/BF Protection of GIS Bay EA06 & EA04 are already pre-wired.
ENGG CERT
ASH
ASH
ASH
DC System scope: Existing 125V DC Distribution Panel has not enough spare
LEADS
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
the wall.
12/28/16
12/14/16
12/18/16
Cable structural support shall be Unistrut type similar design that existing
ones.
NO.
REV
G
E
DISCIPLINE
ENGINEER
ALL LEADS General requirements:
DATE: 12/28/16 o Contractor shall incorporate all the MARAFIQ comments during detail
PROJECT
ENGINEER engineering. Refer Appendix-12 for MARAFIQ comments.
A M ALMATROOK o Contractor/SAPMT shall include MARAFIQ in the Engineering Review
DATE: 12/28/16
CERTIFIED
Cycle during detail engineering.
AMR EL SHARKAWY o Contractor shall procure all equipment related to MARAFIQ Scope as per
12/28/16
DATE: Royal Commissioning Standards.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI 4.16 Communication
DATE: 12/28/16
OPERATIONS
ALI H GHAMDI A. DATA NETWORK
12/28/16
DATE:
CONTROL NUMBER
VERIFICATION
Scope of Work
EDSD
several physically separated LANs that includes the Enterprise LAN for
REVISIONCERTIFICATION
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG SAES-T-555.
SAY
SAY
SAY
The Security LAN may utilize the Enterprise LAN to transport the traffic
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
The Yanbu Distribution Hub Enterprise LAN shall manage and control
all business related types of traffic that shall traverse through its own
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
Gate & Tank Farm) and will be uplinked to the Distribution switch using
JO/EWO
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
DISCIPLINE
ENGINEER
and Wireless Access points within the Yanbu Distribution Hub.
ALL LEADS
DATE: 12/28/16 The Wireless LAN System under this project will be provided at
PROJECT
ENGINEER Operation Building, Maintenance & Engineering Building, Operator
A M ALMATROOK Shelter and Security Support Building (Main Gate & Tank Farm) to
DATE: 12/28/16 support mobile computing in the Yanbu Distribution Hub facilities.
CERTIFIED
AMR EL SHARKAWY
12/28/16 CONTRACTOR shall provide and install the following wireless LAN
DATE:
CONSTRUCTION subsystems:
AGENCY
SHAHZAD YAZDANI
Wireless access points
DATE: 12/28/16
OPERATIONS
Mounting kits for access points
ALI H GHAMDI
DATE:
12/28/16 Patch cords
CONTROL NUMBER
VERIFICATION
EDSD
CONTRACTOR shall provide and install the wireless LAN and ensure
the appropriate placement of wireless access points to provide excellent
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
WLAN access point outlets shall not be installed more than 3.75 meters
C
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG The access point shall be connected to the PoE+ port of Access switch
SAY
SAY
SAY
using UTP CAT-6 cable and shall be powered through its power-over-
ENGG CERT
ASH
ASH
Ethernet port.
ASH
LEADS
LEADS
ALL
ALL
Schematic Diagram,
Overall Data System CO-A10033.001
Overall System Diagram
Data Network System CO-A10036.001
Schematic Diagram,
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
G
E
DISCIPLINE
ENGINEER CONTRACTOR shall procure, install, test and commission the one (1)
ALL LEADS
Distribution switch equipped of 20-Port 1Gigabit Ethernet /2-Port
DATE: 12/28/16
PROJECT 10Gigabit Ethernet L2/L3 line card with SFP pluggable 1000Base-X
ENGINEER
A M ALMATROOK
Mini-GBIC and 10GBE-XFP Transceivers that support single mode fiber
DATE: 12/28/16
over 1310nm wavelength with LC connector. The 1000Base-X Mini-
CERTIFIED GBIC Transceiver supports 9 micron single mode fiber up to a
AMR EL SHARKAWY
12/28/16
maximum distance of 10km.
DATE:
CONSTRUCTION
AGENCY CONTRACTOR shall provide a 4-Port 10-Gigabit Ethernet Enhanced
SHAHZAD YAZDANI
DPC module with 10Gigabit Ethernet XFP transceivers for the utilization
DATE: 12/28/16
OPERATIONS
of the existing Juniper MX-960 PPE Routers. CONTRACTOR shall
ALI H GHAMDI utilize and reserve the slot 4 of the existing Juniper MX-960 on both
DATE:
12/28/16 Communication Building 12 at Yanbu NGL and Admin Building 1401 at
Yanbu Refinery
CONTROL NUMBER
VERIFICATION
EDSD
The CONTRACTOR shall procure, install, test and commission one (1)
Provider Edge (PE) router with redundant power supplies.
DATE:
BY:
REVISIONCERTIFICATION
CONTRACTOR shall procure, install, test and commission the one (1)
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Access Switch and one (1) Modular Access switch equipped with
(DCC) NO. _____________________
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG The 1000Base-X Mini-GBIC Transceiver supports 9 micron single mode
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
ALL
ALL
The PE Router and Access switch and Modular Access switch installed
in Maintenance & Engineering Building shall be powered from utility
power source and Telecoms-dedicated Uninterruptible Power Supply
(UPS) system
DESCRIPTION
Operation Building
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
G
E
DISCIPLINE CONTRACTOR shall install Universal 19” Standard Rack to mount the
ENGINEER
ALL LEADS Modular Access switch, Redundant Power Supply, fiber optic/UTP
DATE: 12/28/16 copper patch panel and ancillaries.
PROJECT
ENGINEER
A M ALMATROOK
The Modular Access switch shall be powered from utility power source
DATE: 12/28/16 and dedicated Rack Mounted UPS systems installed in
CERTIFIED
AMR EL SHARKAWY
Telecommunication Room.
12/28/16
DATE: Receiving Substation Building
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI CONTRACTOR shall procure, install, test and commission the one (1)
DATE: 12/28/16 Redundant Power Supply and one (1) Access switches equipped with
OPERATIONS
SFP pluggable 1000Base-X Mini-GBIC Transceivers that support single
ALI H GHAMDI
12/28/16
mode fiber over 1310nm wavelength with LC connector. The
DATE:
1000Base-X Mini-GBIC Transceiver supports 9 micron single mode
CONTROL NUMBER
VERIFICATION
The access switch shall be powered from utility power source and
(DCC) NO. _____________________
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Room.
SAY
SAY
SAY
ASH
ASH
ASH
CONTRACTOR shall procure, install, test and commission the one (1)
LEADS
LEADS
LEADS
ALL
ALL
ALL
Redundant Power Supply and one (1) Access switch equipped with
SFP pluggable 1000Base-X Mini-GBIC Transceivers that support single
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
The access switch shall be powered from utility power source and
dedicated Rack Mounted UPS systems installed in Telecommunication
Room.
10-02399-
10-02399-
0001
0001
0001
CONTRACTOR shall procure, install, test and commission the one (1)
12/28/16
12/14/16
12/18/16
Redundant Power Supply and one (1) Access switch equipped with
DATE
G
E
DISCIPLINE
1000Base-X Mini-GBIC Transceiver supports 9 micron single mode
ENGINEER
ALL LEADS
fiber up to a maximum distance of 10km.
DATE: 12/28/16
PROJECT CONTRACTOR shall install Universal 19” Standard Rack to mount the
ENGINEER
access switch, Redundant Power Supply, fiber optic/UTP copper patch
A M ALMATROOK
DATE: 12/28/16
panel and ancillaries.
CERTIFIED
AMR EL SHARKAWY
The access switch shall be powered from utility power source and
12/28/16
DATE: dedicated Rack Mounted UPS systems installed in Telecommunication
CONSTRUCTION
AGENCY Cabinet (TC).
SHAHZAD YAZDANI
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG panel and ancillaries.
SAY
SAY
SAY
The access switch shall be powered from utility power source and
ENGG CERT
ASH
ASH
ASH
LEADS
Room.
LEADS
ALL
ALL
ALL
CONTRACTOR shall procure, install, test and commission the one (1)
Redundant Power Supply and one (1) Access switch equipped with
SFP pluggable 1000Base-X Mini-GBIC Transceivers that support single
DESCRIPTION
The access switch shall be powered from utility power source and
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
General
NO.
REV
G
E
DISCIPLINE
ENGINEER This document shall be constructed in concurrence with the data network
ALL LEADS
drawing CO-A00033 sheet 001.
DATE: 12/28/16
PROJECT
ENGINEER
AMR EL SHARKAWY
CERTIFIED
Access and Distribution Switches
12/28/16 Firewalls
DATE:
CONSTRUCTION
Wireless Access points
AGENCY
UPS Equipment
SHAHZAD YAZDANI
Grounding Kits
DATE: 12/28/16
OPERATIONS Fiber optic transceivers
ALI H GHAMDI Fiber Patch cords
DATE:
12/28/16 UTP Patch cords
CONTROL NUMBER
VERIFICATION
requirements. These additional tasks shall include, but not necessary limited
to, the following:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG commissioning spares to site.
SAY
SAY
SAY
ASH
ASH
ASH
ALL
ALL
optimization.
Installation of additional UTP cabling from the access points to the
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
personnel.
The logistics associated with the In-Kingdom Installation.
The provision of all materials, tools, test equipment, and other items of
equipment to effect the installation and commissioning.
Project Management.
CONTRACTOR shall obtain SAUDI ARAMCO approval for the design
prior to implementation.
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
G
E
DISCIPLINE
format and also a CD-ROM based electronic file copy.
ENGINEER
ALL LEADS
Materials
DATE: 12/28/16
PROJECT
ENGINEER CONTRACTOR shall provide ample supply of ancillaries, patch cords as
A M ALMATROOK the project requires, and to have a more viable system.
DATE: 12/28/16
CERTIFIED Software
AMR EL SHARKAWY
12/28/16
DATE: All the software are the property of SAUDI ARAMCO, therefore
CONSTRUCTION
AGENCY CONTRACTOR shall provide SAUDI ARAMCO with a complete list of all
SHAHZAD YAZDANI
software installed, complete with revisions, versions, installed locations,
DATE: 12/28/16 migration path, maintenance agreement and related upgrades for
OPERATIONS
maintenance and operation of the equipment as specified in this FSD.
ALI H GHAMDI
12/28/16
DATE: CONTRACTOR shall provide SAUDI ARAMCO with software and related
CONTROL NUMBER
versions, etc.
BY:
For each software package the migration path (when upgrades will be
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Any sub-routine used to enhance the software shall be SAUDI
SAY
SAY
SAY
ARAMCO property.
ENGG CERT
ASH
ASH
ASH
REFERENCE DRAWINGS
LEADS
LEADS
LEADS
ALL
ALL
ALL
Listed below are proposal engineering documents and drawings which shall
be finalized by CONTRACTOR during detail design.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
SHEET
DRAWING NO. DRAWING TITLE
NO.
CO-A10033 001 Schematic Diagram, Overall Data System
DESCRIPTION
B. TELEPHONE NETWORK
Scope of Work
10-02399-
JO/EWO
10-02399-
10-02399-
0001
IP Telephony
0001
0001
12/28/16
12/14/16
12/18/16
G
E
DISCIPLINE Distribution Hub. This shall include the provision and installation of
ENGINEER
ALL LEADS
fifty nine (59) totals of new IP telephone handsets which includes
DATE: 12/28/16 one (1) Conference Telephone handset and seventeen (17) analog
PROJECT
ENGINEER & ten (10) hotline telephone handsets including all required
A M ALMATROOK accessories and materials. The IP Telephone System shall utilize
DATE: 12/28/16 the provided Data Network System under this project for
CERTIFIED
AMR EL SHARKAWY transmission and connection towards IP Telephone Core System
DATE:
12/28/16 located at SAUDI ARAMCO Dhahran B-840 and Abqaiq Comm.
CONSTRUCTION
AGENCY
Building. All new telephone equipment shall comply with the
SHAHZAD YAZDANI equipment platform provided under BI-10-00246 Replace
DATE: 12/28/16 Telephone Switches Kingdom Wide.
OPERATIONS
ALI H GHAMDI
CONTRACTOR shall install and commission the IP Telephone
12/28/16
DATE: System as per the following drawings:
CONTROL NUMBER
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG building.
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
ALL
ALL
Location Subtotal
Phone Phone IP Phone
Engineering &
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
6 25 1 32
Maintenance Building
Operations Shelter-1 0 4 -- 4
DESCRIPTION
Operations Shelter-2 0 4 -- 4
Operation Building 5 7 -- 12
Receiving Substation 3 -- -- 3
10-02399-
10-02399-
1 -- -- 1
0001
Main Gate
0001
0001
12/28/16
12/14/16
12/18/16
DATE
1 -- -- 1
G
E
Tank Farm
DISCIPLINE
ENGINEER
Security Guardhouse
ALL LEADS 1 -- -- 1
(Tank Farm)
DATE: 12/28/16
PROJECT
ENGINEER
Utility Power Substation 4 -- -- 4
A M ALMATROOK
DATE: 12/28/16
CERTIFIED TOTAL 22 36 1 59
AMR EL SHARKAWY
12/28/16
DATE:
CONSTRUCTION
AGENCY CONTRACTOR shall provide approve Basic IP telephones for
SHAHZAD YAZDANI
Basic Users, Office IP telephones for all Office Class users and
DATE: 12/28/16
OPERATIONS
Conference IP phone.
ALI H GHAMDI
12/28/16
CONTRACTOR shall provide the required Port licenses for all new
DATE:
IP telephones to expand the IP telephony platforms located in
CONTROL NUMBER
VERIFICATION
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG CONTRACTOR shall provide, procure, install, test and commission
SAY
SAY
SAY
one (1) new Line Access Gateway (LAG) including all required
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Analog Hotline
Location Subtotal
Phone Phone
Engineering & Maintenance
4 -- 4
Building
Operations Shelter-1 1 -- 2
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
Operations Shelter-2 1 -- 2
12/28/16
12/14/16
12/18/16
Operation Building 2 4 6
DATE
G
E
DATE: 12/28/16
FSF Support Building -- 1 1
OPERATIONS
ALI H GHAMDI Chemical Shelter 1 -- 1
12/28/16
DATE:
Metering Shelter 1 -- 1
CONTROL NUMBER
VERIFICATION
YASREF -- 1 1
EDSD
SAMREF -- 1 1
DATE:
BY:
REVISIONCERTIFICATION
Marafiq Substation -- 1 1
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
Analog Hotline
SAY
Location Subtotal
Phone Phone
ENGG CERT
ASH
ASH
ASH
TOTAL 17 11 28
LEADS
LEADS
LEADS
ALL
ALL
ALL
This project shall allocate the four (4) hotline circuits in Operation
DESCRIPTION
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
NO.
REV
DISCIPLINE
ENGINEER
two (2) new Ethernet switches. The Ethernet Switch shall be utilized
ALL LEADS to support the system 10/100/1000Base-T ports and GBE ports
DATE: 12/28/16
interface requirements.
PROJECT
ENGINEER
A M ALMATROOK CONTRACTOR shall provide, procure, install and activate two (2)
DATE: 12/28/16
CERTIFIED
1000 Base-TX SFP Modules on GE SFP port on each of the two
AMR EL SHARKAWY Huawei Firewalls.
12/28/16
DATE:
CONSTRUCTION CONTRACTOR shall provide, procure, install and activate two (2)
AGENCY
SHAHZAD YAZDANI 1000 Base-TX SFP Modules on Distribution Switch located at
DATE: 12/28/16 Engineering & Maintenance Building.
OPERATIONS
ALI H GHAMDI CONTRACTOR shall provide, install and terminate two (2) Duplex
12/28/16
DATE: Fiber Optic Patch Cords, 10M with LC-LC connectors between
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG CONTRACTOR shall provide, procure, install, test and commission
SAY
SAY
SAY
ASH
ASH
ASH
materials. The Voice Recorder shall be utilized to log and record all
hotlines/ emergency calls for 12 months as per HCIS requirement.
LEADS
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
This project shall lease a telephone Trunk Lines from a local service
12/28/16
12/14/16
12/18/16
Sheet 001 for the trunk lines detail. This project shall also provide
four (4) hotline circuits going to Yanbu Regional Security Command
NO.
REV
G
E
DISCIPLINE
Centre (YRSCC).
ENGINEER
ALL LEADS
A Main Distribution Frame (MDF) shall be provided to allow the orderly
DATE: 12/28/16
PROJECT
and logical termination and interconnection of capable pairs to and from:
ENGINEER
DATE: 12/28/16
CONTRACTOR has to provide the equipment for Telephone Network
OPERATIONS System and Unified Communications as per the System descriptions,
ALI H GHAMDI standards and System interfaces defined around each functional layer of the
DATE:
12/28/16 conceptual design. The overall solution is expected to have availability and
reliability of 99.99%.
CONTROL NUMBER
VERIFICATION
EDSD
ensure that integration shall be seamless. All the System services that are
REVISIONCERTIFICATION
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG finalized during detailed design.
SAY
SAY
SAY
ASH
ASH
ASH
courses for the System. CONTRACTOR shall price the courses according
to the software and equipment installed that make-up the entirety of the
LEADS
LEADS
LEADS
ALL
ALL
ALL
System.
10-02399-
10-02399-
0001
0001
0001
System Configuration
12/28/16
12/14/16
12/18/16
DATE
DISCIPLINE
ENGINEER
ALL LEADS
Overall IP Telephone System CO-A10028.001
DATE: 12/28/16
Overall Analog Telephone System CO-A10029.001
PROJECT
ENGINEER
Commercial off the Shelf (COTS) hardware, system software, application
A M ALMATROOK
software packages and firmware shall be configured to meet the stated
DATE: 12/28/16
CERTIFIED
requirements.
AMR EL SHARKAWY
DATE:
12/28/16 System performance, reliability, flexibility, upward compatibility and
CONSTRUCTION expansion to meet future requirements shall be the basis of the design.
AGENCY
SHAHZAD YAZDANI
Power Systems
DATE: 12/28/16
OPERATIONS
The System power shall be derived from a - 4 8 V o l t D C p o w e r
ALI H GHAMDI
system.
12/28/16
DATE:
CONTROL NUMBER
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
EQUIPMENT SPECIFICATIONS
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
IP TELEPHONE SETS
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Scope
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
10-02399-
10-02399-
0001
0001
12/18/16
DATE
G
E
DISCIPLINE
this project and to accommodate all new required software,
ENGINEER hardware and device licenses as required.
ALL LEADS
DATE: 12/28/16 • IP Phone shall be compatible with the existing Huawei IMS
CERTIFIED Plat form.
AMR EL SHARKAWY
12/28/16
DATE:
CONSTRUCTION
AGENCY
IP Phone Types
SHAHZAD YAZDANI
DATE: 12/28/16
OPERATIONS
The project shall provide three (3) types of IP telephones which are to be
ALI H GHAMDI
installed within the Yanbu Distribution Hub:
12/28/16
DATE:
Office Class IP Phone
CONTROL NUMBER
VERIFICATION
Conference IP Phone
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Analogue Telephone
C
This project shall supply and install a Line Access Gateway (LAG) with
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Analogue Telephone sets in the Engineering & Maintenance Building to
SAY
SAY
SAY
serve the Yanbu Distribution Hub. A Line Access Gateway (LAG) shall
be provided to serve locations where IP telephone handsets cannot be
ENGG CERT
ASH
ASH
ASH
provided.
LEADS
LEADS
LEADS
ALL
ALL
ALL
This project shall supply and install Hotline Telephone between Main Gate,
Operation Building and FSF Support Building.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
This project shall supply and install analogue telephone handsets in the
various location of Yanbu Distribution Hub as listed in Table 2 of this
document.
DESCRIPTION
BANDWIDTH REQUIREMENTS
Introduction
The purpose of this section is to provide all the critical VoIP solution sizing
statistics and results that shall be used by CONTRACTOR to design their
solutions. The solution and equipment proposed by CONTRACTOR for
Yanbu Dist r ibut ion Hub shall have the capability to support a minimum
10-02399-
JO/EWO
10-02399-
10-02399-
0001
of 59 users.
0001
0001
12/18/16
DATE
G
E
IP ANALOG
DISCIPLINE BUILDING NAME
ENGINEER TELEPHONE TELEPHONE
ALL LEADS
DATE: 12/28/16
Maintenance & Engineering Building 32 4
PROJECT
ENGINEER
Operator Shelter 1 & 2 8 2
A M ALMATROOK
12/28/16
DATE: Security Guardhouse 1 2
CONTROL NUMBER
VERIFICATION
Receiving Substation 3 --
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
--
C
Chemical Shelter 1
(DCC) NO. _____________________
Metering Shelter -- 1
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
IP ANALOG
SAY
BUILDING NAME
TELEPHONE TELEPHONE
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
--
YASREF 1
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
--
SAMREF 1
--
Yanbu Refinery Terminal 1
DESCRIPTION
TOTAL 59 27
Scope of Work
General
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
This shall primarily provide wireless LAN connectivity for the users where the
12/28/16
12/14/16
12/18/16
The project shall provide and commission the following wireless LAN
NO.
REV
G
E
subsystems:
DISCIPLINE
ENGINEER
ALL LEADS Wireless LAN indoor access points
DATE: 12/28/16 Mounting kits for access points
PROJECT
ENGINEER UTP patch cords
A M ALMATROOK
DATE: 12/28/16 The wireless LAN network shall have a flexible configuration that enables it to
CERTIFIED be deployed at any location within the new Yanbu Distribution Hub and
AMR EL SHARKAWY
12/28/16
associated open areas with secured connectivity.
DATE:
CONSTRUCTION
AGENCY The WLAN system shall consider providing coverage and connectivity for
SHAHZAD YAZDANI 802.11ac in addition to 802.11a/b/g and 802.11n users. This shall be
DATE: 12/28/16 designed and implemented to provide the capability to work efficiently with
OPERATIONS
high performance in mix-mode without interference.
ALI H GHAMDI
12/28/16
DATE: The WLAN shall share the data network infrastructure in terms of access
CONTROL NUMBER
flexible and secure wireless LAN network to facilitate wireless data access for
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
CONTRACTOR shall design and implement the System by using the latest
(DCC) NO. _____________________
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
The following indoor areas shall be provided with wireless LAN facilities:
Operation Building
Operation Shelter
Security Guardhouse
DESCRIPTION
All components and accessories required for the completion and successful
operation of the proposed WLAN system, either specified in detail or not, shall
be supplied and installed by the CONTRACTOR. CONTRACTOR shall verify
all required quantities and provide the System “Fit for Purpose’, irrespective of
estimated quantities given in this document.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
12/28/16
12/14/16
12/18/16
Equipment Provision
DATE
This project shall provide, install, test and commission a permanent, scalable
NO.
REV
G
E
A M ALMATROOK
The wireless LAN equipment shall be installed in areas as mentioned above.
Wireless LAN access points shall be directly connected to the Power-over-
DATE: 12/28/16
CERTIFIED Ethernet (PoE) ports of the access switches unless otherwise specified.
AMR EL SHARKAWY
DATE:
12/28/16 Wireless Controller
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI CONTRACTOR shall utilize the existing Wireless LAN Controller in
DATE: 12/28/16
the Yanbu NGL.
OPERATIONS The Wireless LAN Controller shall manage, secure, route and
ALI H GHAMDI switching function for all wireless access points.
12/28/16
DATE:
Access Points
CONTROL NUMBER
VERIFICATION
EDSD
Wireless LAN access points shall employ two radios at 2.4 and
5GHz Frequency band
DATE:
BY:
Wireless LAN access points inside the building shall utilize UTP
copper connection to the assigned access switch.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
OF THIS DRAWING IS COVERED, FOR ALL
specified.
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG used in a meshed configuration and utilizing fiber optic connection
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
REFERENCE DRAWINGS
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
SHEET
DRAWING NO. DRAWING TITLE
NO.
CO-A10033 001 Schematic Diagram, Overall Data System
DESCRIPTION
SCOPE DESCRIPTION
General
This describes the design requirement for the Building Structured Cabling
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
12/18/16
DATE
G
E
DISCIPLINE
ENGINEER
ALL LEADS
Telecommunication services will be provided at the new Yanbu Distribution
DATE: 12/28/16
Hub facilities.
PROJECT
ENGINEER
All equipment and materials specified to be supplied will be of modern,
A M ALMATROOK
proven and reliable design which will comply with the applicable standards
DATE: 12/28/16
CERTIFIED or codes and embody the latest proven technology.
AMR EL SHARKAWY
DATE:
12/28/16 STANDARDS
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
General
DATE: 12/28/16
OPERATIONS The materials and equipment provided for this System shall conform to the
ALI H GHAMDI requirements of the latest issues and most recent revisions and
12/28/16 amendments of the standards listed below and the local laws and
DATE:
regulations applicable to the site.
CONTROL NUMBER
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG General
SAY
SAY
SAY
All the materials and equipment provided for this System shall meet the
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Technical Bulletins. The cables shall conform to the fire and safety codes
NEC Article 800- 51(b) or equivalent.
10-02399-
10-02399-
0001
0001
0001
12/18/16
G
E
DISCIPLINE
ENGINEER Cableway System (horizontal and backbone) which includes but
ALL LEADS not limited to cable tray system, Rigid Steel Conduit (RSC) and
DATE: 12/28/16 Electro Malleable Tubing (EMT) conduits, sleeves, pull boxes,
PROJECT
ENGINEER outlet boxes, cableway supports, etc.
A M ALMATROOK
DATE: 12/28/16 The Work shall include but not limited to installation, termination and
CERTIFIED testing of CAT6 modules and test all horizontal and backbone cabling.
AMR EL SHARKAWY
12/28/16
DATE: TECHNICAL REQUIREMENTS
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI Telecom Equipment Room (TER)/Telecom Rooms (TR)
DATE: 12/28/16
OPERATIONS
CONTRACTOR shall design and provide a Telecom Equipment Room
ALI H GHAMDI
(TER)/Telecommunications Rooms (TR) in the required buildings for the
12/28/16
DATE: co-location of data and voice termination equipment on each location of
CONTROL NUMBER
associated facilities within the TR to include but not limited to, cable splice
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
If the total horizontal cabling length to any IO exceeds 90m from the patch
panels, additional TR and IDF’s shall be provided.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
Physical Characteristics
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
G
E
DISCIPLINE
A Wall Mounted Telephone shall be placed in the TER/TR.
ENGINEER
ALL LEADS
The main entrance door shall have a combination door lock and
shall open outward if the building fire code allows.
DATE: 12/28/16
PROJECT Lighting and emergency lighting shall be provided in each TER/TR.
ENGINEER
Electrical convenience duplex 230V AC outlet spaced at 1880mm
A M ALMATROOK
intervals around the perimeter of the walls at a height of 450mm
DATE: 12/28/16
CERTIFIED above floor level,
AMR EL SHARKAWY A twist lock duplex 230V above each equipment rack ceiling
DATE:
12/28/16 mounted AC outlet together with the dedicated power outlets shall
CONSTRUCTION be provided.
AGENCY
SHAHZAD YAZDANI Each Line circuit shall originate from the dedicated power panel
DATE: 12/28/16
located in each TER/TR. For buildings with UPS power, the
OPERATIONS dedicated power panel shall be powered from the Building UPS.
ALI H GHAMDI Grounding - CONTRACTOR shall supply a #4/0 AWG grounding
DATE:
12/28/16 conductor bonded to the building ground grid, for later connection to
the TER/TR grounding system.
CONTROL NUMBER
VERIFICATION
Plywood boarding ¾ inch thick by eight (8) feet by four (4) feet shall
EDSD
be installed on at least two walls within the rooms and painted with
two (2) coats of fire retardant white paint.
DATE:
BY:
The cable support system inside the TER/TR shall be Ladder type
REVISIONCERTIFICATION
trays. Cable Trays fittings and hardware include, but not limited to:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
hangers, ground straps, fixtures etc. The size and layout of the
C
detail design.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG A full complement of mounting brackets shall be incorporated in the
SAY
SAY
SAY
design which shall include but not limited to threaded rod bracket
kits, ladder rack bracket kits, wall bracket kits and all other
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
room or space.
12/28/16
12/14/16
12/18/16
extended from the TER to a point 1.5 meters from the building foundation.
Please refer to OSP documentation for additional details on the entrance
NO.
REV
G
E
Conduits.
DISCIPLINE
ENGINEER
ALL LEADS
The entrance room/space is typically located within 15m (50ft) of the
DATE: 12/28/16 outside cable entrance point. The entrance facilities shall contain the inter-
PROJECT
ENGINEER building backbone cabling pathways that link a building to other buildings
A M ALMATROOK on site.
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY
Equipment Racks
12/28/16
DATE:
CONSTRUCTION
Cable management system shall be provided using the rack system that
AGENCY supports heavy equipment and high capacity cable for cross-connect or
SHAHZAD YAZDANI
interconnect applications in a telecommunication room.
DATE: 12/28/16
OPERATIONS
Equipment Racks shall be used for the installation of both passive and
ALI H GHAMDI
active equipment required for their complete installation in all
12/28/16
DATE: communication rooms. In locations that require special security or where
CONTROL NUMBER
DATE:
The racks system shall be modular and support copper and fiber cables.
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
components.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
The rack shall be UL listed for 800 pound load rating to accommodate
large networking equipment.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
The rack shall supply space identification of quick and easy location of
rack mount items, double sided#12-24 EIA universal mounting-hole
ENGG CERT
ASH
ASH
ASH
spacing.
LEADS
LEADS
LEADS
ALL
ALL
ALL
The rack shall accept removable, hinged doors and fingers cable
management system. The rack system shall meet all EIA requirements as
defined in EIA-310-D.The standard racks shall be high strength aluminum
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
Each rack shall be bonded together with approved bonding jumpers to the
communications room ground bus bar.
Equipment Enclosures
10-02399-
10-02399-
0001
12/28/16
12/18/16
DATE
communications room but still require voice and data connections to the
LAN enclosures shall have a locking mechanism.
NO.
REV
G
E
DISCIPLINE
ENGINEER
Fan units equipped with a fit for purpose filtration system shall be used,
ALL LEADS where necessary, to ensure that the maximum enclosure temperature
DATE: 12/28/16 does not exceed the manufacturer’s recommended operating temperature
PROJECT
ENGINEER for active equipment.
A M ALMATROOK
Patch panels shall be sized with a minimum 25 percent spare capacity for
DATE:
BY:
future growth and MAC (Moves, Adds & Changes) work. The patch panels
REVISIONCERTIFICATION
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG All horizontal cables serving the information outlets (IO’s) at the IWAs shall
SAY
SAY
SAY
ASH
ASH
ASH
Patch Panels shall be, modular, CAT-6 UTP, with integral high density
punch down style connecting base. The connecting base shall employ
LEADS
LEADS
LEADS
ALL
ALL
ALL
Four pair Category 6 UTP cabling shall be terminated onto four pair punch
down style connecting hardware mounted to the rear (integral to the patch
panel) to the category 6 modules on the front face of the patch panel
DESCRIPTION
The wire strip and connecting block, shall be marked with a highly visible
color code and allow for termination of one full pair or four full pairs at a
time.
Port and panels shall be easy to identify with write on areas and optional
label holder for color coded labels.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
racks/enclosures.
12/28/16
12/14/16
12/18/16
DATE
G
E
used as a interconnect.
VERIFICATION
EDSD
Patch cords shall use 24 AWG stranded Category 6 cable. The cable shall
be terminated onto eight position punch down style plugs (R-J45 modular
DATE:
BY:
plugs featuring a one piece, tangle free latch design and strain relief boots)
REVISIONCERTIFICATION
and tested to exceed the Category 6 performances when used with the
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
The patch cords shall use grey cords with grey connectors, shall be field
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG terminable and shall employ a clear cap for wiring identification.
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
provided to terminate the cables. Patching within the cabinets /racks shall
be via dual SC-SC connector fiber patch cables.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
The fiber patch cords and pigtails shall be constructed from high
performance single mode optical fiber cable with SC connectors.
Integral boots shall be provided to provide strain relief and help maintain
consistent polarity.
The fiber Patch cords come in lengths of one, two and three meters.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
Cable Management
0001
0001
12/28/16
Cable management shall be used to provide a neat and efficient means for
12/14/16
12/18/16
DATE
routing and protecting fiber and copper cables and patch cords on the
equipment racks and enclosures. The system shall be complete cable
NO.
REV
G
E
bend radius and providing cable strain relief. Panels shall be universal
C
design mounting to EIA 19” racks and constructed of steel base with
(DCC) NO. _____________________
plastic fingers. The duct fingers shall include retaining tabs to retain the
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG cables in place during cover removal. The covers shall be easily removed
SAY
SAY
SAY
ASH
ASH
ASH
The cable mangers shall be provided with wire retainers to retain the
cables during cover removal and # 12-24 English and M6 metric mounting
LEADS
LEADS
LEADS
ALL
ALL
ALL
screws. The two rack unit space, horizontal cable management panel shall
be provided between two modular patch panels.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
Backbone Cabling
10-02399-
10-02399-
0001
facilities.
12/14/16
12/18/16
DATE
The Backbone fiber optic cable shall be glass cable, single mode fiber
NO.
REV
G
E
The Fiber Optic cables shall be designed with Reverse Oscillated Lay
Stranding Method to facilitate mid-span access of fibers. All the Fiber Optic
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Patch cords of same specification shall be used for the indoor distribution
C
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
The type of Backbone copper cable shall be 100 ohms unshielded twisted
pair multi-pair cable.
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Punch down 110 base and system, Cat-6 ( Cat3) UTP cable shall be
terminated upon a standard density 110 style cat-6 connecting block,
providing for termination of four pair cables.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
Protection Units
12/28/16
12/14/16
12/18/16
protector unit at the demarcation point of every building. All protector units
shall be grounded according to the manufactures recommendations.
NO.
REV
G
E
DISCIPLINE
ENGINEER Cross Connecting Hardware
ALL LEADS
DATE: 12/28/16 Category 6 UTP patch cord shall be used between 110 style connecting
PROJECT
ENGINEER bases when configured as a cross-connect or between connecting block
A M ALMATROOK and networking hardware when the connecting block is used as an
DATE: 12/28/16 interconnect. Patch cords shall be 24 AWG stranded Category 6 cable.
CERTIFIED
AMR EL SHARKAWY
The cable shall be terminated onto 110 style plugs tested to exceed CAT-6
12/28/16
performance when used in a channel with the specified category 6
DATE:
CONSTRUCTION
modules.
AGENCY
SHAHZAD YAZDANI
The patch cords shall be factory terminated with modular plugs featuring a
DATE: 12/28/16 one piece, tangle free latch design and black strain relief boots. No field
OPERATIONS
terminated patch cords or cross-connects shall be used for the permanent
ALI H GHAMDI
installation.
12/28/16
DATE:
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
General
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG All horizontal cabling shall be CAT6 UTP, plenum rated, 24 AWG 100
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Plenum cable shall be utilized for the horizontal cable distribution network
where cables are subjected to airflow and are not totally enclosed in steel
conduit. Other areas shall use non-plenum grade in NEC & UL.
DESCRIPTION
Bridged taps and splices are not permitted as part of the copper horizontal
cabling.
All horizontal cables shall be terminated onto punch down style UTP, CAT-
10-02399-
JO/EWO
10-02399-
10-02399-
0001
12/18/16
DATE
G
E
Category 6 cables.
DISCIPLINE
ENGINEER
ALL LEADS Horizontal Cable Management
DATE: 12/28/16
PROJECT
ENGINEER All major runs of the horizontal cable shall be installed in a
A M ALMATROOK communications cable tray C-profile perforated, metallic, 75 mm deep and
DATE: 12/28/16 width as per the calculated sizing depending upon the usable area served
CERTIFIED by them.
AMR EL SHARKAWY
12/28/16
DATE: Communication cables or wires shall not be strapped, taped or attached by
CONSTRUCTION
AGENCY any means to the exterior of any conduit or raceway as a means of
SHAHZAD YAZDANI support. All trays shall be installed with the proper bend radius and support
DATE: 12/28/16 for maximum loading.
OPERATIONS
ALI H GHAMDI The maximum fill ratio shall not exceed 40% of the cable installed. A full
12/28/16 complement of fittings must be available including, but not limited to 45
DATE:
CONTROL NUMBER
degree and 90 degree flat, vertical inside and outside elbows, tee and
VERIFICATION
cross fittings, reducers, end caps and all other components necessary to
EDSD
make the system workable. Snap-on or split covers shall be available for
all directional fittings.
DATE:
BY:
REVISIONCERTIFICATION
radius. The communications cable tray shall not be shared with building
C
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
rack bracket kits, wall bracket kits and all other components necessary to
make the system workable. The mounting brackets shall be manufactured
from cold rolled steel with zinc chromate, e-coating or painted black
powder coat finish.
DESCRIPTION
Cables installed in ducts, plenums and other spaces for environmental air
shall be Communication Plenum Cable Type (CMP). Listed plenum
communications raceways shall be installed in ducts and plenums. Cables
installed in vertical runs and penetrating more than one floor, or cables
installed in vertical runs in a shaft, shall be Communication Riser Cable
Type (CMR). Floor penetrations requiring Type CMR shall contain only
10-02399-
JO/EWO
10-02399-
10-02399-
0001
floor.
12/14/16
12/18/16
DATE
Only Type CMP and CMR cables shall be installed in these raceways.
NO.
REV
G
E
DATE: 12/28/16 The work area shall consist of the connectivity equipment used to connect
CERTIFIED the horizontal cabling subsystem and the equipment in the work area. The
AMR EL SHARKAWY
connectivity equipment might include the following options:
12/28/16
DATE:
CONSTRUCTION
AGENCY Patch(equipment cords) and modular connectors
SHAHZAD YAZDANI Outlet and surface mount boxes
DATE: 12/28/16 Surface raceway and outlet poles
OPERATIONS
ALI H GHAMDI
Information Outlets (IO) and surface mount boxes
12/28/16
DATE:
CONTROL NUMBER
Each building shall be pre-wired for voice/data and Wireless Local Area
VERIFICATION
provided for each room. Two (2) CAT6 4-pair horizontal cables shall be
BY:
routed, terminated and certified from the Information Outlet to the patch
REVISIONCERTIFICATION
The maximum CAT6 cable length between the IO and patch panels shall
be 90 meters.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
All insert modules shall be 8P8C, non-keyed, modular RJ45 jack with
pin/pair assignments wired per T568B standard termination.
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
In cases where the conduits originate from the data cabinet but partial run
12/28/16
is flushed floor before serving the outlet, the amount of run above ground
12/14/16
12/18/16
DATE
shall be 1” diameter EMT and that under the ground shall be 1” diameter
PVC coated RSC. At each end of the conduits, bushings shall be provided
NO.
REV
G
E
depths. Each faceplate shall accept outlet modules that can be individually
EDSD
Power poles can be used as pathways for the horizontal cable from the
REVISIONCERTIFICATION
ceiling to the work areas. Power poles that are used for voice, data and
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
power cable shall be listed for the applications with a divider for
C
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
Fire Stopping
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Communications Grounding
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
10-02399-
10-02399-
0001
power cables, even when isolated by metallic conduits. The location of the
0001
0001
bus bar shall be designed for attaching entrance facility equipment and
12/28/16
12/18/16
DATE
The TGB is the bar used to ground the passive and active components
NO.
REV
G
E
inside the communications room. The TGB shall be a predrilled electro tin
DISCIPLINE
ENGINEER
plated copper bus bar provided with standard NEMA bolt hole sizing and
ALL LEADS spacing. Minimum dimensions for the TGB are 6 mm (1/4 in) thickness x
DATE: 12/28/16 50 mm (2 in) width. Length can vary as required in each communications
PROJECT
ENGINEER room.
A M ALMATROOK
DATE: 12/28/16 All bonding conductors shall be a minimum of No. 6 AWG insulated copper
CERTIFIED using listed 2-hole compression connectors. Each bonding conductor shall
AMR EL SHARKAWY
be labeled per ANSI/TIA/EIA 606. All bonding conductors shall be marked
12/28/16
DATE: by a distinctive green color and be tagged with the label.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI EXPANSION CAPABILITIES
DATE: 12/28/16
OPERATIONS Unless specified otherwise, the following shall apply.
ALI H GHAMDI
12/28/16 SCS horizontal cabling shall have two (2) or three (3) UTP cables wired to
DATE:
CONTROL NUMBER
The backbone cable system shall be sized with a minimum of 50% spare
capacity, allowing for future expansion.
DATE:
BY:
REVISIONCERTIFICATION
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Distribution Design (BICSI RCDD) to ensure that a minimum level of
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Installation
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
Quality
10-02399-
10-02399-
0001
0001
0001
CONTRACTOR shall label each wire and cable in each end indicating the
12/28/16
12/18/16
DATE
G
E
CONTRACTOR shall neatly arrange all cables on the cable ladder rack,
DISCIPLINE
ENGINEER
cable tray, or supports to prevent twisting and unnecessary crossover of
ALL LEADS cables. All signal cables and wiring shall be secured.
DATE: 12/28/16
PROJECT
ENGINEER Plant Tagging
A M ALMATROOK
DATE: 12/28/16 CONTRACTOR shall be responsible for tagging all equipment and the
CERTIFIED verification of proper tagging shall be carried out as part of the mechanical
AMR EL SHARKAWY
completion inspection.
12/28/16
DATE:
CONSTRUCTION
AGENCY Testing and Inspection of UTP Cables
SHAHZAD YAZDANI
and near end cross talk (NEXT) at the following frequencies: 1 MHz,
4.0 MHz, 25 MHz and 250 MHz as a minimum. Insertion loss and
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG cross talk must be measured with a cable length of at least 305
SAY
SAY
SAY
meters (1000 ft). If the cable lengths are greater than 305 m, the
results must be normalized to 305 m for comparison with the
ENGG CERT
ASH
ASH
ASH
manufacturer’s data.
LEADS
LEADS
LEADS
ALL
ALL
ALL
Figures 18-D and 18-E show the test set up for insertion loss and
NEXT respectively. The frequency oscillator must be set to the
correct frequency, level (0 dBm), and source impedance (100 ohm).
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
The level of meter must cover the required range of frequencies and
a wide range of sensitivity down to 100 dBm. Test cords must be
short and calibrated according to ANSI/EIA/TIA-5
DESCRIPTION
10-02399-
10-02399-
0001
0001
0001
25
100
12/28/16
12/14/16
12/18/16
200
DATE
250
NO.
REV
G
E
Use this table to record the measure value as a result of testing on the cable.
DISCIPLINE
ENGINEER
ALL LEADS
On the basis that an estimated 360 cable reels of 305 meters each will be used, it is
DATE: 12/28/16 proposed to select 50 random samples for measurement. If the measured values exceed
PROJECT
ENGINEER (in the case of insertion loss) or are less than (in the case of NEXT) the manufacturer’s
A M ALMATROOK specifications by more than 5% at any frequency, the results must be reported to the
DATE: 12/28/16 SAUDI ARAMCO Representative and another lot of samples will be chosen for testing. If
CERTIFIED
AMR EL SHARKAWY
the second lot of samples fails again, the batch must be rejected.
12/28/16
DATE:
CONSTRUCTION
After installation, all copper cable pairs shall be tested for circuit continuity (end to end),
AGENCY split pairs, pair-to-pair short, attenuation and noise as specified in SAES-T-634. The
SHAHZAD YAZDANI
recommended test set is fluke Omni scanner.
DATE: 12/28/16
OPERATIONS
ALI H GHAMDI
12/28/16
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG All horizontal cabling must be tested in accordance with TIA/EIA TSB 67 known as
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
12/28/16
12/14/16
12/18/16
NO. DATE
REV
G
E
DISCIPLINE
ENGINEER
ALL LEADS
DATE: 12/28/16
PROJECT
ENGINEER
A M ALMATROOK
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY
12/28/16
DATE:
CONSTRUCTION
AGENCY
The SCS installation and testing shall be performed by Category 6 cable
SHAHZAD YAZDANI
manufacturer certified installer.
DATE: 12/28/16
OPERATIONS
ALI H GHAMDI
Test results shall be signed by the Category 6 cable manufacturer certified
12/28/16
installer in each sheet and witnessed by SAUDI ARAMCO Representative.
DATE:
CONTROL NUMBER
VERIFICATION
Test results shall be submitted at least two copies (both hard & soft copy)
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG After CONTRACTOR has carried out installation, certified UTP
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
2. Length
3. NEXT
4. Attenuation
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
5. ELFEXT
6. Delay & Delay Skew
7. Return Loss
8. Power Sum Cross talk (PS Next & PS Elfext)
DESCRIPTION
Fluke Omni scanner is to be used for these tests. Records for every
cable shall be printed out and kept for future reference.
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
G
E
The Field Test Report will consist of the following information in order:
DISCIPLINE
ENGINEER
ALL LEADS Type of test and name of systems tested.
DATE: 12/28/16 Copy of the Test Procedure(s) that have been followed.
PROJECT
ENGINEER Copies of the completed and signed test Record Forms.
A M ALMATROOK Summary discussion of the test performed and the overall results.
DATE: 12/28/16 Discussion of any problems encountered and how they were
CERTIFIED
AMR EL SHARKAWY resolved.
12/28/16 Test Equipment List.
DATE:
CONSTRUCTION
AGENCY
Quality Control
SHAHZAD YAZDANI
DATE: 12/28/16
OPERATIONS
The installation team chief on a daily basis performs QA/QC inspections
ALI H GHAMDI
during the equipment installation. Monitoring may also be conducted by
12/28/16
SAUDI ARAMCO Operations personnel on their own and notify the
DATE:
installation team of findings.
CONTROL NUMBER
VERIFICATION
Design Drawings
EDSD
DATE:
Two sets of design drawings are available during each site installation.
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
Safety Equipment
ENGG CERT
ASH
ASH
ASH
First aid kits, fire extinguisher, hard hats, safety shoes, and other safety
devices will be prepared for safety personnel before testing.
LEADS
LEADS
LEADS
ALL
ALL
ALL
Proof of Performance
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
General
This test plan describes the requirements for testing copper cables for
voice and data circuits.
10-02399-
10-02399-
0001
0001
Volt Ohmmeter
0001
12/18/16
G
E
Reference Documents
DISCIPLINE
ENGINEER
ALL LEADS
As-Built Drawings
DATE: 12/28/16
Approved Test Procedures
PROJECT
ENGINEER SAUDI ARAMCO Standards : SAES-T-634
A M ALMATROOK
Test Equipment Manuals for Volt-Ohmmeter, Megger (Insulation
DATE: 12/28/16 tester), and PCM - 23 (VF tester)
CERTIFIED
AMR EL SHARKAWY
12/28/16
DATE:
CONSTRUCTION DESIGN DRAWINGS
AGENCY
SHAHZAD YAZDANI
General
DATE: 12/28/16
OPERATIONS
ALI H GHAMDI
CONTRACTOR shall list all required drawings in the Non-Material
12/28/16
Requirement (NMR).
DATE:
CONTROL NUMBER
VERIFICATION
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
For each drawing created via a CADD system, the relevant CADD
computer files shall be provided to SAUDI ARAMCO in the form of
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Purchase order shall be placed immediately for long lead items. All
DESCRIPTION
10-02399-
10-02399-
0001
0001
0001
All “NMRs” that have changed since the PDR and all new “NMRs” shall
12/28/16
12/18/16
DATE
As-Built Drawings
NO.
REV
G
E
DISCIPLINE
ENGINEER
After completion of the Site Acceptance Test (SAT), pre-commissioning
ALL LEADS and commissioning, CONTRACTOR shall update the drawings to reflect
DATE: 12/28/16 any changes. These drawings shall be clearly marked “As-Built” and
PROJECT
ENGINEER dated.
A M ALMATROOK
DATE:
12/28/16 Certificates of Acceptance
CONTROL NUMBER
VERIFICATION
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
ASH
ASH
ASH
SCOPE DESCRIPTION
LEADS
LEADS
LEADS
ALL
ALL
ALL
GENERAL
This project shall provide 24-core single mode fiber optic cables 8/125
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
microns 1310 nanometer in Star Topology from the E & M Bldg to the
Operation Building, Utility Substation, Operator Shelter, Receiving
Substation, Security Support building Main Gate and Security Support
Building Tank Farm. All terminations will be done on proposed 24-core
DESCRIPTION
In addition, this project shall provide 2-24 core single mode fiber optic
cable infrastructures to be installed for communication systems from
Engineering & Maintenance Bldg. to Yanbu refinery. All terminations will
be done on proposed 24-ports fiber patch panels.
10-02399-
10-02399-
0001
0001
12/18/16
DATE
In addition, this project shall provide 4-12 core single mode fiber optic
cable infrastructures to be installed for control and communication
NO.
REV
DATE:
12/28/16
In addition, this project shall provide 5-24 core single mode FO cable
CONSTRUCTION
AGENCY
infrastructure to be installed for Fire Alarm System from Operation Bldg
SHAHZAD YAZDANI to Receiving Substation, Operation Bldg to Utility Substation, E&M
DATE: 12/28/16 Building, Operation Bldg to Security Support Main Gate, Operation Bldg
OPERATIONS to Security Support Computer Gate.
ALI H GHAMDI
DATE:
12/28/16 The design of the fiber optic cable shall be such that the performance
objectives of the System are achieved when the cable has been
CONTROL NUMBER
VERIFICATION
The System shall provide permanent cabling for Local Area Network
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
(LAN Enterprise) and Process Control System (PCS). These cables shall
C
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG such as pedestals, pedestal guards, marker posts, grounding protection,
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
This project shall provide 200-pair copper cables from the Operation
Building and to be distributed to the following buildings:
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
1. E & M Building
2. Operation Building
3. Operator Shelter
DESCRIPTION
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
G
E
DISCIPLINE
ENGINEER
The proposed copper cable shall be used for analog telephones for
ALL LEADS emergency purposes.
DATE: 12/28/16
PROJECT
ENGINEER
The X-RAY Bldg. and Security Gatehouse of Main Gate & Tank Farm,
A M ALMATROOK Voice & data requirements can be served through the proposed POE
DATE: 12/28/16 Ethernet switch and analog line via proposed 1571 OSP cable from the
CERTIFIED main protector in the Security Support building to the remote protector in
AMR EL SHARKAWY
the Security Gatehouse. Such cable will be installed through PVC 2-4’’Ø
12/28/16
DATE: PVC duct to be encased in concrete.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI The design of the copper cable network shall be such that the
DATE: 12/28/16 performance objectives of the System are achieved when the cables
OPERATIONS have been manufactured, installed, spliced and terminated.
ALI H GHAMDI
DATE:
12/28/16 The System shall provide permanent cabling for local distribution (Analog
and special services) to the designated locations in the Yanbu Distribution
CONTROL NUMBER
VERIFICATION
Hub Plant areas. The copper cable shall be designed for direct buried or
EDSD
pairs with varying lay lengths to minimize crosstalk and specific color
REVISIONCERTIFICATION
assembled into units, which are then used to assemble the core. Units are
C
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG compound, completely filling the interstices between the pairs and under
SAY
SAY
SAY
the core wrap. A corrugated steel wrap, is applied over the core assembly
to provide protection for the core. North American color coded insulation. A
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
G
E
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Equipment manuals
OF THIS DRAWING IS COVERED, FOR ALL
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
System is provided.
applicable.
10-02399-
10-02399-
0001
specialist tools that are required to operate and maintain the test
0001
0001
equipment.
12/28/16
12/14/16
12/18/16
DATE
Spares
NO.
REV
G
E
DATE: 12/28/16 The design of copper cables shall be such that the performance
CERTIFIED objectives of the system are achieved when the cables have been
AMR EL SHARKAWY
manufactured, installed, spliced and terminated.
12/28/16
DATE:
CONSTRUCTION
AGENCY The system shall provide permanent cabling for local distribution (Analog
SHAHZAD YAZDANI and special services) to the designated locations. The copper cable shall
DATE: 12/28/16 be designed for direct buried or underground duct application. Conductor
OPERATIONS shall be solid annealed multi pair copper conductors are in 22 and 26
ALI H GHAMDI AWG. Individual conductors are twisted into pairs with varying lay
12/28/16 lengths to minimized crosstalk and specific color combinations to provide
DATE:
CONTROL NUMBER
pair identification. Cables larger than 25 pairs are assembled into units,
VERIFICATION
which are then used to assemble the core. Units are individually
EDSD
identifiable by color coded unit binders. The core assembly is filled with
80ºC (198ºF) ETPR (External Thermal Plastic Rubber) compound,
DATE:
BY:
completely filling the interstices between the pairs and under the core
REVISIONCERTIFICATION
provide protection for the core. North American color coded insulation. A
C
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG marked information such as manufacture’s identification, pair count,
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Copper cable will be installed from the Operation Building branch spliced
to different buildings. Buildings to be served are the following.
DESCRIPTION
Operation Building 25
Operator Shelter 25
10-02399-
JO/EWO
10-02399-
10-02399-
25
0001
0001
12/18/16
DATE
Metering Shelter 25
NO.
REV
G
E
DISCIPLINE
ENGINEER
Security Support Building, Tank Farm 25
ALL LEADS
A M ALMATROOK
Security Support Building, Main Gate 25
DATE: 12/28/16
CERTIFIED Government Security Facility 25
AMR EL SHARKAWY
12/28/16
DATE:
CONSTRUCTION
AGENCY For further details on the fiber optic cable routing, refer to the following
SHAHZAD YAZDANI
drawings:
DATE: 12/28/16
OPERATIONS
ALI H GHAMDI DRAWING NO. SHEET NO. DRAWING TITLE
12/28/16 CO-A10067 001-002 COPPER SCHEMATIC DIAGRAM -YDH
DATE:
CONTROL NUMBER
VERIFICATION
DATE:
The design of the fiber optic cable shall be such that the performance
BY:
objectives of the System are achieved when the cable has been
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
The above fiber optic system shall be used to link those buildings that
require data type service in the proposed Yanbu Distribution Hub.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
For further details on the fiber optic cable routing, refer to the following
drawings:
DESCRIPTION
10-02399-
10-02399-
0001
CO-A10005 001
0001
0001
12/18/16
DATE
CO-A10074 001
FOC-OPERATION BLDG, RIB1, RIB2
NO.
REV
G
E
DISCIPLINE
ENGINEER
The exact cable routings shall be verified by CONTRACTOR during detailed
ALL LEADS design, and, if required, alternative routings shall be recommended by
DATE: 12/28/16 CONTRACTOR.
PROJECT
ENGINEER
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Attenuation discontinuities at 13100nm <0.1 dB
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Cable Design
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
General
The structure of the cable core shall permit high cable flexibility with minimum
stress to the individual fibers.
DESCRIPTION
CONTRACTOR shall use a loose, fiber bundle (tube) or a slotted core type
cable with multiple fibers per tube or slot.
The core shall be filled with a compound to inhibit water migration and wrapped
10-02399-
JO/EWO
10-02399-
10-02399-
0001
12/28/16
12/18/16
DATE
G
E
The filling compound shall not affect the color of the individual fibers.
DISCIPLINE
ENGINEER
ALL LEADS The filling compound shall be non-toxic and present no dermal hazards.
DATE: 12/28/16
PROJECT
ENGINEER The drop point of the filling compound shall not be less than 80 deg. C.
A M ALMATROOK
DATE: 12/28/16 The filling compound shall remain stable and unaffected by long term exposure
CERTIFIED to weather.
AMR EL SHARKAWY
12/28/16
DATE: The filling compound shall have chemical and mechanical compatibility with
CONSTRUCTION
AGENCY other cable components and splicing hardware.
SHAHZAD YAZDANI
cable.
EDSD
The cable jacket shall be of a high molecular weight, black polyethylene with a
DATE:
BY:
thickness that is suitable for the proposed environment, but not less than 3.0
REVISIONCERTIFICATION
mm.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
The cable jacket shall have permanent surface printed sequentially numbered
length markers at one meter intervals.
ENGG CERT
ASH
ASH
ASH
The cable jacket shall have permanent surface printed marks at regular
LEADS
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
2. Operation Building
0001
0001
0001
12/18/16
DATE
4. Utility Substation
5. Operator Shelter
NO.
REV
G
E
Single mode fiber optic cables 24 strands will be installed from the
DATE:
instrument rack room at the new Operation building to RIO Building 2 (RIB-
BY:
2) under this BI for the ESD System. The route of the fiber should be
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
redundant and diverse. Process control System will assign dedicated fiber
OF THIS DRAWING IS COVERED, FOR ALL
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Single mode fiber optic cables 24 strands will be installed from the
SAY
SAY
SAY
instrument rack room at the new Operation building to RIO Building 2 (RIB-
2) under this BI for the DCS System. The route of the fiber should be
ENGG CERT
ASH
ASH
ASH
redundant and diverse. Process control System will assign dedicated fiber
strands assignment for the DCS system.
LEADS
LEADS
LEADS
ALL
ALL
ALL
Single mode fiber optic cables 12 strands will be installed from the new
Operation building to YASREF Control System under this BI. Process
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
control System will assign dedicated fiber strands assignment for various
control system.
Single mode fiber optic cables 12 strands will be installed from the new
DESCRIPTION
Single mode fiber optic cables 48 strands will be installed from the new
Operation building to Yanbu Refinery Control System under this BI.
Process control System will assign dedicated fiber strands assignment for
various control system.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
12/28/16
12/18/16
DATE
G
E
12/28/16
DATE: System Design Life and Reliability
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI The conduit system shall be designed and engineered to retain usable for
DATE: 12/28/16 75 to 100 years and fulfill design requirements and specifications
OPERATIONS
ALI H GHAMDI Other Materials
12/28/16
DATE:
All other materials that might be required during the course of the work will
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG materials procured.
SAY
SAY
SAY
CABLE PLACEMENT
ENGG CERT
ASH
ASH
ASH
General
LEADS
LEADS
LEADS
ALL
ALL
ALL
The fiber optic cable minimum bending radius and maximum pulling
tensions shall be in accordance with SAES-T-624 (Sections 4.1.10 and
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
4.1.11) and the fiber optic cable manufacturer’s specifications. The optical
fiber cable shall not be cut for convenience during placement. Splices shall
be located in accordance with the design drawing provided by
CONTRACTOR and approved by SAUDI ARAMCO.
DESCRIPTION
This Specification covers the expected types of cable and civil construction
work normally required to prepare the fiber optic cable facilities up to and
including cable splicing and work as required.
10-02399-
10-02399-
0001
12/18/16
DATE
G
E
quantities by CONTRACTOR.
DATE:
BY:
promptly notified, with written follow-up, of any damage that occurs during
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG construction.
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Installation work shall not commence before the relevant permits have
10-02399-
JO/EWO
10-02399-
10-02399-
0001
12/28/16
12/18/16
DATE
G
E
loose rock and solid rock. Backfill of the excavated material or bringing-in
DISCIPLINE
ENGINEER
of new fill may be required. The hauling away of excavated material and
ALL LEADS removal of above-grade debris/soil to an approved SAUDI ARAMCO site
DATE: 12/28/16 may be required. . The filling materials shall comply with SAES A 114.
PROJECT
ENGINEER
construction crew.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
For the safety of personnel and for purposes of maintaining stability of the
excavation, the excavation work shall include all necessary timbering,
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Excavations shall not be kept open any longer than reasonably necessary
to perform the intended Work.
The detail design drawing shall specify the scope, location and deep of
excavation. If a survey marker and/or a monument is damaged as a
consequence of the Work, CONTRACTOR shall be responsible for any
fines, where applicable, repairing such marker and/or monument and
returning the same to its original place without any additional
10-02399-
JO/EWO
10-02399-
10-02399-
0001
compensation.
0001
0001
12/28/16
12/18/16
DATE
G
E
Trenching
DISCIPLINE
ENGINEER
ALL LEADS Trench excavation is required, to lay direct buried cable or place conduits
DATE: 12/28/16 in the core area, plant area and open desert area. All kinds of soil
PROJECT
ENGINEER conditions may be encountered. These Specifications are intended to
A M ALMATROOK cover the various approved methods of trenching and laying cables or
DATE: 12/28/16 conduits under the expected range of soil and field conditions.
CERTIFIED
AMR EL SHARKAWY
The detail design drawings shall describe the required location, alignment,
12/28/16
DATE: length and depth of cable or conduits to be placed by the trenching
CONSTRUCTION
AGENCY method.
SHAHZAD YAZDANI
DATE: 12/28/16 The reference standards and drawing shall detail the requirements of
OPERATIONS construction.
ALI H GHAMDI
rock saw.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
water or other pipelines and telephone/ power cable facilities and such
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG SAES-B-064.
SAY
SAY
SAY
ASH
ASH
ASH
and excavate the trench as narrow as possible and place 4” PVC concrete
encased conduits as per SAES-T-928 Para 6.1.5. The disturbed roadbed
LEADS
LEADS
LEADS
ALL
ALL
ALL
shall be restored with the original type of fill and compacted to the
requirements of the relevant Road Authority. Hot mix asphalt shall be used
to restore the pavement to original condition.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
Warning tape (terra tape) shall always be installed above the cable or
conduits. Refer to standard Drawing AA-036748.
A trench shall not be left open any longer than necessary. Cables or
conduits shall be placed concurrently with trench work, inspected and
10-02399-
JO/EWO
10-02399-
10-02399-
0001
12/28/16
12/18/16
DATE
SCOPE DESCRIPTION
NO.
REV
G
E
DISCIPLINE
ENGINEER
General
ALL LEADS
DATE: 12/28/16 This defines the scope of CONTRACTOR to procure, design, install,
PROJECT
ENGINEER integrate, test and commission a TETRA base station at the new Operation
A M ALMATROOK and Maintenance Engineering building and associated radio terminals and
DATE: 12/28/16 accessories.
CERTIFIED
AMR EL SHARKAWY
CONTRACTOR shall provide indoor and outdoor coverage in Yanbu
12/28/16
DATE: Distribution Hub operational area. This new TETRA base station and
CONSTRUCTION
AGENCY TETRA Dispatch Workstations shall be integrated to the existing Saudi
SHAHZAD YAZDANI Aramco TETRA network in Yanbu NGL SCN network. All interfaces, cards
DATE: 12/28/16 and services required for integration with existing TETRA Network shall be
OPERATIONS
provided by CONTRACTOR.
ALI H GHAMDI
12/28/16
DATE: CONTRACTOR shall design, install, test and commission new antenna
CONTROL NUMBER
and transmission line system for the TETRA base station. The antenna
VERIFICATION
and transmission line system shall be installed on the proposed 25M Self-
EDSD
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
1 12 DAS-SHELTER-1
2 13 DAS-SHELTER-2
3 18 METERING ROOM-MARAFIQ
4 SS-XXX1 RECEIVING STATION TRANSFORMER YARD
5 SS-XXX2 REMOTE I/O BUILDING
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
result of RF coverage required for suitable radio and indoor amplifier study.
In addition, antenna mast support, lightning arrestor and grounding system
should be included.
NO.
REV
G
E
DISCIPLINE
ENGINEER CONTRACTOR shall install antenna grounding and feeder system, and all
ALL LEADS
its ancillaries as per SAES-T-795 and SAES-T-887.
DATE: 12/28/16
PROJECT
ENGINEER CONTRACTOR shall be install outdoor antenna with 5 db gain or better.
A M ALMATROOK An undistorted radiation pattern shall be ensured by optimal placement of
DATE: 12/28/16 the antenna. All materials required for the complete installation of RFDT,
CERTIFIED
AMR EL SHARKAWY
including the radio, transmission line, connectors, antenna, conduits,
12/28/16 grounding, electrostatic protection, and wall penetration port shall be
DATE:
CONSTRUCTION
provided.
AGENCY
SHAHZAD YAZDANI
CONTRACTOR shall perform all necessary Indoor signal coverage
DATE: 12/28/16
analysis in all buildings, frequency study to determine the optimum
OPERATIONS
antenna type, transmission line system, antenna height, and antenna
ALI H GHAMDI
system configuration that assure radio coverage at Yanbu operational
12/28/16
DATE: area.
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
CONTRACTOR shall install the Dispatch Work Stations inside the Room
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG CONTRACTOR shall provide HPR encryption and authentication keys.
SAY
SAY
SAY
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
End-User Terminal
10-02399-
10-02399-
0001
0001
0001
a. Programming Tools
12/28/16
12/14/16
12/18/16
DATE
G
E
DISCIPLINE
interface data port to configure the radio terminals.
ENGINEER
ALL LEADS
Tools for remote and centralized multi-programming of end-user radios
DATE: 12/28/16
PROJECT
shall be provided to enable off-site programming. The remote
ENGINEER programming kit shall be interconnected to the master terminal through the
A M ALMATROOK SAUDI ARAMCO corporate data network.
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY
Dispatcher Work Station (DWS)
12/28/16
DATE: CONTRACTOR shall install the Dispatch Work Stations inside Room 204
CONSTRUCTION
AGENCY of Yanbu Distribution Hub Maintenance & Engineering. Specifications are
SHAHZAD YAZDANI provided in terms of the workstation features, network interfacing,
DATE: 12/28/16 equipment hardware and accessories.
OPERATIONS
ALI H GHAMDI The table below identifies the key buildings to be equipped with DWS:-
12/28/16
DATE:
DWS Location Quantity
CONTROL NUMBER
VERIFICATION
DATE:
BY:
a. Network Interfacing
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
the SCN. For details refer to Block and Level Diagram-TETRA DWS
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
b. Power
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
a. Locating Feature
12/28/16
12/14/16
12/18/16
DATE
G
E
DISCIPLINE
b. Hazardous Classified Area Requirements
ENGINEER
ALL LEADS
The minimum Equipment Protection Level for handheld radios and its
DATE: 12/28/16
PROJECT
portables accessories shall be:
ENGINEER
A M ALMATROOK
Class 1, Zone 1, Gas Groups IIC (Acetylene, Hydrogen, Ethylene &
DATE: 12/28/16
CERTIFIED
Propane).
AMR EL SHARKAWY
12/28/16 All handheld and portable Digital Trunked radio devices shall be
DATE:
CONSTRUCTION intrinsically safe “ib” or “ia”.
AGENCY
SHAHZAD YAZDANI
All handheld devices shall adhere to the requirement of GI-0006.008 in
DATE: 12/28/16
OPERATIONS
terms of restriction, labelling and use.
ALI H GHAMDI
12/28/16
The Hand held radios (HPRs) shall be certified intrinsically Safe and
DATE:
adhere to Hazardous and Environmental classified areas requirement
CONTROL NUMBER
VERIFICATION
c. Environmental Specifications
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
+50 degrees Celsius and have protection against humidity, water and
OF THIS DRAWING IS COVERED, FOR ALL
dust. The HPR shall have loud voice which can operate in noisy areas.
(DCC) NO. _____________________
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
The weight of an HPR shall be less than 450 grams its dimensions
within the 165x65x45mm limits.
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
12/18/16
provided.
NO.
REV
G
E
DATE: 12/28/16 Six(6) VMRs will be provided under BI-02399. The exact quantity of VMRs
CERTIFIED
AMR EL SHARKAWY
will be finalized during the radio coverage analysis and traffic study.
12/28/16
DATE:
VMR Transmitter/Receiver Specifications:
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI Frequency 410-430 MHz
DATE: 12/28/16 Transmitter RF Power 3 Watt or higher
OPERATIONS RF Channel Bandwidth 25 KHz
ALI H GHAMDI RF Power Control Steps 5 dB
12/28/16
Receiver Static Sensitivity -112 dBm or better
DATE: Receiver Dynamic Sensitivity -103 dBm or better
CONTROL NUMBER
For details, refer to VMR Block Diagram Drawing No. CO-A00006 sheet
BY:
001.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
General Specification
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
ASH
ASH
ASH
ALL
ALL
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
Sheet 001.
10-02399-
10-02399-
0001
0001
12/18/16
DATE
G
E
F
DATE: 12/28/16 Security gates shall be provided and installed with outdoor
PROJECT
ENGINEER speakers to support personnel operations.
A M ALMATROOK
12/28/16
RFDTs shall be provided with all the required hardware including
DATE:
mounting brackets, RF feeder cables, data cables and connectors,
CONSTRUCTION
AGENCY Equipment rack and rack mounting kits shall be provided to mount
SHAHZAD YAZDANI
RFDTs inside Telecommunications Equipment Rooms. Surge protectors
DATE: 12/28/16 and grounding kit shall also be provided.
OPERATIONS
ALI H GHAMDI
RFDT Antenna Systems
12/28/16
DATE:
CONTROL NUMBER
RFDTs shall be provided with outdoor antenna, the antenna shall be 5 dBi
VERIFICATION
RFDT antennas shall be provided with built-in ground plate for grounding.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
The antenna size and BUC power shall be based on the link budget
C
analysis specified for the TETRA scope to ensure the minimum BER
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
All materials required for the complete installation of RFDT's, including the
radio, transmission line, connectors, antenna, conduits (as required),
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
REFERENCE DRAWINGS
DESCRIPTION
Listed below are proposal engineering documents and drawings which shall
be finalized by CONTRACTOR during detail design.
10-02399-
10-02399-
0001
0001
0001
G. TRANSMISSION SYSTEM
12/28/16
12/14/16
12/18/16
DATE
SCOPE DESCRIPTION
SDH Equipment
NO.
REV
G
E
DISCIPLINE
ENGINEER BI-02399 shall provide new Alcatel 1646 SDH node at Yanbu Distribution
ALL LEADS
Hub. The proposed SDH node shall be STM-4 and shall be connected to
DATE: 12/28/16
PROJECT
Yanbu Refinery (60YREF0A
ENGINEER
A M ALMATROOK New STM-4 interface card shall be provided by this BI in Yanbu Refinery to
DATE: 12/28/16 connect the new 1646 SDH at Yanbu Distribution Hub as a spur of
CERTIFIED
AMR EL SHARKAWY 60YREF0A in Yanbu Refinery.
12/28/16
DATE:
CONSTRUCTION
AGENCY
CONTRACTOR shall provide one (1) New ES1-8FE Integrated Services
SHAHZAD YAZDANI
Adapter (ISA) card with 8 Fast Ethernet interface port shall be provided.
DATE: 12/28/16
OPERATIONS
Necessary port and interface cards shall also be provided for E1 interface
ALI H GHAMDI
port. Necessary DDF shall also be provided by the CONTRACTOR.
12/28/16
DATE:
The following circuits require connectivity through the new SDH:
CONTROL NUMBER
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG and Maintenance Building.
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
SCOPE DESCRIPTION
10-02399-
10-02399-
0001
0001
12/18/16
G
E
12/28/16
DATE:
CONSTRUCTION
DRAWING NO. SHEET NO. DRAWING TITLE
AGENCY
SHAHZAD YAZDANI COA00060 001 BLOCK & LEVEL DIAGRAM - TELEPHONY
DATE: 12/28/16 001
COA00061 OVERALL LOGICAL DIAGRAM - DATA
OPERATIONS
ALI H GHAMDI COA00062 001 TRENCH AND CONDUIT LAYOUT
DATE:
12/28/16
COA00063 001 COPPER CABLE SCHEMATIC DIAGRAM
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
C
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG I. EMERGENCY SIREN SYSTEM (ESS)
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
System (ESS). The ESS shall facilitate alarm broadcasting and notification
ALL
ALL
ALL
service for the entire Yanbu Distribution Hub and shall follow SAES-B-071
standard.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
CONTRACTOR shall provide and install ESS Control Station (CS) which
shall be composed but not to be limited to:
JO/EWO
10-02399-
10-02399-
0001
0001
12/18/16
Antenna Cable
Antenna Polyphasor – Lightning Strike Protector
NO.
REV
G
E
DATE: 12/28/16
CONTRACTOR shall provide and install the above Control Station at
CERTIFIED
AMR EL SHARKAWY Yanbu Distribution Hub in Operation Building. Activation of the sounders
DATE:
12/28/16 from the Control Station shall be realized through wireless
CONSTRUCTION
AGENCY
communication/connectivity which shall utilize commercial operating
SHAHZAD YAZDANI frequency between 330-360 Mhz Radio.
DATE: 12/28/16
OPERATIONS CONTRACTOR shall provide and install Stationary Electronic Sirens which
ALI H GHAMDI
shall be composed but not to be limited to:
12/28/16
DATE:
CONTROL NUMBER
BY:
Antenna Cable
REVISIONCERTIFICATION
communication
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG CONTRACTOR shall provide and install the Stationary Electronics Sirens
SAY
SAY
SAY
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall ensure that the sounders for plants alerting shall be
placed at a minimum of 15 meters above local grade. The loudspeakers
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
CONTRACTOR shall provide, install and ensure that the sounders not be
closer than 15 meters to the windows of normally occupied buildings.
DESCRIPTION
CONTRACTOR shall ensure that all installation shall follow all applicable
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
G
E
DISCIPLINE
ENGINEER CO-A100054 001 SYSTEM DIAGRAM, EMERGENCY SIREN SYS.
ALL LEADS
DATE: 12/28/16
PROJECT
ENGINEER J. PAGING SYSTEM
A M ALMATROOK
DATE: 12/28/16 CONTRACTOR shall design, procure, construct, test and commission a
CERTIFIED
AMR EL SHARKAWY permanent, fully flexible, operational, and maintainable In-Plant Paging
12/28/16 System (IPPS).
DATE:
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
This IPPS shall facilitate voice and alarm broadcasting services for the
Yanbu Distribution Hub in accordance with SAES-T-481 (In-Plant Voice
DATE: 12/28/16
OPERATIONS Paging System) and all SAUDI ARAMCO applicable standards.
ALI H GHAMDI
DATE:
12/28/16 Equipment to be provided as part of the System shall meet the best
commercial practices, reliability, maintainability and performance of the
CONTROL NUMBER
VERIFICATION
System.
EDSD
For the System, all equipment shall be located within the battery limits of
DATE:
BY:
the process area of the plant with desktop access units and switching
REVISIONCERTIFICATION
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Master Call Station/Access Units
SAY
SAY
SAY
ASH
ASH
ASH
Audio Messenger
LEADS
LEADS
LEADS
ALL
ALL
ALL
The In-Plant Paging System (IPPS) shall also consist of the following:
Equipment cabinets
0001
0001
12/18/16
DATE
G
E
DATE: 12/28/16
Uninterruptible Power Supply
PROJECT
ENGINEER
A M ALMATROOK
Miscellaneous items where necessary to complete the System
DATE: 12/28/16
design e.g. acoustic booths, enclosures etc.
CERTIFIED
AMR EL SHARKAWY
12/28/16
DATE: Final locations of field devices shall be determined during detailed design;
CONSTRUCTION
AGENCY
however they shall typically cover the main process buildings/plant areas,
SHAHZAD YAZDANI together with the Operation buildings and Control Rooms.
DATE: 12/28/16
OPERATIONS In-Plant Communications equipment shall be able to operate under
ALI H GHAMDI
environmental conditions stated in the SAES-J-003.
12/28/16
DATE:
CONTROL NUMBER
All field equipment shall be suitable for use in its designated area
VERIFICATION
The System shall operate in high noise areas up to 80dBA with the support
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG supported by a remote power amplifier for driving the loudspeakers.
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
12/18/16
DATE
G
E
DISCIPLINE The power for the In-Plant Communications equipment shall be supplied
ENGINEER
ALL LEADS
from the UPS located in either of the Bulk Plant Control Room or Jetty
DATE: 12/28/16
Control Room and shall operate from a 230 VAC.
PROJECT
ENGINEER
A M ALMATROOK
DRAWING NO. SHEET NO. DRAWING TITLE
DATE: 12/28/16 CO-A10047 001 BLOCK & LEVEL DIAGRAM, IN-PLANT PAGING
CERTIFIED
AMR EL SHARKAWY
12/28/16
DATE:
CONSTRUCTION 4.14.1 IT NETWORK ENGINEER APPLICATION REQUIREMENT
AGENCY
SHAHZAD YAZDANI
IT physical infrastructure shall be fully documented in the geographic
DATE: 12/28/16
OPERATIONS information system (GIS) based IT Network Engineer (NE) application. The
ALI H GHAMDI CONTRACTOR shall include as part of his estimate the cost for Network
12/28/16 Engineer updates and documentation. The updates and documentation
DATE:
shall include:
CONTROL NUMBER
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
reserved in NE include:
OF THIS DRAWING IS COVERED, FOR ALL
Power
Space (floor space, rack space, wall space) in any IT Building or
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG IT controlled space (Telecommunication Rooms, etc.)
SAY
SAY
SAY
ASH
ASH
ASH
outlets
Connections to any existing IT Communications Grounding
LEADS
LEADS
LEADS
ALL
ALL
ALL
system
Use of existing Outside Plant (OSP) ducts or sub-ducts
Use of existing Outside Plant (OSP) cable pairs/strands
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
10-02399-
10-02399-
0001
12/28/16
It shall be noted that the IT Network Engineer Access Policy only allows
12/14/16
12/18/16
DATE
G
E
and Documentation Group. Also, the application can only be accessed via
DISCIPLINE
ENGINEER
the SAUDI ARAMCO corporate Network.
ALL LEADS
DATE: 12/28/16 This requirement does NOT change or supersede any existing e- review or
PROJECT
ENGINEER IPlant drawings project submittal requirements.
A M ALMATROOK
Install and Test Fire Water Systems and execute all other work requirements
competently in accordance with SAES-B-017.
DATE:
BY:
REVISIONCERTIFICATION
Fire Water Systems shall be Designed and Installed under the Supervision of a
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
with at least five (5) years of experience in the design of Fire Water Systems.
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG SAUDI ARAMCO procedures for Plan and Equipment submittals.
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Hydraulic Calculations shall be performed using only software that complies with
requirements of SAUDI ARAMCO and calculations of NFPA 13. Software to be
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
Design, Drawings and Calculations for Fire Water and Foam System(s) shall be
supervised by a Registered Professional Engineer in the specialty of Fire
DESCRIPTION
Protection in accordance with SAES-B-070. All Drawings shall bear the seal of
that Registered Engineer. The Systems Detailed Design shall be Reviewed and
Approved by Chief Fire Prevention Engineers Representative.
All Fire Protectioin system shall be designed as per Saudi Aramco, Yanbu Royal
Commision and NFPA standards.
10-02399-
10-02399-
0001
0001
1000 gpm and maximum of 4000 gpm based on the design basis requirement
12/28/16
12/14/16
12/18/16
Firewater demand shall be based on the single largest fire hazard within the
NO.
REV
G
E
facility.
DISCIPLINE
ENGINEER
ALL LEADS Fire Water Storage: Two (2) Fire Water Storage Tanks equal in Size and
DATE: 12/28/16 dedicated only for firewater service shall be provided with total storage capacity
PROJECT
ENGINEER of 12 hours in accordance with SAUDI ARAMCO requirement for Hydrocarbon
A M ALMATROOK storage Facilities.
DATE: 12/28/16
AMR EL SHARKAWY
CERTIFIED
Fire Water Supply: Fire Water supply shall be provided by MARAFIQ – ROYAL
12/28/16
COMMISSION as the primary source. Truck Filling Connection will also be
DATE:
CONSTRUCTION
provided as a backup.
AGENCY
SHAHZAD YAZDANI
Firewater Pumping System: Dedicated Two (2) no. of Electric Driven Fire
DATE: 12/28/16
Pumps as primary Fire pumps, One (1) no. of Diesel Driven Fire Pumps as
OPERATIONS
100% backup Fire Pumps and Two (2) no. of Jockey Pumps (1-Duty & 1-
ALI H GHAMDI
Standby) to maintain the required pressure in the Fire Water Network. The
12/28/16
DATE: design of firewater pumps shall be in accordance with NFPA 20 and SAES-B-
CONTROL NUMBER
Fire Water Distribution: A fire water distribution main shall be looped around
DATE:
the plant areas. Firewater main ring shall be located underground to protect it
BY:
from mechanical damage. Where the main cannot be buried, it shall be suitably
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
protected from vehicle impacts and the effects of fires and explosions. All
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
1FE0U and Above Ground Piping are considered to be FBE Lined Carbon
Steel, as per SAES-L-105, Line Class: 1LE0U. The Fire Water Ring main shall
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG be hydraulically sized for the maximum Demand Flow Rates on the basis of
SAY
SAY
SAY
Dual Feed.
ENGG CERT
ASH
ASH
ASH
Fire Water Hydrants: Fire Hydrants shall be located throughout the facility.
Hydrants shall be located not less than 15m from the protected risk and shall
LEADS
LEADS
LEADS
ALL
ALL
ALL
be spaced not more than 75m apart. Fire Hydrants shall be Wet Barrel type
Hydrants that meet ANSI/AWWA C503 requirements. The Wet Barrel Hydrant
shall be a Listed Commercial Unit that complies with AWWA and has a working
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
Pressure of 1380 kPag (200 PSIG). The Inlet shall be 6 inches in diameter with
approved Flat Face ANSI Flange.
Fixed Foam System: Fixed Deluge Foam Water System shall be provided to
DESCRIPTION
protect Product Transfer Pumps and Shipper pumps with Two (2) no. of Foam
Skid package for Product Transfer pumps areas. Foam System shall be
provided in accordance with SAES-B-018 & NFPA 16 requirements. Transfer
pumps shall cover the pump casing and the floor or area at least 0.6 m (2 ft)
from the periphery of the casing. The suction and discharge flanges, casing
drain valves, gauge connections, balance lines, and pump seals shall be
included in the spray area.
Semi Fixed Foam System: Semi Fixed Foam System to be provided for Open-
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
Top Floating Roof Tanks. This is a vendor Item and will be part of the Tank
Vendor package that will be responsible for the entire semi-fixed foam system
12/28/16
12/14/16
12/18/16
Portable Fire Fighting Equipment: Hand Held and Mobile Fire Extinguishers
NO.
REV
G
E
shall be provided for the Facilities. The Extinguishers shall be Selected and
DISCIPLINE
ENGINEER Positioned in areas of Risk relevant to their application as per SAES-B-019
ALL LEADS
requirements. Where extinguishers are protecting individual equipment, they
DATE: 12/28/16 shall be located at least 7.5m from the equipment’s.
PROJECT
ENGINEER
12/28/16
DATE: o Set not less than 900 mm deep in a Concrete Footing of not less than a
CONTROL NUMBER
400 mm diameter.
VERIFICATION
EDSD
o Set with the Top of the ports not less than 914 mm Above Ground.
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
o Located not less than 900 mm from any part of the Hydrant or Fire
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG o Guard Post shall not be installed in-line (directly in front of) with any of
SAY
SAY
SAY
the Hydrant or Fire Protection Equipment outlets where the Fire Hose is
attached and where the Posts could contact the Hose when it gets
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
o For Above Ground Piping or for Under Ground Piping prior to Burial, newly
installed Fire Protection Systems in Water Service, regardless of materials,
shall be Hydrostatically Tested to 1,380 kPag (200 PSIG) or 345 kPag (50
PSIG) in excess of maximum operating pressure, whichever is greater, and
held without pressure loss for 4 hours. All Piping is required to be Hydro-
Tested, including that of open ended piping for Deluge Systems.
10-02399-
10-02399-
0001
0001
welds and joints cannot be left exposed during Testing. All Hydrostatic
0001
12/18/16
G
E
Acceptance.
DISCIPLINE
ENGINEER
ALL LEADS o Safety Procedures in accordance with GI-0002.102 shall be followed during
DATE: 12/28/16 Pressure Testing.
PROJECT
ENGINEER
A M ALMATROOK o Dry Pipe Fire Protection System shall be Hydro-Tested in accordance with
DATE: 12/28/16 NFPA 13 and SAES-B-017.
CERTIFIED
AMR EL SHARKAWY
C. FIRE PROTECTION CONCEPT
12/28/16
DATE:
CONSTRUCTION
AGENCY CONTRACTOR scope of work shall include but not limited to the, detailed
SHAHZAD YAZDANI engineering design, procurement, quality control and quality assurance
DATE: 12/28/16 documentation, construction, as-built documentation, inspection, testing, pre-
OPERATIONS
commissioning, assistance to commissioning and start-up for all Fire Protection
ALI H GHAMDI
Work associated with this project.
12/28/16
DATE:
CONTROL NUMBER
CONTRACTOR shall Design and Construct the New Fire Piping System
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
C
(Underground) with Piping, Fittings, Fire Hydrant, Fire Monitor, Live Hose reel
and Post Indicator Valves as show on Fire Protection drawing FI-A00011-001
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG and FIA00016-001 .
SAY
SAY
SAY
CONTRACTOR shall provide and install Two (2) new Electric Driven Fire
ENGG CERT
ASH
ASH
ASH
Pumps, One (1) new Diesel Driven Fire Pump along with One (1) Diesel Tank
and Two (2) new Jockey Pumps as shown on drawings # FIA00011-003.
LEADS
LEADS
LEADS
ALL
ALL
ALL
CONSTRUCTION CONTRACTON shall provide Two (2) New Foam Skids for
RE-ISSUED FOR 100% PROJECT PROPOSAL
FIA00013-001.
CONTRACTOR shall provide Deluge Foam Water Spray system with all Piping,
Fittings, Air Aspirated Foam Nozzles, Deluge Valves, Gate Vales, Y-Strainers
DESCRIPTION
for the Product pumps as per SAES-B-017 and SAES-B-070, as shown on Fire
Protection drawings FIA00012-002, FI-A00013-002, FIA00018.001, FIA00019-
001, FIA00019-002, FIA00019-003, FIA00019-007.
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
G
E
DISCIPLINE
CONTRACTOR shall perform Hydro-Testing of complete Fire Protection
ENGINEER System as per SAES-B-017 & SAES-A-004 requirements.
ALL LEADS
DATE: 12/28/16
PROJECT
CONTRACTOR shall install two-wheel, cart type dry chemical, 68 kg size BC
ENGINEER extinguisher units as specified in Table -1, SAES-B-019, They shall be covered
A M ALMATROOK
with the manufacture’s cover or housed inside a roofed, noncombustible shed,
DATE: 12/28/16 with access door facing in the opposite direction of hydrocarbon handling
CERTIFIED
AMR EL SHARKAWY equipment.
12/28/16
DATE:
CONSTRUCTION CONTRACTOR shall install 12.5 Kg BC type dry chemical hand fire
AGENCY
extinguisher shall be provided at least 7.5m for the protect pumps being
SHAHZAD YAZDANI
protected.
DATE: 12/28/16
OPERATIONS
ALI H GHAMDI
All Fire Protection Equipment and Appurtenances shall be purchased as
12/28/16 specified in the SAUDI ARAMCO Materials System and SAES-U-101.
DATE:
CONTROL NUMBER
VERIFICATION
All Below Grade Valves in Fire Protection Systems shall be listed for use in Fire
EDSD
Service.
DATE:
All Below Grade Block Valves in Main or Branch Service shall be Listed Post
BY:
Indicator Type Valve with Position Indicators above Grade to meet the
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
All Manual Block Valves in Fire Protection Service shall be Car-Sealed in their
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Normal Operating Position or shall be otherwise supervised per NFPA 24.
SAY
SAY
SAY
Block Valves located on Above Grade Piping shall be Accessible as per SAES-
ENGG CERT
ASH
ASH
ASH
B-054.
LEADS
LEADS
LEADS
ALL
ALL
ALL
Commissioning and Testing Procedures for Foam Spray System shall meet the
requirements of NFPA 16. All Tests shall be witnessed by Designated SAUDI
RE-ISSUED FOR 100% PROJECT PROPOSAL
Departments.
(GEN-E0103).
D. INSTRUMENTATION
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
G
E
ENGINEER
ALL LEADS CONTRACTOR shall provide and install homerun cables from fire water
DATE: 12/28/16 tanks X40-D-0701/702 to DCS cabinet located in rack room of O & M
PROJECT
ENGINEER
Building.
A M ALMATROOK Foam Generating Skid 1 & 2:
DATE: 12/28/16
CERTIFIED Foam skid vendor shall provide skid instrumentation and control,
AMR EL SHARKAWY
CONTRACTOR shall provide and install data communication cables from
12/28/16 Foam Skid Control Panel to DCS as per block diagram IN-A00001.010.
DATE:
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI Reference drawings
DATE: 12/28/16
OPERATIONS Drawing # Description
ALI H GHAMDI IN-A00001 System Block Diagrams
DATE:
12/28/16 IN-A00002 Instrument Block Diagrams
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
Drawing # Description
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
B73.1. Fire Water Main Pumps (Diesel Engine Driven and Electric Motor
G
E
DISCIPLINE
ENGINEER
Driven) shall be in accordance with NFPA 20 and are of axial split, between
ALL LEADS bearing design due to their high flow requirement. This design is also
DATE: 12/28/16 maintenance friendly at site as top half of the pumps can easily be open to
PROJECT
ENGINEER access the internal components without disturbing the piping connections.
A M ALMATROOK
DATE: 12/28/16
CERTIFIED
MISCELLANEOUS REQUIREMENTS
AMR EL SHARKAWY
DATE:
12/28/16 Reference shall be made to technical specifications for pumps included in
CONSTRUCTION
AGENCY
Index-A for further details of these pumps.
SHAHZAD YAZDANI
DATE: 12/28/16 Pump Datasheets provided in this package are preliminary only. These will be
OPERATIONS
further verified by CONTRACTOR during detailed design phase of the project
ALI H GHAMDI
12/28/16
before issuing for procurement activities.
DATE:
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Contract.
SAY
SAY
SAY
ENGG CERT
ASH
ASH
ASH
CONTRACTOR shall prepare Material Requisition Package for all the pumps
and shall obtain approvals from relevant SAUDI ARAMCO Departments before
LEADS
LEADS
LEADS
ALL
ALL
ALL
issuing to Vendors.
Material take-offs have been prepared for reference only and will not be
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
CONTRACTOR shall be responsible for review and approval of NMRs 601, 602
10-02399-
JO/EWO
10-02399-
10-02399-
0001
and 603.
0001
0001
12/28/16
12/14/16
12/18/16
DATE
G
E
DISCIPLINE requirements by stating on all sub suppliers’ purchase order SAUDI ARAMCO’s
ENGINEER
ALL LEADS intention to inspect material.
DATE: 12/28/16
PROJECT
ENGINEER Equipment installation and Commissioning shall be in accordance with
A M ALMATROOK
approved Vendor’s installation and commissioning procedures.
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY
Supply of Commissioning and Start-up spares and first fill of all the lubricants
12/28/16
DATE: and chemicals is in the scope of CONTRACTOR. CONTRACTOR shall obtain
CONSTRUCTION
AGENCY approval of Aramco Operations before filling of lubricants and chemicals.
SHAHZAD YAZDANI
DATE: 12/28/16
OPERATIONS
CONTRACTOR will provide all Non Material Requirement (NMR-602/603),
ALI H GHAMDI Operation and Instruction Manuals of CONTRACTOR supplied material in
DATE:
12/28/16 electronic format (Latest Acrobat Reader).
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG A. GENERAL
SAY
SAY
SAY
CONTRACTOR shall connect the industrial drain generated within the facility to the
ENGG CERT
ASH
ASH
ASH
YDH evaporation pond. All industrial drainages shall be treated in the oily water
treatment system. The industrial oily water treatment system shall consist of but not
LEADS
LEADS
LEADS
ALL
ALL
ALL
limited to an oily water equalization tank, CPI separator, water break tank, two effluent
water pumps (one operating, one spare), two skimmed oil pumps (one operating, one
spare) and necessary instrumentation and interconnecting piping.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
The oily water treatment system shall be of a complete vendor skid design and the
treatment system shall receive the effluent from the oily water sump via normal flow
pump, main source of oily water will be dewatered effluent from the product storage
DESCRIPTION
tanks. CONTRACTOR shall route the dewatered effluent from the tanks to the oily
water lift stations and then effluent will transfer from normal flow pumps to the
equalization tank.
The CPI vendor shall provide the pump to transfer the recovered oil from the CPI to
the slop tank while effluent water to be transferred to the YDH evaporation pond.
CONTRACTOR and CPI system vendor shall ensure that the treated water meets the
effluent water quality requirement for YRC.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
12/28/16
12/18/16
DATE
water network; however at a later stage this connection is no longer required. LSTK
Contractor shall delete the industrial drainage from YDH to MARAFIQ outlined in PFD
NO.
REV
G
E
12/28/16
DATE: Contaminated water from the tank farm dikes will be controlled by a 10”
CONSTRUCTION
AGENCY diameter gate valve connected to the oily water sewer network. Further, in
SHAHZAD YAZDANI case of Major flood/raptor an additional 4” gate valve and 4” pipe branch line
DATE: 12/28/16 with vacuum truck connection shall be provided outside the dike oily water
OPERATIONS
pipe.
ALI H GHAMDI
DATE:
12/28/16
Dewatering from Diesel tanks shall be connected to the Oily water system
CONTROL NUMBER
from the diked areas. Dewatering from the Kerosene and Gasoline tanks
VERIFICATION
CONTRACTOR shall provide two (2) Oily water Lift Station wherein the
DATE:
BY:
OWS inlet pipe will be connected. CONTRACTOR shall assess and re-
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
validate the design of the OWS drainage system. The internal wall of the lift
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
stations shall be coated with APCS-3 or better and while the exterior wall
(DCC) NO. _____________________
shall be coated with APCS-10 on below ground and exterior coating above
ground shall be APCS-1B.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
ASH
ASH
ASH
network will discharge to the sand separator tank before the OWLS. The
inlet pipe to the sand separator will include a gate valve indicator O&Y for
LEADS
LEADS
LEADS
ALL
ALL
ALL
Each oily water lift station shall be provided with two pumps for normal flow
(one operating, one spare) and two pumps for maximum flow (one
operating, one spare). The normal flow pumps will discharge to an oily
water treatment system whereas the maximum flow pump shall discharge
DESCRIPTION
CONTRACTOR shall provide an 8”, 10”, 12” and 16” diameter RTR pipe,
IFE0U, 01-SAMSS-034 for underground oily water gravity sewer.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
12/18/16
system.
DATE
To prevent fire transferring from an area to another area, the Oily water
NO.
REV
G
E
network will be connected using sealed inlet oily water manholes following
DISCIPLINE
ENGINEER standards and drawings details supplied in civil drawings.
ALL LEADS
DATE: 12/28/16
PROJECT
To prevent that oily water manholes will collapse by sand sedimentation,
ENGINEER the contractor shall construct catch basin lids/grates with means to retain
A M ALMATROOK sand from reaching the pipe network.
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY Provide underground oily water sewer pressure line from oily separation to
12/28/16 evaporation pond.
DATE:
CONSTRUCTION
AGENCY
Provide oily water sewer connection from transformer retention channel to
SHAHZAD YAZDANI
oily water sewer network.
DATE: 12/28/16
OPERATIONS
ALI H GHAMDI
Provide neutralization pit for all battery acid wash water which shall be
12/28/16 connected to oily water sewer network. Neutralization pit shall be coated
DATE:
with, acid resistant material. The pit shall be sized for the expected waste
CONTROL NUMBER
VERIFICATION
acid flow and dilution or wash-down water. The pit shall be in a readily
EDSD
accessible location, and shall be vented to the outside. The minimum vent
size shall be 63 mm (2 in) OD as per SAES-S-060 para. 811.9C.
DATE:
BY:
Provide oily water connection from foam skid, fire water pump house,
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG change of direction.
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
The lift station construction shall be in accordance with ACI 350 as a water
tight structure. Concrete compressive strength shall be 34.474 MPa (5000
PSI) minimum.
DESCRIPTION
LSTK CONTRACTOR shall consider the no. of drain points of tanks as per
P&ID VA-247904-001.
Oily water sumps at YDH will be provided with following sets of pumps:
10-02399-
10-02399-
0001
0001
0001
Each Oily Water Sump will be provided with 02 sets of normal flow pumps and 01
12/28/16
12/14/16
12/18/16
accordance with 31-SAMSS-004 shall be selected for this service. This is due to
the reason that latest update of SAES-G-005 prohibits the use of self-priming
NO.
REV
G
E
pumps for Oily Water Sump services if flammable liquids are going to be drained to
DISCIPLINE
ENGINEER these sumps.
ALL LEADS
DATE: 12/28/16 Reference shall be made to Index-G of FEL-3 package for pump datasheets.
PROJECT
ENGINEER Below are the pump tag numbers and datasheet numbers.
A M ALMATROOK
.
EDSD
MISCELLANEOUS REQUIREMENTS
DATE:
BY:
REVISIONCERTIFICATION
Pump Datasheets provided in FEL-3 package are preliminary only. These will
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG be further verified by CONTRACTOR during detailed design phase of the
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Contract.
a
CONTRACTOR shall prepare Material Requisition Package for all the pumps
and shall obtain approvals from relevant SAUDI ARAMCO Departments before
issuing to Vendors.
Material take-offs have been prepared for reference only and will not be
considered as contractual documents and cannot be used as a basis for any
10-02399-
JO/EWO
10-02399-
10-02399-
0001
change order.
0001
0001
12/28/16
12/14/16
12/18/16
DATE
Technical quotations obtained from vendors will list all exceptions and /or,
additions to applicable project Drawings and SAUDI ARAMCO Specifications. If
there is no exception to specifications, CONTRACTOR will make a statement
NO.
REV
G
E
DATE: 12/28/16 CONTRACTOR shall be responsible for Technical Bid Evaluation, placing the
PROJECT
ENGINEER Purchase Order to technically approved Vendors.
A M ALMATROOK
DATE: 12/28/16
CERTIFIED CONTRACTOR shall be responsible for review and approval of NMRs 601, 602
AMR EL SHARKAWY
and 603.
12/28/16
DATE:
CONSTRUCTION
AGENCY Inspection and Testing of CONTRACTOR supplied materials will be performed
SHAHZAD YAZDANI
as per applicable SAUDI ARAMCO Inspection Requirement form A-175.
DATE: 12/28/16
OPERATIONS
CONTRACTOR will arrange with his sub suppliers to comply with these
ALI H GHAMDI requirements by stating on all sub suppliers’ purchase order SAUDI ARAMCO’s
DATE:
12/28/16 intention to inspect material.
CONTROL NUMBER
VERIFICATION
Supply of Commissioning and Start-up spares and first fill of all the lubricants
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG CONTRACTOR will provide all Non Material Requirement (NMR-602/603),
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall develop and submit for SAUDI ARAMCO acceptance rigging
plans and transportation calculations for all major equipment.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
CONTRACTOR shall supply spreader bars, shackles, and slings for the lifting of
0001
0001
equipment.
12/28/16
12/14/16
12/18/16
DATE
G
E
DISCIPLINE
ENGINEER
CONTRACTOR shall be responsible for insulation (where specified on the data
ALL LEADS sheet or P&IDs) and fireproofing (where specified on the data sheet or P&IDs).
DATE: 12/28/16
PROJECT
ENGINEER
All skid packages design shall be vendor proven design. Skid packages shall be
A M ALMATROOK
suitable for the specific application by meeting all the process design requirements
DATE: 12/28/16
and environmental, safety and Industry standards.
CERTIFIED
AMR EL SHARKAWY
12/28/16
DATE: Reference Documents for Oily Water Treatment System
CONSTRUCTION
AGENCY Document # Description
SHAHZAD YAZDANI EQ-E00030 Datasheet for Oily Water Treatment System
DATE: 12/28/16 EQ-E00009 Technical Specification for Oily Water
OPERATIONS Treatment System
ALI H GHAMDI
DATE:
12/28/16 CONTRACTOR shall provide oily water treatment package as per above
reference documents.
CONTROL NUMBER
VERIFICATION
EDSD
E. INSTRUMENTATION
DATE:
BY:
REVISIONCERTIFICATION
CONTRACTOR shall provide and install oil-in-water analyzer at the inlet and outlet
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
of CPI Separator skid as indicated in P & ID and IPL. The skid instrumentation
C
CONTRACTOR shall provide and install field junction boxes to connect CPI skid
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG instrument to DCS for remote monitoring and control.
SAY
SAY
SAY
Provide and install homerun cables from CPI skid X40-X-1101 to remote I/O
ENGG CERT
ASH
ASH
ASH
cabinet located in RIB-2. The cable shall be routed on the cable trays.
Hydro carbon detectors to be provided at the sump for the oily water sumps.
LEADS
LEADS
LEADS
ALL
ALL
ALL
Reference drawings
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
Drawing # Description
IN-A00001 System Block Diagrams
IN-A00002 Instrument Block Diagrams
IN-A00027 Instrument Points & Lines
DESCRIPTION
10-02399-
10-02399-
0001
0001
12/18/16
.
NO.
REV
G
E
DATE:
12/28/16 B. CONTRACTOR shall prepare finish grade level in reference to the
CONSTRUCTION latest rough grading drawing.
AGENCY
SHAHZAD YAZDANI
C. CONTRACTOR shall re-evaluate/validate the design requirement
DATE: 12/28/16
OPERATIONS and possible improvement on layout design storm water drainage
ALI H GHAMDI system. CONTRACTOR shall evaluate the cost with possible
12/28/16 provision of concrete channel and box culvert, if necessary in
DATE:
accordance with SAUDI ARAMCO Engineering Standard, SAES-S-
CONTROL NUMBER
VERIFICATION
030.
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG flow thru gravity open drain direct the new drain channel outside the
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
A. CONTRACTOR shall install the utility water pipe network from the
12/28/16
12/14/16
12/18/16
DATE
G
E
A. CONTRACTOR shall install the sanitary waste water network from each
DATE:
BY:
building to the lift stations and from the lift stations to the tie-in point
REVISIONCERTIFICATION
connection to MARAFIQ.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG the provision of sanitary manholes, cleanouts and other fixtures.
SAY
SAY
SAY
C. The forced sanitary waste water pipes from the lift stations will be
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
any other possible improvement / requirements not spelled out but are
essential on layout design of civil works for bulk plant area, access roads,
traffic scheme, main gate layout and temporary construction facility that
includes but not limited to the following:
CONTRACTOR shall revalidate and re-establish all the finish grade elevations
in reference to the latest existing topographic survey drawing and to the latest
rough grading drawing.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
CONTRACTOR shall provide concrete sidewalks inside the parking area, Gate
House, E&M Building and other Support Building Facilities as provided and
12/28/16
12/14/16
12/18/16
drawing no. CI-A00106. The sidewalk shall be 100mm thick concrete provided
with 150x150xMW9xMW9 welded wire fabric (WWF) and shall be in
NO.
REV
G
E
accordance with SAUDI ARAMCO Standard drawing no. AB-036260 sheet 001
DISCIPLINE
ENGINEER rev. 05.
ALL LEADS
DATE: 12/28/16 CONTRACTOR provide 300 500 mm thick marl capping inside dike area and
PROJECT
ENGINEER 150 mm thick marl capping outside the dike peripheral at all non-paved areas
A M ALMATROOK including the sleeper areas and future tank foundations/apron/yard areas. Dike
DATE: 12/28/16 fill material shall comply with SAES-Q-006, sub-base material Class, placement
CERTIFIED
AMR EL SHARKAWY
and compaction shall be in accordance with SAES-Q-006.
12/28/16
DATE:
CONTRACTOR shall provide and develop a total of forty five (45) shaded
CONSTRUCTION
AGENCY parking slots at E&M building and six (6) parking slots at operation building as
SHAHZAD YAZDANI
shown on the drawing CI-A00106. Likewise, a total of thirty (30) shaded
DATE: 12/28/16 parking slots shall be provided for visitors outside the security fence. Structural
OPERATIONS
design detailed calculation of the sunshades shall be submitted by the vendor.
ALI H GHAMDI
Refer to DA-950182-001. Provide five (5) shaded parkings near the FSF
12/28/16
DATE: building and three (3) near the Operator shelter.
CONTROL NUMBER
VERIFICATION
CONTRACTOR shall provide HCIS Category I around the tank farm as shown
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG The CONTRACTOR shall provide two (2) access gates.
SAY
SAY
SAY
Provide two (2) 9.0 meters wide double leaf decorative metal gates provided
ENGG CERT
ASH
ASH
ASH
with four (4) units of 4.3 meters long hydraulic crash barrier and 8 inches
LEADS
diameter bollards at main security gate house and Tank Farm Gate. Each gate
LEADS
LEADS
ALL
ALL
ALL
is designed to have a two (2) lanes security access road. Also, provide two (2)
1.20 meters single leaf decorative metal gates to be utilized as walkway gate
RE-ISSUED FOR 100% PROJECT PROPOSAL
where each located at main entrance and exit gates. Four (4) Drop arms shall
RE-ISSUED FOR 100% PROJECT PROPOSAL
be provided also in each gate. Two (2) shall be installed at the entry lane and
the other Two (2) shall be installed at the exit lane.
DESCRIPTION
CONTRACTOR shall provide turnstile for pedestrian entry and exit access.
Provide non-mountable curb and curb & gutter. curb & gutter shall be in
reference to standard drawing AB-036260-001 rev. 005
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
G
E
DISCIPLINE
4. Armor Vehicle shed
ENGINEER 5. Non-Electrical Utility (Water & Sanitary)
ALL LEADS
12/28/16
DATE:
CONSTRUCTION
a. CONTRACTOR shall develop detail design of storm water flow in all the
AGENCY asphalt paved area including applicable storm drain system and surface
SHAHZAD YAZDANI
drain with proper slope.
DATE: 12/28/16
OPERATIONS
b. Provide 100mm thick concrete side walk provided with
ALI H GHAMDI
150x150xMW9xMW9 welded wire fabric (WWF) and shall be in
12/28/16
DATE: accordance, as applicable, as per SAUDI ARAMCO Standard drawing
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
prohibited signs, yield signs, speed limit signs) and informative signs
(DCC) NO. _____________________
showing the direction of bulk plant and access road. Use thermoplastic
paint for road markings.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
1. Yellow paint line with 200mm wide on walkway edge paint line
2. White paint line with 120mm wide for car parking interval
ENGG CERT
ASH
ASH
ASH
(separation)
3. White paint line with 500mm wide for stop line
LEADS
LEADS
LEADS
ALL
ALL
ALL
Parking stall layout and wheel stop detail and pavement arrows and
cross walk markings shall be in reference as per standard drawing nos.
DD-950107 sheet 001 rev. 00 and AD-036512 sheet 001 rev. 00
respectively. Likewise, miscellaneous parking related work like
installation of parking bumpers etc. shall refer to standard drawing no.
AE-036254-001
10-02399-
10-02399-
0001
The Plant Access Road traffic scheme shall include but not limited to the
0001
0001
following:
12/28/16
12/14/16
12/18/16
DATE
CONTRACTOR shall provide access to the bulk plant that includes necessary
traffic signs, road markings and sign board as per standard. Plant access roads
NO.
REV
G
E
DATE: 12/28/16 CONTRACTOR shall provide drop gates (drop arms) for vehicles control for
PROJECT
ENGINEER both entrance and exit road lines
A M ALMATROOK
DATE: 12/28/16 The road asphalt structure for 7.0 meter internal road is comprises of the
CERTIFIED following materials as per SAES-Q-006;
AMR EL SHARKAWY
12/28/16
DATE: 1. 50mm thick asphalt concrete wearing/surface course, Class B,
CONSTRUCTION
AGENCY 2. 90mm thick asphalt concrete binder course, Class B, and provided with
SHAHZAD YAZDANI Tack Coat, RC-250, on top surface of the binder course
DATE: 12/28/16 3. 230mm thick aggregate base course with provision of prime coat, MC-
OPERATIONS
70, on top surface of the aggregate base course
ALI H GHAMDI
CONTRACTOR shall Utilize CBR test values given in geotechnical report 2015/104
12/28/16
DATE: in order to finalize the road structure.
CONTROL NUMBER
VERIFICATION
Filling materials for road subgrade shall comply with SAES Q 006 chapter 5.
EDSD
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
Adequate soil stabilization methods and drainage shall be provided for all
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
ways.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Provide adequate standard traffic regulatory signs (stop signs, over-taking
SAY
SAY
SAY
prohibited signs, yield signs, speed limit signs) and informative signs showing
the direction of bulk plant and access road. Use thermoplastic Paint for road
ENGG CERT
ASH
ASH
ASH
markings.
LEADS
LEADS
LEADS
ALL
ALL
ALL
steel post which approximately 2.0 meters high with respect to the finish
grade/road level and to include its foundation.
Provide 6.0m wide access ramps crossing the dike wall to all tanks.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
G
E
DISCIPLINE
ENGINEER CONTRACTOR shall re-evaluate/validate the design requirement and include
ALL LEADS
any other possible improvement/ requirements on layout design of access
DATE: 12/28/16
road, in plant road traffic scheme that includes but not limited to the following:
PROJECT
ENGINEER
A M ALMATROOK Provide 4.6 meters wide external asphalt concrete patrol road shall comprise of
DATE: 12/28/16 the following structure.
CERTIFIED
AMR EL SHARKAWY
12/28/16
4.23 Process Automation & Controls
DATE:
CONTROL NUMBER
Process Automation shall ensure safe and reliable operation of YDH operations. The
VERIFICATION
layout IN-A00004.
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
TMS System
(DCC) NO. _____________________
The project shall provide the YDH with a TMS system installed in the
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Operation Building, complete with operator workstations, engineering
SAY
SAY
SAY
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
systems.
The TMS shall include Human-Machine Interface (HMI) and software
capable of providing functions such as; graphic displays with real-time
DESCRIPTION
10-02399-
10-02399-
0001
0001
0001
installed in the rack room of O &M building, and in addition the project
shall provide remote I/O cabinets in remote instrument buildings (RIB).
12/28/16
12/14/16
12/18/16
DATE
G
E
The ESD system, I/O, and marshaling cabinets shall be installed in the
VERIFICATION
rack room of O& M building and in addition the project shall provide
EDSD
BY:
The ESD shall provide for the safe and orderly shutdown and isolation
REVISIONCERTIFICATION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Activation of ESD system shall not cause activation of any fire
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
G
E
DATE: 12/28/16
The data connection with respective refinery is shown in block diagrams
CERTIFIED IN-A00001.004/007/008. LSTK in conjunction with respective PCS
AMR EL SHARKAWY
12/28/16
vendor shall further evaluate the data interface during detail design
DATE:
CONSTRUCTION
phase
AGENCY
SHAHZAD YAZDANI
DATE: 12/28/16
Fire Detection System
OPERATIONS
Addressable fire alarm system shall be provided consisting of smoke
ALI H GHAMDI
detectors, heat sensors, and manual pull stations wired through to Local
12/28/16
DATE: Fire Alarm Panels (LFAP) in each building. Zone alarms and trouble
CONTROL NUMBER
alarms shall be wired from each LFAP to a Master Fire Alarm Control
VERIFICATION
Panel (MFACP) located in YDH control room. Common fire, ground fault
EDSD
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Engineer.
SAY
SAY
SAY
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
The shipper and booster pumps and motors shall be provided with a VMS
ALL
ALL
consistent with SA standards and operating practice. The project shall meet
the below requirements as a minimum:
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
temperature data, and total tank inventory calculations. The RTG shall
G
E
DISCIPLINE
ENGINEER
include Human Machine Interfaces (HMI) located in the O & M building,
ALL LEADS and shall include a redundant interface with the DCS.
DATE: 12/28/16 Radar tank gauging system shall be provided with temperature
PROJECT
ENGINEER
compensated level measurement. Pressure transmitters shall be
A M ALMATROOK
provided to compute the product density.
DATE: 12/28/16
CERTIFIED Field Communication Units and RTG network devices shall be designed
AMR EL SHARKAWY
considering the future expansions and the RTG network components
12/28/16
DATE: installed in rack room of OME building.
CONSTRUCTION
AGENCY Refer system block diagram IN-A00001.005 details.
SHAHZAD YAZDANI
RTG shall be as per IN-E00019 FSD
DATE: 12/28/16
OPERATIONS
ALI H GHAMDI
Batch Transfer Metering System
12/28/16
DATE:
Batch Detection system shall be part of TMS-DCS to detect the grades
CONTROL NUMBER
VERIFICATION
detail design.
BY:
This project shall incorporate best automation practice for the product
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
transfer to/from YDH. The process automation systems will provide for
OF THIS DRAWING IS COVERED, FOR ALL
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG cost-effective means of managing batch transfers. This application
SAY
SAY
SAY
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
G
E
A M ALMATROOK
The system shall allow for upgrade of system operating software
DATE: 12/28/16
on all redundant modules of the system without impact on
CERTIFIED process operations.
AMR EL SHARKAWY
DATE:
12/28/16 The custody metering system shall comprise of the following:
CONSTRUCTION
AGENCY a) FC’s
SHAHZAD YAZDANI
b) PLC
DATE: 12/28/16
OPERATIONS
c) MSC
ALI H GHAMDI d) MSC Operator workstations
12/28/16
DATE:
CONTROL NUMBER
standards.
EDSD
and duty.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG o This project shall install new flow computers with the latest
SAY
SAY
SAY
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
interlocks
The HMI provided by this project shall have a configurable Graphic
User Interface (GUI) comprising of video displays and accessories,
operator control selections, report printing, trending and alarm
capabilities. At a minimum, the MSC’s shall provide the following
functions:
a) Be capable of reading and collecting all metering and
process data and valve status from the flow computer, PLC,
10-02399-
JO/EWO
10-02399-
10-02399-
0001
12/18/16
G
E
DISCIPLINE provide the required graphics for display of the meter runs,
ENGINEER
ALL LEADS automatic sampling system, and (when required) additional
DATE: 12/28/16 piping process piping and valves.
PROJECT
ENGINEER d) Shall be capable of integrating to Refinery Control system for
A M ALMATROOK monitoring the metering parameters.
DATE: 12/28/16
CERTIFIED
Refer system block diagram IN-A00001.003 details.
AMR EL SHARKAWY
12/28/16
DATE: Management Information Systems
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
The MIS shall be comprised of a Plant Information (PI) Server that runs
DATE: 12/28/16 Oil System Incorporation (OSI) PI software. The PI Servers shall act as
OPERATIONS a data buffer/storage device and is interfaced to the DCS HMI for data
ALI H GHAMDI
retrieval. The PI Server shall be located in the rack room and connected
12/28/16
DATE: to OSPAS through the Saudi Aramco corporate backbone.
CONTROL NUMBER
VERIFICATION
EDSD
Enterprise Systems
DATE:
DCS. The OSI PI system shall obtain data from the DCS for
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Process Automation Networks (PAN) & Systems Security
SAY
SAY
SAY
The project shall provide all security systems required to protect the
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
serve as the termination and internal distribution point for field instrumentation
wiring. The rack room shall be unmanned and shall be equipped with HVAC
systems and UPS systems. The rack room shall house the following
equipment:
TMS-DCS Servers (Redundant)
DCS System, FTA & Marshalling Cabinets
ESD System, FTA & Marshalling Cabinets
Cabinets for RTG network components and server
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
G
E
DISCIPLINE
utilized. All field wiring with the exception of Automation communication links
ENGINEER shall be terminated inside marshaling cabinets in accordance with SAES-J-902;
ALL LEADS
and, all incoming cables must be sealed in accordance with Section 15.4 of
DATE: 12/28/16
PROJECT
SAES-P-104. Refer drawing IN-A00004.002 for preliminary cabinet layout.
ENGINEER
A M ALMATROOK
HMI console shall be provided to control the facility. The Operations Room
VERIFICATION
workstation etc.
DATE:
BY:
The Operations Room shall be designed so that only activities associated with
plant control are performed there. The operation room shall be engineered to
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
The building shall be located to minimize the risk of external damage from fires,
explosions, or toxic releases per SAES-B-014 and shall provide essential
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG administrative facilities necessary to support the continuous operation of the
SAY
SAY
SAY
YDH.
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
location indicated in the Plot Plan. The RIB shall house the following as
minimum:
Remote I/O with FTA & marshalling cabinets for DCS.
DESCRIPTION
0001
0001
12/28/16
12/14/16
12/18/16
Purpose
NO.
REV
G
E
DISCIPLINE
ENGINEER The purpose of this budget item is to provide an integrated Security System at
ALL LEADS the new Yanbu Distribution Hub. The Security System is composed of the
DATE: 12/28/16 following sub-systems:
PROJECT
ENGINEER
DATE:
12/28/16 c) Intrusion Detection and Assessment System (IDAS) / Long Range
CONSTRUCTION
AGENCY
Detection and Assessment System (LRDAS)
SHAHZAD YAZDANI
DATE: 12/28/16
OPERATIONS The PRS System equipment shall be installed at the YDH Main Gatehouse;
ALI H GHAMDI
The SACS systems shall be installed at the YDH Tank Farm Gatehouse. The
12/28/16 IDAS cameras and field sensors shall be installed in the Yanbu Distribution
DATE:
Hub perimeter to provide full perimeter fence coverage intrusion detection and
CONTROL NUMBER
VERIFICATION
Present Situation
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Related Documents
PROJECT OBJECTIVES
10-02399-
JO/EWO
10-02399-
10-02399-
General
0001
0001
0001
This project shall provide a Security Access Control System (SACS) for access
12/28/16
12/14/16
12/18/16
DATE
G
E
A M ALMATROOK
comprised of card readers on the turnstiles and drop gate for vehicles, SACS
DATE: 12/28/16 servers and storage equipment, display and logging devices, single entry
CERTIFIED
AMR EL SHARKAWY
device interfaces/controllers. Intercoms and communications interfaces,
12/28/16 relational databases and data extraction and reporting capabilities.
DATE:
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
The SACS system shall be connected to the central SAUDI ARAMCO SACS
DATE: 12/28/16
system located in Dhahran through the corporate data network.
OPERATIONS
ALI H GHAMDI
This project shall provide a Plate Recognition System (PRS) and CCTV camera
12/28/16
DATE: will also be provided. The PRS also monitors public vehicles accessing the
CONTROL NUMBER
VERIFICATION
detector sensors, and computer software for intelligent vehicle license plate
recognition capabilities.
DATE:
BY:
REVISIONCERTIFICATION
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG The IDAS/LRDAS equipment shall be remotely controlled by Yanbu RSCC and
SAY
SAY
SAY
locally controlled in Tank Farm Gatehouse of YDH. The system includes control
ENGG CERT
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
The IDAS system provided shall monitor the approximately 5.5 kilometer
perimeter fence and critical gates. The IDAS/LRDAS shall be integrated with
the existing C2I system of the existing Yanbu Regional Security Center.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
The FOFSS and MIDS sensor shall detect intrusion and transmit data to Yanbu
Regional Security Control Center (YNBRSCC). Failure of one of the field
DESCRIPTION
devices connected to the communications network shall not affect the ability of
the system. Communication network shall be supplied in one-to-one redundant
configuration with automatic changeover.
The project shall design Shelters and Field Equipment Cabinets to house the
IDAS/LRDAS electronics and network interface equipment. The Security
Equipment Building shall house the Security System Servers, recorders,
Workstations, Fiber Optic Network termination and related security equipment
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
12/28/16
12/14/16
12/18/16
DESIGN OBJECTIVES
DATE
G
E
DISCIPLINE
Detection and Assessment System (LRDAS)
ENGINEER
ALL LEADS
The IDAS system has different types of distinct field sensor technologies for
DATE: 12/28/16
PROJECT intrusion detection:
ENGINEER
A M ALMATROOK
DATE: 12/28/16 CCTV which consists of Fixed and PTZ cameras installed along the
CERTIFIED
AMR EL SHARKAWY
perimeter fence to ensure full coverage of the plant so as to secure it from
12/28/16 possible intruders.
DATE:
CONSTRUCTION
DATE: 12/28/16 “sterile” area between the Category 1/Outer fence and the SAUDI
OPERATIONS ARAMCO Type III/Inner fence. Sterile area measures 8 meters from the
ALI H GHAMDI
Outer fence to the Inner fence.
12/28/16
DATE:
CONTROL NUMBER
Anti-Personnel Fence Fabric and on the side of the Barbed Tape Wire
(Concertina) which is located on top of the Anti-Personnel Fence Fabric.
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
The distance between the poles will be reduced for areas in the site where
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
there are curves and/or corners to ensure no “dead” zones within the area. The
(DCC) NO. _____________________
final number of MIDS pairs shall be determined during the detail design.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
For the assessment part, fixed color day/night cameras with at least 5 meter
ENGG CERT
ASH
ASH
high poles with vari-focal lens located in parallel to the perimeter fence and
ASH
spaced at a maximum distance 75 meters apart for straight line fence. The
LEADS
LEADS
LEADS
ALL
ALL
ALL
distance between the poles will be reduced for areas in the site where there are
curves and/or corners to ensure no “dead” zones of the “sterile” area. Based on
this, it is estimated that the project will utilize approximately 82 fixed cameras.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
The final number of fixed cameras will be determined during the detail design
phase.
DESCRIPTION
Pan Tilt Zoom (PTZ) day/night cameras with at least 7 meter high poles facing
perpendicularly to the perimeter fence, set at approximately 300m apart, no
“dead” zones between the camera coverage. Based on this, it is estimated that
the project will utilize approximately 18 PTZ cameras. The final number of
cameras will be determined during the detail design.
For the traceability part of the IDAS/LRDAS, the project shall provide the
following:
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
record in real time all video signals from fixed and PTZ cameras.
12/28/16
12/14/16
12/18/16
G
E
DISCIPLINE
ENGINEER
ALL LEADS
For integrating all these technologies, the project shall provide the following:
DATE: 12/28/16
PROJECT
ENGINEER Alarm Management Software (AMS) with Servers to be installed
A M ALMATROOK at the Security Support Building.
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY Approximately 94 Field Equipment foundations and 94 cabinets
DATE:
12/28/16 IP 66/NEMA 4X type with ancillary hardware for mounting.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI Industrial grade Ethernet switches with dual fiber optic uplink for
DATE: 12/28/16 communications redundancy.
OPERATIONS
ALI H GHAMDI
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
servers and applications located in the Security Support Building. The AMS
OF THIS DRAWING IS COVERED, FOR ALL
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG It shall integrate different IDAS sensors subsystem technologies
SAY
SAY
SAY
ASH
ASH
ASH
tamper.
LEADS
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
G
E
APPROVAL/CERTIFICATION REQUIREMENTS,
All IDAS day/night Fixed and PTZ Cameras shall run at 25fps PAL or 30fps
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
camera shall have a minimum of 525 TVL and run in MJPEG, MPEG-4, and
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG H.264 format.
SAY
SAY
SAY
ENGG CERT
The radar shall be fully solid state and have a modular construction
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
can be part of the assembly but can also be detachable for the ease of
transportation and installation.
DESCRIPTION
The System shall interface with the Long Range Surveillance System. It
shall trigger alarms and activate the long range cameras on receipt of a
possible intrusion.
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
G
E
A M ALMATROOK
DATE: 12/28/16
The IDAS/LRDAS AMS and sensor subsystems shall be provided based on
CERTIFIED an “open architecture” concept that allows for future inter-operability of
AMR EL SHARKAWY
other security systems that use standardized systems interfaces and
12/28/16
DATE:
Commercial off the shelf products (COTS). The system shall have the
CONSTRUCTION
AGENCY capability to remotely monitor and manage with these parameters.
SHAHZAD YAZDANI
DATE: 12/28/16
OPERATIONS
ALI H GHAMDI
This project shall provide shelters, typically 32 m2 in size consisting of one
12/28/16 security room and one electrical room, approximately positioned one every
DATE:
two (2) km for the following reasons:
CONTROL NUMBER
VERIFICATION
EDSD
It shall house the IDAS and its field sensors systems for this
DATE:
particular area of the fence including the video signals from all
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG It shall provide UPS based 230VAC power to the IDAS field
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
with two (2) hour battery back-up. The UPS shall also function in
the always “on” mode.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
The Security Access Control System (SACS) which shall be installed at the
Yanbu Distribution Hub’s Computer Gatehouse’s vehicle lanes drop gates,
NO.
REV
G
E
DATE: 12/28/16
Access controlled drop gates and turnstiles will be provided with
CERTIFIED electronically controlled locks or opening mechanism. The drop
AMR EL SHARKAWY
12/28/16
gate and turnstile shall be provided with a secure mechanical
DATE:
CONSTRUCTION
override to allow operation of the turnstile/drop gate in the event of
AGENCY
system or power failure
SHAHZAD YAZDANI
DATE: 12/28/16
The System shall offer consistent read range unaffected by body
OPERATIONS shielding or variable environment conditions.
ALI H GHAMDI
The System shall be capable of preventing repeated entries
12/28/16
DATE: except when an entry is followed by an exit.
CONTROL NUMBER
VERIFICATION
Provide Access Control Proximity Card with contact smart chip modules
EDSD
used for gate card readers. Must have at least 1 second approve or cancel
DATE:
BY:
The system Administrative Client Work Server, Local Client Server and
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Main Server should be located so that both remote support and local
(DCC) NO. _____________________
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG the gatehouse for the efficient operation of the RFID system, all other
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
The PRS shall have a minimum 95% Arabic and 95% Latin character
recognition accuracy.
DESCRIPTION
10-02399-
10-02399-
The PRS System shall capture all vehicles entering and leaving at a rate of
0001
0001
0001
100%. These images shall be of the front license plates, together with the
12/28/16
12/18/16
DATE
G
E
DISCIPLINE
Standard Code for Information Interchange), Unicode or USC (Universal
ENGINEER
ALL LEADS
Character Set) format. Only one character format will be used throughout
DATE: 12/28/16
the system.
PROJECT
ENGINEER
A M ALMATROOK The PRS shall read all types of rectangular Saudi number plates (Short and
DATE: 12/28/16 long). The PRS shall also be capable of Saudi license plate (Red, Blue,
CERTIFIED
AMR EL SHARKAWY
White, Yellow, Black and Green) and shall be capable of distinguishing
DATE:
12/28/16 similar alphanumeric license plates with different background colors.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI The PRS shall read the newly released types of rectangular Saudi number
DATE: 12/28/16 plates, four (4) numbers and three (3) alphabet and added features. The
OPERATIONS
PRS shall also be capable of recognizing all six (6) different colors
ALI H GHAMDI
representing different classes of Saudi License plate (Blue, White, Yellow,
12/28/16
DATE:
Black, Grey and Green), and shall be capable of distinguishing similar
CONTROL NUMBER
VERIFICATION
the system shall have the capability of reading the newly added shapes
(triangle, circle) with all direction and configuration.
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
The system shall have the capability of capturing images of all retro-
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
The PRS shall provide full time image capturing capability by use of color
ENGG CERT
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
The PRS shall be able to read any plate tilted or mounted away from a
normal vertical position at an angle of 15º or less.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
The PRS may use additional external system triggers to detect vehicles.
White light illuminators shall be provided for the automatic number plate
DESCRIPTION
10-02399-
10-02399-
0001
0001
0001
provided as necessary.
12/14/16
12/18/16
DATE
G
E
DISCIPLINE
to 80Km/h at the capture point.
ENGINEER
ALL LEADS
DATE: 12/28/16
The width of the camera footprint for the color cameras is to be no greater
PROJECT
ENGINEER
than 1.6 meters at the optimum capture point.
A M ALMATROOK
DATE: 12/28/16 The PRS shall display all characters of a number plate.
CERTIFIED
AMR EL SHARKAWY
DATE:
12/28/16 The PRS should be based on optical character recognition (OCR)
CONSTRUCTION processing with the capacity to “learn” variation in characters through
AGENCY
SHAHZAD YAZDANI system input.
DATE: 12/28/16
OPERATIONS
The PRS shall provide both monochrome and color images of the number
ALI H GHAMDI
plate for OCR identification and license color verification purposes.
12/28/16
DATE:
CONTROL NUMBER
VERIFICATION
The system shall process color images to allow the color background of
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG The PRS shall be compatible with TCP/IP communications architecture.
SAY
SAY
SAY
ENGG CERT
ASH
ASH
The PRS shall have the capability to alert staff of the approach of a suspect
ASH
LEADS
LEADS
ALL
ALL
ALL
The alarm signal shall be both visual and audible, and shall indicate in
which lane the vehicle is traveling.
10-02399-
10-02399-
0001
0001
0001
The PRS shall be able to simultaneously monitor; process and store the
12/28/16
information from all lanes approaching the Gates. The system shall be
12/14/16
12/18/16
DATE
G
E
DISCIPLINE
The local PRS Processing/ Storage Equipment shall fully monitor, store,
ENGINEER
ALL LEADS
and send PRS Alarms and Transaction Events to a centralized database.
DATE: 12/28/16
The processing unit shall integrate (OCR) information and license plate
PROJECT
ENGINEER
color information from each vehicle plate.
A M ALMATROOK
DATE: 12/28/16 CONTRACTORS shall refer to the provided drawings to identify the position
CERTIFIED
AMR EL SHARKAWY
and space requirements for the local PRS Processing Equipment. The form
DATE:
12/28/16 factor of the equipment at Gatehouse should reflect the limited space at
CONSTRUCTION these locations. All ancillary equipment necessary for the proper operation
AGENCY
SHAHZAD YAZDANI of the PRS system shall remain in the gatehouse including the PRS
DATE: 12/28/16 workstation for the local monitoring & control of PRS system. The PRS
OPERATIONS
system shall be able to work independently when a breakdown occurs in
ALI H GHAMDI
the corporate network connectivity.
12/28/16
DATE:
CONTROL NUMBER
VERIFICATION
The Fault Tolerant PRS Main Server shall be provided and installed by
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG The Fault Tolerant Main Server shall have redundancy in terms of storage
SAY
SAY
SAY
failures.
ENGG CERT
ASH
ASH
ASH
The PRS Main Server shall be interconnected with all the Local PRS
LEADS
LEADS
LEADS
ALL
ALL
ALL
The PRS main Server shall distribute the updated hot list inputs concerning
flagged vehicles within (60) seconds to the new local PRS Processing
DESCRIPTION
Equipment automatically.
The PRS Main Server shall have sufficient storage capacity to store
information for the following periods of time:
10-02399-
10-02399-
The PRS Main Server shall have an option to automatically archive records,
0001
0001
0001
medium.
12/14/16
12/18/16
DATE
The PRS Main Server shall maintain an accurate clock set to local time
NO.
REV
G
E
DISCIPLINE
using Coordinated Universal Time (UTC) information derived from the
ENGINEER
ALL LEADS
SAUDI ARAMCO Master Clock. The local time will be synchronized to all
DATE: 12/28/16
Local Processor from the Main Server, by the use of a Network Time
PROJECT
ENGINEER
Protocol (NTP). All system transactions will be appended with a tamper-
A M ALMATROOK proof time-stamp.
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY
The Local PRS Processing Equipment shall distribute its database
DATE:
12/28/16 transactions events to the PRS Main Server automatically within not more
CONSTRUCTION than thirty (30) minutes and upon request from local machine at gatehouse.
AGENCY
SHAHZAD YAZDANI The local PRS Processing Equipment shall automatically distribute its
DATE: 12/28/16 database Alarm within no more than one (1) second to the PRS Main
OPERATIONS
Server.
ALI H GHAMDI
12/28/16
DATE:
The Local PRS Processing Equipment shall have sufficient storage
CONTROL NUMBER
VERIFICATION
capacity to store information for the following periods of time (based upon
EDSD
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG entries – 30 days.
SAY
SAY
SAY
ENGG CERT
ASH
ASH
System Users shall be able to query the PRS System which shall be
ASH
capable of generating, saving and printing Local and Site Global reports
LEADS
LEADS
LEADS
ALL
ALL
ALL
listing:
The PRS system shall ensure that there is a clear view of each vehicle’s
license plate and shall propose measures to ensure vehicle license plates
are captured and processed in all traffic conditions, which may require
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
12/28/16
12/18/16
DATE
G
E
DISCIPLINE
ENGINEER Outside Plant System (OSP)
ALL LEADS
DATE: 12/28/16 The Outside Plant Cable and Conduit System shall support the Security Cabling
PROJECT
ENGINEER connectivity from Security Support Building to various locations of Field
A M ALMATROOK
Equipment Cabinets (FECs) through Shelter #1 and Shelter #2 along the
DATE: 12/28/16
CERTIFIED perimeter fence.
AMR EL SHARKAWY
DATE:
12/28/16 The works includes excavation, installation of buried and underground (in
CONSTRUCTION
AGENCY
conduit) fiber optic cables, construction of conduit facilities, installation of
SHAHZAD YAZDANI pedestal with guard post, cable splicing, installation of fiber optic patch panels,
DATE: 12/28/16 cutting and replacing of paved and asphalt areas to original condition,
OPERATIONS
installation of marker post, installation of electronic marker, termination of fiber
ALI H GHAMDI
12/28/16
cables, cable testing and tagging.
DATE:
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
ASH
ASH
to the C2I platform to integrate with the different Security systems installed
ASH
under BI-10-00555.
LEADS
LEADS
LEADS
ALL
ALL
ALL
The C2I application software installed in the Dhahran RSCC under BI-10-
10-02399-
JO/EWO
10-02399-
10-02399-
00555 shall have the capability to view each site and when required, a
0001
0001
0001
password protection scheme to take over the application of this site. The
12/28/16
12/18/16
DATE
allocated space for the sites that normally report to other RSCCs.
NO.
REV
G
E
DISCIPLINE
SAUDI ARAMCO Corporate Network
ENGINEER
ALL LEADS
DATE: 12/28/16
The security system platform shall be capable of utilizing a high-
PROJECT
ENGINEER
performance standard IP-based network to establish internal
A M ALMATROOK communications between the systems components and to interface with
DATE: 12/28/16 SAUDI ARAMCO Corporate Data Network.
CERTIFIED
AMR EL SHARKAWY
12/28/16 The proposed system shall be connected to the IP-Data network. The
DATE:
CONSTRUCTION connection shall utilize Gigabit Ethernet Local Area Network.
AGENCY
SHAHZAD YAZDANI
DATE: 12/28/16
OPERATIONS
ALI H GHAMDI
12/28/16
DATE:
CONTROL NUMBER
ENVIRONMENTAL IMPACT
VERIFICATION
EDSD
All work under the Scope of this project shall conform to all SAUDI
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
4.25 STRUCTURAL
ENGG CERT
ASH
ASH
ASH
GENERAL
LEADS
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
CONTRACTOR shall ensure achieving high safety and security standards and
0001
0001
0001
12/18/16
DATE
G
E
DATE: 12/28/16 The mapped Maximum Considered Earthquake (MCE) spectral response
OPERATIONS accelerations for the Yanbu area are documented in SAES-A-112 as follows:
ALI H GHAMDI
12/28/16
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
Criteria Parameter
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
Criteria Parameter
Site Class as per geotechnical D
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
the given test location contractor shall utilize the nearest test location and
prepare standalone report for utilization of nearest test location and submit it to
SAUDI ARAMCO for approval.
10-02399-
10-02399-
0001
0001
0001
12/18/16
CONTRACTOR shall check and verify all Sub-Contractor and Vendor design
DATE
and drawings provided comply with the Scope of Work, and documents
provided with this Scope, relevant SAUDI ARAMCO and International
NO.
REV
G
E
DATE: 12/28/16 CONTRACTOR shall refer project proposal drawing ST-A00100.001 for
CERTIFIED
AMR EL SHARKAWY
general notes on structural steel work. CONTRACTOR shall execute all
12/28/16
structural steel work in accordance with SAUDI ARAMCO standards.
DATE:
CONSTRUCTION
AGENCY CONTRACTOR shall note that all structural drawings of project proposal are
SHAHZAD YAZDANI
indicative; CONTRACTOR shall perform detailed structural calculations during
DATE: 12/28/16 detailed design as per vendor data and in accordance with SAUDI ARAMCO
OPERATIONS
standards.
ALI H GHAMDI
12/28/16
DATE: CONTRACTOR shall finalize all building design incorporating
CONTROL NUMBER
DATE:
Equipment Foundations
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG CONTRACTOR shall provide concrete foundations for dye injection skid, SDA
SAY
SAY
SAY
injection skid, conductivity enhancer skid, custody metering skid, meter prover
and custody metering shelter (vendor package).
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall provide slab on grade and toe wall as per vendor
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
CONTRACTOR shall utilize approved NMR 602 vendor data for preparation of
IFC drawing for all equipment foundations.
10-02399-
10-02399-
0001
12/18/16
DATE
approval.
NO.
REV
G
E
DATE: 12/28/16
Tank farm and support infrastructure
CERTIFIED
AMR EL SHARKAWY Equipment Foundations
12/28/16
DATE:
CONSTRUCTION CONTRACTOR shall provide concrete foundations for diesel day tank, 2 No’s
AGENCY
SHAHZAD YAZDANI
of emergency generator set, DPK filtration skid, surge skid (DO/DPK), surge
skid (GASOLINE), utility water tank, fire water tank, 2 No’s of foam skid, pumps
DATE: 12/28/16
OPERATIONS and OWS treatment package.
ALI H GHAMDI
CONTRACTOR shall provide slab on grade and toe wall as per vendor
requirement for equipment’s.
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
CONTRACTOR shall utilize approved NMR 602 vendor data for preparation of
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG IFC drawing for all equipment foundations.
SAY
SAY
SAY
ENGG CERT
ASH
ASH
ASH
Shelters
LEADS
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
0001
0001
0001
CONTRACTOR shall design shelter foundations as per PEB- vendor load data
and provide anchor bolts as per vendor requirement.
12/28/16
12/14/16
12/18/16
DATE
CONTRACTOR shall provide slab on grade for foam skid shelter with isolation
NO.
REV
DATE: 12/28/16
Oily water lift stations (2 No’s)
PROJECT
ENGINEER
CONTRACTOR shall design and detail reinforced cement concrete oily water
A M ALMATROOK
lift station as per sizing requirement with appropriate coating on inside and
DATE: 12/28/16
CERTIFIED outside face as per SAUDI ARAMCO standards.
AMR EL SHARKAWY
DATE:
12/28/16 CONTRACTOR shall provide dewatering system based on the depth of lift
CONSTRUCTION station and water table level and shall dispose the water to an approved
AGENCY
SHAHZAD YAZDANI
location by SAUDI ARAMCO.
DATE: 12/28/16
OPERATIONS CONTRACTOR shall take appropriate measures as per SAUDI ARAMCO
ALI H GHAMDI standards for deep soil excavations.
12/28/16
DATE:
CONTROL NUMBER
VERIFICATION
CONTRACTOR shall design and detail reinforced cement concrete sanitary lift
DATE:
station as per sizing requirement with appropriate coating on inside and outside
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
station and water table level and shall dispose the water to an approved
location by SAUDI ARAMCO.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
sanitary pump.
Dike wall
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
CONTRACTOR shall provide vertical expansion joint in dike wall as per figure 2
of SAES-B-005.
CONTRACTOR shall provide 1.5 mm thick HDPE liner below dike area with
appropriate HDPE insert on concrete dike wall inside face.
CONTRACTOR shall weld 1.5 mm thick HDPE liner for dike area with HDPE
liner provided by other CONTRACTOR around the tank foundations.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
below grade.
12/28/16
12/14/16
12/18/16
DATE
G
E
DISCIPLINE CONTRACTOR shall provide minimum 500 mm MARL cover for HDPE liner
ENGINEER
ALL LEADS provided inside dike area.
DATE: 12/28/16
PROJECT
ENGINEER
Steel pipe support, pipe sleepers, structural platforms and crossovers
A M ALMATROOK
DATE: 12/28/16
CERTIFIED CONTRACTOR shall provide structural pipe support, structural platforms and
AMR EL SHARKAWY crossovers as per piping plans and design in accordance with SAUDI
DATE:
12/28/16 ARAMCO standards. CONTRACTOR shall provide all structural calculations for
CONSTRUCTION SAUDI ARAMCO approval.
AGENCY
SHAHZAD YAZDANI
DATE: 12/28/16
CONTRACTOR shall provide steel fabrication drawings for SAUDI ARAMCO
OPERATIONS approval.
ALI H GHAMDI
12/28/16 CONTRACTOR shall provide concrete foundations for pipe supports, platforms,
DATE:
crossovers and pipe sleepers as per piping plans. CONTRACTOR shall design
CONTROL NUMBER
VERIFICATION
Culvert
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG CONTRACTOR shall provide clearance from pipe to concrete edges as per
SAY
SAY
SAY
ASH
ASH
ASH
CONTRACTOR shall design RCC culvert for all possible load cases and load
LEADS
LEADS
LEADS
ALL
ALL
ALL
Buildings
DESCRIPTION
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
bolts shall be specified by vendor and selection of anchor bolt shall be as per
SAUDI ARAMCO standards.
NO.
REV
G
E
DISCIPLINE Musallah
ENGINEER
ALL LEADS
CONTRACTOR shall provide reinforced cement concrete frame and roof slab
DATE: 12/28/16
PROJECT as per architectural plans, sections and elevations.
ENGINEER
A M ALMATROOK
CONTACTOR shall perform structural design of Musallah building in
DATE: 12/28/16
CERTIFIED
accordance with SAUDI ARAMCO standards and submit design calculations to
AMR EL SHARKAWY SAUDI ARAMCO for review and approval.
12/28/16
DATE:
CONSTRUCTION Security Guard house (2 No’s)
AGENCY
SHAHZAD YAZDANI
CONTRACTOR shall provide reinforced cement concrete frame and roof slab
DATE: 12/28/16
OPERATIONS
as per architectural plans, sections and elevations.
ALI H GHAMDI
12/28/16
CONTACTOR shall perform structural design of security guard house building
DATE:
in accordance with SAUDI ARAMCO standards and submit design calculations
CONTROL NUMBER
VERIFICATION
CONTRACTOR shall provide reinforced cement concrete frame and roof slab
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG SAUDI ARAMCO for review and approval.
SAY
SAY
SAY
Smoking shelter
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall provide foundation for smoking shelter as per load data
DESCRIPTION
for structural steel shelter and providing anchor bolts as per SAUDI ARAMCO
standards.
CONTRACTOR shall provide reinforced cement concrete frame and roof slab
as per architectural plans, sections and elevations.
10-02399-
10-02399-
0001
0001
12/18/16
DATE
G
E
DISCIPLINE CONTRACTOR shall provide PEB vendor space frame structural design
ENGINEER
ALL LEADS calculation for SAUDI ARAMCO review and approval. Space frame design
DATE: 12/28/16
shall be in accordance with SAUDI ARAMCO standards.
PROJECT
ENGINEER
A M ALMATROOK
CONTRACTOR shall provide foundation size as per vendor data. Design of
DATE: 12/28/16
CERTIFIED foundation shall be as per foundation load data provided by vendor. Anchor
AMR EL SHARKAWY bolts shall be specified by vendor and selection of anchor bolt shall be as per
DATE:
12/28/16 SAUDI ARAMCO standards.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
Receiving substation
DATE: 12/28/16
OPERATIONS CONTRACTOR during detail design shall validate the use of SAUDI ARAMCO
ALI H GHAMDI library drawing for receiving substation and adopt appropriate structural
12/28/16 arrangement to support overhead crane for GIS room.
DATE:
CONTROL NUMBER
VERIFICATION
standards and provide design calculations to SAUDI ARAMCO for review and
approval.
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
vendors for the design and fabrication of precast walls and double tee slabs.
OF THIS DRAWING IS COVERED, FOR ALL
Necessary loading on roof shall be considered for the design of double tee.
(DCC) NO. _____________________
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
ASH
ASH
ASH
CONTRACTOR shall provide slab on grade and toe/curb wall around the slab
LEADS
LEADS
LEADS
ALL
ALL
ALL
10-02399-
10-02399-
CONTRACTOR shall provide slab on grade and toe/curb wall around the slab
0001
0001
0001
12/18/16
DATE
CONTRACTOR shall provide reinforced cement concrete frame and roof slab
NO.
REV
G
E
DISCIPLINE
as per architectural plans, sections and elevations.
ENGINEER
ALL LEADS
CONTACTOR shall perform structural design of E & M building in accordance
DATE: 12/28/16
PROJECT
with SAUDI ARAMCO standards and submit design calculations to SAUDI
ENGINEER
ARAMCO for review and approval.
A M ALMATROOK
12/28/16 CONTRACTOR shall provide reinforced cement concrete frame and roof slab
DATE:
CONSTRUCTION
as per architectural plans, sections and elevations.
AGENCY
SHAHZAD YAZDANI
CONTACTOR shall perform structural design of security support building in
DATE: 12/28/16
accordance with SAUDI ARAMCO standards and submit design calculations to
OPERATIONS
SAUDI ARAMCO for review and approval.
ALI H GHAMDI
12/28/16
DATE: Temporary construction facility
CONTROL NUMBER
VERIFICATION
ARAMCO standards.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
CONTRACTOR shall provide structural pipe support and platforms for TCF
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG X-Ray Building
SAY
SAY
SAY
CONTRACTOR shall provide reinforced cement concrete frame and roof slab
ENGG CERT
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall provide structural framing for covered car parking as per
DESCRIPTION
CONTRACTOR shall provide foundation for covered car parking as per SAUDI
ARAMCO library drawings DA-950184.001, DA-950185.001.
Chemical shelter
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
CONTRACTOR shall provide reinforced cement concrete frame and roof slab
as per architectural plans, sections and elevations.
12/28/16
12/14/16
12/18/16
DATE
G
E
DISCIPLINE
SAUDI ARAMCO for review and approval.
ENGINEER
ALL LEADS
For revised location of chemical shelter building refer revised YDH plot plan
DATE: 12/28/16
PROJECT
Rev E.
ENGINEER
CONTRACTOR shall provide reinforced cement concrete frame and roof slab
VERIFICATION
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
Operation building
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG CONTRACTOR shall provide reinforced cement concrete frame and roof slab
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall provide foundations for fixed camera, PTZ camera, field
equipment cabinet, MIDS poles and PRS supports.
10-02399-
10-02399-
0001
0001
12/18/16
DATE
G
E
DISCIPLINE vendor load data and shall be in compliance with SAUDI ARAMCO standards.
ENGINEER
ALL LEADS
Anchor bolts shall be specified by vendor in accordance with SAUDI ARAMCO
standards.
DATE: 12/28/16
PROJECT
ENGINEER
Miscellaneous Structural Works
A M ALMATROOK
DATE: 12/28/16
CERTIFIED
CONTRACTOR shall construct concrete paving slab at entrance near Security
AMR EL SHARKAWY Guardhouse and wherever indicated on civil drawings. CONTRACTOR shall
12/28/16 provide construction, contraction and isolation/expansion joints as per ACI 224
DATE:
CONSTRUCTION in order to transfer traffic loads across the joints.
AGENCY
SHAHZAD YAZDANI
CONTRACTOR shall construct concrete duct banks for cable routing as shown
DATE: 12/28/16
OPERATIONS
in electrical drawings.
ALI H GHAMDI
12/28/16
CONTRACTOR shall construct crash rated barriers, crash rated beams and
DATE:
valve boxes.
CONTROL NUMBER
VERIFICATION
catch basins.
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Contractor shall provide 18 No’s ground water monitoring well in accordance
SAY
SAY
SAY
ASH
ASH
ASH
drawing RC-EN-1. For proposed location of ground water monitoring wells refer
SKETCH-ST-001. Contractor shall take prior approval from royal commission
LEADS
LEADS
LEADS
ALL
ALL
ALL
General
DESCRIPTION
Equipment Foundations
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
package).
G
E
A M ALMATROOK
CONTRACTOR shall provide anchor bolts as per vendor requirement in
DATE: 12/28/16
CERTIFIED
accordance with SAUDI ARAMCO standards.
AMR EL SHARKAWY
DATE:
12/28/16 CONTRACTOR shall utilize approved NMR 602 vendor data for preparation of
CONSTRUCTION IFC drawing for all equipment foundations.
AGENCY
SHAHZAD YAZDANI
CONTRACTOR shall refer to Project Scoping Paper GEN-E0103 for changes
DATE: 12/28/16
OPERATIONS in SAMREF due to relocation of surge tank, surge tank dike, and surge pumps,
ALI H GHAMDI addition of Foam skid and its shelter, oily water lift station, Electrical room and
12/28/16 culvert for pipe crossing.
DATE:
CONTROL NUMBER
VERIFICATION
location to access tank settlement (immediate and long term) and soil bearing
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
CONTRACTOR shall design tank foundations for all loadings as per final IFC
load data. IFC load data shall cover all loadings for tank including tank shell,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG tank roof and bottom plates, Empty weight, operating weight, hydro test weight,
SAY
SAY
SAY
corroded weight, wind load and seismic loading etc. and all loading shall be
reported as per API-650 standard.
ENGG CERT
ASH
ASH
ASH
CONTRACTOR is fully responsible for the design of tank foundations. E.g. type
LEADS
LEADS
LEADS
ALL
ALL
ALL
of foundation, materials, quantities etc. the drawings those are being provided
to CONTRACTOR are for their reference and for cost estimate purpose. It is
CONTRACTOR’s responsibility to ensure that adequate tank foundations are
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
In case anchor bolts are required for tank anchorage to the foundations, then
DESCRIPTION
anchor bolts shall as per SASD AA-036322-001 Rev 08. Coating requirement
of anchor bolts shall be as per 32-SAMSS-005 and bolts shall be coated with
fluoropolymer/ceramic; galvanized bolts shall not be used.
Fluoropolymer/ceramic coating shall be in accordance with 09-SAMSS-107.
10-02399-
10-02399-
0001
as per tank vendor specifications for SAUDI ARAMCO review and approval. In
case actual settlements are more than recommended and not acceptable to
12/28/16
12/14/16
12/18/16
DATE
Saudi Aramco, CONTRACTOR shall improve the soil to ensure that edge and
differential settlements are within the limits concurred by SAUDI ARAMCO.
NO.
REV
G
E
DISCIPLINE
ENGINEER
CONTRACTOR shall coordinate with his Cathodic Protection Subcontractor
ALL LEADS (CPS) to keep sleeves for conduits.
DATE: 12/28/16
PROJECT
ENGINEER
CONTRACTOR shall fulfill all requirements specified in Appendix B of 32-
A M ALMATROOK
SAMSS-005 for foundation design and construction.
DATE: 12/28/16
CERTIFIED CONTRACTOR shall provide complete system for leak detection. Tanks in
AMR EL SHARKAWY
services other than water shall be provided with an under tank leak detection
12/28/16
DATE: and sub-grade protection according to API STD 650, Appendix I.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI CONTRACTOR shall develop procedure and monitor tank settlement as per
DATE: 12/28/16 API 650 standard and shall submit method statement to Saudi Aramco for
OPERATIONS approval.
ALI H GHAMDI
DATE:
12/28/16 Dike wall for surge relief tank
CONTROL NUMBER
VERIFICATION
EDSD
CONTRACTOR shall provide vertical expansion joint in dike wall as per figure 2
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
of SAES-B-005.
OF THIS DRAWING IS COVERED, FOR ALL
CONTRACTOR shall provide 1.5 mm thick HDPE liner below dike area with
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG appropriate HDPE insert on concrete dike wall inside face and outer face of
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
CONTRACTOR shall provide minimum 500 mm MARL cover for HDPE liner
provided inside dike area.
DESCRIPTION
10-02399-
10-02399-
0001
approval.
0001
0001
12/18/16
DATE
crossovers and pipe sleepers as per piping plans. CONTRACTOR shall design
foundations as per stress analysis load data in accordance with SAUDI
NO.
REV
G
E
DATE: 12/28/16 CONTRACTOR shall note due to changes defined in Project Scoping Paper
PROJECT
ENGINEER
GEN-E0103, modification required in sleepers, pipe supports, structural
A M ALMATROOK
platforms and crossover inside SAMREF refinery shall be done during detailed
DATE: 12/28/16
design as per changes shown in marked up piping plans (refer appendix 04
CERTIFIED given along with Project Scoping Paper GEN-E0103).
AMR EL SHARKAWY
12/28/16
DATE: Yanbu refinery scope
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI General
DATE: 12/28/16
OPERATIONS CONTRACTOR shall conduct detailed geotechnical investigation if required
ALI H GHAMDI during detailed design for foundation required inside Yanbu refinery as per
12/28/16 SAES-A-113.
DATE:
CONTROL NUMBER
VERIFICATION
CONTRACTOR shall conduct site visits to finalize the piping road crossing
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
inside Yanbu refinery plant as per piping plans. CONTRACTOR shall check
OF THIS DRAWING IS COVERED, FOR ALL
available space inside existing culverts to cross pipes for proposed lines and if
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG propose modifications of Existing culvert or new culverts with prior approval
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
Project Scoping Paper GEN-E0104). Height of new culvert shall match with the
road top level of Yanbu refinery roads where these culverts are required.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
10-02399-
10-02399-
0001
12/18/16
DATE
G
E
A M ALMATROOK
CONTRACTOR shall provide concrete foundations for pipe supports, platforms,
DATE: 12/28/16
crossovers and pipe sleepers as per piping plans. CONTRACTOR shall design
CERTIFIED foundations as per stress analysis load data in accordance with SAUDI
AMR EL SHARKAWY
ARAMCO standards. CONTRACTOR shall provide all foundation design
12/28/16
DATE: calculations for SAUDI ARAMCO approval.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI CONTRACTOR shall note due to change in surge system which is defined in
DATE: 12/28/16 Project Scoping Paper GEN-E0104, modification required in sleepers, pipe
OPERATIONS supports, structural platforms and crossover inside Yanbu refinery shall be
ALI H GHAMDI done during detailed design as per changes shown in marked up piping plans
DATE:
12/28/16 (refer appendix 02 given along with Project Scoping Paper GEN-E0104)
CONTROL NUMBER
VERIFICATION
EDSD
General
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
approval from SAUDI ARAMCO and prepare standalone report indicating use
of existing borehole for deriving bearing capacity for foundation design.
10-02399-
10-02399-
0001
12/18/16
DATE
G
E
DATE: 12/28/16 CONTRACTOR shall provide concrete foundations for pipe supports, platforms,
PROJECT
ENGINEER
crossovers and pipe sleepers as per piping plans. CONTRACTOR shall design
A M ALMATROOK
foundations as per stress analysis load data in accordance with SAUDI
DATE: 12/28/16
ARAMCO standards. CONTRACTOR shall provide all foundation design
CERTIFIED calculations for SAUDI ARAMCO approval.
AMR EL SHARKAWY
DATE:
12/28/16
SECTION 5.0 – BUILDINGS
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
DATE:
BY:
All exterior walls will be CMU and insulated and cladded with drywalls from
REVISIONCERTIFICATION
inside the buildings (Except Substation Building which will have precast panels
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
All interior walls will be CMU and drywalls as per the standards and codes
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG requirements.
SAY
SAY
SAY
All exterior walls (Except Substation Building) will have plaster with paint
ENGG CERT
ASH
ASH
ASH
finish.
LEADS
All interior wall surfaces and exposed structures shall be painted and finished
LEADS
LEADS
ALL
ALL
ALL
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
Buildings will have acoustical ceiling tiles where allowed by standards and
codes.
All buildings will have finishing materials as per Building Design and Finishing
Guidelines (SAES-R-004) and as per the applicable standards.
Smoking Shelter is open (No walls) covered by steel structure shelter and
including 4 wooden bench.
M-009.
JO/EWO
10-02399-
10-02399-
0001
0001
0001
Fire barriers shall be provided to separate different use area. Fire walls shall
12/28/16
12/14/16
12/18/16
DATE
G
E
DISCIPLINE
ENGINEER
ALL LEADS
Interior framing, members, finishes, partition, cabinets, doors, and trim, shall
be non-combustible.
DATE: 12/28/16
PROJECT
ENGINEER
Provide gypsum board (fire rated and moisture resistant) drywall partitions
A M ALMATROOK
with insulation on metal studs with painted finish and ceramic tiles at wet
DATE: 12/28/16
CERTIFIED areas where required.
AMR EL SHARKAWY
DATE:
12/28/16 All ceramic wall tiles finished shall be full height extended to under face of
CONSTRUCTION ceiling. Ceramic wall base shall be cove and rounded edges at exposed
AGENCY
SHAHZAD YAZDANI
corner angles.
DATE: 12/28/16
OPERATIONS All separating wall shall be constructed to achieve a giving fire rating where
ALI H GHAMDI necessary exposed internal concrete surfaces shall be paint finished.
12/28/16
DATE:
Provide 19 mm thick plywood and finished with 2 coats of fire retardant paint
CONTROL NUMBER
VERIFICATION
assembly such as type ‘X’ fire rated gypsum board or concrete wall.
DATE:
BY:
Raised Access Floor shall be heavy grade access floor system with coated
REVISIONCERTIFICATION
steel and durable anti-static pressure laminate floor. Where required this shall
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Room.
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
ALL
ALL
Battery Room shall be exposed smooth surface concrete structure with acid
resistant paint finished.
DESCRIPTION
Name of manufacturer.
Trademark of the third-party inspection agency.
Fire-protection rating.
Maximum transmitted temperature end point for fire door exit enclosure and
exit passageway.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
Smoke and draft control door shall show the letter “S” on the label.
12/28/16
12/14/16
12/18/16
DATE
All fire rated doors shall be provided with required fire rating including smoke
and draft seals in accordance with IBC Chapter 7, and UL listed, with
complete door assemblies and shutters according to IBC, under Section
NO.
REV
G
E
715.3, and NFPA 80. Fire rated door shall not be provided with stoppers.
DISCIPLINE
ENGINEER Double door shall be provided with dust proof and astragal, weather strip and
ALL LEADS
door bottom sweep.
DATE: 12/28/16
PROJECT
ENGINEER Provide all exit doors with panic devices as per IBC 2009, Section 1008.1.10
A M ALMATROOK and SAES-B-014, Section 5.13 and SAES-P-103 , Section 6.2.4
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY All fire rated doors shall be provided with door closers and with smoke/in
12/28/16 tumescent seals to heads and both sides. Closer shall be specified to operate
DATE:
CONSTRUCTION for individual door size/weight and for particular internal and external.
AGENCY
SHAHZAD YAZDANI
Provide all internal door sets paint finished galvanized steel and providing fire
DATE: 12/28/16
OPERATIONS
and sound resistance where necessary. Doors with vision glass panel shall be
ALI H GHAMDI
wired-glass. All ironmongery shall be stainless steel.
12/28/16
DATE:
Provide all external door paint finished, thermally insulated and fire-resistant
CONTROL NUMBER
VERIFICATION
galvanized steel door with gas, dust and weather seals. Entrance door to air
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
accordance with all requirements set forth in IBC-2009, Section 1012 and
OF THIS DRAWING IS COVERED, FOR ALL
1013 respectively.
(DCC) NO. _____________________
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG SAES-B-069. (Typical for all the buildings which include Battery Room)
SAY
SAY
SAY
All buildings windows must have, LOW-E (on 2nd. Face) double glazed (6mm,
ENGG CERT
ASH
ASH
ASH
16mm, 6mm), reflective heat strengthen exterior & clear tempered interior
glazing set in powder-coated (PVDF)-Thermally Broken aluminum window
LEADS
LEADS
LEADS
ALL
ALL
ALL
CIVIL
STRUCTURAL
FIRE PROTECTION
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
locations at grade. Their location shall be marked in RED in a way that will
attract attention, and otherwise meet the requirements of NFPA 10, Chapter
6.
NO.
REV
G
E
DISCIPLINE
ENGINEER CONTRACTOR shall provide and Install Portable type Fire Extinguisher
ALL LEADS
inside the Buildings as per Table -1, SAES-B-019.
DATE: 12/28/16
PROJECT
ENGINEER CONTRACTOR shall install all fire Extinguisher units less than 18 kg shall
A M ALMATROOK
be mounted so that the extinguisher top is not more than 1.5 m above the
DATE: 12/28/16 floor level. Extinguisher units weighing over 18 Kg shall be mounted so that
CERTIFIED
AMR EL SHARKAWY extinguisher top is not more than 1.0 m above the floor level.
12/28/16
DATE:
CONSTRUCTION TELECOMMUNICATION
AGENCY
SHAHZAD YAZDANI
CONTRACTOR shall procure, install, test and commission 1 basic IP
DATE: 12/28/16
OPERATIONS
phone and 2 analog phones.
ALI H GHAMDI
12/28/16 CONTRACTOR shall provide this building 4 outlets for voice and data
DATE:
communication. UTP Cat 6 4-pr x 23 ga. Cable will be used going to each
CONTROL NUMBER
VERIFICATION
CONTRACTOR shall procure, install, test and commission one (1) Radio
DATE:
shall be located at the Security Support Building and the control head at the
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Guardhouse.
OF THIS DRAWING IS COVERED, FOR ALL
Outdoor type Cat 6 4-pr x 23ga cable will be extended from the Support
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Facility building for the connectivity required in the gatehouse. Cat 6
SAY
SAY
SAY
ASH
ASH
ASH
ELECTRICAL
LEADS
LEADS
LEADS
ALL
ALL
ALL
5.2. MUSALLAH
CIVIL
DESCRIPTION
Provide 8” diameter RTR pipe, 80FEOD, for sanitary waste water from
the support buildings toilet sanitary pipe and shall be connected to
sanitary sewer network then heading to the sanitary lift station area.
These will include the provision of sanitary manholes, cleanouts and other
fixtures.
Provide 2” diameter RTR pipe, 12FEOU, from water supply network loop
to support building facilities toilet.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
DISCIPLINE
ENGINEER
ALL LEADS ARCHITECTURAL
DATE: 12/28/16
PROJECT
ENGINEER
CONTRACTOR shall provide a 110 m2 air-conditioned building with
A M ALMATROOK ablution, janitor store and toilets which shall be constructed to serve as the
DATE: 12/28/16 main Musallah near the E & M building. The proposed Musallah capacity
CERTIFIED
AMR EL SHARKAWY
shall be for approximately 45 persons with an ablution area and toilets.
12/28/16
DATE:
CONSTRUCTION The proposed building shall be CMU external wall, concrete frame structure
AGENCY
SHAHZAD YAZDANI and concrete roof slab with all utilities to be provided. For the proposed
DATE: 12/28/16 building floor plan refer to drawing # ARA00002-001
OPERATIONS
ALI H GHAMDI
STRUCTURAL
12/28/16
DATE:
CONTROL NUMBER
HVAC
DATE:
BY:
(PACU-1 – Duty) outside the building to serve the building along with
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG units.
SAY
SAY
SAY
ASH
ASH
ASH
LEADS
LEADS
ALL
ALL
ALL
The condensate drain line from each HVAC Equipment shall be routed
to a nearby drain line with proper slope and P trap.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
CONTRACTOR shall ensure that all HVAC Equipment selected for the
project are as per the EER requirements tabulated under Chapter 7 of
SAES-K-001.
10-02399-
JO/EWO
10-02399-
10-02399-
0001
0001
0001
12/18/16
DATE
CONTRACTOR shall provide and install Exhaust Fans for the different
NO.
REV
G
E
DISCIPLINE
areas listed in the building as per HVAC Layouts along with all
ENGINEER accessories such as back draft dampers and disconnect switch.
ALL LEADS
DATE: 12/28/16
PROJECT
Fire & Smoke Dampers shall be installed on all fire rated walls and
ENGINEER
these fire & smoke dampers shall be manufactured according to UL555
A M ALMATROOK
and UL 555S standard and shall bear a seal from UL.
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY CONTRACTOR shall provide and install a Direct Digital Control Panel
DATE:
12/28/16 to sequence the HVAC Equipment and Exhaust Fans along with
CONSTRUCTION necessary field devices such as temperature sensors, transmitters,
AGENCY
SHAHZAD YAZDANI
pressure differential switches, damper actuators, duct smoke detectors
and air-flow switches as per the requirements of SAUDI ARAMCO
DATE: 12/28/16
OPERATIONS standards.
ALI H GHAMDI
12/28/16 The DDC Panel shall provide following alarms (Audio & visual) as a
DATE:
minimum:
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
SAY
SAY
SAY
CONTRACTOR shall interface the DDC Panel with Fire Alarm Control
Panel & DCS.
ENGG CERT
ASH
ASH
ASH
LEADS
ALL
ALL
CONTRACTOR shall provide & install Gas Detectors on the Fresh Air
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL
Intake duct as per layout drawing and shall be connected to DDC and
DCS System.
The Testing and Air - Balancing requirements shall be provided for the
DESCRIPTION
PLUMBING
10-02399-
10-02399-
building. The water supply system shall provide both Cold and Hot
0001
0001
0001
water requirements to the building utility areas. For water supply layout,
12/28/16
12/18/16
DATE
CONTRACTOR shall provide and install hose bib with vacuum breaker
NO.
REV
G
E
DATE: 12/28/16
CERTIFIED
CONTRACTOR shall provide water supply piping material as per the
AMR EL SHARKAWY Plumbing Drawings. The hot water pipes shall be provided with closed
12/28/16 cell fiberglass insulation of density 64 kg/m3.
DATE:
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI Domestic hot water will be generated by point of use water heaters.
DATE: 12/28/16 Point of use or “instantaneous” types will be provided for remote, single
OPERATIONS
fixture applications and will be mounted on the wall below the fixture
ALI H GHAMDI
being served.
12/28/16
DATE:
CONTROL NUMBER
CONTRACTOR shall provide tie –in to the building water supply lines
VERIFICATION
along with standard accessories such as Isolation valves and back flow
EDSD