You are on page 1of 290

Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

PIPELINES, DISTRIBUTION & TERMINAL


ENGG CERT

ASH
ASH
ASH

PROJECTS DEPARTMENT
LEADS

LEADS
LEADS
ALL

ALL
ALL

RE-ISSUED FOR 100% PROJECT PROPOSAL


RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

YANBU-NORTH JIDDAH DISTRIBUTION &


PIPELINE PROJECTS DIVISION
DESCRIPTION

BI-10-02399

YANBU DISTRIBUTION HUB AND NORTH


10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

JIDDAH BULK PLANT EXPANSION


12/28/16
12/14/16

12/18/16
DATE

(YANBU DISTRIBUTION HUB PORTION)


NO.
REV

G
E

DISCIPLINE
ENGINEER
ALL LEADS

DATE: 12/28/16
PROJECT
ENGINEER PROJECT PROPOSAL NARRATIVE
A M ALMATROOK

DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY

DATE:
CONSTRUCTION
12/28/16
RE-ISSUED FOR 100% PROJECT
AGENCY
SHAHZAD YAZDANI PROPOSAL
DATE: 12/28/16
OPERATIONS
ALI H GHAMDI

12/28/16
ADDENDUM 4
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:

PREPARED BY:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

MUSTANG-HDP,
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

AL-KHOBAR, SAUDI ARABIA.


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 1


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

TABLE OF CONTENTS
ENGG CERT

ASH
ASH
ASH

SECTION 1.0 – INTRODUCTION .............................................................................................. 4


LEADS

LEADS
LEADS
ALL

ALL

1.1 PREFACE ................................................................................................................... 4


ALL

1.2 PRESENT SITUATION ............................................................................................... 4


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

1.3 PROJECT PROPOSAL NARRATIVE .......................................................................... 4


1.4 SAUDI ARAMCO DESIGN / ENGINEERING STANDARDS ........................................ 6
1.5 LIST OF ABBREVIATIONS AND ACRONYMS.......................................................... 21
DESCRIPTION

SECTION 2.0 – PROJECT DESCRIPTION .............................................................................. 25


2.1 PLANT LOCATION ................................................................................................... 25
2.2 LAND USE PERMIT (LUP) ........................................................................................ 25
SECTION 3.0 – PROJECT DESIGN CRITERIA ....................................................................... 25
SECTION 4.0 – DETAILED SCOPE OF WORK ....................................................................... 26
4.1 OVERALL SCOPE .................................................................................................... 26
10-02399-
JO/EWO

10-02399-
10-02399-

INTERFACES WITH OTHER BI’S ............................................................................. 26


0001

4.2
0001
0001

4.3 PROJECT PHYSICAL INTERFACES ....................................................................... 27


12/28/16
12/14/16

12/18/16
DATE

4.4 PROJECT OPERATING INTERFACES .................................................................... 42


4.5 DEMOLITION ACTIVITIES ....................................................................................... 42
NO.
REV

G
E

DISCIPLINE
ENGINEER
4.6 RECEIPT PIPELINE AND CONNECTIONS ......................................................................... 44
ALL LEADS
4.7 YANBU’ DISTRIBUTION HUB TANK FARM AND SUPPORT INFRASTRUCTURE ..................... 50
DATE: 12/28/16
PROJECT
ENGINEER 4.8 YANBU TO JIDDAH PIPELINE 1 & 2 SUPPORT INFRASTRUCTURE ..................................... 69
A M ALMATROOK
4.9 PUMPS AND MOTORS FOR THE YANBU TO JIDDAH PIPELINE........................................... 71
DATE: 12/28/16
CERTIFIED 4.10 PUMP OPERATIONS FOR THE YANBU TO JIDDAH PIPELINE ............................................. 78
AMR EL SHARKAWY

DATE:
12/28/16 4.11 PIPELINE CONNECTION FROM GRASSROOTS-YANBU ARAMCO REFINERY ....................... 78
CONSTRUCTION
AGENCY 4.12 PIPELINE CONNECTION FROM SAMREF REFINERY....................................................... 79
SHAHZAD YAZDANI
4.13 PIPELINE CONNECTION FROM YASREF REFINERY ....................................................... 83
DATE: 12/28/16
OPERATIONS 4.14 PIPELINE CONNECTION FROM YANBU REFINERY TERMINAL ........................................... 86
ALI H GHAMDI

12/28/16 4.15 ELECTRICAL............................................................................................................ 91


DATE:
CONTROL NUMBER

4.16 COMMUNICATION ...................................................................................................... 115


VERIFICATION
EDSD

4.17 FIRE PROTECTION .................................................................................................... 175


4.18 INDUSTRIAL DRAINAGE SYSTEM................................................................................. 182
DATE:
BY:

4.19 GRADING & STORM WATER DRAINAGE ............................................................. 188


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

4.20 UTILITY WATER SUPPLY ...................................................................................... 189


C

(DCC) NO. _____________________

4.21 SANITARY WASTE WATER ................................................................................... 189

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 2


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG 4.22 OVERALL SITE DEVELOPMENT AND FACILITIES: .............................................. 190
SAY
SAY
SAY

4.23 PROCESS AUTOMATION & CONTROLS ........................................................................ 193


ENGG CERT

ASH
ASH
ASH

4.24 INTEGRATED SECURITY SYSTEM ....................................................................... 200


LEADS

LEADS
LEADS
ALL

ALL

4.25 STRUCTURAL........................................................................................................ 213


ALL

SECTION 5.0 – BUILDINGS .................................................................................................. 227


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

GENERAL ARCHITECTURAL BASIS OF DESIGN ........................................................... 227


5.1. MAIN GATEHOUSE................................................................................................ 230
5.2. MUSALLAH ............................................................................................................ 231
DESCRIPTION

5.3. SECURITY GUARD HOUSE (2 NOS.) ..................................................................... 234


5.4. OPERATOR SHELTER (2 NOS.) ............................................................................ 236
5.5. SMOKING SHELTER.............................................................................................. 240
5.6. FSF SUPPORT BUILDING ..................................................................................... 241
5.7. RECEIVING SUBSTATION..................................................................................... 245
5.8. UTILITY POWER SUBSTATION ............................................................................. 250
10-02399-
JO/EWO

10-02399-
10-02399-
0001

5.9. ENGINEERING & MAINTENANCE (E & M) BUILDING ........................................... 256


0001
0001

5.10. SECURITY SUPPORT BUILDING (2 NOS).............................................................. 262


12/28/16
12/14/16

12/18/16
DATE

5.11. TEMPORARY CONSTRUCTION FACILITY ........................................................... 267


5.12. X-RAY BUILDING ................................................................................................... 270
NO.
REV

G
E

DISCIPLINE
ENGINEER
5.13. FIRE WATER UTILITY WATER PUMP SHELTER .................................................. 273
ALL LEADS
5.14. CHEMICAL SHELTER ............................................................................................ 273
DATE: 12/28/16
PROJECT
ENGINEER 5.15. REMOTE I/O BUILDINGS (2 UNITS) ...................................................................... 277
A M ALMATROOK
5.16. IDAS SHELTER (2 UNITS)...................................................................................... 280
DATE: 12/28/16
CERTIFIED 5.17. OPERATION BUILDING ......................................................................................... 283
AMR EL SHARKAWY

DATE:
12/28/16 SECTION 6.0 – MATERIALS REQUIREMENT ...................................................................... 288
CONSTRUCTION
AGENCY SECTION 7.0 – HIGH COMMISSION FOR INDUSTRIAL SECURITY ................................... 288
SHAHZAD YAZDANI
SECTION 8.0 – VALUE PRACTICES / WORKSHOPS .......................................................... 289
DATE: 12/28/16
OPERATIONS SECTION 9.0 – OTHER ENGINEERING STUDIES / ASSESSMENTS / ANALYSIS ............. 289
ALI H GHAMDI

12/28/16 SECTION 10.0 – APPENDICES ............................................................................................. 290


DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 3


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

SECTION 1.0 – INTRODUCTION


ENGG CERT

ASH
ASH
ASH

1.1 PREFACE
LEADS

LEADS
LEADS
ALL

ALL
ALL

The purpose of the proposed facilities is to efficiently meet the Kingdom’s refined
product demand in Makkah Province through the construction of the Yanbu Distribution
Hub (YDH). This project will aggregate refined product from the three local refineries
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

(SAMREF, YASREF, and Yanbu Terminal) to facilitate shipment via two connecting
pipelines: the (a) Yanbu to Jiddah pipeline and the (b) Yanbu to Central Region pipeline,
which are two additional Budget Items under development.
DESCRIPTION

This project is in alignment with the current Distribution Master Plan.

The Yanbu-Jiddah Pipeline, BI-10-02155, initially included the Yanbu to Jiddah pipeline
scope, NJBP scope, YDH scope, and the SSSP-5 supply pipeline scope. As the scope
for BI-10-2155 increased, it was decided to split and segregate the pipelines scope from
the in-plant scope.

BI-10-02399, Additional Capacity – North Jiddah Bulk Plant, has been introduced to the
2016-2018 Business Plan to handle the below major scope elements from BI-10-2155:
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

1. North Jiddah Bulk Plant Expansion (NJBP)


12/28/16
12/14/16

12/18/16

2. Yanbu Distribution Hub (YDH), this Project Proposal Narrative (PPN)


DATE

1.2 PRESENT SITUATION


NO.
REV

G
E

DISCIPLINE
ENGINEER The three refineries in the Yanbu area currently deliver product to the Western Region of
ALL LEADS Saudi Arabia via truck loading, marine vessel loading, and pipeline deliveries to
DATE: 12/28/16 Madinah. Projected product demand growth in the central and western regions will
PROJECT
ENGINEER require that additional infrastructure be built to meet these higher demands. With
A M ALMATROOK currently over 900 MBD of refining capacity, Yanbu has been identified as the refined
DATE: 12/28/16 product origin hub to supply Jiddah and the Central Region.
CERTIFIED
AMR EL SHARKAWY

12/28/16
The 2040 demand forecasts identify the following demand gaps to be supplied by YDH:
DATE:
CONSTRUCTION
AGENCY  576 MBD on the Yanbu to North Jiddah (YNJ-1/2) pipelines (to be constructed as part
SHAHZAD YAZDANI
of this budget item, BI-10-02155); and,
DATE: 12/28/16
OPERATIONS  400 MBD on the Yanbu to Central Region pipeline (future construction, BI-10-02167).
ALI H GHAMDI

12/28/16 1.3 PROJECT PROPOSAL NARRATIVE


DATE:
CONTROL NUMBER
VERIFICATION

This document, the “Project Proposal Narrative” (PPN), is intended to describe the
EDSD

overall scope for YDH project. CONTRACTOR shall read this document and its
attachments carefully and determine all the Materials, Equipment and other
DATE:

requirements of the entire project for supply, installation and successful commissioning
BY:

of YDH project, fully meeting the objective of BI-10-02399.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

The PPN shall be treated as construction scope of work. It provides overall requirements
(DCC) NO. _____________________

of the systems in a comprehensive way and is not intended to cover the work in detail.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 4


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG This document (PPN) describes the overall and major equipment, material and the work
SAY
SAY
SAY

to be provided for YDH project and it is deemed to be the responsibility of


CONTRACTOR to supply, fabricate, install, inspect, test, pre-commissioning,
ENGG CERT

ASH
ASH
ASH

commissioning support, and hand over the project to SAUDI ARAMCO, on time, in a full
operating condition in compliance with the relevant SAUDI ARAMCO standards,
LEADS

LEADS
LEADS
ALL

ALL
ALL

practices, GIs, procedures and other requirements.

The term “Provide” used in the document in different sections by various engineering
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

disciplines/trades shall mean to instruct CONTRACTOR to detail design, supply,


fabricate, install, erect, inspect, test, and commission the equipment, system for the
entire facility. This also includes, but is not limited to, all other sundry materials,
products, consumables and all other necessary items including labor to build the
DESCRIPTION

facilities/ project safely and make it operational and deliver the expected results.

Any equipment/system/materials and efforts that are missing, not fully covered in this
document, but are required to complete the systems shall be identified by
CONTRACTOR during the bidding process and shall be provided.

CONTRACTOR shall conduct field surveys & testing and other engineering studies
workshops and best practices required for the project.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

 CONTRACTOR shall address all project proposal comments which were closed and
0001
0001

reflected in drawings during the detail design and construction phases as applicable.
12/28/16
12/14/16

12/18/16
DATE

 CONTRACTOR shall address and consider in the detail design package all the
recommendations outlined in various studies and submitted proposals to relevant
authorities for setting up YDH.
NO.
REV

G
E

DISCIPLINE
ENGINEER
 CONTRACTOR shall be responsible to produce a detail design package based on
ALL LEADS Project Proposal Package using a SAUDI ARAMCO approved engineering design
DATE: 12/28/16 office; CONTRACTOR shall be responsible for the correctness of all the engineering
PROJECT
ENGINEER
drawings, documents produced by the design office also for the drawings & documents
A M ALMATROOK
provided by vendors. Approval of above drawings and documents by SAUDI ARAMCO
DATE: 12/28/16
does not relieve CONTRACTOR of the responsibility of correct design, right
CERTIFIED equipment, proper installation, testing & commissioning.
AMR EL SHARKAWY

12/28/16
 CONTRACTOR shall have full responsibility for the detail design and engineering of all
DATE:
CONSTRUCTION
required items, elements and systems necessary for the complete, functional and safe
AGENCY operation of the entire scope of equipment and systems. The design criteria and
SHAHZAD YAZDANI
contract documents included are not all-inclusive and represent minimum
DATE: 12/28/16 requirements. Any additional elements or items required to achieve the correct and
OPERATIONS
safe operation of the system shall be engineered, designed, and shall be in place,
ALI H GHAMDI
complete and functional.
12/28/16
 CONTRACTOR shall review and approve Vendor and SUBCONTRACTOR drawings,
DATE:
CONTROL NUMBER
VERIFICATION

design, specifications and other documents for conformity to this Contract and institute
EDSD

effective internal control for prompt receipt, review, approval, and return of such
documents. CONTRACTOR shall incorporate all such applicable Vendor and
DATE:

SUBCONTRACTOR information in THE CONTRACTOR’S submittals to SAUDI


BY:

ARAMCO.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

 THE CONTRACTOR’S drawings shall include all necessary plans, elevations,


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

arrangements, sections, profiles, views and details of all facilities


(DCC) NO. _____________________

 CONTRACTOR shall follow relevant guidelines and Standards mandated by Yanbu


`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 5


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Royal Commission (YRC) for setting up YDH facility and its operation.
SAY
SAY
SAY

 CONTRACTOR shall systematically check his design and drawings to ensure they
ENGG CERT

ASH
ASH

comply with the Scope of Work, relevant SAUDI ARAMCO, YRC standards and
ASH

International Standards and are in keeping with good engineering practices.


LEADS

LEADS
LEADS
ALL

ALL
ALL

1.4 SAUDI ARAMCO DESIGN / ENGINEERING STANDARDS


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

CONTRACTOR shall consider the SAUDI ARAMCO Design and Engineering Standards
as per the cut-off date of September 2016. CONTRACTOR shall meet all the
requirements of the Mandatory SAUDI ARAMCO Engineering Requirements (MSAERs),
YRC, SAMREF, YASREF and Marafiq standards.
DESCRIPTION

Contractor shall use the latest edition, revision, addenda, errata of the applicable local
and international codes and standards, unless otherwise explicitly specified.
In case of conflict between requirements mentioned in different documents, the most
stringent interpretation shall be followed.

The following are the latest applicable Design and Engineering Standards and
international Codes and Standards, available for the project design.
10-02399-
JO/EWO

10-02399-
10-02399-

Any changes during execution of the project will be informed by SAUDI ARAMCO.
0001

0001
0001

1.4.1 SAUDI ARAMCO Engineering Standards (SAES)


12/28/16
12/14/16

12/18/16
DATE

SAES-A-004 General Requirements for Pressure Testing


NO.
REV

G
E

SAES-A-007 Hydrostatic Testing Fluids and Lay-Up Procedures


DISCIPLINE
ENGINEER SAES-A-100 Survey Coordinates, Datum and Data Formats
ALL LEADS SAES-A-102 Ambient Air Quality and Source Emissions Standards
DATE: 12/28/16 SAES-A-104 Waste water treatment, Reuse and Disposal
PROJECT
ENGINEER SAES-A-105 Noise Control
A M ALMATROOK
SAES-A-112 Meteorological and Seismic Design Data
DATE: 12/28/16
CERTIFIED SAES-A-113 Geotechnical Engineering Requirements
AMR EL SHARKAWY
SAES-A-114 Excavation and Backfill
12/28/16
DATE: SAES-A-202 SAUDI ARAMCO Engineering Drawing Preparation
CONSTRUCTION
AGENCY SAES-A-204 Preparation of Structural Calculations
SHAHZAD YAZDANI
SAES-A-400 Industrial Drainage Systems
DATE: 12/28/16
OPERATIONS
SAES-A-401 Closed Drain Systems (CDS)
ALI H GHAMDI SAES-B-005 Spacing and Diking for Atmospheric Low Pressure Tanks
DATE:
12/28/16 SAES-B-006 Fireproofing for plants
SAES-B-014 Safety Requirements for Plant and Operations Support
CONTROL NUMBER
VERIFICATION

Buildings
EDSD

SAES-B-017 Fire Water System Design


DATE:

SAES-B-018 Foam Systems


BY:

SAES-B-019 Portable, Mobile and Special Fixed Firefighting


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

Equipment
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

SAES-B-054 Access, Egress and Material Handling for Plant Facilities


(DCC) NO. _____________________

SAES-B-055 Plant Layout

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 6


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG SAES-B-058 Emergency Shutdown, Isolation and Depressurizing
SAY
SAY
SAY

SAES-B-067 Safety Identification and Safety Colors


ENGG CERT

ASH
ASH

SAES-B-068 Electrical area classification


ASH

SAES-B-069 Emergency Eyewashes and Showers


LEADS

LEADS
LEADS
ALL

ALL
ALL

SAES-B-070 Fire and Safety Requirements for Bulk Plants, Air Fueling
Terminals and sulfur Handling Facilities
SAES-D-109 Design of Small Metallic Storage Tank
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

SAES-D-001 Design Criteria for Pressure Vessels


SAES-D-100 Design Criteria of Atmospheric and Low Pressure Tanks
SAES-E-007 Design Criteria for Air-Cooled heat Exchanges
DESCRIPTION

SAES-G-005 Centrifugal Pumps


SAES-G-006 Positive Displacement Pumps-Controlled Volume
SAES-G-007 Submersible Pumps and Motors for Water Well and
Offshore Service
SAES-G-101 Regulated Vendors List for Pumps and Mechanical Seals
SAES-H-001 Coating Selection and Application Requirements for
Industrial Plant and Equipment
SAES-H-002 Internal and External Coatings for Steel Pipelines &
10-02399-
JO/EWO

10-02399-
10-02399-

Piping
0001

0001
0001

SAES-H-003 Protective Coating for Industrial Concrete Structures


12/28/16

SAES-H-101V Approved SAUDI ARAMCO Data Sheets- Paints and


12/14/16

12/18/16
DATE

Coatings
SAES-J-002 List of Inspectable Instruments
NO.
REV

G
E

DISCIPLINE
SAES-J-003 Instrumentation – Basic Design Criteria
ENGINEER
ALL LEADS
SAES-J-200 Pressure
DATE: 12/28/16
SAES-J-300 Level
PROJECT
ENGINEER
SAES-J-400 Temperature
A M ALMATROOK SAES-J-505 Combustible Gas and Hydrogen Sulfide in Air Detection
DATE: 12/28/16 Systems
CERTIFIED
AMR EL SHARKAWY
SAES-J-600 Pressure Relief Devices
DATE:
12/28/16 SAES-J-601 Emergency Shutdown and Isolation Systems
CONSTRUCTION SAES-J-604 Protective and Condition Monitoring Equipment for
AGENCY
SHAHZAD YAZDANI Rotating Machinery
DATE: 12/28/16 SAES-J-700 Control Valves
OPERATIONS
SAES-J-801 Control Buildings
ALI H GHAMDI
SAES-J-605 Surge Relief Protection System
12/28/16
DATE:
SAES-J-902 Electrical Systems for Instrumentation
CONTROL NUMBER
VERIFICATION

SAES-J-904 Foundation fieldbus (FF) Systems


EDSD

SAES-K-001 Design and Installation of Heating, Ventilating and Air


Conditioning Systems
DATE:
BY:

SAES-K-002 Air Conditioning Systems for Essential Operating


REVISIONCERTIFICATION

Facilities
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

SAES-K-003 HVAC Systems for Communications Facilities & Data


(DCC) NO. _____________________

Centers

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 7


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG SAES-K-100 SAUDI ARAMCO Mechanical (HVAC) Code
SAY
SAY
SAY

SAES-L-100 Applicable Codes and Standards for Pressure Piping


ENGG CERT

ASH
ASH

Systems
ASH

SAES-K-101 Regulated Vendors List for Heating, Ventilating and Air


LEADS

LEADS
LEADS
ALL

ALL
ALL

Conditioning (HVAC) Equipment.


SAES-L-102 Regulated Vendors List for Valves
SAES-L-105 Piping Material Specifications
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

SAES-L-108 Selection of Valves


SAES-L-109 Selection of Flanges, Stud Bolts & Gaskets
SAES-L-132 Material Selection for Piping Systems
DESCRIPTION

SAES-L-133 Corrosion Protection Requirements for Pipelines, Piping


and Process Equipment
SAES-L-150 Pressure Testing of Plant Piping and Pipelines
SAES-L-310 Design of Plant Piping
SAES-L-350 Construction of Plant Piping
SAES-L-610 Nonmetallic Piping in Oily Water
SAES-M-001 Structural Design Criteria for Non-Building Structures
SAES-M-006 SAUDI ARAMCO General Purpose Fencing
10-02399-
JO/EWO

10-02399-
10-02399-

SAES-M-009 Design Criteria for Blast Resistant Buildings


0001

0001
0001

SAES-M-100 SAUDI ARAMCO Building Code


12/28/16

SAES-N-004 Design and Installation of Building Thermal Insulation


12/14/16

12/18/16
DATE

SAES-O-201 Application of security directive


SAES-O-202 Security Fencing
NO.
REV

G
E

DISCIPLINE
SAES-O-203 Security Gate
ENGINEER
ALL LEADS
SAES-O-204 Security Lighting
DATE: 12/28/16
SAES-O-205 Integrated Security System
PROJECT
ENGINEER
SAES-O-206 Security Devices
A M ALMATROOK SAES-O-207 Power Supply for Security System
DATE: 12/28/16 SAES-O-208 Communication for security system
CERTIFIED
AMR EL SHARKAWY
SAES-O-209 Security Door
DATE:
12/28/16 SAES-O-210 Security Lock
CONSTRUCTION SAES-O-211 Identification Card
AGENCY
SHAHZAD YAZDANI SAES-O-212 Security Information Protection
DATE: 12/28/16 SAES-P-100 Basic Power System Design Criteria
OPERATIONS
SAES-P-101 Regulated Vendors List for Electrical Equipment
ALI H GHAMDI
SAES-P-103 UPS and DC system
12/28/16
DATE:
SAES-P-104 Wiring Methods and Materials
CONTROL NUMBER
VERIFICATION

SAES-P-107 Overhead Distribution System


EDSD

SAES-P-111 Grounding
SAES-P-113 Motors and Generators
DATE:
BY:

SAES-P-114 Power System and Equipment Protection


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

SAES-P-116 Switchgear and Control Equipment


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

SAES-P-119 Onshore Substations


(DCC) NO. _____________________

SAES-P-121 Transformers and Reactors

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 8


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG SAES-P-123 Lighting
SAY
SAY
SAY

SAES-P-126 Power System Automation


ENGG CERT

ASH
ASH

SAES-Q-001 Criteria for design and construction of


ASH

concrete structures
LEADS

LEADS
LEADS
ALL

ALL
ALL

SAES-Q-005 Concrete Foundations


SAES-Q-006 Asphalt and Sulfur Extended Asphalt Concrete Paving
SAES-Q-007 Foundations and Supporting Structures for Heavy
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

Machinery
SAES-Q-009 Concrete Retaining Walls
SAES-Q-010 Cement Based, Non-Shrink Grout for Structural and
DESCRIPTION

Equipment Grouting
SAES-Q-011 Epoxy Grout for Machinery Support
SAES-Q-012 Criteria for Design and Construction of Precast and
Pre stressed Concrete Structures
SAES-R-004 Building Design & Finishing Guidelines
SAES-S-010 Sanitary Sewers
SAES-S-020 Oily Water Drainage Systems
SAES-S-030 Storm Water Drainage Systems
10-02399-
JO/EWO

10-02399-
10-02399-

SAES-S-040 SAUDI ARAMCO Water Systems


0001

0001
0001

SAES-S-060 SAUDI ARAMCO Plumbing Code


12/28/16

SAES-S-070 Installation of Utility Piping Systems


12/14/16

12/18/16
DATE

SAES-T-018 Telecommunications – Symbols, Abbreviations and


Definitions
NO.
REV

G
E

DISCIPLINE
SAES-T-151 D.C. Power Systems
ENGINEER
ALL LEADS
SAES-T-492 VHF/UHF Land-Mobile and Fixed Radio Communication
DATE: 12/28/16
SAES-T-493 Digital Trunked Radio System
PROJECT
ENGINEER
SAES-T-494 Very Small Aperture Terminal (VSAT) Network Design
A M ALMATROOK SAES-T-556 Circuit Quality and Performance
DATE: 12/28/16 SAES-T-566 Plant Demilitarized Zone (DMZ) Architecture
CERTIFIED
AMR EL SHARKAWY
SAES-T-603 Safeguards and Warning Devices
DATE:
12/28/16 SAES-T-624 Telecommunications – OSP Fiber Optics
CONSTRUCTION SAES-T-625 Inter and Intra-Building Fiber Optic Communications
AGENCY
SHAHZAD YAZDANI Cables
DATE: 12/28/16 SAES-T-628 Underground Cable
OPERATIONS
SAES-T-629 Telecommunications – Buried Cable and Wire
ALI H GHAMDI
SAES-T-631 Communications Cable Terminals
12/28/16
DATE:
SAES-T-632 Communications Cable Splicing
CONTROL NUMBER
VERIFICATION

SAES-T-633 Communications Splice Closures


EDSD

SAES-T-634 Telecommunications – Cable Testing and Acceptance


SAES-T-744 Design Criteria and Installation of Communication
DATE:
BY:

Towers
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

SAES-T-795 Communications Facility Grounding System


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

SAES-T-887 Protection at Power Plants and Radio Stations


(DCC) NO. _____________________

SAES-T-903 Electrical Protection – Outside Plant

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 9


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG SAES-T-911 Telecommunications Conduit System Design
SAY
SAY
SAY

SAES-T-912 Communications Feeder Cable


ENGG CERT

ASH
ASH

SAES-T-914 Telecommunications Distribution Cable


ASH

SAES-T-916 Telecommunications Building Cable Systems


LEADS

LEADS
LEADS
ALL

ALL
ALL

SAES-T-920 Telecommunications Cable Information


SAES-T-928 Telecommunications – OSP Buried Plant
SAES-T-938 Telecommunications – OSP System DesignSAES-U-101
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

Regulated Vendors List for Fire Protection Equipment


SAES-U-101 Regulated Vendors List for Fire Protection Equipment
SAES-W-010 Welding Requirements for Pressure Vessels
DESCRIPTION

SAES-W-011 Welding Requirements for On Plot Piping


SAES-W-012 Welding Requirements for Pipelines
SAES-W-017 Welding Requirements for Tanks
SAES-X-400 Cathodic Protection Buried pipelines
SAES-X-500 Cathodic Protection of Vessel and Tank Internals
SAES-X-600 Cathodic Protection of Plant facilities
SAES-X-700 Cathodic Protection of onshore well casings
SAES-Y-103 Royalty/Custody Metering of Hydrocarbon Liquids
10-02399-
JO/EWO

10-02399-
10-02399-

SAES-Y-301 Royalty/Custody Measurement of Hydrocarbon using


0001

0001
0001

Radar Tank Gauging Systems


12/28/16

SAES-Y-501 Dynamic Sampling of Hydrocarbon Liquids for


12/14/16

12/18/16
DATE

Royalty/Custody Transfers
SAES-Z-001 Process Control System
NO.
REV

G
E

DISCIPLINE
SAES-Z-002 Technically Acceptable Process Automation Systems
ENGINEER
ALL LEADS
SAES-Z-008 Terminal Management System
DATE: 12/28/16
SAES-Z-010 Process Automation Networks Connectivity
PROJECT
ENGINEER
SAES-Z-020 Design and Installation of Fiber Optic Cables Systems for
A M ALMATROOK Process Control Networks
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY
1.4.2 SAUDI ARAMCO Inspection Requirements
12/28/16
DATE:
175-000003 Instructions & Explanations of Inspection Requirements
CONSTRUCTION
AGENCY 175-321900 Pressure Vessels
SHAHZAD YAZDANI
175-343100 Panels and Cabinets for Outdoor Area
DATE: 12/28/16
OPERATIONS 175-013100 Fabricated Carbon Steel Piping
ALI H GHAMDI 175-019800 Auxiliary Piping for Mechanical Equipment
DATE:
12/28/16 175-022500 Flanges, Spectacle Plates, Spacers & Blinds
CONTROL NUMBER

175-022501 Flanges; Weld Neck, Forged Steel


VERIFICATION

175-091900 Inspection and Testing Requirements


EDSD

175-060100 GASKETS: Metal, Spiral-Wound or Jacketed


DATE:

175-120100 Steel Structures


BY:

175-170200 Severe Duty Totally Enclosed Squirrel Cage Induction


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Motors to 500 HP
C

175-170300 Motors Foam-Wound, Squirrel Cage Induction 500 HP


(DCC) NO. _____________________

and above or Brushless Synchronous


`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 10


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG 175-171300 Galvanic Anodes: Aluminum, Magnesium, or Zinc for
SAY
SAY
SAY

Cathodic Protection
ENGG CERT

ASH
ASH

175-171500 Cables for Cathodic Protection


ASH

175-120150 Spreader Beam


LEADS

LEADS
LEADS
ALL

ALL
ALL

175-310200 Mechanical Seals for Pumps


175-130900 Coupling Shaft Special Purpose
175-320300 Positive Material Identification
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

175-324900 Tanks Atmosphere, Steel within scope


175-323600 Air Cooled Heat Exchangers
175-325100 Steel Tanks Aboveground according to API-12F, API-650
DESCRIPTION

Appendix-J and UL-142


175-326100 Lubrication, Shaft Sealing and Control Oil Systems
175-310500 Pump: API, Centrifugal Horizontal, End Suction Single
Stage or Vertical Inline
175-341700 Pressure Retaining Instruments
175-310600 Pump: API, Centrifugal
175-310200 Mechanical Seals for Pumps
175-341900 Valve Safety Relief Conventional and Balanced Type
10-02399-
JO/EWO

10-02399-
10-02399-

175-310300 Pumps: Rotary per API-676


0001

0001
0001

175-173700 Skid Mounted Equipment: Auxiliary Electrical


12/28/16

Systems
12/14/16

12/18/16
DATE

175-340100 Valve: Control


175-340200 Package Unit Instrumentation
NO.
REV

G
E

DISCIPLINE
175-343100 Control Panels
ENGINEER
ALL LEADS
175-345100 Monitoring Systems Vibration, Axial position and
DATE: 12/28/16
bearing Temperatures
PROJECT
ENGINEER
175-347600 Cable: Instrumentation
A M ALMATROOK

DATE: 12/28/16 1.4.3 SAUDI ARAMCO Material Specification Standards


CERTIFIED
AMR EL SHARKAWY
01-SAMSS-010 Fabricated Steel Piping
12/28/16
DATE:
01-SAMSS-017 Auxiliary Piping for Mechanical Equipment
CONSTRUCTION
AGENCY 01-SAMSS-029 RTR (Fiberglass) Sewer Pipe and Fittings for Gravity
SHAHZAD YAZDANI
Flow
DATE: 12/28/16
OPERATIONS 01-SAMSS-034 RTR (Fiberglass) Pressure Pipe and Fittings
ALI H GHAMDI 01-SAMSS-035 API Line Pipe
DATE:
12/28/16 01-SAMSS-038 Small quantity purchase and Approved pipe mills
CONTROL NUMBER

01-SAMSS-091 Oil Field Chemical Injection Skid System


VERIFICATION

02-SAMSS-005 Butt Welding Pipe Fittings


EDSD

02-SAMSS-011 Forged Steel and Alloy Flanges


DATE:

04-SAMSS-001 Gate Valves


BY:

04-SAMSS-002 Globe Valves


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

04-SAMSS-005 Check Valves, Swing Type


C

04-SAMSS-035 General Requirements for Valves


(DCC) NO. _____________________

04-SAMSS-041 Expanding Plug Valves


`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 11


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG 04-SAMSS-048 Valve Inspection and Testing Requirements
SAY
SAY
SAY

04-SAMSS-051 Ball Valves, API SPEC 6D


ENGG CERT

ASH
ASH

04-SAMSS-052 Ball Valves, API SPEC 6A


ASH

09-SAMSS-021 Qualification Requirements for Alkyd Enamel Coating


LEADS

LEADS
LEADS
ALL

ALL
ALL

System (APCS-6)
09-SAMSS-060 Packaging Requirements for Coatings
09-SAMSS-067 Qualification Requirements for Internal Coating Systems
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

Used in Immersion Service


09-SAMSS-069 Qualification Requirements for Epoxy Coatings for
Atmospheric Service
DESCRIPTION

09-SAMSS-088 Aggregates for Concrete


09-SAMSS-091 Qualification Requirement For Shop-Applied Internal
FBE Coatings
09-SAMSS-097 Ready-Mixed Concrete
09-SAMSS-107 Qualification Requirements and Application of Composite
Fluoro-polymer/Ceramic Coatings to Fasteners
12-SAMSS-005 Marking of Metal Products
12-SAMSS-007 Fabrication of Structural and Miscellaneous Steel
10-02399-
JO/EWO

10-02399-
10-02399-

12-SAMSS-008 Erection of Structural and Miscellaneous Steel


0001

0001
0001

12-SAMSS-014 Pre-Engineered Metal Buildings


12/28/16

14-SAMSS-531 Power Transformers


12/14/16

12/18/16
DATE

14-SAMSS-536 Pad mounted Three Phase Distribution Transformers


15-SAMSS-502 Medium Voltage Cable 5KV through 35 KV
NO.
REV

G
E

DISCIPLINE
16-SAMSS-502 Metal-Enclosed Metal-Clad Low Voltage Switchgear
ENGINEER
ALL LEADS
Assemblies
DATE: 12/28/16
16-SAMSS-503 Indoor Control gear-Low Voltage
PROJECT
ENGINEER
16-SAMSS-504 Indoor Metal-Clad Switchgear: 1 to 38 KV
A M ALMATROOK 16-SAMSS-512 Outdoor Switchrack – Low Voltage
DATE: 12/28/16 16-SAMSS-513 Power System Automation Components
CERTIFIED
AMR EL SHARKAWY
16-SAMSS-518 Low Voltage Panel boards
DATE:
12/28/16 16-SAMSS-519 Indoor Switchboards-Low Voltage
CONSTRUCTION 16-SAMSS-520 Cable Bus
AGENCY
SHAHZAD YAZDANI 17-SAMSS-004 Conventional (Tap Adjustable) Rectifiers for Cathodic
DATE: 12/28/16 protection
OPERATIONS
17-SAMSS-005 Cathodic Protection phase controlled Rectifiers
ALI H GHAMDI
17-SAMSS-006 Galvanic Anodes for Cathodic Protection
12/28/16
DATE:
17-SAMSS-007 Impressed Current Anodes for Cathodic Protection
CONTROL NUMBER
VERIFICATION

17-SAMSS-008 Junction Boxes for Cathodic Protection


EDSD

17-SAMSS-017 Impressed Current Cathodic protection Cables


17-SAMSS-018 Remote Monitoring System for Cathodic protection
DATE:
BY:

17-SAMSS-502 Form-Wound Induction Motors 500 HP and Above


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

17-SAMSS-503 Severe Duty, Totally Enclosed Squirrel Cage Induction


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Motors to 500 HP
(DCC) NO. _____________________

17-SAMSS-515 Auxiliary Electrical Systems for Skid-Mounted Equipment

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 12


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG 17-SAMSS-511 Stationary Storage Batteries
SAY
SAY
SAY

17-SAMSS-514 Battery Charger/Rectifier


ENGG CERT

ASH
ASH

17-SAMSS-515 Auxiliary Electrical Systems for Skid-Mounted Equipment


ASH

17-SAMSS-516 Uninterruptible Power Supply System


LEADS

LEADS
LEADS
ALL

ALL
ALL

17-SAMSS-518 Diesel Generator Sets


26-SAMSS-059 Insulating Oil Uninterruptible Power Supply System
18-SAMSS-625 Outside Plant – Fiber optic cable specifications (single
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

mode and multiple mode).


20-SAMSS-001 Welding and Brazing Consumables
21-SAMSS-011 Fluoro Protein Foam Concentrate For MTBE
DESCRIPTION

Hydrocarbon Fires
23-SAMSS-010 Distributed Control Systems
23-SAMSS-050 Terminal Management System
23-SAMSS-701 Industrial Ethernet Switch Specifications
26-SAMSS-084 Turbo Compressor oil 46
27 SAMSS-011 Fire, Smoke, and Combination Fire-Smoke Dampers
31-SAMSS-003 Reciprocating Compressors for Air or Gas Service
31-SAMSS-004 Centrifugal Pumps
10-02399-
JO/EWO

10-02399-

Positive Displacement Pumps – Controlled Volume3


10-02399-

31-SAMSS-009
0001

0001
0001

31-SAMSS-010 Submersible Pumps and Motors for Water Well and


12/28/16

Offshore Service
12/14/16

12/18/16
DATE

31-SAMSS-012 Shaft Sealing System for Centrifugal and Rotary


Pumps
NO.
REV

G
E

DISCIPLINE
32-SAMSS-004 Manufacture of Pressure Vessels
ENGINEER
ALL LEADS
32-SAMSS-005 Manufacture of Atmospheric Tanks
DATE: 12/28/16
32-SAMSS-013 Lubrication, Shaft Sealing and Control Oil Systems
PROJECT
ENGINEER
32-SAMSS-030 Manufacture of Small Metallic Atmospheric Storage
A M ALMATROOK Tanks
DATE: 12/28/16 32-SAMSS-038 manufacture of Skid Mounted units
CERTIFIED
AMR EL SHARKAWY
34-SAMSS-117 Turbine Flow Meters in Liquid Service
DATE:
12/28/16 34-SAMSS-118 Positive Displacement Meters
CONSTRUCTION 34-SAMSS-119 Bi-Directional Meter Prover
AGENCY
SHAHZAD YAZDANI 34-SAMSS-120 Uni-Directional Meter Prover
DATE: 12/28/16 34-SAMSS-121 Small Volume Prover
OPERATIONS
34-SAMSS-167 Truck Loading Metering Systems
ALI H GHAMDI
34-SAMSS-319 Radar Tank Gauging Equipment
12/28/16
DATE:
34-SAMSS-514 Combustible Gas and Hydrogen Sulfide Monitors
CONTROL NUMBER
VERIFICATION

34-SAMSS-318 Automatic Tank Gauging Equipment


EDSD

34-SAMSS-321 Radar Tank Gauging Systems for Royalty/Custody


Measurement of Hydrocarbon Liquids
DATE:
BY:

34-SAMSS-010 Quality Requirement for Pressure Retaining


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

Instruments
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

34-SAMSS-611 Safety Relief Valves Conventional and Balanced


(DCC) NO. _____________________

Types

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 13


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG 34-SAMSS-623 Programmable Controller Based ESD Systems
SAY
SAY
SAY

34-SAMSS-625 Machinery Protection System


ENGG CERT

ASH
ASH

34-SAMSS-634 Local ZV Control Systems


ASH

34-SAMSS-711 Control Valves


LEADS

LEADS
LEADS
ALL

ALL
ALL

34-SAMSS-717 Hydraulic Valve Actuators Systems

34-SAMSS-718 Electric Motor Operated Valve Actuators


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

34 SAMSS 820 Instrument Control Panel Indoors


34-SAMSS-821 Instrument Control Cabinets – Outdoor
34-SAMSS-830 Programmable Logic Controllers
DESCRIPTION

34-SAMSS-831 Instrumentation for Packaged Units


34-SAMSS-841 Flow Computer for Custody Transfer Measurement of
Hydrocarbon Liquids
34-SAMSS-847 Preset Controller for Truck Loading and Unloading
Systems
34-SAMSS-913 Instrumentation and Thermocouple Cable

1.4.4 SAUDI ARAMCO Engineering Procedure


10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

SAEP-14 Project Proposal


SAEP-22 Tank Calibration Requirements
12/28/16
12/14/16

12/18/16
DATE

SAEP-28 Radar Tank Gauging System Verification Requirements


SAEP-99 Process Automation Networks and Systems Security
NO.
REV

SAEP-302 Instructions for Obtaining a Waiver of a Mandatory


G
E

DISCIPLINE SAUDI ARAMCO Engineering Requirement


ENGINEER
ALL LEADS SAEP-334 Retrieval, Certification and Submittal of SAUDI ARAMCO
DATE: 12/28/16 Engineering & Vendor Drawings
PROJECT
ENGINEER SAEP-316 Performance Qualification Requirements of Coating
A M ALMATROOK Personnel
DATE: 12/28/16 SAEP-318 Pressure Relief Valve Program Authorization for
CERTIFIED
AMR EL SHARKAWY
Installation, Deletion and Changes
12/28/16 SAEP-319 Pressure Relief Devices - Testing and Inspection
DATE:
CONSTRUCTION
Requirements
AGENCY SAEP-747 Pipelines Leak Detection Systems
SHAHZAD YAZDANI

DATE: 12/28/16
OPERATIONS
SAEP-1152 Approval procedure for Ready-Mixed concrete mix
ALI H GHAMDI design
DATE:
12/28/16 SAEP-1624 Preparation of System Design Document
SAEP-1630 Preparation of Integration Test Procedure
CONTROL NUMBER
VERIFICATION

SAEP-1634 Factory Acceptance Test


EDSD

SAEP-1638 Site Acceptance Test


DATE:

SAEP-3101 Equipment & Spare Parts Data Requirement for


BY:

CONTRACTOR Produced Equipment.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

1.4.5 SAUDI ARAMCO Standards Drawings (SASD)


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 14


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG AA-036024-001 Roof framing plan sunshade type-I, community
SAY
SAY
SAY

AA-036513-001 Custody Transfer


ENGG CERT

ASH
ASH

AA-036322-001 Rev.08 Anchor Bolt Details


ASH

AA-036026-001 Site L/O-Decorative Metal Gate


LEADS

LEADS
LEADS
ALL

ALL
ALL

AA-036026-002 Foundation General


AA-036026-003 Details, Decorative Metal Gate
AA-036051 Site Layout-Computer Gate House Fac. 4 lanes
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

AA-036678 SAUDI ARAMCO Security and General Purpose Fencing


AA-036755-001 Details-Drive Gate & Walk Gate
AA036755-002 Details-Gates Locking Device and Drop Bolt
DESCRIPTION

AB-036003-001 Manways and Vents for Tanks


AB-036054 Oily Water Sewer Manholes
AB-036260 Concrete Sidewalk, Curb and Gutter Details
AB-036019 Thermowell Assembly and Detail
AB-036106-001 Assembly and Details of Type "A” Stairs for Walkways
and Platforms.
AB-036106-002 Assembly and Details of Type "A" Stairs for Walkways
and Platforms-Metric
10-02399-
JO/EWO

10-02399-
10-02399-

AB-036227 Standard Symbols for Piping Orthographic Drawings


0001

0001
0001

AB-036386 Hardness Testing for Welding Procedure Qualifications


12/28/16

AB-036521 Bridge Weld and Typical Brace Seal Welded and Socket
12/14/16

12/18/16
DATE

Welded Valves On Process Lines


AC-036045 Detail Vent, Drain and Sample Connections
NO.
REV

G
E

DISCIPLINE
AC-036950 Instrument Symbols
ENGINEER
ALL LEADS
AE-036137 Truck Loading Bottom Specification
DATE: 12/28/16
AE-036175 Details of Heavy Welding Boss for Threaded
PROJECT
ENGINEER
Connections to Vessels and Lines
A M ALMATROOK AE-036451 Pre-Heat Levels for Welding Carbon Steel
DATE: 12/28/16 AE-036141 Truck loading or unloading – general arrangement
CERTIFIED
AMR EL SHARKAWY
SA-2693 Safety Instruction Sheet – Tanks
DATE:
12/28/16 AB-036402 Details Cast Iron Catch Basin with Side inlet s
CONSTRUCTION AE-036470 RIP-RAP Slope Protection Detail
AGENCY
SHAHZAD YAZDANI AC-036078 Details Cast Iron Catch Basin without Side inlets
DATE: 12/28/16 AC-036489 Traffic Control Devices
OPERATIONS
AC-036680 SAUDI ARAMCO Security and General Purpose
ALI H GHAMDI
Fencing-Footing Details
12/28/16
DATE:
AB-036677 SAUDI ARAMCO Security and General Purpose Fencing
CONTROL NUMBER
VERIFICATION

AB-036679 Gate Details


EDSD

AD-036009 Water Line Valve Direct Buried


AD-036512 Arrows and Cross Walk Markings
DATE:
BY:

AE-036083 Manhole Cover for Sewer


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

AE-036254 Parking Bumpers Precast Concrete Block


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

AE-036412 Guard Post and Guardrail details


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 15


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG 1.4.6 SAUDI ARAMCO Library Drawings (SALD)
SAY
SAY
SAY
ENGG CERT

DB-950054 Thermocouple Well Assemblies-Horizontal Process


ASH
ASH
ASH

Lines Details
LEADS

LEADS
LEADS
ALL

DC-950040 Pressure Indicators and Switches - Locally Mounted


ALL
ALL

DC-950042 Pressure Instrument - Blinds and Indicating Type -


Instrument Piping Details
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

DC-950043 Electrical Connections for Field-Mounted Instruments


DD-950022-006 Details of Ground Connections, Switchboard/Control
Panels Ground Bus to Ground Grid
DESCRIPTION

DD-950025 Nameplate Details for Instrument Boards


DD-950053 Field Mounting Details for Instruments.

1.4.7 Non-Material Requirement (NMR)

NMR - 7907 Instrumentation


NMR - 7912 Electric Rotary Machinery
NMR - 7919-1 Pressure Vessels
NMR - 7925 Valves
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

NMR - 7927 Fabricated Structural Steel


NMR - 7918 Safety relief Valves
12/28/16
12/14/16

12/18/16
DATE

NMR - 7923 Control Panel


NMR - 7927 Fabricated Structural Steel
NO.
REV

G
E

NMR - 7918-1 Tanks


F

DISCIPLINE
ENGINEER
NMR - 7902 Pumps
ALL LEADS

DATE: 12/28/16
1.4.8 SAUDI ARAMCO Construction Safety Manual and Safety Handbook
PROJECT
ENGINEER

A M ALMATROOK All work is to be carried out in accordance with the SAUDI ARAMCO
DATE: 12/28/16
CERTIFIED
Construction Safety Manual and the minimum behavioral safety standards
AMR EL SHARKAWY detailed in the SAUDI ARAMCO Safety Handbook. Furthermore, the project
12/28/16 shall provide Safety and Hazard Identification Plans (HIP) for Loss Prevention
DATE:
CONSTRUCTION
AGENCY
approval.
SHAHZAD YAZDANI

DATE: 12/28/16 1.4.9 SAUDI ARAMCO General Instructions


OPERATIONS
ALI H GHAMDI
CONTRACTOR shall adhere to all pertinent general instructions, in particular,
12/28/16
DATE: the following for the execution of the work:
CONTROL NUMBER
VERIFICATION

G.I.001 General Instruction


EDSD

G.I.2.100 Work Permit System


DATE:

G.I.2.721 Electrical Arc Flash Hazard Mitigation


BY:
REVISIONCERTIFICATION

G.I.6.001 Notification Requirement for Incidents (Including Fires)


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

G.I.6.012 Isolation, Lockout and Use of Hold Tags


C

(DCC) NO. _____________________

G.I.6.030 Traffic and Vehicle Safety


G.I.8.001 Safety Requirements for Scaffolding
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 16


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG G.I.298.010 Administration Procedure of Contractor Camps/Parks
SAY
SAY
SAY

and Construction Camps


ENGG CERT

ASH
ASH

G.I.710.001 SAUDI ARAMCO ID Cards


ASH

G.I.710.002 Classification of Sensitive Documents


LEADS

LEADS
LEADS
ALL

ALL
ALL

GI-1781.001 Inspection, Testing and Maintenance of Fire


Protection Equipment
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

1.4.10 Yanbu Royal Commission Standards

This project is within YRC jurisdictions and CONTRACTOR shall adhere to all
DESCRIPTION

YRC applicable standards. For full list of applicable standards See Appendix 9.

RCER-2015-Volume I- FINAL-July 2, 2015 Environmental Regulations


RCER-2015-Volume II- FINAL-July 2, 2015 Environmental Regulations

1.4.11 SAMREF Standards

CONTRACTOR shall adhere to all SAMREF standards, format, procedures and


requirements standards, for the scope of work inside SAMREF facilities. See
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

Appendix 10.
12/28/16
12/14/16

12/18/16
DATE

Dwg. Numbering Procedure


Drafting Procedure
NO.
REV

Juction Box -Numbering Std


G
E

DISCIPLINE
ENGINEER
Junction Box and Cable Installation Std
ALL LEADS Marked up P&ID - Tie-ins
DATE: 12/28/16 MOV’s Purchase Specs - Sample
PROJECT
ENGINEER P&ID Legend & Details
A M ALMATROOK
SAMREF Approved Manufacturer List (AML)
DATE: 12/28/16
CERTIFIED SAMREF Piping Class
AMR EL SHARKAWY
Eqp. & Inst. Tag number Req. Form
12/28/16
DATE:
CONSTRUCTION
AGENCY 1.4.12 INTERNATIONAL CODES AND STANDARDS
SHAHZAD YAZDANI

DATE: 12/28/16 IBC-2009 International Building Code.


OPERATIONS
NFPA-72 National Fire Alarm Code
ALI H GHAMDI

12/28/16
AISC Steel Construction Manual-13th Edition
DATE:
ACI American Concrete Institute
CONTROL NUMBER
VERIFICATION

API Standard 650 Welded Tanks for oil storage


EDSD

API 2003 Protection Against Ignitions Arising Out of Static,


Lightning and Stray Currents
DATE:
BY:

API 505 Recommended practice for classification of locations for


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

electrical installations at petroleum facilities


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

API 541 Form-wound Squirrel-Cage Induction Motors—500


(DCC) NO. _____________________

Horsepower and Larger

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 17


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG API 546 Brushless synchronous machines-500KVA and larger
SAY
SAY
SAY

API 675 Positive Displacement Pumps – Controlled Volume


Positive Displacement Pumps – Rotary
ENGG CERT

ASH
ASH

API 676
ASH

ANSI American National Standards Institute (ANSI) Standards


LEADS

LEADS
LEADS
ALL

ALL
ALL

API STD 610 Centrifugal Pumps for Petroleum, Petrochemical and


Natural Gas Industries
API STD 614 Lubrication shaft sealing and control oil system
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

for special purpose application


API STD 682 Shaft Sealing Systems for Centrifugal and Rotary
Pumps
DESCRIPTION

API STD 671 Special purpose coupling for petroleum, chemical


and gas industry services
HI 9.6.7 Viscosity Correction
API American Petroleum Institute (API) Standards
AWS American Welding Society (AWS) Standards
ASTM American Society for Testing Materials
ASME Section IX Welding & Brazing Qualifications
ASME Section V Non Destructive Testing
10-02399-
JO/EWO

10-02399-
10-02399-

ASME SEC VIII Div. 1 Rules for Construction of Pressure Vessels


0001

0001
0001

ASME B31.3 Process Piping


12/28/16

ASME B31.4 Pipeline Transportation for liquid hydrocarbons


12/14/16

12/18/16
DATE

ASME B16.5 Pipe Flanges and Flanged Fittings


ASME B16.11 Forged Steel Fittings, Socket-welded and Threaded.
NO.
REV

G
E

DISCIPLINE
ASME B73.1 Specification for End suction horizontal Centrifugal
ENGINEER
ALL LEADS
Pumps for chemical Process
DATE: 12/28/16
API – MPMS API Manual of Petroleum Measurement Standards
PROJECT
ENGINEER
(MPMS)
A M ALMATROOK API, RP 2000 Safety Relief Valve Sizing
DATE: 12/28/16 API-RP 686 Recommended Practices for machinery Installation and
CERTIFIED
AMR EL SHARKAWY
Installation Design
DATE:
12/28/16 B30.10 Hooks
CONSTRUCTION B30.17 Overhead and Gantry Cranes (Top Running Bridge
AGENCY
SHAHZAD YAZDANI Single Girder, Under Hung Hoist)
DATE: 12/28/16 HST-4M Performance Standard for Overhead Electric Wire Rope
OPERATIONS
Hoists
ALI H GHAMDI

12/28/16
DATE:
American National Standards Institute (ANSI)/National Electrical Manufacturers
CONTROL NUMBER
VERIFICATION

Association (NEMA)
EDSD

ANSI / NEMA ICS 2 Industrial Control Devices


DATE:
BY:

ANSI / NEMA ICS 6 Enclosures or Industrials Controls and Systems


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

American National Standards Institute (ANSI)/National Fire Protection


C

Association (NFPA)
(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 18


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG ANSI / NFPA 70 National Electric Codes
SAY
SAY
SAY

NFPA 13 Standard for the Installation of Sprinkler Systems


ENGG CERT

ASH
ASH

NFPA 16 Installation of Foam-Water Sprinkler and Foam-Water


ASH

Spray Systems
LEADS

LEADS
LEADS
ALL

ALL
ALL

NFPA 20 Installation of Stationary Pumps


NFPA 22 Water Tanks for Private Fire Protection
NFPA 24 Installation of Private Fire Service Mains and Their
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

Appurtenances
NFPA 30 Flammable and Combustible Liquids Code
DESCRIPTION

NFPA 90A Installation of Air Conditioning and Ventilating


System
American Society of Heating, refrigerating & Air-Conditioning Engineers,
Inc. (ASHRAE)

ASHRAE STD 52 Filters, Testing Air-Cleaning Devices


ASHRAE STD 55 Thermal Environmental Conditions for Human
Comfort
10-02399-
JO/EWO

10-02399-
10-02399-

ASHRAE STD 62 Ventilation for Acceptable Indoor Quality


0001

0001
0001

ASHRAE STD 111 Practice for Measurement, Testing, Adjusting and


12/28/16

Balancing of HVAC Systems


12/14/16

12/18/16
DATE

ASHRAE Handbook HVAC Applications


ASHRAE Handbook Systems and Equipment
NO.
REV

G
E

DISCIPLINE
ASHRAE Handbook Fundamentals
ENGINEER
ALL LEADS
INSTRUMENT, SYSTEMS AND AUTOMATION SOCIETY (ISA)
DATE: 12/28/16
PROJECT
ENGINEER

A M ALMATROOK
ISA S5.1 Instrumentation Symbols and Identification
DATE: 12/28/16
CERTIFIED International Organization for Standardization
AMR EL SHARKAWY

12/28/16
DATE: ISO 9000 Quality Systems – Model for Quality Assurance in
CONSTRUCTION
AGENCY Design/Development, Production, Installation and Servicing.
SHAHZAD YAZDANI

DATE: 12/28/16
OPERATIONS
International Electro -Technical Commissions (IEC)
ALI H GHAMDI

12/28/16
IEC 61000-6-2 Generic Standards – Immunity for Industrial
DATE:
Environments
CONTROL NUMBER
VERIFICATION

IEC 62305-1,2, 4, 5 Standard for Lightning Protection System


EDSD

DATE:

SMACNA
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

SMACNA 2002 HVAC SYSTEM-TESTING, Adjusting and


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Balancing, 3rd Edition


(DCC) NO. _____________________

SMACNA 2005 HVAC Duct Construction Standard-Metal and

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 19


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Flexible, 3rd Edition
SAY
SAY
SAY

SMACNA 2002 Fire, Smoke and Radiation damper Installation Guide


for HVAC Systems, 5th Edition
ENGG CERT

ASH
ASH
ASH
LEADS

LEADS
LEADS
ALL

American National Standards Institute (ANSI) / American Water Works


ALL
ALL

Association (AWWA)
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

ANSI / AWWA C503 Wet Barrel Fire Hydrants

American National Standards Institute (ANSI) Standards


American Petroleum Institute (API) Standards.
DESCRIPTION

AMS/ANSI B31.3 Process Piping


CMAA SPEC # 70 Specification for Top Running & Gantry Type Multiple
Girder Electric Overhead Traveling Cranes
CMAA SPEC #74 Specification for Top Running and Under Running Single
Girder Electrical Travelling Cranes Utilizing Under
Running Trolley Hoist
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

The International Society of Automation (ISA) Standards and Recommended


Practices for Instrumentation and Control.
12/28/16
12/14/16

12/18/16
DATE

National Fire Protection Association (NFPA) Standards


National Electrical Manufacturers Association (NEMA) Standards
NO.
REV

G
E

DISCIPLINE ISA RP 12.1 - Electrical Instruments in Hazardous Atmospheres


ENGINEER
ALL LEADS IEEE 100 - Standard Dictionary of Electrical and Electronic Terms
DATE: 12/28/16
PROJECT
ANSI/ICS 6-1983 - Enclosures for Industrial Controls and Systems
ENGINEER

A M ALMATROOK
API Manual of Petroleum Measurement Standards (MPMS)
DATE: 12/28/16 API Recommended Practice 2003-1998, Protection Against Ignitions Arising
CERTIFIED
AMR EL SHARKAWY
Out of Static, Lighting and Stray Currents
DATE:
12/28/16 API Recommended Practice 2610-1194, Design, Construction, Operation,
CONSTRUCTION
AGENCY
Maintenance and Inspection of Terminal, Tank Facilities
SHAHZAD YAZDANI
American Society of Civil Engineers (ASCE) Publication 7- 05 Standards -
DATE: 12/28/16
OPERATIONS
Minimum Design Loads for Buildings and Other Structures
ALI H GHAMDI API Recommended Practice 1004, Bottom Loading and Vapor Recovery
12/28/16
DATE: MC 306 Tank Motor Vehicles (to be used in conjunction with U.S. Department
CONTROL NUMBER
VERIFICATION

of Transportation 406, Section 49)


EDSD

PROCESS INDUSTRIES PRACTICES (PIP)


DATE:

UL Underwriters Laboratories, Inc.


BY:
REVISIONCERTIFICATION

OSHA Occupational Safety and Health Act Standards


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

SSPC Society for Protective Coatings


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 20


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG 1.5 LIST OF ABBREVIATIONS AND ACRONYMS
SAY
SAY
SAY

Process
ENGG CERT

ASH
ASH
ASH

BBL Barrels
BPD Barrels per day
LEADS

LEADS
LEADS
ALL

ALL
ALL

DO Diesel oil
DPK Dual purpose kerosene
MB 1000 barrel
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

MBD 1000 barrel per day


NJBP North Jiddah Bulk Plant
PG 91 Premium Gasoline-91 RON
PG 95 Premium Gasoline-95 RON
DESCRIPTION

PSP Project Scoping Paper


TBD To be decided
ULSD Ultra-low Sulphur diesel
YNJ-1 Yanbu Jiddah pipeline -1
YNJ-2 Yanbu Jiddah pipeline -2

TELECOM
ARS Automatic Route Selection
AUTH Authorization Code
10-02399-
JO/EWO

10-02399-
10-02399-
0001

BI Budget Item
0001
0001

BS Base Station
CAT Category
12/28/16
12/14/16

12/18/16
DATE

CIDR Classless Inter-Domain Routing


CNI Caller Number Identification
NO.
REV

G
E

DB Decibel
DISCIPLINE
ENGINEER
DDF Digital Distribution Frame
ALL LEADS DHCP Dynamic Host Configuration Protocol
DATE: 12/28/16 DWS Dispatcher Work Station
PROJECT
ENGINEER
EADS European Aeronautic Defense and Space Company
A M ALMATROOK
EARP Ethernet Address Resolution Protocol
DATE: 12/28/16
EIA Electronic Industries Alliance
CERTIFIED EMS Electronic Marker System
AMR EL SHARKAWY
ETSI European Telecommunications Standards Institute
12/28/16
DATE: FAT Factory Acceptance Test
CONSTRUCTION
AGENCY
FDP Fiber Distribution Panel
SHAHZAD YAZDANI FMR Field Material Request
DATE: 12/28/16 FOC Fiber Optic Cable
OPERATIONS FSD Functional Specification Document
ALI H GHAMDI FSF Facility Security Forces
DATE:
12/28/16 GI General Instructions
GPS Global Positioning System
CONTROL NUMBER
VERIFICATION

HCRMON Remote Monitoring for High Capacity Network


EDSD

HDPE High Density Polyethylene


HPR Hand Portable Radio
DATE:
BY:

ICMP Internet Control Message Protocol


REVISIONCERTIFICATION

IEEE Institute of Electrical and Electronics Engineers


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

IF Interfaces
C

IL Insertion Loss
(DCC) NO. _____________________

IP Internet Protocol

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 21


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG ISDN Integrated Services Digital Network
SAY
SAY
SAY

ISIS Intermediate System to Intermediate System


ITU International Telecommunications Union
ENGG CERT

ASH
ASH
ASH

kb/s Kilobits Per Second


Km Kilometers
LEADS

LEADS
LEADS
ALL

ALL
ALL

LAG Line Access Gateway


LAN Local Area Network
LCD Liquid Crystal Display
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

MAC Media Access Control


Mb/s Megabits Per Second
Mbps Mega-bits per second transmission data rate
MCAN Mechanical Completion Acceptance Notice
DESCRIPTION

MCC Mechanical Completion Certificate


MDPE Medium Density Polyethylene
MGCP Media Gateway Control Protocol
MH Maintenance Hole
MHz Mega Hertz
MIB Management Information Base
MOH Music on Hold
MSTP Multiple Spanning Tree Protocol
MTBF Mean Time between Failures
10-02399-
JO/EWO

10-02399-
10-02399-
0001

MTO Material Take-off


0001
0001

MTTR Mean Time to Repair


12/28/16

NEC National Electric Code


12/14/16

12/18/16
DATE

NEMA National Electrical Manufacturer’s Association


NESC National Electric Safety Code
NO.
REV

G
E

NFC National Fire Code


DISCIPLINE
ENGINEER
NFPA National Fire Protection Association
ALL LEADS Nm Nanometer
DATE: 12/28/16 NMS Network Management System
PROJECT
ENGINEER O&M Operation & Maintenance
A M ALMATROOK OSP Outside Plant
DATE: 12/28/16 OSPF Open Shortest Path First
CERTIFIED OTDR Optical Time Domain Reflectometer
AMR EL SHARKAWY
P/L Pipeline
12/28/16
DATE: PAT Performance Acceptance Test
CONSTRUCTION
AGENCY PED Pedestal
SHAHZAD YAZDANI PoE Power over Ethernet
DATE: 12/28/16 PVC Polyvinyl Chloride
OPERATIONS QoS Quality of Service
ALI H GHAMDI REA Rural Electrification Administration
12/28/16 RFC Request for Comments
DATE:
CONTROL NUMBER

RFDT Radio Frequency Dispatch Terminal


VERIFICATION

RFI Request for Information


EDSD

RFUT RF User Terminal


RMON Remote Network Monitoring
DATE:
BY:

RSTP Rapid Spanning Tree Protocol


REVISIONCERTIFICATION

SACS Saudi Aramco Construction Standards


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

SAEP Saudi Aramco Engineering Procedure


C

SAES Saudi Aramco Engineering Standards


(DCC) NO. _____________________

SAMSS Saudi Aramco Materials Supply System

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 22


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG SAPMT SAUDI ARAMCO Project Management Team
SAY
SAY
SAY

SASO Saudi Arabian Standards Organization


SAT Site Acceptance Test
ENGG CERT

ASH
ASH
ASH

SCCP Skinny Client Control Protocol


SCN Switching Control Node
LEADS

LEADS
LEADS
ALL

ALL
ALL

SIP Session Initiation Protocol


SNMP Simple Network Management Protocol
SSD Safety and Security Directives
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

STP Spanning Tree Protocol


TBC TETRA Base Station Controller
TCP Transmission Control Protocol
TDMA Time Division Multiple Access
DESCRIPTION

TER Telecommunications Equipment Room


TETRA Terrestrial Trunk Radio
TGB Telecommunications Ground Bar
TIA Telecommunications Industry Association
TMGB Telecommunications Master Ground Bar
TR Telecommunication Room
UDP UTP Distribution Panel
UHF Ultra High Frequency
UPS Uninterruptible Power Supply
10-02399-
JO/EWO

10-02399-
10-02399-
0001

UTP Unshielded Twisted Pair


0001
0001

VAC Voltage Alternating Current


12/28/16

VAD Voice Activity Detection


12/14/16

12/18/16
DATE

VDC Voltage Direct Current


VHF Very High Frequency
NO.
REV

G
E

VLAN Virtual Local Area Network


DISCIPLINE
ENGINEER
VMR Vehicle Mounted Radios
ALL LEADS VPN Virtual Private Network
DATE: 12/28/16 WAN Wide Area Network
PROJECT
ENGINEER WAP Wireless Access Protocol
A M ALMATROOK WLAN Wireless Local Area Network
DATE: 12/28/16
CERTIFIED INSTRUMENTATION
AMR EL SHARKAWY
BOL Bill of Lading
12/28/16
DATE: ESD Emergency Shut Down
CONSTRUCTION
AGENCY DID Driver Interface Device
SHAHZAD YAZDANI DVS Drivers verification device
DATE: 12/28/16 FCU Field Control Unit
OPERATIONS FOC Fiber Optic Cable
ALI H GHAMDI LAN Local Area Network
12/28/16 MOV Motor Operated Valve
DATE:
CONTROL NUMBER

OID Optical Interface Detector


VERIFICATION

OIS Order Identification System


EDSD

PLC Programmable Logic Controller


PP Patch Panel
DATE:
BY:

RFI Radio Frequency Interference


REVISIONCERTIFICATION

RTG Radar Tank Guag / Inventory


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

SAT Site Acceptance Test


C

SI System International
(DCC) NO. _____________________

SIB Satellite Instrument Building

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 23


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
EDSD REV
REVISION CERTIFICATE
REVISIONCERTIFICATION VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
C

DATE:
DATE:
THIS INDICATES THAT REV. NO.__________ 10-02399- ALL
E 12/14/16 0001 RE-ISSUED FOR 100% PROJECT PROPOSAL LEADS ASH SAY AHG
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS, 10-02399- ALL
F 12/18/16 RE-ISSUED FOR 100% PROJECT PROPOSAL LEADS ASH SAY AHG

AGENCY
BY: 0001

ALL LEADS

PROJECT

DATE: 12/28/16
BY DRAWING COMPLETION CERTIFICATE

ENGINEER

DATE: 12/28/16
ENGINEER

12/28/16
DATE: 12/28/16

ALI H GHAMDI
DISCIPLINE

12/28/16
CERTIFIED
10-02399- ALL

AMR EL SHARKAWY

OPERATIONS
CONSTRUCTION
A M ALMATROOK
12/28/16 RE-ISSUED FOR 100% PROJECT PROPOSAL ASH AHG

SHAHZAD YAZDANI
(DCC) NO. _____________________ G 0001 LEADS SAY
DATE:

YANBU
PROJECT
Saudi Aramco 2616-ENG (03/99)

TIS

UPS
TMS

WAN

YDH & NJBP EXPANSION


PROPOSAL NARRATIVE

YANBU DISTRIBUTION HUB PORTION


DOC

SAUDI ARABIA
Wide Area Network

X40
JO / EWO:
Truck Identification System

Uninterruptible Power Supply

A
Terminal Management System

DWG.TYPE PLANT NO. INDEX


SAUDI ARABIAN OIL COMPANY

10-02399-0001
DRAWING NO.

GEN-E0102
24
Of
290
SHT.NO.

G
EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

SECTION 2.0 – PROJECT DESCRIPTION


ENGG CERT

ASH
ASH
ASH

2.1 PLANT LOCATION


LEADS

LEADS
LEADS
ALL

ALL
ALL

This project is located near the city of Yanbu and the Yanbu area refineries. This plot of
land is approximately 2 km2 in size and is located east of the SAUDI ARAMCO Yanbu
Refinery (YR), adjacent to the east side of King Abdulaziz Road, and within the Yanbu
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

Royal Commission (YRC) Industrial City.

2.2 LAND USE PERMIT (LUP)


DESCRIPTION

This project requires Land Use Permits (LUP) for both the work areas in and around
NJBP and YDH, including: YDH plant, MARAFIQ to YDH corridor for Electrical & FO
cables, Yanbu refinery/YDH Interconnecting pipelines corridor, SAMREF/YDH
Interconnecting pipeline corridor, Access road for YDH and Temporary Construction
Facility

SECTION 3.0 – PROJECT DESIGN CRITERIA


10-02399-
JO/EWO

10-02399-
10-02399-
0001

3.1 The Project Proposal Narrative with all its attachments and drawings shall be the basis
0001
0001

and serve the purpose of defining the overall scope of this project.
12/28/16
12/14/16

12/18/16
DATE

3.2 In addition, the SAUDI ARAMCO engineering procedures, practices, and general
instructions are also considered as part of the design basis for the development of
NO.
REV

G
E

DISCIPLINE CONTRACTOR’s bid.


ENGINEER
ALL LEADS

DATE: 12/28/16
3.3 Any conflict between various design basis documents shall be highlighted to SAUDI
PROJECT
ENGINEER
ARAMCO for their review and resolution.
A M ALMATROOK

DATE: 12/28/16 3.4 This document shall be read in conjunction with relevant contract documents.
CERTIFIED
AMR EL SHARKAWY

12/28/16
3.5 CONTRACTOR shall prepare detail design package as per latest Saudi Aramco
DATE:
CONSTRUCTION
Engineering Standards, procedures and material specifications. Yanbu Royal
AGENCY
Commission standards & guidelines shall be considered for the detail design package.
SHAHZAD YAZDANI

DATE: 12/28/16
OPERATIONS 3.6 CONTRACTOR shall prepare the earthquake resistant design and detailing per
ALI H GHAMDI requirements of AISC-341, Seismic Design Manual of AISC, ACI-318 and ASCE-05.
DATE:
12/28/16 Geotech report of the project shall be utilized for the determination of Seismic Design
CONTROL NUMBER

Category (SDC) per guidelines of ASCE-05.


VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 25


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

SECTION 4.0 – DETAILED SCOPE OF WORK


ENGG CERT

ASH
ASH
ASH

Section 4 is included in this PPN to provide design basis and an overall picture of the total
project associated with BI-10-02399. This is specifically intended to provide CONTRACTOR
LEADS

LEADS
LEADS
ALL

ALL
ALL

as much overall project information as possible to enable CONTRACTOR to consider


execution methods/ strategies that may reduce the overall cost of the defined scope included
in this PPN. Note that portions of section 4 are applicable to YDH PPN scope of work.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

General Engineering and Design

CONTRACTOR shall commit dedicated manpower, equipment and all necessary resources to
DESCRIPTION

perform the Works activities.

CONTRACTOR shall assign a dedicated full-time team to work on the Yanbu Distribution Hub
for the entire project duration which includes but not limited to the engineering design office
and construction site office. The team shall be located in the same floor as the SAUDI
ARAMCO PMT assigned offices.

CONTRACTOR shall abide by the conditions of Royal Commission permit listed in the
Acceptance letter under Appendix-16.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

4.1 OVERALL SCOPE


12/28/16
12/14/16

12/18/16
DATE

The proposed facilities shall interface with the related budget items (BI’s) and other
components of this BI. Work for this project shall be coordinated with the respective
NO.
REV

G
E

projects as noted below. Each respective BI below shall address interconnections


DISCIPLINE
ENGINEER
between the other related BI’s and existing facilities. To the extent possible, any
ALL LEADS physical tie-ins shall be made without affecting operations. Any changes in the
DATE: 12/28/16 approved Testing and Inspection (T&I) schedules shall be coordinated with Oil Supply
PROJECT
ENGINEER
Planning and Scheduling department (OSPAS).
A M ALMATROOK

DATE: 12/28/16
4.2 INTERFACES WITH OTHER BI’s
CERTIFIED
AMR EL SHARKAWY
Related Budget Items
12/28/16
DATE:
CONSTRUCTION
AGENCY
4.2.1 BI-10-02155, Yanbu – Jiddah Refined Product Pipeline
SHAHZAD YAZDANI This project shall construct refined product pipelines to deliver products from
DATE: 12/28/16 Yanbu to the North Jiddah Bulk Plant. The current scope transports 576 MBD
OPERATIONS
of refined petroleum products. These pipeline systems will deliver Diesel,
ALI H GHAMDI
Kerosene, Premium 91, and Premium 95 Gasoline designated for the Makkah
12/28/16
DATE: province.
CONTROL NUMBER
VERIFICATION

The project must consider the origin pipeline pump station and origin storage
EDSD

tank requirements into the facility design.


DATE:
BY:

ERA: 8/16, ERC: 7/20


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

4.2.2 BI-10-02167, Refined Product Pipeline – Yanbu-Central Region


This project constructs a refined product pipeline to delivery product from
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 26


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Yanbu into the central region of Saudi Arabia. The current scope transports
SAY
SAY
SAY

400 MBD of refined petroleum product to a bulk plant destination in the central
region.
ENGG CERT

ASH
ASH
ASH
LEADS

LEADS
LEADS

The project must consider the origin pipeline pump station and origin storage
ALL

ALL
ALL

tank requirements into the facility design. Additional storage tanks at YDH shall
be constructed as part of this pipeline project.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

ERA: 2/17, ERC: 1/21

4.2.3 BI-10-02159, Grassroots Refinery and Petrochemical – Yanbu


DESCRIPTION

This project expands the Yanbu Refinery to increase Western Region’s refined
products supply and increase the integration between the refinery and
chemicals to maximize profitability.

The refined product production resulting from this project will be a significant
amount of product supply for YDH.

ERA: 7/18, ERC: 12/23


10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

4.2.4 BI-10-00043, Yanbu Refinery Clean Fuels – YASREF Interface


12/28/16
12/14/16

12/18/16

This project constructs two pipelines to transfer Clean Transportation Fuels


DATE

(ULSD, PG91, and PG95) from the YASREF Refinery to the Yanbu Refinery.
The proposed pipeline route shall follow the Royal Commission Corridor
NO.
REV

G
E

between the YASREF Refinery and the Yanbu Refinery.


DISCIPLINE
ENGINEER
ALL LEADS
The custody metering shall be located inside YDH battery limit along with
DATE: 12/28/16
PROJECT supervisory monitoring and control Process Automation.
ENGINEER
The YASREF supply connection into YDH will connect into each of the
A M ALMATROOK
pipelines.
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY
ERA: 2/16, ERC: 5/19
12/28/16
DATE:
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
4.3 PROJECT PHYSICAL INTERFACES
DATE: 12/28/16
OPERATIONS
The project scope for the YNJ-1/2 pipelines, BI-10-02155 & YDH and North Jiddah
ALI H GHAMDI
Bulk Plant (NJBP) Expansion & Upgrade, BI-10-02399 will contain elements that shall
12/28/16
DATE: be interfaced to achieve project purpose and intend.
CONTROL NUMBER
VERIFICATION

This project has very complicated interfaces as listed below; it is highly recommended
EDSD

that the CONTRACTOR assign a dedicated Interfaces Manager to handle those


DATE:

challenging interfaces and to present an interface management plan at an early stage


BY:

of the project following the direction of SAEP-367.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

CONTRACTOR shall consider the interfaces when studying the Project Risk
(DCC) NO. _____________________

Management, and Constructability and logistic assessment.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 27


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG CONTRACTOR shall consider all the relevant Reservation forms and interface
SAY
SAY
SAY

packages used in the Project Proposal package for the detail design.
ENGG CERT

ASH
ASH
ASH

BI-10-02155 is comprised of:


LEADS

LEADS
LEADS
ALL

ALL
ALL

Yanbu-North Jiddah Pipeline System


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

This BI also provides for The YNJ-1/2 Pipeline System to transport 576 MBD of refined
product from YDH to the NJBP. This pipeline system will deliver Diesel, Kerosene,
Premium 91, and Premium 95 Gasoline designated for the Makkah province.
DESCRIPTION

BI-10-02399 is comprised of the following two components:

a) Yanbu Distribution Hub

YDH is a Greenfield refined storage facility at Yanbu that collects products


(PG91, PG95, DO and DPK) from the local Yanbu area refineries and delivers
to pipelines extending to Jiddah and the Central Region.
10-02399-
JO/EWO

10-02399-
10-02399-

b) North Jiddah Bulk Plant Expansion and Upgrade


0001

0001
0001

12/28/16
12/14/16

12/18/16

The existing bulk plant at North Jiddah shall be upgraded and expanded to
DATE

accommodate the receipt of the YNJ-1/2 pipelines as well as increased truck


loading and offloading facilities..
NO.
REV

G
E

DISCIPLINE
ENGINEER
ALL LEADS

DATE: 12/28/16
PROJECT
ENGINEER

A M ALMATROOK

DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY

12/28/16
DATE:
CONSTRUCTION
AGENCY
Figure 1. Project boundaries for BI-10-02155 and BI-10-02399
SHAHZAD YAZDANI

DATE: 12/28/16
OPERATIONS 4.3.1 Refinery Connections:
ALI H GHAMDI

12/28/16 Refer to Appendix 2 Project Proposal Interface Packages.


DATE:
CONTROL NUMBER
VERIFICATION

Appendix 2 contains all reservation forms, 90% comment logs, documents and
drawings related to the interfaces with MARAFIQ, Yanbu Royal Commissioning,
EDSD

Yanbu NGL, Yanbu refinery, SAMREF, and YASREF. The drawings included in
DATE:

this Appendix are also included in the general YDH package.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

YDH shall construct multiple pipelines to tie into the tank farm of each respective
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

refinery. The tie-in location shall be downstream of any tankage and booster
(DCC) NO. _____________________

pumps within the respective refinery tank farm and YRT discharge lines from
terminal ship pump.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 28


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG YASREF
SAY
SAY
SAY

YDH shall receive PG 91/95 and DO products from the YASREF via two
ENGG CERT

ASH
ASH
ASH

pipelines. Part of the pipeline supply from YASREF to YDH will be provided by
BI-10-00043, for the supply of clean transportation fuel to Yanbu refinery. Two (2)
LEADS

LEADS
LEADS
ALL

ALL
ALL

pipelines (one for DO and one for PG 91/95) between YASREF & Yanbu refinery
shall be provided under BI-10-00043. This project will tie-in to the isolation valve
downstream provided on the pipeline and shall be the connecting points for the
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

pipelines leading to YDH. BI-10-00043 will provide a manual valve on both


pipelines for tie-ins to YDH.

The interface scope with YASREF is described as following:


DESCRIPTION

A. Instrumentation:
 The YDH control system shall be interfaced to YASREF control system to
have READ ONLY access to the data points such as the CMS, EIV status
and Pump status. The data is to be exchanged via plant DMZ through PI
system at both the facilities.
 Contractor shall provide new fiber optic cable from YASREF to YDH for the
data exchange. The interface is shown in preliminary block # IN-A00001.004
10-02399-


JO/EWO

10-02399-
10-02399-

Contractor shall coordinate with Refinery Control System Vendor for the
0001

0001
0001

interface requirements.

12/28/16

Reference Drawing: BLOCK DIAGRAM-YASREF INTERFACE IN-


12/14/16

12/18/16
DATE

A00001.004
NO.
REV

G
E

B. Telecom
DISCIPLINE
ENGINEER  Provide 12 core Fiber optic cable from Yanbu Distribution Hub to YASREF
ALL LEADS Central Control Building (CCB).
DATE: 12/28/16
PROJECT
 Provide VOIP hotline in YASREF Central Control Building (CCB)
ENGINEER

A M ALMATROOK SAMREF
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY
YDH shall receive PG 91/95, DO, and DPK from the SAMREF refinery via three
12/28/16 pipelines extending from the SAMREF tank farm to YDH product receiving
DATE:
CONSTRUCTION
manifolds. The SAMREF supply connection to YDH shall be downstream of
AGENCY existing export pumps. And the required new metering skids shall be installed
SHAHZAD YAZDANI
at SAMREF. These tie-ins will be taken from the SAMREF export lines going to
DATE: 12/28/16
their terminal near to the fence at King Fahad Road (RC Corridor). All new
OPERATIONS
equipment shall also be installed at space available adjacent to the tie-ins.
ALI H GHAMDI

12/28/16
DATE: The interface scope with SAMREF is described as following:
CONTROL NUMBER
VERIFICATION

A. Piping:
EDSD

 Construct 7 tie-ins with SAMREF pipelines, including MOVs, and ZVs.


DATE:


BY:

Construct 1 tie-in with drain system


REVISIONCERTIFICATION

 Install 3 metering skids & 2 Prover skids.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

 Installation of 01 surge tank & 02 pumps


(DCC) NO. _____________________

 Using the existing pumps.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 29


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG B. Instrumentation:
SAY
SAY
SAY

 Provide and install Three (3) custody metering skids PG91/95, DO and DPK
with a prover PG91/95 and DO, and a separate prover for DPK, the skid shall
ENGG CERT

ASH
ASH
ASH

be as per SAES-Y-103. The metering skids field instrumentation shall be


LEADS

integrated to metering and control cabinets such as flow computer cabinet,


LEADS
LEADS
ALL

ALL
ALL

PLC cabinet and MSC cabinet. A vendor supplied metering shelter shall be
provided to house these cabinets.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

 Skid Vendor/LSTK shall supply prefab air-conditioned Metering Shelter


constructed in compliance with electrical area classification requirements and
Saudi Aramco /SAMREF Standards.
 The contractor shall provide a new DCS Controller with input-output modules
DESCRIPTION

and a FTA/marshalling cabinet to integrate new field instruments added by


BI-10-02399 in SAMREF facility. The DCS cabinets shall be installed in
metering shelter. The Metering Supervisory Computer (MSC) shall be
interfaced to DCS via open industry standard protocol such as Modbus
TCP/IP, OPC etc. Refer block diagram IN-A00001.009 for Custody Metering
System.
 The contractor shall provide redundant fiber optic cables between metering
shelter and nearest OMS control building in the tank farm area of SAMREF.
The new DCS shall be tied to the existing plant control network at OMS
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

control room. The HMI station at OMS control room will be updated with the
new instrumentation added by BI-10-02399.
12/28/16
12/14/16

12/18/16


DATE

The new ESD valves added by BI-10-02399 at the battery limit of SAMREF
facility shall be integrated to existing ESD system. The contractor shall
provide new junction boxes and cables. The ESD marshalling cabinet
NO.
REV

G
E

DISCIPLINE
OMMRS01 shall be used to terminate ESD cables at OMS Rack-room.

ENGINEER
ALL LEADS The contractor shall provide junction boxes and field homerun cables as
DATE: 12/28/16 indicated in block diagram# IN-A00001.007
PROJECT
ENGINEER  The YDH control system shall be interfaced to SAMREF control system to
A M ALMATROOK have READ ONLY access to the data points such as the CMS, EIV status
DATE: 12/28/16 and Pump status and tank status. The data is to be exchanged via plant DMZ
CERTIFIED
AMR EL SHARKAWY
through PI system at both the facilities. New fiber optic cable is to be laid from
12/28/16
SAMREF to YDH for the data exchange.
DATE:
CONSTRUCTION  Contractor shall install MOV-1111/2/3/4, MOV-1211/12, and MOV-
AGENCY
SHAHZAD YAZDANI
1311/12/13/14/15/16/17/18 as shown in P &ID and Piping Plan #PI-
A00435/36/37/38. Provide and install Junction boxes and lay homerun cable
DATE: 12/28/16
OPERATIONS IC-0116/117/124/125 up to new DCS Marshalling Cabinet in located in
ALI H GHAMDI
metering shelter.
DATE:
12/28/16  Contractor shall provide and install ZV-1112/1212/1312 and install cable IC-
0133 from ESD junction box to existing ESD marshalling cabinet OMRS01.
CONTROL NUMBER
VERIFICATION

Contractor shall utilize existing cable tray to run home cable from junction to
EDSD

OMS control room.



DATE:

Installation shall be as per below reference drawings


BY:
REVISIONCERTIFICATION

Drawing Description
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

J8DF5007-001 OMS CONTROL ROOM LAYOUT


(DCC) NO. _____________________

232J081-001 BLOCK DIAGRAM, OM & S CONTROL HOUSE

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 30


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG IN-A00001.009 SAMREF CUSTODY METERING SKIDS
SAY
SAY
SAY

IN-A00001.007 SAMREF INTERFACE


ENGG CERT

ASH
ASH
ASH

IN-E00031 DCS INPUT-OUTPUT LIST


IN-E00032 ESD INPUT-OUTPUT LIST
LEADS

LEADS
LEADS
ALL

ALL
ALL

IN-D00030.001 CABLE AND CONDUIT SCHEDULE


IN-E00015 FSD- DISTRIBUTED CONTROL SYSTEM
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

IN-E00016 TSD-DCS MODIFICATION-SAMREF DCS


IN-E00011 SHT 001-014 ISS FOR MOVs
IN-E00006/7 SHT 001-003 ISS FOR PZVs
DESCRIPTION

IN-E00013 SHT 001-003 ISS FOR ZVs

C. Telecom
 Provide 12 core Fiber optic cable from Yanbu Distribution Hub to SAMREF
new Metering Shelter.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

 Provide 12 core Fiber optic cable from SAMREF new Metering Shelter to
OMS Control Room.
12/28/16
12/14/16

12/18/16
DATE

 Provide VOIP hotline in SAMREF OMS Control Room.


NO.
REV

D. Electrical:
E

DISCIPLINE
ENGINEER
ALL LEADS Electrical Scope in SAMREF, Refer to GEN-E0103.
DATE: 12/28/16
PROJECT
ENGINEER E. Structural:
A M ALMATROOK  LSTK contractor shall perform required geotechnical investigation inside
DATE: 12/28/16 SAMREF refinery during detailed design.
CERTIFIED
AMR EL SHARKAWY  All necessary structures and foundations for MOV’s and metering skids.
12/28/16
DATE:
CONSTRUCTION Yanbu Refinery
AGENCY
SHAHZAD YAZDANI
YDH shall receive PG 91/95, DO, and DPK from the Yanbu Refinery Terminal
DATE: 12/28/16
OPERATIONS through three pipelines extending from YRT through Yanbu refinery tank farm
ALI H GHAMDI
to YDH. The Yanbu refinery supply connection to YDH shall be downstream of
12/28/16 existing marine loading pumps. These pumps will take suction from ship pump.
DATE:
The required new metering skids shall be installed at YDH.
CONTROL NUMBER
VERIFICATION
EDSD

Provisions shall be provided in the receiving manifold for the future connection
of PG 91/95, DO & DPK from Yanbu grass root refinery.
DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

The interface scope with SAMREF is described as following:


C

(DCC) NO. _____________________

A. Piping:

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 31


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG  Construct 4 tie-ins with YR pipelines, including MOVs, and ZVs.
SAY
SAY
SAY

 Installation of surge tanks and pumps


ENGG CERT

ASH
ASH
ASH

B. Instrumentation:
LEADS

 Contractor shall provide and install Motor Operated and Electrohydraulic ESD
LEADS
LEADS
ALL

ALL
ALL

valves at the battery limit of Yanbu Refinery, MOVs shall also be provide at
the tie-in locations.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

 Contractor shall provide and install new homerun cables from valves up to
the existing SIH-1590 (Satellite Instrument House) in tank farm area. SIH-
1590 is expanded under BI-10-00043, the project shall coordinate with BI-10-
00043 to reserve the space in the cabinets required by this BI. All new EIVs
DESCRIPTION

will be connected to new ESD Marshalling Cabinet provided by BI-10-00043.


BI-10-02399 will provide required input-output modules to integrate to ESD
system provided under BI-10-00043.
 All non-ESD instruments will be connected to new DCS Marshalling Cabinet
provided by BI-10-00043. BI-10-02399 will provide required input-output
modules to integrate to DCS system provided under BI-10-00043.
 SIH-1590 will be expanded under BI-10-00043 to accommodate the
expansions under this BI. The DCS/ESD provided under BI-10-00043 will be
10-02399-
JO/EWO

integrated to YR plant network.


10-02399-
10-02399-
0001

0001
0001

 New instrumentation provided under BI-10-02399 will be controlled from YR


tank farm control room and the HMIs at tank farm control room will be
12/28/16
12/14/16

12/18/16
DATE

updated accordingly Refer block diagram IN-A00001.008 for details.


 In addition to this, BI-10-02399 shall interface Yanbu Refinery TCFR control
NO.
REV

G
E

system to YDH provides View only signals related to product transfer. The
DISCIPLINE
ENGINEER data points shall be the status of product pumps and EIVs such as running,
ALL LEADS stopped, tripped etc. The requirements of data from Yanbu Refinery shall be
DATE: 12/28/16 further evaluated during detailed design in coordination with YDH and YREF
PROJECT
ENGINEER operations.
A M ALMATROOK
 The interface shall be through PI system installed at both the facility, DMZ
DATE: 12/28/16
CERTIFIED
shall be used in order to make the data exchange highly secured. Contractor
AMR EL SHARKAWY shall provide fiber cables between YREF and YDH. The possible option of
DATE:
12/28/16 interfacing both the facilities shall be further evaluated during detailed design.
CONSTRUCTION
AGENCY
 Contractor shall provide and install new junction boxes, branch cables,
SHAHZAD YAZDANI homerun cables for instruments added by this BI.
DATE: 12/28/16  The field installation shall be as per P & IDs VA-247876/877 and VA-
OPERATIONS
234308.015/020/027 and Piping Plans PI-A00403.004, VA-236952.001, VA-
ALI H GHAMDI
236952.002, VA-236956.001, VA-236956.002 and VA-236960.002
12/28/16
DATE:
 Contractor shall run homerun cables from Junction boxes to SIH-1590
CONTROL NUMBER
VERIFICATION

utilizing existing cable trays. Refer drawing VA-549870.001 for cable routing.
EDSD

 Reference Drawings:
DATE:
BY:

Drawing Description
REVISIONCERTIFICATION

IN-A00001.008 Block Diagram-Yanbu Refinery


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

VA-549870.001 Cable/Conduit Layout


(DCC) NO. _____________________

VA-549714.002 System Architecture PCS Tank Farm

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 32


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
Drawing Description
SAY
SAY
SAY

IN-D00031.001 Cable and Conduit Schedule


ENGG CERT

ASH
ASH
ASH

Technical Specification Document -DCS


IN-E00020 Modification
LEADS

LEADS
LEADS
ALL

ALL
ALL

IN-E00033 DCS INPUT-OUTPUT LIST


IN-E00034 ESD INPUT-OUTPUT LIST
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

IN-E00008/9/10/12.001 ISS FOR ANALOG INSTRUMENTS


IN-E00011-015 TO 046 ISS FOR MOVs
IN-E00013-004 TO 008 ISS FOR ZVs
DESCRIPTION

C. Telecom
 Provide two (2) 24-core Fiber optic cable from Yanbu Distribution Hub to
Yanbu Refinery Admin Bldg 1401 for IT Communications.
 Provide one (1) 48-core Fiber optic cable from Yanbu Distribution Hub to
Yanbu Refinery Admin Bldg 1401 for Process/Instrumentation
Communications.
 Provide hotline circuits in Operation Bldg. at Yanbu Distribution Hub to
10-02399-
JO/EWO

connect in the Yanbu RSCC.


10-02399-
10-02399-
0001

0001
0001

 Provide PE Router in Yanbu Distribution Hub to connect in the existing PPE


Routers at Yanbu Refinery Admin Bldg 1401 and Yanbu NGL.
12/28/16
12/14/16

12/18/16
DATE

 Provide Access Points (APs) in Yanbu Distribution Hub to connect in the


existing WLAN Controller at Yanbu NGL.
NO.
REV

G
E

DISCIPLINE  Provide connectivity and associated equipment in Yanbu Distribution Hub to


ENGINEER the third party SAMREF, YASREF and YRT.
ALL LEADS

DATE: 12/28/16  Provide the TETRA Radio system in Yanbu Distribution Hub to connect in the
PROJECT
ENGINEER
existing SCN in Yanbu NGL.
A M ALMATROOK  Provide Transmission connectivity for SDH equipment in Riyadh Refinery.
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY

12/28/16 D. Electrical:
DATE:
CONSTRUCTION  Provide and Install four 480V, 3phase, 3wire MOVs Panels feeding from
AGENCY
YANBU refinery existing Substation No. 7, 8 and 9.
SHAHZAD YAZDANI

DATE: 12/28/16  Empty spaces of existing MCCs in Substation No. 7, 8 and 9 shall be utilized
OPERATIONS to feed MOVs Panels.
ALI H GHAMDI
 Run and terminate power cables for MOV.
12/28/16
DATE:
 Provide Grounding to new MOV panels from existing YANBU refinery
CONTROL NUMBER
VERIFICATION

Grounding network.
EDSD

 Provide task/area lighting for new equipment from existing nearby lighting
Panels.
DATE:
BY:

E. Structural:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

 LSTK contractor shall use geotechnical report recommendation from proposal


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

geotechnical report 2015/104 and existing geotechnical report 93/90 for


(DCC) NO. _____________________

foundation design requirement during detailed design.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 33


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG  All necessary structures and foundations for MOV’s and Pipe Supports.
SAY
SAY
SAY

Other Connection: MARAFIQ


ENGG CERT

ASH
ASH
ASH

A. Electrical Scope at MARAFIQ Substation # 9I Interface:


LEADS

LEADS
LEADS
ALL

ALL
ALL

 THE CONTRACTOR shall coordinate with Saudi Aramco and MARAFIQ for
the portion of works under MARAFIQ scope and insure correct interface of all
discipline’s i.e. Civil, Electrical, Protection, Communication, etc.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

 THE CONTRACTOR shall furnish electrical detailed drawings, documents


and any calculation requested by MARAFIQ / Roya Commission (RC) to fulfill
the connection agreement requirements.
DESCRIPTION

 THE CONTRACTOR shall utilize existing spare breaker EA06 & EB04 of GIS
to feed power to Yanbu Distribution Hub (YDH). (Refer sketch # SK-A10011,
SK-A10013 & SK-A10014)
 THE CONTRACTOR shall provide one (1) metering panel to accommodate
two (2) revenue meters & two check meters for YDH feeders-1 & 2. (Refer
sketch # SK-A10013 & SK-A10014)
 THE CONTRACTOR shall provide Four (4) protection relay panel to
accommodate line differential relays & directional relays for YDH feeders-1 &
10-02399-

2. (Refer sketch # SK-A10013 & SK-A10014)


JO/EWO

10-02399-
10-02399-
0001

0001
0001

 THE CONTRACTOR shall provide one (1) 125VDC Power Panel to supply
power to new relay panels. (Refer sketch # SK-A10012)
12/28/16
12/14/16

12/18/16
DATE

 THE CONTRACTOR shall provide two (2) fiber optic patch panel to be install
in Substation 9I. (Refer sketch # SK-A10014)
NO.
REV

G
E

DISCIPLINE
 THE CONTRACTOR shall design, supply, install, test and assist with
ENGINEER commissioning of two run, 3x1/C- 630 mm2, 115kV cables of 3.85km in
ALL LEADS
length, from MARAFIQ Substation #9I to YDH. (Refer sketch # SK-A10010 &
DATE: 12/28/16
PROJECT
SK-A10015)
ENGINEER

A M ALMATROOK
 THE CONTRACTOR shall provide termination kits, including connectors, at
DATE: 12/28/16
the MARAFIQ end and at the Saudi Aramco 115kV GIS end. THE
CERTIFIED CONTRACTOR shall coordinate with MARAFIQ and Saudi Aramco for
AMR EL SHARKAWY
termination at the MARAFIQ end.
12/28/16
DATE:  THE CONTRACTOR shall confirm MARAFIQ protection and metering
CONSTRUCTION
AGENCY requirements and reflect accordingly within the Detail Design Drawings.
SHAHZAD YAZDANI Development of protection, control, fire alarm, communication, etc., interface
DATE: 12/28/16 drawings shall be THE CONTRACTOR responsibility including purchase,
OPERATIONS
installation, termination and testing of the required cabling.
ALI H GHAMDI

12/28/16
 THE CONTRACTOR shall assist MARAFIQ as required with Manpower, and
DATE:
test equipment, as necessary to complete MARAFIQ 115kV and Saudi
CONTROL NUMBER
VERIFICATION

Aramco 115kV Interface Testing including Protection, Metering, Controls, etc.


including wiring interface drawing development. Test Results shall be signed
EDSD

by all relevant parties including POD, PID, MARAFIQ, etc. and be included
DATE:

within the Project Test Results binders maintained and developed by THE
BY:

CONTRACTOR as per SAEP-122.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE


OF THIS DRAWING IS COVERED, FOR ALL

THE CONTRACTOR to consider Integration Philosophy between the


BY DRAWING COMPLETION CERTIFICATE
C

MARAFIQ 115KV Substation # 9I and the New Saudi Aramco 115kV


(DCC) NO. _____________________

Receiving Substation. Interface philosophy will be finalized as per Connection

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 34


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Agreement between MARAFIQ & Saudi Aramco. Initial communication has
SAY
SAY
SAY

been established to finalize the scope segregation between Saudi Aramco &
MARAFIQ. Proposed interface requirements are as followed:
ENGG CERT

ASH
ASH
ASH

- MARAFIQ confirmed to reserve the existing Two (2) spare GIS Bays:
LEADS

LEADS
LEADS
ALL

=EB04 and =EA06 for Saudi Aramco YDH project. MARAFIQ requested
ALL
ALL

Saudi Aramco to submit the breaker reservation thru official letter.


- MARAFIQ confirmed these 2 Spare GIS are already pre-wired to the local
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

control panel =EB04+S and =EA06+S.


- A new metering panel is required, same model and configuration than as
in existing Crystal metering panels. This new metering panel shall be the
DESCRIPTION

combine metering panels for 2 feeders of YDH. Each YDH feeders shall
have a separate revenue meters and will be accommodated in this panel.
Reserved available floor space for this panel. New Panel to be tagged as:
=E+MP05 115KV Service Cable/Revenue Metering panel.
- Protection Scope- Primary Protection: Two (2) new Relay Panels are
required based on ABB relays. Reserved available floor spaces for these
two panels. New panels to be tagged as: =EB04+R1 and =EA06+R1
115kV Service Line Aramco- YDH/ Primary Protection.
10-02399-
JO/EWO

10-02399-

- Protection Scope- Back Up Protection: Two (2) new relay Panels are
10-02399-
0001

0001
0001

required based on Siemens relays. Available floor spaces for these 2


panels. New Panels to be tagged as: =EB04+R2 and =EA06+R2 115KV
12/28/16
12/14/16

12/18/16
DATE

Service Line Aramco- YDH/ Back Up protection Panel.


- MARAFIQ confirmed that existing Relay Panels =E+BB1 and =E+BB4 for
NO.
REV

G
E

Bus Bar/BF Protection of GIS Bay EA06 & EA04 are already pre-wired.
DISCIPLINE
ENGINEER - DC System scope: Existing 125V DC Distribution Panel has not enough
ALL LEADS
spare breakers for new DC scope. MARAFIQ requested to provide new
DATE: 12/28/16
PROJECT DC panel same manufacturer than existing panels “Riyadh Factory For
ENGINEER

A M ALMATROOK
Panelboard” Available floor space for this new DC panel. New Panel to be
DATE: 12/28/16 tagged as: 125V DCDB 125V Main DCDB No. 3.
CERTIFIED
AMR EL SHARKAWY
- AC System scope: Existing 220V AC Distribution Panel has required spare
12/28/16 breakers for new AC scope. THE CONTRACTOR to utilize existing spare
DATE:
CONSTRUCTION breakers from 220V AC Distribution Panel No. 1, 2 & 3. Note: There is No
AGENCY
SHAHZAD YAZDANI
480V AC panel available in MARAFIQ Substation.
DATE: 12/28/16 - Power Cable Routing in Basement: MARAFIQ requested as minimum to
OPERATIONS follow the same cable routing design in the basement:
ALI H GHAMDI
- Cable trays have to be heavy duty 600mmx150mm for cable transition to
12/28/16
DATE: the wall.
CONTROL NUMBER
VERIFICATION

- Cable trays support shall be unistrut type.


EDSD

- Cable structural support shall be Unistrut type similar design that existing
ones.
DATE:


BY:

General:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

- MARAFIQ shall be included in the Review Cycle during Detail Engineering.


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

- MARAFIQ informed that technical queries shall be submitted on separate


(DCC) NO. _____________________

Memos, queries under same discipline can be grouped in one Memo.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 35


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG - MARAFIQ requested Saudi Aramco to provide the SOW Narrative for
SAY
SAY
SAY

review.
ENGG CERT

ASH
ASH

- MARAFIQ informed that all equipment related to MARAFIQ scope shall be


ASH

procured as per RC Standards.


LEADS

LEADS
LEADS
ALL

ALL
ALL

B. Telecom:
 THE CONTRACTOR shall design, supply, install, test and assist with
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

commissioning of two (2) x 2 run 12C Single Mode Fiber Optic Cables run
along with each power feeder cable from MARAFIQ Substation #9I to YDH.
(Refer sketch # SK-A10010 & ELA10130-001-003). Each of the two (2) fiber
run will have one 12 core fiber for Control and one 12 core fiber for
DESCRIPTION

Communication connectivity.
 The fiber patch panel in Substation #91 shall be wall type and in YDH the
fiber patch panel shall be rack mounted type.

C. Instrumentation:
THE CONTRACTOR shall provide and install the following for Water
metering system with MARAFIQ:


10-02399-
JO/EWO

10-02399-
10-02399-

UTILITY WATER
0001

0001
0001

- Provide metering skid for utility water system as indicated in the drawing
12/28/16

INA00001-011, the skid shall be provided with field instruments such as


12/14/16

12/18/16
DATE

Electromagnetic flowmeter, Pressure transmitters, Temperature


transmitters and pH analyzer.
NO.
REV

G
E

DISCIPLINE
- Supplied field instruments shall be as per MARAFIQ standard and from
ENGINEER
ALL LEADS
approved vendors list.
DATE: 12/28/16
- Provide and install Junction boxes and branch cabling.
PROJECT
ENGINEER
- Provide and install RTU with GPRS Communication Gateway. Integrate
A M ALMATROOK the RTU with existing MARAFIQ SCADA.
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY  SANITARY WATER
DATE:
12/28/16 - Provide metering skid for Sanitary water system as indicated in the
CONSTRUCTION
AGENCY
drawing INA00001-011, the skid shall be provided with field instruments
SHAHZAD YAZDANI such as Electromagnetic flowmeter, Pressure transmitters and
DATE: 12/28/16 Temperature transmitters.
OPERATIONS
- Supplied field instruments shall be as per MARAFIQ standard and from
ALI H GHAMDI

12/28/16
approved vendors list.
DATE:
- Provide and install Junction boxes and branch cabling.
CONTROL NUMBER
VERIFICATION

- Provide and install RTU with GPRS Communication Gateway. Integrate


EDSD

the RTU with existing MARAFIQ SCADA.


DATE:
BY:

D. Civil:
REVISIONCERTIFICATION

 THE CONTRACTOR shall provide and install the following for Water systems
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

with MARAFIQ.
(DCC) NO. _____________________

 UTILITY WATER

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 36


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG - Provide connection of Utility Water at the approved tie-in point for Potable
SAY
SAY
SAY

water system as indicated in the drawing CIA00110-002 and CIA00116-


ENGG CERT

ASH
ASH

001, using the standard typical connections of RC.


ASH

- Contractor shall coordinate with MARAFIQ for the time to make the
LEADS

LEADS
LEADS
ALL

ALL
ALL

connection to facilitate the connection without interfering with the line


operation. Requesting the close down of the pipe section if applicable and
execute the connection in a time manner.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

- Provided with pipes, fittings and flanges for a proper connection and leave
the connection uncovered until a water test verifies there are not spills at
the joint of tie in point.
DESCRIPTION

- Provide excavation and backfilling following Aramco standard SAES A


114.
 SANITARY WATER
- Provide connection of Sanitary Water at the approved tie- in point for
Sanitary water system as indicated in the drawing CIA00110-002 and
CIA00116-001, using the standard typical connections of RC.
- Contractor shall coordinate with MARAFIQ for the time to make the
connection to facilitate the connection without interfering with the line
10-02399-
JO/EWO

10-02399-
10-02399-

operation.
0001

0001
0001

- Provided with pipes, fittings and flanges for a proper connection and leave
12/28/16
12/14/16

12/18/16

the connection uncovered until a water test verifies there are not spills at
DATE

the joint of tie in point.


- Provide excavation and backfilling following Aramco standard SAES-A-
NO.
REV

G
E

DISCIPLINE 114.
ENGINEER
ALL LEADS

DATE: 12/28/16
Yanbu NGL & Yanbu Royal Commissioning
PROJECT
ENGINEER

A M ALMATROOK
 Refer to Appendix 2 for reservation forms and drawings.
DATE: 12/28/16
CERTIFIED Storage Tanks and Piping
AMR EL SHARKAWY

12/28/16
DATE: The interface point shall be at the flange face at each respective product
CONSTRUCTION
AGENCY
header line downstream of any tankage, booster pumps, process piping, and
SHAHZAD YAZDANI measurement equipment downstream of YDH Receipt Header Line as outlined
DATE: 12/28/16 below.
OPERATIONS
ALI H GHAMDI

12/28/16
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

 Manifolds shall be constructed to allow for dedicated product service and

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 37


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG dedicated receipt and delivery of product (2-PG91, 2-PG95, 2-DO, 2-
SAY
SAY
SAY

DPK, and slop).


ENGG CERT

ASH
ASH
ASH

 A product dedicated receipt manifold shall connect all of the refinery


LEADS

LEADS
LEADS

supply pipelines to each tank in that respective service including the T&I
ALL

ALL
ALL

tank with dual product service.


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

 A product dedicated delivery manifold shall connect each tank in that


respective service including the T&I tank with dual product service with
each of the designated outbound pipelines.
DESCRIPTION

 Each manifold shall be designed to provide for future expansion of


connections for additional tanks or supply/delivery pipelines. All piping
and manifolds shall be designed to minimize product cross
contamination.

 Manifold/piping velocities shall comply with SAUDI ARAMCO standards


and Loss Prevention Study Recommendations (CFPE-011-2014) on
reduced loading rates for low sulfur diesel and aromatic products.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

Gasoline Dye Injection


12/28/16
12/14/16

12/18/16

Two separate red and green color dye injection systems shall be installed in
DATE

YDH facility. The dye injection must inject dye at the inlet header of storage
tanks (at the downstream of receiving manifold) so that a single skid of green
NO.
REV

G
E

dye and single skid for red dye can provide adequate coloration for PG-91 and
DISCIPLINE
ENGINEER PG-95 from all the source. The color dye injection system shall be a complete
ALL LEADS vendor skid with tank and injection pumps.
DATE: 12/28/16
PROJECT
ENGINEER The scope for the color dye injection Skid is outlined in PFD VA247835-001
A M ALMATROOK and P&IDs VA247891-001. CONTRACTOR shall develop a detailed P&ID after
DATE: 12/28/16 vendor information during detail design.
CERTIFIED
AMR EL SHARKAWY

12/28/16 DPK Filtration System


DATE:
CONSTRUCTION
AGENCY The DPK filtration is proposed to be a complete vendor skid with circulation
SHAHZAD YAZDANI
pumps, pre filters and after filters. Normally, the filtration skid shall be designed
DATE: 12/28/16
and shall have flexibilities to circulate into the same product tanks or to an
OPERATIONS
empty DPK tank as per the operation requirement. DPK filtration skids shall be
ALI H GHAMDI
sized to handle a capacity of 45 to 200 MBD and will be a completely vendor
12/28/16
DATE: designed skid
CONTROL NUMBER
VERIFICATION

The scope for Filtration Skid is outlined in PFD VA-247843.001 and P&IDs VA-
EDSD

247915.001. CONTRACTOR shall develop a detailed P&ID after vendor


DATE:

information during detail design and CONTRACTOR shall make sure the
BY:

design shall meet the requirement of SAES-A-302 Aviation fuel quality


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

assurance design requirement


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

Conductivity Enhancer Injection Skid

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 38


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Conductivity enhancer injection skid shall be provided at YDH to enhance
SAY
SAY
SAY

conductivity of DPK. The conductivity enhancer injection skid is proposed to be


a complete vendor skid. The injection shall be provided on the inlet line to DPK
ENGG CERT

ASH
ASH
ASH

storage tanks from receiving manifold. Provision shall also be provided for
injection to the suction of the booster pumps in view of conductivity reduced in
LEADS

LEADS
LEADS
ALL

ALL
ALL

the product due to filtration or aging. The conductivity enhancer injection


system shall be a complete vendor skid with tank and injection pumps.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

The scope for the conductivity enhancer injection Skid is outlined in PFD
VA247835-001 and P&IDs VA247892-001. CONTRACTOR shall develop a
detailed P&ID after receiving vendor information during detail design.
DESCRIPTION

Static Dissipative Additive (SDA) Injection Skid

Static Dissipative Additive (SDA) injection skid shall be provided at YDH to


reduce the static charge accumulation in DO. The SDA injection skid is
proposed to be a complete vendor skid. The injection shall be done on the inlet
line to DO storage tanks from distribution manifold. The static dissipative
additive injection system shall be a complete vendor skid with tank and
injection pumps.
10-02399-

The scope for the static dissipative additive injection Skid is outlined in PFD
JO/EWO

10-02399-
10-02399-
0001

0001
0001

VA247835-001 and P&IDs VA247893-001. CONTRACTOR shall develop a


detailed P&ID after receiving vendor information during detail design.
12/28/16
12/14/16

12/18/16
DATE

Process Automation and Communications


NO.
REV

G
E

DISCIPLINE
ENGINEER TMS with Distributed Control System (DCS) shall be provided for the control
ALL LEADS
and logic functions required to operate YDH. The TMS-DCS shall also be
DATE: 12/28/16
PROJECT
interfaced with subsystems such as the Emergency Shutdown System (ESD),
ENGINEER
Vibration Monitoring System (VMS), Radar Tank Gauging System (RTG), Fire
A M ALMATROOK
& Gas Detection System (FDS), and Custody Monitoring System (CMS) and
DATE: 12/28/16
CERTIFIED
other Third party controls within YDH. All the relevant communication, process
AMR EL SHARKAWY parameters and status shall be interlinked between Yanbu, YASREF, SAMREF
DATE:
12/28/16 refineries, MARAFIQ & YDH.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
4.3.2 Yanbu to Jiddah Pipeline
DATE: 12/28/16
OPERATIONS The YNJ-1/2 pipeline system shall tie-in with YDH at downstream of shipper
ALI H GHAMDI pump after the PCVs. The battery limit will be the tie-in flange provided by YDH
12/28/16 in the scraper launcher lateral line for YNJ-1 / YNJ-2 and the flanges provided
DATE:
in the delivery manifold for the central region pipeline. As YDH is a greenfield
CONTROL NUMBER
VERIFICATION

development, the planning of both the YNJ-1/2 pipeline system and YDH shall
EDSD

consider each other in the design as well as future plans for the facilities within
YDH.
DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

4.3.2.1 Mechanical
(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 39


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG The project construction interface point shall be a flange connection at the
SAY
SAY
SAY

pipeline scraper launcher. The design interface point shall be at the tank outlet
flange because the system hydraulic modelling shall be included in the scope
ENGG CERT

ASH
ASH
ASH

of the YNJ-1/2 pipeline project, BI-10-02155 Industrial drainage system piping


shall take into account YNJ-1/2 Pipeline System drainage requirements.
LEADS

LEADS
LEADS
ALL

ALL
ALL

4.3.2.2 Electrical
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

YDH 480V systems shall provide power to the panel board located at the
Scraper Launcher area within YDH battery limit. The 480V panel board shall
be provided by BI-10-02155.
DESCRIPTION

4.3.2.3 Non-Electrical Utilities

The YNJ-1/2 pipeline project, BI-10-02155, shall provide information required


for the sizing, not design, of the non-electrical facilities included in YDH project
scope, BI-10-02399. The non-electrical utility systems include, but are not
limited to:


10-02399-

Potable water system


JO/EWO

10-02399-
10-02399-
0001

0001
0001

 Fire protection system


 Industrial drainage (oily water) system
12/28/16
12/14/16

12/18/16
DATE

 Storm water drainage


 Sewerage system
NO.
REV

G
E

DISCIPLINE 4.3.2.4 Buildings


ENGINEER
ALL LEADS

DATE: 12/28/16 There are no anticipated interfaces for the building scope at YDH.
PROJECT
ENGINEER

A M ALMATROOK 4.3.2.5 Process Automation and Communications


DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY Process Automation systems for YDH and YNJ-1/2 pipelines should synergize
DATE:
12/28/16 engineering design, construction and/or start-up to ensure cost effective and
CONSTRUCTION safe commissioning and start-up.
AGENCY
SHAHZAD YAZDANI

DATE: 12/28/16
OPERATIONS
ALI H GHAMDI 4.3.3 Yanbu to Central Region Pipeline
12/28/16
DATE:
CONTROL NUMBER

The pipeline system shall tie-in with YDH at each respective product header
VERIFICATION

line downstream of any tankage and upstream of the pipeline booster pumps.
EDSD

The detailed planning of the pipeline connection shall occur at a future date
when the project plan is initiated and further developed. At this time, YDH shall
DATE:
BY:

consider general provisions for the pipeline connection.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

4.3.4 Communications / IT
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 40


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

The communications system shall interface to existing SAUDI ARAMCO (SA)


ENGG CERT

ASH
ASH

communication infrastructure for Voice, Plant Dedicated Network (PDN),


ASH

Corporate IT, data centers, mobile radio and security. The project shall provide
LEADS

the necessary interface cards in the telecommunications equipment and cables


LEADS
LEADS
ALL

ALL
ALL

to provide the connectivity to the networks as required.


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

 The single mode fiber (per 18-SAMSS-625) connections to the Yanbu’


area refineries will be provided under this project. Connectivity of YDH
to Yanbu NGL will terminate first to Yanbu Refinery Admin Bldg. 1401.
 The YDH Package shall reserve rack space location at Engineering and
DESCRIPTION

Maintenance Building for Pipeline FOC patch panel provided under BI-
10-2155
 The YDH Package shall reserve duct bank at Engineering and
Maintenance Building for Pipeline FOC cable provided under BI-10-
2155
 The process automation traffic shall be transmitted through dedicated
fiber strands, PDN segregated from the corporate IT data network.
 The IT and security systems traffic shall be transmitted through the
corporate IT data network. PDN should meet SAEP-99 as a minimum
10-02399-
JO/EWO

10-02399-
10-02399-

requirement.
0001

0001
0001

 The telephone services shall be IP based and provided through the


VoIP call control systems core servers in Dhahran and Abqaiq.
12/28/16
12/14/16

12/18/16
DATE

 Mobile radio shall be based on Terrestrial Trunked Radio (TETRA)


technology.
 The security systems will be interfaced to Yanbu Regional Security
NO.
REV

G
E

DISCIPLINE Control Center (YRSCC).


ENGINEER
ALL LEADS

DATE: 12/28/16 4.3.5 MARAFIQ


PROJECT
ENGINEER

A M ALMATROOK Electrical
DATE: 12/28/16
CERTIFIED The electrical interface includes a 115 kV power connection with GIS at
AMR EL SHARKAWY
MARAFIQ’s Substation #9I, which is located about 3.85 km away from the
12/28/16
DATE: proposed YDH. Refer to Cable Routing drawing EL-A10150.001,EL-
CONSTRUCTION
AGENCY A10130.001-004.
SHAHZAD YAZDANI

DATE: 12/28/16
OPERATIONS
ALI H GHAMDI Non-Electrical Utilities
12/28/16
DATE:
CONTROL NUMBER

This BI will also interface with MARAFIQ utilities. The scope development
VERIFICATION

design activities will coordinate with MARAFIQ to finalize a formal agreement.


EDSD

The non-electrical utility Interfaces include:


DATE:
BY:

 Potable water system


REVISIONCERTIFICATION

 Fire protection system


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Sanitary sewer

(DCC) NO. _____________________

Storm water drainage (MARAFIQ channels)

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 41


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

4.3.6 Yanbu Royal Commission (YRC)


ENGG CERT

ASH
ASH
ASH

All pipelines, power cables and fiber optic cables connecting YDH to the
previously mentioned interfaces (SAMREF, YASREF, YR, MARAFIQ and
LEADS

LEADS
LEADS
ALL

ALL
ALL

YNGL) are within Yanbu Royal Commission jurisdictions.

CONTRACTOR shall comply with Yanbu Royal Commission (YRC) Standards


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

and regulations for any scope related to YRC and MARAFIQ.

4.4 PROJECT OPERATING INTERFACES


DESCRIPTION

This project shall coordinate construction activities with the respective refineries,
pipeline construction, OSPAS and Domestic Sales & Logistics (DS&LD) departments.
Scheduling for refinery shutdowns and other critical operations shall be developed
during the detail design and shall be included in the Project Execution Plan. Pre-
commissioning, shutdown, commissioning and startup procedures shall be
implemented in such a manner that disruptions to continuing refinery operations are
minimized. All shutdowns shall be coordinated with related companies and
departments for review and scheduling of work. Any changes in approved T&I
10-02399-
JO/EWO

10-02399-
10-02399-
0001

schedules shall be coordinated with OSPAS.


0001
0001

12/28/16

4.5 DEMOLITION ACTIVITIES


12/14/16

12/18/16
DATE

A. GENERAL
NO.
REV

G
E

DISCIPLINE
ENGINEER
The demolition activities in this project will be limited to the demolition required
ALL LEADS for tie-in to the existing piping in:
DATE: 12/28/16
PROJECT
 Yanbu refinery for the terminal unloading line and existing pump
ENGINEER
headers.
A M ALMATROOK
 SAMREF for the product pipeline tie-in.
DATE: 12/28/16
CERTIFIED  MARAFIQ tie-in points for utilities (water supply, sanitary and oily water)
AMR EL SHARKAWY

12/28/16
DATE:
CONSTRUCTION
AGENCY CONTRACTOR shall identify the required demolitions for tie-in during detail
SHAHZAD YAZDANI
design and construction.
DATE: 12/28/16
OPERATIONS
ALI H GHAMDI B. PIPING
12/28/16
DATE:
CONTRACTOR shall be responsible for demolishing the following facility
CONTROL NUMBER
VERIFICATION

components:
EDSD

YANBU REFINERY
DATE:

 Demolition of existing Gasoline, DO & DPK pipeline (approx. 1m to 1.5m


BY:
REVISIONCERTIFICATION

length) for new tie-in connection for Product pipelines from YR Terminal per
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

SAUDI ARAMCO standards.


C

 To install new feed line for Gasoline(PG91/PG95) to YDH ,Tie-in at the 18”
(DCC) NO. _____________________

common header of Gasoline loading and Transfer pumps(V25-P-P17 A-

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 42


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG E)to be taken at Yanbu Refinery near Pump Station-C
SAY
SAY
SAY

 To install new feed line for Kerosene (DPK) to YDH, Tie-in at the 20”
common header of Kerosene loading and Transfer pumps(V25-P22 A/B/C)
ENGG CERT

ASH
ASH
ASH

to be taken at Yanbu Refinery near Pump Station-B.


 To install new feed line for Diesel (DO) to YDH ,Tie-in at the 20”MDO
LEADS

LEADS
LEADS
ALL

ALL
ALL

common header of Diesel loading and Transfer Pumps(V25-P24-A/B/C) to


be taken at Yanbu Refinery near Pump Station-B.

RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

Refer below mentioned demolition piping plan drawings.


 VA236952D-001, VA236952D-002, VA236956D-001, VA236956D-002 and
VA236960D-002.
DESCRIPTION

SAMREF REFINERY

 Demolition of existing Gasoline, DO & DPK pipeline (approx. 1m to 1.5m


length) for new tie-in connection for product pipelines from SAMREF
Refinery per SAUDI ARAMCO standards.

 These tie-ins are required to transfer products from SAMREF to YDH from
existing product export pumps (DO, PG 91, 95 & DPK) at the SAMREF
refinery.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

 Refer demolition piping plan drawings. PIA00438D-001


12/28/16
12/14/16

12/18/16
DATE

YASREF REFINERY

 No Demolition is required at the YASREF. Tie-in will be provided by other


NO.
REV

G
E

DISCIPLINE
BI-10-00043 inside the Yanbu refinery
ENGINEER
ALL LEADS
 These tie-ins are required to transfer products from YASREF to YDH from
DATE: 12/28/16
PROJECT
ENGINEER existing product export pumps (DO & PG 91,95) at the YASREF refinery.
A M ALMATROOK

DATE: 12/28/16
CERTIFIED
NEW GRASS ROOT YANBU REFINERY
AMR EL SHARKAWY

DATE:
12/28/16  It is future refinery, at present there is no interface scope.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI

DATE: 12/28/16
OPERATIONS
ALI H GHAMDI
General Requirement:
12/28/16
DATE:
CONTROL NUMBER

Tie-in connections:
VERIFICATION
EDSD

CONTRACTOR to provide construction tie-in package with regard to location,


orientation, dimensions, etc., prior to final fabrication.
DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

CONTRACTOR shall verify each tie-in with regard to location, orientation,


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

dimensions, etc., prior to final fabrication.


(DCC) NO. _____________________

CONTRACTOR shall assist SAUDI ARAMCO to isolate product lines & re-

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 43


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG commission each system to be tied into.
SAY
SAY
SAY

CONTRACTOR shall submit to SAUDI ARAMCO, for approval specific


ENGG CERT

ASH
ASH
ASH

procedures and sequences for tie-ins to existing facilities and to new facilities.
The tie-in procedures are to be submitted fourteen (14) days in advance of the
LEADS

LEADS
LEADS
ALL

ALL
ALL

planned tie-in date.

CONSTRUCTION CONTRACTOR shall perform tie-ins to existing facilities as


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

stipulated in the project. For interface with other BI’s CONTRACTOR is


mandated to closely co-ordinate with other BI’s to ensure that all agreed
interfaces are covered and performed. Refer to interfaces are covered and
performed.
DESCRIPTION

Refer to Tie-in index drawings for YANBU, PI-B00401.001/002/003/004.


Refer to Tie-in index drawing for YASREF, PIB00451-001.
Refer to Tie-in index drawing for SAMREF, PIB00434-001.

C. CIVIL

 CONTRACTOR shall provide demolition drawing for the demolition of existing


10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

asphalt road and paving and or concrete paving in location where pipelines
redundant in open cut road crossings are to be installed.
12/28/16
12/14/16

12/18/16
DATE

 CONTRACTOR shall provide civil and structural drawings for all the required
NO.
REV

G
E

road crossings and fence penetration for laying the product pipelines, electrical
DISCIPLINE
ENGINEER
& instrument cables.
ALL LEADS

DATE: 12/28/16
PROJECT
 CONTRACTOR shall determine other demolition activities during detail design
ENGINEER
stage, which have not been included in this demolition scope.
A M ALMATROOK

DATE: 12/28/16
CERTIFIED  Roads that are demolished for the above reasons will be backfilling following
AMR EL SHARKAWY
SAES-A-114 and reinstated after the under pavement work is completed.
12/28/16
DATE: Work shall be in accordance with SAES-Q-006 clause 6, Pavement
CONSTRUCTION
AGENCY Reconstruction after trenching.
SHAHZAD YAZDANI

DATE: 12/28/16
OPERATIONS
ALI H GHAMDI 4.6 Receipt Pipeline and Connections
12/28/16
DATE:
A. GENERAL
CONTROL NUMBER
VERIFICATION
EDSD

CONTRACTOR shall design and install the product receiving station in YDH
including, but not limited to the following facilities:
DATE:
BY:

 Four product receiving and distribution manifolds, one each for PG 95,
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

PG 91, DO & DPK


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

 One Slop manifold


(DCC) NO. _____________________

 Provision for connections in the receiving manifolds for two product

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 44


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG pipelines from YASREF
SAY
SAY
SAY

 Provision for connections in the receiving manifolds for three product


pipelines from SAMREF
ENGG CERT

ASH
ASH
ASH

 Provision for connections in the receiving manifolds for three product


LEADS

pipelines from Yanbu Refinery Terminal (YRT) via Yanbu Refinery (YR)
LEADS
LEADS
ALL

ALL
ALL

 Provision in the receiving manifolds for future connection of PG 91/95,


DO & DPK from Yanbu Grass root refinery

RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

Two dye injection skids for PG 95 and PG 91 at YDH


 Conductivity enhancer injection skid for DPK at YDH
 Static Dissipative Additive (SDA) injection skid for DO at YDH
 Three custody metering skids with two provers (1 for PF/DO & 1 for
DESCRIPTION

DPK) and densitometer at YDH (for YRT products)


 Surge relief protection for all eight inbound pipelines from all 3 sources
(SAMREF, YASREF & YR)
 Interface management system

The receipt manifolds shall be sized for the maximum flow rate of a single
refinery supply and the manifold is not expected to receive the same
product from two sources simultaneously. The manifolds shall be
connected to all the three product sources at the upstream and to
10-02399-
JO/EWO

10-02399-
10-02399-

respective storage tanks at the downstream. CONTRACTOR shall provide


0001

0001
0001

Process interlocks to the manifold valves to receive the product from one
source at a time. Provision for connecting the future GR refinery shall be
12/28/16
12/14/16

12/18/16
DATE

provided in all receipt manifolds.

The product and slop manifolds shall be of 30” size and for each manifold
NO.
REV

G
E

DISCIPLINE CONTRACTOR shall provide the provision for extension in future. Each of
ENGINEER
ALL LEADS the manifold inlet and outlet lines shall be equipped with motor operated
DATE: 12/28/16 valves and the segregation of the batches between PG 95 and PG 91 shall
PROJECT
ENGINEER
be through a batch management system. Manifold inlet lines shall also be
A M ALMATROOK
equipped with ZV.
DATE: 12/28/16
CERTIFIED Conductivity enhancer injection skid shall be installed to inject the chemical
AMR EL SHARKAWY
for enhancement of conductivity of DPK. The additives shall be injected to
12/28/16
DATE: the main line from DPK receiving manifold to DPK storage tanks and also to
CONSTRUCTION
AGENCY
DPK main line from DPK storage tanks to booster pumps. Details of
SHAHZAD YAZDANI Conductivity enhancer injection skid shall be finalized after vendor
DATE: 12/28/16 information during detail design.
OPERATIONS
ALI H GHAMDI Static Dissipative Additive (SDA) injection skid shall be installed to inject the
12/28/16
DATE: chemical to reduce the static charge of DO. The additives shall be injected
CONTROL NUMBER

to the main line from the DO receiving manifold to the DO storage tanks.
VERIFICATION
EDSD

Three custody metering skids each dedicated for PG95/PG91, DO and


DATE:
BY:

DPK shall also be installed at YDH for YRT products. Each metering skid
REVISIONCERTIFICATION

shall consist of 4 meter runs (3 operating and 1 standby), prover assembly


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

and densitometer. Prover shall be common for PG 91 , PG 95 and diesel,


C

(DCC) NO. _____________________

whereas one prover will be dedicated for DPK.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 45


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Red and green dye injection skids shall be installed at YDH for the coloring
SAY
SAY
SAY

of PG 95 and PG 91 products from all sources. The red and green dye shall
ENGG CERT

ASH
ASH

be injected to the main line from the PG-95/91 receiving manifold to the
ASH

PG-95/91 storage tanks respectively.


LEADS

LEADS
LEADS
ALL

ALL
ALL

All eight inbound pipelines from all 3 sources (SAMREF, YASREF & YR)
shall be protected for surge relief and will relief into surge relief tank at
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

YDH. Each inlet line shall have two SRVs with its isolation valves and a
thermal relief valve.
DESCRIPTION

The scope for the product receiving station is outlined in PFD VA-
247835.001 & VA-247949.001 and P&IDs VA-247891.001 to VA-
247897.001 & VA-247929.001.

The details of the batch management system are outlined in Section B


instrumentation.

B. INSTRUMENTATION
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

 THE CONTRACTOR shall provide and install cables IC-0952/0610


& IC-0953/0611 from red and green dye injection controller to DCS,
12/28/16
12/14/16

12/18/16
DATE

the connection to Skid controller shall be over Modbus Serial.


Cables IC-0959 & IC-0960 shall be provided to ESD system as
hardwire connection. For details refer block diagram IN-A00001.010
NO.
REV

G
E

DISCIPLINE
ENGINEER
ALL LEADS
 THE CONTRACTOR shall provide and install cable IC-0956 from
DATE: 12/28/16
Conductivity Enhancer Injection Skid controller to DCS, the
PROJECT connection to Skid controller shall be over Modbus Serial. For
ENGINEER
details refer block diagram IN-A00001.010
A M ALMATROOK

DATE: 12/28/16
CERTIFIED  THE CONTRACTOR shall provide and install cable IC-0957 from
AMR EL SHARKAWY SDA Injection Skid controller to DCS, the connection to Skid
DATE:
12/28/16 controller shall be over Modbus Serial. For details refer block
CONSTRUCTION diagram IN-A00001.010
AGENCY
SHAHZAD YAZDANI

DATE: 12/28/16
 THE CONTRACTOR shall provide and install field instruments for
OPERATIONS Gasoline P95/91 at receiving manifold as indicated in P & ID# VA-
ALI H GHAMDI 247894.001 and Block Diagram IN-A00002.017
12/28/16
DATE:
 THE CONTRACTOR shall provide and install branch cables from
CONTROL NUMBER
VERIFICATION

field instruments to junction boxes X40-AJB-2033/DJB-1037/EAJB-


EDSD

4027/EDJB-3022 as per Block Diagram IN-A00002.017.


DATE:


BY:

THE CONTRACTOR shall provide and install homerun cables IC-


REVISIONCERTIFICATION

0790/0797/0798/0805/0806 from junction boxes X40-AJB-


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

2033/DJB-1037/EAJB-4027/EDJB-3022 to DCS/ESD Remote I/O


C

Marshalling Cabinets located in RIB-1 as per Block Diagram IN-


(DCC) NO. _____________________

A00002.017.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 46


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

 THE CONTRACTOR shall provide and install field instruments for


DO/DPK at receiving manifold as indicated in P & ID# VA-
ENGG CERT

ASH
ASH
ASH

247895.001/ VA-247896.001/ VA-247897.001 and Block Diagram


IN-A00002.018
LEADS

LEADS
LEADS
ALL

ALL
ALL

 THE CONTRACTOR shall provide and install branch cables from


RE-ISSUED FOR 100% PROJECT PROPOSAL

field instruments to junction boxes X40-AJB-2034/DJB-1038/EAJB-


RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

4028/EDJB-3023 as per Block Diagram IN-A00002.018.

 THE CONTRACTOR shall provide and install homerun cables IC-


DESCRIPTION

0832/0838/0839/0849/0850/0851 from junction boxes X40-AJB-


2034/DJB-1038/EAJB-4028/EDJB-3023 to DCS/ESD Remote I/O
Marshalling Cabinets located in RIB-1 as per Block Diagram IN-
A00002.018.
 THE CONTRACTOR shall provide and install field instruments for
slop manifold as indicated in P & ID# VA-247897.001 and Block
Diagram IN-A00002.019.

 THE CONTRACTOR shall provide and install branch cables from


field instruments to junction boxes X40-DJB-1039/DJB-1040 as per
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

Block Diagram IN-A00002.018.


12/28/16
12/14/16

12/18/16


DATE

THE CONTRACTOR shall provide and install homerun cables IC-


0856/0857/0862/0863 from junction boxes X40-DJB-1039/DJB-1040
to DCS Remote I/O Marshalling Cabinets located in RIB-1 as per
NO.
REV

G
E

DISCIPLINE
Block Diagram IN-A00002.019.
ENGINEER  THE CONTRACTOR shall provide and install custody metering
ALL LEADS
skids X40-U-0014A/B/C for Gasoline-P91/95, DO & DPK and
DATE: 12/28/16
PROJECT
provers X40-U-0014D/E inside YDH facility at the location indicated
ENGINEER in facility plot plan. The skids shall be vendor supplied, cable
A M ALMATROOK
between field instrument, junction boxes and marshaling cabinet
DATE: 12/28/16 shall be vendor supplied.
CERTIFIED
AMR EL SHARKAWY
 THE CONTRACTOR/SKID VENDOR shall supply and install
12/28/16
DATE: metering shelter to house metering and control cabinets. Contractor
CONSTRUCTION
AGENCY shall integrate metering shelter F & G to DCS system.
SHAHZAD YAZDANI
 Refer block diagram IN-A00001.003 for YDH CMS overview and IN-
DATE: 12/28/16
OPERATIONS
A 00002.020 metering MOVs. The preliminary custody metering
ALI H GHAMDI
design is indicated in P &IDs VA-247886-001 to VA247890-001.
DATE:
12/28/16  THE CONTRACTOR/VENDOR shall provide and install cables
CONTROL NUMBER

between metering skid junction boxes to metering shelter control


VERIFICATION

panels. The quantity and type cables shall be provided by skid


EDSD

vendor to LSTK.
DATE:

 CMS shall be interfaced to DCS over Modbus TCP/IP, fiber optic


BY:

cables shall be provided to connect to DCS system located in rack


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

room of operations building.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C


(DCC) NO. _____________________

All branch cables shall be through conduit and homerun cables shall
run on the cables trays provided on pipe sleepers.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 47


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG  Communications with all third party control system shall be
SAY
SAY
SAY

redundant.
ENGG CERT

ASH
ASH
ASH

 Reference drawings:
LEADS

Drawing # Description
LEADS
LEADS
ALL

ALL
ALL

IN-A00001 System Block Diagrams


IN-A00002 Instrument Block Diagrams
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

IN-A00027 Instrument Points & Lines


IN-D00201 Instrument Installation Schedule-Flow
IN-D00202 Instrument Installation Schedule-Pressure
DESCRIPTION

IN-D00203 Instrument Installation Schedule-Level


IN-D00204 Instrument Installation Schedule-Temperature
IN-D00205 Instrument Installation Schedule-Misc
IN-D00206 Instrument Installation Schedule-MOV/GOV/HOV/AOV
IN-D00207 Instrument Installation Schedule-Relief Valves
IN-A00004 Equipment Layouts
IN-A00003 Cable Routing Plan
IN-D00005 Cable and Conduit Schedule
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

12/28/16
12/14/16

12/18/16
DATE

C. FIRE PROTECTION


NO.
REV

Demolition work in SAMREF as detailed in Project Scoping Paper


G
E

DISCIPLINE (GEN-E0103).
ENGINEER
ALL LEADS

DATE: 12/28/16
D. COMMUNICATION
PROJECT
ENGINEER

A M ALMATROOK
 CONTRACTOR shall provide FO cable infrastructure to be installed
DATE: 12/28/16
for Metering System connectivity to YASREF Control System,
CERTIFIED SAMREF Control System, and YRT Control System All terminations
AMR EL SHARKAWY
will be done on proposed 12-core fiber patch panels except for
12/28/16
DATE: Yanbu Refinery where 48-core fiber will be used.
CONSTRUCTION
AGENCY
 CONTRACTOR shall provide one (1) analog telephone each inside
SHAHZAD YAZDANI
YASREF Control System, SAMREF Control System, and YRT
DATE: 12/28/16
OPERATIONS
Control System to be connected to existing Saudi Aramco
ALI H GHAMDI
Telephone Network via the proposed network of YDH.
12/28/16 Drawing # Description
DATE:

Cable Routing Plan – YDH –YREF, YASREF & SAMREF


CONTROL NUMBER

CO-A10002
VERIFICATION

CO-A10003 Instrument Connection/Interconnection Diagram - YREF,


EDSD

YASREF & SAMREF


DATE:

CO-A10029 Schematic Diagram Analog Telephone System


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

E. CIVIL
C

(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 48


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG  CONTRACTOR shall provide Oily water system to collect oily water
SAY
SAY
SAY

from this facility.


ENGG CERT

ASH
ASH
ASH

 CONTRACTOR shall provide Utility/potable water connection for


washing, eye wash and shower.
LEADS

LEADS
LEADS
ALL

ALL
ALL

 CONTRACTOR shall provide sealed catch basin.


 CONTRACTOR shall provide storm water system.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

F. PIPING
DESCRIPTION

The design and installation of product receiving manifold in YDH shall


include, but not limited to the following facilities:

 Apart from original scope, LSTK contractor to refer below two Project
Scoping paper for revision due to changes in surge sytem.
o Refer to Project Scoping Paper (GEN-E0103) and its
Appendix-3 & 4 for changes due to surge system for scope of
work in SAMREF refinery.
10-02399-

O Refer to Project Scoping Paper (GEN-E0104) and its


JO/EWO

10-02399-
10-02399-
0001

0001
0001

Appendix-2 & 3 for changes due to surge system for scope of


work in Yanbu refinery/YDH.
12/28/16
12/14/16

12/18/16
DATE

 Piping shall provide Dedicated product receipt manifold from the


source refineries consist of total four (04) receipt manifold
NO.
REV

G
E

DISCIPLINE
connecting eight pipelines carrying PG95/PG91/DO & DPK near
ENGINEER battery limit of YDH/RC corridor on west side of plot(Refer Plot plan
ALL LEADS

DATE: 12/28/16
No.PI-A00001-001)
PROJECT
ENGINEER
 This manifold connected to all the three product sources on the
A M ALMATROOK upstream side of the facility to respective storage tanks on the
DATE: 12/28/16 downstream side of the facility.
CERTIFIED
AMR EL SHARKAWY
 Pipelines at Receipt manifold provided with structural
DATE:
12/28/16 supports/Operating platforms to operate control valves/ZVs/PZVs &
CONSTRUCTION Isolation valves.
AGENCY
SHAHZAD YAZDANI  The Product and slop manifold shall be provided with future
DATE: 12/28/16 connections with Isolation valves.

OPERATIONS
The pipeline for three custody metering skids each is dedicated for
ALI H GHAMDI

12/28/16
PG95/PG91, DO and DPK, also two provers shall be provided near
DATE:
Receipt manifold.
CONTROL NUMBER
VERIFICATION

 Pipeline for Red and Green dye injection skids shall be installed at
EDSD

YDH for product identification for products received from all source
refineries
DATE:
BY:

 SDA injection skid and Conductivity enhancer skid located near


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

metering skid.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

 The piping layout for Receipt manifold, Custody metering skids are
(DCC) NO. _____________________

shown in Piping plan as per Drawing control sheet.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 49


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG  Piping layout for Dye injection, SDA & Conductivity enhancer skid
SAY
SAY
SAY

are mainly small bore lines, which to be carried during detail design.
ENGG CERT

ASH
ASH
ASH

CONTRACTOR shall design and install the product receiving manifold in YDH
LEADS

LEADS
LEADS
ALL

ALL
ALL

as per drawings issued DCL.no.GEN-D0001 including, but not limited to the


following facilities:
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

 CONTRACTOR shall perform Piping Design, Procurement,


Fabrication, Transportation, Erection, Installation, Testing,
Inspection, Pre commissioning and Commissioning support for the
DESCRIPTION

following piping system in accordance with the latest edition of


SAUDI ARAMCO Engineering Standards & Specifications and other
applicable International Codes and Standards:
 Distribution manifold of four products and slops shall be routed to
associated facilities inside YDH limit in accordance with project
drawings listed in document control list.
 All new piping from Battery limit of RC Corridor to New storage Tank
feeding to the booster pumps as per Project P&IDs and Piping Plans
10-02399-
JO/EWO

10-02399-
10-02399-
0001

listed in DCL.
0001
0001

 Hydraulics & surge analysis of the pipeline system shall be provided


12/28/16
12/14/16

12/18/16
DATE

by the contractor and approved prior to laying and installation of the


pipeline system.
 Surge relief system for the pipelines along with associated pumps
NO.
REV

G
E

DISCIPLINE and connections shall be covered under contractor’s scope of work.


ENGINEER
ALL LEADS  Pipe supports/platforms/elevated structures as per piping plans and
DATE: 12/28/16 other project documents. Requirement of additional supports not
PROJECT
ENGINEER covered in the proposal drawings but required to complete the
A M ALMATROOK
project shall be include in CONTRACTOR scope
DATE: 12/28/16
CERTIFIED  Overall dimensions of all CONTROL VALVES,ZVs/MOVs/PZVs/SP
AMR EL SHARKAWY
items shown in piping plan are preliminary only, contractor to verify
12/28/16
DATE: final dimensions and all piping drawings, size, elevation of operating
CONSTRUCTION
AGENCY platforms, lifting arrangement to be executed during detail design by
SHAHZAD YAZDANI
THE CONTRACTOR.
DATE: 12/28/16
OPERATIONS
 Insulating gaskets and stud bolds at interface with pipelines shall be
ALI H GHAMDI within piping CONTRACTOR scope.
12/28/16
DATE:
4.7 Yanbu’ Distribution Hub Tank Farm and Support Infrastructure
CONTROL NUMBER
VERIFICATION
EDSD

Yanbu’ distribution hub tank farm and support infrastructure consists of the
following facilities:
DATE:
BY:
REVISIONCERTIFICATION

GENERAL
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

 Product storage tanks


(DCC) NO. _____________________

 Slop System

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 50


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG  Surge Relief System
SAY
SAY
SAY

 DPK Filtration Skid



ENGG CERT

ASH

Hydrocarbon Drain System


ASH
ASH

 Metering System
LEADS

LEADS
LEADS
ALL

ALL
ALL

NON-ELECTRICAL UTILITIES


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

Potable water system


 Fire protection system
 Industrial drainage (oily water) system
 Sanitary sewer
DESCRIPTION

 Storm water drainage


 Evaporation Pond
 Oily water treatment system

A. GENERAL

Product Storage Tanks


10-02399-
JO/EWO

10-02399-

The product tanks shall be constructed as a separate construction package in the


10-02399-
0001

0001
0001

distribution hub (YDH) and is not included in this scope of THE CONTRACTOR;
however CONTRACTOR shall provide automatic tank dewatering system, the
12/28/16
12/14/16

12/18/16
DATE

required instrumentation and piping requirements as specified in the piping, and


instrumentation sections of this document. Refer to Appendix 6 for YDH Storage
Tanks Package (by Others).
NO.
REV

G
E

DISCIPLINE
ENGINEER
ALL LEADS
The product split, the type and the capacities for the tanks to be constructed in
Yanbu’ distribution hub are summarized in the table below.
DATE: 12/28/16
PROJECT
ENGINEER Tank Size-
A M ALMATROOK
Total Capacity
Working Number Design Design MDMT
DATE: 12/28/16 Tank Type Working
Volume m³ of Tanks Pressure Temp. (⁰C) (⁰C)
CERTIFIED Volume m³ (MB)
AMR EL SHARKAWY (MB)
12/28/16 External
DATE:
PG 91 27,658 (174) 3 82,974 (522) Atm 75 0
CONSTRUCTION Floating roof
AGENCY
SHAHZAD YAZDANI

DATE: 12/28/16 External


OPERATIONS PG 95 27,658 (174) 3 82,974 (522) Atm 75 0
Floating roof
ALI H GHAMDI
Fixed Dome
12/28/16 DO 40,842 (256.9) 3 122,526 (770.7) Atm 75 0
DATE:
roof
CONTROL NUMBER
VERIFICATION

Internal
DPK 40,228 (253) 1 Atm 75 0
EDSD

Floating roof
121,552 (764.5)
Internal
DATE:

DPK 27,108 (170.5) 3 Atm 75 0


BY:

Floating roof
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

Internal
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

DO/DPK 53,132 (334.2) 1 53,132 (334.2) Atm 75 0


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Floating Roof
(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 51


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Note: The tank capacities are provided to meet the 85% of nominal volume
SAY
SAY
SAY

specified per the project scoping paper.


ENGG CERT

ASH
ASH
ASH

Slop System
LEADS

LEADS
LEADS
ALL

ALL
ALL

Slop system shall be consisting of two slop tanks (by others) and two slop pumps
(one operating, one spare) with necessary instrumentation and piping. Two slop
tanks each of 13,514 m³ (85 MB) working capacity shall be provided to handle the
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

intermix products from the pipeline, slops from the oily water treatment and surge
relief tank. The design parameters for the slop tank shall be as follows:
DESCRIPTION

Total Capacity,
Tank Size- Working Number of Working Design Design MDMT
Tank Type
Volume m3 (MB) Tanks Volume, m3 Pressure Temp. (⁰C) (⁰C)
(MB)
Internal
Slop 13514 (85) 2 27028 (170) Atm 75 0
Floating roof
10-02399-
JO/EWO

10-02399-
10-02399-
0001

The slop tanks shall be constructed as separate construction package in YDH


0001
0001

along with product storage tanks and is not included in this scope of The
CONTRACTOR; however CONTRACTOR shall provide tank dewatering system,
12/28/16
12/14/16

12/18/16
DATE

the required instrumentation and piping requirements as specified in the piping and
instrumentation sections of this document. Refer to Appendix 6 for YDH Storage
NO.
REV

G
E

Tanks Package (by Others).


DISCIPLINE
ENGINEER
ALL LEADS CONTRACTOR shall provide pumps to empty the slop tanks to product tanks and
DATE: 12/28/16 the slop product shall be blended with the finished product in in storage tanks
PROJECT
ENGINEER
without affecting the quality of the product. CONTRACTOR shall connect the slop
A M ALMATROOK
tank pump discharge to individual tank inlet to avoid any product contamination
DATE: 12/28/16
during transfer. Slop tank shall also be provided with a provision to connect to the
CERTIFIED DO /DPK booster pump suction, which enables YDH to pump the slop product to
AMR EL SHARKAWY
NJBP along with the intermix products.
12/28/16
DATE:
CONSTRUCTION
AGENCY
The scope for the slop system is outlined in PFD VA-247842.001 and P&IDs VA-
SHAHZAD YAZDANI 247912.001 to VA-247914.001.
DATE: 12/28/16
OPERATIONS Surge Relief System
ALI H GHAMDI

12/28/16 The following is a general scope narrative for the surge relief system:
DATE:
CONTROL NUMBER
VERIFICATION

CONTRACTOR shall design and install surge relief systems at YDH for the YNJ-1
EDSD

& YNJ-2 pipelines per surge requirement from BI-10-02155 and for all the inbound
pipelines from each source. A surge relief system consisting of a SRVs, surge
DATE:

relief tank (by others) and pumps & its associated piping & instrumentation shall be
BY:

installed. The surge tank pump will transfer the surge volume to the slop tank.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Refer to Project Scoping Paper (GEN-E0104) for the changes in surge system of
(DCC) NO. _____________________

YR / YDH.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 52


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

Similarly, like surge relief system at YDH, surge system shall also be provided at
SAMREF as detailed in Project Scoping Paper (GEN-E0103).
ENGG CERT

ASH
ASH
ASH

DPK Filtration Skid


LEADS

LEADS
LEADS
ALL

ALL
ALL

The CONTRACTOR shall provide a DPK filtration system to filter the off spec DPK
from the tanks. The DPK filtration is proposed to be a complete vendor skid with
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

circulation pumps, pre filters and after filters. Normally, the filtration skid circulates
into the same product tanks or to an empty DPK tank as per the operation
requirement. . The DPK filtration skids shall be sized to handle a capacity of 45 to
200 MBD and will be a completely vendor designed skid.
DESCRIPTION

The preliminary scope for Filtration Skid is outlined in PFD VA-247843.001 and
P&IDs VA-247915.001. CONTRACTOR shall develop detailed P&ID after vendor
information during detail design and CONTRACTOR shall make sure the design
shall meet the requirement of SAES-A-302 Aviation fuel quality assurance design
requirement.

B. NON-ELECTRICAL UTILITIES
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

The MARAFIQ battery limit will be the tie-in point at the RC corridor for potable
water and sanitary waste water. MARAFIQ will be supplying the required quantity
12/28/16
12/14/16

12/18/16
DATE

of potable water and YDH will be discharging the industrial waste and sanitary
waste water to MARAFIQ network. CONTRACTOR shall make sure that the
NO.
REV

receipt and discharge from / to MARAFIQ network is provided with the metering
G
E

DISCIPLINE system as per the requirement of MARAFIQ.


ENGINEER
ALL LEADS

DATE: 12/28/16
PROJECT The non-electrical utility systems include, but are not limited to:
 Utility water system
ENGINEER

A M ALMATROOK

DATE: 12/28/16
 Sanitary sewer
CERTIFIED  Storm water drainage
AMR EL SHARKAWY
 Fire protection system
12/28/16
DATE:
CONSTRUCTION
AGENCY
Utility water system
SHAHZAD YAZDANI

DATE: 12/28/16 CONTRACTOR shall provide utility water tank for the storage and supply of utility
OPERATIONS water. The utility water tank and pressure equipment pumps shall be separated
ALI H GHAMDI from the Fire protection water tanks and equipment.
12/28/16
DATE:
Utility water shall be provided from the MARAFIQ sweet water main. Adequate
CONTROL NUMBER
VERIFICATION

metering system per the requirement of MARAFIQ will be provided for the metering
EDSD

of utility water inflow.


DATE:
BY:

Utility water will be supplied to the buildings, eyewash / safety showers, and YNJ-1
REVISIONCERTIFICATION

& YNJ-2 pipeline scraper launchers through utility water pumps (one operating,
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

one spare).
C

(DCC) NO. _____________________

CONTRACTOR shall provide Metering system required for the receipt of utility

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 53


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG water per the requirement of MARAFIQ. The scope for the utility water system is
SAY
SAY
SAY

outlined in PFD VA-247847.001 and P&IDs VA-247924.001, 002.


ENGG CERT

ASH
ASH
ASH

Oily Water Collection and Treatment system


LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall install two (2) oily water lift stations in Yanbu’ distribution hub
to facilitate the gravity drain of oily water from all sources.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

Oily water discharge from all identified sources shall be routed to the oily water lift
stations.
DESCRIPTION

The rainfall water within the tank farm dikes is considered contaminated water and
it will be collected by an oily water pipe system towards the oily water lift stations.

In addition to the oily water drains from catch basins in the process area and storm
water inside of the tank dike, Oily water & DO storage tanks, sump shall also
receive flammable tank dewatering, pure hydrocarbon drains from process areas,
and pumps. The details of hydrocarbon drain network are specified below under
utilities section.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

Before water entering into the lift stations, the water shall pass through a sand
0001
0001

separator /trap which properly designed will retain sand particles from the sump
12/28/16

pumps
12/14/16

12/18/16
DATE

Each oily water lift station shall be provided with two pumps for normal flow (one
NO.
REV

G
E

operating, one spare) and two pumps for maximum flow (one operating, one
DISCIPLINE
ENGINEER
spare). The normal flow pumps will discharge to an oily water treatment system
ALL LEADS whereas the maximum flow pump shall discharge to the Evaporation pond.
DATE: 12/28/16
PROJECT
ENGINEER
The details of the oily water lift station, instrumentation and details of pumps are
A M ALMATROOK
outlined in instrumentation and mechanical sections below.
DATE: 12/28/16
CERTIFIED CONTRACTOR shall provide an Oily water treatment system for the treatment of
AMR EL SHARKAWY
oily water. The oily water treatment system shall be of a complete vendor skid
12/28/16
DATE: design and the treatment system shall receive the effluent from the oily water sump
CONSTRUCTION
AGENCY
via normal flow pump.
SHAHZAD YAZDANI

DATE: 12/28/16 CONTRACTOR shall route the effluent from normal flow pumps to an equalization
OPERATIONS tank which will discharge into the CPI Oily water treatment.
ALI H GHAMDI

DATE:
12/28/16 The oily water treatment system shall receive the effluent from the normal flow
pump and the dewatered effluent from the product storage tanks. Before oily water
CONTROL NUMBER
VERIFICATION

entering into the oily water treatment unit, it shall pass through an equalization
EDSD

tank.
DATE:
BY:

The oily water treatment system shall be of a complete vendor skid design. The
REVISIONCERTIFICATION

oily water treatment system shall consist of but is not limited to an oily water
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

equalization tank, CPI separator, water break tank, two effluent water pumps (one
C

operating, one spare), two skimmed oil pumps (one operating, one spare) and
(DCC) NO. _____________________

necessary instrumentation and interconnecting piping. Pumps shall be provided to

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 54


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG transfer the recovered oil to the slop tank while effluent water to be transferred to
SAY
SAY
SAY

the YDH evaporation pond.


ENGG CERT

ASH
ASH
ASH

The detail for the skid is outlined in mechanical section below. CONTRACTOR
LEADS

shall provide the pump to transfer the recovered oil to the slop tank while effluent
LEADS
LEADS
ALL

ALL
ALL

water to be transferred to the evaporation pond.


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

The scope for the oily water system is outlined in PFD VA-247846.001 & VA-
247848.001 and P&IDs VA-247921.001 to VA-247923.001 CONTRACTOR shall
develop detailed P&ID after vendor information during detail design.
DESCRIPTION

Hydrocarbon Drain System

CONTRACTOR shall make sure that a separate drain network Drains from the
product tanks, manifolds, scraper launchers and pump stations will be routed to
the oily water lift stations in a separated network from the other oily water
resources.

Utility water system


10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

Utility water shall be provided from the MARAFIQ sweet water main. Adequate
metering system per the requirement of MARAFIQ will be provided for the
12/28/16
12/14/16

12/18/16

metering of utility water inflow. CONTRACTOR shall provide utility water tank
DATE

for the storage and supply of utility water. Utility water will be supplied to
eyewash / safety showers, YNJ-1 & YNJ-2 pipeline scraper launchers and to
NO.
REV

G
E

the buildings through utility water pumps (one operating, one spare).
DISCIPLINE
ENGINEER
ALL LEADS CONTRACTOR shall provide Metering system required for the receipt of utility
DATE: 12/28/16 water per the requirement of MARAFIQ. The scope for the utility water system
PROJECT
ENGINEER is outlined in PFD VA-247847.001 and P&IDs VA-247924.001, 002.
A M ALMATROOK

DATE: 12/28/16 Sewage collection and disposal


CERTIFIED
AMR EL SHARKAWY

12/28/16
Instrumentation for the collection and discharge of sewage from the buildings to
DATE:
the MARAFIQ network.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
Sewage discharged from buildings will be routed to a common sump and
DATE: 12/28/16 transported by two lift pumps (one operating, one spare) to the MARAFIQ
OPERATIONS
sewage water network.
ALI H GHAMDI

12/28/16
DATE: Sanitary sewage pipes from Operator shelters in the tank farm area will be
CONTROL NUMBER

discharged to the sanitary lift station near the Main Gate. The present location
VERIFICATION

of the sanitary lift station shall be re-evaluated/validated during detail design


EDSD

stage in order to optimize the depth of the lift station.


DATE:
BY:

Adequate metering system per the requirement of MARAFIQ shall be provided


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

for the metering of discharge effluent. The scope for the sanitary system is
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

outlined in PFD VA-247848.001 and P&IDs VA-247926.001.


(DCC) NO. _____________________

Storm water collection system


`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 55


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

CONTRACTOR shall construct the storm water collection system consisting in


but not limited to pipes, culverts, transfer boxes, manholes, channels, and
ENGG CERT

ASH
ASH
ASH

headwalls discharge structures.


LEADS

LEADS
LEADS
ALL

ALL
ALL

The drainage system considers an adequate and consistent finish floor slope
towards channels and catch basins. Channels will be sloped properly to
conduct the storm water and discharge to MARAFIQ channels network.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

The contaminated storm water is collected by an oily water system to be


discharge in the evaporation pond
DESCRIPTION

Evaporation pond

CONTRACTOR shall validate the design of evaporation pond considering the


total influent of fire water, contaminated storm water, hydro test water from
pumps house and tank farm area. In addition to these requirements, Project
shall consider the Royal Commission Environmental Regulation in sizing the
Pond.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

Provide Two (2) evaporation ponds for waste oily water sewage and one (1)
0001
0001

evaporation pond for hydro test and contaminated storm water. The
12/28/16

evaporation ponds shall be excavated with sufficient depth in order to


12/14/16

12/18/16
DATE

accommodate about 2.0 meter deep oily water waste. Provide 0.6m minimum
free board.
NO.
REV

G
E

DISCIPLINE
ENGINEER
Provide 300mm thick marl capping bed inside evaporation pond includes 60mil
ALL LEADS rough surface HDPE (UV Resistant) liner above the marl capping.
DATE: 12/28/16
PROJECT
ENGINEER Provide 150 mm thick reinforced concrete Splash.
A M ALMATROOK

DATE: 12/28/16 C. MECHANICAL ROTATING EQUIPMENT


CERTIFIED
AMR EL SHARKAWY
YDH Tank Farm and Support structure will have following sets of pumps.
12/28/16
DATE:
CONSTRUCTION
AGENCY SLOP TANK PUMPS (X40-G-0022 A/B)
SHAHZAD YAZDANI

DATE: 12/28/16 Slop tanks will be emptied through Slop Tank Pumps (X40-G-0022 A/B) to
OPERATIONS
product tanks. These pumps shall be of Vertical Can Type due to low NPSH
ALI H GHAMDI
available as per hydraulic calculations. Pumps shall be in accordance with 31-
12/28/16
DATE:
SAMSS-004. Reference shall be made to datasheet no. RE-E00105 in Index-G
CONTROL NUMBER
VERIFICATION

for further details of these pumps.


EDSD

MISCELLANEOUS DUTY PUMPS


DATE:
BY:

Apart from above following sets of pumps shall also be provided as part of YDH
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

Tank Farm and Support structure. Reference shall be made to Index-G for
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

preliminary datasheets of these pumps.


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 56


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG  Utility Water Pumps (X40-G-0030 A/B) for eyewash, safety showers and
SAY
SAY
SAY

drinking water – Datasheet No. RE-E00113


ENGG CERT

ASH
ASH
ASH

 Sanitary Pumps for Sewage Lift Stations (X40-G-0029 A/B) – Datasheet


LEADS

LEADS

No. RE-E00112
LEADS
ALL

ALL
ALL

 Surge Relief Pumps to transfer the surge volumes to respective product


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

tanks (X40-G-0023 A/B) – Datasheet No. RE-E00106

 CPI Separator Skim Oil Pumps (X40-G-0025 A/B) – Datasheet No. RE-
E00108 and effluent water pumps (X40-G-0026 A/B) – Datasheet No.
DESCRIPTION

RE-E00109. These will be part of CPI Separator package and shall be


finalized by CPI Package vendor.

In addition to above, Surge Relief & Oily Water Pumps are required for
SAMREF surge system as detailed in Document No. GEN-E0103.

MISCELLANEOUS REQUIREMENTS

 Reference shall be made to technical specifications for pumps included


10-02399-
JO/EWO

10-02399-
10-02399-

in Index-A for further details of these pumps.


0001

0001
0001

12/28/16


12/14/16

12/18/16

Pump Datasheets provided in this package will be further verified by


DATE

CONTRACTOR during detailed design phase of the project before


issuing for procurement activities.
NO.
REV

G
E

DISCIPLINE


ENGINEER
ALL LEADS CONTRACTOR shall be responsible for producing equipment
DATE: 12/28/16 datasheet, SIS sheets, Noise Datasheets in accordance with SAUDI
PROJECT
ENGINEER ARAMCO standard forms and datasheets.
A M ALMATROOK

DATE: 12/28/16  All pumps will be procured by CONTRACTOR from SAUDI ARAMCO
CERTIFIED
AMR EL SHARKAWY approved manufacturer for each Commodity Classification Code (CCC).
DATE:
12/28/16 SAUDI ARAMCO will provide the list of approved manufacturers after
CONSTRUCTION
AGENCY
award of Contract.
SHAHZAD YAZDANI

DATE: 12/28/16  CONTRACTOR shall prepare Material Requisition Package for all the
OPERATIONS
pumps and shall obtain approvals from relevant SAUDI ARAMCO
ALI H GHAMDI

12/28/16
Departments before issuing to Vendors.
DATE:
CONTROL NUMBER
VERIFICATION

 Material take-offs have been prepared for reference only and will not be
EDSD

considered as contractual documents and cannot be used as a basis for


any change order.
DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

 Technical quotations obtained from vendors will list all exceptions and
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

/or, additions to applicable project Drawings and SAUDI ARAMCO


(DCC) NO. _____________________

Specifications. If there is no exception to specifications, CONTRACTOR

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 57


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG will make a statement to that effect.
SAY
SAY
SAY


ENGG CERT

ASH
ASH

CONTRACTOR shall be responsible for Technical Bid Evaluation,


ASH

placing the Purchase Order to technically approved Vendors.


LEADS

LEADS
LEADS
ALL

ALL
ALL

 CONTRACTOR shall be responsible for review and approval of NMRs


601, 602 and 603.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

 Inspection and Testing of CONTRACTOR supplied materials will be


performed as per applicable SAUDI ARAMCO Inspection Requirement
DESCRIPTION

form A-175. CONTRACTOR will arrange with his sub suppliers to


comply with these requirements by stating on all sub suppliers’
purchase order SAUDI ARAMCO’s intention to inspect material.

 Equipment installation and Commissioning shall be in accordance with


approved Vendor’s installation and commissioning procedures.

 Supply of Commissioning and Start-up spares and first fill of all the
10-02399-
JO/EWO

10-02399-
10-02399-

lubricants and chemicals is in the scope of CONTRACTOR.


0001

0001
0001

CONTRACTOR shall obtain approval of Aramco Operations before


12/28/16

filling of lubricants and chemicals.


12/14/16

12/18/16
DATE

 CONTRACTOR will provide all Non Material Requirement (NMR-


NO.
REV

G
E

DISCIPLINE
602/603), Operation and Instruction Manuals of CONTRACTOR
ENGINEER
ALL LEADS
supplied material in electronic format (Latest Acrobat Reader).
DATE: 12/28/16
PROJECT
ENGINEER
 CONTRACTOR will provide critical spare parts for CONTRACTOR
A M ALMATROOK supplied items in accordance with SAEP-3101. Contractor will develop
DATE: 12/28/16 list of critical plant equipment spares and identification.
CERTIFIED
AMR EL SHARKAWY

12/28/16 D. MECHANICAL STATIC EQUIPMENT


DATE:
CONSTRUCTION
AGENCY This section describes the Contractor’s scope of work for the design,
SHAHZAD YAZDANI
manufacture /fabrication, supply, packaging & storage, supervision for
DATE: 12/28/16
OPERATIONS
installation, commissioning, start-up activities. Provision of Spare Parts
ALI H GHAMDI
required for erection & commissioning, start-up and 2 years operation.
12/28/16
DATE:
Following list of equipment shall be provided by CONTRACTOR:
CONTROL NUMBER
VERIFICATION

SR NO
EDSD

EQUIPMENT TAG NO. QTY SERVICE


DATE:
BY:

1 X40-D-0028A/B 2 FIRE WATER TANK


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

2 1 UTILITY WATER TANK


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

X40-D-0014
(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 58


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

3 1 DIESEL DAY TANK


X40-D-0037
ENGG CERT

ASH
ASH
ASH

4 X40-U-0XX1 1 MONORAIL
LEADS

LEADS
LEADS
ALL

ALL
ALL

5 X40-U-0021, X40-U- 3 OVERHEAD CRANES


0024 & X40-U-0025
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

In addition to the above, one Surge Tank is required at SAMREF. Refer to


Document No. GEN-E0103.
DESCRIPTION

Following Packages shall be provided by CONTRACTOR:

SR NO
EQUIPMENT TAG NO. QTY SERVICE

1 X40-U-0001 1 KEROSENE FILTRATION SKID

2 1 GASOLINE 95 RED DYE


X40-U-0002
INJECTION SKID
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

3 1 GASOLINE 91 GREEN DYE


X40-U-0003
12/28/16
12/14/16

12/18/16

INJECTION SKID
DATE

4 1 OILY WATER TREATMENT


X40-U-0004
NO.
REV

G
E

PACKAGE
DISCIPLINE
ENGINEER
ALL LEADS 5 1 CONDUCTIVITY ENHANCER
X40-U-0005
DATE: 12/28/16 INJECTION SKID
PROJECT
ENGINEER
6 1 STATIC DISSIPATIVE ADDITIVE
A M ALMATROOK X40-U-0011
DATE: 12/28/16
INJECTION SKID
CERTIFIED
AMR EL SHARKAWY

12/28/16
DATE:
CONSTRUCTION
Below are the reference documents for all Mechanical Static equipment
AGENCY and Packages.
SHAHZAD YAZDANI

DATE: 12/28/16
REFERENCE DOCUMENTS:
OPERATIONS
ALI H GHAMDI
TECHNICAL SPECIFICATION:
12/28/16
DATE:
CONTROL NUMBER
VERIFICATION

EQE00006012 TECHNICAL SPECIFICATION FOR FIRE & UTILITY WATER TANKS


EDSD

TECHNICAL SPECIFICATION FOR OILY WATER TREATMENT PACKAGE


EQE00009018 (X40-U-0004)
DATE:
BY:

EQE00011029 TECHNICAL SPECIFICATION FOR DPK FILTRATION SKID


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

EQE00012030 TECHNICAL SPECIFICATION FOR DYE INJECTION SKIDS


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

EQE00015014 TECHNICAL SPECIFICATION FOR OVERHEAD CRANES


(DCC) NO. _____________________

EQE00016010 TECHNICAL SPECIFICATION FOR UL-142 TANKS


`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 59


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
EQE00018008 TECHNICAL SPECIFICATION FOR DROP ARM BARRIER
SAY
SAY
SAY

EQE00019010 TECHNICAL SPECIFICATION FOR CRASH BARRIER


ENGG CERT

ASH
ASH
ASH

EQE00013018 TECHNICAL SPECIFICATION FOR INJECTION SKID


LEADS

LEADS
LEADS
ALL

ALL
ALL

DATA SHEETS:
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

EQE00027004 DATA SHEET FOR FIRE WATER TANKS (X40-D-0028 A/B)


EQE00028004 DATA SHEET FOR UTILITY WATER TANK (X40-D-0014)
DESCRIPTION

EQE00030001 DATA SHEET FOR OILY WATER TREATMENT PACKAGE (X40-U-0004)


EQE00032001 DATA SHEET FOR DPK FILTRATION SKID (X40-U-0001)
EQE00033001 DATA SHEET FOR P95 RED DYE INJECTION SKIDS (X40-U-0002)
EQE00034001 DATA SHEET FOR P91 GREEN DYE INJECTION SKIDS (X40-U-0003)
DATASHEET FOR CONDUCTIVITY ENHANCER INJECTION SKID (X40-U-
EQE00041001 0005)
DATASHEET FOR STATIC DISSIPATIVE ADDITIVE INJECTION SKID (X40-
EQE00042001 U-0011)
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

EQE00046003 DATASHEET FOR DIESEL DAY TANK X40-D-0037


DATASHEET FOR OVERHEAD CRANE FOR FIRE WATER PUMP SHELTER
12/28/16
12/14/16

12/18/16
DATE

EQE00051002 (X40-U-0021)
EQE00052002 DATASHEET FOR OVERHEAD CRANE FOR GIS ROOM (X40-U-0024)
NO.
REV

G
E

DISCIPLINE
DATASHEET FOR OVERHEAD CRANE FOR ENGG. & MAINTENANCE
ENGINEER EQE00053002 BUILDING (X40-U-0025)
ALL LEADS

DATE: 12/28/16 EQE00059002 DATASHEET FOR MONORAIL (SANITARY LIFT STATION)


PROJECT
ENGINEER

A M ALMATROOK

DATE: 12/28/16 CONTRACTOR shall be responsible for supply, procurement, fabrication,


CERTIFIED transportation handling, storage at site, erection, inspection, testing and Pre-
AMR EL SHARKAWY
commissioning, Commissioning support of all equipment and packages.
12/28/16
DATE:
CONSTRUCTION
AGENCY CONTRACTOR shall take necessary precautions in handling the equipment to
SHAHZAD YAZDANI prevent any damage during transportation and loading/unloading.
DATE: 12/28/16
OPERATIONS CONTRACTOR shall develop and submit for SAUDI ARAMCO acceptance
ALI H GHAMDI rigging plans and transportation calculations for all major equipment.
12/28/16
DATE:
CONTROL NUMBER

CONTRACTOR shall supply spreader bars, shackles, and slings for the lifting
VERIFICATION

of equipment.
EDSD

All equipment shall be installed and commissioned as per SAUDI ARAMCO


DATE:
BY:

Standards and Manufacturer recommendations.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

CONTRACTOR shall be responsible for insulation (where specified on the data


C

sheet or P&IDs) and fireproofing (where specified on the data sheet or P&IDs).
(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 60


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG All skid packages design shall be vendor proven design. Skid packages shall
SAY
SAY
SAY

be suitable for the specific application by meeting all the process design
requirements and environmental, safety and Industry standards.
ENGG CERT

ASH
ASH
ASH
LEADS

LEADS
LEADS
ALL

ALL
ALL

E. INSTRUMENTATION

CONTRACTOR shall perform the following activities at following areas as


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

mentioned below:

RTG for Product Storage & Slop Tanks:


DESCRIPTION

 Provide and install radar level transmitters, multisport temperature sensors,


pressure transmitters and other tank gauging devices as indicated in P &
IDs VA-247898.001 to VA-247911.001 and for slop tanks P & ID VA-
247912/ VA-247913. Refer block diagram IN-A00001.005 for details.
 Provide and install cable between RTG instruments, the cables shall run
through conduits.
 Provide RTG junction boxes at the tanks as indicated in block diagram IN-
A00001.005.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

 Provide and install fieldbus cables from RTG level transmitters to RTG
junction boxes through conduit.
12/28/16
12/14/16

12/18/16
DATE

 Provide and install RTG fieldbus homerun cables between RTG junction
boxes and Field Communication Units located in Rack room of Operation
NO.
REV

G
E

building.
DISCIPLINE
ENGINEER
ALL LEADS  Refer block diagram IN-A00001.005 for fieldbus cabling and FCU
DATE: 12/28/16
assignments. The assignment shown is preliminary and shall be finalized
PROJECT during detail design phase.
ENGINEER

A M ALMATROOK  All RTG components inside the rack room shall be supplied within a
DATE: 12/28/16 cabinet. The RTG shall be interfaced to DCS over industry standard open
CERTIFIED
AMR EL SHARKAWY
protocols.
12/28/16
DATE:
CONSTRUCTION
AGENCY
Product Storage & Slop Tanks Field Instrumentation
SHAHZAD YAZDANI

DATE: 12/28/16  Provide and install field instruments in the tank farm area as per P & IDs
OPERATIONS VA-247898.001 to VA-247911.001 and for slop tanks P & ID VA-247912/
ALI H GHAMDI VA-247913 and block diagrams IN-A00002.001/002/003/004.
12/28/16
DATE:  Provide and install branch cables from field instruments to junction boxes.
CONTROL NUMBER
VERIFICATION

 Provide and install junction boxes as per block diagrams IN-


EDSD

A00002.001/002/003/004.
DATE:

 Provide and install homerun cables from field junction boxes to DCS/ESD
BY:

marshalling cabinets located in Rack room of Operations Building and


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

Remote Instrument Buildings as per overall cable routing drawing IN-


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

A00003.001 and block diagrams IN-A00002.001/002/003/004.


(DCC) NO. _____________________

 To include product quantity measuring system from YDH to

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 61


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

Surge Relief System


ENGG CERT

ASH
ASH
ASH

CONTRACTOR shall
LEADS

LEADS
LEADS
ALL

ALL
ALL

 Provide and install field instruments as indicated in P &IDs VA-247929-001


and VA-247930-001 and as per block diagram IN-A00002.016
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

 Provide and install field junction box X40-AJB-2032 & X40-EAJB-X032 lay
homerun cable IC-0773,IC-0950 from JB to RIB-2.
 Provide and install cables between IRP panels located in substation XXX1
to RIB-2 DCS/ESD remote I/O cabinets.
DESCRIPTION

DPK Filtration Skid

THE CONTRACTOR/VENDOR SHALL

 DPK Filtration Skid vendor shall provide and install field instruments as
indicated in P &IDs VA-247915 as per block diagram IN-A00002.022
 DPK Filtration Skid vendor shall provide and install junction boxes.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

 Contractor shall provide and install homerun cables from skid junction
boxes to DCS marshaling cabinet located in RIB-2. The cables laying shall
12/28/16
12/14/16

12/18/16
DATE

be as per block diagram IN-A00002.022.


 Contractor shall integrate skid pumps to IRP panel located in substation
NO.
REV

G
E

XXX2. Provide and install homerun cables DCS marshaling cabinet located
DISCIPLINE
ENGINEER in RIB-2 to MCC. The cables laying shall be as per block diagram IN-
ALL LEADS
A00002.022.
DATE: 12/28/16
PROJECT
ENGINEER
 Field instruments for all the skids to be included
A M ALMATROOK Oily Water Collection and Treatment system
DATE: 12/28/16


CERTIFIED
AMR EL SHARKAWY
Contractor shall provide and install field instruments as indicated in P &IDs
12/28/16 VA-247921, VA-247922 & VA-247923 and as per block diagram IN-
DATE:
CONSTRUCTION
A00002.011, IN-A00002.012 & IN-A00002.021
AGENCY
SHAHZAD YAZDANI  Provide and install branch cables from field instruments to junction boxes.
DATE: 12/28/16
OPERATIONS
 Provide and install junction boxes as per block diagrams IN-A00002.011,
ALI H GHAMDI
IN-A00002.012 & IN-A00002.021
DATE:
12/28/16  Provide and install homerun cables from field junction boxes to DCS/ESD
marshalling cabinets located in Rack room of Operations Building and
CONTROL NUMBER
VERIFICATION

Remote Instrument Buildings as per overall cable routing drawing IN-


EDSD

A00003.001 and block diagrams IN-A00002.011/012/021.


DATE:

 Provide and install cables between MCC IRP to DCS/ESD cabinets located
BY:

in Remote Instrument Buildings.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Utilities
(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 62


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG a) Utility Water/Waste Water/Sanitary water
SAY
SAY
SAY
ENGG CERT

ASH
ASH


ASH

Contractor shall provide water metering skids as shown in P&IDs.


 Contractor shall supply metering skid for Utility water, Waste water
LEADS

LEADS
LEADS
ALL

ALL
ALL

and sanitary water.


 Metering skids shall be provided with an RTU to connect to existing
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

SCADA located in MARAFIQ facility.


 Metering skid interface shall be as per block diagram IN-
A00001.001
DESCRIPTION

 Totalizer / quantity measurement reading for products at YDH


upstream of Yanbu-Jiddah pipeline to be connected to the DCS.

 Reference drawings
Drawing # Description
IN-A00001 System Block Diagrams
IN-A00002 Instrument Block Diagrams
10-02399-
JO/EWO

10-02399-
10-02399-
0001

IN-A00027 Instrument Points & Lines


0001
0001

IN-D00201 Instrument Installation Schedule-Flow


12/28/16
12/14/16

12/18/16
DATE

IN-D00202 Instrument Installation Schedule-Pressure


IN-D00203 Instrument Installation Schedule-Level
NO.
REV

G
E

IN-D00204 Instrument Installation Schedule-Temperature


DISCIPLINE
ENGINEER IN-D00205 Instrument Installation Schedule-Misc
ALL LEADS
IN-D00206 Instrument Installation Schedule-MOV/GOV/HOV/AOV
DATE: 12/28/16
PROJECT IN-D00207 Instrument Installation Schedule-Relief Valves
ENGINEER

A M ALMATROOK
IN-A00004 Equipment Layouts
DATE: 12/28/16 IN-A00003 Cable Routing Plan
CERTIFIED
AMR EL SHARKAWY
IN-D00005 Cable and Conduit Schedule
12/28/16
DATE:
CONSTRUCTION
AGENCY
F. PIPING
SHAHZAD YAZDANI

DATE: 12/28/16  Piping plans have been developed showing the conceptual routing of all
OPERATIONS major pipes with proper configuration in order to meet process objectives.
ALI H GHAMDI Pipe supports, platform and elevated structures shown in this submittal are
DATE:
12/28/16 preliminary. All major instruments such as MOVs, ZVs, PZVs and control
valves are located.
CONTROL NUMBER
VERIFICATION

 In addition to orginal scope, LSKT Contacator to refer Project Scoping


EDSD

Paper (GEN-E0104) and its Appendix-2& 3 for changes due to surge


DATE:

system for scope of work in Yanbu refinery/YDH.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

These piping plans are intended to define scope of work for


CONTRACTOR and calculate “Bill of Quantity” for estimation.
(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 63


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG  The Detail Design contractor shall develop further details of the Piping Plan
SAY
SAY
SAY

& Isometrics for construction and installation purposes.


ENGG CERT

ASH
ASH
ASH

 The preliminary stress analysis has been done for only the critical lines
connected to pump systems. Any re-adjustment of the pipe routing if
LEADS

LEADS
LEADS
ALL

ALL
ALL

needed and provision proper supports such as guides, stoppers, spring


supports in order to limit the stresses within the acceptable code limits will
be developed during detail design phase.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

 All the Facility shall be design & constructed with adequate space to
facilitate operation and maintenance and with minimum spacing
requirement as per SAUDI ARAMCO standards.
DESCRIPTION

 The Piping Design, Procurement, Fabrication, Transportation, Erection,


Installation, Testing, Inspection, Pre commissioning and Commissioning
support of the following piping system in the New Tank Farm Area shall be
in accordance with project drawings listed in the document control list.
 All new piping systems associated with New Product Tanks
(Ref. Process Equipment list PR-E00103 & Overall Plot plan-PI-
A00001.001)
10-02399-
JO/EWO

10-02399-
10-02399-
0001

 All New piping (Only 2” & above) from Source refinery to receipt manifold,
0001
0001

Inside YDH routing to product/ slop, surge storage tanks, Booster/Shipper


12/28/16
12/14/16

12/18/16

Pumps, OWS lift station, DPK Filtration skid, Dye-in skid, Drain vessel,
DATE

Scraper Launchers, Utility station, Raw/Drinking water system, Firewater


piping near tank/pumps, drain lines should be as per the requirements of
NO.
REV

G
E

the Project P&IDs and Piping plan As per DCL list located in Appendix
DISCIPLINE
ENGINEER 13.2.2.)
ALL LEADS

DATE: 12/28/16
 Line sizes 1.5” & below are not considered in during the Project Proposal,
PROJECT MTO will be factored for small bore lines for estimation purpose.
ENGINEER

A M ALMATROOK  Only Preliminary stress analysis done for lines connected to tanks and
DATE: 12/28/16 pumps as part of design verification.
CERTIFIED
AMR EL SHARKAWY
 During detail desing all large bore and critical lines to be stress analyse and
12/28/16 requried special and spring support to be provided.
DATE:
CONSTRUCTION
AGENCY  Future space considered for extension of sleepers in Pipe way & Pipe
SHAHZAD YAZDANI
trench.
DATE: 12/28/16
OPERATIONS  The requirement of surge tank, surge skid, surge tank pump are tentatively
ALI H GHAMDI shown in SAMREF and Yanbu refinery overall plot plan Yanbu refinery. The
DATE:
12/28/16 location & feasibility study to be carry after confirmation from client.
CONTROL NUMBER


VERIFICATION

Detail layout showing assembly areas, travel distances shall be develop


during detail design by CONTRACTOR.
EDSD

DATE:
BY:

General Requirement for Piping


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

CONTRACTOR shall implement and comply with all the requirements below, in
(DCC) NO. _____________________

full.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 64


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG  CONTRACTOR shall perform Piping Design, Procurement, Fabrication,
SAY
SAY
SAY

Transportation, Erection, Installation, Testing, Inspection, Pre-


commissioning and Commissioning support in accordance with the latest
ENGG CERT

ASH
ASH
ASH

edition of SAUDI ARAMCO Engineering Standards & Specifications and


other applicable International Codes and Standards.
LEADS

LEADS
LEADS
ALL

ALL
ALL

 CONTRACTOR shall provide the detailed construction drawing package


required to complete the facility and shall comply with all applicable codes
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

and standards.
 CONTRACTOR shall complete the design calculations in support of the
construction drawings and all other necessary calculations/documents.
DESCRIPTION

 CONTRACTOR shall develop further details and isometrics for construction


and installation purpose.
 CONTRACTOR shall also perform the stress calculations and readjust the
pipe routing if needed and provide proper supports such as guides,
stoppers, spring supports in order to limit the stresses within the acceptable
code limits.
 CONTRACTOR shall design and construct the Facility with adequate space
to facilitate operation and maintenance and with minimum spacing
10-02399-
JO/EWO

10-02399-
10-02399-

requirement as per SAUDI ARAMCO standards.


0001

0001
0001

 CONTRACTOR shall perform Piping Design, Procurement, Fabrication,


12/28/16
12/14/16

12/18/16

Transportation, Erection, Installation, Testing, Inspection, Pre


DATE

commissioning and pre-commissioning support of the following piping


system in the New Tank Farm Area in accordance with project drawings
NO.
REV

G
E

listed in the document control list.


DISCIPLINE


ENGINEER
ALL LEADS CONTRACTOR shall perform all Piping works in accordance with SAUDI
DATE: 12/28/16
ARAMCO Engineering Standard SAES-L-310, SAES-L-350 other
PROJECT
ENGINEER
applicable SAUDI ARAMCO Standards and Specifications and the
A M ALMATROOK
American Society of Mechanical Engineers (ASME) Code ASME B31.4.
DATE: 12/28/16  CONTRACTOR shall carry out all piping work in close liaison with the
CERTIFIED
AMR EL SHARKAWY
SAUDI ARAMCO Representative to meet the project requirements.
DATE:
12/28/16
 CONTRACTOR shall be responsible for verifying all dimensions, angles,
CONSTRUCTION
AGENCY
and elevations prior to fabrication and installation.

SHAHZAD YAZDANI
CONTRACTOR shall provide all necessary vehicles for transportation of
DATE: 12/28/16
OPERATIONS
personnel, utilities equipment and materials to and from the job site.
ALI H GHAMDI  CONTRACTOR shall be responsible for the security and protection of all
DATE:
12/28/16 equipment, tools and materials at the job site until installation is complete
and accepted by SAUDI ARAMCO.
CONTROL NUMBER
VERIFICATION

 Materials that are removed from the job site shall be hauled back to the
EDSD

materials storage yard. Any of the materials left at the end of the job shall
DATE:

be transported to designated yard or stored as directed by SAUDI


BY:

ARAMCO.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

CONTRACTOR shall provide all labor and support equipment including, but
C

not limited to, scaffolding to perform piping work.


(DCC) NO. _____________________

 CONTRACTOR shall field verify all the dimensions and elevations shown
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 65


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG on drawings prior to start of any fabrication, erection and installation.
SAY
SAY
SAY

 CONTRACTOR shall install all bolted flanged joints in accordance with


ENGG CERT

ASH
ASH
ASH

SAEP-351.
 CONTRACTOR shall follow all safety precautions required by SAUDI
LEADS

LEADS
LEADS
ALL

ALL
ALL

ARAMCO Standards and those suggested by the Loss Prevention Engineer


to ensure safe construction works.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

 Flanged and bolted connections shall meet the requirements of SAES-L-


109.
 Bolts and studs shall extend completely through their nuts. As a minimum,
three (3) bolt threads shall extend through the nuts.
DESCRIPTION

 CONTRACTOR shall design and fabricate all miscellaneous pipe supports


required for the project and ensure that pipe support attachments to piping
are included during fabrication of piping spools and prior to any hydrostatic
testing of the system. Pipes shall be provided with necessary guides,
springs, clamps, anchors, etc. as required. Pipe shoe shall be provided for
insulated lines. Height of shoe for different lines shall be adjusted as per the
thickness of insulation. Pipe Support number shall be marked in relevant
piping drawings
10-02399-
JO/EWO

10-02399-
10-02399-
0001


0001
0001

CONTRACTOR shall fabricate and install field pipe supports, dummy legs,
guides, saddles, slide bearing plates, shoes and shims.
12/28/16
12/14/16

12/18/16
DATE

 CONTRACTOR shall provide high point vent and low point drain at suitable
locations shall be provided in piping system.
NO.
REV

G
E

 CONTRACTOR shall furnish, without limitation, all facilities, tools, labor,


DISCIPLINE
ENGINEER supervision, technical and professional services, material, equipment,
ALL LEADS
supplies and consumables required to procure, construct, install, test and
DATE: 12/28/16 commission, the NJBP expansion facility in accordance with the Project
PROJECT
ENGINEER Documents listed in Document Control list.
A M ALMATROOK

DATE: 12/28/16
 CONTRACTOR shall design and construct the Facility with adequate space
CERTIFIED to facilitate operation and maintenance and with minimum spacing
AMR EL SHARKAWY
requirement as per SAUDI ARAMCO standard. Layout shall allow crane
12/28/16
DATE: access for equipment from relevant sides.
CONSTRUCTION
AGENCY  Detailed design package shall be prepared with use of 3D modeling
SHAHZAD YAZDANI
software (PDS).
DATE: 12/28/16
OPERATIONS  CONTRACTOR shall design and construct all piperacks, pipe bridges, pipe
ALI H GHAMDI supports and concrete pipe sleepers. CONTRACTOR shall consider all
DATE:
12/28/16 relevant loads in his design. Structural steel shall be galvanized. Material
shall be as per 12-SAMSS-007.
CONTROL NUMBER
VERIFICATION

 CONTRACTOR shall follow SAES-Q-001 for concrete design.


EDSD

CONTRACTOR shall consider necessary clearance under roads while


DATE:

designing piperacks.
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

PIPING MATERIAL SUPPLY


BY DRAWING COMPLETION CERTIFICATE
C

(DCC) NO. _____________________

 CONTRACTOR shall supply all materials and consumables required for

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 66


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG fabrication and construction of piping works for North Jiddah Bulk Plant
SAY
SAY
SAY

Expansion.
ENGG CERT

ASH
ASH


ASH

CONTRACTOR shall ensure that all piping materials shall conform to the
SAUDI ARAMCO piping specification SAES-L-105 together with project
LEADS

LEADS
LEADS
ALL

ALL
ALL

piping material specification and other related applicable SAUDI ARAMCO


Standards and Specifications.
 CONTRACTOR shall use only new materials. Material substitutions shall
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

not be permitted without the approval of SAUDI ARAMCO prior to any


procurement or fabrication activities.
DESCRIPTION

WELDING WORK

 Welders and Welding Procedures shall be qualified and approved in


accordance with SAUDI ARAMCO Engineering Procedures SAEP-324,
SAEP-352 (CONTRACTOR Welders and Procedures) and Standard SAES-
W-011 before welding start.
 Welds which are defective and beyond repair, in the sole opinion of the
SAUDI ARAMCO Representative, shall be cut out and replaced by
CONTRACTOR at no additional cost to SAUDI ARAMCO.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

 CONTRACTOR shall provide all required welding equipment accessories


and consumables.
12/28/16
12/14/16

12/18/16
DATE

 When joining pipes and fittings of unequal wall thickness, CONTRACTOR


shall counter bore the larger wall thickness prior to welding in accordance
NO.
REV

G
E

with ASME B31.3.


DISCIPLINE
ENGINEER
ALL LEADS
 Before welding pipe joints, CONTRACTOR shall inspect each joint or spool
to ensure that it is free of sand, debris or other foreign materials. Each pipe
DATE: 12/28/16
PROJECT string or section shall be internally cleaned before welding, coupling or
ENGINEER
bolting to another pipe section or equipment in accordance with SAES-L-
A M ALMATROOK
350.
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY
RADIOGRAPHY AND NDT
12/28/16
DATE:
CONSTRUCTION
AGENCY
 CONTRACTOR shall perform radiography of all piping joints as per clauses
SHAHZAD YAZDANI 17.2 and 17.5 of SAES-W-011.
DATE: 12/28/16
OPERATIONS
 Magnetic Particle Testing and Liquid Penetrant Testing requirements for
ALI H GHAMDI
pressure containing welds other than butt welds (including sockolets,
12/28/16
weldolets and welded bosses) shall be per clause 17.5.3 of SAES-W-011.
DATE:
 Upon approval of waiver, spool pieces which cannot be hydro tested are to
CONTROL NUMBER
VERIFICATION

be 100% radio graphed.


EDSD

 Radiography of welds shall be in accordance with SAEP-1143.


DATE:
BY:

 CONTRACTOR shall provide adequate testing facilities at site including all


REVISIONCERTIFICATION

necessary equipment, consumables, materials, labor etc., to enable to


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

complete the Piping work, including radiography and other NDT methods
(DCC) NO. _____________________

and testing. CONTRACTOR shall develop and propose the required


inspection and NDT methods, documentation records and procedures to

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 67


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG meet the Aramco requirements.
SAY
SAY
SAY
ENGG CERT

ASH
ASH
ASH

PAINTING, COATING AND INSULATION


LEADS

LEADS
LEADS
ALL

CONTRACTOR shall supply and apply painting and coating material in


ALL
ALL

accordance with vendor's recommended practice and as outlined in SAUDI


ARAMCO Engineering Standards Index-H series.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

 CONTRACTOR shall supply all mixing, cleaning, spray, and other


applicable materials and all equipment required to perform painting.
 CONTRACTOR shall provide all instruments and tools required to verify
DESCRIPTION

paint dry film thickness.


 CONTRACTOR shall be responsible for cleanup of all paint cans and
debris associated with painting at the jobsite at the end of each working
day.
 CONTRACTOR shall ensure that no paint shall be placed within 2 inches of
areas to be welded prior to welding. Weld areas can only be painted after
the successful completion of required testing.
 CONTRACTOR shall adhere to safety identification and color coding as
10-02399-
JO/EWO

10-02399-
10-02399-
0001

specified in SAES-B-067.
0001
0001

 CONTRACTOR shall supply insulation for piping system. CONTRACTOR


12/28/16
12/14/16

12/18/16
DATE

shall also be responsible for application of insulation material, stainless


steel cladding including provision of vapor barrier, supports, wire mesh,
cleat, clips, etc. on piping system as per relevant specifications.
NO.
REV

G
E

DISCIPLINE
ENGINEER
ALL LEADS Special Requirements:
DATE: 12/28/16
PROJECT
ENGINEER  Prior to start of construction, CONTRACTOR shall perform field verification
A M ALMATROOK of all existing hazards that may jeopardize the safety of personnel and
DATE: 12/28/16 property.
CERTIFIED
AMR EL SHARKAWY

DATE:
12/28/16  CONTRACTOR shall submit Loss Prevention Program and Hazard
CONSTRUCTION Identification Plan for SAUDI ARAMCO approval no later than thirty (30)
AGENCY
SHAHZAD YAZDANI
days after the effective date of the contract.
DATE: 12/28/16
OPERATIONS
 Prior to start of construction activities, CONTRACTOR shall identify the
ALI H GHAMDI
existing pipeway/pipe culverts to be extend in SAMREF/YASREF & submit
12/28/16
DATE: safe execution plan to SAUDI ARAMCO representative to work nearer to
CONTROL NUMBER

active product/utility lines


VERIFICATION


EDSD

CONTRACTOR shall comply with all SAUDI ARAMCO safety regulations


and manual.
DATE:
BY:
REVISIONCERTIFICATION


APPROVAL/CERTIFICATION REQUIREMENTS,

CONTRACTOR shall prepare a detailed construction Critical Path Method


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(CPM) schedule and submit it to SAUDI ARAMCO for approval. Unless


(DCC) NO. _____________________

otherwise instructed by the SAUDI ARAMCO Representative,


CONTRACTOR shall dismantle all temporary facilities after completion of
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 68


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG work and return all SAUDI ARAMCO supplied materials to a location
SAY
SAY
SAY

designated by the SAUDI ARAMCO Representative.


ENGG CERT

ASH
ASH
ASH

 CONTRACTOR shall dispose wastes associated with this scope of work in


LEADS

LEADS
LEADS
ALL

accordance with G.I. 430. 001 “Waste Management” and Cat-3 EIA report.
ALL
ALL

 CONTRACTOR shall be responsible for handling, transporting and storing


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

critical materials such as scraper cups, chemicals and other materials


which require temperature controlled storage space
DESCRIPTION

4.8 Yanbu to Jiddah Pipeline 1 & 2 Support Infrastructure

A. GENERAL

CONTRACTOR shall design and install the YNJ-1 & YNJ-2 support infrastructure
including, but not limited to the following facilities:

 Tie-in to 20” YNJ-1 pipeline for PG95/PG91


 Tie-in to 24” YNJ-2 pipeline for DO/DPK
10-02399-


JO/EWO

10-02399-
10-02399-

Utility water supply tie-in to YNJ-1 & YNJ-2 pipeline scrapers


0001

0001
0001

 Drain collection tie-in from YNJ-1 & YNJ-2 pipeline scrapers


12/28/16
12/14/16

12/18/16
DATE

The battery limit will be the tie-in flange (downstream of gate valves) provided by
YDH in the scraper launcher lateral line for YNJ-1 / YNJ-2. The 20” gate valve for
YNJ-1 and 24” gate valve for YNJ-2 are in scope of this BI. Utility Water supply
NO.
REV

G
E

DISCIPLINE from YDH shall also be provided for YNJ-1 & YNJ-2 pipeline scrapers and
ENGINEER
ALL LEADS accordingly drain from YNJ-1 & YNJ-2 pipeline scrapers shall also be received into
DATE: 12/28/16
oily water lift station.
PROJECT
ENGINEER

A M ALMATROOK
The following are the interfaces with BI-10-02155 and CONTRACTOR shall re-
DATE: 12/28/16
confirm the tie-in conditions with BI-10-02155 during detail design.
CERTIFIED
AMR EL SHARKAWY
a) Pipelines (YNJ-1 & YNJ-2):
12/28/16
DATE:
CONSTRUCTION
2 Nos. pipelines, one of 20” ND (YNJ-1) and the other of 24” ND (YNJ-2) of
AGENCY
SHAHZAD YAZDANI following specs:
DATE: 12/28/16
Pipeline Material = API 5L Gr.X65
OPERATIONS
ALI H GHAMDI Flange Rating = 900#
12/28/16
DATE: MAOP = 15513.2 kPag (2250 PSIG)
CONTROL NUMBER
VERIFICATION

Design Temperature = 60 °C
EDSD

DATE:
BY:

b) Utilities:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

- Utility water supply from YDH to YNJ-1/2 pipeline scraper launchers via two
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

4” flange connections.
(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 69


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG - Drain from YNJ-1/2 pipeline scrapers to YDH via two 4” flange connections
SAY
SAY
SAY

The scope for the YNJ-1 & YNJ-2 support infrastructure is outlined in PFDs VA-
ENGG CERT

ASH
ASH
ASH

247844.001 to VA-247847 and P&IDs VA-247918.002, VA-247920.002, VA-


247924.001 and VA-247921.002.
LEADS

LEADS
LEADS
ALL

ALL
ALL

B. PIPING
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

 The scope of work includes design and construction of two pipelines ,YNJ-1
& 2 inside battery limit of YDH, but not limited to, the following activities:
 YNJ-1 20” Gasoline Pipeline & YNJ-2 24” DO/DPK Pipeline:
DESCRIPTION

 The design and installation of YNJ-1 20” Gasoline Pipeline & YNJ-2 24”
DO/DPK Pipeline from Gasoline & DO/DPK Shipper pump to Scraper
Launcher Facility constructed under BI-10-02155. Design and Installation of
the Scraper launcher shall be the part of BI-10-02155 YDH Scope will start
at a flange upstream of the Scraper launcher.
 Interface requirements shall be accordingly coordinated with pipeline
project BI-10-02155. Following are the interface connections.
10-02399-
JO/EWO

10-02399-
10-02399-

a. YNJ-1 Pipeline connection Upstream scraper Launcher


0001

0001
0001

b. YNJ-2 Pipeline connection Upstream of Scraper Launcher


12/28/16
12/14/16

12/18/16

c. Drain connection for both Scraper Launchers.


DATE

d. Utility water connection.


NO.
REV

G
E

DISCIPLINE
Reference Dwg: As per DCL no.GEN-D0001.
ENGINEER
ALL LEADS
General Requirement for Piping
DATE: 12/28/16
PROJECT
ENGINEER

A M ALMATROOK
 CONTRACTOR scope of work includes design and construction of two
DATE: 12/28/16
pipelines ,YNJ-1 & 2 inside battery limit of YDH ,but not limited to the
CERTIFIED following activities:
AMR EL SHARKAWY

12/28/16
DATE:
CONSTRUCTION
 YNJ-1 20” Gasoline Pipeline & YNJ-2 24” DO/DPK Pipeline:
AGENCY
SHAHZAD YAZDANI

DATE: 12/28/16  CONTRACTOR shall design and install YNJ-1 20” Gasoline Pipeline &
OPERATIONS YNJ-2 24” DO/DPK Pipeline from Gasoline & DO/DPK Shipper pump to
ALI H GHAMDI Scraper Launcher Facility constructed under BI-10-02155. Design and
DATE:
12/28/16 Installation of Scraper launcher shall be the part of BI-10-02155; YDH
Scope will start at a flange upstream of Scraper launcher.
CONTROL NUMBER
VERIFICATION
EDSD

 Interface requirements shall be accordingly coordinated with pipeline


DATE:

project BI-10-02155. Following are the interface connections.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

e. YNJ-1 Pipeline connection Upstream scraper Launcher


C

(DCC) NO. _____________________

f. YNJ-2 Pipeline connection Upstream of Scraper Launcher


g. Drain connection for both Scraper Launchers.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 70


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG h. Utility water connection.
SAY
SAY
SAY


ENGG CERT

ASH
ASH

CONTRACTOR shall perform Piping Design, Procurement, Fabrication,


ASH

Transportation, Erection, Installation, Testing, Inspection, and


LEADS

Commissioning and Pre-commissioning the following piping system in


LEADS
LEADS
ALL

ALL
ALL

accordance with the latest edition of SAUDI ARAMCO Engineering


Standards & Specifications and other applicable International Codes and
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

Standards.

a. Product piping upstream of scraper launcher which shall be


connected to respective shipper pumps as per project drawings.
DESCRIPTION

b. New pipe ways and pipe supports as required by project


drawings shall be provided.
c. An elevated platform shall be provided for control valves station.
d. Surge relief tanks and associated piping.
e. Surge product transfer pump and associated piping.
f. Interface product shipper pumps and associated piping.

Refer DCL no.GEN-D0001.for list of drawings.


10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

4.9 Pumps and Motors for the Yanbu to Jiddah Pipeline


12/28/16
12/14/16

12/18/16
DATE

A. GENERAL
NO.
REV

G
E

CONTRACTOR shall design and install the booster and shipper pumps for YNJ-1
DISCIPLINE
ENGINEER and YNJ-2 pipelines including, but not limited to the following facilities:
ALL LEADS

DATE: 12/28/16
 Three (3) booster pumps for YNJ-1 pipeline
PROJECT
ENGINEER  Three (3) shipper pumps for YNJ-1 pipeline
A M ALMATROOK
 Three (3) booster pumps for YNJ-2 pipeline
DATE: 12/28/16
CERTIFIED
 Three (3) shipper pumps for YNJ-2 pipeline
AMR EL SHARKAWY  Pumps associated automation, control and safety shutdown requirements.
12/28/16
DATE:
CONSTRUCTION CONTRACTOR shall design and install three (3) booster pumps for YNJ-1 and
AGENCY
SHAHZAD YAZDANI
YNJ-2.Pumps shall be electric motor and fixed speed with spillback to tank being
emptied. The motors shall be sized to accommodate the pump loads for the full
DATE: 12/28/16
OPERATIONS spectrum of the pump curve. The pumps shall be fitted with all necessary
ALI H GHAMDI
instrumentation to protect the pump (including seal leak detection) and prevent
12/28/16 overpressure.
DATE:
CONTROL NUMBER
VERIFICATION

CONTRACTOR shall design and install three (3) shipper pumps for YNJ-1 and
EDSD

YNJ-2. Pumps shall be electric motor driven and fixed speed. The motors shall be
sized to accommodate the pump loads for the full spectrum of the pump curve. The
DATE:

pumps shall be fitted with all necessary instrumentation to protect the pump
BY:

(including seal leak detection) and to prevent overpressure.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

The following design parameters are established for the pipeline booster pumps.
(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 71


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

Rated flow Diff. Pressure Design Temp


Service Product No. of pumps
m³/hr (MBD) (kPa) ⁰C
ENGG CERT

ASH
ASH
ASH
LEADS

LEADS
LEADS
ALL

YNJ-1 PG 91 /95 530 (80) 3* 490.2 75


ALL
ALL

YNJ-2 DO /DPK 744 (112.33) 3* 557.8 75

*Fourth pump shall be installed during Phase-II.


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

The following design parameters are established for the pipeline shipper pumps.
Rated flow Diff. Pressure Design Temp
Service Product No. of pumps
DESCRIPTION

m³/hr (MBD) (kPa) ⁰C

YNJ-1 PG 91 /95 530 (80) 3* 13479.3 75


YNJ-2 DO /DPK 744 (112.33) 3* 13451.7 75

*Fourth pump shall be installed during Phase-II.

The scope for the YNJ-1 & YNJ-2 pumps is outlined in PFDs VA-247844.001 &
VA-247845.001 and P&IDs VA-247917.001 to VA-247920.002.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

B. MECHANICAL – ROTATING EQUIPMENT


12/28/16
12/14/16

12/18/16
DATE

B.01 BOOSTER PUMPS

GASOLINE BOOSTER PUMPS (X40-G-0020 A/B/C)


NO.
REV

G
E

DISCIPLINE
ENGINEER
ALL LEADS
Gasoline booster pumps shall be in accordance with 31-SAMSS-004 and shall be
of Vertical Can type centrifugal pumps (API VS6 or VS7) due to low NPSH
DATE: 12/28/16
PROJECT availability. These pumps are provided to meet the high NPSHR of shipper pumps.
ENGINEER
Pumps will be limited to maximum of 1800 RPM. Pump materials, mechanical
A M ALMATROOK
seals shall be in accordance with SAES-G-005. Reference shall be made to
DATE: 12/28/16
CERTIFIED
datasheet no. RE-E00103 included in Index-G.
AMR EL SHARKAWY

DATE:
12/28/16 DIESEL/DPK BOOSTER PUMPS (X40-G-0018 A/B/C)
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
Diesel/DPK booster pumps shall be in accordance with 31-SAMSS-004 and shall
be of between bearings, horizontal split casing type Centrifugal pumps (API BB1).
DATE: 12/28/16
OPERATIONS These pumps are provided to meet the high NPSHR of shipper pumps. Pump
ALI H GHAMDI materials, mechanical seals shall be in accordance with SAES-G-005. Reference
12/28/16 shall be made to datasheet no. RE-E00101 included in Index-G.
DATE:
CONTROL NUMBER
VERIFICATION

MISCELLANEOUS REQUIREMENTS
EDSD

 Reference shall be made to technical specifications for pumps included


DATE:
BY:

in Index-A for further details of these pumps.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Pump Datasheets provided in this package are preliminary only. These


(DCC) NO. _____________________

will be further verified by CONTRACTOR during detailed design phase


of the project before issuing for procurement activities.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 72


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

 CONTRACTOR shall be responsible for producing equipment


ENGG CERT

ASH
ASH

datasheet, SIS sheets, Noise Datasheets in accordance with SAUDI


ASH

ARAMCO standard forms and datasheets.


LEADS

LEADS
LEADS
ALL

ALL
ALL

 All pumps will be procured by CONTRACTOR from SAUDI ARAMCO


approved manufacturer for each Commodity Classification Code (CCC).
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

SAUDI ARAMCO will provide the list of approved manufacturers after


award of Contract.
DESCRIPTION

 CONTRACTOR shall prepare Material Requisition Package for all the


pumps and shall obtain approvals from relevant SAUDI ARAMCO
Departments before issuing to Vendors.

 Material take-offs have been prepared for reference only and will not be
considered as contractual documents and cannot be used as a basis for
any change order.
10-02399-
JO/EWO

10-02399-


10-02399-

Technical quotations obtained from vendors will list all exceptions and
0001

0001
0001

/or, additions to applicable project Drawings and SAUDI ARAMCO


12/28/16

Specifications. If there is no exception to specifications, CONTRACTOR


12/14/16

12/18/16
DATE

will make a statement to that effect.


NO.
REV

G
E

DISCIPLINE
 CONTRACTOR shall be responsible for Technical Bid Evaluation,
ENGINEER
ALL LEADS
placing the Purchase Order to technically approved Vendors.
DATE: 12/28/16
PROJECT
ENGINEER
 CONTRACTOR shall be responsible for review and approval of NMRs
A M ALMATROOK 601, 602 and 603.
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY
 Inspection and Testing of CONTRACTOR supplied materials will be
DATE:
12/28/16 performed as per applicable SAUDI ARAMCO Inspection Requirement
CONSTRUCTION form A-175. CONTRACTOR will arrange with his sub suppliers to
AGENCY
SHAHZAD YAZDANI comply with these requirements by stating on all sub suppliers’
DATE: 12/28/16 purchase order SAUDI ARAMCO’s intention to inspect material.
OPERATIONS
ALI H GHAMDI
 Equipment installation and Commissioning & Pre-commissioning shall
12/28/16
DATE:
be in accordance with approved Vendor’s installation and
CONTROL NUMBER
VERIFICATION

commissioning procedures.
EDSD

 Supply of Commissioning & Pre-commissioning and Start-up spares


DATE:
BY:

and first fill of all the lubricants and chemicals is in the scope of
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

CONTRACTOR. CONTRACTOR shall obtain approval of Aramco


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Operations before filling of lubricants and chemicals.


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 73


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG  CONTRACTOR will provide all Non Material Requirement (NMR-
SAY
SAY
SAY

602/603), Operation and Instruction Manuals of CONTRACTOR


ENGG CERT

ASH
ASH

supplied material in electronic format (Latest Acrobat Reader).


ASH
LEADS

LEADS
LEADS
ALL


ALL
ALL

CONTRACTOR will provide critical spare parts for CONTRACTOR


supplied items in accordance with SAEP-3101. Contractor will develop
list of critical plant equipment spares and identification.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

B.02 SHIPPER PUMPS


DESCRIPTION

GASOLINE SHIPPER PUMPS (X40-G-0021 A/B/C)

Gasoline Shipper pumps shall be in accordance with 31-SAMSS-004 and shall be


of between bearing, vertical split casing type centrifugal pumps (API BB5). Pump
materials, mechanical seals are in accordance with SAES-G-005. Reference shall
be made to datasheet no. RE-E00104 included in Index-G.

Shipper pumps shall be provided with forced type lubrication system i-e lube oil
skids will be provided in accordance with applicable SAUDI ARAMCO Standards.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

Each shipper pump will also have a Vibration Monitoring System in accordance
with applicable SAUDI ARAMCO Standards.
12/28/16
12/14/16

12/18/16
DATE

DIESEL/DPK SHIPPER PUMPS (X40-G-0019 A/B/C)


NO.
REV

G
E

DISCIPLINE
ENGINEER Diesel/DPK Shipper pumps shall be in accordance with 31-SAMSS-004 and shall
ALL LEADS be of between bearing, vertical split casing design centrifugal pumps (API BB5).
DATE: 12/28/16 Pump materials, mechanical seals shall also be in accordance with SAES-G-005.
PROJECT
ENGINEER Reference shall be made to datasheet no. RE-E00102 included in Index-G.
A M ALMATROOK

DATE: 12/28/16 Shipper pumps will be provided with forced type lubrication system i-e lube oil
CERTIFIED
AMR EL SHARKAWY
skids will be provided in accordance with applicable SAUDI ARAMCO Standards.
12/28/16
Each shipper pump will also have Vibration Monitoring System in accordance with
DATE:
applicable SAUDI ARAMCO Standards
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI

DATE: 12/28/16
MISCELLANEOUS REQUIREMENTS
OPERATIONS


ALI H GHAMDI
Reference shall be made to technical specifications for pumps included
12/28/16
DATE:
in Index-A for further details of these pumps.
CONTROL NUMBER
VERIFICATION
EDSD

 Pump Datasheets provided in this package are preliminary only. These


will be further verified by CONTRACTOR during detailed design phase
DATE:
BY:

of the project before issuing for procurement activities.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

 CONTRACTOR shall be responsible for producing equipment


(DCC) NO. _____________________

datasheet, SIS sheets, Noise Datasheets in accordance with SAUDI

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 74


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG ARAMCO standard forms and datasheets.
SAY
SAY
SAY


ENGG CERT

All pumps will be procured by CONTRACTOR from SAUDI ARAMCO


ASH
ASH
ASH

approved manufacturer for each Commodity Classification Code (CCC).


LEADS

LEADS
LEADS
ALL

SAUDI ARAMCO will provide the list of approved manufacturers after


ALL
ALL

award of Contract.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

 CONTRACTOR shall prepare Material Requisition Package for all the


pumps and shall obtain approvals from relevant SAUDI ARAMCO
Departments before issuing to Vendors.
DESCRIPTION

 Material take-offs have been prepared for reference only and will not be
considered as contractual documents and cannot be used as a basis for
any change order.

 Technical quotations obtained from vendors will list all exceptions and
/or, additions to applicable project Drawings and SAUDI ARAMCO
Specifications. If there is no exception to specifications, CONTRACTOR
10-02399-
JO/EWO

10-02399-
10-02399-

will make a statement to that effect.


0001

0001
0001

 CONTRACTOR shall be responsible for Technical Bid Evaluation,


12/28/16
12/14/16

12/18/16
DATE

placing the Purchase Order to technically approved Vendors.


NO.
REV

G
E

 CONTRACTOR shall be responsible for review and approval of NMRs


DISCIPLINE
ENGINEER 601, 602 and 603.
ALL LEADS

DATE: 12/28/16
PROJECT  Inspection and Testing of CONTRACTOR supplied materials will be
ENGINEER

A M ALMATROOK
performed as per applicable SAUDI ARAMCO Inspection Requirement
DATE: 12/28/16 form A-175. CONTRACTOR will arrange with his sub suppliers to
AMR EL SHARKAWY
CERTIFIED
comply with these requirements by stating on all sub suppliers’
12/28/16 purchase order SAUDI ARAMCO’s intention to inspect material.
DATE:
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
 Equipment installation and Commissioning & Pre-commissioning shall
DATE: 12/28/16 be in accordance with approved Vendor’s installation and
OPERATIONS commissioning procedures.
ALI H GHAMDI

12/28/16
DATE:  Supply of Commissioning & Pre-commissioning and Start-up spares
CONTROL NUMBER
VERIFICATION

and first fill of all the lubricants and chemicals is in the scope of
EDSD

CONTRACTOR. CONTRACTOR shall obtain approval of Aramco


Operations before filling of lubricants and chemicals.
DATE:
BY:
REVISIONCERTIFICATION

 CONTRACTOR will provide all Non Material Requirement (NMR-


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

602/603), Operation and Instruction Manuals of CONTRACTOR


(DCC) NO. _____________________

supplied material in electronic format (Latest Acrobat Reader).

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 75


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

 CONTRACTOR will provide critical spare parts for CONTRACTOR


ENGG CERT

ASH
ASH

supplied items in accordance with SAEP-3101. Contractor will develop


ASH

list of critical plant equipment spares and identification.


LEADS

LEADS
LEADS
ALL

ALL
ALL

RE-ISSUED FOR 100% PROJECT PROPOSAL


RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

C. INSTRUMENTATION

SHIPPER & BOOSTER PUMP STATIONS FOR P91/95, DO/DPK


DESCRIPTION

CONTRACTOR shall perform the following activities at the pump shipper and
booster pump stations.

 Provide and install field instrument as indicated in below P & IDs


and block diagrams IN-A00002.005/006/007/008.

VA247917-001 P&ID-GASOLINE 95/91 BOOSTER PUMPS


VA247918-001 P&ID-GASOLINE 95/91 SHIPPER PUMPS
VA247918-002 P&ID-GASOLINE 95/91 SHIPPER PUMPS
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

VA247919-001 P&ID-DO/DPK BOOSTER PUMPS


VA247920-001 P&ID-DO/DPK SHIPPER PUMPS
12/28/16
12/14/16

12/18/16
DATE

VA247920-002 P&ID-DO/DPK SHIPPER PUMPS


NO.
REV

G
E


DISCIPLINE
ENGINEER Provide and install branch cables from field instruments to field
ALL LEADS junction boxes as indicated in block diagrams IN-
DATE: 12/28/16 A00002.005/006/007/008.
PROJECT


ENGINEER
Provide and install homerun cables from field junction boxes to
A M ALMATROOK
remote instrument buildings as indicated in IN-
DATE: 12/28/16
CERTIFIED A00002.005/006/007/008.
AMR EL SHARKAWY
 Provide and install cables from DCS/ESD IRP panels located in
12/28/16
DATE: Substations to RIBs as indicated in IN-A00002.005/006/007/008.
CONSTRUCTION
AGENCY  Provide and install vibration and bearing temperature junction boxes
SHAHZAD YAZDANI
as per block diagram IN-A00001.006
DATE: 12/28/16
OPERATIONS  Provide homerun cables from junction boxes to VMS Marshaling
ALI H GHAMDI Cabinets and system racks located in respective RIBs.
12/28/16
DATE:
 VMS system shall be connected to DCS via Modbus TCP/IP and
CONTROL NUMBER

hardwired to ESD remote I/O’s located in RIB buildings.


VERIFICATION
EDSD

 Reference drawings:
DATE:
BY:
REVISIONCERTIFICATION

Drawing # Description
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

IN-A00001 System Block Diagrams


(DCC) NO. _____________________

IN-A00002 Instrument Block Diagrams

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 76


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
Drawing # Description
SAY
SAY
SAY

IN-A00027 Instrument Points & Lines


ENGG CERT

ASH
ASH
ASH

IN-D00201 Instrument Installation Schedule-Flow


IN-D00202 Instrument Installation Schedule-Pressure
LEADS

LEADS
LEADS
ALL

ALL
ALL

IN-D00203 Instrument Installation Schedule-Level


IN-D00204 Instrument Installation Schedule-Temperature
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

IN-D00205 Instrument Installation Schedule-Misc


IN-D00206 Instrument Installation Schedule-MOV/GOV/HOV/AOV
IN-D00207 Instrument Installation Schedule-Relief Valves
DESCRIPTION

IN-A00004 Equipment Layouts


IN-A00003 Cable Routing Plan
IN-D00005 Cable and Conduit Schedule

D. ELECTRICAL

 CONTRACTOR shall utilize the one line diagrams attached to this package
to develop the detail design package for utilization within purchase orders
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

and for construction and commissioning & Pre-commissioning.


 CONTRACTOR shall use induction motors for all shipper pumps. Design of
12/28/16
12/14/16

12/18/16
DATE

induction motors shall be such that to achieve power factor equal or greater
than 0.95.
NO.
REV

G
E

DISCIPLINE
 Shipper pump motors power supply shall be from 13.8kV switchgear (Refer
ENGINEER to drawing # EL-A10008). Auxiliary loads for these main pumps shall be
ALL LEADS
from 480V control gears (refer to drawing # EL-A10014 to EL-A10017).
DATE: 12/28/16
PROJECT
ENGINEER
 Booster pump motors power supply shall be from 4.16kV switchgear (Refer
A M ALMATROOK
to drawing # EL-A10011). Auxiliary loads for these main pumps shall be
DATE: 12/28/16
from 480V control gears (refer to drawing # EL-A00014 to EL-A00017).
CERTIFIED
AMR EL SHARKAWY  CONTRACTOR shall design, supply, install, test, pre-commission and
12/28/16 provide assistance in commissioning and integrated testing to insure fully
DATE:
CONSTRUCTION operational systems. All Electrical Control Panels and Stop-Start Stations
AGENCY
shall have Push-to-Test Multi-Cluster LED’s for indication.
SHAHZAD YAZDANI

DATE: 12/28/16  CONTRACTOR shall design, supply and install and test Local Control Push
OPERATIONS Button Stations appropriate for the areas of installation, Install control
ALI H GHAMDI cables and conduits between control stations and the Interposing relay
DATE:
12/28/16 panels or Control gear.
CONTROL NUMBER


VERIFICATION

Within Switchgear and Control gear switching assemblies and Starter


Control panels for all motors 75 kW (100 HP) and larger, and all other
EDSD

motors where the engineering documents indicate motor space heaters are
DATE:

installed, a contact shall be wired to a terminal block in the low voltage


BY:

compartment of the Switchgear Feeder or Control gear bucket, as


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

applicable, for connection to a 24VAC control circuit (panel shall be


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

designed and provided by THE CONTRACTOR) of a remotely mounted


(DCC) NO. _____________________

motor space heater contactor. Contact shall be closed when the main motor
circuit contactor is de-energized. This is in accordance with SAES-P-116
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 77


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG and shall be provided, installed, tested, pre commissioned, and with
SAY
SAY
SAY

commissioning assistance, by THE CONTRACTOR.


ENGG CERT

ASH
ASH


ASH

CONTRACTOR shall be responsible for design, supply, installation and


testing of the interconnection wiring between Vendor supplied Electrical
LEADS

LEADS
LEADS
ALL

ALL
ALL

Equipment and Skids and the parent equipment, field instruments, etc. and
CONTRACTOR shall develop Wiring Interconnection Drawings, based on
Actual Vendor Certified NMR 602 Drawings and NMR 603 Manuals, to
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

SAUDI ARAMCO standards and submit to SAUDI ARAMCO for acceptance


prior to termination of cabling.
 CONTRACTOR shall develop Area Classification drawings at the beginning
of detailed design phase and obtain SAUDI ARAMCO Approval. Equipment
DESCRIPTION

installed in YDH area will be rated according to area classification layout


drawings (Refer to drawing #EL-A10003). Attached drawings shall be used
only as guide actual drawings shall be developed by the CONTRACTOR.
 CONTRACTOR to update the ETAP study provided during the detail
design.

4.10 Pump Operations for the Yanbu to Jiddah Pipeline


10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

A. GENERAL
12/28/16
12/14/16

12/18/16

CONTRACTOR shall ensure the pump operation of the YNJ-1 and YNJ-2 pipelines
DATE

including, but not limited to the following facilities:


NO.
REV

G
E

Three (3) Booster and Three (3) shipper pumps shall be designed for YNJ-1 and
DISCIPLINE
ENGINEER YNJ-2. (Fourth pump shall be installed in phase-2) Pumps shall be electric motor
ALL LEADS
and fixed speed with spillback to tank being emptied.
DATE: 12/28/16 The pipeline booster and shipper pumps shall be controlled locally from YDH but
PROJECT
ENGINEER CONTRACTOR shall provide viewing capabilities to OSPAS. Pump start-up
A M ALMATROOK philosophy shall be based on the start-up of a single shipper pump at a time and
DATE: 12/28/16 not two or more shipper pumps simultaneously. CONTRACTOR shall co-ordinate
CERTIFIED
AMR EL SHARKAWY
with BI-10-02155 for the operation philosophy required by the pipeline prior to
12/28/16
detail design and construction.
DATE:
CONSTRUCTION
AGENCY The scope for the YNJ-1 & YNJ-2 pumps’ operation is outlined in PFDs VA-
SHAHZAD YAZDANI
247844.001 & VA-247845.001 and P&IDs VA-247917.001 to VA-247920.002.
DATE: 12/28/16
OPERATIONS
ALI H GHAMDI
4.11 Pipeline Connection from Grassroots-Yanbu Aramco Refinery
12/28/16
DATE: A. GENERAL
CONTROL NUMBER
VERIFICATION

CONTRACTOR shall provide provision in the receiving manifolds for the future
EDSD

connections of PG 91/95, DO & DPK from Yanbu grass root refinery. A valve with a
DATE:

same size as of manifold (30”) shall be kept as provision in each of the product
BY:

manifold.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

The scope for the pipeline connections from Yanbu Grass root refinery is outlined
(DCC) NO. _____________________

in PFD VA-247835.001 and P&IDs VA-247894.001 to VA-247897.001.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 78


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG B. PIPING
SAY
SAY
SAY

All pumps are located centrally with respective storage tanks, so that the pressure
ENGG CERT

ASH
ASH
ASH

reduction due to pipe length from tank outlet to pump inlet is minimized to meet
process requirement.
LEADS

LEADS
LEADS
ALL

ALL
ALL

Pumps are grouped to permit economical pipe routing with free space for future
pumps & possible extension of main pipe header for future expansion.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

Space for laydown areas has been considered for all pump bays which will be
required for pump maintenance purpose.
DESCRIPTION

The layout of pump suction-discharge lines, associated header lines & the
provision for future connection in PG95/PG91, DO, DPK shall be provided as per
branch connections with isolation valves with blinds as per piping plan (Ref. DCL
No GEN-D0001 )

CONTRACTOR shall provide branch connection with isolation valves with blind per
piping plan (Ref. Piping Plan listed in DCL No GEN-D0001) for future connection in
PG95/PG91, DO, DPK and Slop manifold
10-02399-
JO/EWO

10-02399-
10-02399-
0001

Based on surge study, it is proposed to add new Surge tank & associated facilities
0001
0001

inside SAMREF refinery, this has been shown as preliminary information in overall
12/28/16

plot plan. Exact location and feasibility study to be conducted after confirmation
12/14/16

12/18/16
DATE

during detail design phase. No piping plan and MTO considered in 90% submittal.
NO.
REV

G
E

DISCIPLINE
ENGINEER
4.12 Pipeline Connection from SAMREF Refinery
ALL LEADS

DATE: 12/28/16 A. GENERAL


PROJECT
ENGINEER

A M ALMATROOK
Refer to Project Scoping Paper (GEN-E0103) for details of SAMREF scope of
DATE: 12/28/16
work.
CERTIFIED
AMR EL SHARKAWY
B. PIPING
12/28/16
DATE:
CONSTRUCTION
AGENCY
YDH shall receive PG 91/95, DO, and DPK from the SAMREF refinery via three
SHAHZAD YAZDANI pipelines extending from the SAMREF tank farm to YDH product receiving
DATE: 12/28/16 manifolds.
OPERATIONS
ALI H GHAMDI In addition to orginal scope, LSKT Contacator to refer Project Scoping Paper
DATE:
12/28/16 (GEN-E0103) and its Appendix-3 & 4 for changes due to surge system for scope
of work in SAMREF refinery.
CONTROL NUMBER
VERIFICATION
EDSD

 The SAMREF supply connection to YDH shall be downstream of existing


export pumps. And the required new metering skids & injections skids shall be
DATE:
BY:

installed at SAMREF.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 The main interface connection between this BI-10-02399 and others is at the
C

existing headers itself, i.e., from the SAMREF export lines going to their
(DCC) NO. _____________________

terminal near to the fence at King Fahad Road (RC Corridor. Inside plant,

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 79


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG piping team will bring the connection to battery limit where inside plant piping
SAY
SAY
SAY

and these 3 YR - YDH pipelines interfaces.


ENGG CERT

ASH
ASH
ASH

 The tie-in details and routing of three pipelines are shown in piping plans, Tie-
in Index as per DCL No GEN-D0001. The drawings mentioned here are only
LEADS

LEADS
LEADS
ALL

ALL
ALL

for reference; however these drawing to be verify during detail design.

 New metering skid to be installed inside SAMREF refinery. (Ref. Plot plan
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

Drawing PIA00430-001). The final location will be finalized during detail


design.

 Based on surge study, new Surge tank & associated facilities inside SAMREF
DESCRIPTION

refinery were added, exact location and feasibility study to be conducted after
confirmation during detail design phase.

C. PIPELINE

C.01 PURPOSE
The following design basis has been established for YDH to be constructed by this
project.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

C.02 PIPELINE DESIGN BASIS


12/28/16
12/14/16

12/18/16
DATE

Three product pipelines shall be constructed from SAMREF refinery to YDH receipt
manifolds. These pipelines shall handle diesel, DPK/kerosene and gasoline. The
NO.
REV

G
E

gasoline pipeline shall transfer both PG91 and PG95 products in a batching
DISCIPLINE
ENGINEER operation.
ALL LEADS

DATE: 12/28/16 C.03 PIPELINE PHYSICAL INTERFACES


PROJECT
ENGINEER

A M ALMATROOK The main interface connection between this BI-10-02399 and SAMREF is at the
DATE: 12/28/16 existing lines (SAMREF to Marine Terminal). Inside plant piping team will bring the
CERTIFIED connection to battery limit where inside plant piping and these 3 SAMREF - YDH
AMR EL SHARKAWY

12/28/16
pipelines interfaces
DATE:
CONSTRUCTION
AGENCY C.04 PRODUCT PIPELINE CORRIDOR
SHAHZAD YAZDANI

DATE: 12/28/16 1. The pipeline to be constructed for this project shall be routed through
OPERATIONS
existing RC pipeline corridors. Pipeline route from SAMREF is through
ALI H GHAMDI
pipeline corridor at BB Avenue, going to the 4th street corridor and
12/28/16
DATE: to the pipeline corridor in between King Abdul-Aziz road and Haul road of
CONTROL NUMBER

the refineries. Each product pipeline is approximately 11.0 km long from


VERIFICATION

SAMREF to YDH. Each pipeline shall be design to have Vertical U-Loops


EDSD

for flexibility.
DATE:
BY:

2. CONTRACTOR shall verify and comply with the Pipeline route according to
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

the Overall Pipeline route DWG PP-A00005.001, the attached route and
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

cross sections under Appendix-13.The CONTRACTOR shall ensure that


(DCC) NO. _____________________

the new pipelines will be routed within YRC corridor boundaries during the
detail design.Few locations may not fit within the corridor limits and the

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 80


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG CONTRACTOR shall raise it to SARAMCO during the development of the
SAY
SAY
SAY

design. ..
ENGG CERT

ASH
ASH
ASH

C.05 PIPELINE PARAMETERS


LEADS

LEADS
LEADS
ALL

ALL
ALL

Design Pressure (P) = MAOP of 1792.6 kPag (260 PSIG)


Design Temperature = 75°C
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

Corrosion Allowance = 1.6mm


Pipeline Diameter (D) = 30 inch
Pipe Specification = API-5L Grade X60
DESCRIPTION

Flange Rating = ASME Class 150

*Other Flow conditions are shown in the Line Designation Table see PID00442
sheet 001 to 002 and PID00442 sheet 001 to 003.

C.06 PIPELINE ROAD CROSSING

The three (3) 30” pipelines will cross eleven (11) roads as follow:
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

Item Road Name PROPOSED Length (M) REF. DWG


12/28/16
12/14/16

12/18/16
DATE

No. CROSSING Approx.


TYPE
1 #1-King Fahd Road Thrust Boring 90 PP-
NO.
REV

G
E

DISCIPLINE A00130.001
ENGINEER
ALL LEADS
2 #2-Main Berth Access Road Thrust Boring 21 PP-
DATE: 12/28/16
A00131.001
PROJECT 3 #3-Causeway Road and piping Thrust Boring 45 PP-
ENGINEER
Corridor A00131.002
A M ALMATROOK
4 #4-NGL Main Facilities Thrust Boring 23 PP-
DATE: 12/28/16
CERTIFIED A00132.001
AMR EL SHARKAWY 5 #5-NGL Plant Entrance Road Thrust Boring 37 PP-
DATE:
12/28/16 A00133.001
CONSTRUCTION
AGENCY
6 #6-Access Road to Diners Thrust Boring 34 PP-
SHAHZAD YAZDANI A00134.001
DATE: 12/28/16 7 #7- Al Mishani Street (Haul Road) Thrust Boring 25 PP-
OPERATIONS A00135.001
ALI H GHAMDI 8 #8-Approach Road(From/To Thrust Boring 47 PP-
DATE:
12/28/16 YASREF) A00136.001
9 #9-Approach Road(From/To YR) Thrust Boring 46 PP-
CONTROL NUMBER
VERIFICATION

A00137.001
EDSD

10 #10-King Abdul Aziz Road Thrust Boring 55 PP-


A00138.001
DATE:
BY:

11 #11-Shareh Al Awel Thrust Boring 126 PP-


REVISIONCERTIFICATION

A00139.001
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Thrust boring procedure shall be done by the approved SAUDI ARAMCO Thrust boring
(DCC) NO. _____________________

contractor and pipe shall be coated as per SAES-H-002 Para. 5.1.2. and 5.4.4.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 81


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

CONTRACTOR shall conduct site survey to finalize the pipeline routing proposed
during detailed design.
ENGG CERT

ASH
ASH
ASH

CONTRACTOR shall provide all adequate civil /structural arrangements for road
LEADS

LEADS
LEADS
ALL

ALL
ALL

crossings as proposed in pipeline drawings this shall include but not limited to soil
excavation, backfilling, concrete lining, dewatering if required and detour for open cut
road crossings.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

CONTRACTOR shall conduct detailed geotechnical investigation at road crossing


location to assess soil condition to determine methodology to be used for thrust boring
option.
DESCRIPTION

CONTRACTOR shall discuss and coordinate with thrust boring CONTRACTOR for the
required spacing. The spacing will be reviewed, concurred and approved by SAUDI
ARAMCO and YRC.

CONTRACTOR shall verify and provide insulation gasket and set of flanges installation
for above & underground transitions at road crossings and interface points (between
Piping and Pipeline) inside the refineries in accordance with SAUDI ARAMCO Standard
requirements for cathodic protection.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

CONTRACTOR shall review the proposed road crossing techniques and prepare a
12/28/16

complete construction packages and seek approval from SAUDI ARAMCO, YRC and
12/14/16

12/18/16
DATE

relevant local authorities at early stage of project design.


NO.
REV

G
E

CONTRACTOR may consider thrust boring utilizing Micro-Tunneling Method (MTM) for
DISCIPLINE
ENGINEER
pipeline road crossings, wherever it entails time and safety advantages to the project..
ALL LEADS

DATE: 12/28/16 SAMREF pipeline drawings submitted to YRC for road crossings are attached under
PROJECT
ENGINEER Appendix 2.
A M ALMATROOK

DATE: 12/28/16 D. INSTRUMENTATION


CERTIFIED
AMR EL SHARKAWY
Refer to Project Scoping Paper (GEN-E0103) for details of SAMREF scope of
12/28/16
DATE: work.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI

DATE: 12/28/16 E. ELECTRICAL


OPERATIONS
ALI H GHAMDI Electrical Scope in SAMREF, Refer to GEN-E0103.
12/28/16
DATE:
CONTROL NUMBER

F. CIVIL
VERIFICATION
EDSD

Refer to Project Scoping Paper (GEN-E0103) for details of SAMREF surge system.
DATE:
BY:

E. Telecom
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

For FOC cable road crossing, refer to Appendix 2


C

(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 82


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG 4.13 Pipeline Connection from YASREF Refinery
SAY
SAY
SAY

A. GENERAL
ENGG CERT

ASH
ASH
ASH

YDH is designed to receive gasoline and diesel products from the YASREF
LEADS

LEADS
LEADS
ALL

ALL
ALL

refinery via two pipelines. The pipeline connection will be downstream of the
YASREF pumps to utilize the pump as the pressure source to move the product
into a full tank at YDH. YDH pipeline connection shall not interfere with the transfer
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

operation of product flowing from YASREF to Yanbu as per the project BI-10-
00043, Yanbu Refinery Clean Fuels – YASREF Interface.

CONTRACTOR shall design and install the two product pipelines from YASREF
DESCRIPTION

and their connections into YDH receiving manifolds including, but not limited to the
following facilities:

 Two tie-ins in pipes at Yanbu Refinery


 Two product pipelines each for PG95/91 and DO from tie-in
 Interfacing of both custody metering skids from YASREF to YDH
 Connections in YDH receiving manifolds for two product pipelines from
YASREF
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

Two pipelines (one for DO and one for PG 95/91) along with metering skids at
YASREF shall be provided under BI-10-00043. This project will tie-in to the
12/28/16
12/14/16

12/18/16

downstream of the metering skid and isolation valve (outside YASREF battery limit,
DATE

inside the Yanbu refinery ) to utilize the existing export pumps and new metering
skids provided by BI-10-00043, for the supply to YDH. The tie-in locations to the
NO.
REV

G
E

pipeline will be inside the Yanbu refinery and BI-10-00043 will provide a manual
DISCIPLINE
ENGINEER valve on both pipelines for tie-ins to YDH. CONTRACTOR shall co-ordinate with
ALL LEADS BI-10-00043 for the tie-in location before detail design.
DATE: 12/28/16
PROJECT
ENGINEER CONTRACTOR shall design and install two product pipelines each of 30” size for
A M ALMATROOK PG95/PG91 and DO. Tie-ins will be taken accordingly in the 30” pipeline to YR
DATE: 12/28/16 under BI-10-00043 scope. Two custody metering skids to be installed under BI-10-
CERTIFIED
AMR EL SHARKAWY
00043 shall be interfaced with YDH.
12/28/16
DATE:
The scope for the YASREF pipelines and their connections into YDH receiving
CONSTRUCTION
AGENCY manifolds is outlined in PFD VA-247833.001 and P&IDs VA-247876.001 & VA-
SHAHZAD YAZDANI
247877.001.
DATE: 12/28/16
OPERATIONS
B. PIPING
ALI H GHAMDI

12/28/16
DATE: YDH shall receive PG 91/95 and DO products from the YASREF via two pipelines.
CONTROL NUMBER

The pipeline supply to YDH will connect to the pipeline provided by BI-10-00043.
VERIFICATION
EDSD

The location of Tie in connection of PG91/95 (Tie-in No. V25-023) & DO (Tie-in No.
DATE:

V25-025) from YASREF will be taken near the entrance of YR or inside the YR.
BY:

The exact location will be decided during detail design stage & co-ordination with
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

BI-10-00043.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

The tie-in details and routing of two pipelines are shown in PIB00451.001 & piping
plan dwg no. PI-A00403.004 located in DCL no GEN-D0001. The drawing

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 83


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG mentioned here are only for reference.
SAY
SAY
SAY

The dye injection skid & associated facilities for YASREF product pipeline for
ENGG CERT

ASH
ASH
ASH

PG91/95 will be provided inside boundary limit of YDH.


LEADS

LEADS
LEADS
ALL

ALL
ALL

Based on surge study, new Surge lines & associated facilities were added inside
YANBU refinery, exact location and feasibility study to be conducted after
confirmation during detail design phase.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

C. PIPELINE
DESCRIPTION

C.01 PURPOSE

The following design basis has been established for YDH to be constructed by this
project.

C.02 PIPELINE DESIGN BASIS

The two new 30-inch product pipelines shall tie-in to the existing YASREF refinery
lines going to the YDH receipt manifolds The pipeline shall handle diesel and
10-02399-
JO/EWO

10-02399-
10-02399-
0001

gasoline. The gasoline pipeline shall transfer both PG91 and PG 95 products in a
0001
0001

batching operation. A 30-inch Pipeline for the surge will be routed and constructed
12/28/16

from YANBU refinery parallel with these 2 new pipelines till the interface in YDH.
12/14/16

12/18/16
NO. DATE
REV

G
E

C.03 PIPELINE PHYSICAL INTERFACES


DISCIPLINE
ENGINEER
ALL LEADS These products, diesel and gasoline, shall be transferred from YASREF to YANBU
DATE: 12/28/16 refinery as part of BI-10-00043. The tie-in to these two pipelines will be to manual
PROJECT
ENGINEER Tie-in Globe Valves (provided by BI-10-00043) located inside the perimeter fence
A M ALMATROOK of YANBU refinery, the physical interface shall be at the flange provided by plant
DATE: 12/28/16 piping team. The reference drawings for 30-inch surge pipeline at Yanbu Refinery
CERTIFIED is PI-A00403.004 and YDH is PI-A00047.001.
AMR EL SHARKAWY

12/28/16
DATE: C.04 PRODUCT PIPELINE CORRIDOR
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI The pipeline to be constructed for this project shall be routed through new pipeline
DATE: 12/28/16 corridors. Pipeline route from YANBU refinery is through a thrust boring starting
OPERATIONS from inside YANBU refinery and going to cross SSD fence, Haul Road, King
ALI H GHAMDI Abdulaziz Road and Shareh Al-Awel to YDH. Each product pipeline is
12/28/16 approximately 500 meter long from YANBU to the new Yanbu Distribution Hub.
DATE:
CONTROL NUMBER

Each pipeline shall be designed to have Vertical U-Loops for flexibility.


VERIFICATION
EDSD

CONTRACTOR shall verify and comply with the Pipeline route according to the
Overall Pipeline route DWG PP-A00005.001, the attached route and cross sections
DATE:
BY:

under Appendix-13.The CONTRACTOR shall ensure that the new pipelines will be
REVISIONCERTIFICATION

routed within YRC corridor boundaries during the detail design.Few locations may
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

not fit within the corridor limits and the CONTRACTOR shall raise it to SARAMCO
C

during the development of the design.


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 84


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG C.05 PIPELINE PARAMETERS
SAY
SAY
SAY

Design Pressure (P) = MAOP of 1792.6 kPag (260 PSIG)


ENGG CERT

ASH
ASH
ASH

Design Temperature = 75°C


LEADS

LEADS
LEADS
ALL

ALL
ALL

Corrosion Allowance = 1.6mm


Pipeline Diameter (D) = 30 inch
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

Pipe Specification = API-5L Grade X60


Flange Rating = ASME Class 150
DESCRIPTION

*Other Flow conditions are shown in the Line Designation Table see PID0450
sheet 001 to 002.

C.06 PIPELINE ROAD CROSSING

The two (2) pipelines and 30inch surge pipeline will cross Three (3) roads as
follows:
10-02399-
JO/EWO

10-02399-

Item Road Name PROPOSED Length (M) REF. DWG


10-02399-
0001

0001
0001

No. CROSSING Approx.


TYPE
12/28/16
12/14/16

12/18/16
DATE

1 #10-King Abdul Aziz Thrust Boring 55 PP-A00138.001


Road
2 #11-Shareh Al-Awel Thrust Boring 126 PP-A00139.001
NO.
REV

G
E

DISCIPLINE 3 #12-Haul Road (Yanbu Thrust Boring 69 PP-A00150.001


ENGINEER
ALL LEADS
Refinery
DATE: 12/28/16
PROJECT CONTRACTOR shall conduct site survey to finalize the pipeline routing proposed
ENGINEER
during detailed design.
A M ALMATROOK

DATE: 12/28/16
CERTIFIED CONTRACTOR shall provide all adequate civil /structural arrangements for road
AMR EL SHARKAWY crossings as proposed in pipeline drawings this shall include but not limited to soil
DATE:
12/28/16 excavation, backfilling, concrete lining, dewatering if required.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI CONTRACTOR shall conduct detailed geotechnical investigation at road crossing
DATE: 12/28/16
location to assess soil condition to determine methodology to be used for thrust boring
OPERATIONS option.
ALI H GHAMDI

DATE:
12/28/16 CONTRACTOR shall discuss and coordinate with thrust boring CONTRACTOR for the
required spacing. The spacing will be reviewed, concurred and approved by
CONTROL NUMBER
VERIFICATION

SARAMCO and RC.


EDSD

CONTRACTOR shall verify and provide insulation gasket and set of flanges
DATE:
BY:

installation for above and underground transitions at road crossings and interface
points (between Piping and Pipeline) inside the refineries in accordance with SAUDI
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

ARAMCO Standard requirements for cathodic protection.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

CONTRACTOR shall review the proposed road crossing techniques and prepare a

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 85


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG complete construction packages and seek approval from SAUDI ARAMCO, YRC and
SAY
SAY
SAY

relevant local authorities at early stage of project design.


ENGG CERT

ASH
ASH
ASH

CONTRACTOR may consider thrust boring utilizing Micro-Tunneling Method (MTM) for
pipeline road crossings, wherever it entails time and safety advantages to the project..
LEADS

LEADS
LEADS
ALL

ALL
ALL

YASREF pipeline drawings submitted to YRC for road crossings attached.


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

D. INSTRUMENTATION
DESCRIPTION

YDH control system shall be interfaced to YASREF control system to have


READ ONLY access to the data points such as the CMS, EIV status and Pump
status. The data is to be exchanged via plant DMZ through PI system at both
the facilities.

As alternate method, LSTK CONTRACTOR shall evaluate the implementation


of the MODBUS TOFINO Firewall method within P&CSD concurrence once
PCS vendor is selected.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

Contractor shall provide new fiber optic cable from YASREF to YDH for the
0001
0001

data exchange. The interface is shown in preliminary block # IN-A00001.004


12/28/16
12/14/16

12/18/16
DATE

Contractor shall coordinate with Refinery Control System Vendor for the
interface requirements.
NO.
REV

G
E

DISCIPLINE
ENGINEER
F. Telecom
ALL LEADS

DATE: 12/28/16 For FOC cable road crossing, refer to Appendix 2


PROJECT
ENGINEER

A M ALMATROOK 4.14 Pipeline Connection from Yanbu Refinery Terminal


DATE: 12/28/16
CERTIFIED A. GENERAL
AMR EL SHARKAWY

12/28/16
DATE: YDH is designed to receive PG 91, PG 95, Diesel, and Kerosene from the Yanbu
CONSTRUCTION
AGENCY
Refinery Terminal. Three pipelines will connect into the Yanbu Refinery Terminal
SHAHZAD YAZDANI offload pipelines at a location just upstream of the Existing Aramco refinery tank
DATE: 12/28/16 farm to utilize the vessel offload pump as the primary pressure source and the
OPERATIONS existing marine loading & transfer pumps as booster pumps to move the product
ALI H GHAMDI into a full tank at YDH. The new connections shall be designed not to interfere with
DATE:
12/28/16 the current vessel offload operations
CONTROL NUMBER
VERIFICATION

CONTRACTOR shall design and install the three product pipelines each of 24” size
EDSD

from Yanbu Refinery Terminal (YRT) through Yanbu Refinery (YR) and their
connections into YDH receiving manifolds including, but not limited to the following
DATE:
BY:

facilities:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Tie-ins in existing piping at YR


C


(DCC) NO. _____________________

Three product pipelines each for PG95/91, DO and DPK from YR to YDH
 Connections in YDH receiving manifolds for three product pipelines from YRT

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 86


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG  Fire water system connection
SAY
SAY
SAY

YDH shall receive PG 91/95, DO, and DPK from the Yanbu Refinery Terminal
ENGG CERT

ASH
ASH
ASH

through three pipelines extending from Yanbu refinery tank farm to YDH. The
interface to the terminal unloading lines will be at Yanbu refinery tank farm. The
LEADS

LEADS
LEADS
ALL

ALL
ALL

primary source for the supply of products to YDH shall be the pumps on the ship
and the existing marine loading & transfer pumps shall be used as booster pumps
to move the product into a full tank at YDH.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

CONTRACTOR shall design and install three product pipelines each of 24” size for
PG95/PG91, DPK and DO. These pipelines will be connected at the discharge of
existing marine loading & transfer pumps. Pump suction side shall be connected to
DESCRIPTION

new lines that are tied into existing lines coming from YRT. Accordingly, tie-ins will
be taken from the existing pipes at existing pump suction & discharge side and
existing pipes coming from YRT.

Refer to Project Scoping Paper (GEN-E0104) for details of changes in YR/YDH


surge system.

B. PIPING
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

YDH shall receive PG 91/95, DO, and DPK from the Yanbu Refinery Terminal
12/28/16
12/14/16

12/18/16

through three pipelines extending from Yanbu refinery tank farm to YDH. The
DATE

interface to the terminal unloading lines will be at Yanbu refinery tank farm.
NO.
REV

G
E

The primary source for the supply of products to YDH shall be by utilizing the
DISCIPLINE
ENGINEER
existing pumps installed at Yanbu Refinery Tank farm near to available space
ALL LEADS towards YRT fence to feed to YDH.
DATE: 12/28/16
PROJECT
ENGINEER  To install new feed line for Gasoline (PG91/PG95) to YDH, tie-in at the 18”
A M ALMATROOK common header of Gasoline loading and Transfer pumps (V25-P-P17 A-E)
DATE: 12/28/16
to be taken at Yanbu Refinery near Pump Station-C.
CERTIFIED
AMR EL SHARKAWY

DATE:
12/28/16  To install new feed line for Kerosene (DPK) to YDH, Tie-in at the 20”
CONSTRUCTION
AGENCY
common header of Kerosene loading and Transfer pumps (V25-P22 A/B/C)
SHAHZAD YAZDANI to be taken at Yanbu Refinery near Pump Station-B.
DATE: 12/28/16
OPERATIONS  To install new feed line for Diesel(DO) to YDH ,Tie-in at the 20”MDO
ALI H GHAMDI common header of Diesel loading and Transfer Pumps(V25-P24-A/B/C) to
DATE:
12/28/16 be taken at Yanbu Refinery near Pump Station-B.
CONTROL NUMBER
VERIFICATION

The Layout of feed lines from existing header lines to Interface connection
EDSD

with pipeline near YR battery limit, refer to section C.03 for detailed
DATE:

description.
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

 OWS UG/AG connection shall be verified during detail design Phase.


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 87


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG C. PIPELINE
SAY
SAY
SAY

C.01 PURPOSE
ENGG CERT

ASH
ASH
ASH

The following design basis has been established for YDH to be constructed by this
LEADS

LEADS
LEADS
ALL

ALL
ALL

project.

C.02 PIPELINE DESIGN BASIS


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

Three product pipelines shall be constructed from YANBU refinery terminal to YDH
receipt manifolds. The pipeline shall handle diesel, both grades of gasoline, and
DPK/kerosene. The gasoline pipeline shall transfer both PG91 and PG 95 products
DESCRIPTION

in a batching operation.

C.03 PIPELINE PHYSICAL INTERFACES

The main interface connection between this BI-10-02399 and others is at the
existing headers itself and not elsewhere. Inside plant piping team will bring the
connection to battery limit where inside plant piping and these 3 YR - YDH
pipelines interfaces.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

C.04 PRODUCT PIPELINE CORRIDOR


0001
0001

12/28/16

The pipeline to be constructed for this project shall be routed through new pipeline
12/14/16

12/18/16
DATE

corridors. Pipeline route from YANBU refinery is through Thrust Boring starting
from inside YANBU refinery and going to cross existing SSD fence, Haul Road,
NO.
REV

G
E

King Abdulaziz Road and Shareh Al-Awel to YDH. Each product pipeline is
DISCIPLINE
ENGINEER
approximately 500 meter long from YANBU to the new Yanbu Distribution Hub.
ALL LEADS Each pipeline shall be design to have Vertical U-Loops for flexibility.
DATE: 12/28/16
PROJECT
ENGINEER CONTRACTOR shall verify and comply with the Pipeline route according to the
A M ALMATROOK Overall Pipeline route DWG PP-A00005.001, the attached route and cross sections
DATE: 12/28/16 under Appendix-13.The CONTRACTOR shall ensure that the new pipelines will be
CERTIFIED routed within YRC corridor boundaries during the detail design.Few locations may
AMR EL SHARKAWY
not fit within the corridor limits and the CONTRACTOR shall raise it to SARAMCO
12/28/16
DATE: during the development of the design. , the attached preliminary route and cross
CONSTRUCTION
AGENCY sections along the corridor.The CONTRACTOR shall ensure that the new pipelines
SHAHZAD YAZDANI route will be within RC corridor boundaries.
DATE: 12/28/16
OPERATIONS C.05 PIPELINE PARAMETERS
ALI H GHAMDI

12/28/16 Design Pressure (P) = MAOP of 1792.6 kPag (260 PSIG)


DATE:
CONTROL NUMBER
VERIFICATION

Design Temperature = 75°C


EDSD

Corrosion Allowance = 1.6mm


DATE:

Pipeline Diameter (D) = 24 inch


BY:
REVISIONCERTIFICATION

Pipe Specification = API-5L Grade X60


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Flange Rating = ASME Class 150


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 88


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

*Other Flow conditions are shown in the Line Designation Table see PID00402
sheet 001 to 004.
ENGG CERT

ASH
ASH
ASH

C.06 PIPELINE ROAD CROSSING


LEADS

LEADS
LEADS
ALL

ALL
ALL

The three (3) pipelines and 30 inch surge pipeline will cross three (3) roads as
follow:
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

Item Road Name CROSSING TYPE Length(M) REF. DWG


No. Approx.
1 #10-King Abdul Aziz Thrust Boring 55 PP-A00138.001
DESCRIPTION

Road
2 #11-Shareh Al-Awel Thrust Boring 126 PP-A00139.001
3 #12-Haul Road Thrust Boring 69 PP-A00150.001
(Yanbu Refinery

CONTRACTOR shall conduct site survey to finalize the pipeline routing proposed
during detailed design.

CONTRACTOR shall provide all adequate civil /structural arrangements for road
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

crossings as proposed in pipeline drawings this shall include but not limited to soil
excavation, backfilling, concrete lining, dewatering if required.
12/28/16
12/14/16

12/18/16
DATE

CONTRACTOR shall conduct detailed geotechnical investigation at road crossing


location to assess soil condition to determine methodology to be used for thrust boring
NO.
REV

G
E

option.
DISCIPLINE
ENGINEER
ALL LEADS CONTRACTOR shall discuss and coordinate with thrust boring CONTRACTOR for the
DATE: 12/28/16 required spacing. The spacing will be reviewed, concurred and approved by SAUDI
PROJECT
ENGINEER ARAMCO and YRC.
A M ALMATROOK

DATE: 12/28/16 CONTRACTOR shall verify and provide insulation gasket and set of flanges
CERTIFIED
AMR EL SHARKAWY
installation for above & underground transitions at road crossings and interface points
12/28/16
(between Piping and Pipeline) inside the refineries in accordance with SAUDI
DATE:
ARAMCO STANDARD requirements for cathodic protection.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
CONTRACTOR can consider thrust boring thru the Micro-Tunneling Method (MTM) for
DATE: 12/28/16 pipeline road crossings, wherever it entails cost, time and safety advantages to the
OPERATIONS
project with previous SAUDI ARAMCO approval.
ALI H GHAMDI

12/28/16
DATE: SAMREF pipeline drawings submitted to YRC for road crossings to be attached.
CONTROL NUMBER
VERIFICATION

D. INSTRUMENTATION
EDSD

DATE:

CONTRACTOR shall provide and install field instruments, Motor Operated and
BY:

Electrohydraulic ESD valves at the battery limit of Yanbu Refinery, MOVs shall also be
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

provide at the tie-in locations.


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

CONTRACTOR shall provide and install new homerun cables from valves up to the
existing SIH-1590 (Satellite Instrument House) in tank farm area. SIH-1590 is
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 89


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG expanded under BI-10-00043, the project shall coordinate with BI-10-00043 shall to
SAY
SAY
SAY

reserve the space required by this BI. All new EIVs will be connected to new ESD
Marshalling Cabinet provided by BI-10-00043. BI-10-02399 will provide required input-
ENGG CERT

ASH
ASH
ASH

output modules to integrate to ESD system provided under BI-10-00043.


LEADS

LEADS
LEADS
ALL

ALL
ALL

All non-ESD instruments will be connected to new DCS Marshalling Cabinet provided
by BI-10-00043. BI-10-02399 will provide required input-output modules to integrate to
DCS system provided under BI-10-00043.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

SIH-1590 will be expanded under BI-10-00043 to accommodate the expansions under


this BI. The DCS/ESD provided under BI-10-00043 will be integrated to YR plant
network.
DESCRIPTION

New instrumentation provided under BI-10-02399 will be controlled from YR tank farm
control room and the HMIs at tank farm control room will be updated accordingly.

In addition to this, BI-10-02399 shall interface Yanbu Refinery TCFR control system to
YDH provides View only signals related to product transfer. The data points shall be
the status of product pumps and EIVs such as running, stopped, tripped etc. The
requirements of data from Yanbu Refinery shall be further evaluated during Detail
design phase in coordination with YDH and YREF operations.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

The interface shall be through PI system installed at both the facility, DMZ shall be
12/28/16

used in order to make the data exchange highly secured. Contractor shall provide fiber
12/14/16

12/18/16
DATE

cables between YREF and YDH.


NO.
REV

G
E

As alternate method, LSTK CONTRACTOR shall evaluate the implementation of the


DISCIPLINE
ENGINEER
MODBUS TOFINO Firewall method within P&CSD concurrence once PCS vendor is
ALL LEADS selected.
DATE: 12/28/16
PROJECT
ENGINEER CONTRACTOR shall provide and install new junction boxes, branch cables, homerun
A M ALMATROOK cables for instruments added by this BI.
DATE: 12/28/16
CERTIFIED The field installation shall be as per P & IDs VA-247876/877 and
AMR EL SHARKAWY
VA-234308.015/020/027 and Piping Plans PI-A00403.004, VA-236952.001, VA-
12/28/16
DATE: 236952.002, VA-236956.001, VA-236956.002 and VA-236960.002
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI

DATE: 12/28/16
OPERATIONS
ALI H GHAMDI CONTRACTOR shall provide and install cables between IRP panels located in
12/28/16 substation to SIH-1590 Building.
DATE:
CONTROL NUMBER
VERIFICATION

CONTRACTOR shall run homerun cables from Junction boxes to SIH-1590 utilizing
EDSD

existing cable trays. Refer drawing VA-549870.001 for cable routing.


DATE:
BY:

Reference Drawings:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Drawing# Description
(DCC) NO. _____________________

IN-A00001.008 Block Diagram-Yanbu Refinery

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 90


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
Drawing# Description
SAY
SAY
SAY

IN-A00001.013 Instrument Block Diagram


ENGG CERT

ASH
ASH
ASH

VA-549870.001 Cable/Conduit Layout


VA-549714.002 System Architecture PCS Tank Farm
LEADS

LEADS
LEADS
ALL

ALL
ALL

IN-D00031.001 Cable and Conduit Schedule


IN-E00000 Technical Specification Document -DCS Modification
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

IN-E00033 DCS INPUT-OUTPUT LIST


IN-E00034 ESD INPUT-OUTPUT LIST

Refer to Project Scoping Paper (GEN-E0104) for details of changes in YR/YDH surge
DESCRIPTION

system.

G. ELECTRICAL

Yanbu’ Refinery shall supply all electrical power and connections required for
MOVs and other miscellaneous loads. Total electrical loads anticipated are about
10kVA Four (4) 480V, 100A, 3Ph, 3W, 60Hz Outdoor Power Panel (NEMA 4X)
shall be provided to feed power to MOVs and other miscellaneous loads. (Refer to
drawing # EL-A10111).
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

CONTRACTOR shall utilize existing space in V21-MC71A, V21-MC81A & V21-


MC91A at Substation no-7, 8 & 9 for Four (4nos.) 100AF new circuit breakers to
12/28/16
12/14/16

12/18/16
DATE

feed new MOV power panels (Refer drawing # VA-240892-001, VA-240893.002 &
VA-240894.002).
NO.
REV

G
E

DISCIPLINE
ENGINEER
CONTRACTOR shall Provide Lighting and Grounding system in compliance with
ALL LEADS SAUDI ARAMCO Standards by utilizing existing system.
DATE: 12/28/16
PROJECT
ENGINEER

A M ALMATROOK H. Telecom
DATE: 12/28/16
CERTIFIED For FOC cable road crossing, refer to Appendix 2
AMR EL SHARKAWY

12/28/16
DATE: 4.15 ELECTRICAL
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI A. GENERAL
DATE: 12/28/16
OPERATIONS Electrical General Requirements
ALI H GHAMDI

12/28/16
DATE:
CONTRACTOR shall implement and comply with all the requirements as stated but
CONTROL NUMBER
VERIFICATION

not limited to following:


EDSD

CONTRACTOR scope shall include but not be limited to Detail Design,


DATE:
BY:

procurement, supply, deliver / store, install, test, pre-commission, commissioning


REVISIONCERTIFICATION

assistance and Final Integrated Testing, with New and Existing Systems, for all the
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

equipment provided by CONTRACTOR and all the equipment provided by SAUDI


(DCC) NO. _____________________

ARAMCO under this BI / Project, as required for a Fully Functional and Operational

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 91


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Facility.
SAY
SAY
SAY
ENGG CERT

ASH
ASH

CONTRACTOR shall include MARAFIQ on the Engineering Review Cycle for any
ASH

job related to MARAFIQ.


LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall comply with Yanbu Royal Commission (YRC) Standards and
regulations for any scope related to YRC and MARAFIQ.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

CONTRACTOR shall comply with SAMREF and YASREF refineries Standards and
regulations for any scope related to these refineries.
DESCRIPTION

CONTRACTOR shall implement Electricity & Cogeneration Regulatory Authority


(ECRA) requirement.

CONTRACTOR shall be responsible for the correctness of all Drawings and


Documents and Software provided from vendors / manufactures / suppliers / sub-
contractors, etc. Approval or Acceptance of these Drawings and Documents and
Software by SAUDI ARAMCO does not relive CONTRACTOR of the responsibility
10-02399-
JO/EWO

10-02399-
10-02399-

of correct design, right equipment, proper installation, testing and commissioning.


0001

0001
0001

12/28/16

CONTRACTOR shall be fully responsible for the preparation of purchase orders,


12/14/16

12/18/16
DATE

SAUDI ARAMCO Acceptance or Approvals, FAT’s (Factory Inspection test)


inspections, Delivery to Site and storage of all the required electrical items; cooling
NO.
REV

G
E

DISCIPLINE
for batteries (UPS & DC) shall be operational prior to site delivery at a temperature
ENGINEER
ALL LEADS
concurred by the battery manufacturer. All electric equipment that requires space
DATE: 12/28/16
heater or anti condensation shall be provided with safe space heating arrangement
PROJECT
ENGINEER
to prevent moisture absorption and damage to equipment; temporary power
A M ALMATROOK requirements shall be arranged by THE CONTRACTOR.
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY
CONTRACTOR shall provide an Equipment Preservation Plan to SAUDI ARAMCO
DATE:
12/28/16 a Minimum of 90 days prior to site delivery of any major electrical equipment or
CONSTRUCTION electronic or battery systems and temperature sensitive equipment arrival on the
AGENCY
SHAHZAD YAZDANI project site or delivery to an off-site storage warehouse/location for SAUDI
DATE: 12/28/16 ARAMCO Projects Inspection Acceptance.
OPERATIONS
ALI H GHAMDI
CONTRACTOR shall be responsible for the proper function and safe operation of
12/28/16
DATE:
all the equipment and systems. The design criteria and contract documents
CONTROL NUMBER
VERIFICATION

included are not all-inclusive and represent minimum requirements. Any additional
EDSD

elements or items required to achieve the correct and safe operation of the system
shall be engineered, designed, supplied and installed in place to render a complete
DATE:
BY:

functional system.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

CONTRACTOR shall utilize the Metric System measurement in all documents and
(DCC) NO. _____________________

drawings unless specifically directed otherwise by SAUDI ARAMCO.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 92


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

CONTRACTOR shall review and approve Vendor and Subcontractor drawings,


ENGG CERT

ASH
ASH

design, specifications and other documents for conformity to this Contract and
ASH

institute effective internal control for prompt receipt, review, approval and return of
LEADS

LEADS
LEADS
ALL

ALL
ALL

such documents. CONTRACTOR shall incorporate all such applicable Vendor and
Subcontractor information in THE CONTRACTOR’S submittals to SAUDI
ARAMCO.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

THE CONTRACTOR’S detailed “SHOP Drawings” (site developed for site


installation and interface of Vendor equipment’s based on actual purchased
DESCRIPTION

equipment Certified NMR 602 & NMR 603 data) shall include all necessary plans,
elevations, arrangements, sections, profiles, views and details of all facilities.

The Project SOW as conveyed herein and the documents and drawings provided
with this Scope of Work document are Coherent and NOT to be utilized separately.
Any item mentioned in this document and not indicated on drawings or indicated on
drawings or not mentioned in other documents provided with this PPN, shall be of
like effect as if indicated or mentioned in both and vice versa.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

CONTRACTOR shall check and verify all Sub-Contractor and Vendor design and
12/28/16

drawings provided comply with the Scope of Work, and documents provided with
12/14/16

12/18/16
DATE

this Scope, relevant SAUDI ARAMCO and International Standards and are in
keeping with “Good Engineering Practices”.
NO.
REV

G
E

DISCIPLINE
ENGINEER
ALL LEADS
CONTRACTOR shall comply with SAUDI ARAMCO Standards and seek SAUDI
DATE: 12/28/16
ARAMCO advice for any potential Waivers. CONTRACTOR shall prepare such
PROJECT
ENGINEER
Waivers as per SAEP-302, as required by SAUDI ARAMCO.
A M ALMATROOK

DATE: 12/28/16 CONTRACTOR shall note that “CLOUDS” on the drawings indicate a HOLD point
CERTIFIED
AMR EL SHARKAWY
due to unavailability of information or indicates a REQUIRED Tie-in from Existing
DATE:
12/28/16 Equipment and Systems into New Equipment and Systems. This Tie-in is part of
CONSTRUCTION CONTRACTOR Scope including any Software Supply, Upgrade and / or
AGENCY
SHAHZAD YAZDANI modifications of Existing software.
DATE: 12/28/16
OPERATIONS
CONTRACTOR shall verify the power source of all equipment supplied under this
ALI H GHAMDI
project by installing a Label on or near each equipment or device receiving power.
12/28/16
DATE:
Switchgear, Controlgear, Power Panels, Motors, Receptacles, Light Switches,
CONTROL NUMBER
VERIFICATION

each Light, HVAC Panel, Communication Cabinet, Security Cabinet, Fire Alarm
EDSD

Panel, etc. shall have a Phenolic Label with Black text on a White background
attached with stainless steel screws identifying the upstream power source. For
DATE:
BY:

example, for each Receptacle, Light Switch and Light, the label shall indicate the
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

Upstream Panelboard Number and Circuit Breaker Number and indicate if a GFCI
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

circuit.
(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 93


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG SAUDI ARAMCO requires new power sub-distribution systems to be
SAY
SAY
SAY

400VAC/230VAC for four wire systems as listed in SAES-P-100.


ENGG CERT

ASH
ASH
ASH

SAUDI ARAMCO requires general purpose receptacles be powered with 230VAC


LEADS

LEADS
LEADS
ALL

ALL
ALL

as per SASCO 2203 receptacle requirements as indicated within SAES-P-119


“Substations”. On drawings which indicate a GFCI is required, CONTRACTOR is
permitted to install a GFCI molded case circuit breaker within the panelboard
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

powering the receptacle with a 5mA trip or an Equipment Protection Device with
nominal 30mA trip and shall label the receptacle with the panelboard number,
circuit breaker number and indicate on the label “Fed from GFCI MCCB”. The label
DESCRIPTION

shall be phenolic with Black text on a White background attached with stainless
steel screws. Receptacles with integral ground fault protection are NOT
acceptable.

Framed A-Size one lines (as-built) shall be provided by CONTRACTOR and


installed in applicable Substations & Electrical Rooms including ALL rooms which
contain at least one (1) or more Switchgear, Controlgear, ATS, Battery Charger,
Stand Alone UPS, Panelboard, etc. A copy of the applicable Certified NMR-602
10-02399-
JO/EWO

10-02399-
10-02399-

shall be provided in the applicable electrical equipment room and with a metal book
0001

0001
0001

case within each room in which an NMR is provided. These shall be provided
12/28/16

before energization of the equipment.


12/14/16

12/18/16
DATE

CONTRACTOR shall use Premium efficiency motors for all the motor less than
NO.
REV

G
E

DISCIPLINE
500HP.
ENGINEER
ALL LEADS

DATE: 12/28/16
CONTRACTOR shall carry out all Electrical work in close liaison with the SAPMT
PROJECT
ENGINEER
to meet the project requirements.
A M ALMATROOK

DATE: 12/28/16 CONTRACTOR scope shall include but not be limited to Detail Design,
CERTIFIED
AMR EL SHARKAWY
procurement, supply, deliver / store, install, test, pre-commission, commissioning
DATE:
12/28/16 assistance and Final Integrated Testing, with New and Existing Systems, including
CONSTRUCTION required ETAP studies, Plant Distribution system, Plant & buildings internal &
AGENCY
SHAHZAD YAZDANI external Lighting System, Plant & Buildings Grounding & Lightning System,
DATE: 12/28/16 Security & Fence Lighting System, Plant & Buildings Fire Alarm System,
OPERATIONS
Emergency Power supply System by installing Generators, UPS power supply
ALI H GHAMDI
System for Plant operations, Security operations and Communication operations,
12/28/16
DATE:
DC system for Substation switchgear protection, Complete Substation with
CONTROL NUMBER
VERIFICATION

Substation Automation system, Cathodic Protection System, LED Lighting within


EDSD

the Buildings and for all External Lights (except substation exterior & fence lighting)
attached to the buildings,115kV cable routing, Interfacing with 115kV GIS at
DATE:
BY:

MARAFIQ Substation # 9I, Electrical Interfacing with the SAMREF, YASREF,


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

Yanbu Refinery and Yanbu-Jiddah Pipeline to provide power & Cathodic


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Protection(CP).
(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 94


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Electrical Studies
SAY
SAY
SAY
ENGG CERT

ASH
ASH

CONTRACTOR shall perform and validate all the Electrical studies as per SAES-
ASH

P-100 and obtain SAUDI ARAMCO approval in order to finalize and freeze the long
LEADS

LEADS
LEADS
ALL

ALL
ALL

lead electrical items to facilitate timely procurement. The purpose of the electrical
studies is to verify the ability of the plant electrical power distribution components
are adequately sized and perform as designed during normal steady state
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

operation, with stand allowable transients and isolate faulty sections during faults.
Following Electrical studies shall be perform as a minimum but not limited to:
DESCRIPTION

 ETAP Short Circuit Analysis


 ETAP Loads Flow Analysis
 ETAP Motor Starting Study
 ETAP Protective Device Co-Coordination
 ETAP Arc Flash Studies as per SABP-P-051 & SAES-P-100
 ETAP Grounding study
 ETAP Power Factor Correction study
 Switching Transient Analysis, Transient Recovery Voltage (TRV) evaluation and
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

Insulation Coordination studies


 Lightning Protection Studies
12/28/16
12/14/16

12/18/16
DATE

 Cathodic protection study


NO.
REV

G
E

CONTRACTOR shall perform the ETAP study and give recommendations to


DISCIPLINE
ENGINEER
improve overall power factor as per SAES-P-100. Based on preliminary ETAP
ALL LEADS study, Two (2), 4.2MVar, 13.8kV, 3Ph, 60Hz MV Automatic Capacitor Bank is
DATE: 12/28/16
PROJECT
required to achieve power factor above 0.95 at PCC. It shall be further evaluated
ENGINEER
with different scenarios and options to maintain pf 0.95 at PCC as per SAES-P-100
A M ALMATROOK
requirement.
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY
For each of the above studies, the final study shall be completed to confirm that all
12/28/16
DATE: electrical equipment including all transformers, switchgear, all controlgear and all
CONSTRUCTION
AGENCY large motors, are adequately rated and properly specified. The study and report
SHAHZAD YAZDANI
shall be issued for review and approval to SAUDI ARAMCO.
DATE: 12/28/16
OPERATIONS
ALI H GHAMDI All electrical loads and equipment ratings indicated on the project proposal
DATE:
12/28/16 drawings and documents are preliminary and shall be verified and updated as part
CONTROL NUMBER

of the detailed design engineering phase. These load values are intended only for
VERIFICATION

ER estimate and shall not be used for construction.


EDSD

DATE:

CONTRACTOR shall define jointly with Saudi Aramco the electrical substation ID
BY:

number.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Electrical Overall Power Distribution System – Design Basis


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 95


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Total power demand for the proposed YDH facility is estimated to be 46 MVA, with
SAY
SAY
SAY

a first phase of approximately 23.0 MVA by 2019. Adequate spare space at all
ENGG CERT

ASH
ASH

levels of power distribution shall be considered in order to accommodate future


ASH

proposed shipper pumps for Yanbu to Central Region pipeline planned from this
LEADS

LEADS
LEADS
ALL

ALL
ALL

facility. The power system shall be suitable to start larger shipper pumps without
any voltage drop impact when started direct on line. For detailed electrical load list
refer to document # CAL- EL121.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

Electrical Load Summary – Estimation electrical load include the demand load till
2040.
DESCRIPTION

S.No. Load Description by Project Maximum Operating Load


Phase (MVA)
1. Phase-1 23.0 MVA
2. Phase-2 9.5 MVA
3. Future 12.8 MVA
Total Demand Load (including 46.0 MVA
10% growth)
10-02399-
JO/EWO

10-02399-
10-02399-

The normal power supply to the proposed facility shall be from ‘MARAFIQ’s
0001

0001
0001

Substation # 9I’ which is located about 3.85km from YDH facility fence. Two (2)
115 kV feeder from the GIS at MARAFIQ’s Substation #9I, shall be used to supply
12/28/16
12/14/16

12/18/16
DATE

power to YDH facility.


NO.
REV

G
E

DISCIPLINE CONTRACTOR shall coordinate with MARAFIQ and implement the connection
ENGINEER
ALL LEADS
agreement requirements between MARAFIQ & SAUDI ARAMCO during detail
DATE: 12/28/16 design & construction phase of the project.
PROJECT
ENGINEER

A M ALMATROOK MARAFIQ substation is connected to a reliable and strong grid point, the SSBB
DATE: 12/28/16 115 kV substation of Yanbu-II power plant (by 2018 this new power plant will be
CERTIFIED
AMR EL SHARKAWY available to generate 800 MW electricity, a strong reliable power source of this
DATE:
12/28/16 region).
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI Two (2) new substations (Receiving & Utility Substation) shall be built at YDH to
DATE: 12/28/16 receive & distribute the power within YDH.
OPERATIONS
ALI H GHAMDI

12/28/16
Receiving Substation shall house 115kV Gas Insulated Circuit Breaker bay, 13.8kV
DATE:
& 480V Metal Clad Switchgear and 480V Controlgear as main electrical equipment
CONTROL NUMBER
VERIFICATION

to receive power from MARAFIQ substation # 9I and further distribute power to


EDSD

Utility Substation and Shipper Pumps.


DATE:
BY:

CONTRACTOR shall perform the ETAP study and give recommendations to


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

improve overall power factor as per SAES-P-100. Based on preliminary ETAP


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

study, Two (2), 4.2MVar, 13.8kV, 3Ph, 60Hz MV Automatic Capacitor Bank is
(DCC) NO. _____________________

required to achieve power factor above 0.95 at PCC. It shall be further evaluated

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 96


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG with different scenarios and options to maintain pf 0.95 at PCC as per SAES-P-100
SAY
SAY
SAY

requirement.
ENGG CERT

ASH
ASH
ASH

Utility Substation shall house 4.16kV & 480V Metal Clad Switchgear and 480V
LEADS

LEADS
LEADS
ALL

ALL
ALL

Controlgear as main electrical equipment to distribute power within YDH facilities.

Refer to Document Control Log (GEN-D0001) for the Overall Electrical System
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

Design and proposed Power Distribution to YDH facilities.

Power is stepped down from 115kV to 13.8kV and from 13.8kV to 4.16kV, 480V
DESCRIPTION

and 400V by installing appropriate Power and Pad Mounted Transformers, refers
to Key Single Line Diagram EL-A10006.

HV Switchgear & HV Controlgear shall be used to supply power to shipper pump


motors, booster pump motors, fire pumps motors, power transformers & loop feed
pad mounted transformers.

LV MCC, Switchracks and local panels for power supply to auxiliary pump motors,
10-02399-
JO/EWO

10-02399-
10-02399-

MOVs, auxiliary power and lighting power requirements, etc.


0001

0001
0001

12/28/16

Plant Emergency backup generator c/w emergency distribution panel/MCC shall be


12/14/16

12/18/16
DATE

provided to power the critical loads and all vital service loads and infrastructure in
order to enable safe shutdown of the facility in the event of loss of Utility Power.
NO.
REV

G
E

DISCIPLINE
Generator shall be provided with an acoustic enclosure suitable for outdoor
ENGINEER
ALL LEADS
environment.
DATE: 12/28/16
PROJECT
ENGINEER
Dry type transformers, sub distribution power panels, lighting control panel, control
A M ALMATROOK wiring, power receptacles, indoor/outdoor lighting, and grounding, for all buildings.
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY
Additionally, existing MV and LV power networks associated with Yanbu area
DATE:
12/28/16 refineries (Yanbu Terminal, SAMREF & YASREF) will be utilized for any new loads
CONSTRUCTION to be added in the respective facilities. Refer to Appendix 2 Interface packages.
AGENCY
SHAHZAD YAZDANI

DATE: 12/28/16 Electrical System Optimization


OPERATIONS
ALI H GHAMDI
CONTRACTOR is full responsible to Optimize the complete electrical system
12/28/16
DATE:
during the Detail Engineering based on latest vendor data, current site conditions,
CONTROL NUMBER
VERIFICATION

good industrial practices, International Codes and Standards, Safety Standards,


EDSD

and SAUDI ARAMCO Standards, to make the electrical system as effective or


functional as possible.
DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

CONTRACTOR shall apply optimization techniques in the following areas, but not
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

limited to:
(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 97


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG  Substation equipment layout arrangement and building dimensions.
SAY
SAY
SAY

 Transformer yard arrangement based on transformer vendor data.


ENGG CERT

ASH
ASH


ASH

Optimize the GIS room layout and dimensions based on latest vendor data.
 Power and distribution transformer sizing, and loading factors.
LEADS

LEADS
LEADS
ALL

ALL
ALL

 Switchgears, switchboards, motor control centers, and power panel boards’


location, number’s and bus ratings.

RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

Power cable sizing.


 Electrical load duties for equipment sizing purpose.
 Major electrical equipment location in plot plan in order to minimize voltage
drop issues, oversized cables, and unnecessary costs.
DESCRIPTION

The current Receiving Substation equipment layout is as indicated in the


Equipment Layout Dwg ELA10001.001-002. LSTK CONTRACTOR shall revise
and submit all affected deliverables based on this equipment layout during detail
design.

This Optimization shall be oriented to determine the most economical expansion


policy remaining the electrical system optimized around the desired criteria (cost,
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

reliability, environmental, safety, etc.).


12/28/16
12/14/16

12/18/16
DATE

CONTRACTOR shall re-check all electrical drawings provided in this Project


Proposal in order to identify the possible Optimization with appropriate solutions as
NO.
REV

well as discuss with SAUDI ARAMCO its implementation.


G
E

DISCIPLINE
ENGINEER
ALL LEADS Electrical Detailed Description
DATE: 12/28/16
PROJECT
ENGINEER CONTRACTOR scope shall include but not be limited to Detail Design,
A M ALMATROOK
procurement, supply, deliver / store, install, test, pre-commission, commissioning
DATE: 12/28/16
CERTIFIED assistance and Final Integrated Testing, for the following items but is not limited to:
AMR EL SHARKAWY

12/28/16
DATE: One (1) Lot 115kV, 1250A, 3Ph, 3W, 60Hz, Gas Insulated Switchgear in receiving
CONSTRUCTION
AGENCY substation as well as the Gas Insulated Bus (GIB) in GIS Room (Refer to drawing #
SHAHZAD YAZDANI
EL-A10007 & EL-A10005).
DATE: 12/28/16
OPERATIONS
ALI H GHAMDI One (1) 13.8kV, 3000A, 3Ph, 3W, 60Hz, metal clad switchgear in receiving
DATE:
12/28/16 substation (Refer to drawing # EL-A10008).
CONTROL NUMBER
VERIFICATION

Two (2), 4.2MVar, 13.8kV, 3Ph, 60Hz, Outdoor type, detuned switched capacitor
EDSD

bank, at receiving substation transformer yard. (Refer to drawing # EL-A10008 &


DATE:

EL-A10001.002).
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

One (1) 4.16kV, 1200A, 3Ph, 3W, 60Hz, metal clad switchgear in utility substation
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(Refer to drawing # EL-A10009).


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 98


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG One (1) 480V, 1600A, 3Ph, 3W, 60Hz, metal clad switchgear in receiving
SAY
SAY
SAY

substation (Refer to drawing # EL-A10012).


ENGG CERT

ASH
ASH
ASH

One (1) 480V, 1600A, 3Ph, 3W, 60Hz, metal clad switchgear in utility substation
LEADS

LEADS
LEADS
ALL

ALL
ALL

(Refer to drawing # EL-A10013).

One (1) 4.16kV, 1200A, 3Ph, 3W, 60Hz, controlgear in utility substation (Refer to
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

drawing # EL-A10010).

One (1) 4.16kV, 1200A, 3Ph, 3W, 60Hz, controlgear in utility substation (Refer to
DESCRIPTION

drawing # EL-A10011).

Two (2) 480V, 800A, 3Ph, 3W, 60Hz, controlgear in receiving substation (Refer to
drawing # EL-A10014 to EL-A10015).

Two (2) 480V, 800A, 3Ph, 3W, 60Hz, controlgear in utility substation (Refer to
drawing # EL-A10016 to EL-A10017).
10-02399-
JO/EWO

10-02399-
10-02399-

One (1) 400V, 1250A, 3Ph, 4W, 60Hz, switchboard in E & M building (Refer to
0001

0001
0001

drawing # EL-A10018).
12/28/16
12/14/16

12/18/16
DATE

One (1) 480V, 600A, 3Ph, 3W, 60Hz, emergency controlgear in Security Support
building (Refer to drawing # EL-A10020).
NO.
REV

G
E

DISCIPLINE
ENGINEER
ALL LEADS
Three (3) 480V, 100A, 3Ph, 3W, 60Hz, switchracks, strategically located inside
DATE: 12/28/16
YDH to feed power to tank farms auxiliary motors, area lighting power panels,
PROJECT
ENGINEER
MOVs power panels, Cathodic Protection power panels and other facilities loads
A M ALMATROOK (Refer to drawing # EL-A10021 to EL-A10023).
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY
Two (2) 50/66.6 MVA OA/FA, 115kV/13.8kV, power transformer located at
DATE:
12/28/16 receiving substation feeding 13.8kV switchgear (Refer to drawing # EL-A10006).
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI Two (2) 3.75/4.68 MVA OA/FA, 13.8kV/4.16kV, power transformer located at utility
DATE: 12/28/16 substation feeding 4.16kV switchgear (Refer to drawing #EL-A10006).
OPERATIONS
ALI H GHAMDI
Two (2) 1.5 MVA, 13.8kV/0.48kV, power transformer located at receiving
12/28/16
DATE:
substation feeding 480V switchgear (Refer to drawing #EL-A10006).
CONTROL NUMBER
VERIFICATION
EDSD

Two (2) 1.5 MVA, 13.8kV/0.48kV, power transformer located at utility substation
feeding 480V switchgear (Refer to drawing #EL-A10006).
DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

One (1) 500KVA, 13.8kV/0.48kV, pad mounted transformer strategically located


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

inside YDH to feed power to emergency controlgear in control room (Refer to


(DCC) NO. _____________________

drawing #EL-A10006)

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 99


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

One (1) 1000 KVA, 13.8kV/0.4kV, pad mounted transformer strategically located
ENGG CERT

ASH
ASH

inside YDH to feed power to switchboard in E & M building (Refer to drawing #EL-
ASH

A10006).
LEADS

LEADS
LEADS
ALL

ALL
ALL

One (1) Skid mounted Diesel Generator Set, self-contained, sound attenuated
container with motorized louvers, complete with lighting, Fire Alarm and grounding
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

for the container. The Emergency Diesel Generator 160kW, 400V, 3Ph, 4W, 60Hz,
200kVA, 0.8 PF, complete with day oil tank, Fuel system, Cooling system, exhaust
system along with Generator controls/protection and generator circuit breaker at
DESCRIPTION

Generator (Refer to drawing# EL-A10019).

One (1) Skid mounted Diesel Generator Set, self-contained, sound attenuated
container with motorized louvers, complete with lighting, Fire Alarm and grounding
for the container. The Emergency Diesel Generator 400kW, 480V, 3Ph, 3W, 60Hz,
500kVA, 0.8 PF, complete with day oil tank, Fuel system, Cooling system, exhaust
system along with Generator controls/protection and generator circuit breaker at
Generator (Refer to drawing# EL-A10020).
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

One (1), 400V, 400A, 3Ph, 4W, 60Hz Automatic Transfer Switch (Refer to
12/28/16

drawing# EL-A10019).
12/14/16

12/18/16
DATE

One (1), 480V, 600A, 3Ph, 3W, 60Hz Automatic Transfer Switch (Refer to
NO.
REV

G
E

DISCIPLINE
drawing# EL-A10020).).
ENGINEER
ALL LEADS

DATE: 12/28/16
CONTRACTOR shall design Local Control Push Button Stations appropriate for
PROJECT
ENGINEER
the areas of installation, Install control cables and conduits between control
A M ALMATROOK stations and the Interposing relay panels or MCC.
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY
Convenience Outlets: 480 VAC welding receptacles shall be installed at locations
DATE:
12/28/16 where mobile welding sets or power water wash equipment use is required. In
CONSTRUCTION addition, 230 VAC convenience outlets shall be placed throughout the plant at all
AGENCY
SHAHZAD YAZDANI location where hand tools would be required for maintenance and inside the
DATE: 12/28/16 buildings.
OPERATIONS
ALI H GHAMDI
UPS & DC System
12/28/16
DATE:
CONTROL NUMBER
VERIFICATION

CONTRACTOR scope shall include but not be limited to Detail Design,


EDSD

procurement, supply, deliver / store, install, test, pre-commission, commissioning


assistance and Final Integrated Testing for UPS & DC system of the entire YDH
DATE:
BY:

facility as described below:


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

UPS power supply system shall be provided for the E & M Building loads,
(DCC) NO. _____________________

Operation building loads, RIO building loads, main Security Support building loads,

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 100


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Tank Farm and other field Instrument Loads. Integrated AC UPS & DC Systems
SAY
SAY
SAY

c/w respective distribution panels to power critical loads such as Control, ESD,
ENGG CERT

ASH
ASH

FGS and telecommunications system. Batteries for 8 hour back up installed in a


ASH

separate room within the E & M Building for Telecommunication Loads. Batteries
LEADS

LEADS
LEADS
ALL

ALL
ALL

for 4 hour back up installed in a separate room within the Security Support Building
for Security Loads.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

UPS system shall be redundant as per Figure-2 of SAES-P-103 for


Telecommunication system. For Instrument System & Security System Loads
“Simplex UPS systems shall be used. The UPS system shall be complete with
DESCRIPTION

charger rectifiers, inverters static switches, batteries, bypass switch, isolation


transformers and distribution panels, mimic panels, and smoke detection in the
UPS cabinet (Refer to drawing #EL-A10024 to EL-A10028). Ratings are as follows:

One (1) 5kVA, Input voltage 400V 3Ph 3W 60Hz, Output voltage 230 1Ph 2W
60Hz (X40- UPS-001).

One (1) 10kVA, Input voltage 400V 3Ph 3W 60Hz, Output voltage 230 1Ph 2W
10-02399-
JO/EWO

10-02399-
10-02399-

60Hz (X40-UPS-010).
0001

0001
0001

12/28/16

One (1) 20kVA, Input voltage 480V 3Ph 3W 60Hz, Output voltage 400V 3Ph 4W
12/14/16

12/18/16
DATE

60Hz (X40-UPS-002).
NO.
REV

G
E

DISCIPLINE
Three (3) 10kVA, Input voltage 480V 3Ph 3W 60Hz, Output voltage 230 1Ph 2W
ENGINEER
ALL LEADS
60Hz (X40-UPS-007, X40-UPS-008 & X40-UPS-009).
DATE: 12/28/16
PROJECT
ENGINEER
One (1) 45kVA, Input voltage 400V 3Ph 3W 60Hz, Output voltage 400V 3Ph 4W
A M ALMATROOK 60Hz (X40-UPS-003).
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY
Two (2) 25kVA, Input voltage 480V 3Ph 3W 60Hz, Output voltage 230 1Ph 2W,
DATE:
12/28/16 60Hz (X40-UPS-004 & X40-UPS-005).
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI CONTRACTOR shall provide complete battery set, battery chargers, DC
DATE: 12/28/16 distribution panels required for 125VDC system as per one line diagram #EL-
OPERATIONS
A10029, EL-A10030 & EL-A10033) for receiving & utility substation. Each DC
ALI H GHAMDI
Power System shall include two (2) rectifier battery chargers and two set of
12/28/16
DATE:
batteries, battery racks and battery monitoring system. Ratings are as follows:
CONTROL NUMBER
VERIFICATION
EDSD

One (1) 125 VDC, 300A Output, 480V, 3Ph, 60 Hz Input (X40-BC-001 & X40-BC-
002).
DATE:
BY:

One (1) 125 VDC, 250A Output, 480V, 3Ph, 60 Hz Input (X40-BC-003 & X40-BC-
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

004).
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

One (1) -48 VDC, 320A Output, 480V, 3Ph, 60 Hz Input (X40-BC-005 & X40-BC-
(DCC) NO. _____________________

006).

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 101


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

Cable, Cablebus & Cable Tray System


ENGG CERT

ASH
ASH
ASH

CONTRACTOR scope shall include but not be limited to Detail Design,


LEADS

LEADS
LEADS
ALL

ALL
ALL

procurement, supply, deliver / store, install and test for Cables (power & control),
Cable bus & Cable Tray but not limited to:
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

About 3.85kM 115kV cabling from MARAFIQ Substation #9I to receiving substation
115kV Gas Insulated Switchgear (GIS) at YDH. Thrust Boring or Horizontal
Direction Drilling (HDD) cables installation method shall be used to cross main
DESCRIPTION

highway as per Royal Commission (RC) & MARAFIQ Guidelines. (Refer sketch
SK-A10010.001)

13.8kV cabling from new 13.8kV Switchgear located inside the Receiving
Substation to Utility Substation power transforms, Pad Mounted Looped
Transformers & Shipper Pumps. (Refer drawing # EL-A10103 sheet 001 to 004)

4.16kV cabling from new 4.16kV Switchgear located inside the Utility Substation to
10-02399-
JO/EWO

10-02399-
10-02399-

Controlgear & Booster Pumps. (Refer drawing # EL-A10103 sheet 001 to 004.
0001

0001
0001

12/28/16

Buried Power and control cabling to all MV and LV loads. (Refer drawing # EL-
12/14/16

12/18/16
DATE

A10103 sheet 001 to 004.


NO.
REV

G
E

DISCIPLINE
Cable Bus from Power Transformers to respective Switchgears at the receiving &
ENGINEER
ALL LEADS
utility substation. (Refer drawing # EL-A10001 & EL-A10002)
DATE: 12/28/16
PROJECT
ENGINEER
Cable trays shall be provided inside receiving, utility substation and E & M building.
A M ALMATROOK (Refer drawing # EL-A10042, EL-A10043 & EL-A10044)
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY
Lighting System
12/28/16
DATE:
CONSTRUCTION CONTRACTOR scope shall include but not be limited to Detail Design,
AGENCY
SHAHZAD YAZDANI procurement, supply, deliver / store, install & test for lighting system.
DATE: 12/28/16
OPERATIONS
The Lighting designs for this project shall be in accordance with IESNA RP-7
ALI H GHAMDI
(practice for Industrial Lighting) and as supplemented by SAES-P-123. The lighting
12/28/16
DATE:
system shall be designed for energy efficient operation.
CONTROL NUMBER
VERIFICATION
EDSD

CONTRACTOR shall design following types of lighting but not limited to; Buildings
interior & exterior lighting, Area Lighting, Security Fence Lighting, Street Lighting,
DATE:
BY:

Task Lighting, Emergency Lighting, Tank Lighting .


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

CONTRACTOR shall provide interior & exterior lighting for the below listed
(DCC) NO. _____________________

buildings & Shelters. (Refer drawing # EL-A10034, EL-A10035, EL-A10047, EL-

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 102


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG A10050, EL-A10054, EL-A10057, EL-A10060, EL-A10063, EL-A10066, EL-
SAY
SAY
SAY

A10069, EL-A10072, EL-A10075, EL-A10078, EL-A10081, EL-A10084, EL-


ENGG CERT

ASH
ASH

A10086, EL-A10088, EL-A10090 & EL-A10094).


ASH
LEADS

LEADS
LEADS
ALL


ALL
ALL

Receiving Substation
 Utility Substation
 E & M Building
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

 Security Support Buildings


 Operation Building
 Operator Shelter
DESCRIPTION

 Remote I/O Buildings


 FSF Support Building
 Musallah
 Foam Skid Shelter
 Chemical Shelter
 X-Ray Building
 IDAS Shelter
 Guard House
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

 Security Main Gate


 Shipper, Booster and other Pump Shelters
12/28/16
12/14/16

12/18/16
DATE

CONTRACTOR shall provide outdoor plant and fence lighting. (Refer drawing #
NO.
REV

G
E

EL-A10101)
DISCIPLINE
ENGINEER
ALL LEADS
CONTRACTOR shall provide tank lighting including cables, conduits, junction box,
DATE: 12/28/16
PROJECT cable trays etc. CONTRACTOR shall coordinate with Tank Package Contractor for
ENGINEER

A M ALMATROOK
the location of Tank lighting and develop detail design drawings as required.
DATE: 12/28/16
CERTIFIED Grounding & Lightning Protection System
AMR EL SHARKAWY

12/28/16
DATE:
CONSTRUCTION CONTRACTOR scope shall include but not be limited to Detail Design,
AGENCY
SHAHZAD YAZDANI
procurement, supply, deliver / store, install & test for grounding system as required
DATE: 12/28/16
for the new Facilities in accordance with IEEE 142 and shall meet the requirements
OPERATIONS of ANSI/NFPA 70 (NEC) and ANSI C2, as supplemented or amended by SAES-P-
ALI H GHAMDI
111 and SAES-J-902. Intrinsically Safe Systems shall be grounded in accordance
12/28/16
DATE: with certification requirements and SAES-J-903. Calculations of allowable and
CONTROL NUMBER
VERIFICATION

actual step & touch potentials for Substations shall be done in accordance with
EDSD

IEEE 80.
DATE:
BY:

CONTRACTOR shall extend existing Plant Ground grid at YASREF, SAMREF and
REVISIONCERTIFICATION

Yanbu Refineries to bond the new electrical equipment, tanks, fence post,
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

structural steel, etc. Grounding system shall utilize buried copper wire loops and
(DCC) NO. _____________________

grounding rods for perimeter grids around the transformers, substation building and
all other electrical equipment.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 103


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

CONTRACTOR shall provide grounding system for the substations, transformer


ENGG CERT

ASH
ASH

yards, E&M Building, operation room, control building, security support buildings,
ASH

shelters, other supporting buildings and overall plant grounding. (Refer drawing #
LEADS

LEADS
LEADS
ALL

ALL
ALL

EL-A10040, EL-A10041, EL-A10049, EL-A10051, EL-A10055, EL-A10058, EL-


A10061, EL-A10064, EL-A10067, EL-A10070, EL-A10073, EL-A10076, EL-
A10079, EL-A10082, EL-A10085, EL-A10087, EL-A10089, EL-A10093, EL-A10095
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

& EL-A10102 )

CONTRACTOR shall provide and install additional ground rods and ground grid as
DESCRIPTION

required to ensure that the ground resistance does not exceed safe values as
defined in IEEE 80 to comply with SAES-P-111.

CONTRACTOR scope shall include but not be limited to Detail Design,


procurement, supply, deliver / store, install & test for Lightning protection system of
the buildings at YDH. The design and installation shall be based on: NFPA 780, UL
96A, and IEEE 998 or IEC 62305-1, 2, 3, 4.
10-02399-
JO/EWO

10-02399-
10-02399-

CONTRACTOR shall provide Lightning Protection System for Receiving


0001

0001
0001

Substation, Utility Substation, transformer yards and other buildings. (Refer


12/28/16

drawing # EL-A10045 & EL-A10046)


12/14/16

12/18/16
DATE

Cathodic Protection System:


NO.
REV

G
E

DISCIPLINE
ENGINEER
ALL LEADS
CONTRACTOR shall prepare Cathodic Protection Specialist (CPS)
DATE: 12/28/16
CONTRACTOR scope of work. The CPS CONTRACTOR scope shall include one
PROJECT
ENGINEER
complete package for the entire YDH underground pipeline & tanks Cathodic
A M ALMATROOK Protection. The complete CP system shall be in full compliance of SAES-X-400,
DATE: 12/28/16 SAES-X-500 & SAES-X-600. For scope description refer to document # EL-
CERTIFIED
AMR EL SHARKAWY
E10067007.
12/28/16
DATE:
CONSTRUCTION The CPS CONTRACTOR scope of work shall include but not limited to prepare a
AGENCY
SHAHZAD YAZDANI detailed design package comprising of CP drawings, layouts, installations details,
DATE: 12/28/16 detail material take offs, specifications, testing, pre-commissioning &
OPERATIONS
commissioning procedure, calculations for required voltage, amperage and life
ALI H GHAMDI
expectancy of anode, No of anodes, material type of anodes, weight of anodes,
12/28/16
DATE:
spacing between the anodes, minimum current density and consumption rate of
CONTROL NUMBER
VERIFICATION

anode and required rating & number of rectifiers.


EDSD

Fire Detection & Alarm System


DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

CONTRACTOR scope shall include but not be limited to Detail Design duly
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

endorsed by Certified Fire Protection Engineer, procurement, supply, deliver /


(DCC) NO. _____________________

store, install & test for complete, microprocessor-based addressable fire detection

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 104


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG and alarm system, featuring intelligent spot, linear beam detectors using multi-
SAY
SAY
SAY

sensor technology, Multi spectrum IR Flame detectors, a powerful networking


ENGG CERT

ASH
ASH

capability, with reliable peer-to-peer communication. The Fire Alarm System for
ASH

this project comprises of plant system and the buildings systems.


LEADS

LEADS
LEADS
ALL

ALL
ALL

The Fire Alarm system shall include but not limited to the following: Fire Alarm
control panel, multi spectrum flame detectors, beam detectors, automatic and
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

manually activated alarm initiating device, indicating devices, isolating devices,


power supply modules, Battery Modules, Control Modules, Electro-Magnetic door
holders, fire and smoke dampers and their controls, remote indicators,
DESCRIPTION

annunciators, network cards, along with RGS conduits, wires and accessories
required to furnish a complete operational system. All fire alarm system devices
and components shall be from one Manufacturer to avoid last minute compatibility
issues. All components employed in the Fire Alarm system and the Fire Protection
System shall be UL listed.

CONTRACTOR shall provide Fire Detection & Alarm System for Receiving
Substation, Utility Substation, all other buildings and shelters (Refer drawing # EL-
10-02399-
JO/EWO

10-02399-
10-02399-

A10121, to EL-A10145, EL-A10147 & EL-A10148)


0001

0001
0001

12/28/16

CONTRACTOR shall provide Electronic Fire Detection (EFD) technology for


12/14/16

12/18/16
DATE

Shipper pumps areas. Fire detection shall be cross zoned such that two detector
units must detect fire in order to activate an automatic fire suppression system.
NO.
REV

G
E

DISCIPLINE
ENGINEER
ALL LEADS
CONTRACTOR shall coordinate & finalize interface requirements with Tank
DATE: 12/28/16
Package Contractor for the Linear Heat Detection System for the external floating
PROJECT
ENGINEER
roof tanks. Linear Heat Detection System shall be interface with the nearest Fire
A M ALMATROOK Alarm Control Panel provided by CONTRACTOR (Refer drawing # EL-A10149 &
DATE: 12/28/16 EL-E10068).
CERTIFIED
AMR EL SHARKAWY

DATE:
12/28/16 Power System Automation (PSA)
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI CONTRACTOR scope shall include but not be limited to Detail Design,
DATE: 12/28/16 procurement, supply, deliver / store, install, test, pre-commission, commissioning
OPERATIONS
assistance and Final Integrated Testing for Power System Automation (PSA) at
ALI H GHAMDI
YDH Receiving Substation. Information of Receiving Substation shall be linked to
12/28/16
DATE:
Power System Automation (PSA). (Refer document # EL-A10031 & EL-E10039)
CONTROL NUMBER
VERIFICATION
EDSD

CONTRACTOR scope shall include but not be limited to Detail Design,


procurement, supply, deliver / store, install, test, pre-commission, commissioning
DATE:
BY:

assistance and Final Integrated Testing for Power System Automation (PSA) at
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

YDH Utility Power Substation. Information of Utility Substation shall be linked to


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Power System Automation (PSA). (Refer document # EL-A10032 & EL-E10039)


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 105


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG CONTRACTOR shall consider electrical interface to YDH control system as per
SAY
SAY
SAY

following:
 Interposing relay cabinet shall be provided in substation to control booster,
ENGG CERT

ASH
ASH
ASH

shipper and other utility pumps. Homerun cables between substation and
LEADS

LEADS
LEADS
ALL

ALL
ALL

respective RIB shall be laid. The pump status and control signals shall be
integrated to the remote I/O’s provided in the RIBs.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

 PSA Server shall be interfaced to DCS via OPC or other open industry
standard protocol.
DESCRIPTION

CONTRACTOR shall consider electrical interface to MARAFIQ control system as


per following:
 Two (2) new Fiber optic patch panel (wall mounted) at MARAFIQ (SS-9I)
shall be interfaced to existing OSAS via existing RTU to provide the 115kV
breaker status to existing OSAS.

Interconnections, Motor Controls & Instrument Relay Panels


10-02399-
JO/EWO

10-02399-
10-02399-

CONTRACTOR shall design, supply, install, test, pre-commission and provide


0001

0001
0001

assistance in commissioning and integrated testing to insure fully operational


12/28/16
12/14/16

12/18/16

systems. All Electrical Control Panels and Stop-Start Stations shall have Push-to-
DATE

Test Multi-Cluster LED’s for indication.


NO.
REV

G
E

DISCIPLINE
CONTRACTOR shall design, supply and install and test Local Control Push Button
ENGINEER
ALL LEADS
Stations appropriate for the areas of installation, Install control cables and conduits
DATE: 12/28/16
between control stations and the Interposing relay panels or Controlgear.
PROJECT
ENGINEER

A M ALMATROOK CONTRACTOR shall design, supply and install and test Interposing Relay Panels
DATE: 12/28/16 within the NEW Substations. The Interposing Relay Panels shall have separate
CERTIFIED
AMR EL SHARKAWY relays for start and stop commands and other signals as per instrument ILD’s.
DATE:
12/28/16 Refer to Instrumentation Section for interface details. If additional relay panels are
CONSTRUCTION required, CONTRACTOR shall design provide and install and place into service.
AGENCY
SHAHZAD YAZDANI

DATE: 12/28/16 CONTRACTOR shall design, provide, install, and test control/signal cables
OPERATIONS
between Interposing relay panels and Controlgear and Instrument marshaling
ALI H GHAMDI
cabinets.
12/28/16
DATE:
CONTROL NUMBER
VERIFICATION

Control Panels & Power Associated with Skids and Vendor Packages
EDSD

CONTRACTOR shall design, supply, install, test, pre-commission and provide


DATE:
BY:

assistance in commissioning the control panels associated with vendor supplied


REVISIONCERTIFICATION

skids such as Dye Injection skids, DPK Filtration skids, Conductivity Enhancer
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Injection skids, Custody Metering skids, Static, Dissipative Agent Injection skids,
C

(DCC) NO. _____________________

Oily Water Treatment Package, Foam Skids, pump controllers, power


supplies/controls, etc. which shall be further defined by CONTRACTOR during
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 106


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Detail Design development.
SAY
SAY
SAY
ENGG CERT

ASH
ASH

CONTRACTOR shall supply any and all cabling required for Equipment, Skids and
ASH

Vendor Package integration and install and test and pre-commission and support
LEADS

LEADS
LEADS
ALL

ALL
ALL

commissioning as required to insure fully functional integrated systems for YDH


Project.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

CONTRACTOR shall be responsible for the supply, installation, and testing, pre-
commission and provide commissioning assistance for any other control panels
and systems not mentioned herein and are part of the mechanical, instrument or
DESCRIPTION

piping equipment, but not limited too.

CONTRACTOR shall be responsible for the interconnection between the skids and
the parent equipment, and field instruments, Substations and Control Rooms and
shall develop interconnection wiring and piping drawings to SAUDI ARAMCO
SACS standards for input in to IPlant. The drawings shall be submitted to SAUDI
ARAMCO for acceptance.
10-02399-
JO/EWO

10-02399-

Oily Water Lift Station Control Panels


10-02399-
0001

0001
0001

CONTRACTOR shall design, supply, install, test, pre-commission and provide


12/28/16
12/14/16

12/18/16
DATE

assistance in commissioning the Oily Water Lift station control panels for Normal
Flow and Maximum Flow. The Oily Water Lift Station Control panel shall have two
NO.
REV

G
E

independent power supply sources with auto transfer facility built into the local
DISCIPLINE
ENGINEER control panel, to provide a continuous source of power to the lift station. The
ALL LEADS
Control Panel shall be in full compliance with SAES-S-020.
DATE: 12/28/16
PROJECT
ENGINEER

A M ALMATROOK
The enclosures shall be of dead front construction and shall have two doors and
DATE: 12/28/16
two compartments that are separated by a barrier. One compartment shall house
CERTIFIED the motor starter package and the other shall house the controls for liquid level and
AMR EL SHARKAWY

12/28/16
alarms. The doors shall overlap to prevent them from being opened with the pump
motor disconnect devices in the “ON” position. The starters shall be complete with
DATE:
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
Start / Stop Push Buttons, Start / Stop Indications, local remote control and
DATE: 12/28/16
indications; HOA switches etc. The starters shall be provided with dry run
OPERATIONS protection relay to prevent the motors from dry run.
ALI H GHAMDI

12/28/16
DATE: CONTRACTOR shall be responsible for the design, supply, installation, and test,
CONTROL NUMBER

pre-commission and provide assistance in commissioning of any other control


VERIFICATION

panels and systems not mentioned herein and are part of the mechanical,
EDSD

instrument or piping equipment.


DATE:
BY:
REVISIONCERTIFICATION

Electrical and electronic equipment and associated wiring in Oily Water Lift Station
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

systems shall be suitable for the electrical area classification in accordance with
C

(DCC) NO. _____________________

SAES-B-068, SAES-P-100 and NFPA 70 (NEC) and the Detail Design developed
Electrical Area Classification Drawings.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 107


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

Sanitary Lift Station Control Panel


ENGG CERT

ASH
ASH
ASH

CONTRACTOR shall design, supply, install, test, pre-commission and provide


LEADS

LEADS
LEADS

assistance in commissioning the sanitary lift station control panels. The Sanitary
ALL

ALL
ALL

Lift Station Control Panel shall have two independent power supply sources with
auto transfer facility built into the panel, to provide a continuous source of power to
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

the lift station. The Control Panel shall be in full compliance with SAES-S-010.

The enclosure shall be of dead front construction and shall have two doors and two
DESCRIPTION

compartments that are separated by a barrier. One compartment shall house the
motor starter package and the other shall house the controls for liquid level and
alarms. The doors shall overlap to prevent them from being opened with the pump
motor disconnect devices in the “ON” position. The starters shall be complete with
Start / Stop Push Buttons, Start / Stop Indications, local remote control &
indications; HOA switches etc. The starters shall be provided with dry run
protection relay to prevent the motors from dry run.
10-02399-

Electrical and electronic equipment and associated wiring in Oily Water Lift Station
JO/EWO

10-02399-
10-02399-
0001

0001
0001

systems shall be suitable for the electrical area classification in accordance with
SAES-B-068, SAES-P-100 and NFPA 70 (NEC) and the Detail Design developed
12/28/16
12/14/16

12/18/16
DATE

Electrical Area Classification Drawings.


NO.
REV

G
E

Motor Space Heater Control Panel


DISCIPLINE
ENGINEER
ALL LEADS
Within Switchgear and Controlgear switching assemblies and Starter Control
DATE: 12/28/16
PROJECT
panels for all motors 75 kW (100 HP) and larger, and all other motors where the
ENGINEER
engineering documents indicate motor space heaters are installed, a contact shall
A M ALMATROOK

DATE: 12/28/16
be wired to a terminal block in the low voltage compartment of the Switchgear
CERTIFIED Feeder or Controlgear bucket, as applicable, for connection to a 24VAC control
AMR EL SHARKAWY
circuit (panel shall be designed and provided by THE CONTRACTOR) of a
12/28/16
DATE:
remotely mounted motor space heater contactor. Contact shall be closed when the
CONSTRUCTION
AGENCY main motor circuit contactor is de-energized. This is in accordance with SAES-P-
SHAHZAD YAZDANI
116 and shall be provided, installed, tested, pre commissioned, and with
DATE: 12/28/16
OPERATIONS commissioning assistance, by THE CONTRACTOR.
ALI H GHAMDI

DATE:
12/28/16 Interconnection Wiring
CONTROL NUMBER
VERIFICATION

CONTRACTOR shall be responsible for design, supply, installation and testing of


EDSD

the interconnection wiring between Vendor supplied Electrical Equipment and


DATE:

Skids and the parent equipment, field instruments, etc. and CONTRACTOR shall
BY:

develop Wiring Interconnection Drawings, based on Actual Vendor Certified NMR


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

602 Drawings and NMR 603 Manuals, to SAUDI ARAMCO standards and submit
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

to SAUDI ARAMCO for acceptance prior to termination of cabling.


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 108


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Electrical Area Classification
SAY
SAY
SAY
ENGG CERT

ASH
ASH

CONTRACTOR shall develop Area Classification drawings at the beginning of


ASH

detailed design phase and obtain SAUDI ARAMCO Approval. Equipment installed
LEADS

LEADS
LEADS
ALL

ALL
ALL

in Bulk Plant area will be rated according to area classification layout drawings
(Refer to drawing #EL-A10003). Attached drawings shall be used only as guide
actual drawings shall be developed by THE CONTRACTOR.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL


DESCRIPTION

General Building Notes

CONTRACTOR shall design all the Electrical rooms, battery rooms, UPS rooms,
based on the actual Vendor information as per the SAUDI ARAMCO Direct Charge
NMR as available from SAPMT; under no circumstances the sizes shall fall short of
required spaces and clearances, to avoid future delays and expensive rework due
to SAUDI ARAMCO inspection group objections.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

Buildings where Battery rooms are provided shall comply with all requirements of
12/28/16

SAES-P-103, Battery rooms shall be provided with an eye wash facility with
12/14/16

12/18/16
DATE

potable water connection & drain, and the drain shall be through acid neutralization
pit. The ventilation system shall be 100% redundant. Only direct driven exhaust
NO.
REV

G
E

DISCIPLINE
fans shall be used. An interlock with the ventilation system shall be provided to
ENGINEER
ALL LEADS
stop the high-rate battery charging if the exhaust fan stops.
DATE: 12/28/16
PROJECT
ENGINEER
CONTRACTOR scope shall include but not be limited to Detail Design,
A M ALMATROOK procurement, supply, deliver / store, install & test for Fire Stops wherever
DATE: 12/28/16 cable/conduit/cable trays pass through fire rated walls, Floor or Ceiling. The Fire
CERTIFIED
AMR EL SHARKAWY
Stops shall be in compliance with UL and SAES-U-101.
12/28/16
DATE:
CONSTRUCTION CONTRACTOR scope shall include but not be limited to Detail Design,
AGENCY
SHAHZAD YAZDANI procurement, supply, deliver / store, install & test for lighting fixtures, receptacles,
DATE: 12/28/16 lighting panels, power panels, lighting circuits, power circuits and grounding for the
OPERATIONS
following buildings but not limited to:
ALI H GHAMDI

12/28/16
DATE:
Receiving Substation, Utility Power Substation, Engineering & Maintenance (E &
CONTROL NUMBER
VERIFICATION

M) Building, Operation Building, Operation Shelter, Chemical Shelter, Pump


EDSD

Shelters, Musalla, Security Gate House, Security Support Building, Security Guard
Houses, RIO Building, IDAS Shelter, X-Ray Building, FSF Building & Foam Skid
DATE:
BY:

Building.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

CONTRACTOR shall design, supply, install test, pre-commission and provide


(DCC) NO. _____________________

commissioning assistance for ALL Buildings under this scope of work to include but

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 109


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG not be limited to following electrical equipment:
SAY
SAY
SAY
ENGG CERT

Power Panels
ASH
ASH
ASH

Power Circuits
LEADS

Lighting Panels
LEADS
LEADS
ALL

ALL
ALL

Lighting Circuits
Fire Alarm Detection
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

Disconnect Switches
Sockets / Receptacles
Dry Type Transformers
Control Panels
DESCRIPTION

Grounding

All in accordance with the detailed design Lighting Layouts, Power Layouts, Panel
Schedules, Fire Alarm Layouts and Grounding Layouts. Refer to project proposal
drawings as per DCL # GEN-D0001 for Lighting, Power, Grounding, Fire Alarm
Layouts, Panel schedules and Electrical One Line Diagrams of respective
buildings.

Electrical Major Deliverables


10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

Reference Documents attached to this PPN include but are NOT limited to the
12/28/16
12/14/16

12/18/16
DATE

following and shall be further developed by CONTRACTOR during the Detail


Design:
NO.
REV

G
E

DISCIPLINE
ENGINEER
Electrical One Line Diagrams
ALL LEADS Protection & Metering Diagrams
DATE: 12/28/16 Electrical Area Classification
PROJECT
ENGINEER
Substation Equipment Layouts
A M ALMATROOK Lighting Layouts
DATE: 12/28/16 Power Layouts
CERTIFIED Grounding Layouts
AMR EL SHARKAWY
Lightning Protection Layouts
12/28/16
DATE: Fire Detection & Alarm Layouts
CONSTRUCTION
AGENCY Fire Detection & Alarm Riser Diagrams
SHAHZAD YAZDANI Substation Automation Block Diagram
DATE: 12/28/16 Input / Output List for PSA & SCADA
OPERATIONS Panelboard Schedules
ALI H GHAMDI Cable Routing Layouts
DATE:
12/28/16 Cable Tray Layouts
Equipment Data Sheets
CONTROL NUMBER
VERIFICATION

Cable & Conduit Schedule


EDSD

Typical Installation Details


DATE:
BY:

CONTRACTOR shall as a minimum develop the following Detail Design


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

Deliverables for utilization during procurement, construction and commissioning:


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

 Electrical Area Classification

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 110


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG  General Electrical Notes and Symbols
SAY
SAY
SAY

 Power & Grounding Layouts


ENGG CERT

ASH
ASH


ASH

Lightning Protection Layouts


 Installation Details – Duct Bank, Cable Trench, Cable Bldg Entrance, Power,
LEADS

LEADS
LEADS
ALL

ALL
ALL

Lighting, Grounding
 Cable Routing Layouts

RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

Panelboard Schedules
 Major Equipment Specifications with Purchase Requisitions Development
 Buildings, Area, Access Road, Tanks Lighting Layouts
 Fire Alarm Detection Layouts, Riser Diagrams, Cause & Effect Logic
DESCRIPTION

 Substation Automation Input / Output List for PSA & SCADA


 Substations Equipment Layout
 Substation Equipment Section & Details
 Electrical Load List – including Process, Mechanical (HVAC, Rotating,
Vessels), Telecommunications, Security, Automation, Instrumentation Loads
 One Line Diagrams – Key and Protection & Metering
 Schematic & Interconnection drawings

10-02399-
JO/EWO

Cable & Conduit Schedule


10-02399-
10-02399-
0001

0001
0001

 Equipment Datasheets
 Material Take-Off
12/28/16
12/14/16

12/18/16
DATE

 ETAP Studies including Load Flow, Short Circuit, Relay Coordination, Arc
Flash
NO.
REV

G
E

DISCIPLINE
 ETAP GPR & Ground Grid Calculations
ENGINEER
ALL LEADS
 Switching Transient Analysis, Transient Recovery Voltage (TRV) evaluation
DATE: 12/28/16 and Insulation Coordination studies
PROJECT
ENGINEER  Lightning Protection Studies
A M ALMATROOK  Calculations including Lighting LUX, Cable sizing, Transformer sizing, Battery
DATE: 12/28/16 Charger sizing, UPS sizing, Switchgear, Controlgear and Generator Sizing
CERTIFIED
AMR EL SHARKAWY  Smart Plant Electrical Outputs
DATE:
12/28/16
 3D Model.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI Detailed Design drawings shall include all necessary plans, elevations, arrangements,
DATE: 12/28/16
sections, profiles, views and details of all facilities.
OPERATIONS
ALI H GHAMDI

12/28/16 CONTRACTOR develops the Detail Design Deliverables as necessary to insure a


DATE:
fully functional operational facility.
CONTROL NUMBER
VERIFICATION
EDSD

CONTRACTOR shall incorporate ALL Vendor NMR’s into the IFC package as vendor
DATE:

data becomes available and shall insure drawings utilized for construction have NMR
BY:

602 and NMR 603 data incorporated within, prior to site construction execution. Note
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

that this is critical path prior to pouring Concrete for Substation Floors, Precast Walls,
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Transformer and Generator, Motor, Skids, Pole Foundations, etc.


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 111


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Electrical Scope at Physical Interface Points with Pipelines & Refineries
SAY
SAY
SAY
ENGG CERT

ASH
ASH
ASH

Yanbu to Jiddah Pipeline:


LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall provide, install, test and terminate a 480V power cable to the
Scraper Launcher Area Power Panelboard. The Panelboard will be provided and
installed within the Scraper Launcher Area by BI-10-02155. (Refer drawing # EL-A10014
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

sht. 001)

Electrical interfaces include power connection of 480V used to power the pipeline scraper
DESCRIPTION

launcher facilities loads inside YDH perimeter fence. One (1) 480V, 150A, 3Ph, 3W, 60Hz
Outdoor Power Panel shall be provided by BI 10-02155 (Yanbu - North Jiddah Products
Pipelines).

CONTRACTOR shall develop all required detailed design drawings as necessary to


construct the electrical power requirements for all the projects NEW and Existing
Electrical Equipment, in order to purchase the material and install, test and commission
all equipment requiring electrical power and electrical equipment interfaces, for YDH.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

YASREF Refinery Connection:


12/28/16
12/14/16

12/18/16
DATE

There is no physical interface within the facility; will be utilize the pipeline provided by BI-
00043. Therefore no electrical load has been anticipated.
NO.
REV

G
E

DISCIPLINE
ENGINEER
ALL LEADS SAMREF Refinery Connection:
DATE: 12/28/16
PROJECT
ENGINEER Electrical Scope in SAMREF, Refer to GEN-E0103.
A M ALMATROOK

DATE: 12/28/16
Yanbu Refinery Connection:
CERTIFIED
AMR EL SHARKAWY

DATE:
12/28/16 Yanbu Refinery shall supply all electrical power and connections required MOVs and
CONSTRUCTION
AGENCY
other miscellaneous loads. Total electrical loads anticipated are about 10kVA.
SHAHZAD YAZDANI

DATE: 12/28/16 CONTRACTOR scope shall include but not be limited to Detail Design, procurement,
OPERATIONS
supply, deliver / store, install & test for Four (4 nos.) 480V, 100A, 3Ph, 3W, 60Hz Outdoor
ALI H GHAMDI

12/28/16
Power Panel (NEMA 4X) with all cables, conduits, supports structures and other required
DATE:
accessories to feed power to MOVs and other miscellaneous loads (refer to drawing #
CONTROL NUMBER
VERIFICATION

EL-A10111).
EDSD

CONTRACTOR shall utilize existing space in V21-MC71A, V21-MC81A & V21-MC91A


DATE:
BY:

and supply; install Four (4nos.) 100AF new circuit breakers to feed new MOV power
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

panels, including feeder cables, conduits and other required accessories. (Refer Drawing
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

no# VA-240892.001, VA-240893.002, VA-240894.002)


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 112


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG CONTRACTOR shall provide Grounding to new equipment from existing YANBU
SAY
SAY
SAY

REFINERY Grounding network.


ENGG CERT

ASH
ASH
ASH

CONTRACTOR shall provide task lighting for new equipment from existing lighting
LEADS

LEADS
LEADS
ALL

ALL
ALL

Panels

Electrical Scope at MARAFIQ Substation # 9I Interface


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

CONTRACTOR shall coordinate with SAUDI ARAMCO and MARAFIQ for the portion of
works under MARAFIQ scope and insure correct interface of all discipline’s i.e. Civil,
DESCRIPTION

Electrical, Protection, Communication, etc.


CONTRACTOR shall furnish electrical detailed drawings, documents and any calculation
requested by MARAFIQ / Yanbu Royal Commission (YRC) to fulfill the connection
agreement requirements.

CONTRACTOR shall utilize existing spare breaker EA06 & EB04 of GIS to feed power to
YDH. (Refer sketch # SK-A10011, SK-A10013 & SK-A10014)
10-02399-
JO/EWO

10-02399-
10-02399-

CONTRACTOR shall provide one (1) metering panel to accommodate two (2) revenue
0001

0001
0001

meters & two check meters for YDH feeders-1 & 2. (Refer sketch # SK-A10013 & SK-
12/28/16
12/14/16

12/18/16

A10014). The supplied meters shall be smart type meters and shall comply the MARAFIQ
DATE

standard. Refer Doc-ELE10069-002 for Technical specification and details for these
meters.
NO.
REV

G
E

DISCIPLINE
ENGINEER
ALL LEADS
CONTRACTOR shall provide Four (4) protection relay panel to accommodate line
DATE: 12/28/16
differential relays & directional relays for YDH feeders-1 & 2. (Refer sketch # SK-A10013
PROJECT
ENGINEER
& SK-A10014)
A M ALMATROOK

DATE: 12/28/16 CONTRACTOR shall provide one (1) 125VDC Power Panel to supply power to new relay
CERTIFIED
AMR EL SHARKAWY panels. (Refer sketch # SK-A10012)
12/28/16
DATE:
CONSTRUCTION CONTRACTOR shall provide two (2) fiber optic patch panel to be install in Substation 9I.
AGENCY
SHAHZAD YAZDANI (Refer sketch # SK-A10014)
DATE: 12/28/16
OPERATIONS CONTRACTOR shall design, supply, install, test and assist with commissioning of two
ALI H GHAMDI
run, 3x1/C- 630 mm2, 115kV cables of 3.85km in length, from MARAFIQ Substation #9I to
12/28/16
DATE: YDH. (Refer sketch # SK-A10010 & SK-A10015)
CONTROL NUMBER
VERIFICATION
EDSD

CONTRACTOR shall design, supply, install, test and assist with commissioning of two (2)
run 12C Single Mode Fiber Optic Cables run along with each power feeder cable from
DATE:
BY:

MARAFIQ Substation #9I to YDH. (Refer sketch # SK-A10010 & SK-A10015)


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

CONTRACTOR shall provide termination kits, including connectors, at the MARAFIQ end
(DCC) NO. _____________________

and at the SAUDI ARAMCO 115kV GIS end. CONTRACTOR shall coordinate with

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 113


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG MARAFIQ and SAUDI ARAMCO for termination at the MARAFIQ end.
SAY
SAY
SAY
ENGG CERT

ASH
ASH

CONTRACTOR shall confirm MARAFIQ protection and metering requirements and reflect
ASH

accordingly within the Detail Design Drawings. Development of protection, control, fire
LEADS

LEADS
LEADS
ALL

ALL
ALL

alarm, communication, etc., interface drawings shall be CONTRACTOR responsibility


including purchase, installation, termination and testing of the required cabling.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

CONTRACTOR shall assist MARAFIQ as required with Manpower, and test equipment,
as necessary to complete MARAFIQ 115kV and SAUDI ARAMCO 115kV Interface
Testing including Protection, Metering, Controls, etc. including wiring interface drawing
DESCRIPTION

development. Test Results shall be signed by all relevant parties including POD, PID,
MARAFIQ, etc. and be included within the Project Test Results binders maintained and
developed by CONTRACTOR as per SAEP-122.

CONTRACTOR to consider Integration Philosophy between the MARAFIQ 115KV


Substation # 9I and the New SAUDI ARAMCO 115kV Receiving Substation. Interface
philosophy will be finalized as per Connection Agreement between MARAFIQ & SAUDI
ARAMCO. Initial communication has been established to finalize the scope segregation
10-02399-
JO/EWO

10-02399-
10-02399-

between SAUDI ARAMCO & MARAFIQ. Proposed interface requirements are as


0001

0001
0001

followed:
12/28/16
12/14/16

12/18/16
DATE

 MARAFIQ confirmed to reserve the existing Two (2) spare GIS Bays: =EB04
and =EA06 for SAUDI ARAMCO YDH project.
NO.
REV

G
E

DISCIPLINE
ENGINEER
ALL LEADS  MARAFIQ confirmed these 2 Spare GIS are already pre-wired to the local
DATE: 12/28/16 control panel =EB04+S and =EA06+S.
PROJECT
ENGINEER

A M ALMATROOK  A new metering panel is required, same model and configuration than existing
DATE: 12/28/16 metering panels. This new metering panel shall be the combine metering
CERTIFIED
AMR EL SHARKAWY panels for 2 feeders of YDH. Each YDH feeders shall have a separate
DATE:
12/28/16 revenue meters and will be accommodated in this panel. Reserved available
CONSTRUCTION
AGENCY
floor space for this panel. New Panel to be tagged as: =E+MP05 115KV
SHAHZAD YAZDANI Service Cable/Revenue Metering panel.
DATE: 12/28/16
OPERATIONS
ALI H GHAMDI
 Protection Scope- Primary Protection: Two (2) new Relay Panels are required
12/28/16 based on ABB relays. Reserved available floor spaces for these two panels.
DATE:
New panels to be tagged as: =EB04+R1 and =EA06+R1 115kV Service Line
CONTROL NUMBER
VERIFICATION

Aramco- YDH/ Primary Protection.


EDSD

 Protection Scope- Back Up Protection: Two (2) new relay Panels are required
DATE:
BY:

based on Siemens relays. Available floor spaces for these 2 panels. New
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

Panels to be tagged as: =EB04+R2 and =EA06+R2 115KV Service Line


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Aramco- YDH/ Back Up protection Panel.


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 114


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG  MARAFIQ confirmed that existing Relay Panels =E+BB1 and =E+BB4 for Bus
SAY
SAY
SAY

Bar/BF Protection of GIS Bay EA06 & EA04 are already pre-wired.
ENGG CERT

ASH
ASH
ASH

 DC System scope: Existing 125V DC Distribution Panel has not enough spare
LEADS

LEADS
LEADS
ALL

ALL
ALL

breakers for new DC scope. MARAFIQ requested to provide new DC panel


same manufacturer than existing panels “Riyadh Factory For Panelboard”
Available floor space for this new DC panel. New Panel to be tagged as: 125V
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

DCDB 125V Main DCDB No. 3.

 AC System scope: Existing 220V AC Distribution Panel has required spare


DESCRIPTION

breakers for new AC scope. CONTRACTOR to utilize existing spare breakers


from 220V AC Distribution Panel No. 1, 2 & 3. Note: There is No 480V AC
panel available in MARAFIQ Substation.

 Power Cable Routing in Basement: CONTRACTOR to develop detailed cable


routing drawings following existing cable routing at MARAFIQ Substation
basement as much as possible:
10-02399-
JO/EWO

10-02399-
10-02399-


0001

Cable trays have to be heavy duty 600mmx150mm for cable transition to


0001
0001

the wall.
12/28/16
12/14/16

12/18/16

 Cable trays support shall be unistrut type.


DATE

 Cable structural support shall be Unistrut type similar design that existing
ones.
NO.
REV

G
E

DISCIPLINE
ENGINEER
ALL LEADS  General requirements:
DATE: 12/28/16 o Contractor shall incorporate all the MARAFIQ comments during detail
PROJECT
ENGINEER engineering. Refer Appendix-12 for MARAFIQ comments.
A M ALMATROOK o Contractor/SAPMT shall include MARAFIQ in the Engineering Review
DATE: 12/28/16
CERTIFIED
Cycle during detail engineering.
AMR EL SHARKAWY o Contractor shall procure all equipment related to MARAFIQ Scope as per
12/28/16
DATE: Royal Commissioning Standards.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI 4.16 Communication
DATE: 12/28/16
OPERATIONS
ALI H GHAMDI A. DATA NETWORK
12/28/16
DATE:
CONTROL NUMBER
VERIFICATION

Scope of Work
EDSD

The Yanbu Distribution Hub Data Network System will comprise of


DATE:
BY:

several physically separated LANs that includes the Enterprise LAN for
REVISIONCERTIFICATION

corporate systems including OSPAS, Security CCTV LAN and Process


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

LAN to mainly secure and independently transport, control and manage


(DCC) NO. _____________________

their respective traffic. CCTV design shall be in full compliance with

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 115


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG SAES-T-555.
SAY
SAY
SAY

The Security LAN may utilize the Enterprise LAN to transport the traffic
ENGG CERT

ASH
ASH
ASH

provided with adequate level of logical separation.


LEADS

LEADS
LEADS
ALL

ALL
ALL

The Yanbu Distribution Hub Enterprise LAN shall manage and control
all business related types of traffic that shall traverse through its own
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

physically dedicated network which can be Internet, E-mail, VoIP


telephony, and any other data services. It may also carry traffic of
Security CCTV that shall be assigned with a dedicated virtual LAN.
DESCRIPTION

The Yanbu Distribution Hub Enterprise LAN shall consist of a PE Router


in Maintenance & Engineering Building, which shall connect to the
existing Juniper MX-960 in the Admin Building 1401 at Yanbu Refinery
and Communication Building 2 at Yanbu NGL.

Access switches shall be located in Operation Building, Maintenance &


Engineering Building, Utility Power Substation Building, Receiving
Substation Building, Operator Shelter, Security Support Building (Main
10-02399-

Gate & Tank Farm) and will be uplinked to the Distribution switch using
JO/EWO

10-02399-
10-02399-
0001

0001
0001

inter-building Outside Plant Fiber Optic cable.


12/28/16
12/14/16

12/18/16
DATE

CONTRACTOR shall install, test and commission the full functionality of


switch with required Power over Ethernet (PoE) ports. The access
NO.
REV

switches with Redundant Power Supply shall be used for IP telephones


G
E

DISCIPLINE
ENGINEER
and Wireless Access points within the Yanbu Distribution Hub.
ALL LEADS

DATE: 12/28/16 The Wireless LAN System under this project will be provided at
PROJECT
ENGINEER Operation Building, Maintenance & Engineering Building, Operator
A M ALMATROOK Shelter and Security Support Building (Main Gate & Tank Farm) to
DATE: 12/28/16 support mobile computing in the Yanbu Distribution Hub facilities.
CERTIFIED
AMR EL SHARKAWY

12/28/16 CONTRACTOR shall provide and install the following wireless LAN
DATE:
CONSTRUCTION subsystems:
AGENCY


SHAHZAD YAZDANI
Wireless access points
DATE: 12/28/16
OPERATIONS
 Mounting kits for access points
ALI H GHAMDI

DATE:
12/28/16  Patch cords
CONTROL NUMBER
VERIFICATION
EDSD

CONTRACTOR shall provide and install the wireless LAN and ensure
the appropriate placement of wireless access points to provide excellent
DATE:
BY:

radio coverage and mobility to all wireless IP devices.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

WLAN access point outlets shall not be installed more than 3.75 meters
C

above finished floor level.


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 116


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG The access point shall be connected to the PoE+ port of Access switch
SAY
SAY
SAY

using UTP CAT-6 cable and shall be powered through its power-over-
ENGG CERT

ASH
ASH

Ethernet port.
ASH
LEADS

LEADS

All components and accessories required for the satisfactory operation


LEADS
ALL

ALL
ALL

of the WLAN system shall be supplied and installed by the


CONTRACTOR.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

 CONTRACTOR shall install, test and commission the Data Network


System as per the following drawings:
DESCRIPTION

 Schematic Diagram,
Overall Data System CO-A10033.001
 Overall System Diagram
Data Network System CO-A10036.001
 Schematic Diagram,
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

Overall WLAN System CO-A10039.001


12/28/16
12/14/16

12/18/16
DATE

Maintenance & Engineering Building


NO.
REV

G
E

DISCIPLINE
ENGINEER CONTRACTOR shall procure, install, test and commission the one (1)
ALL LEADS
Distribution switch equipped of 20-Port 1Gigabit Ethernet /2-Port
DATE: 12/28/16
PROJECT 10Gigabit Ethernet L2/L3 line card with SFP pluggable 1000Base-X
ENGINEER

A M ALMATROOK
Mini-GBIC and 10GBE-XFP Transceivers that support single mode fiber
DATE: 12/28/16
over 1310nm wavelength with LC connector. The 1000Base-X Mini-
CERTIFIED GBIC Transceiver supports 9 micron single mode fiber up to a
AMR EL SHARKAWY

12/28/16
maximum distance of 10km.
DATE:
CONSTRUCTION
AGENCY CONTRACTOR shall provide a 4-Port 10-Gigabit Ethernet Enhanced
SHAHZAD YAZDANI
DPC module with 10Gigabit Ethernet XFP transceivers for the utilization
DATE: 12/28/16
OPERATIONS
of the existing Juniper MX-960 PPE Routers. CONTRACTOR shall
ALI H GHAMDI utilize and reserve the slot 4 of the existing Juniper MX-960 on both
DATE:
12/28/16 Communication Building 12 at Yanbu NGL and Admin Building 1401 at
Yanbu Refinery
CONTROL NUMBER
VERIFICATION
EDSD

The CONTRACTOR shall procure, install, test and commission one (1)
Provider Edge (PE) router with redundant power supplies.
DATE:
BY:
REVISIONCERTIFICATION

CONTRACTOR shall procure, install, test and commission the one (1)
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Access Switch and one (1) Modular Access switch equipped with
(DCC) NO. _____________________

redundant SFP pluggable 1000Base-X Mini-GBIC Transceivers that


support single mode fiber over 1310nm wavelength with LC connector.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 117


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG The 1000Base-X Mini-GBIC Transceiver supports 9 micron single mode
SAY
SAY
SAY

fiber up to a maximum distance of 10km.


ENGG CERT

ASH
ASH
ASH

CONTRACTOR shall install Universal 19” Standard Rack to mount the


LEADS

LEADS

switches, Redundant Power Supply, fiber optic/UTP copper patch panel


LEADS
ALL

ALL
ALL

and ancillaries on each floor.


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

The PE Router and Access switch and Modular Access switch installed
in Maintenance & Engineering Building shall be powered from utility
power source and Telecoms-dedicated Uninterruptible Power Supply
(UPS) system
DESCRIPTION

CONTRACTOR shall be responsible for the logical set-up of the


required VLAN/IP addressing and shall be followed based on the
provided Data Configuration Sheet of Data Network and Engineering

Operation Building

CONTRACTOR shall procure, install, test and commission the


redundant power supply, one (1) Modular Access switch equipped with
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

interface modules and SFP pluggable 1000Base-X Mini-GBIC


Transceivers that support single mode fiber over 1310nm wavelength
12/28/16
12/14/16

12/18/16
DATE

with LC connector. The 1000Base-X Mini-GBIC Transceiver supports 9


micron single mode fiber up to a maximum distance of 10km.
NO.
REV

G
E

DISCIPLINE CONTRACTOR shall install Universal 19” Standard Rack to mount the
ENGINEER
ALL LEADS Modular Access switch, Redundant Power Supply, fiber optic/UTP
DATE: 12/28/16 copper patch panel and ancillaries.
PROJECT
ENGINEER

A M ALMATROOK
The Modular Access switch shall be powered from utility power source
DATE: 12/28/16 and dedicated Rack Mounted UPS systems installed in
CERTIFIED
AMR EL SHARKAWY
Telecommunication Room.
12/28/16
DATE: Receiving Substation Building
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI CONTRACTOR shall procure, install, test and commission the one (1)
DATE: 12/28/16 Redundant Power Supply and one (1) Access switches equipped with
OPERATIONS
SFP pluggable 1000Base-X Mini-GBIC Transceivers that support single
ALI H GHAMDI

12/28/16
mode fiber over 1310nm wavelength with LC connector. The
DATE:
1000Base-X Mini-GBIC Transceiver supports 9 micron single mode
CONTROL NUMBER
VERIFICATION

fiber up to a maximum distance of 10km.


EDSD

CONTRACTOR shall install Universal 19” Standard Rack to mount the


DATE:
BY:

access switch, Redundant Power Supply, fiber optic/UTP copper patch


REVISIONCERTIFICATION

panel and ancillaries.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

The access switch shall be powered from utility power source and
(DCC) NO. _____________________

dedicated Rack Mounted UPS systems installed in Telecommunication


`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 118


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Room.
SAY
SAY
SAY

Utility Power Substation


ENGG CERT

ASH
ASH
ASH

CONTRACTOR shall procure, install, test and commission the one (1)
LEADS

LEADS
LEADS
ALL

ALL
ALL

Redundant Power Supply and one (1) Access switch equipped with
SFP pluggable 1000Base-X Mini-GBIC Transceivers that support single
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

mode fiber over 1310nm wavelength with LC connector. The


1000Base-X Mini-GBIC Transceiver supports 9 micron single mode
fiber up to a maximum distance of 10km.
DESCRIPTION

CONTRACTOR shall install Universal 19” Standard Rack to mount the


access switch, Redundant Power Supply, fiber optic/UTP copper patch
panel and ancillaries.

The access switch shall be powered from utility power source and
dedicated Rack Mounted UPS systems installed in Telecommunication
Room.

Operator Shelter 1 & 2


10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

CONTRACTOR shall procure, install, test and commission the one (1)
12/28/16
12/14/16

12/18/16

Redundant Power Supply and one (1) Access switch equipped with
DATE

SFP pluggable 1000Base-X Mini-GBIC Transceivers that support single


mode fiber over 1310nm wavelength with LC connector. The
NO.
REV

G
E

DISCIPLINE
1000Base-X Mini-GBIC Transceiver supports 9 micron single mode
ENGINEER
ALL LEADS
fiber up to a maximum distance of 10km.
DATE: 12/28/16
PROJECT CONTRACTOR shall install Universal 19” Standard Rack to mount the
ENGINEER
access switch, Redundant Power Supply, fiber optic/UTP copper patch
A M ALMATROOK

DATE: 12/28/16
panel and ancillaries.
CERTIFIED
AMR EL SHARKAWY
The access switch shall be powered from utility power source and
12/28/16
DATE: dedicated Rack Mounted UPS systems installed in Telecommunication
CONSTRUCTION
AGENCY Cabinet (TC).
SHAHZAD YAZDANI

DATE: 12/28/16 Security Support Building Main Gate


OPERATIONS
ALI H GHAMDI CONTRACTOR shall procure, install, test and commission the one (1)
12/28/16
DATE: Redundant Power Supply and one (1) Access switches equipped with
CONTROL NUMBER

SFP pluggable 1000Base-X Mini-GBIC Transceivers that support single


VERIFICATION

mode fiber over 1310nm wavelength with LC connector. The


EDSD

1000Base-X Mini-GBIC Transceiver supports 9 micron single mode


DATE:
BY:

fiber up to a maximum distance of 10km.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

CONTRACTOR shall install Universal 19” Standard Rack to mount the


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

access switch, Redundant Power Supply, fiber optic/UTP copper patch


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 119


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG panel and ancillaries.
SAY
SAY
SAY

The access switch shall be powered from utility power source and
ENGG CERT

ASH
ASH
ASH

dedicated Rack Mounted UPS systems installed in Telecommunication


LEADS

LEADS

Room.
LEADS
ALL

ALL
ALL

Security Support Building Tank Farm Gate


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

CONTRACTOR shall procure, install, test and commission the one (1)
Redundant Power Supply and one (1) Access switch equipped with
SFP pluggable 1000Base-X Mini-GBIC Transceivers that support single
DESCRIPTION

mode fiber over 1310nm wavelength with LC connector. The


1000Base-X Mini-GBIC Transceiver supports 9 micron single mode
fiber up to a maximum distance of 10km.

CONTRACTOR shall install Universal 19” Standard Rack to mount the


access switch, Redundant Power Supply, fiber optic/UTP copper patch
panel and ancillaries.

The access switch shall be powered from utility power source and
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

dedicated Rack Mounted UPS systems installed in Telecommunication


Room.
12/28/16
12/14/16

12/18/16
DATE

General
NO.
REV

G
E

DISCIPLINE
ENGINEER This document shall be constructed in concurrence with the data network
ALL LEADS
drawing CO-A00033 sheet 001.
DATE: 12/28/16
PROJECT
ENGINEER

A M ALMATROOK CONTRACTOR shall provide and commission the following subsystems:


DATE: 12/28/16

AMR EL SHARKAWY
CERTIFIED
 Access and Distribution Switches
12/28/16  Firewalls

DATE:
CONSTRUCTION
Wireless Access points
AGENCY
 UPS Equipment
SHAHZAD YAZDANI
 Grounding Kits
DATE: 12/28/16
OPERATIONS  Fiber optic transceivers
ALI H GHAMDI  Fiber Patch cords
DATE:
12/28/16  UTP Patch cords
CONTROL NUMBER
VERIFICATION

In addition to the Supply, Installation and Commissioning of the equipment,


EDSD

CONTRACTOR shall undertake a number of ancillary tasks to ensure


conformity of the equipment and System to the overall intent of Project
DATE:
BY:

requirements. These additional tasks shall include, but not necessary limited
to, the following:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

 Procure Commissioning spares


(DCC) NO. _____________________

 Deliver accessories, equipment, installation and other materials, and

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 120


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG commissioning spares to site.
SAY
SAY
SAY

 Conduct factory, site and system acceptance tests.


 Provide installation drawings, wiring and cabling schedules, and
ENGG CERT

ASH
ASH
ASH

equipment location plans.



LEADS

Conduct link test to ensure maximum 1G or higher bandwidth


LEADS
LEADS
ALL

ALL
ALL

optimization.
 Installation of additional UTP cabling from the access points to the
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

appropriate data switches.


 Provide commissioning test plans, test schedules and test reports.
 Provide accommodation, transportation and all necessary permits,
clearances and protective safety equipment for their In-Kingdom
DESCRIPTION

personnel.
 The logistics associated with the In-Kingdom Installation.
 The provision of all materials, tools, test equipment, and other items of
equipment to effect the installation and commissioning.
 Project Management.
 CONTRACTOR shall obtain SAUDI ARAMCO approval for the design
prior to implementation.

Drawings and Documents


10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

CONTRACTOR shall ensure that the Engineering Drawings, Data Sheets,


and configuration sheets are readily available in the facility where the
12/28/16
12/14/16

12/18/16
DATE

equipment indicated will be installed.

CONTRACTOR shall deliver all documentation in both hardbound paper


NO.
REV

G
E

DISCIPLINE
format and also a CD-ROM based electronic file copy.
ENGINEER
ALL LEADS
Materials
DATE: 12/28/16
PROJECT
ENGINEER CONTRACTOR shall provide ample supply of ancillaries, patch cords as
A M ALMATROOK the project requires, and to have a more viable system.
DATE: 12/28/16
CERTIFIED Software
AMR EL SHARKAWY

12/28/16
DATE: All the software are the property of SAUDI ARAMCO, therefore
CONSTRUCTION
AGENCY CONTRACTOR shall provide SAUDI ARAMCO with a complete list of all
SHAHZAD YAZDANI
software installed, complete with revisions, versions, installed locations,
DATE: 12/28/16 migration path, maintenance agreement and related upgrades for
OPERATIONS
maintenance and operation of the equipment as specified in this FSD.
ALI H GHAMDI

12/28/16
DATE: CONTRACTOR shall provide SAUDI ARAMCO with software and related
CONTROL NUMBER

upgrades for maintenance and operation of the equipment as follow:


VERIFICATION
EDSD

 A complete list of all software installed, complete with revisions,


DATE:

versions, etc.
BY:

 The locations where this software is installed.


REVISIONCERTIFICATION

 For each software package the migration path (when upgrades will be
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

expected, how the upgrades will be delivered, loaded, patching, etc.).


(DCC) NO. _____________________

 Upgrade/patching management should be part of a service or


maintenance agreement for a prolonged period of time.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 121


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG  Any sub-routine used to enhance the software shall be SAUDI
SAY
SAY
SAY

ARAMCO property.
ENGG CERT

ASH
ASH
ASH

REFERENCE DRAWINGS
LEADS

LEADS
LEADS
ALL

ALL
ALL

Listed below are proposal engineering documents and drawings which shall
be finalized by CONTRACTOR during detail design.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

SHEET
DRAWING NO. DRAWING TITLE
NO.
CO-A10033 001 Schematic Diagram, Overall Data System
DESCRIPTION

Overall System Diagram, Data Network


CO-A10036 001
System
CO-A10039 001 Schematic Diagram, Overall WLAN System

B. TELEPHONE NETWORK

Scope of Work
10-02399-
JO/EWO

10-02399-
10-02399-
0001

IP Telephony
0001
0001


12/28/16
12/14/16

12/18/16

CONTRACTOR shall provide, procure, install, configure and test an


DATE

IP Telephony System to be utilized as a primary medium for


inbound and outbound voice communications at the new Yanbu
NO.
REV

G
E

DISCIPLINE Distribution Hub. This shall include the provision and installation of
ENGINEER
ALL LEADS
fifty nine (59) totals of new IP telephone handsets which includes
DATE: 12/28/16 one (1) Conference Telephone handset and seventeen (17) analog
PROJECT
ENGINEER & ten (10) hotline telephone handsets including all required
A M ALMATROOK accessories and materials. The IP Telephone System shall utilize
DATE: 12/28/16 the provided Data Network System under this project for
CERTIFIED
AMR EL SHARKAWY transmission and connection towards IP Telephone Core System
DATE:
12/28/16 located at SAUDI ARAMCO Dhahran B-840 and Abqaiq Comm.
CONSTRUCTION
AGENCY
Building. All new telephone equipment shall comply with the
SHAHZAD YAZDANI equipment platform provided under BI-10-00246 Replace
DATE: 12/28/16 Telephone Switches Kingdom Wide.
OPERATIONS
ALI H GHAMDI
 CONTRACTOR shall install and commission the IP Telephone
12/28/16
DATE: System as per the following drawings:
CONTROL NUMBER
VERIFICATION
EDSD

 Schematic Diagram, - CO-A10028.001


DATE:
BY:

Overall IP Telephone System


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

 CONTRACTOR shall provide the required IP telephone system as


(DCC) NO. _____________________

per below listed breakdown of numbers and IP phone types per

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 122


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG building.
SAY
SAY
SAY

Table 1 – IP Telephone Count and Types


ENGG CERT

ASH
ASH
ASH
LEADS

Basic IP Office IP Conference


LEADS
LEADS
ALL

ALL
ALL

Location Subtotal
Phone Phone IP Phone

Engineering &
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

6 25 1 32
Maintenance Building

Operations Shelter-1 0 4 -- 4
DESCRIPTION

Operations Shelter-2 0 4 -- 4

Operation Building 5 7 -- 12

Receiving Substation 3 -- -- 3

Security Support Building


10-02399-
JO/EWO

10-02399-
10-02399-

1 -- -- 1
0001

Main Gate
0001
0001

12/28/16
12/14/16

12/18/16
DATE

Security Main Gatehouse 1 -- -- 1

Security Support Building


NO.
REV

1 -- -- 1
G
E

Tank Farm
DISCIPLINE
ENGINEER
Security Guardhouse
ALL LEADS 1 -- -- 1
(Tank Farm)
DATE: 12/28/16
PROJECT
ENGINEER
Utility Power Substation 4 -- -- 4
A M ALMATROOK

DATE: 12/28/16
CERTIFIED TOTAL 22 36 1 59
AMR EL SHARKAWY

12/28/16
DATE:
CONSTRUCTION
AGENCY  CONTRACTOR shall provide approve Basic IP telephones for
SHAHZAD YAZDANI
Basic Users, Office IP telephones for all Office Class users and
DATE: 12/28/16
OPERATIONS
Conference IP phone.
ALI H GHAMDI

12/28/16
 CONTRACTOR shall provide the required Port licenses for all new
DATE:
IP telephones to expand the IP telephony platforms located in
CONTROL NUMBER
VERIFICATION

Dhahran and Abqaiq provided under BI-10-00246.


EDSD

 CONTRACTOR shall be responsible for all connection and


DATE:
BY:

integration requirements of IP Phone endpoints going to the Access


REVISIONCERTIFICATION

Ethernet Switch located at the designated building.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Analog / Hotline Telephone


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 123


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG  CONTRACTOR shall provide, procure, install, test and commission
SAY
SAY
SAY

one (1) new Line Access Gateway (LAG) including all required
ENGG CERT

ASH
ASH
ASH

accessories and materials. The LAG shall be utilized to provide


analog telephone lines for the Yanbu Distribution Hub and provide
LEADS

LEADS
LEADS
ALL

ALL
ALL

back-up outside access calls when the corporate telephone network


is unavailable. As a minimum, the LAG shall compose of the
following modules; two (2) FXO/FXS Interface Modules and an
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

active & standby Main Control Boards.

 CONTRACTOR shall provide the required Analog and Hotline


DESCRIPTION

telephone system as listed in below Table.

Table 2 – Analog and Hotline Telephone Count

Analog Hotline
Location Subtotal
Phone Phone
Engineering & Maintenance
4 -- 4
Building
Operations Shelter-1 1 -- 2
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

Operations Shelter-2 1 -- 2
12/28/16
12/14/16

12/18/16

Operation Building 2 4 6
DATE

Remote Interface Unit Building 1 1 -- 1


NO.
REV

G
E

DISCIPLINE Remote Interface Unit Building 2 1 -- 1


ENGINEER
ALL LEADS Security Support Building
1 -- 1
DATE: 12/28/16 Main Gate
PROJECT
ENGINEER Security Main Gate 1 1 2
A M ALMATROOK

DATE: 12/28/16 X-Ray Building 1 -- 1


CERTIFIED
AMR EL SHARKAWY Security Support Building
1 -- 1
12/28/16 (Tank Farm)
DATE:
CONSTRUCTION Security Guardhouse
1 1 2
AGENCY (Tank Farm)
SHAHZAD YAZDANI

DATE: 12/28/16
FSF Support Building -- 1 1
OPERATIONS
ALI H GHAMDI Chemical Shelter 1 -- 1
12/28/16
DATE:
Metering Shelter 1 -- 1
CONTROL NUMBER
VERIFICATION

YASREF -- 1 1
EDSD

SAMREF -- 1 1
DATE:
BY:
REVISIONCERTIFICATION

Yanbu Refinery Terminal -- 1 1


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Marafiq Substation -- 1 1
(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 124


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
Analog Hotline
SAY

Location Subtotal
Phone Phone
ENGG CERT

ASH
ASH
ASH

TOTAL 17 11 28
LEADS

LEADS
LEADS
ALL

ALL
ALL

 CONTRACTOR shall provide an approve telephones for all analog


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

users and approve dial-less red phone for all hotline/emergency


telephone users.

 This project shall allocate the four (4) hotline circuits in Operation
DESCRIPTION

Building to Yanbu Regional Security Command Centre (YRSCC).

 CONTRACTOR shall install and commission the Analog/Hotline


Telephony System as per the following drawings:

 Schematic Diagram, - CO-A10029.001


Overall Analog Telephone System

10-02399-

CONTRACTOR shall provide, procure, install, test and commission


JO/EWO

10-02399-
10-02399-
0001

0001
0001

two (2) new Firewalls. The Firewall shall be utilized to provide


security protection against threats such as DDoS attacks, malicious
12/28/16
12/14/16

12/18/16
DATE

intrusions, and viruses.


NO.
REV

CONTRACTOR shall provide, procure, install, test and commission


E

DISCIPLINE
ENGINEER
two (2) new Ethernet switches. The Ethernet Switch shall be utilized
ALL LEADS to support the system 10/100/1000Base-T ports and GBE ports
DATE: 12/28/16
interface requirements.
PROJECT
ENGINEER

A M ALMATROOK  CONTRACTOR shall provide, procure, install and activate two (2)
DATE: 12/28/16
CERTIFIED
1000 Base-TX SFP Modules on GE SFP port on each of the two
AMR EL SHARKAWY Huawei Firewalls.
12/28/16
DATE:
CONSTRUCTION  CONTRACTOR shall provide, procure, install and activate two (2)
AGENCY
SHAHZAD YAZDANI 1000 Base-TX SFP Modules on Distribution Switch located at
DATE: 12/28/16 Engineering & Maintenance Building.
OPERATIONS
ALI H GHAMDI  CONTRACTOR shall provide, install and terminate two (2) Duplex
12/28/16
DATE: Fiber Optic Patch Cords, 10M with LC-LC connectors between
CONTROL NUMBER

system Firewalls to Distribution Switch.


VERIFICATION
EDSD

 CONTRACTOR shall provide, install and terminate eighty six (86) 5


DATE:

Meters Systimax UTP Cat-6 Patch Cords with RJ-45 connectors.


BY:

UTP Patch Cords shall be utilized for telephone system equipment


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

network cabling as shown in drawing number CO-A10028 Sheet 001


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

and CO-A10029 Sheet 001.


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 125


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG  CONTRACTOR shall provide, procure, install, test and commission
SAY
SAY
SAY

one Voice Recording System including all required accessories and


ENGG CERT

ASH
ASH
ASH

materials. The Voice Recorder shall be utilized to log and record all
hotlines/ emergency calls for 12 months as per HCIS requirement.
LEADS

LEADS
LEADS
ALL

ALL
ALL

See reference drawing CO-A10028 Sheet 001 and CO-A10029


Sheet 001 for details.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

 CONTRACTOR shall provide and install one (1) 600mm (W) X


1000mm (D) X 1800mm (H) System Cabinet including all required
accessories. The cabinet shall be utilized to house the telephone
DESCRIPTION

system equipment and shall be located at Engineering &


Maintenance Building.

 Telephone system equipment shall be powered through a -


Distribution Power Panel located at Telecommunication Room.

 Telephone active equipment shall be grounded and bonded to the


nearest telecommunications grounding system as per SAES-T-795
Para. 4.2.2.3.4.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

 This project shall lease a telephone Trunk Lines from a local service
12/28/16
12/14/16

12/18/16

provider for its Backup/outside call access. Refer to CO-A10028


DATE

Sheet 001 for the trunk lines detail. This project shall also provide
four (4) hotline circuits going to Yanbu Regional Security Command
NO.
REV

G
E

DISCIPLINE
Centre (YRSCC).
ENGINEER
ALL LEADS
A Main Distribution Frame (MDF) shall be provided to allow the orderly
DATE: 12/28/16
PROJECT
and logical termination and interconnection of capable pairs to and from:
ENGINEER

A M ALMATROOK  Line Access Gateway


DATE: 12/28/16
CERTIFIED
 Analog Telephones
AMR EL SHARKAWY  Public exchange trunk lines
DATE:
12/28/16  Building distribution IDFs and structured cabling patch
CONSTRUCTION
AGENCY
panels
SHAHZAD YAZDANI

DATE: 12/28/16
CONTRACTOR has to provide the equipment for Telephone Network
OPERATIONS System and Unified Communications as per the System descriptions,
ALI H GHAMDI standards and System interfaces defined around each functional layer of the
DATE:
12/28/16 conceptual design. The overall solution is expected to have availability and
reliability of 99.99%.
CONTROL NUMBER
VERIFICATION
EDSD

CONTRACTOR shall integrate the System to the COMPANY’s Telephone


Network System located in Dhahran and Abqaiq. CONTRACTOR shall
DATE:
BY:

ensure that integration shall be seamless. All the System services that are
REVISIONCERTIFICATION

available in the Yanbu Distribution Hub shall be accessible by the


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

COMPANY in Dhahran and vice-versa.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

The document also specified the CONTRACTOR’S obligations and will be

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 126


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG finalized during detailed design.
SAY
SAY
SAY

CONTRACTOR shall propose to the COMPANY the recommended training


ENGG CERT

ASH
ASH
ASH

courses for the System. CONTRACTOR shall price the courses according
to the software and equipment installed that make-up the entirety of the
LEADS

LEADS
LEADS
ALL

ALL
ALL

System.

CONTRACTOR shall design, procure, construct, test and commission a


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

permanent, fully flexible, operational, and maintainable System.

CONTRACTOR shall supply its latest hardware and software required to


support the above capacities with consideration for the expansion.
DESCRIPTION

CONTRACTOR shall supply the required port licenses for IP phones to


expand the IP telephony platforms located in Dhahran and Abqaiq provided
under BI-10-00246.

CONTRACTOR is responsible for designing, supplying, delivering, surveying


and installing, commissioning, developing test acceptance documents,
testing, acceptance testing, performing configuration and warranting all
equipment.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

System Configuration
12/28/16
12/14/16

12/18/16
DATE

The Yanbu Distribution Hub Telephone Network System shall be configured


NO.
REV

as described on Schematic Diagrams.


G
E

DISCIPLINE
ENGINEER
ALL LEADS
 Overall IP Telephone System CO-A10028.001
DATE: 12/28/16
 Overall Analog Telephone System CO-A10029.001
PROJECT
ENGINEER
Commercial off the Shelf (COTS) hardware, system software, application
A M ALMATROOK
software packages and firmware shall be configured to meet the stated
DATE: 12/28/16
CERTIFIED
requirements.
AMR EL SHARKAWY

DATE:
12/28/16 System performance, reliability, flexibility, upward compatibility and
CONSTRUCTION expansion to meet future requirements shall be the basis of the design.
AGENCY
SHAHZAD YAZDANI
Power Systems
DATE: 12/28/16
OPERATIONS
The System power shall be derived from a - 4 8 V o l t D C p o w e r
ALI H GHAMDI
system.
12/28/16
DATE:
CONTROL NUMBER

For equipment requiring other supply voltages, suitable transformers,


VERIFICATION

inverters or AC/DC power supplies shall be provided.


EDSD

DATE:

Equipment plugs shall be of a US “flat pin” design with grounding contact.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

EQUIPMENT SPECIFICATIONS
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

IP TELEPHONE SETS

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 127


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Scope
SAY
SAY
SAY

CONTRACTOR shall engineer, procure, test and install with this


ENGG CERT

ASH
ASH
ASH

Specification, and the scope shall be as follows:



LEADS

LEADS
LEADS

Connectivity of IP phone at each communication service point


ALL

ALL
ALL

to 10/100/1000 Mbps switched Fast Ethernet ports shall be


over Unshielded Twisted Pair (UTP) Category 6 cable.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

• IP Phones shall have 2-port built-in switch in which


first port connects to the Access Layer in the TER/TR
and the second port connects towards the PC/mobile
terminals in the work areas.
DESCRIPTION

• IP Phones shall support existing and latest IEEE (Power-


over- Ethernet) standards.
• Procurement of Enterprise grade IP Phones to
meet the requirements of this project and to be installed in
each of the communication service points of Hail Distribution
Facility.
• IP-Phone based terminals use for Hotline Communications
10-02399-
JO/EWO

10-02399-
10-02399-

shall be equipped with add-on dialing module which has


0001

0001
0001

programmable keys that includes easy identification of the


functions and display on the LCD the name of the sites or
12/28/16
12/14/16

12/18/16
DATE

stations with Hotline IP-Phone terminals.


• Configuration of all IP Phones procured and installed under
NO.
REV

G
E

DISCIPLINE
this project and to accommodate all new required software,
ENGINEER hardware and device licenses as required.
ALL LEADS

DATE: 12/28/16 • Testing and Commissioning the IP Phone endpoints


PROJECT
ENGINEER and completion of the installation.
A M ALMATROOK

DATE: 12/28/16 • IP Phone shall be compatible with the existing Huawei IMS
CERTIFIED Plat form.
AMR EL SHARKAWY

12/28/16
DATE:
CONSTRUCTION
AGENCY
IP Phone Types
SHAHZAD YAZDANI

DATE: 12/28/16
OPERATIONS
The project shall provide three (3) types of IP telephones which are to be
ALI H GHAMDI
installed within the Yanbu Distribution Hub:
12/28/16
DATE:
 Office Class IP Phone
CONTROL NUMBER
VERIFICATION

 Basic Class IP Phone


EDSD

 Conference IP Phone
DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Analogue Telephone
C

(DCC) NO. _____________________

This project shall supply and install a Line Access Gateway (LAG) with

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 128


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Analogue Telephone sets in the Engineering & Maintenance Building to
SAY
SAY
SAY

serve the Yanbu Distribution Hub. A Line Access Gateway (LAG) shall
be provided to serve locations where IP telephone handsets cannot be
ENGG CERT

ASH
ASH
ASH

provided.
LEADS

LEADS
LEADS
ALL

ALL
ALL

This project shall supply and install Hotline Telephone between Main Gate,
Operation Building and FSF Support Building.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

This project shall supply and install analogue telephone handsets in the
various location of Yanbu Distribution Hub as listed in Table 2 of this
document.
DESCRIPTION

BANDWIDTH REQUIREMENTS

Introduction

The purpose of this section is to provide all the critical VoIP solution sizing
statistics and results that shall be used by CONTRACTOR to design their
solutions. The solution and equipment proposed by CONTRACTOR for
Yanbu Dist r ibut ion Hub shall have the capability to support a minimum
10-02399-
JO/EWO

10-02399-
10-02399-
0001

of 59 users.
0001
0001

The breakdown of the quantity of IP and Analog telephones types per


12/28/16
12/14/16

12/18/16
DATE

building is listed in Table below.


NO.
REV

G
E

IP ANALOG
DISCIPLINE BUILDING NAME
ENGINEER TELEPHONE TELEPHONE
ALL LEADS

DATE: 12/28/16
Maintenance & Engineering Building 32 4
PROJECT
ENGINEER
Operator Shelter 1 & 2 8 2
A M ALMATROOK

DATE: 12/28/16 Operation Building 12 6


CERTIFIED
AMR EL SHARKAWY
Security Support Building (Main Gate) 1 1
12/28/16
DATE:
CONSTRUCTION
AGENCY
Security Main Gate 1 2
SHAHZAD YAZDANI
X-Ray Building -- 1
DATE: 12/28/16
OPERATIONS
Security Support Building (Tank Farm) 1 1
ALI H GHAMDI

12/28/16
DATE: Security Guardhouse 1 2
CONTROL NUMBER
VERIFICATION

FSF Support Building -- 1


EDSD

Receiving Substation 3 --
DATE:
BY:

Utility Power Substation 4 --


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

--
C

Chemical Shelter 1
(DCC) NO. _____________________

Metering Shelter -- 1

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 129


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
IP ANALOG
SAY

BUILDING NAME
TELEPHONE TELEPHONE
ENGG CERT

ASH
ASH
ASH

Remote Interface Unit Building 1 -- 1


LEADS

LEADS
LEADS
ALL

Remote Interface Unit Building 2 -- 1


ALL
ALL

--
YASREF 1
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

--
SAMREF 1
--
Yanbu Refinery Terminal 1
DESCRIPTION

TOTAL 59 27

Standard Erlang and Erlang-B models shall be used to estimate the


required PSTN link capacity.

C. WIRELESS LAN NETWORK

Scope of Work

General
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

This shall primarily provide wireless LAN connectivity for the users where the
12/28/16
12/14/16

12/18/16

wireless LAN installation shall be provided under BI-10-02399.


DATE

The project shall provide and commission the following wireless LAN
NO.
REV

G
E

subsystems:
DISCIPLINE
ENGINEER
ALL LEADS  Wireless LAN indoor access points
DATE: 12/28/16  Mounting kits for access points

PROJECT
ENGINEER UTP patch cords
A M ALMATROOK

DATE: 12/28/16 The wireless LAN network shall have a flexible configuration that enables it to
CERTIFIED be deployed at any location within the new Yanbu Distribution Hub and
AMR EL SHARKAWY

12/28/16
associated open areas with secured connectivity.
DATE:
CONSTRUCTION
AGENCY The WLAN system shall consider providing coverage and connectivity for
SHAHZAD YAZDANI 802.11ac in addition to 802.11a/b/g and 802.11n users. This shall be
DATE: 12/28/16 designed and implemented to provide the capability to work efficiently with
OPERATIONS
high performance in mix-mode without interference.
ALI H GHAMDI

12/28/16
DATE: The WLAN shall share the data network infrastructure in terms of access
CONTROL NUMBER

switches to facilitate wireless connectivity.


VERIFICATION
EDSD

CONTRACTOR shall design, procure, install, test and commission a fully


DATE:

flexible and secure wireless LAN network to facilitate wireless data access for
BY:

the users in Yanbu Distribution Hub facilities.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

CONTRACTOR shall design and implement the System by using the latest
(DCC) NO. _____________________

proven technology of wireless equipment hardware and software available to


prevent product early obsolescence.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 130


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

CONTRACTOR shall develop a design that presents the appropriate


placement of wireless access points to provide excellent radio coverage and
ENGG CERT

ASH
ASH
ASH

mobility to all wireless IP devices.


LEADS

LEADS
LEADS
ALL

ALL
ALL

The following indoor areas shall be provided with wireless LAN facilities:

 Maintenance and Engineering Building – Ground Floor & 1st Floor


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

 Operation Building
 Operation Shelter
 Security Guardhouse

DESCRIPTION

Security Main Gate

CONTRACTOR shall be responsible for the complete system design to


ensure full coverage within Yanbu Distribution Hub facilities.

All components and accessories required for the completion and successful
operation of the proposed WLAN system, either specified in detail or not, shall
be supplied and installed by the CONTRACTOR. CONTRACTOR shall verify
all required quantities and provide the System “Fit for Purpose’, irrespective of
estimated quantities given in this document.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

12/28/16
12/14/16

12/18/16

Equipment Provision
DATE

This project shall provide, install, test and commission a permanent, scalable
NO.
REV

G
E

and a complete WLAN system in accordance with the minimum requirement


DISCIPLINE
ENGINEER
as specified.
ALL LEADS

DATE: 12/28/16 Installation


PROJECT
ENGINEER

A M ALMATROOK
The wireless LAN equipment shall be installed in areas as mentioned above.
Wireless LAN access points shall be directly connected to the Power-over-
DATE: 12/28/16
CERTIFIED Ethernet (PoE) ports of the access switches unless otherwise specified.
AMR EL SHARKAWY

DATE:
12/28/16 Wireless Controller
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI  CONTRACTOR shall utilize the existing Wireless LAN Controller in
DATE: 12/28/16
the Yanbu NGL.
OPERATIONS  The Wireless LAN Controller shall manage, secure, route and
ALI H GHAMDI switching function for all wireless access points.
12/28/16
DATE:
Access Points
CONTROL NUMBER
VERIFICATION


EDSD

Wireless LAN access points shall employ two radios at 2.4 and
5GHz Frequency band
DATE:


BY:

Wireless LAN access points inside the building shall utilize UTP
copper connection to the assigned access switch.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE


OF THIS DRAWING IS COVERED, FOR ALL

Wireless access points shall be ceiling mounted unless otherwise


BY DRAWING COMPLETION CERTIFICATE
C

specified.
(DCC) NO. _____________________

 Wireless LAN access points shall be Power-over-Ethernet unless

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 131


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG used in a meshed configuration and utilizing fiber optic connection
SAY
SAY
SAY

which is powered independently through a power injector.


 Wireless LAN access point mounting assembly should be
ENGG CERT

ASH
ASH
ASH

ergonomically designed so that the aesthetic view of the area shall


be preserved.
LEADS

LEADS
LEADS
ALL

ALL
ALL

REFERENCE DRAWINGS
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

SHEET
DRAWING NO. DRAWING TITLE
NO.
CO-A10033 001 Schematic Diagram, Overall Data System
DESCRIPTION

CO-A10039 001 Schematic Diagram, Overall WLAN System

D. STRUCTURED CABLING SYSTEM

SCOPE DESCRIPTION

General

This describes the design requirement for the Building Structured Cabling
10-02399-
JO/EWO

10-02399-
10-02399-

System (SCS) for Yanbu Distribution Hub, to provide the communication


0001

0001
0001

services for the new buildings.


12/28/16
12/14/16

12/18/16
DATE

This technical specification shall be used as the basis in specifying and


defining the requirements for the design, supply, installation and
commissioning of the structured cabling system for the new building.
NO.
REV

G
E

DISCIPLINE
ENGINEER
ALL LEADS
Telecommunication services will be provided at the new Yanbu Distribution
DATE: 12/28/16
Hub facilities.
PROJECT
ENGINEER
All equipment and materials specified to be supplied will be of modern,
A M ALMATROOK
proven and reliable design which will comply with the applicable standards
DATE: 12/28/16
CERTIFIED or codes and embody the latest proven technology.
AMR EL SHARKAWY

DATE:
12/28/16 STANDARDS
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
General
DATE: 12/28/16
OPERATIONS The materials and equipment provided for this System shall conform to the
ALI H GHAMDI requirements of the latest issues and most recent revisions and
12/28/16 amendments of the standards listed below and the local laws and
DATE:
regulations applicable to the site.
CONTROL NUMBER
VERIFICATION
EDSD

This specification is to be read in conjunction with all relevant SAUDI


ARAMCO Engineering and Material standards, codes, practices and
DATE:

regulations, Ministry of PTT requirements, and Saudi Arabian Government


BY:

Safety and Security Directives (SSD).


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

GENERAL SYSTEM REQUIREMENTS


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 132


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG General
SAY
SAY
SAY

All the materials and equipment provided for this System shall meet the
ENGG CERT

ASH
ASH
ASH

best commercial practices, reliability, maintainability and performance of


the systems defined in this specification.
LEADS

LEADS
LEADS
ALL

ALL
ALL

Structured Cabling System shall comply with BICSI standards as well as


EIA/TIA 568, EIA/TIA-569, EIA/TIA-606, EIA/TIA-607 and all associated
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

Technical Bulletins. The cables shall conform to the fire and safety codes
NEC Article 800- 51(b) or equivalent.

BICSI certified RCDD shall be prerequisites for the designers of the


DESCRIPTION

building cabling system.

Building Structured Cabling System shall be designed for at least a


minimum operating lifetime of 20 years.

Structured Cabling System shall be designed, procured, installed, tested


and commissioned as a complete, fully flexible system to facilitate
communications services for voice and data of the buildings which
includes the following:
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

 Cableway infrastructure and termination inside the Telecom


12/28/16
12/14/16

12/18/16

Equipment Room /Telecom Room and enclosure which includes


DATE

but not limited to cable runways, equipment racks, cross-connect


terminals, grounding, horizontal and backbone cabling.
NO.
REV

G
E

DISCIPLINE
ENGINEER  Cableway System (horizontal and backbone) which includes but
ALL LEADS not limited to cable tray system, Rigid Steel Conduit (RSC) and
DATE: 12/28/16 Electro Malleable Tubing (EMT) conduits, sleeves, pull boxes,
PROJECT
ENGINEER outlet boxes, cableway supports, etc.
A M ALMATROOK

DATE: 12/28/16 The Work shall include but not limited to installation, termination and
CERTIFIED testing of CAT6 modules and test all horizontal and backbone cabling.
AMR EL SHARKAWY

12/28/16
DATE: TECHNICAL REQUIREMENTS
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI Telecom Equipment Room (TER)/Telecom Rooms (TR)
DATE: 12/28/16
OPERATIONS
CONTRACTOR shall design and provide a Telecom Equipment Room
ALI H GHAMDI
(TER)/Telecommunications Rooms (TR) in the required buildings for the
12/28/16
DATE: co-location of data and voice termination equipment on each location of
CONTROL NUMBER

the buildings in accordance with EIA/TIA 569 & BICSI TDMM.


VERIFICATION
EDSD

CONTRACTOR shall design, procure, construct, test, and commission all


DATE:

associated facilities within the TR to include but not limited to, cable splice
BY:

closure, grounding system, and cable tagging and relevant backboards.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Telecommunications Room (TER/TR) in the required buildings shall house


(DCC) NO. _____________________

the telecommunication equipment to serve the occupants of the building at


each floor.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 133


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

CONTRACTOR shall ensure that the TR arrangements, cable pathways


details shall meet the requirements per ANSI/TIA/EIA-569B and grounding
ENGG CERT

ASH
ASH
ASH

requirement per ANSI/TIA/EIA-607.


LEADS

LEADS
LEADS
ALL

ALL
ALL

If the total horizontal cabling length to any IO exceeds 90m from the patch
panels, additional TR and IDF’s shall be provided.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

Physical Characteristics

The environment and the physical features of the space of TER/TR


shall be as follows:
DESCRIPTION

 HVAC system shall ensure that the TER/TR is maintained at a


temperature of 18-24 degrees centigrade indoor dry bulb
temperature.
 The HVAC system shall provide humidity control to keep the indoor
air relative humidity level at 30-55%.
 Each TER/TR shall have independent HVAC controls, i.e. a
thermostat to regulate the temperature and humidity controls
located inside the TER/TR.
10-02399-
JO/EWO

10-02399-
10-02399-
0001


0001
0001

Fire Alarm and Detection System shall be provided in each TER/TR.


 The Fire Detector shall have a remote light extended from its circuit
12/28/16
12/14/16

12/18/16
DATE

to a location outside the main entrance door.


 All walls and doors in the TER/TR shall have a one-hour fire rating.
 Minimum of one fire extinguisher of required type shall be installed.
NO.
REV

G
E

DISCIPLINE
 A Wall Mounted Telephone shall be placed in the TER/TR.
ENGINEER
ALL LEADS
 The main entrance door shall have a combination door lock and
shall open outward if the building fire code allows.
DATE: 12/28/16
PROJECT  Lighting and emergency lighting shall be provided in each TER/TR.

ENGINEER
Electrical convenience duplex 230V AC outlet spaced at 1880mm
A M ALMATROOK
intervals around the perimeter of the walls at a height of 450mm
DATE: 12/28/16
CERTIFIED above floor level,
AMR EL SHARKAWY  A twist lock duplex 230V above each equipment rack ceiling
DATE:
12/28/16 mounted AC outlet together with the dedicated power outlets shall
CONSTRUCTION be provided.
AGENCY
SHAHZAD YAZDANI  Each Line circuit shall originate from the dedicated power panel
DATE: 12/28/16
located in each TER/TR. For buildings with UPS power, the
OPERATIONS dedicated power panel shall be powered from the Building UPS.
ALI H GHAMDI  Grounding - CONTRACTOR shall supply a #4/0 AWG grounding
DATE:
12/28/16 conductor bonded to the building ground grid, for later connection to
the TER/TR grounding system.
CONTROL NUMBER
VERIFICATION

 Plywood boarding ¾ inch thick by eight (8) feet by four (4) feet shall
EDSD

be installed on at least two walls within the rooms and painted with
two (2) coats of fire retardant white paint.
DATE:
BY:

 The cable support system inside the TER/TR shall be Ladder type
REVISIONCERTIFICATION

trays. Cable Trays fittings and hardware include, but not limited to:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

hangers, ground straps, fixtures etc. The size and layout of the
C

ladders and cable trays shall be determined and approved during


(DCC) NO. _____________________

detail design.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 134


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG  A full complement of mounting brackets shall be incorporated in the
SAY
SAY
SAY

design which shall include but not limited to threaded rod bracket
kits, ladder rack bracket kits, wall bracket kits and all other
ENGG CERT

ASH
ASH
ASH

components necessary to make the system workable. The mounting


brackets shall be manufactured from cold rolled steel with zinc
LEADS

LEADS
LEADS
ALL

ALL
ALL

chromate, e-coating or painted black powder coat finish.


 Outside plant fiber optic feeder cable shall be fed onto the fiber optic
RE-ISSUED FOR 100% PROJECT PROPOSAL

patch panel located inside the telecommunications equipment room.


RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

 Fire retardant tape shall be wrapped on to the outside Fiber Optic


Cable Terminating on to the fiber patch panel on the run from the
Cable entry point inside the TER/TER to the Patch Panel.

DESCRIPTION

However , in places where it is mandatory to place the terminating


hardware more than 15 meters from the underground cable entry
point, suitable splice closure shall be provided for transition of
outdoor type cable to the indoor type cable.

Building Entrance/Entrance Facilities

The building entrance facilities shall consist of the telecommunication


service entrance to the building, including the entrance point through the
building floor adjacent to an exterior wall and continuing to the entrance
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

room or space.
12/28/16
12/14/16

12/18/16

Entrance conduits – 4” diameter PVC concrete encased conduits shall be


DATE

extended from the TER to a point 1.5 meters from the building foundation.
Please refer to OSP documentation for additional details on the entrance
NO.
REV

G
E

Conduits.
DISCIPLINE
ENGINEER
ALL LEADS
The entrance room/space is typically located within 15m (50ft) of the
DATE: 12/28/16 outside cable entrance point. The entrance facilities shall contain the inter-
PROJECT
ENGINEER building backbone cabling pathways that link a building to other buildings
A M ALMATROOK on site.
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY
Equipment Racks
12/28/16
DATE:
CONSTRUCTION
Cable management system shall be provided using the rack system that
AGENCY supports heavy equipment and high capacity cable for cross-connect or
SHAHZAD YAZDANI
interconnect applications in a telecommunication room.
DATE: 12/28/16
OPERATIONS
Equipment Racks shall be used for the installation of both passive and
ALI H GHAMDI
active equipment required for their complete installation in all
12/28/16
DATE: communication rooms. In locations that require special security or where
CONTROL NUMBER

environmental requirements for the active equipment cannot be met, an


VERIFICATION

enclosure may be required.


EDSD

DATE:

The racks system shall be modular and support copper and fiber cables.
BY:

The rack shall be constructed of steel material to accommodate 19”


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

components.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

The rack shall be UL listed for 800 pound load rating to accommodate
large networking equipment.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 135


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

The rack shall supply space identification of quick and easy location of
rack mount items, double sided#12-24 EIA universal mounting-hole
ENGG CERT

ASH
ASH
ASH

spacing.
LEADS

LEADS
LEADS
ALL

ALL
ALL

The rack shall accept removable, hinged doors and fingers cable
management system. The rack system shall meet all EIA requirements as
defined in EIA-310-D.The standard racks shall be high strength aluminum
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

with heavy-duty base and top angle hardware.

Standard Rack dimensions shall be 7 feet height x 19 inches width.


Minimum of two (2) 19” X 7” equipment racks and associated vertical &
DESCRIPTION

horizontal cable management system is required per TR.

Each rack shall be bonded together with approved bonding jumpers to the
communications room ground bus bar.

Equipment Enclosures

Communication equipment enclosures shall be designed and installed on


a case by case basis depending on the circumstance that would require a
10-02399-
JO/EWO

10-02399-
10-02399-
0001

change from the project standard equipment rack.


0001
0001

12/28/16

Enclosures may be used in buildings where size may prohibit a


12/14/16

12/18/16
DATE

communications room but still require voice and data connections to the
LAN enclosures shall have a locking mechanism.
NO.
REV

G
E

DISCIPLINE
ENGINEER
Fan units equipped with a fit for purpose filtration system shall be used,
ALL LEADS where necessary, to ensure that the maximum enclosure temperature
DATE: 12/28/16 does not exceed the manufacturer’s recommended operating temperature
PROJECT
ENGINEER for active equipment.
A M ALMATROOK

DATE: 12/28/16 Cable Termination Hardware


CERTIFIED
AMR EL SHARKAWY
Each horizontal or backbone cabling run will be terminated to the patch
12/28/16
DATE: panels using appropriate connectors or connecting blocks depending upon
CONSTRUCTION
AGENCY the cable type. Matching patch cords will be used to perform cross connect
SHAHZAD YAZDANI into the networking / voice hardware.
DATE: 12/28/16
OPERATIONS To ensure uniformity, all patch panels for their perspective application,
ALI H GHAMDI copper, fiber, etc. shall be from the same manufacturer and part number
12/28/16 throughout the job site. All copper patch panels shall support CAT6
DATE:
CONTROL NUMBER

applications and facilitate cross-connection using modular CAT6 4-pair


VERIFICATION

patch cords with RJ-45 end plug.


EDSD

Patch panels shall be sized with a minimum 25 percent spare capacity for
DATE:
BY:

future growth and MAC (Moves, Adds & Changes) work. The patch panels
REVISIONCERTIFICATION

design shall remove any tools involving MAC work.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Modular Patch Panel


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 136


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG All horizontal cables serving the information outlets (IO’s) at the IWAs shall
SAY
SAY
SAY

be terminated onto a patch panels in TER/TR/TC or data enclosures.


ENGG CERT

ASH
ASH
ASH

Patch Panels shall be, modular, CAT-6 UTP, with integral high density
punch down style connecting base. The connecting base shall employ
LEADS

LEADS
LEADS
ALL

ALL
ALL

deep channels to provide additional space for cable management. The


connecting block shall have a compatible footprint with installed 110
systems. The connecting block shall have rounded edge.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

Four pair Category 6 UTP cabling shall be terminated onto four pair punch
down style connecting hardware mounted to the rear (integral to the patch
panel) to the category 6 modules on the front face of the patch panel
DESCRIPTION

wiring configuration shall conform to EIA/TIA 568B standard.

The wire strip and connecting block, shall be marked with a highly visible
color code and allow for termination of one full pair or four full pairs at a
time.

Port and panels shall be easy to identify with write on areas and optional
label holder for color coded labels.
10-02399-
JO/EWO

10-02399-
10-02399-

The patch panels shall be mountable to the standard EIA 19”


0001

0001
0001

racks/enclosures.
12/28/16
12/14/16

12/18/16
DATE

Modular Patch Cords


NO.
REV

G
E

Modular patch cords shall be used between patch panels configured as


DISCIPLINE
ENGINEER
cross-connect or between the patch panel and the networking hardware
ALL LEADS when the patch is used as an interconnection.
DATE: 12/28/16
PROJECT
ENGINEER The Patch cords shall be factory terminated with modular plugs featuring a
A M ALMATROOK one piece , tangle free latch design and black strain relief boots to support
DATE: 12/28/16 easy moves , addition and changes .They shall be constructed with
CERTIFIED Category 6 24 AWG stranded UTP cable. Each patch cord shall be 100%
AMR EL SHARKAWY
performance tested at the factory in a channel test to the Category 6
12/28/16
DATE: standards.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI Punch Down System and Patch Cord Assemblies
DATE: 12/28/16
OPERATIONS Category 6 UTP patch cords shall be used between punch down style
ALI H GHAMDI connecting blocks when configured as a cross connect or between the
12/28/16 connecting block and networking hardware when the connecting block is
DATE:
CONTROL NUMBER

used as a interconnect.
VERIFICATION
EDSD

Patch cords shall use 24 AWG stranded Category 6 cable. The cable shall
be terminated onto eight position punch down style plugs (R-J45 modular
DATE:
BY:

plugs featuring a one piece, tangle free latch design and strain relief boots)
REVISIONCERTIFICATION

and tested to exceed the Category 6 performances when used with the
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

specified Category 6 modular jacks.


C

(DCC) NO. _____________________

The patch cords shall use grey cords with grey connectors, shall be field

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 137


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG terminable and shall employ a clear cap for wiring identification.
SAY
SAY
SAY

Fiber Patch Panels


ENGG CERT

ASH
ASH
ASH

Fiber Patch Panels shall be equipped with SC connectors shall be


LEADS

LEADS
LEADS
ALL

ALL
ALL

provided to terminate the cables. Patching within the cabinets /racks shall
be via dual SC-SC connector fiber patch cables.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

Fiber Optic Patch Cords

The fiber patch cords shall be pre-terminated patch cables with SC


connector.
DESCRIPTION

The fiber patch cords and pigtails shall be constructed from high
performance single mode optical fiber cable with SC connectors.

Integral boots shall be provided to provide strain relief and help maintain
consistent polarity.

The fiber Patch cords come in lengths of one, two and three meters.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

Cable Management
0001
0001

12/28/16

Cable management shall be used to provide a neat and efficient means for
12/14/16

12/18/16
DATE

routing and protecting fiber and copper cables and patch cords on the
equipment racks and enclosures. The system shall be complete cable
NO.
REV

G
E

management system comprised of vertical cable managers, horizontal


DISCIPLINE
ENGINEER
cable managers, and cable management accessories used throughout the
ALL LEADS cabling system. The system shall protect network investment by
DATE: 12/28/16 maintaining system performance, controlling cable bend radius and
PROJECT
ENGINEER providing cable strain relief.
A M ALMATROOK

DATE: 12/28/16 Vertical Cable Manager


CERTIFIED
AMR EL SHARKAWY
Vertical cable mangers shall include components that aid in routing,
12/28/16
DATE: managing and organizing cable to and from patch panels and/or
CONSTRUCTION
AGENCY equipment. Managers shall protect network equipment by controlling cable
SHAHZAD YAZDANI bend radius and providing cable strain relief .Managers shall be universal
DATE: 12/28/16 design mounting to EIA 19” racks and constructed of base with plastic
OPERATIONS fingers. The duct fingers shall include retaining tabs to retain the cables in
ALI H GHAMDI place during cover removal. The covers shall be easily removed or hinged
12/28/16 to allow for quick moves, addition and changes.
DATE:
CONTROL NUMBER
VERIFICATION

Horizontal Cable Manager


EDSD

Horizontal cable managers shall include components that aid in routing,


DATE:
BY:

managing and organizing cable to and from patch panels and/or


REVISIONCERTIFICATION

equipment. Panels shall protect network equipment by controlling cable


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

bend radius and providing cable strain relief. Panels shall be universal
C

design mounting to EIA 19” racks and constructed of steel base with
(DCC) NO. _____________________

plastic fingers. The duct fingers shall include retaining tabs to retain the

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 138


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG cables in place during cover removal. The covers shall be easily removed
SAY
SAY
SAY

or hinged to allow for quick moves, addition and changes.


ENGG CERT

ASH
ASH
ASH

The cable mangers shall be provided with wire retainers to retain the
cables during cover removal and # 12-24 English and M6 metric mounting
LEADS

LEADS
LEADS
ALL

ALL
ALL

screws. The two rack unit space, horizontal cable management panel shall
be provided between two modular patch panels.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

In Cabinet Cable Manager

In cabinet cable management system shall include components that aid in


routing, managing and organizing cable to and from patch panels and/or
DESCRIPTION

equipment within a cabinet. Mangers shall protect network equipment by


controlling cable bend radius and providing cable strain relief. Panels shall
be a flexible design with adjustable mounting Panels shall be constructed
PVC duct with steel mounting brackets attached. Duct fingers shall have
score lines for easy removal.

Backbone Cabling

The Backbone Cable Subsystem in a building is the part of the structured


10-02399-
JO/EWO

10-02399-
10-02399-
0001

cabling system that provides connectivity between Equipment rooms,


0001
0001

telecommunication rooms and telecommunication service entrance


12/28/16

facilities.
12/14/16

12/18/16
DATE

The Backbone fiber optic cable shall be glass cable, single mode fiber
NO.
REV

G
E

optic cable conforming to G.652D standard.


DISCIPLINE
ENGINEER
ALL LEADS The optic core optical fibers unarmored distribution cable shall be used
DATE: 12/28/16 within buildings. Applications include intra-building backbones, routing
PROJECT
ENGINEER between telecommunication rooms and connectorized cables in riser and
A M ALMATROOK plenum environments.
DATE: 12/28/16
CERTIFIED Cables shall be CSA-FT4 rated or an equivalent. The Optical Fiber cables
AMR EL SHARKAWY
shall have water blocking, application specific fame / smoke rating high
12/28/16
DATE: density features.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI The optical fiber cable shall be suitable for riser and plenum applications.
DATE: 12/28/16
OPERATIONS The optical fiber cables shall have riser and Plenum designs UL listed as
ALI H GHAMDI CMR/OFNR (CSA-FT4) and CMP/OFNP (CSA-FT6) or an equivalent
12/28/16
DATE:
CONTROL NUMBER

The indoor Fiber Optic cable shall be un-armored.


VERIFICATION
EDSD

The Fiber Optic cables shall be designed with Reverse Oscillated Lay
Stranding Method to facilitate mid-span access of fibers. All the Fiber Optic
DATE:
BY:

Cables shall be terminated to a patch panel.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Patch cords of same specification shall be used for the indoor distribution
C

system from network switches to end devices throughout the building, as


(DCC) NO. _____________________

well as the interfaces between various systems and networks.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 139


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

The type of Backbone copper cable shall be 100 ohms unshielded twisted
pair multi-pair cable.
ENGG CERT

ASH
ASH
ASH

Copper Cable: In cases where copper cables shall be utilized to provide


LEADS

LEADS
LEADS
ALL

ALL
ALL

analogue telephone service or any other voice communication service,


following shall be the minimum standard required for the cable to be used:
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

 All cables shall meet or exceed Category 6 or Cat 3 UTP


 These requirements are for multi-pair 25 pair or more UTP 24 AWG
copper cables.

DESCRIPTION

All cables shall conform to the requirements for communication


circuits defined by local electrical code equivalent to NEC.
 The cable manufacturer shall be ISO 9001 registered.

Voice Termination Hardware

Punch down 110 base and system, Cat-6 ( Cat3) UTP cable shall be
terminated upon a standard density 110 style cat-6 connecting block,
providing for termination of four pair cables.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

Protection Units
12/28/16
12/14/16

12/18/16

All copper circuits shall be protected between each building with a


DATE

protector unit at the demarcation point of every building. All protector units
shall be grounded according to the manufactures recommendations.
NO.
REV

G
E

DISCIPLINE
ENGINEER Cross Connecting Hardware
ALL LEADS

DATE: 12/28/16 Category 6 UTP patch cord shall be used between 110 style connecting
PROJECT
ENGINEER bases when configured as a cross-connect or between connecting block
A M ALMATROOK and networking hardware when the connecting block is used as an
DATE: 12/28/16 interconnect. Patch cords shall be 24 AWG stranded Category 6 cable.
CERTIFIED
AMR EL SHARKAWY
The cable shall be terminated onto 110 style plugs tested to exceed CAT-6
12/28/16
performance when used in a channel with the specified category 6
DATE:
CONSTRUCTION
modules.
AGENCY
SHAHZAD YAZDANI
The patch cords shall be factory terminated with modular plugs featuring a
DATE: 12/28/16 one piece, tangle free latch design and black strain relief boots. No field
OPERATIONS
terminated patch cords or cross-connects shall be used for the permanent
ALI H GHAMDI
installation.
12/28/16
DATE:
CONTROL NUMBER

Horizontal Cable System


VERIFICATION
EDSD

The horizontal cabling system is the portion of the telecommunication


DATE:

cabling system that extends from the work area telecommunication


BY:

outlet/connector to the horizontal cross-connect in the Telecommunication


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

Room/Telecommunication Equipment Room/Telecom Closet.


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

General

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 140


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG All horizontal cabling shall be CAT6 UTP, plenum rated, 24 AWG 100
SAY
SAY
SAY

Ohm, 4-pair cables to create a truly structured cable environment where


each horizontal link can be used for either voice or data as required.
ENGG CERT

ASH
ASH
ASH

The horizontal cabling shall utilize a physical star-wired configuration. It


LEADS

LEADS
LEADS
ALL

ALL
ALL

shall comprise of uninterrupted cable runs terminated at the user


information outlets and within the Telecommunications Room.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

Plenum cable shall be utilized for the horizontal cable distribution network
where cables are subjected to airflow and are not totally enclosed in steel
conduit. Other areas shall use non-plenum grade in NEC & UL.
DESCRIPTION

Bridged taps and splices are not permitted as part of the copper horizontal
cabling.

The maximum distance of the horizontal cable shall be 90 meters. The


maximum distance for cross-connect jumpers and patch cords, jumpers
and patch cords that connect horizontal cabling with equipment or
backbone cabling shall not exceed 6 meters in length.

All horizontal cables shall be terminated onto punch down style UTP, CAT-
10-02399-
JO/EWO

10-02399-
10-02399-
0001

6 modular patch panels or punch down style connecting blocks in


0001
0001

TER/TR/TC / DATA enclosure at one end and at CAT- 6 outlet using


12/28/16

EIA/TIA 568-B at the IWA at the other end.


12/14/16

12/18/16
DATE

Each telecommunication outlet location shall have at a minimum three (3)


NO.
REV

G
E

Category 6 cables.
DISCIPLINE
ENGINEER
ALL LEADS Horizontal Cable Management
DATE: 12/28/16
PROJECT
ENGINEER All major runs of the horizontal cable shall be installed in a
A M ALMATROOK communications cable tray C-profile perforated, metallic, 75 mm deep and
DATE: 12/28/16 width as per the calculated sizing depending upon the usable area served
CERTIFIED by them.
AMR EL SHARKAWY

12/28/16
DATE: Communication cables or wires shall not be strapped, taped or attached by
CONSTRUCTION
AGENCY any means to the exterior of any conduit or raceway as a means of
SHAHZAD YAZDANI support. All trays shall be installed with the proper bend radius and support
DATE: 12/28/16 for maximum loading.
OPERATIONS
ALI H GHAMDI The maximum fill ratio shall not exceed 40% of the cable installed. A full
12/28/16 complement of fittings must be available including, but not limited to 45
DATE:
CONTROL NUMBER

degree and 90 degree flat, vertical inside and outside elbows, tee and
VERIFICATION

cross fittings, reducers, end caps and all other components necessary to
EDSD

make the system workable. Snap-on or split covers shall be available for
all directional fittings.
DATE:
BY:
REVISIONCERTIFICATION

The fitting shall be capable of maintaining a 2” minimum cable bend


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

radius. The communications cable tray shall not be shared with building
C

electrical cable. Communications wires and cables shall be separated by


(DCC) NO. _____________________

at least 50.8mm (2 in) from conductors of any electric light or power.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 141


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

In each section of tray, a bonding jumper shall be installed as required.


When combination utility poles are used from the ceiling for power and
ENGG CERT

ASH
ASH
ASH

communication cable, the poles shall be specifically listed for the


application.
LEADS

LEADS
LEADS
ALL

ALL
ALL

A full complement of mounting brackets shall be incorporated in the design


which shall include but not limited to Threaded rod bracket kits, Ladder
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

rack bracket kits, wall bracket kits and all other components necessary to
make the system workable. The mounting brackets shall be manufactured
from cold rolled steel with zinc chromate, e-coating or painted black
powder coat finish.
DESCRIPTION

Horizontal Cable Types

Cables installed in ducts, plenums and other spaces for environmental air
shall be Communication Plenum Cable Type (CMP). Listed plenum
communications raceways shall be installed in ducts and plenums. Cables
installed in vertical runs and penetrating more than one floor, or cables
installed in vertical runs in a shaft, shall be Communication Riser Cable
Type (CMR). Floor penetrations requiring Type CMR shall contain only
10-02399-
JO/EWO

10-02399-
10-02399-
0001

cables suitable for riser or plenum use. Listed riser communications


0001
0001

raceways shall be installed in vertical riser runs in a shaft from floor to


12/28/16

floor.
12/14/16

12/18/16
DATE

Only Type CMP and CMR cables shall be installed in these raceways.
NO.
REV

G
E

Communications cables Types CMP, CMR, Communications General


DISCIPLINE
ENGINEER
Purpose Cable (CMG) shall be used in distribution frames and cross-
ALL LEADS connect arrays.
DATE: 12/28/16
PROJECT
ENGINEER Work Area Subsystems
A M ALMATROOK

DATE: 12/28/16 The work area shall consist of the connectivity equipment used to connect
CERTIFIED the horizontal cabling subsystem and the equipment in the work area. The
AMR EL SHARKAWY
connectivity equipment might include the following options:
12/28/16
DATE:
CONSTRUCTION
AGENCY  Patch(equipment cords) and modular connectors
SHAHZAD YAZDANI  Outlet and surface mount boxes
DATE: 12/28/16  Surface raceway and outlet poles
OPERATIONS
ALI H GHAMDI
Information Outlets (IO) and surface mount boxes
12/28/16
DATE:
CONTROL NUMBER

Each building shall be pre-wired for voice/data and Wireless Local Area
VERIFICATION

Network (WLAN) access point connection in accordance with TIA/EIA-


EDSD

568B wiring standard. Dual Port RJ-45 Information Outlets shall be


DATE:

provided for each room. Two (2) CAT6 4-pair horizontal cables shall be
BY:

routed, terminated and certified from the Information Outlet to the patch
REVISIONCERTIFICATION

panels within the building’s Telecommunication Room (TER/TR).


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

The maximum CAT6 cable length between the IO and patch panels shall
be 90 meters.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 142


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

All insert modules shall be 8P8C, non-keyed, modular RJ45 jack with
pin/pair assignments wired per T568B standard termination.
ENGG CERT

ASH
ASH
ASH

All outlets shall be manufactured from high impact thermoplastic material


LEADS

LEADS
LEADS
ALL

ALL
ALL

UL flammability rating of 94 HB or better. All outlets and surface mount


boxes shall be available in four colors including off-white (IW), Electrical
Ivory (EI), White (WH) and international Grey (IG).
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

Each gang box shall be connected to 1” diameter conduit. In cases of false


ceiling installation, the conduit shall begin from the cable tray (installed in
the space between the Ceiling and the false ceiling) and terminate at the
DESCRIPTION

outlet gang box.

The conduits installed underground flushed with floor shall be 1” diameter


PVC.

A 1” diameter coupling shall be provided at the transition point of 1”


diameter EMT to 1” diameter PVC. In cases where conduits originate
directly from the Data Cabinet feed to the outlet directly whole run being
above ground, 1” diameter EMT conduit shall be provided.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

In cases where the conduits originate from the data cabinet but partial run
12/28/16

is flushed floor before serving the outlet, the amount of run above ground
12/14/16

12/18/16
DATE

shall be 1” diameter EMT and that under the ground shall be 1” diameter
PVC coated RSC. At each end of the conduits, bushings shall be provided
NO.
REV

G
E

for protection of the cables.


DISCIPLINE
ENGINEER
ALL LEADS Surface mount boxes shall be provided in 4 ports low profile boxes. Boxes
DATE: 12/28/16 shall accept all fiber, copper and miscellaneous audio/video modules. The
PROJECT
ENGINEER Boxes shall mount with screws, adhesives or optional magnets. The box
A M ALMATROOK covers include breakouts for use with surface raceway. Cable tie slots
DATE: 12/28/16 shall be included to prove strain relief to the cables.
CERTIFIED
AMR EL SHARKAWY
The information outlet openings shall be standard NEMA-equivalent
12/28/16
DATE: opening .This size shall provide openings that are dimensionally equivalent
CONSTRUCTION
AGENCY to standard (NEMA OS 1 WD-6) openings. In addition, a minimum depth of
SHAHZAD YAZDANI 30.5mm (1.2 in) should be provided.
DATE: 12/28/16
OPERATIONS Face plates shall be two ports as required, single gang with painted
ALI H GHAMDI combination head screw. The face plates shall mount to standard US
12/28/16 NEMA boxes and adapters .Dedicated sloped versions shall be provided
DATE:
CONTROL NUMBER

for improved bend radius control and decreased requirements in wall


VERIFICATION

depths. Each faceplate shall accept outlet modules that can be individually
EDSD

inserted and removed as required.


DATE:
BY:

Power poles can be used as pathways for the horizontal cable from the
REVISIONCERTIFICATION

ceiling to the work areas. Power poles that are used for voice, data and
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

power cable shall be listed for the applications with a divider for
C

separation. The poles shall be installed as per the manufacture installation


(DCC) NO. _____________________

instructions and following the local applicable codes.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 143


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

Fire Stopping
ENGG CERT

ASH
ASH
ASH

Fire stopping material and procedures shall conform to the international


BICSI TDMM standard
LEADS

LEADS
LEADS
ALL

ALL
ALL

Communications Grounding
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

CONTRACTOR shall provide communications grounding and bonding


system in all locations that utilize communications equipment, both passive
and active. Telecommunications Main Grounding Busbar (TMGB), the
Telecommunications Grounding Busbar (TGB), the Telecommunications
DESCRIPTION

Bonding Backbone (TBB), the Telecommunications Bonding Backbone


Interconnecting Bonding Conductor (TBBIBC) and the conductors used to
bond the components together are the components for the communication
grounding and bonding infrastructure.

The TMGB is generally located in the entrance facility, where the


communication service enters the building. Its primary function is to
conduct lightning and AC fault currents from the primary protectors. The
conductor for the TMGB shall be a minimum of 300 mm (1 ft.) from any
10-02399-
JO/EWO

10-02399-
10-02399-
0001

power cables, even when isolated by metallic conduits. The location of the
0001
0001

bus bar shall be designed for attaching entrance facility equipment and
12/28/16

other grounding bars.


12/14/16

12/18/16
DATE

The TGB is the bar used to ground the passive and active components
NO.
REV

G
E

inside the communications room. The TGB shall be a predrilled electro tin
DISCIPLINE
ENGINEER
plated copper bus bar provided with standard NEMA bolt hole sizing and
ALL LEADS spacing. Minimum dimensions for the TGB are 6 mm (1/4 in) thickness x
DATE: 12/28/16 50 mm (2 in) width. Length can vary as required in each communications
PROJECT
ENGINEER room.
A M ALMATROOK

DATE: 12/28/16 All bonding conductors shall be a minimum of No. 6 AWG insulated copper
CERTIFIED using listed 2-hole compression connectors. Each bonding conductor shall
AMR EL SHARKAWY
be labeled per ANSI/TIA/EIA 606. All bonding conductors shall be marked
12/28/16
DATE: by a distinctive green color and be tagged with the label.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI EXPANSION CAPABILITIES
DATE: 12/28/16
OPERATIONS Unless specified otherwise, the following shall apply.
ALI H GHAMDI

12/28/16 SCS horizontal cabling shall have two (2) or three (3) UTP cables wired to
DATE:
CONTROL NUMBER

the information outlets of each quadplex plate.


VERIFICATION
EDSD

The backbone cable system shall be sized with a minimum of 50% spare
capacity, allowing for future expansion.
DATE:
BY:
REVISIONCERTIFICATION

COMMUNICATIONS DISTRIBUTION DESIGNER


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

All building telecommunications cable system design must be done under


(DCC) NO. _____________________

the design authority of a valid/current BICSI Registered Communications

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 144


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Distribution Design (BICSI RCDD) to ensure that a minimum level of
SAY
SAY
SAY

competency has been provided in the telecommunication office building


infrastructure and cable system.
ENGG CERT

ASH
ASH
ASH

INSTALLATION AND COMMISSIONING


LEADS

LEADS
LEADS
ALL

ALL
ALL

Installation
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

CONTRACTOR shall install all equipment required by this specification to


produce a fully functional system ready for handling over to SAUDI
ARAMCO.
DESCRIPTION

Quality

CONTRACTOR shall ensure that the installation is to be carried out by


fully trained personnel, with installation techniques who are familiar with
the system and the equipment.

CONTRACTOR shall ensure installation work shall be performed in a


workmanlike manner using best practices, and adhering to the
requirements of SAUDI ARAMCO standards.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

CONTRACTOR shall label each wire and cable in each end indicating the
12/28/16

wire designation. The labeling shall be identical in nomenclature and all


12/14/16

12/18/16
DATE

labels shall be typed and covered with transparent heat-shrinkable tubing.


NO.
REV

G
E

CONTRACTOR shall neatly arrange all cables on the cable ladder rack,
DISCIPLINE
ENGINEER
cable tray, or supports to prevent twisting and unnecessary crossover of
ALL LEADS cables. All signal cables and wiring shall be secured.
DATE: 12/28/16
PROJECT
ENGINEER Plant Tagging
A M ALMATROOK

DATE: 12/28/16 CONTRACTOR shall be responsible for tagging all equipment and the
CERTIFIED verification of proper tagging shall be carried out as part of the mechanical
AMR EL SHARKAWY
completion inspection.
12/28/16
DATE:
CONSTRUCTION
AGENCY Testing and Inspection of UTP Cables
SHAHZAD YAZDANI

DATE: 12/28/16 Manufacturer’s Data


OPERATIONS
ALI H GHAMDI
 Test data shall be provided by the manufacturer for each purchase
12/28/16
DATE: order of copper premises distribution system cables, complying with
CONTROL NUMBER

the TIA/EIA 568B.2-1, ISO/IEC 11801 (2002) and CENELEC


VERIFICATION

EN50173-1 (2002) specifications for UTP Cat. 6 cables.


EDSD

Test To Be Performed By CONTRACTOR before Installation


DATE:
BY:
REVISIONCERTIFICATION

 In addition to the test data provided by the manufacturer, the


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Category 6 cables shall be measured for attenuation (insertion loss)


(DCC) NO. _____________________

and near end cross talk (NEXT) at the following frequencies: 1 MHz,
4.0 MHz, 25 MHz and 250 MHz as a minimum. Insertion loss and
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 145


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG cross talk must be measured with a cable length of at least 305
SAY
SAY
SAY

meters (1000 ft). If the cable lengths are greater than 305 m, the
results must be normalized to 305 m for comparison with the
ENGG CERT

ASH
ASH
ASH

manufacturer’s data.
LEADS

LEADS
LEADS
ALL

ALL
ALL

 Figures 18-D and 18-E show the test set up for insertion loss and
NEXT respectively. The frequency oscillator must be set to the
correct frequency, level (0 dBm), and source impedance (100 ohm).
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

The level of meter must cover the required range of frequencies and
a wide range of sensitivity down to 100 dBm. Test cords must be
 short and calibrated according to ANSI/EIA/TIA-5
DESCRIPTION

Cable Crosstalk between pairs


Insertion
Freq.
Loss (dB) (dB)
(MHz)
1-2 1-3 1-4 2-3 2-4 3-4
1
4
16
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

25
100
12/28/16
12/14/16

12/18/16

200
DATE

250
NO.
REV

G
E

Use this table to record the measure value as a result of testing on the cable.
DISCIPLINE
ENGINEER
ALL LEADS
On the basis that an estimated 360 cable reels of 305 meters each will be used, it is
DATE: 12/28/16 proposed to select 50 random samples for measurement. If the measured values exceed
PROJECT
ENGINEER (in the case of insertion loss) or are less than (in the case of NEXT) the manufacturer’s
A M ALMATROOK specifications by more than 5% at any frequency, the results must be reported to the
DATE: 12/28/16 SAUDI ARAMCO Representative and another lot of samples will be chosen for testing. If
CERTIFIED
AMR EL SHARKAWY
the second lot of samples fails again, the batch must be rejected.
12/28/16
DATE:
CONSTRUCTION
After installation, all copper cable pairs shall be tested for circuit continuity (end to end),
AGENCY split pairs, pair-to-pair short, attenuation and noise as specified in SAES-T-634. The
SHAHZAD YAZDANI
recommended test set is fluke Omni scanner.
DATE: 12/28/16
OPERATIONS
ALI H GHAMDI

12/28/16
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 146


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG All horizontal cabling must be tested in accordance with TIA/EIA TSB 67 known as
SAY
SAY
SAY

“Transmission Performance Specification for Field Testing of Unshielded Twisted Pair


Cabling”.
ENGG CERT

ASH
ASH
ASH
LEADS

LEADS
LEADS
ALL

ALL
ALL

RE-ISSUED FOR 100% PROJECT PROPOSAL


RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL


DESCRIPTION
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

12/28/16
12/14/16

12/18/16
NO. DATE
REV

G
E

DISCIPLINE
ENGINEER
ALL LEADS

DATE: 12/28/16
PROJECT
ENGINEER

A M ALMATROOK

DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY

12/28/16
DATE:
CONSTRUCTION
AGENCY
The SCS installation and testing shall be performed by Category 6 cable
SHAHZAD YAZDANI
manufacturer certified installer.
DATE: 12/28/16
OPERATIONS
ALI H GHAMDI
Test results shall be signed by the Category 6 cable manufacturer certified
12/28/16
installer in each sheet and witnessed by SAUDI ARAMCO Representative.
DATE:
CONTROL NUMBER
VERIFICATION

Copy of calibration certificate shall be attached to test results document.


EDSD

Testing shall be done in the presence of SAUDI ARAMCO Representative.


DATE:
BY:

Test results shall be submitted at least two copies (both hard & soft copy)
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

Test to be performed by UTP cable Manufacturer for Certification

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 147


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG  After CONTRACTOR has carried out installation, certified UTP
SAY
SAY
SAY

cable Manufacturer Structured Cabling Engineer will carry out the


following tests on-site before the service is cut over.
ENGG CERT

ASH
ASH
ASH

1. Wire map (Continuity)


LEADS

LEADS
LEADS
ALL

ALL
ALL

2. Length
3. NEXT
4. Attenuation
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

5. ELFEXT
6. Delay & Delay Skew
7. Return Loss
8. Power Sum Cross talk (PS Next & PS Elfext)
DESCRIPTION

 Fluke Omni scanner is to be used for these tests. Records for every
cable shall be printed out and kept for future reference.

Test Record Forms

Acceptance Test Record Forms will be used for Exchanged Cable,


Digital Test Data. Refer to Section 4 or to the SAES-T-634.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

Supplemental electronic data file will be made on diskette or CD


attached to the associated Test Record Form.
12/28/16
12/14/16

12/18/16
DATE

Test Report Format


NO.
REV

G
E

The Field Test Report will consist of the following information in order:
DISCIPLINE
ENGINEER
ALL LEADS  Type of test and name of systems tested.
DATE: 12/28/16  Copy of the Test Procedure(s) that have been followed.
PROJECT
ENGINEER  Copies of the completed and signed test Record Forms.
A M ALMATROOK  Summary discussion of the test performed and the overall results.
DATE: 12/28/16  Discussion of any problems encountered and how they were
CERTIFIED
AMR EL SHARKAWY resolved.
12/28/16  Test Equipment List.
DATE:
CONSTRUCTION
AGENCY
Quality Control
SHAHZAD YAZDANI

DATE: 12/28/16
OPERATIONS
The installation team chief on a daily basis performs QA/QC inspections
ALI H GHAMDI
during the equipment installation. Monitoring may also be conducted by
12/28/16
SAUDI ARAMCO Operations personnel on their own and notify the
DATE:
installation team of findings.
CONTROL NUMBER
VERIFICATION

Design Drawings
EDSD

DATE:

Two sets of design drawings are available during each site installation.
BY:

On-site modifications will be legibly marked on two drawing sets. After


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

installation, one set will be returned for as-built drawing preparation.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

The remaining set is kept with the SAUDI ARAMCO Operations


(DCC) NO. _____________________

personnel for plant-in-place records until the corrected as-built set is


developed.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 148


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

Safety Equipment
ENGG CERT

ASH
ASH
ASH

First aid kits, fire extinguisher, hard hats, safety shoes, and other safety
devices will be prepared for safety personnel before testing.
LEADS

LEADS
LEADS
ALL

ALL
ALL

Proof of Performance
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

After mechanical completion, official demonstration will be performed


with the installed cabling to show the system installed means the
designed criteria.
DESCRIPTION

Field Test Procedure

General

This test plan describes the requirements for testing copper cables for
voice and data circuits.

Test Equipment Requirement


10-02399-
JO/EWO

10-02399-
10-02399-


0001

0001

Volt Ohmmeter
0001

 Megger (Insulation tester)



12/28/16
12/14/16

12/18/16

PCM - 23 (VF tester)


NO. DATE
REV

G
E

Reference Documents
DISCIPLINE
ENGINEER
ALL LEADS
 As-Built Drawings
DATE: 12/28/16
 Approved Test Procedures
PROJECT
ENGINEER  SAUDI ARAMCO Standards : SAES-T-634
A M ALMATROOK
 Test Equipment Manuals for Volt-Ohmmeter, Megger (Insulation
DATE: 12/28/16 tester), and PCM - 23 (VF tester)
CERTIFIED
AMR EL SHARKAWY

12/28/16
DATE:
CONSTRUCTION DESIGN DRAWINGS
AGENCY
SHAHZAD YAZDANI
General
DATE: 12/28/16
OPERATIONS
ALI H GHAMDI
CONTRACTOR shall list all required drawings in the Non-Material
12/28/16
Requirement (NMR).
DATE:
CONTROL NUMBER
VERIFICATION

All drawings shall be prepared and submitted in accordance with SAUDI


ARAMCO Standards.
EDSD

DATE:

All drawings specifically prepared for this project shall be prepared


BY:

using CADD and submitted on removable mass storage media in


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________

accordance with the SAUDI ARAMCO Drafting Manual.


CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

Use of common drawings whenever practicable shall be acceptable,


provided that there is no loss of clarity.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 149


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

For each drawing created via a CADD system, the relevant CADD
computer files shall be provided to SAUDI ARAMCO in the form of
ENGG CERT

ASH
ASH
ASH

portable removable mass storage media (CD-ROM, tape cartridge,


diskette, etc.).
LEADS

LEADS
LEADS
ALL

ALL
ALL

Review Drawings – Preliminary Design Review (PDR)


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

CONTRACTOR shall submit PDR package with system drawings in two


(2) weeks after contract award.

Purchase order shall be placed immediately for long lead items. All
DESCRIPTION

Non-Material Requirements (NMR) shall be reviewed during the PDR.


The detailed drawings shall have sufficient detail for fabrication of the
system.

Review Drawings – Final Design Review

Three (3) weeks after contract award, CONTRACTOR shall submit


Final Design Review Package with all final “build to” drawings for
SAUDI ARAMCO final review and approval.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

All “NMRs” that have changed since the PDR and all new “NMRs” shall
12/28/16

be shown during the CDR and confirmed as part of the design.


12/14/16

12/18/16
DATE

As-Built Drawings
NO.
REV

G
E

DISCIPLINE
ENGINEER
After completion of the Site Acceptance Test (SAT), pre-commissioning
ALL LEADS and commissioning, CONTRACTOR shall update the drawings to reflect
DATE: 12/28/16 any changes. These drawings shall be clearly marked “As-Built” and
PROJECT
ENGINEER dated.
A M ALMATROOK

DATE: 12/28/16 System Manuals


CERTIFIED
AMR EL SHARKAWY
CONTRACTOR shall provide System Manuals for operation,
12/28/16
DATE: preventative maintenance and repair of the System.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI Appropriate Quality Assurance procedures for each application shall be
DATE: 12/28/16 provided including all validation tests procedures and project
OPERATIONS maintenance techniques.
ALI H GHAMDI

DATE:
12/28/16 Certificates of Acceptance
CONTROL NUMBER
VERIFICATION

CONTRACTOR shall prepare Certificates of Acceptance for each major


EDSD

phase of factory/site testing. Any noted exceptions to the test phases


shall be attached to the document that then finalizes completion of that
DATE:
BY:

particular phase. There shall be no outstanding exception items


REVISIONCERTIFICATION

remaining at the time of Site Acceptance Test (SAT) certification.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 150


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

E. OUTSIDE PLANT SYSTEM


ENGG CERT

ASH
ASH
ASH

SCOPE DESCRIPTION
LEADS

LEADS
LEADS
ALL

ALL
ALL

GENERAL

 This project shall provide 24-core single mode fiber optic cables 8/125
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

microns 1310 nanometer in Star Topology from the E & M Bldg to the
Operation Building, Utility Substation, Operator Shelter, Receiving
Substation, Security Support building Main Gate and Security Support
Building Tank Farm. All terminations will be done on proposed 24-core
DESCRIPTION

fiber patch panels in every building.

 In addition, this project shall provide 2-24 core single mode fiber optic
cable infrastructures to be installed for communication systems from
Engineering & Maintenance Bldg. to Yanbu refinery. All terminations will
be done on proposed 24-ports fiber patch panels.

 In addition, this project shall provide FO cable infrastructure to be


installed for process automation systems (ESD) for two (2) RIO
10-02399-
JO/EWO

10-02399-
10-02399-

buildings. All terminations will be done on proposed 24-core FOC and


0001

0001
0001

fiber patch panels.


12/28/16
12/14/16

12/18/16
DATE

 In addition, this project shall provide 4-12 core single mode fiber optic
cable infrastructures to be installed for control and communication
NO.
REV

systems from Receiving Substation to MARAFIQ-91 Substation. All


G
E

DISCIPLINE terminations will be done on proposed 24-ports fiber patch panels.


ENGINEER
ALL LEADS

DATE: 12/28/16  In addition, this project shall provide FO cable infrastructure to be


PROJECT
ENGINEER
installed for Metering System connectivity to YASREF Control System,
A M ALMATROOK
SAMREF Control System, and YRT Control System All terminations will
DATE: 12/28/16
be done on proposed 12-core fiber patch panels except for Yanbu
CERTIFIED Refinery where 48-core fiber will be used.
AMR EL SHARKAWY

DATE:
12/28/16
 In addition, this project shall provide 5-24 core single mode FO cable
CONSTRUCTION
AGENCY
infrastructure to be installed for Fire Alarm System from Operation Bldg
SHAHZAD YAZDANI to Receiving Substation, Operation Bldg to Utility Substation, E&M
DATE: 12/28/16 Building, Operation Bldg to Security Support Main Gate, Operation Bldg
OPERATIONS to Security Support Computer Gate.
ALI H GHAMDI

DATE:
12/28/16  The design of the fiber optic cable shall be such that the performance
objectives of the System are achieved when the cable has been
CONTROL NUMBER
VERIFICATION

manufactured, installed, spliced and terminated. The performance of the


EDSD

terminal, transmission and ancillary equipment covered by this scope of


works shall be taken into account under this obligation.
DATE:
BY:

 The System shall provide permanent cabling for Local Area Network
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

(LAN Enterprise) and Process Control System (PCS). These cables shall
C

consist of single-mode nonmetallic fiber optics. Cable installation will


(DCC) NO. _____________________

include the underground conduit system. Also all associated facilities,

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 151


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG such as pedestals, pedestal guards, marker posts, grounding protection,
SAY
SAY
SAY

and FOC fiber patch panels shall be provided


ENGG CERT

ASH
ASH
ASH

OUTSIDE PLANT COPPER CABLES


LEADS

LEADS
LEADS
ALL

ALL
ALL

 This project shall provide 200-pair copper cables from the Operation
Building and to be distributed to the following buildings:
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

1. E & M Building
2. Operation Building
3. Operator Shelter
DESCRIPTION

4. Remote Interface Building - RIB-XXX1


5. Remote Interface Building – RIB-XXX2
6. Metering Shelter
7. Security Support Building Tank Farm
8. Chemical Shelter
9. Security Support Building Main Gate
10. Government Security Facility
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

 CONTRACTOR shall provide 25-pairs x 22 gauge copper cables to the


aforementioned buildings. Likewise, CONTRACTOR shall provide
12/28/16
12/14/16

12/18/16
DATE

protected terminal block 489ACC 1-25 to each building for cable


termination.
NO.
REV

G
E

DISCIPLINE
ENGINEER
 The proposed copper cable shall be used for analog telephones for
ALL LEADS emergency purposes.
DATE: 12/28/16
PROJECT
ENGINEER
 The X-RAY Bldg. and Security Gatehouse of Main Gate & Tank Farm,
A M ALMATROOK Voice & data requirements can be served through the proposed POE
DATE: 12/28/16 Ethernet switch and analog line via proposed 1571 OSP cable from the
CERTIFIED main protector in the Security Support building to the remote protector in
AMR EL SHARKAWY
the Security Gatehouse. Such cable will be installed through PVC 2-4’’Ø
12/28/16
DATE: PVC duct to be encased in concrete.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI The design of the copper cable network shall be such that the
DATE: 12/28/16 performance objectives of the System are achieved when the cables
OPERATIONS have been manufactured, installed, spliced and terminated.
ALI H GHAMDI

DATE:
12/28/16 The System shall provide permanent cabling for local distribution (Analog
and special services) to the designated locations in the Yanbu Distribution
CONTROL NUMBER
VERIFICATION

Hub Plant areas. The copper cable shall be designed for direct buried or
EDSD

underground duct application. Conductors shall be solid annealed multi-


pair copper conductors in 22 AWG. Individual conductors are twisted into
DATE:
BY:

pairs with varying lay lengths to minimize crosstalk and specific color
REVISIONCERTIFICATION

combinations to provide pair identification. Cables larger than 25 pairs are


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

assembled into units, which are then used to assemble the core. Units are
C

individually identifiable by color coded unit binders. The core assembly is


(DCC) NO. _____________________

filled with an 80 ºC (198 ºF) ETPR (External Thermal Plastic Rubber)

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 152


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG compound, completely filling the interstices between the pairs and under
SAY
SAY
SAY

the core wrap. A corrugated steel wrap, is applied over the core assembly
to provide protection for the core. North American color coded insulation. A
ENGG CERT

ASH
ASH
ASH

corrugated, copolymer coated, 8-mil aluminum inner shielding. A black,


linear low-density polyethylene jacket is applied overall with surface
LEADS

LEADS
LEADS
ALL

ALL
ALL

marked information such as manufacturer’s identification, pair count,


AWG, product, identification, and sequential footage. Cable shall
conform to (REA U.S.) specification PE-39.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

The exact cable routings shall be field verified by CONTRACTOR during


detailed design. If required, alternative routings shall be recommended
DESCRIPTION

by the CONTRACTOR. In addition, the exact cable lengths shall be


determined by CONTRACTOR during detailed design.

UNDERGROUND CONDUIT SYSTEM

This project shall provide 4-4ӯ PVC underground conduit encased in


concrete to accommodate the proposed fiber optic and copper cables.
The trench will end on the proposed pedestals and building entrance
walls.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

All conduits shall be designed to accommodate fiber optic and copper


paired type of cables.
12/28/16
12/14/16

12/18/16
DATE

A pedestal is an enclosure providing an accessible cable splice point or


terminal above ground. Refer to standard drawing AA-036748. A
NO.
REV

G
E

pedestal guard shall be installed and secured by concrete footings


DISCIPLINE
ENGINEER around pedestals as per design drawing standards.
ALL LEADS

DATE: 12/28/16 The underground duct-bank system shall be designed, procured,


PROJECT
ENGINEER constructed and Commissioned by the CONTRACTOR. The exact
A M ALMATROOK underground conduit routings shall be field verified by the
DATE: 12/28/16 CONTRACTOR. If required, alternative routings shall be recommended
CERTIFIED
AMR EL SHARKAWY
by the CONTRACTOR. In addition, the exact duct-bank section lengths
12/28/16
shall be determined by CONTRACTOR during detailed design.
DATE:
CONSTRUCTION
AGENCY Additional Requirements
SHAHZAD YAZDANI

DATE: 12/28/16 DOCUMENTATION


OPERATIONS
ALI H GHAMDI
CONTRACTOR shall supply the following documentation:
12/28/16
DATE:


CONTROL NUMBER

A System design manual


VERIFICATION

 Construction drawings and documentation


EDSD

 Red-lined and As-built drawing


DATE:

 Factory Acceptance Test Procedures


BY:

 Commissioning and Performance Acceptance Test procedures


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

Equipment manuals
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

 Operating and Maintenance (O&M) manuals and handbooks


(DCC) NO. _____________________

 Spare parts data package for cataloguing and standardization

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 153


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

CONTRACTOR shall be responsible for completing plant tagging of


capital equipment in accordance with SAUDI ARAMCO requirements.
ENGG CERT

ASH
ASH
ASH

Installation Materials, Installation and Commissioning Services


LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall install the equipment to ensure that requirements


for a complete, fully operational, integrated and maintainable turnkey
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

System is provided.

The installation shall comply with SAUDI ARAMCO standards, Saudi


Arabia Government standards, and/or International standards as
DESCRIPTION

applicable.

CONTRACTOR shall Commission the System. Once the System is on-


stream, CONTRACTOR shall hand over the operational System to
SAUDI ARAMCO.

Tools and Test Equipment

CONTRACTOR shall make available, as part of the System, any


10-02399-
JO/EWO

10-02399-
10-02399-
0001

specialist tools that are required to operate and maintain the test
0001
0001

equipment.
12/28/16
12/14/16

12/18/16
DATE

Spares
NO.
REV

G
E

Start-up Spares shall be supplied in accordance with Contract.


DISCIPLINE
ENGINEER
ALL LEADS Copper Cable
DATE: 12/28/16
PROJECT
ENGINEER Copper Cable Specifications
A M ALMATROOK

DATE: 12/28/16 The design of copper cables shall be such that the performance
CERTIFIED objectives of the system are achieved when the cables have been
AMR EL SHARKAWY
manufactured, installed, spliced and terminated.
12/28/16
DATE:
CONSTRUCTION
AGENCY The system shall provide permanent cabling for local distribution (Analog
SHAHZAD YAZDANI and special services) to the designated locations. The copper cable shall
DATE: 12/28/16 be designed for direct buried or underground duct application. Conductor
OPERATIONS shall be solid annealed multi pair copper conductors are in 22 and 26
ALI H GHAMDI AWG. Individual conductors are twisted into pairs with varying lay
12/28/16 lengths to minimized crosstalk and specific color combinations to provide
DATE:
CONTROL NUMBER

pair identification. Cables larger than 25 pairs are assembled into units,
VERIFICATION

which are then used to assemble the core. Units are individually
EDSD

identifiable by color coded unit binders. The core assembly is filled with
80ºC (198ºF) ETPR (External Thermal Plastic Rubber) compound,
DATE:
BY:

completely filling the interstices between the pairs and under the core
REVISIONCERTIFICATION

wrap. A corrugated steel wrap, is applied over the core assembly to


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

provide protection for the core. North American color coded insulation. A
C

corrugated, copolymer coated, 8-mil aluminum inner shielding. A black,


(DCC) NO. _____________________

linear low-density polyethylene jacket is applied overall with surface

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 154


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG marked information such as manufacture’s identification, pair count,
SAY
SAY
SAY

AWG, product identification and sequential footage. Cable shall conform


to (REA U.S.) specification PE-39.
ENGG CERT

ASH
ASH
ASH

The exact cable routings shall be field verified by CONTRACTOR during


LEADS

LEADS
LEADS
ALL

ALL
ALL

detailed design. If required, alternative routings shall be recommended


by THE CONTRACTOR. In addition, the exact cable lengths shall be
determined by CONTRACTOR during detail design.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

Copper cable will be installed from the Operation Building branch spliced
to different buildings. Buildings to be served are the following.
DESCRIPTION

BUILDING NAME NUMBER OF COPPER PAIRS

E & M Building 200

Operation Building 25

Operator Shelter 25
10-02399-
JO/EWO

10-02399-
10-02399-

Remote Interface Building – RIB-1


0001

25
0001
0001

Remote Interface Building – RIB-2 25


12/28/16
12/14/16

12/18/16
DATE

Metering Shelter 25
NO.
REV

G
E

DISCIPLINE
ENGINEER
Security Support Building, Tank Farm 25
ALL LEADS

DATE: 12/28/16 Chemical Shelter 25


PROJECT
ENGINEER

A M ALMATROOK
Security Support Building, Main Gate 25
DATE: 12/28/16
CERTIFIED Government Security Facility 25
AMR EL SHARKAWY

12/28/16
DATE:
CONSTRUCTION
AGENCY For further details on the fiber optic cable routing, refer to the following
SHAHZAD YAZDANI
drawings:
DATE: 12/28/16
OPERATIONS
ALI H GHAMDI DRAWING NO. SHEET NO. DRAWING TITLE
12/28/16 CO-A10067 001-002 COPPER SCHEMATIC DIAGRAM -YDH
DATE:
CONTROL NUMBER
VERIFICATION

Fiber Optic Cable


EDSD

DATE:

The design of the fiber optic cable shall be such that the performance
BY:

objectives of the System are achieved when the cable has been
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

manufactured, installed, spliced and terminated. The performance of the


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

terminal, transmission and ancillary equipment covered by this scope of


(DCC) NO. _____________________

work shall be taken into account under this obligation.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 155


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

The cable shall be ITU-G.652D single-mode non-metallic fiber optics and


meet all requirements of 18-SAMSS-625. Also, all associated facilities, such
ENGG CERT

ASH
ASH
ASH

as splice closures, marker posts, grounding protection and the fiber


distribution panels.
LEADS

LEADS
LEADS
ALL

ALL
ALL

The above fiber optic system shall be used to link those buildings that
require data type service in the proposed Yanbu Distribution Hub.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

For further details on the fiber optic cable routing, refer to the following
drawings:
DESCRIPTION

DRAWING NO. SHEET NO. DRAWING TITLE


CO-A10066 001 FOC SCHEMATIC DIAGRAM- YDH TO YREF

CO-A10068 001-002 FOC SCHEMATIC DIAGRAM- YDH


INSTRUMENT INTERCON DIAGRAM – YREF,
CO-A10003 001 YASREF & SAMREF
INST CONN/INTERCONNECTION DIAG – OB,
10-02399-
JO/EWO

10-02399-
10-02399-
0001

CO-A10005 001
0001
0001

RIB1, RIB2, RS & METERING SHELTER


INST CONN/INTERCONNECTION DIAG – ESD
12/28/16
12/14/16

12/18/16
DATE

CO-A10074 001
FOC-OPERATION BLDG, RIB1, RIB2
NO.
REV

G
E

DISCIPLINE
ENGINEER
The exact cable routings shall be verified by CONTRACTOR during detailed
ALL LEADS design, and, if required, alternative routings shall be recommended by
DATE: 12/28/16 CONTRACTOR.
PROJECT
ENGINEER

A M ALMATROOK Exact cable lengths shall be determined by CONTRACTOR during detailed


DATE: 12/28/16 design.
CERTIFIED
AMR EL SHARKAWY
Four (4) 1-inch, multi-color, corrugated sub-ducts and pull rope shall be
12/28/16
DATE: installed in one duct of each of the underground duct banks (per SAES-T-624
CONSTRUCTION
AGENCY Section 4.3.1).
SHAHZAD YAZDANI

DATE: 12/28/16 Fiber Optic Cable Specifications


OPERATIONS
ALI H GHAMDI All dielectric, Loose Buffered, Filled for underground and direct buried
DATE:
12/28/16 environment.
CONTROL NUMBER

Non Zero Dispersion shifted


VERIFICATION

Non-metallic, including strength member


EDSD

Tensile strength: >= 10N


Mode field diameter: 8.6 – 9.5 Microns
DATE:
BY:

Cladding Diameter: 125.0 microns


REVISIONCERTIFICATION

Concentricity error <1 micron


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Attenuation @ wavelength: 1550 nm – 0.35dB/km


C

Variation of attenuation between 0 deg. C & 70 deg. C: -0.01 dB


(DCC) NO. _____________________

Cable cut off wavelength <1260nM

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 156


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Attenuation discontinuities at 13100nm <0.1 dB
SAY
SAY
SAY

Attenuation change 1300 to 1324 nm <0.09 dB/km


Proof test stress 0.69 Gpa (Minimum)
ENGG CERT

ASH
ASH
ASH

Zero dispersion wavelength 1540 nm (zero dispersion cable)


Expected fiber life span: 20 years
LEADS

LEADS
LEADS
ALL

ALL
ALL

Cable Design
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

General

The structure of the cable core shall permit high cable flexibility with minimum
stress to the individual fibers.
DESCRIPTION

One or more strength members shall be an integral part of the cable


construction. The strength members shall be sufficient to support the stress of
installation and protect the cable in service.

CONTRACTOR shall use a loose, fiber bundle (tube) or a slotted core type
cable with multiple fibers per tube or slot.

The core shall be filled with a compound to inhibit water migration and wrapped
10-02399-
JO/EWO

10-02399-
10-02399-
0001

with a barrier tape.


0001
0001

12/28/16

The filling compound shall be homogenous and uniformly mixed. The


12/14/16

12/18/16
DATE

compound will at least be sufficiently translucent for fiber identification.


NO.
REV

G
E

The filling compound shall not affect the color of the individual fibers.
DISCIPLINE
ENGINEER
ALL LEADS The filling compound shall be non-toxic and present no dermal hazards.
DATE: 12/28/16
PROJECT
ENGINEER The drop point of the filling compound shall not be less than 80 deg. C.
A M ALMATROOK

DATE: 12/28/16 The filling compound shall remain stable and unaffected by long term exposure
CERTIFIED to weather.
AMR EL SHARKAWY

12/28/16
DATE: The filling compound shall have chemical and mechanical compatibility with
CONSTRUCTION
AGENCY other cable components and splicing hardware.
SHAHZAD YAZDANI

DATE: 12/28/16 Cable Jacket


OPERATIONS
ALI H GHAMDI The outer jacket shall provide the cable with a tough, flexible, protective
12/28/16 covering which can withstand exposure to sunlight, to atmospheric
DATE:
CONTROL NUMBER

temperatures and to stresses that can be expected in the installation of this


VERIFICATION

cable.
EDSD

The cable jacket shall be of a high molecular weight, black polyethylene with a
DATE:
BY:

thickness that is suitable for the proposed environment, but not less than 3.0
REVISIONCERTIFICATION

mm.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

The cable jacket shall be resistant to crude oil, hydrocarbons, sulfur


(DCC) NO. _____________________

compounds and salt water.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 157


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

The cable jacket shall have permanent surface printed sequentially numbered
length markers at one meter intervals.
ENGG CERT

ASH
ASH
ASH

The cable jacket shall have permanent surface printed marks at regular
LEADS

LEADS
LEADS
ALL

ALL
ALL

intervals consisting of Manufacturer, (number of fibers) Fiber Optic Cable and


the Actual Year of Manufacture.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

Fiber Optic Cable for Inside Use


Upon entering a building all fiber cables shall have a transition splice to
convert the cable from outside rated cable to internal rated cable. All
DESCRIPTION

internal cables will comply with (SAES-T-624 Para 4.2.2). Under no


circumstances shall outside rated cable be terminated at the equipment.
Local Area Network (LAN)

Single mode fiber optic cables using a non-dispersion-shifted fiber G.652D


will be installed from OME building to various building as follows:
1. Engineering & Maintenance Building
10-02399-
JO/EWO

10-02399-
10-02399-

2. Operation Building
0001

0001
0001

3. Security Support Building, Tank Farm


12/28/16
12/14/16

12/18/16
DATE

4. Utility Substation
5. Operator Shelter
NO.
REV

G
E

DISCIPLINE 6. Receiving Substation


ENGINEER
ALL LEADS
7. Security Support Building, Main Gate
DATE: 12/28/16
PROJECT
ENGINEER

A M ALMATROOK Process Control System (PCS)


DATE: 12/28/16
CERTIFIED Single mode fiber optic cables 24 strands will be installed from the
AMR EL SHARKAWY instrument rack room at the new Operation building to RIO Building 1 (RIB-
DATE:
12/28/16 1) under this BI for the ESD System. The route of the fiber should be
CONSTRUCTION redundant and diverse. Process control System will assign dedicated fiber
AGENCY
SHAHZAD YAZDANI
strands assignment for the ESD system.
DATE: 12/28/16
OPERATIONS Single mode fiber optic cables 24 strands will be installed from the
ALI H GHAMDI instrument rack room at the new Operation building to RIO Building 1 (RIB-
12/28/16 1) under this BI for the DCS System. The route of the fiber should be
DATE:
redundant and diverse. Process control System will assign dedicated fiber
CONTROL NUMBER
VERIFICATION

strands assignment for the DCS system.


EDSD

Single mode fiber optic cables 24 strands will be installed from the
DATE:

instrument rack room at the new Operation building to RIO Building 2 (RIB-
BY:

2) under this BI for the ESD System. The route of the fiber should be
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

redundant and diverse. Process control System will assign dedicated fiber
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

strands assignment for the ESD system.


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 158


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Single mode fiber optic cables 24 strands will be installed from the
SAY
SAY
SAY

instrument rack room at the new Operation building to RIO Building 2 (RIB-
2) under this BI for the DCS System. The route of the fiber should be
ENGG CERT

ASH
ASH
ASH

redundant and diverse. Process control System will assign dedicated fiber
strands assignment for the DCS system.
LEADS

LEADS
LEADS
ALL

ALL
ALL

Single mode fiber optic cables 12 strands will be installed from the new
Operation building to YASREF Control System under this BI. Process
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

control System will assign dedicated fiber strands assignment for various
control system.

Single mode fiber optic cables 12 strands will be installed from the new
DESCRIPTION

Operation building to SAMREF Control System under this BI. Process


control System will assign dedicated fiber strands assignment for various
control system.

Single mode fiber optic cables 48 strands will be installed from the new
Operation building to Yanbu Refinery Control System under this BI.
Process control System will assign dedicated fiber strands assignment for
various control system.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

The PCS fiber optic cables will be routed underground.


0001
0001

12/28/16

PCS and communications ducts shall have separate building entries, IT


12/14/16

12/18/16
DATE

and NON-IT, respectively.


NO.
REV

G
E

PCS fiber optic patch panels will be provided by this BI.


DISCIPLINE
ENGINEER
ALL LEADS Temporary Requirements
DATE: 12/28/16
PROJECT
ENGINEER Temporary communication services required during construction shall be
A M ALMATROOK provided by this BI. This includes the installation and removal of all
DATE: 12/28/16 temporary facilities required by CONTRACTOR and SAPMT. Final location
CERTIFIED of the site offices shall be provided during detailed design stage.
AMR EL SHARKAWY

12/28/16
DATE: System Design Life and Reliability
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI The conduit system shall be designed and engineered to retain usable for
DATE: 12/28/16 75 to 100 years and fulfill design requirements and specifications
OPERATIONS
ALI H GHAMDI Other Materials
12/28/16
DATE:
All other materials that might be required during the course of the work will
CONTROL NUMBER
VERIFICATION

be procured by SAUDI ARAMCO on a Field Material Request (FMR)


EDSD

generated by THE CONTRACTOR.


DATE:
BY:

Transportation, Handling and Delivery


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

All materials are to be inspected upon delivery by the SAUDI ARAMCO


C

Representative for signs of damage during transport, handling and


(DCC) NO. _____________________

delivery. Reports of damage are to be compiled immediately and new

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 159


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG materials procured.
SAY
SAY
SAY

CABLE PLACEMENT
ENGG CERT

ASH
ASH
ASH

General
LEADS

LEADS
LEADS
ALL

ALL
ALL

The fiber optic cable minimum bending radius and maximum pulling
tensions shall be in accordance with SAES-T-624 (Sections 4.1.10 and
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

4.1.11) and the fiber optic cable manufacturer’s specifications. The optical
fiber cable shall not be cut for convenience during placement. Splices shall
be located in accordance with the design drawing provided by
CONTRACTOR and approved by SAUDI ARAMCO.
DESCRIPTION

This Specification covers the expected types of cable and civil construction
work normally required to prepare the fiber optic cable facilities up to and
including cable splicing and work as required.

All Work including design drawings, cable splicing, terminating, testing,


and Commissioning shall be evaluated and accepted as defined within all
applicable requirements and standards.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

All specification rely on the referenced standards, standard drawings,


0001
0001

codes of practice, industry standards, general instructions, operating


12/28/16

instructions, safety policy, Saudi Arabian Government standards and


12/14/16

12/18/16
DATE

policies and the other requirements listed in this Specification Document.


NO.
REV

G
E

If there is a conflict between the requirements of the various reference


DISCIPLINE
ENGINEER
documents, the matter shall be brought to the attention of the SAUDI
ALL LEADS ARAMCO representative for resolution.
DATE: 12/28/16
PROJECT
ENGINEER Each Work category of this Specification includes a broad description of
A M ALMATROOK the Work, variables and options (depending on the design drawing and
DATE: 12/28/16 field condition), prime reference documents for broad scope and/or
CERTIFIED guidance, principal requirements and precautions and a listing of
AMR EL SHARKAWY
inspection items. Mandatory SAUDI ARAMCO witnessed inspection items
12/28/16
DATE: are specifically noted.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI The design drawings are intended to show the estimated design and
DATE: 12/28/16 material requirement for the construction of the facilities. The drawings are
OPERATIONS to be marked up in the field to reflect as- built construction, which is in any
ALI H GHAMDI way different from the original design.
12/28/16
DATE:
CONTROL NUMBER

To ensure uninterrupted installation and start up all tools, equipment,


VERIFICATION

machinery and installation materials shall be provided in sufficient


EDSD

quantities by CONTRACTOR.
DATE:
BY:

All CONTRACTOR provided materials shall be subject to SAUDI


REVISIONCERTIFICATION

ARAMCO inspection and evaluation for quality. All reasonable precautions


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

shall be taken to ensure that damage to buildings, furnishing, structures,


C

utilities, pipelines and other facilities be avoided. SAUDI ARAMCO shall be


(DCC) NO. _____________________

promptly notified, with written follow-up, of any damage that occurs during

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 160


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG construction.
SAY
SAY
SAY

Some Work may be performed adjacent to, or in conjunction with existing,


ENGG CERT

ASH
ASH
ASH

operational communication systems. CONTRACTOR shall ensure that the


operational integrity of the existing system is maintained while performing/
LEADS

LEADS
LEADS
ALL

ALL
ALL

commissioning this work.

CONTRACTOR shall ensure that after conduit and/or cable laying


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

operations, roads, streets, sidewalks and curbing, paved areas, walls,


foundations, fencing, or any other structural, civil or landscaped facilities
are returned to their original condition. This shall be at no additional cost to
SAUDI ARAMCO and subject to the satisfaction of SAUDI ARAMCO
DESCRIPTION

and/or representative(s) of the Saudi Arabian government, as applicable.

Special permit and Work methods may be specified by Saudi Arabian


Government authorities within the area of, or at the boundary of,
government property or facilities such as roads and highways, military
reservations, public utilities. The permit shall be obtained by
CONTRACTOR with the help of SAUDI ARAMCO as needed.

Installation work shall not commence before the relevant permits have
10-02399-
JO/EWO

10-02399-
10-02399-
0001

been obtained by CONTRACTOR construction crew.


0001
0001

12/28/16

Excavation and Site Preparation


12/14/16

12/18/16
DATE

Excavation may be required in sand, marl (natural and/or compacted),


NO.
REV

G
E

loose rock and solid rock. Backfill of the excavated material or bringing-in
DISCIPLINE
ENGINEER
of new fill may be required. The hauling away of excavated material and
ALL LEADS removal of above-grade debris/soil to an approved SAUDI ARAMCO site
DATE: 12/28/16 may be required. . The filling materials shall comply with SAES A 114.
PROJECT
ENGINEER

A M ALMATROOK Excavation may be performed by machine or by hand, depending on the


DATE: 12/28/16 field condition and/or requirements of this Specification, as determined by
CERTIFIED the SAUDI ARAMCO representative(s) and detail design. As a general
AMR EL SHARKAWY
rule, at all Plant facilities, pipeline crossing, and utility crossings, hand
12/28/16
DATE: excavation is the only method permitted.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI Prior to the start of any excavation Work, all underground facilities (i.e. oil,
DATE: 12/28/16 gas and/or water pipes, telephone or power cables, etc.), shall be
OPERATIONS positively identified by CONTRACTOR. This shall be verified by the SAUDI
ALI H GHAMDI ARAMCO and by operating department of the facility. CONTRACTOR
12/28/16 shall use underground facility detection equipment that must be of recent
DATE:
CONTROL NUMBER

manufacture and suitable for performing surveys to locate all types of


VERIFICATION

communication cables, and other utilities. The locating equipment must be


EDSD

able to locate metallic backed warning tape where non-metallic cables


have been placed. The exact location of the identified underground facility
DATE:
BY:

shall be properly marked for easy identification by CONTRACTOR


REVISIONCERTIFICATION

construction crew.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

CONTRACTOR shall employ the most cost efficient equipment and


(DCC) NO. _____________________

machinery within his control to perform the Work.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 161


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

For the safety of personnel and for purposes of maintaining stability of the
excavation, the excavation work shall include all necessary timbering,
ENGG CERT

ASH
ASH
ASH

sheet pilling and shoring.


LEADS

LEADS
LEADS
ALL

ALL
ALL

In no case shall the width of trench excavated in a roadway or under a


pipeline be greater than what is reasonably necessary for completion of
the Work.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

Open excavation shall be guarded by highly visible barricade. Adequate


flashing lights and warning signs must be provided if excavation is
performed in or near any roadway.
DESCRIPTION

Excavations shall not be kept open any longer than reasonably necessary
to perform the intended Work.

The detail design drawing shall specify the scope, location and deep of
excavation. If a survey marker and/or a monument is damaged as a
consequence of the Work, CONTRACTOR shall be responsible for any
fines, where applicable, repairing such marker and/or monument and
returning the same to its original place without any additional
10-02399-
JO/EWO

10-02399-
10-02399-
0001

compensation.
0001
0001

12/28/16

Site leveling, filling and compaction shall be performed as specified in


12/14/16

12/18/16
DATE

conformance with all applicable standards.


NO.
REV

G
E

Trenching
DISCIPLINE
ENGINEER
ALL LEADS Trench excavation is required, to lay direct buried cable or place conduits
DATE: 12/28/16 in the core area, plant area and open desert area. All kinds of soil
PROJECT
ENGINEER conditions may be encountered. These Specifications are intended to
A M ALMATROOK cover the various approved methods of trenching and laying cables or
DATE: 12/28/16 conduits under the expected range of soil and field conditions.
CERTIFIED
AMR EL SHARKAWY
The detail design drawings shall describe the required location, alignment,
12/28/16
DATE: length and depth of cable or conduits to be placed by the trenching
CONSTRUCTION
AGENCY method.
SHAHZAD YAZDANI

DATE: 12/28/16 The reference standards and drawing shall detail the requirements of
OPERATIONS construction.
ALI H GHAMDI

12/28/16 Trenching may be performed by machine or by hand, depending on the


DATE:
CONTROL NUMBER

field situation and/or requirements of this Specification or as determined by


VERIFICATION

the SAUDI ARAMCO representative.


EDSD

Typical trenching machines are backhoe, wheel excavator, rock breaker or


DATE:
BY:

rock saw.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Machine excavation is not permitted either near or under hydrocarbon,


C

water or other pipelines and telephone/ power cable facilities and such
(DCC) NO. _____________________

excavation shall be accordance with the standards SAES-T-911 and

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 162


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG SAES-B-064.
SAY
SAY
SAY

When authorized to open-cut road, CONTRACTOR shall cut the pavement


ENGG CERT

ASH
ASH
ASH

and excavate the trench as narrow as possible and place 4” PVC concrete
encased conduits as per SAES-T-928 Para 6.1.5. The disturbed roadbed
LEADS

LEADS
LEADS
ALL

ALL
ALL

shall be restored with the original type of fill and compacted to the
requirements of the relevant Road Authority. Hot mix asphalt shall be used
to restore the pavement to original condition.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

Shoring or sloping shall be required for safety, depending on soil


conditions and depth of trench.
DESCRIPTION

Dewatering may be required to permit the intended construction and to


enable compaction of the trench bottom and/or the backfill in accordance
with the reference standards and drawings.

Warning tape (terra tape) shall always be installed above the cable or
conduits. Refer to standard Drawing AA-036748.

A trench shall not be left open any longer than necessary. Cables or
conduits shall be placed concurrently with trench work, inspected and
10-02399-
JO/EWO

10-02399-
10-02399-
0001

backfill performed promptly.


0001
0001

12/28/16

F. TETRA RADIO SYSTEM (RFDT)


12/14/16

12/18/16
DATE

SCOPE DESCRIPTION
NO.
REV

G
E

DISCIPLINE
ENGINEER
General
ALL LEADS

DATE: 12/28/16 This defines the scope of CONTRACTOR to procure, design, install,
PROJECT
ENGINEER integrate, test and commission a TETRA base station at the new Operation
A M ALMATROOK and Maintenance Engineering building and associated radio terminals and
DATE: 12/28/16 accessories.
CERTIFIED
AMR EL SHARKAWY
CONTRACTOR shall provide indoor and outdoor coverage in Yanbu
12/28/16
DATE: Distribution Hub operational area. This new TETRA base station and
CONSTRUCTION
AGENCY TETRA Dispatch Workstations shall be integrated to the existing Saudi
SHAHZAD YAZDANI Aramco TETRA network in Yanbu NGL SCN network. All interfaces, cards
DATE: 12/28/16 and services required for integration with existing TETRA Network shall be
OPERATIONS
provided by CONTRACTOR.
ALI H GHAMDI

12/28/16
DATE: CONTRACTOR shall design, install, test and commission new antenna
CONTROL NUMBER

and transmission line system for the TETRA base station. The antenna
VERIFICATION

and transmission line system shall be installed on the proposed 25M Self-
EDSD

Supported Tower beside new Operation and Maintenance Engineering


building.
DATE:
BY:
REVISIONCERTIFICATION

Contractor shall perform all necessary radio coverage analysis and


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

frequency study to determine the optimum antenna type, transmission line


(DCC) NO. _____________________

system, antenna system configuration that assure radio coverage at Yanbu


Distribution Hub.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 163


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

CONTRACTOR shall install complete TETRA desktop radio at a fixed


location at the Operation Center & Control Room with separate radio
ENGG CERT

ASH
ASH
ASH

transceiver and control head at Operations and Engineering Maintenance


building.
LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR’s responsibilities shall include design, procure, install and


commission indoor repeater system to enhanced radio signal with the
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

following key buildings.

No Building number Building Name


DESCRIPTION

1 12 DAS-SHELTER-1
2 13 DAS-SHELTER-2
3 18 METERING ROOM-MARAFIQ
4 SS-XXX1 RECEIVING STATION TRANSFORMER YARD
5 SS-XXX2 REMOTE I/O BUILDING

CONTRACTOR shall be install complete TETRA desktop radio at the


Security gatehouse with complete outdoor antenna and its ancillaries.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

CONTRACTOR shall design, install, test and commission TETRA desktop


radio antenna and ancillaries. Antenna mast height is dependent on the
12/28/16
12/14/16

12/18/16
DATE

result of RF coverage required for suitable radio and indoor amplifier study.
In addition, antenna mast support, lightning arrestor and grounding system
should be included.
NO.
REV

G
E

DISCIPLINE
ENGINEER CONTRACTOR shall install antenna grounding and feeder system, and all
ALL LEADS
its ancillaries as per SAES-T-795 and SAES-T-887.
DATE: 12/28/16
PROJECT
ENGINEER CONTRACTOR shall be install outdoor antenna with 5 db gain or better.
A M ALMATROOK An undistorted radiation pattern shall be ensured by optimal placement of
DATE: 12/28/16 the antenna. All materials required for the complete installation of RFDT,
CERTIFIED
AMR EL SHARKAWY
including the radio, transmission line, connectors, antenna, conduits,
12/28/16 grounding, electrostatic protection, and wall penetration port shall be
DATE:
CONSTRUCTION
provided.
AGENCY
SHAHZAD YAZDANI
CONTRACTOR shall perform all necessary Indoor signal coverage
DATE: 12/28/16
analysis in all buildings, frequency study to determine the optimum
OPERATIONS
antenna type, transmission line system, antenna height, and antenna
ALI H GHAMDI
system configuration that assure radio coverage at Yanbu operational
12/28/16
DATE: area.
CONTROL NUMBER
VERIFICATION

The CONTRACTOR’s responsibilities shall include design, procurement,


EDSD

installation, upgrades, integrations, testing and commissioning of the


DATE:

Mobile Radio System which includes, Antenna System, Dispatch Work


BY:

Stations, Radio Frequency Dispatch Terminals.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

CONTRACTOR shall install the Dispatch Work Stations inside the Room
(DCC) NO. _____________________

204 of Yanbu Distribution Hub Maintenance & Engineering building.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 164


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG CONTRACTOR shall provide HPR encryption and authentication keys.
SAY
SAY
SAY
ENGG CERT

ASH
ASH
ASH

Dispatcher Work Station (DWS)


LEADS

LEADS
LEADS
ALL

ALL
ALL

Voice Logging Recorder


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

This project shall utilize the existing Logging Recorder in building


Communication Building 12 at YANBU NGL. CONTRACTOR shall
upgrade the logging recorder and provide licenses as required to
accommodate this project’s requirement.
DESCRIPTION

The number of Talk groups shall be determined by the proponent and


check the logging recorder at YANBU NGL, if it can accommodate the
project requirements otherwise, an upgrade shall be done by the project.

End-User Terminal

This section presents the type of Radio Frequency Dispatch Terminals


(RFDTs) and the associated accessories.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

a. Programming Tools
12/28/16
12/14/16

12/18/16
DATE

RFUT PC programming kits shall be provided for the configuration, fleet


mapping, profiling and maintenance of the end-user terminals. Each
programming kit shall include suitable software, programming cable, and
NO.
REV

G
E

DISCIPLINE
interface data port to configure the radio terminals.
ENGINEER
ALL LEADS
Tools for remote and centralized multi-programming of end-user radios
DATE: 12/28/16
PROJECT
shall be provided to enable off-site programming. The remote
ENGINEER programming kit shall be interconnected to the master terminal through the
A M ALMATROOK SAUDI ARAMCO corporate data network.
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY
Dispatcher Work Station (DWS)
12/28/16
DATE: CONTRACTOR shall install the Dispatch Work Stations inside Room 204
CONSTRUCTION
AGENCY of Yanbu Distribution Hub Maintenance & Engineering. Specifications are
SHAHZAD YAZDANI provided in terms of the workstation features, network interfacing,
DATE: 12/28/16 equipment hardware and accessories.
OPERATIONS
ALI H GHAMDI The table below identifies the key buildings to be equipped with DWS:-
12/28/16
DATE:
DWS Location Quantity
CONTROL NUMBER
VERIFICATION

Room-204, E&M Bldg 01


EDSD

DATE:
BY:

a. Network Interfacing
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Dispatcher workstations shall be interconnected through E1 circuits to


C

the SCN. For details refer to Block and Level Diagram-TETRA DWS
(DCC) NO. _____________________

drawing number CO-A10049.Sheet 001

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 165


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

b. Power
ENGG CERT

ASH
ASH
ASH

The Dispatcher Work Station (DWS) shall be powered from the


available 230VAC Uninterruptable Power Supply (UPS).
LEADS

LEADS
LEADS
ALL

ALL
ALL

Hand-Portable Radios (HPR)


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

10 HPRs will be provided under BI-02399. However, the exact quantity of


HPRs will be finalized during the detailed design.

HPR Transmit / Receive Specification:


DESCRIPTION

Frequency 410-430 MHz


Transmitter RF Power Minimum of 0.6 Watt with adaptive
power control of 3 steps of 5 dB
RF Channel Bandwidth 25 KHz
Receiver Static Sensitivity -112 dBm or better
Receiver Dynamic Sensitivity -103 dBm or better
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

a. Locating Feature
12/28/16
12/14/16

12/18/16
DATE

For location-type of applications, HPRs shall have built-in GPS


receivers and antennas and support Location Information Protocol.
NO.
REV

G
E

DISCIPLINE
b. Hazardous Classified Area Requirements
ENGINEER
ALL LEADS
The minimum Equipment Protection Level for handheld radios and its
DATE: 12/28/16
PROJECT
portables accessories shall be:
ENGINEER

A M ALMATROOK
Class 1, Zone 1, Gas Groups IIC (Acetylene, Hydrogen, Ethylene &
DATE: 12/28/16
CERTIFIED
Propane).
AMR EL SHARKAWY

12/28/16 All handheld and portable Digital Trunked radio devices shall be
DATE:
CONSTRUCTION intrinsically safe “ib” or “ia”.
AGENCY
SHAHZAD YAZDANI
All handheld devices shall adhere to the requirement of GI-0006.008 in
DATE: 12/28/16
OPERATIONS
terms of restriction, labelling and use.
ALI H GHAMDI

12/28/16
The Hand held radios (HPRs) shall be certified intrinsically Safe and
DATE:
adhere to Hazardous and Environmental classified areas requirement
CONTROL NUMBER
VERIFICATION

under SAES-P-100, SAES-B-068 and SAES-T-493 paragraph 6.5.


EDSD

c. Environmental Specifications
DATE:
BY:

HPRs shall be capable of operating in temperatures ranging from 0 to


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

+50 degrees Celsius and have protection against humidity, water and
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

dust. The HPR shall have loud voice which can operate in noisy areas.
(DCC) NO. _____________________

d. Size and Ergonomics


`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 166


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

The weight of an HPR shall be less than 450 grams its dimensions
within the 165x65x45mm limits.
ENGG CERT

ASH
ASH
ASH

e. Batteries and Chargers


LEADS

LEADS
LEADS
ALL

ALL
ALL

 The battery shall be capable of an operational duty cycle of


5/5/90 (Transmit/Receive/Idle for eight hours of continual use. Each
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

portable radio shall be provided with two batteries, one for


operational use and the other as spare battery. Batteries shall be
intrinsically safe.
DESCRIPTION

 Single unit battery chargers shall be provided with each radio


unit. Multiple unit battery chargers (5-slot minimum) shall be
provided in limited quantities.

 The battery chargers shall operate from 230VAC, 60 Hz. Battery


chargers shall be provided with an electrical cord that has a US-
Type end plug. Adapters for a European 230VAC type plug shall be
provided in limited quantities.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

- All accessories shall be intrinsically safe and interoperable.


12/28/16
12/14/16

12/18/16

Certificates for intrinsically safe rating and interoperability shall be


DATE

provided.
NO.
REV

G
E

- Each HPR's shall be supplied with carrying aids/accessories including


DISCIPLINE
ENGINEER carrying cases, belt clips and belt clips attachment. Some HPR's
ALL LEADS shall be equipped with Remote Speaker Microphone.
DATE: 12/28/16
PROJECT
ENGINEER Vehicle Mounted Radios (VMR)
A M ALMATROOK

DATE: 12/28/16 Six(6) VMRs will be provided under BI-02399. The exact quantity of VMRs
CERTIFIED
AMR EL SHARKAWY
will be finalized during the radio coverage analysis and traffic study.
12/28/16
DATE:
VMR Transmitter/Receiver Specifications:
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI Frequency 410-430 MHz
DATE: 12/28/16 Transmitter RF Power 3 Watt or higher
OPERATIONS RF Channel Bandwidth 25 KHz
ALI H GHAMDI RF Power Control Steps 5 dB
12/28/16
Receiver Static Sensitivity -112 dBm or better
DATE: Receiver Dynamic Sensitivity -103 dBm or better
CONTROL NUMBER

Input Power 13.8 VDC +/- 10%


VERIFICATION

Temperature Range -1000C to +5500C Operating


EDSD

-20 C to +70 C Storage


DATE:

For details, refer to VMR Block Diagram Drawing No. CO-A00006 sheet
BY:

001.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Radio Frequency Dispatch Terminals (RFDT)


(DCC) NO. _____________________

General Specification
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 167


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

 Three(3) RFDT shall be provided under this project. The RFDT is


a radio terminal device at a fixed location, such as an office or
ENGG CERT

ASH
ASH
ASH

control room, that interfaces to and operates on the System in a


LEADS

similar way as a handheld Portable Radio (HPR) or Vehicle


LEADS
LEADS
ALL

ALL
ALL

Mounted Radio (VMR) does, i.e. over the air.


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

The RFDT shall be powered from a 230VAC Uninterruptable


Power Supply (UPS).

 For details, refer to RFDT Block Diagram Drawing No.CO-A10050


DESCRIPTION

Sheet 001.

Features and Accessories

 RFDTs shall have separate transceiver bodies and control heads.

 Multiple desktop remote control functionality with PTT shall be


supported. The remote control heads shall be connected to the
RFDT via the buildings internal copper wiring or by installing
10-02399-
JO/EWO

10-02399-
10-02399-

separate lines. Each RFDT shall be capable to support at least six


0001

0001
0001

remote control heads controllable from a maximum distance of 100


meters. The necessary hardware to support up to six remote
12/28/16
12/14/16

12/18/16
DATE

control heads shall be provided and installed.


NO.
REV

G
E


F

Loudspeakers and speaker/microphone with PTT type of audio


DISCIPLINE
ENGINEER accessories shall be provided for all RFDTs.
ALL LEADS

DATE: 12/28/16  Security gates shall be provided and installed with outdoor
PROJECT
ENGINEER speakers to support personnel operations.
A M ALMATROOK

DATE: 12/28/16 RFDT Installation


CERTIFIED
AMR EL SHARKAWY

12/28/16
RFDTs shall be provided with all the required hardware including
DATE:
mounting brackets, RF feeder cables, data cables and connectors,
CONSTRUCTION
AGENCY Equipment rack and rack mounting kits shall be provided to mount
SHAHZAD YAZDANI
RFDTs inside Telecommunications Equipment Rooms. Surge protectors
DATE: 12/28/16 and grounding kit shall also be provided.
OPERATIONS
ALI H GHAMDI
RFDT Antenna Systems
12/28/16
DATE:
CONTROL NUMBER

RFDTs shall be provided with outdoor antenna, the antenna shall be 5 dBi
VERIFICATION

gain or better. An undistorted radiation pattern shall be ensured by optimal


EDSD

placement of the antennas.


DATE:
BY:

RFDT antennas shall be provided with built-in ground plate for grounding.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

The antenna size and BUC power shall be based on the link budget
C

analysis specified for the TETRA scope to ensure the minimum BER
(DCC) NO. _____________________

threshold required by the TETRA to not lose the MCCH.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 168


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

All materials required for the complete installation of RFDT's, including the
radio, transmission line, connectors, antenna, conduits (as required),
ENGG CERT

ASH
ASH
ASH

grounding, electrostatic surge protection, and wall/roof penetration port shall


be provided.
LEADS

LEADS
LEADS
ALL

ALL
ALL

Refer to the Radio Frequency Report under subcontract studies section of


this package for details.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

REFERENCE DRAWINGS
DESCRIPTION

Listed below are proposal engineering documents and drawings which shall
be finalized by CONTRACTOR during detail design.

DRAWING NO. SHEET NO. DRAWING TITLE


CO-A10049 001 BLOCK & LEVEL TETRA DWS, RM 204, E&M
CO-A10050 001 BLOCK & LEVEL TETRA RFDT, SECURITY GH
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

G. TRANSMISSION SYSTEM
12/28/16
12/14/16

12/18/16
DATE

SCOPE DESCRIPTION

SDH Equipment
NO.
REV

G
E

DISCIPLINE
ENGINEER BI-02399 shall provide new Alcatel 1646 SDH node at Yanbu Distribution
ALL LEADS
Hub. The proposed SDH node shall be STM-4 and shall be connected to
DATE: 12/28/16
PROJECT
Yanbu Refinery (60YREF0A
ENGINEER

A M ALMATROOK New STM-4 interface card shall be provided by this BI in Yanbu Refinery to
DATE: 12/28/16 connect the new 1646 SDH at Yanbu Distribution Hub as a spur of
CERTIFIED
AMR EL SHARKAWY 60YREF0A in Yanbu Refinery.
12/28/16
DATE:
CONSTRUCTION
AGENCY
CONTRACTOR shall provide one (1) New ES1-8FE Integrated Services
SHAHZAD YAZDANI
Adapter (ISA) card with 8 Fast Ethernet interface port shall be provided.
DATE: 12/28/16
OPERATIONS
Necessary port and interface cards shall also be provided for E1 interface
ALI H GHAMDI
port. Necessary DDF shall also be provided by the CONTRACTOR.
12/28/16
DATE:
The following circuits require connectivity through the new SDH:
CONTROL NUMBER

 TETRA Basetation – 2E1


VERIFICATION

 Dispatcher Workstation – 2E1


EDSD

 Power System Automation (PSA) – 2E1


DATE:
BY:
REVISIONCERTIFICATION

Communications Supervisory Alarm System (CSAS)


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C


(DCC) NO. _____________________

CONTRACTOR shall provide and install new CSAS remote


Terminal Unit at the Telecom Equipment Room of the Operations

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 169


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG and Maintenance Building.
SAY
SAY
SAY

 CONTRACTOR shall wire all facility and equipment alarms to the


ENGG CERT

ASH
ASH
ASH

CSAS RTU and shall be transmitted to the Dhahran Network


Operations Center.
LEADS

LEADS
LEADS
ALL

ALL
ALL

 CSAS System shall be equipped with data display, 20-60VDC, 32


RE-ISSUED FOR 100% PROJECT PROPOSAL

digital input, 16 Control Output, with necessary software for


RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

Aramco and with Ethernet interface.


DESCRIPTION

DRAWING NO. SHEET NO. DRAWING TITLE


CO-A10051 001 SDH TRANSMISSION SYSTEM

H. TEMPORARY COMMUNICATION REQUIREMENTS

SCOPE DESCRIPTION

 CONTRACTOR shall provide and install all temporary


10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001

communications services required during construction. This shall


0001

include, Outside Plant Cabling System, Structured Cabling System,


12/28/16
12/14/16

12/18/16

Data Network and Telephone System.


DATE

 All temporary communications facilities shall be decommissioned


NO.
REV

G
E

and removed after the completion of the project.


DISCIPLINE
ENGINEER
ALL LEADS  CONTRACTOR shall coordinate and obtain approval from Saudi
DATE: 12/28/16 Aramco for IT services (data and voice) provided through service
PROJECT
ENGINEER provider. CONTRACTOR should ensure this service provides
A M ALMATROOK Layer-2 supporting SSL-VPN connectivity. CONTRACTOR shall
DATE: 12/28/16 send the service provider quotation to Aramco IT group for review.
CERTIFIED
AMR EL SHARKAWY

12/28/16
DATE:
CONSTRUCTION
DRAWING NO. SHEET NO. DRAWING TITLE
AGENCY
SHAHZAD YAZDANI COA00060 001 BLOCK & LEVEL DIAGRAM - TELEPHONY
DATE: 12/28/16 001
COA00061 OVERALL LOGICAL DIAGRAM - DATA
OPERATIONS
ALI H GHAMDI COA00062 001 TRENCH AND CONDUIT LAYOUT
DATE:
12/28/16
COA00063 001 COPPER CABLE SCHEMATIC DIAGRAM
CONTROL NUMBER
VERIFICATION

COA00064 001 HORIZONTAL OUTLET LAYOUT


EDSD

COA00065 001 HORIZONTAL RISER DIAGRAM


DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

All temporary communications facilities shall be decommissioned


(DCC) NO. _____________________

and removed after the completion of the project.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 170


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG I. EMERGENCY SIREN SYSTEM (ESS)
SAY
SAY
SAY

CONTRACTOR shall design, procure, construct, test and commission a


ENGG CERT

ASH
ASH
ASH

permanent, fully flexible, operational and maintainable Emergency Siren


LEADS

LEADS
LEADS

System (ESS). The ESS shall facilitate alarm broadcasting and notification
ALL

ALL
ALL

service for the entire Yanbu Distribution Hub and shall follow SAES-B-071
standard.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

CONTRACTOR shall provide the ESS at Yanbu Distribution Hub in


accordance with applicable SAUDI ARAMCO Standards. CONTRACTOR
shall ensure that the provided System shall meet the best commercial
DESCRIPTION

practices, reliability, maintainability and performance.

CONTRACTOR shall provide and install ESS Control Station (CS) which
shall be composed but not to be limited to:

 Communication Control Unit


 Noise Cancelling Microphone
 Computer Workstation
10-02399-


JO/EWO

10-02399-
10-02399-

MassAlert Software (Customized for this project)


0001

0001
0001

 Battery (12VD, 7AH)



12/28/16
12/14/16

12/18/16

Antenna (w/ bracket)


DATE

 Antenna Cable
 Antenna Polyphasor – Lightning Strike Protector
NO.
REV

G
E

DISCIPLINE  Advance Communication Board


ENGINEER
ALL LEADS  Radio – Conventional UHF radio to be used for system
DATE: 12/28/16 communication
PROJECT
ENGINEER  Remote Status View
A M ALMATROOK

DATE: 12/28/16
CONTRACTOR shall provide and install the above Control Station at
CERTIFIED
AMR EL SHARKAWY Yanbu Distribution Hub in Operation Building. Activation of the sounders
DATE:
12/28/16 from the Control Station shall be realized through wireless
CONSTRUCTION
AGENCY
communication/connectivity which shall utilize commercial operating
SHAHZAD YAZDANI frequency between 330-360 Mhz Radio.
DATE: 12/28/16
OPERATIONS CONTRACTOR shall provide and install Stationary Electronic Sirens which
ALI H GHAMDI
shall be composed but not to be limited to:
12/28/16
DATE:


CONTROL NUMBER

3200 Watt High Powered Speaker Station


VERIFICATION

 Digitized Pre-Recorded voice Message Board/ACB


EDSD

 Antenna (w/ bracket)


DATE:


BY:

Antenna Cable

REVISIONCERTIFICATION

Antenna Polyphasor – Lightning Strike Protector


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 Radio – Conventional UHF radio to be used for system


C

(DCC) NO. _____________________

communication

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 171


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG CONTRACTOR shall provide and install the Stationary Electronics Sirens
SAY
SAY
SAY

based on site-specific computer-based modeling provided by Siren


ENGG CERT

ASH
ASH

Manufacturer/Vendor to ensure all areas are covered at the minimum


ASH

required sound level.


LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall ensure that the sounders for plants alerting shall be
placed at a minimum of 15 meters above local grade. The loudspeakers
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

shall emit horizontally.

CONTRACTOR shall provide, install and ensure that the sounders not be
closer than 15 meters to the windows of normally occupied buildings.
DESCRIPTION

CONTRACTOR shall provide the mounting poles, foundations, including all


required mounting accessories that shall be utilized by the sounders to
meet its full functionality.

The ESS system shall be powered from a nearest uninterruptible power


supply (UPS) system.

CONTRACTOR shall ensure that all installation shall follow all applicable
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

SAUDI ARAMCO Standards and/or the recommended vendor/manufacturer


procedures and details as stipulated in the user’s manual that is provided
12/28/16
12/14/16

12/18/16
DATE

along with the equipment/devices.

DRAWING NO. SHEET NO. DRAWING TITLE


NO.
REV

G
E

DISCIPLINE
ENGINEER CO-A100054 001 SYSTEM DIAGRAM, EMERGENCY SIREN SYS.
ALL LEADS

DATE: 12/28/16
PROJECT
ENGINEER J. PAGING SYSTEM
A M ALMATROOK

DATE: 12/28/16 CONTRACTOR shall design, procure, construct, test and commission a
CERTIFIED
AMR EL SHARKAWY permanent, fully flexible, operational, and maintainable In-Plant Paging
12/28/16 System (IPPS).
DATE:
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
This IPPS shall facilitate voice and alarm broadcasting services for the
Yanbu Distribution Hub in accordance with SAES-T-481 (In-Plant Voice
DATE: 12/28/16
OPERATIONS Paging System) and all SAUDI ARAMCO applicable standards.
ALI H GHAMDI

DATE:
12/28/16 Equipment to be provided as part of the System shall meet the best
commercial practices, reliability, maintainability and performance of the
CONTROL NUMBER
VERIFICATION

System.
EDSD

For the System, all equipment shall be located within the battery limits of
DATE:
BY:

the process area of the plant with desktop access units and switching
REVISIONCERTIFICATION

equipment to be installed in the Operation Building.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

The In-Plant Paging System (IPPS) shall consist of the following:

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 172


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG  Master Call Station/Access Units
SAY
SAY
SAY

 Controller or Master Control Unit


ENGG CERT

ASH
ASH
ASH

 Audio Messenger
LEADS

LEADS
LEADS
ALL

ALL
ALL

 Telephone Interface Unit


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

 Line Supervisory Unit

 Audio Power Amplifier


DESCRIPTION

 Signaling Devices (beacons)

The In-Plant Paging System (IPPS) shall also consist of the following:

 Equipment cabinets

 Access Panels/Call Stations, Tone & speech generator, Amplifiers


10-02399-
JO/EWO

and Inter cabling within junction boxes/enclosures.


10-02399-
10-02399-
0001

0001
0001

 Loudspeakers and loudspeaker drivers


12/28/16
12/14/16

12/18/16
DATE

 Mounting Assemblies and accessories


NO.
REV

G
E

DISCIPLINE  Power Supplies


ENGINEER
ALL LEADS

DATE: 12/28/16
 Uninterruptible Power Supply
PROJECT
ENGINEER

A M ALMATROOK
 Miscellaneous items where necessary to complete the System
DATE: 12/28/16
design e.g. acoustic booths, enclosures etc.
CERTIFIED
AMR EL SHARKAWY

12/28/16
DATE: Final locations of field devices shall be determined during detailed design;
CONSTRUCTION
AGENCY
however they shall typically cover the main process buildings/plant areas,
SHAHZAD YAZDANI together with the Operation buildings and Control Rooms.
DATE: 12/28/16
OPERATIONS In-Plant Communications equipment shall be able to operate under
ALI H GHAMDI
environmental conditions stated in the SAES-J-003.
12/28/16
DATE:
CONTROL NUMBER

All field equipment shall be suitable for use in its designated area
VERIFICATION

classification. Where applicable, equipment used in hazardous areas shall


EDSD

be certified as Intrinsically Safe.


DATE:
BY:

The System shall operate in high noise areas up to 80dBA with the support
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

and augmentation of Signaling Devices such as beacons or flashing lights.


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

Each indoor, outdoor or hazardous area loudspeakers and horns shall be

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 173


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG supported by a remote power amplifier for driving the loudspeakers.
SAY
SAY
SAY

The Cabling shall consist of the following as a minimum:


ENGG CERT

ASH
ASH
ASH

 System cable from system distribution equipment to the field devices


LEADS

LEADS
LEADS
ALL

ALL
ALL

with ground conductor and spare conductors (recommended cable


by manufacturer).
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

 Loudspeaker/Flashing Light cable shall contain two (2) or three (3)


conductors whichever is applicable per vendor recommendation.

 Cables shall be UL listed for indoor and outdoor applications.


DESCRIPTION

 Cables installed within a building shall be listed as being resistant to


the spread of fire in accordance with the National Electrical Code
(NEC) Article 800-50 and Article 800-51.

 Outer jacket of the cables shall be made of flame retardant, moisture


and ultraviolet resistant material to provide protection from oil,
chemical, mechanical and other environmental abuse.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

 Loudspeaker/Flashing Light cable shall be installed in ¾ inch Rigid


0001
0001

Steel Conduit from amplifier enclosures as required. All fittings,


12/28/16
12/14/16

12/18/16
DATE

enclosures and plugs shall be suitably certified for the hazardous


area.
NO.
REV

G
E

DISCIPLINE The power for the In-Plant Communications equipment shall be supplied
ENGINEER
ALL LEADS
from the UPS located in either of the Bulk Plant Control Room or Jetty
DATE: 12/28/16
Control Room and shall operate from a 230 VAC.
PROJECT
ENGINEER

A M ALMATROOK
DRAWING NO. SHEET NO. DRAWING TITLE
DATE: 12/28/16 CO-A10047 001 BLOCK & LEVEL DIAGRAM, IN-PLANT PAGING
CERTIFIED
AMR EL SHARKAWY

12/28/16
DATE:
CONSTRUCTION 4.14.1 IT NETWORK ENGINEER APPLICATION REQUIREMENT
AGENCY
SHAHZAD YAZDANI
IT physical infrastructure shall be fully documented in the geographic
DATE: 12/28/16
OPERATIONS information system (GIS) based IT Network Engineer (NE) application. The
ALI H GHAMDI CONTRACTOR shall include as part of his estimate the cost for Network
12/28/16 Engineer updates and documentation. The updates and documentation
DATE:
shall include:
CONTROL NUMBER
VERIFICATION
EDSD

a) Reservation of IT physical infrastructure: IT physical infrastructures


that are planned to be used as part of the project must be reserved in
DATE:

NE application. These reservations shall be renewed by the project


BY:

every six (6) months. IT physical infrastructures that are required to be


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

reserved in NE include:
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

 Power
 Space (floor space, rack space, wall space) in any IT Building or
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 174


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG IT controlled space (Telecommunication Rooms, etc.)
SAY
SAY
SAY

 Connections to any existing IT equipment


 Connections to any existing In Side Plant (ISP) cables and/or floor
ENGG CERT

ASH
ASH
ASH

outlets
 Connections to any existing IT Communications Grounding
LEADS

LEADS
LEADS
ALL

ALL
ALL

system
 Use of existing Outside Plant (OSP) ducts or sub-ducts
 Use of existing Outside Plant (OSP) cable pairs/strands
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

 Placement of Antennas on existing Towers

b) Project Proposal Design Package: IT physical infrastructure (both


Inside Plant (ISP) and Outside Plant (OSP)) engineering design shall
DESCRIPTION

be entered into NE upon the completion of the Project Proposal Phase.

c) Issued for Construction Design Package: IT physical infrastructure


(both Inside Plant (ISP) and Outside Plant (OSP)) engineering design
shall be entered into NE application upon the completion of Issued for
Construction (IFC) engineering design package.

d) As-Built Drawings: Actual "redline/as-built" updates of IT physical


infrastructure shall be updated in NE application upon the completion
10-02399-
JO/EWO

10-02399-
10-02399-
0001

of the project as part of the As-built Design package.


0001
0001

12/28/16

It shall be noted that the IT Network Engineer Access Policy only allows
12/14/16

12/18/16
DATE

user accounts for regular SAUDI ARAMCO employees or contractor


employees working under the direct supervision of IT/Engineering Tools
NO.
REV

G
E

and Documentation Group. Also, the application can only be accessed via
DISCIPLINE
ENGINEER
the SAUDI ARAMCO corporate Network.
ALL LEADS

DATE: 12/28/16 This requirement does NOT change or supersede any existing e- review or
PROJECT
ENGINEER IPlant drawings project submittal requirements.
A M ALMATROOK

DATE: 12/28/16 4.17 Fire Protection


CERTIFIED
AMR EL SHARKAWY
A. GENERAL
12/28/16
DATE:
CONSTRUCTION
AGENCY
This Project shall provide Fire water System to provide the required fire protection
SHAHZAD YAZDANI for the proposed facilities. The Fire water system shall consist of new fire water
DATE: 12/28/16 storage, New Fire Pumps and New dedicated Fire Water Network (Underground)
OPERATIONS for the proposed facilities. Water supply from MARAFIQ shall be used as the feed
ALI H GHAMDI source to the new fire water storage tanks.
12/28/16
DATE:
Companies selected for Design and Installation of Fire Water Systems shall have
CONTROL NUMBER
VERIFICATION

Certified Fire Protection Engineer, Qualified Engineers and Designers to Design,


EDSD

Install and Test Fire Water Systems and execute all other work requirements
competently in accordance with SAES-B-017.
DATE:
BY:
REVISIONCERTIFICATION

Fire Water Systems shall be Designed and Installed under the Supervision of a
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Registered Professional Engineer in the specialty of Fire Protection Engineering


C

with at least five (5) years of experience in the design of Fire Water Systems.
(DCC) NO. _____________________

Design Drawings and Hydraulic Calculations shall be submitted according to

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 175


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG SAUDI ARAMCO procedures for Plan and Equipment submittals.
SAY
SAY
SAY

All Tests of Fire Suppression System Shall be witnessed by designated


ENGG CERT

ASH
ASH
ASH

representative of Loss Prevention and Fire Protection Department as per SAES-


B-070, Section 7.5
LEADS

LEADS
LEADS
ALL

ALL
ALL

Hydraulic Calculations shall be performed using only software that complies with
requirements of SAUDI ARAMCO and calculations of NFPA 13. Software to be
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

utilized shall be the latest version.

Design, Drawings and Calculations for Fire Water and Foam System(s) shall be
supervised by a Registered Professional Engineer in the specialty of Fire
DESCRIPTION

Protection in accordance with SAES-B-070. All Drawings shall bear the seal of
that Registered Engineer. The Systems Detailed Design shall be Reviewed and
Approved by Chief Fire Prevention Engineers Representative.

All Fire Protectioin system shall be designed as per Saudi Aramco, Yanbu Royal
Commision and NFPA standards.

B. FIRE PROTECTION CONCEPT


10-02399-
JO/EWO

10-02399-
10-02399-


0001

0001

Fire Water Demand: Fire Water Demand shall be considered as a minimum


0001

1000 gpm and maximum of 4000 gpm based on the design basis requirement
12/28/16
12/14/16

12/18/16

specified in SAES-B-017, Clause 5.19.5 for Medium Risk Areas.


DATE

 Firewater demand shall be based on the single largest fire hazard within the
NO.
REV

G
E

facility.
DISCIPLINE
ENGINEER
ALL LEADS  Fire Water Storage: Two (2) Fire Water Storage Tanks equal in Size and
DATE: 12/28/16 dedicated only for firewater service shall be provided with total storage capacity
PROJECT
ENGINEER of 12 hours in accordance with SAUDI ARAMCO requirement for Hydrocarbon
A M ALMATROOK storage Facilities.
DATE: 12/28/16

AMR EL SHARKAWY
CERTIFIED
 Fire Water Supply: Fire Water supply shall be provided by MARAFIQ – ROYAL
12/28/16
COMMISSION as the primary source. Truck Filling Connection will also be
DATE:
CONSTRUCTION
provided as a backup.
AGENCY
SHAHZAD YAZDANI
 Firewater Pumping System: Dedicated Two (2) no. of Electric Driven Fire
DATE: 12/28/16
Pumps as primary Fire pumps, One (1) no. of Diesel Driven Fire Pumps as
OPERATIONS
100% backup Fire Pumps and Two (2) no. of Jockey Pumps (1-Duty & 1-
ALI H GHAMDI
Standby) to maintain the required pressure in the Fire Water Network. The
12/28/16
DATE: design of firewater pumps shall be in accordance with NFPA 20 and SAES-B-
CONTROL NUMBER

017. All Fire Pumps Shall be UL/FM approved.


VERIFICATION
EDSD

 Fire Water Distribution: A fire water distribution main shall be looped around
DATE:

the plant areas. Firewater main ring shall be located underground to protect it
BY:

from mechanical damage. Where the main cannot be buried, it shall be suitably
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

protected from vehicle impacts and the effects of fires and explosions. All
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Buried Piping are considered to be RTR, as per SAES-L-105, Line Class:


(DCC) NO. _____________________

1FE0U and Above Ground Piping are considered to be FBE Lined Carbon
Steel, as per SAES-L-105, Line Class: 1LE0U. The Fire Water Ring main shall
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 176


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG be hydraulically sized for the maximum Demand Flow Rates on the basis of
SAY
SAY
SAY

Dual Feed.
ENGG CERT

ASH
ASH
ASH

 Fire Water Hydrants: Fire Hydrants shall be located throughout the facility.
Hydrants shall be located not less than 15m from the protected risk and shall
LEADS

LEADS
LEADS
ALL

ALL
ALL

be spaced not more than 75m apart. Fire Hydrants shall be Wet Barrel type
Hydrants that meet ANSI/AWWA C503 requirements. The Wet Barrel Hydrant
shall be a Listed Commercial Unit that complies with AWWA and has a working
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

Pressure of 1380 kPag (200 PSIG). The Inlet shall be 6 inches in diameter with
approved Flat Face ANSI Flange.

 Fixed Foam System: Fixed Deluge Foam Water System shall be provided to
DESCRIPTION

protect Product Transfer Pumps and Shipper pumps with Two (2) no. of Foam
Skid package for Product Transfer pumps areas. Foam System shall be
provided in accordance with SAES-B-018 & NFPA 16 requirements. Transfer
pumps shall cover the pump casing and the floor or area at least 0.6 m (2 ft)
from the periphery of the casing. The suction and discharge flanges, casing
drain valves, gauge connections, balance lines, and pump seals shall be
included in the spray area.

 Semi Fixed Foam System: Semi Fixed Foam System to be provided for Open-
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

Top Floating Roof Tanks. This is a vendor Item and will be part of the Tank
Vendor package that will be responsible for the entire semi-fixed foam system
12/28/16
12/14/16

12/18/16

from top of tank to hose connection outside of the dike area.


DATE

 Portable Fire Fighting Equipment: Hand Held and Mobile Fire Extinguishers
NO.
REV

G
E

shall be provided for the Facilities. The Extinguishers shall be Selected and
DISCIPLINE
ENGINEER Positioned in areas of Risk relevant to their application as per SAES-B-019
ALL LEADS
requirements. Where extinguishers are protecting individual equipment, they
DATE: 12/28/16 shall be located at least 7.5m from the equipment’s.
PROJECT
ENGINEER

A M ALMATROOK  Barriers for Protection of Exposed Fire Fighting Equipment: CONTRACTOR


DATE: 12/28/16 shall provide and install Vertical Traffic Posts (Bollards) to protect all end
CERTIFIED
AMR EL SHARKAWY
devices. The Bollards shall be designed such that access to Equipment is not
12/28/16 impaired. The Bollards shall have the following requirements;
DATE:
CONSTRUCTION
AGENCY o Constructed of Steel not less than 100 mm in diameter and Concrete
SHAHZAD YAZDANI
filled.
DATE: 12/28/16
OPERATIONS
o Spaced not more than 1200 mm between posts on center.
ALI H GHAMDI

12/28/16
DATE: o Set not less than 900 mm deep in a Concrete Footing of not less than a
CONTROL NUMBER

400 mm diameter.
VERIFICATION
EDSD

o Set with the Top of the ports not less than 914 mm Above Ground.
DATE:
BY:

o Horizontal Cross-Bars between Vertical Posts are prohibited.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

o Located not less than 900 mm from any part of the Hydrant or Fire
(DCC) NO. _____________________

Protection Equipment protected.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 177


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG o Guard Post shall not be installed in-line (directly in front of) with any of
SAY
SAY
SAY

the Hydrant or Fire Protection Equipment outlets where the Fire Hose is
attached and where the Posts could contact the Hose when it gets
ENGG CERT

ASH
ASH
ASH

pressurized and gets stiff in a straightened position.


LEADS

LEADS
LEADS
ALL

ALL
ALL

 Hydro – Testing Requirements:

o Hydro-Testing of complete Fire Protection System shall be performed in


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

accordance with SAES-B-017 and SAES-A-004 requirements.

o Prior to Hydro-Testing, the System shall be flushed in accordance with


NFPA 24.
DESCRIPTION

o For Above Ground Piping or for Under Ground Piping prior to Burial, newly
installed Fire Protection Systems in Water Service, regardless of materials,
shall be Hydrostatically Tested to 1,380 kPag (200 PSIG) or 345 kPag (50
PSIG) in excess of maximum operating pressure, whichever is greater, and
held without pressure loss for 4 hours. All Piping is required to be Hydro-
Tested, including that of open ended piping for Deluge Systems.

o For Underground installations, Test Duration shall be 24 hours if piping


10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001

welds and joints cannot be left exposed during Testing. All Hydrostatic
0001

Tests of Fire Water Systems shall be recorded continuously. Partially


12/28/16
12/14/16

12/18/16

Buried Systems shall be treated as Underground Installations. For Fire


DATE

Water Systems not Hydro-Tested as a single system during Construction, a


Final Full System Hydro-Test is required to be made before Final
NO.
REV

G
E

Acceptance.
DISCIPLINE
ENGINEER
ALL LEADS o Safety Procedures in accordance with GI-0002.102 shall be followed during
DATE: 12/28/16 Pressure Testing.
PROJECT
ENGINEER

A M ALMATROOK o Dry Pipe Fire Protection System shall be Hydro-Tested in accordance with
DATE: 12/28/16 NFPA 13 and SAES-B-017.
CERTIFIED
AMR EL SHARKAWY
C. FIRE PROTECTION CONCEPT
12/28/16
DATE:


CONSTRUCTION
AGENCY CONTRACTOR scope of work shall include but not limited to the, detailed
SHAHZAD YAZDANI engineering design, procurement, quality control and quality assurance
DATE: 12/28/16 documentation, construction, as-built documentation, inspection, testing, pre-
OPERATIONS
commissioning, assistance to commissioning and start-up for all Fire Protection
ALI H GHAMDI
Work associated with this project.
12/28/16
DATE:


CONTROL NUMBER

CONTRACTOR shall Design and Construct the New Fire Piping System
VERIFICATION

(Underground) in the new expansion Area, in accordance with applicable


EDSD

SAUDI ARAMCO Engineering Standards - SAES-B-017, SAES-B-018, SAES-


DATE:

B-019, SAES-B-070, SAUDI ARAMCO Engineering Specifications and


BY:

applicable NFPA standards.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

CONTRACTOR shall provide and install New Fire Water Network


(DCC) NO. _____________________

(Underground) with Piping, Fittings, Fire Hydrant, Fire Monitor, Live Hose reel
and Post Indicator Valves as show on Fire Protection drawing FI-A00011-001
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 178


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG and FIA00016-001 .
SAY
SAY
SAY

 CONTRACTOR shall provide and install Two (2) new Electric Driven Fire
ENGG CERT

ASH
ASH
ASH

Pumps, One (1) new Diesel Driven Fire Pump along with One (1) Diesel Tank
and Two (2) new Jockey Pumps as shown on drawings # FIA00011-003.
LEADS

LEADS
LEADS
ALL

ALL
ALL

 CONSTRUCTION CONTRACTON shall provide Two (2) New Foam Skids for
RE-ISSUED FOR 100% PROJECT PROPOSAL

Product Pumps as show on the Fire Protection drawings FIA0012-001 and


RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

FIA00013-001.

CONTRACTOR shall provide Deluge Foam Water Spray system with all Piping,
Fittings, Air Aspirated Foam Nozzles, Deluge Valves, Gate Vales, Y-Strainers
DESCRIPTION

for the Product pumps as per SAES-B-017 and SAES-B-070, as shown on Fire
Protection drawings FIA00012-002, FI-A00013-002, FIA00018.001, FIA00019-
001, FIA00019-002, FIA00019-003, FIA00019-007.

 CONTRACTOR shall provide necessary Caution / Identification Signs for the


Fire Protection System components as per SAUDI ARAMCO and NFPA
requirements.

 CONTRACTOR shall Paint all Above-ground Fire Protection Piping and


10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

Components in Safety Red Color.


12/28/16
12/14/16

12/18/16


DATE

CONTRACTOR shall Provide One Monitor Coverage for Custody Metering


Skids for YDH and SAMREF Area.
NO.
REV

G
E

DISCIPLINE
 CONTRACTOR shall perform Hydro-Testing of complete Fire Protection
ENGINEER System as per SAES-B-017 & SAES-A-004 requirements.
ALL LEADS

DATE: 12/28/16
PROJECT
 CONTRACTOR shall install two-wheel, cart type dry chemical, 68 kg size BC
ENGINEER extinguisher units as specified in Table -1, SAES-B-019, They shall be covered
A M ALMATROOK
with the manufacture’s cover or housed inside a roofed, noncombustible shed,
DATE: 12/28/16 with access door facing in the opposite direction of hydrocarbon handling
CERTIFIED
AMR EL SHARKAWY equipment.
12/28/16
DATE:
CONSTRUCTION  CONTRACTOR shall install 12.5 Kg BC type dry chemical hand fire
AGENCY
extinguisher shall be provided at least 7.5m for the protect pumps being
SHAHZAD YAZDANI
protected.
DATE: 12/28/16
OPERATIONS
ALI H GHAMDI
 All Fire Protection Equipment and Appurtenances shall be purchased as
12/28/16 specified in the SAUDI ARAMCO Materials System and SAES-U-101.
DATE:
CONTROL NUMBER
VERIFICATION

 All Below Grade Valves in Fire Protection Systems shall be listed for use in Fire
EDSD

Service.
DATE:

 All Below Grade Block Valves in Main or Branch Service shall be Listed Post
BY:

Indicator Type Valve with Position Indicators above Grade to meet the
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

requirements of NFPA 24.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

 All Manual Block Valves in Fire Protection Service shall be Car-Sealed in their

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 179


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Normal Operating Position or shall be otherwise supervised per NFPA 24.
SAY
SAY
SAY

 Block Valves located on Above Grade Piping shall be Accessible as per SAES-
ENGG CERT

ASH
ASH
ASH

B-054.
LEADS

LEADS
LEADS
ALL

ALL
ALL

 Commissioning and Testing Procedures for Foam Spray System shall meet the
requirements of NFPA 16. All Tests shall be witnessed by Designated SAUDI
RE-ISSUED FOR 100% PROJECT PROPOSAL

ARAMCO Representatives of the Loss Prevention and Fire Protection


RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

Departments.

 Fire Protection Requirement in SAMREF as detailed in Project Scoping Paper


DESCRIPTION

(GEN-E0103).

D. INSTRUMENTATION

Fire Water System:

 CONTRACTOR shall provide and install field instruments such as pressure


indicator, level transmitters, motor operated valves (MOV) for fire water
tanks as indicated in P &ID drawing FIA00011-002.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

 CONTRACTOR shall provide and install field instruments such pressure


indicators, pressure transmitters, flow meters, pressure control valves as
12/28/16
12/14/16

12/18/16
DATE

depicted in P & ID FIA00011-002 & FIA00011-003.


 As a minimum two (2) junction shall be provided, one each for analog and
NO.
REV

G
E

digital signals as per SAES-J-902.


DISCIPLINE


ENGINEER
ALL LEADS CONTRACTOR shall provide and install homerun cables from fire water
DATE: 12/28/16 tanks X40-D-0701/702 to DCS cabinet located in rack room of O & M
PROJECT
ENGINEER
Building.
A M ALMATROOK Foam Generating Skid 1 & 2:
DATE: 12/28/16
CERTIFIED Foam skid vendor shall provide skid instrumentation and control,
AMR EL SHARKAWY
CONTRACTOR shall provide and install data communication cables from
12/28/16 Foam Skid Control Panel to DCS as per block diagram IN-A00001.010.
DATE:
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI  Reference drawings
DATE: 12/28/16
OPERATIONS Drawing # Description
ALI H GHAMDI IN-A00001 System Block Diagrams
DATE:
12/28/16 IN-A00002 Instrument Block Diagrams
CONTROL NUMBER

IN-A00027 Instrument Points & Lines


VERIFICATION

IN-D00201 Instrument Installation Schedule-Flow


EDSD

IN-D00202 Instrument Installation Schedule-Pressure


DATE:
BY:

IN-D00203 Instrument Installation Schedule-Level


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

IN-D00204 Instrument Installation Schedule-Temperature


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

IN-D00205 Instrument Installation Schedule-Misc


(DCC) NO. _____________________

IN-D00206 Instrument Installation Schedule-MOV/GOV/HOV/AOV

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 180


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG
Drawing # Description
SAY
SAY
SAY

IN-D00207 Instrument Installation Schedule-Relief Valves


ENGG CERT

ASH
ASH
ASH

IN-A00004 Equipment Layouts


IN-A00003 Cable Routing Plan
LEADS

LEADS
LEADS
ALL

ALL
ALL

IN-D00005 Cable and Conduit Schedule


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

E. MECHANICAL - ROTATING EQUIPMENT

 Contractor shall provide following sets of Fire Water Pumps at YDH.


DESCRIPTION

 Diesel Engine Driven Fire Water Pump – 1 No. (X40-G-0035,


Datasheet No. RE-E00119)
 Electric Motor Driven Fire Water Pump – 2 Nos. (X40-G-0034 A/B,
Datasheet No. RE-E00118)
 Fire Water Jockey Pumps – 2 Nos. (X40-G-0036 A/B, Datasheet
No. RE-E00120)
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001


0001

Reference shall be made to individual pump datasheets included in index-G.


12/28/16
12/14/16

12/18/16
DATE

Fire Water pumps shall be selected in accordance with SAES-G-005 and


SAES-B-017. Fire Water Jockey pumps shall be in accordance with ASME
NO.
REV

B73.1. Fire Water Main Pumps (Diesel Engine Driven and Electric Motor
G
E

DISCIPLINE
ENGINEER
Driven) shall be in accordance with NFPA 20 and are of axial split, between
ALL LEADS bearing design due to their high flow requirement. This design is also
DATE: 12/28/16 maintenance friendly at site as top half of the pumps can easily be open to
PROJECT
ENGINEER access the internal components without disturbing the piping connections.
A M ALMATROOK

DATE: 12/28/16
CERTIFIED
MISCELLANEOUS REQUIREMENTS
AMR EL SHARKAWY

DATE:
12/28/16  Reference shall be made to technical specifications for pumps included in
CONSTRUCTION
AGENCY
Index-A for further details of these pumps.
SHAHZAD YAZDANI

DATE: 12/28/16  Pump Datasheets provided in this package are preliminary only. These will be
OPERATIONS
further verified by CONTRACTOR during detailed design phase of the project
ALI H GHAMDI

12/28/16
before issuing for procurement activities.
DATE:
CONTROL NUMBER
VERIFICATION

 CONTRACTOR shall be responsible for producing equipment datasheet, SIS


EDSD

sheets, Noise Datasheets in accordance with SAUDI ARAMCO standard forms


and datasheets.
DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

 All pumps will be procured by CONTRACTOR from SAUDI ARAMCO approved


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

manufacturer for each Commodity Classification Code (CCC). SAUDI


(DCC) NO. _____________________

ARAMCO will provide the list of approved manufacturers after award of

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 181


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Contract.
SAY
SAY
SAY


ENGG CERT

ASH
ASH
ASH

CONTRACTOR shall prepare Material Requisition Package for all the pumps
and shall obtain approvals from relevant SAUDI ARAMCO Departments before
LEADS

LEADS
LEADS
ALL

ALL
ALL

issuing to Vendors.

 Material take-offs have been prepared for reference only and will not be
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

considered as contractual documents and cannot be used as a basis for any


change order.
 Technical quotations obtained from vendors will list all exceptions and /or,
DESCRIPTION

additions to applicable project Drawings and SAUDI ARAMCO Specifications. If


there is no exception to specifications, CONTRACTOR will make a statement
to that effect.

 CONTRACTOR shall be responsible for Technical Bid Evaluation, placing the


Purchase Order to technically approved Vendors.

 CONTRACTOR shall be responsible for review and approval of NMRs 601, 602
10-02399-
JO/EWO

10-02399-
10-02399-
0001

and 603.
0001
0001

12/28/16
12/14/16

12/18/16


DATE

Inspection and Testing of CONTRACTOR supplied materials will be performed


as per applicable SAUDI ARAMCO Inspection Requirement form A-175.
CONTRACTOR will arrange with his sub suppliers to comply with these
NO.
REV

G
E

DISCIPLINE requirements by stating on all sub suppliers’ purchase order SAUDI ARAMCO’s
ENGINEER
ALL LEADS intention to inspect material.
DATE: 12/28/16
PROJECT
ENGINEER  Equipment installation and Commissioning shall be in accordance with
A M ALMATROOK
approved Vendor’s installation and commissioning procedures.
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY
 Supply of Commissioning and Start-up spares and first fill of all the lubricants
12/28/16
DATE: and chemicals is in the scope of CONTRACTOR. CONTRACTOR shall obtain
CONSTRUCTION
AGENCY approval of Aramco Operations before filling of lubricants and chemicals.
SHAHZAD YAZDANI

DATE: 12/28/16
OPERATIONS
 CONTRACTOR will provide all Non Material Requirement (NMR-602/603),
ALI H GHAMDI Operation and Instruction Manuals of CONTRACTOR supplied material in
DATE:
12/28/16 electronic format (Latest Acrobat Reader).
CONTROL NUMBER
VERIFICATION

 CONTRACTOR will provide critical spare parts for CONTRACTOR supplied


EDSD

items in accordance with SAEP-3101. Contractor will develop list of critical


DATE:

plant equipment spares and identification


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

4.18 Industrial Drainage System

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 182


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG A. GENERAL
SAY
SAY
SAY

CONTRACTOR shall connect the industrial drain generated within the facility to the
ENGG CERT

ASH
ASH
ASH

YDH evaporation pond. All industrial drainages shall be treated in the oily water
treatment system. The industrial oily water treatment system shall consist of but not
LEADS

LEADS
LEADS
ALL

ALL
ALL

limited to an oily water equalization tank, CPI separator, water break tank, two effluent
water pumps (one operating, one spare), two skimmed oil pumps (one operating, one
spare) and necessary instrumentation and interconnecting piping.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

The oily water treatment system shall be of a complete vendor skid design and the
treatment system shall receive the effluent from the oily water sump via normal flow
pump, main source of oily water will be dewatered effluent from the product storage
DESCRIPTION

tanks. CONTRACTOR shall route the dewatered effluent from the tanks to the oily
water lift stations and then effluent will transfer from normal flow pumps to the
equalization tank.

The CPI vendor shall provide the pump to transfer the recovered oil from the CPI to
the slop tank while effluent water to be transferred to the YDH evaporation pond.

CONTRACTOR and CPI system vendor shall ensure that the treated water meets the
effluent water quality requirement for YRC.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

12/28/16

The current design considers a permanent drain connection to MARAFIQ industrial


12/14/16

12/18/16
DATE

water network; however at a later stage this connection is no longer required. LSTK
Contractor shall delete the industrial drainage from YDH to MARAFIQ outlined in PFD
NO.
REV

G
E

VA-247846.001 & VA-247848.001 and P&ID VA-247921.001 to VA-247923.001, and


DISCIPLINE
ENGINEER
downside the drain pump.
ALL LEADS

DATE: 12/28/16 B. CIVIL


PROJECT
ENGINEER  Storm water inside the tank farm dikes, plinth areas of pumps and other
A M ALMATROOK process areas, are considered contaminated water. Contaminated water
DATE: 12/28/16 shall be collected by standard oily catch basin and will pass through RTR
CERTIFIED pipe connected to the oily water sewer network and conveyed to OWLS.
AMR EL SHARKAWY

12/28/16
DATE:  Contaminated water from the tank farm dikes will be controlled by a 10”
CONSTRUCTION
AGENCY diameter gate valve connected to the oily water sewer network. Further, in
SHAHZAD YAZDANI case of Major flood/raptor an additional 4” gate valve and 4” pipe branch line
DATE: 12/28/16 with vacuum truck connection shall be provided outside the dike oily water
OPERATIONS
pipe.
ALI H GHAMDI

DATE:
12/28/16
 Dewatering from Diesel tanks shall be connected to the Oily water system
CONTROL NUMBER

from the diked areas. Dewatering from the Kerosene and Gasoline tanks
VERIFICATION

shall be connected to a separate oily water system and conveyed to OWLS.


EDSD

 CONTRACTOR shall provide two (2) Oily water Lift Station wherein the
DATE:
BY:

OWS inlet pipe will be connected. CONTRACTOR shall assess and re-
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

validate the design of the OWS drainage system. The internal wall of the lift
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

stations shall be coated with APCS-3 or better and while the exterior wall
(DCC) NO. _____________________

shall be coated with APCS-10 on below ground and exterior coating above
ground shall be APCS-1B.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 183


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

 Contractor shall construct a sand separator /trap tank properly designed to


retain sand particles from reaching the sump pumps. The oily water
ENGG CERT

ASH
ASH
ASH

network will discharge to the sand separator tank before the OWLS. The
inlet pipe to the sand separator will include a gate valve indicator O&Y for
LEADS

LEADS
LEADS
ALL

ALL
ALL

the purposes of controlling water entering to the sand separator while


maintenance is performing.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

 Each oily water lift station shall be provided with two pumps for normal flow
(one operating, one spare) and two pumps for maximum flow (one
operating, one spare). The normal flow pumps will discharge to an oily
water treatment system whereas the maximum flow pump shall discharge
DESCRIPTION

to the Evaporation pond.

 CONTRACTOR shall provide sealed oily catch basin as per standard


drawing no. AB-036402 and /or drawing no. AC-036078 inside pump
house, scraper area and transformer area. Provide customize sealed catch
basin inside dike area.

 CONTRACTOR shall provide an 8”, 10”, 12” and 16” diameter RTR pipe,
IFE0U, 01-SAMSS-034 for underground oily water gravity sewer.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

CONTRACTOR shall re-validate the propose size during detail design


stage. CONTRACTOR shall provide required fittings to complete the
12/28/16
12/14/16

12/18/16

system.
DATE

 To prevent fire transferring from an area to another area, the Oily water
NO.
REV

G
E

network will be connected using sealed inlet oily water manholes following
DISCIPLINE
ENGINEER standards and drawings details supplied in civil drawings.
ALL LEADS

DATE: 12/28/16
PROJECT
 To prevent that oily water manholes will collapse by sand sedimentation,
ENGINEER the contractor shall construct catch basin lids/grates with means to retain
A M ALMATROOK sand from reaching the pipe network.
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY  Provide underground oily water sewer pressure line from oily separation to
12/28/16 evaporation pond.
DATE:
CONSTRUCTION
AGENCY
 Provide oily water sewer connection from transformer retention channel to
SHAHZAD YAZDANI
oily water sewer network.
DATE: 12/28/16
OPERATIONS
ALI H GHAMDI
 Provide neutralization pit for all battery acid wash water which shall be
12/28/16 connected to oily water sewer network. Neutralization pit shall be coated
DATE:
with, acid resistant material. The pit shall be sized for the expected waste
CONTROL NUMBER
VERIFICATION

acid flow and dilution or wash-down water. The pit shall be in a readily
EDSD

accessible location, and shall be vented to the outside. The minimum vent
size shall be 63 mm (2 in) OD as per SAES-S-060 para. 811.9C.
DATE:
BY:

 Provide oily water connection from foam skid, fire water pump house,
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

metering skid, CPI separator and all pumps containment area.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

 Provide clean out at maximum spacing of 30 meter distance and in every

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 184


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG change of direction.
SAY
SAY
SAY

 CONTRACTOR shall consider the latest revision of the Royal Commission


ENGG CERT

ASH
ASH
ASH

Environmental Regulations (RCER) in validating the design for Industrial


Waste.
LEADS

LEADS
LEADS
ALL

ALL
ALL

 Refer to drawing: CI-A00119 sheet 001-015


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

 The lift station construction shall be in accordance with ACI 350 as a water
tight structure. Concrete compressive strength shall be 34.474 MPa (5000
PSI) minimum.
DESCRIPTION

 LSTK CONTRACTOR shall consider the no. of drain points of tanks as per
P&ID VA-247904-001.

C. MECHANICAL – ROTATING EQUIPMENT

Oily water sumps at YDH will be provided with following sets of pumps:

1. Oily Water Normal Flow Pumps for OWS -1 & 2


2. Oily Water Maximum Flow Pump for OWS-1 & 2
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

Each Oily Water Sump will be provided with 02 sets of normal flow pumps and 01
12/28/16
12/14/16

12/18/16

maximum flow pumps. Vertical discharge through column type pumps in


DATE

accordance with 31-SAMSS-004 shall be selected for this service. This is due to
the reason that latest update of SAES-G-005 prohibits the use of self-priming
NO.
REV

G
E

pumps for Oily Water Sump services if flammable liquids are going to be drained to
DISCIPLINE
ENGINEER these sumps.
ALL LEADS

DATE: 12/28/16 Reference shall be made to Index-G of FEL-3 package for pump datasheets.
PROJECT
ENGINEER Below are the pump tag numbers and datasheet numbers.
A M ALMATROOK

DATE: 12/28/16 X40-G-0027 A/B RE-E00110


CERTIFIED OWS LIFT STATION NO.1 -
AMR EL SHARKAWY
NORMAL FLOW
12/28/16
DATE: X40-G-0028 RE-E00111
CONSTRUCTION OWS LIFT STATION NO.1 -
AGENCY
SHAHZAD YAZDANI
MAXIMUM FLOW
DATE: 12/28/16
X40-G-0033 A/B RE-E00116
OWS LIFT STATION NO.2 -
OPERATIONS
NORMAL FLOW
ALI H GHAMDI
X40-G-0017 RE-E00117
DATE:
12/28/16 OWS LIFT STATION NO.2 -
MAXIMUM FLOW
CONTROL NUMBER
VERIFICATION

.
EDSD

MISCELLANEOUS REQUIREMENTS
DATE:
BY:


REVISIONCERTIFICATION

Reference shall be made to technical specifications for pumps included in


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Index-A of FEL-3 package for further details of these pumps.


C

(DCC) NO. _____________________

 Pump Datasheets provided in FEL-3 package are preliminary only. These will
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 185


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG be further verified by CONTRACTOR during detailed design phase of the
SAY
SAY
SAY

project before issuing for procurement activities.


ENGG CERT

ASH
ASH
ASH

 CONTRACTOR shall be responsible for producing equipment datasheet, SIS


LEADS

LEADS
LEADS
ALL

ALL
ALL

sheets, Noise Datasheets in accordance with SAUDI ARAMCO standard forms


and datasheets.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

 All pumps will be procured by CONTRACTOR from SAUDI ARAMCO approved


manufacturer for each Commodity Classification Code (CCC). SAUDI
ARAMCO will provide the list of approved manufacturers after award of
DESCRIPTION

Contract.
a
 CONTRACTOR shall prepare Material Requisition Package for all the pumps
and shall obtain approvals from relevant SAUDI ARAMCO Departments before
issuing to Vendors.

 Material take-offs have been prepared for reference only and will not be
considered as contractual documents and cannot be used as a basis for any
10-02399-
JO/EWO

10-02399-
10-02399-
0001

change order.
0001
0001

12/28/16
12/14/16

12/18/16


DATE

Technical quotations obtained from vendors will list all exceptions and /or,
additions to applicable project Drawings and SAUDI ARAMCO Specifications. If
there is no exception to specifications, CONTRACTOR will make a statement
NO.
REV

G
E

DISCIPLINE to that effect.


ENGINEER
ALL LEADS

DATE: 12/28/16  CONTRACTOR shall be responsible for Technical Bid Evaluation, placing the
PROJECT
ENGINEER Purchase Order to technically approved Vendors.
A M ALMATROOK

DATE: 12/28/16
CERTIFIED  CONTRACTOR shall be responsible for review and approval of NMRs 601, 602
AMR EL SHARKAWY
and 603.
12/28/16
DATE:


CONSTRUCTION
AGENCY Inspection and Testing of CONTRACTOR supplied materials will be performed
SHAHZAD YAZDANI
as per applicable SAUDI ARAMCO Inspection Requirement form A-175.
DATE: 12/28/16
OPERATIONS
CONTRACTOR will arrange with his sub suppliers to comply with these
ALI H GHAMDI requirements by stating on all sub suppliers’ purchase order SAUDI ARAMCO’s
DATE:
12/28/16 intention to inspect material.
CONTROL NUMBER
VERIFICATION

 Equipment installation and Commissioning shall be in accordance with


EDSD

approved Vendor’s installation and commissioning procedures.


DATE:
BY:

 Supply of Commissioning and Start-up spares and first fill of all the lubricants
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

and chemicals is in the scope of CONTRACTOR. CONTRACTOR shall obtain


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

approval of Aramco Operations before filling of lubricants and chemicals.


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 186


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG  CONTRACTOR will provide all Non Material Requirement (NMR-602/603),
SAY
SAY
SAY

Operation and Instruction Manuals of CONTRACTOR supplied material in


ENGG CERT

ASH
ASH
ASH

electronic format (Latest Acrobat Reader).


LEADS

LEADS
LEADS
ALL

ALL


ALL

CONTRACTOR will provide critical spare parts for CONTRACTOR supplied


items in accordance with SAEP-3101. Contractor will develop list of critical
plant equipment spares and identification
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

D. MECHANICAL- STATIC EQUIPMENT

CONTRACTOR shall be responsible for supply, procurement, fabrication,


DESCRIPTION

transportation handling, storage at site, erection, inspection, testing and


commissioning of all equipment and packages.

CONTRACTOR shall take necessary precautions in handling the equipment to


prevent any damage during transportation and loading/unloading.

CONTRACTOR shall develop and submit for SAUDI ARAMCO acceptance rigging
plans and transportation calculations for all major equipment.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

CONTRACTOR shall supply spreader bars, shackles, and slings for the lifting of
0001
0001

equipment.
12/28/16
12/14/16

12/18/16
DATE

All equipment shall be installed and commissioned as per SAUDI ARAMCO


Standards and Manufacturer recommendations.
NO.
REV

G
E

DISCIPLINE
ENGINEER
CONTRACTOR shall be responsible for insulation (where specified on the data
ALL LEADS sheet or P&IDs) and fireproofing (where specified on the data sheet or P&IDs).
DATE: 12/28/16
PROJECT
ENGINEER
All skid packages design shall be vendor proven design. Skid packages shall be
A M ALMATROOK
suitable for the specific application by meeting all the process design requirements
DATE: 12/28/16
and environmental, safety and Industry standards.
CERTIFIED
AMR EL SHARKAWY

12/28/16
DATE: Reference Documents for Oily Water Treatment System
CONSTRUCTION
AGENCY Document # Description
SHAHZAD YAZDANI EQ-E00030 Datasheet for Oily Water Treatment System
DATE: 12/28/16 EQ-E00009 Technical Specification for Oily Water
OPERATIONS Treatment System
ALI H GHAMDI

DATE:
12/28/16 CONTRACTOR shall provide oily water treatment package as per above
reference documents.
CONTROL NUMBER
VERIFICATION
EDSD

E. INSTRUMENTATION
DATE:
BY:
REVISIONCERTIFICATION

CONTRACTOR shall provide and install oil-in-water analyzer at the inlet and outlet
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

of CPI Separator skid as indicated in P & ID and IPL. The skid instrumentation
C

shall be provided by skid vendor.


(DCC) NO. _____________________

CONTRACTOR shall provide and install field junction boxes to connect CPI skid
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 187


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG instrument to DCS for remote monitoring and control.
SAY
SAY
SAY

Provide and install homerun cables from CPI skid X40-X-1101 to remote I/O
ENGG CERT

ASH
ASH
ASH

cabinet located in RIB-2. The cable shall be routed on the cable trays.
Hydro carbon detectors to be provided at the sump for the oily water sumps.
LEADS

LEADS
LEADS
ALL

ALL
ALL

 Reference drawings
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

Drawing # Description
IN-A00001 System Block Diagrams
IN-A00002 Instrument Block Diagrams
IN-A00027 Instrument Points & Lines
DESCRIPTION

IN-D00201 Instrument Installation Schedule-Flow


IN-D00202 Instrument Installation Schedule-Pressure
IN-D00203 Instrument Installation Schedule-Level
IN-D00204 Instrument Installation Schedule-Temperature
IN-D00205 Instrument Installation Schedule-Misc
IN-D00206 Instrument Installation Schedule-MOV/GOV/HOV/AOV
IN-D00207 Instrument Installation Schedule-Relief Valves
10-02399-
JO/EWO

10-02399-
10-02399-

IN-A00004 Equipment Layouts


0001

0001
0001

IN-A00003 Cable Routing Plan


12/28/16
12/14/16

12/18/16

IN-D00005 Cable and Conduit Schedule


DATE

.
NO.
REV

G
E

DISCIPLINE 4.19 GRADING & STORM WATER DRAINAGE


ENGINEER
ALL LEADS
A. CIVIL
DATE: 12/28/16
PROJECT
ENGINEER
A. CONTRACTOR shall achieve the finish grade level as per required
A M ALMATROOK
design in all the proposed tank farm, all access road areas with fill
DATE: 12/28/16
CERTIFIED
as per the requirements specified under SAES-A-114.
AMR EL SHARKAWY

DATE:
12/28/16 B. CONTRACTOR shall prepare finish grade level in reference to the
CONSTRUCTION latest rough grading drawing.
AGENCY
SHAHZAD YAZDANI
C. CONTRACTOR shall re-evaluate/validate the design requirement
DATE: 12/28/16
OPERATIONS and possible improvement on layout design storm water drainage
ALI H GHAMDI system. CONTRACTOR shall evaluate the cost with possible
12/28/16 provision of concrete channel and box culvert, if necessary in
DATE:
accordance with SAUDI ARAMCO Engineering Standard, SAES-S-
CONTROL NUMBER
VERIFICATION

030.
EDSD

D. CONTRACTOR shall consider data of rain fall intensity to be used


DATE:

as reference for the propose storm water drainage design based on


BY:

the requirements as per SAES- A-112.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

E. CONTRACTOR shall provide storm water open drain concrete


(DCC) NO. _____________________

channel trapezoidal/rectangular type to collect surface water outside


the tank farm and other unpaved non-process area. The water shall
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 188


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG flow thru gravity open drain direct the new drain channel outside the
SAY
SAY
SAY

plant and tie-in to the future RC storm drain channel.


CONTRACTOR shall assess the final disposal of the accumulated
ENGG CERT

ASH
ASH
ASH

storm water considering the Royal Commission Environmental


Regulations.
LEADS

LEADS
LEADS
ALL

ALL
ALL

F. CONTRACTOR shall provide box culvert and junction box as


required where channel passes thru road and security fence.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

G. CONTRACTOR shall establish finished grade and invert elevation of


drain and box culvert as per the project requirements that will
provide more economical concept.
DESCRIPTION

H. Refer to drawing: CI-A00111 sheet 001-021

I. Storm water inside the tank farm area is considered contaminated


water and will be collected by a separated oily water pipe system
network

4.20 UTILITY WATER SUPPLY


10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

A. CONTRACTOR shall install the utility water pipe network from the
12/28/16
12/14/16

12/18/16
DATE

equipment pumps to each building, eye washers, and other


locations where utility water is required. The utility water pipe
NO.
REV

G
E

network shall be installed with RTR pipe, 12FEOU, using


DISCIPLINE
ENGINEER
appropriate manufacture fittings, valves, connections, reducers, and
ALL LEADS manufacturer recommendations for a proper installation.
DATE: 12/28/16
PROJECT
ENGINEER
B. A control gate valve shall be installed before the connection to each
A M ALMATROOK
building or supply point.
DATE: 12/28/16
CERTIFIED C. The Utility water pipe network shall have gate valves for appropriate
AMR EL SHARKAWY
maintenance for the main pipe and for each section.
12/28/16
DATE:
CONSTRUCTION
AGENCY
D. Installation of utility water shall follow SAES S 40, SAES S 70 and
SHAHZAD YAZDANI pipe line classification.
DATE: 12/28/16
OPERATIONS E. The water pipe network shall be tested using the methodology and
ALI H GHAMDI guidelines of SAES S 70.
12/28/16
DATE:
4.21 SANITARY WASTE WATER
CONTROL NUMBER
VERIFICATION
EDSD

A. CONTRACTOR shall install the sanitary waste water network from each
DATE:
BY:

building to the lift stations and from the lift stations to the tie-in point
REVISIONCERTIFICATION

connection to MARAFIQ.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

B. The gravity sanitary waste water network to lift stations will be


(DCC) NO. _____________________

constructed with 8” diameter RTR pipe, 80FEOD. These will include

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 189


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG the provision of sanitary manholes, cleanouts and other fixtures.
SAY
SAY
SAY

C. The forced sanitary waste water pipes from the lift stations will be
ENGG CERT

ASH
ASH
ASH

constructed with 3” diameter RTR pipe, 12FEOU. These will include


the provision of fittings, valves, and flanges.
LEADS

LEADS
LEADS
ALL

ALL
ALL

D. Installation of sanitary waste water shall follow SAES S 10 and SAES S


104 where applicable.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

4.22 OVERALL SITE DEVELOPMENT AND FACILITIES:

 CONTRACTOR shall re-evaluate/validate the design requirement and include


DESCRIPTION

any other possible improvement / requirements not spelled out but are
essential on layout design of civil works for bulk plant area, access roads,
traffic scheme, main gate layout and temporary construction facility that
includes but not limited to the following:

 CONTRACTOR shall revalidate and re-establish all the finish grade elevations
in reference to the latest existing topographic survey drawing and to the latest
rough grading drawing.
10-02399-
JO/EWO

10-02399-
10-02399-


0001

0001
0001

CONTRACTOR shall provide concrete sidewalks inside the parking area, Gate
House, E&M Building and other Support Building Facilities as provided and
12/28/16
12/14/16

12/18/16

shown on architectural drawings and site development plan as shown in


DATE

drawing no. CI-A00106. The sidewalk shall be 100mm thick concrete provided
with 150x150xMW9xMW9 welded wire fabric (WWF) and shall be in
NO.
REV

G
E

accordance with SAUDI ARAMCO Standard drawing no. AB-036260 sheet 001
DISCIPLINE
ENGINEER rev. 05.
ALL LEADS

DATE: 12/28/16  CONTRACTOR provide 300 500 mm thick marl capping inside dike area and
PROJECT
ENGINEER 150 mm thick marl capping outside the dike peripheral at all non-paved areas
A M ALMATROOK including the sleeper areas and future tank foundations/apron/yard areas. Dike
DATE: 12/28/16 fill material shall comply with SAES-Q-006, sub-base material Class, placement
CERTIFIED
AMR EL SHARKAWY
and compaction shall be in accordance with SAES-Q-006.
12/28/16
DATE:
 CONTRACTOR shall provide and develop a total of forty five (45) shaded
CONSTRUCTION
AGENCY parking slots at E&M building and six (6) parking slots at operation building as
SHAHZAD YAZDANI
shown on the drawing CI-A00106. Likewise, a total of thirty (30) shaded
DATE: 12/28/16 parking slots shall be provided for visitors outside the security fence. Structural
OPERATIONS
design detailed calculation of the sunshades shall be submitted by the vendor.
ALI H GHAMDI
Refer to DA-950182-001. Provide five (5) shaded parkings near the FSF
12/28/16
DATE: building and three (3) near the Operator shelter.
CONTROL NUMBER
VERIFICATION

 CONTRACTOR shall provide HCIS Category I around the tank farm as shown
EDSD

in drawing CI-A00105. Fence shall be in accordance to the requirements as per


DATE:

SAES-O-202 and SEC-02.


BY:
REVISIONCERTIFICATION


APPROVAL/CERTIFICATION REQUIREMENTS,

CONTRACTOR shall provide HCIS Category IV around the Support Facility as


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

shown in the drawing CI-A00105. Fence shall be in accordance to the


(DCC) NO. _____________________

requirements as per SAES-O-202 and SEC-02.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 190


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG  The CONTRACTOR shall provide two (2) access gates.
SAY
SAY
SAY

 Provide two (2) 9.0 meters wide double leaf decorative metal gates provided
ENGG CERT

ASH
ASH
ASH

with four (4) units of 4.3 meters long hydraulic crash barrier and 8 inches
LEADS

diameter bollards at main security gate house and Tank Farm Gate. Each gate
LEADS
LEADS
ALL

ALL
ALL

is designed to have a two (2) lanes security access road. Also, provide two (2)
1.20 meters single leaf decorative metal gates to be utilized as walkway gate
RE-ISSUED FOR 100% PROJECT PROPOSAL

where each located at main entrance and exit gates. Four (4) Drop arms shall
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

be provided also in each gate. Two (2) shall be installed at the entry lane and
the other Two (2) shall be installed at the exit lane.


DESCRIPTION

CONTRACTOR shall provide turnstile for pedestrian entry and exit access.

 Provide non-mountable curb and curb & gutter. curb & gutter shall be in
reference to standard drawing AB-036260-001 rev. 005

 Pavement arrow markings shall be in reference as per standard drawing no.


AD-036512 sheet 001 rev. 00.

 CONTRACTOR shall provide check point of Facility Security Forces (FSF)


before the SAUDI ARAMCO main gate. FSF facility shall comply all the
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

Security requirements, not limited to the following:


12/28/16
12/14/16

12/18/16
DATE

1. FSF Support Building


2. FSF Sunshade
3. FSF shaded parking for FSF guards
NO.
REV

G
E

DISCIPLINE
4. Armor Vehicle shed
ENGINEER 5. Non-Electrical Utility (Water & Sanitary)
ALL LEADS

DATE: 12/28/16 VISITOR PARKING ASPHALT PAVEMENT:


PROJECT
ENGINEER

A M ALMATROOK CONTRACTOR shall develop design traffic scheme for adequate


DATE: 12/28/16 maneuvering and clearances at the parking area.
CERTIFIED
AMR EL SHARKAWY

12/28/16
DATE:
CONSTRUCTION
a. CONTRACTOR shall develop detail design of storm water flow in all the
AGENCY asphalt paved area including applicable storm drain system and surface
SHAHZAD YAZDANI
drain with proper slope.
DATE: 12/28/16
OPERATIONS
b. Provide 100mm thick concrete side walk provided with
ALI H GHAMDI
150x150xMW9xMW9 welded wire fabric (WWF) and shall be in
12/28/16
DATE: accordance, as applicable, as per SAUDI ARAMCO Standard drawing
CONTROL NUMBER

no. AB-036260 sheet 001 rev. 05.


VERIFICATION
EDSD

c. Provide curb stone with gutter as per SAUDI ARAMCO standard


DATE:

drawing as stated above.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

d. Provide adequate standard traffic regulatory signs (stop signs,


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

prohibited signs, yield signs, speed limit signs) and informative signs
(DCC) NO. _____________________

showing the direction of bulk plant and access road. Use thermoplastic
paint for road markings.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 191


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

1. Yellow paint line with 200mm wide on walkway edge paint line
2. White paint line with 120mm wide for car parking interval
ENGG CERT

ASH
ASH
ASH

(separation)
3. White paint line with 500mm wide for stop line
LEADS

LEADS
LEADS
ALL

ALL
ALL

4. Regulatory/directional sign board shall be 1.10 meter diameter with


steel post which approximately 2.0 meters high with respect to the
finish grade/road level and to include its foundation.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

5. Informative sign board shall be 1.20mx1.20m boards with steel post


which approximately 2.0 meters high with respect to the finish
grade/road level and to include its foundation.
DESCRIPTION

Parking stall layout and wheel stop detail and pavement arrows and
cross walk markings shall be in reference as per standard drawing nos.
DD-950107 sheet 001 rev. 00 and AD-036512 sheet 001 rev. 00
respectively. Likewise, miscellaneous parking related work like
installation of parking bumpers etc. shall refer to standard drawing no.
AE-036254-001

MAIN ACCESS AND IN-PLANT ROAD:


10-02399-
JO/EWO

10-02399-
10-02399-
0001

The Plant Access Road traffic scheme shall include but not limited to the
0001
0001

following:
12/28/16
12/14/16

12/18/16
DATE

 CONTRACTOR shall provide access to the bulk plant that includes necessary
traffic signs, road markings and sign board as per standard. Plant access roads
NO.
REV

G
E

shall refer to all applicable requirements as per SAES-Q-006, SAES-A-114 and


DISCIPLINE
ENGINEER
AASHTO requirements as required.
ALL LEADS

DATE: 12/28/16  CONTRACTOR shall provide drop gates (drop arms) for vehicles control for
PROJECT
ENGINEER both entrance and exit road lines
A M ALMATROOK

DATE: 12/28/16  The road asphalt structure for 7.0 meter internal road is comprises of the
CERTIFIED following materials as per SAES-Q-006;
AMR EL SHARKAWY

12/28/16
DATE: 1. 50mm thick asphalt concrete wearing/surface course, Class B,
CONSTRUCTION
AGENCY 2. 90mm thick asphalt concrete binder course, Class B, and provided with
SHAHZAD YAZDANI Tack Coat, RC-250, on top surface of the binder course
DATE: 12/28/16 3. 230mm thick aggregate base course with provision of prime coat, MC-
OPERATIONS
70, on top surface of the aggregate base course
ALI H GHAMDI
 CONTRACTOR shall Utilize CBR test values given in geotechnical report 2015/104
12/28/16
DATE: in order to finalize the road structure.
CONTROL NUMBER
VERIFICATION

 Filling materials for road subgrade shall comply with SAES Q 006 chapter 5.
EDSD


DATE:

Pavement materials shall comply with SAES Q 006 chapter 5.


BY:
REVISIONCERTIFICATION


APPROVAL/CERTIFICATION REQUIREMENTS,

Adequate soil stabilization methods and drainage shall be provided for all
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

access roadways in order to prevent the erosion or flooding of project road


(DCC) NO. _____________________

ways.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 192


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG  Provide adequate standard traffic regulatory signs (stop signs, over-taking
SAY
SAY
SAY

prohibited signs, yield signs, speed limit signs) and informative signs showing
the direction of bulk plant and access road. Use thermoplastic Paint for road
ENGG CERT

ASH
ASH
ASH

markings.
LEADS

LEADS
LEADS
ALL

ALL
ALL

1. Yellow paint line with 200mm wide on edge line

2. Regulatory/directional sign board shall be 0.90 meter diameter with


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

steel post which approximately 2.0 meters high with respect to the finish
grade/road level and to include its foundation.

 Pavement arrow markings shall be in reference as per standard drawing no.


DESCRIPTION

AD-036512 sheet 001 rev. 00.

 Provide adequate standard traffic regulatory signs (stop signs, over-taking


prohibited signs, yield signs, speed limit signs) and informative signs showing
the direction of bulk plant and access road. Use thermoplastic Paint for road
markings. Pavement arrow markings shall be in reference as per standard
drawing no. AD-036512 sheet 001 rev. 00.

 Provide 6.0m wide access ramps crossing the dike wall to all tanks.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

 Provide ramp for culvert crossing with adequate slope.


12/28/16
12/14/16

12/18/16
DATE

EXTERNAL PATROL Road


NO.
REV

G
E

DISCIPLINE
ENGINEER CONTRACTOR shall re-evaluate/validate the design requirement and include
ALL LEADS
any other possible improvement/ requirements on layout design of access
DATE: 12/28/16
road, in plant road traffic scheme that includes but not limited to the following:
PROJECT
ENGINEER

A M ALMATROOK  Provide 4.6 meters wide external asphalt concrete patrol road shall comprise of
DATE: 12/28/16 the following structure.
CERTIFIED
AMR EL SHARKAWY

12/28/16 1. 50mm thick asphalt concrete wearing/surface course, Class B,


DATE:
CONSTRUCTION
2. 70mm thick asphalt concrete binder course, Class B, and provided with
AGENCY Tack Coat, RC-250, on top surface of the binder course
SHAHZAD YAZDANI
150mm thick aggregate base course with provision of prime coat, MC-
DATE: 12/28/16
OPERATIONS
70, on top surface of the aggregate base course.
ALI H GHAMDI

12/28/16
4.23 Process Automation & Controls
DATE:
CONTROL NUMBER

Process Automation shall ensure safe and reliable operation of YDH operations. The
VERIFICATION

PCS overview is shown in System Block Diagram IN-A00001.001/002 and Equipment


EDSD

layout IN-A00004.
DATE:
BY:

The functionality of the major process automation is summarized below:


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

TMS System
(DCC) NO. _____________________

 The project shall provide the YDH with a TMS system installed in the
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 193


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Operation Building, complete with operator workstations, engineering
SAY
SAY
SAY

workstations, servers, and printers, in compliance with SAES-Z-008.



ENGG CERT

ASH
ASH

The TMS system shall be capable of monitoring and controlling


ASH

operations associated with product storage tanks, products receipt from


LEADS

LEADS
LEADS
ALL

ALL
ALL

refineries and product transfer via pipeline, pumping manifolds, shipper


pumps, booster pumps, and auxiliary systems.
 The TMS shall be interfaced to DCS, ESD, CMS, VMS and RTG
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

systems.
 The TMS shall include Human-Machine Interface (HMI) and software
capable of providing functions such as; graphic displays with real-time
DESCRIPTION

process data, alarm summaries, trends and displays of historical data.


 The TMS system comprising of DCS & ESD shall be as per the
Function Specification IN-E00017.

TMS-Distributed Control System (DCS)


 CONTRACTOR shall provide a DCS for control and monitoring of YDH
facility.

10-02399-

The DCS system cabinet, I/O and marshalling cabinets shall be


JO/EWO

10-02399-
10-02399-
0001

0001
0001

installed in the rack room of O &M building, and in addition the project
shall provide remote I/O cabinets in remote instrument buildings (RIB).
12/28/16
12/14/16

12/18/16
DATE

 The DCS shall provide regulatory control and supervisory monitoring


YDH operations including product pipeline batch receipts, sequencing of
NO.
REV

G
E

manifold valve line-ups, pump permissive/interlocks, tankage operations


DISCIPLINE
ENGINEER and batch management operations.
ALL LEADS
 The DCS shall provide interface to PLC and Third Party Packages, in
DATE: 12/28/16
PROJECT accordance with SAES-Z-001.
ENGINEER

A M ALMATROOK  PCS components that require time synchronization shall be time


DATE: 12/28/16 synchronized with a master Network Time Protocol (NTP) server such
CERTIFIED
AMR EL SHARKAWY
as GPS server.
12/28/16  Refer system block diagram IN-A00001.001 details.
DATE:
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI TMS-Emergency Shutdown System (ESD)
DATE: 12/28/16
OPERATIONS  A stand-alone ESD shall be provided for safe start-up, operation and
ALI H GHAMDI shutdown of the plant.
DATE:
12/28/16  ESD pushbuttons station shall be provided on Operator console.

CONTROL NUMBER

The ESD system, I/O, and marshaling cabinets shall be installed in the
VERIFICATION

rack room of O& M building and in addition the project shall provide
EDSD

remote I/O cabinets in remote instrument buildings (RIB)


DATE:


BY:

The ESD shall provide for the safe and orderly shutdown and isolation
REVISIONCERTIFICATION

of processes in the event of pre-determined conditions. YDH storage


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

tanks shall be equipped with independent high-high level instruments


C

(DCC) NO. _____________________

hardwired to the ESD. The ESD shall be capable of providing storage


tank isolation via the tank inlet valves.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 194


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG  Activation of ESD system shall not cause activation of any fire
SAY
SAY
SAY

protection system at the respective area.


ENGG CERT

ASH


ASH
ASH

The communication between ESD-DCS shall be via dedicated


redundant communication paths.
LEADS

LEADS
LEADS
ALL

ALL
ALL

 Refer system block diagram IN-A00001.001 details.

Data Interface with Third-Party Process Automation Systems


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

 The DCS shall interface with the third-party Process Automation


systems to view data points from (a) YASREF, (b) SAMREF, (c) Yanbu
Refinery Terminal. CONTRACTOR shall be responsible for
DESCRIPTION

modifications of third party Process Automation systems at the Source.


 The CONTRACTOR shall utilize the FOC that is been laid between the
Refineries and YDH, to transfer the data points related to CMS, Pumps
and valve status and tank status.
 This Contractor shall provide PCS hardware and services required to
integrate new instrumentation in the respective refinery control system.
 The proper selection of TMS-DCS for the control and logic functions is
required to operate YDH in order to interface with the PCS system at
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

source refineries, keeping in mind that SAMREF has Invensys I/A


series, YASREF has Yokogawa DCS system and Yanbu Refinery is
12/28/16
12/14/16

12/18/16
DATE

using Honeywell DCS system. It is the responsibility of LSTK Contractor


to make sure that an appropriate system is selected for YDH which can
NO.
REV

G
E

be integrated with the existing systems in other refineries.


DISCIPLINE
ENGINEER This will require a dedicated effort by the LSTK vendor to bring on board
ALL LEADS
Yokogawa and Honeywell and discuss with them if their systems is
DATE: 12/28/16
PROJECT
capable of integrating with the existing systems currently in operation in
ENGINEER
other refineries.
A M ALMATROOK

DATE: 12/28/16
 The data connection with respective refinery is shown in block diagrams
CERTIFIED IN-A00001.004/007/008. LSTK in conjunction with respective PCS
AMR EL SHARKAWY

12/28/16
vendor shall further evaluate the data interface during detail design
DATE:
CONSTRUCTION
phase
AGENCY
SHAHZAD YAZDANI

DATE: 12/28/16
Fire Detection System
OPERATIONS
Addressable fire alarm system shall be provided consisting of smoke
ALI H GHAMDI
detectors, heat sensors, and manual pull stations wired through to Local
12/28/16
DATE: Fire Alarm Panels (LFAP) in each building. Zone alarms and trouble
CONTROL NUMBER

alarms shall be wired from each LFAP to a Master Fire Alarm Control
VERIFICATION

Panel (MFACP) located in YDH control room. Common fire, ground fault
EDSD

indication and common fault alarms shall be transmitted from the


MFACP to the DCS via redundant communication interface such as
DATE:
BY:

MODBUS or TCP/IP. Interiors of floor-mounted Input/Output, DCS,


REVISIONCERTIFICATION

ESD, uninterrupted power supply (UPS), and other digital cabinets


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

containing power supplies shall be monitored by an addressable high-


(DCC) NO. _____________________

sensitivity air-sampling or point-type smoke detection system. Design


and drawings shall be duly endorsed by Certified Fire Protection

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 195


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Engineer.
SAY
SAY
SAY
ENGG CERT

ASH
ASH
ASH

Vibration Monitoring System (VMS)


LEADS

LEADS
LEADS
ALL

The shipper and booster pumps and motors shall be provided with a VMS
ALL
ALL

consistent with SA standards and operating practice. The project shall meet
the below requirements as a minimum:
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

 Vibration and temperature sensors, wiring and appropriate VMS


monitoring cards shall be provided.
 Shutdown outputs from the VMS shall be hardwired to the ESD to
DESCRIPTION

protect the rotating equipment operation.


 The new VMS equipment shall have Modbus serial or TCP/IP
communication links with DCS for monitoring and control.
 The VMS racks with cabinets shall be installed in RIB-1 & 2 to
monitoring VMS signals from shipper and booster pump stations. VMS
workstation shall be installed in Operation building engineering room
 Refer system block diagram IN-A00001.006 details.
 VMS shall be as per IN-E00018 FSD
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

Radar Tank Gauging System (RTG)


12/28/16
12/14/16

12/18/16
DATE

 Radar Tank Gauging shall be provided for tank level measurements,


NO.
REV

temperature data, and total tank inventory calculations. The RTG shall
G
E

DISCIPLINE
ENGINEER
include Human Machine Interfaces (HMI) located in the O & M building,
ALL LEADS and shall include a redundant interface with the DCS.
DATE: 12/28/16  Radar tank gauging system shall be provided with temperature
PROJECT
ENGINEER
compensated level measurement. Pressure transmitters shall be
A M ALMATROOK
provided to compute the product density.
DATE: 12/28/16
CERTIFIED  Field Communication Units and RTG network devices shall be designed
AMR EL SHARKAWY
considering the future expansions and the RTG network components
12/28/16
DATE: installed in rack room of OME building.
CONSTRUCTION
AGENCY  Refer system block diagram IN-A00001.005 details.
SHAHZAD YAZDANI
 RTG shall be as per IN-E00019 FSD
DATE: 12/28/16
OPERATIONS
ALI H GHAMDI
Batch Transfer Metering System
12/28/16
DATE:
 Batch Detection system shall be part of TMS-DCS to detect the grades
CONTROL NUMBER
VERIFICATION

of gasoline that is being transferred to/from the YDH. The requirement


EDSD

of standalone Batch tracking system shall be further evaluated during


DATE:

detail design.
BY:

 This project shall incorporate best automation practice for the product
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

transfer to/from YDH. The process automation systems will provide for
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

automated transfer of product batches to/from YDH.


(DCC) NO. _____________________

 This project shall optimize interfaces to provide a safe, reliable, and

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 196


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG cost-effective means of managing batch transfers. This application
SAY
SAY
SAY

allows control over motorized valves, pumps, and other equipment


ENGG CERT

ASH
ASH

associated with control of products receipt and transfer. It shall also


ASH

interface with the historian server for long-term data retention


LEADS

LEADS
LEADS
ALL

ALL
ALL

Custody Metering Systems (CMS)


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

BI-10-02399 CONSTRUCTION CONTRACTOR shall provide for custody


metering systems to measure refined product transfers involving third party.
This project shall make the following provisions:
 YASREF products transfer to YDH: Custody transfer metering shall be
DESCRIPTION

provided by BI-10-00043. This project shall provide interface with


custody metering system (CMS) located at YASREF CCR.
 SAMREF products transfer to YDH:. The CMS shall include a complete
packaged flow computer, PLC, and metering supervisory computer
(MSC).
 Yanbu’ Distribution Hub : This project shall provide complete CMS flow
computers, PLC’s, and MSC. The detailed requirement of MSC shall be
10-02399-

determined during detail design, however, the following provides the


JO/EWO

10-02399-
10-02399-
0001

0001
0001

basis for detailed requirement.


o The MSC shall be a packaged unit consisting of MSC Operator
12/28/16
12/14/16

12/18/16
DATE

workstations, flow computer (FC), PLC’s, and system printers.


The MSC shall be designed such that it permits easy addition of
NO.
REV

G
E

future flow meters, flow computers, logic controller input/output


DISCIPLINE
ENGINEER cards, etc. The system shall be composed, to the maximum
ALL LEADS
extent possible, of standard hardware, systems software, and
DATE: 12/28/16
PROJECT firmware that can be configured to meet the stated objectives.
ENGINEER

A M ALMATROOK
The system shall allow for upgrade of system operating software
DATE: 12/28/16
on all redundant modules of the system without impact on
CERTIFIED process operations.
AMR EL SHARKAWY

DATE:
12/28/16 The custody metering system shall comprise of the following:
CONSTRUCTION
AGENCY a) FC’s
SHAHZAD YAZDANI
b) PLC
DATE: 12/28/16
OPERATIONS
c) MSC
ALI H GHAMDI d) MSC Operator workstations
12/28/16
DATE:
CONTROL NUMBER

o The redundancy of MSC system shall comply with SA


VERIFICATION

standards.
EDSD

o The flow measurement elements, meter run size, and number of


DATE:
BY:

runs should be optimum based on the requirement of flow rate


REVISIONCERTIFICATION

and duty.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

o Densitometer skid shall be provided.


C

(DCC) NO. _____________________

o This project shall provide a common meter prover for P91/95,


DO and a separate prover for DPK at the Sources.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 197


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG o This project shall install new flow computers with the latest
SAY
SAY
SAY

technology flow meters suitable for process fluid and required


ENGG CERT

ASH
ASH

delivery flow rates.


ASH

o The PLC provided by this project shall be redundant and at a


LEADS

LEADS
LEADS
ALL

ALL
ALL

minimum perform the following functions:

 Operation of all the meter system’s MOV’s


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

 Various functions pertaining to interlocks, line-up logic,


valve sequencing control and monitoring alarm points
 Redundant I/O and devices that execute control
DESCRIPTION

interlocks
 The HMI provided by this project shall have a configurable Graphic
User Interface (GUI) comprising of video displays and accessories,
operator control selections, report printing, trending and alarm
capabilities. At a minimum, the MSC’s shall provide the following
functions:
a) Be capable of reading and collecting all metering and
process data and valve status from the flow computer, PLC,
10-02399-
JO/EWO

10-02399-
10-02399-
0001

and sampling system via MODBUS or TCP/IP protocol link.


0001
0001

b) The HMI’s shall automatically initiate all the valve


12/28/16
12/14/16

12/18/16

sequencing operations and associated activities after a


DATE

meter is selected for proving by the operator,


c) Configurable color video displays with accessories shall
NO.
REV

G
E

DISCIPLINE provide the required graphics for display of the meter runs,
ENGINEER
ALL LEADS automatic sampling system, and (when required) additional
DATE: 12/28/16 piping process piping and valves.
PROJECT
ENGINEER d) Shall be capable of integrating to Refinery Control system for
A M ALMATROOK monitoring the metering parameters.
DATE: 12/28/16
CERTIFIED
 Refer system block diagram IN-A00001.003 details.
AMR EL SHARKAWY

12/28/16
DATE: Management Information Systems
CONSTRUCTION


AGENCY
SHAHZAD YAZDANI
The MIS shall be comprised of a Plant Information (PI) Server that runs
DATE: 12/28/16 Oil System Incorporation (OSI) PI software. The PI Servers shall act as
OPERATIONS a data buffer/storage device and is interfaced to the DCS HMI for data
ALI H GHAMDI
retrieval. The PI Server shall be located in the rack room and connected
12/28/16
DATE: to OSPAS through the Saudi Aramco corporate backbone.
CONTROL NUMBER
VERIFICATION
EDSD

Enterprise Systems
DATE:

 The project shall provide an OSI PI system with an interface to the


BY:

DCS. The OSI PI system shall obtain data from the DCS for
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

transmission to OSPAS over the Saudi Aramco Wide Area Network.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 198


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Process Automation Networks (PAN) & Systems Security
SAY
SAY
SAY

 The project shall provide all security systems required to protect the
ENGG CERT

ASH
ASH
ASH

process automation networks and systems against cyber threats. The


security systems shall comply with SA standards.
LEADS

LEADS
LEADS
ALL

ALL
ALL

 The project shall provide DMZ in compliance with SAES-T-566/SAEP-


99. Data diodes shall be provided for data security for every
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

interface with third parties and Corporate network.

Equipment Rack Room


Equipment Rack room shall be located in Operation building. Rack room shall
DESCRIPTION

serve as the termination and internal distribution point for field instrumentation
wiring. The rack room shall be unmanned and shall be equipped with HVAC
systems and UPS systems. The rack room shall house the following
equipment:
 TMS-DCS Servers (Redundant)
 DCS System, FTA & Marshalling Cabinets
 ESD System, FTA & Marshalling Cabinets
 Cabinets for RTG network components and server
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001


0001

PSA System Cabinets


 LAN cabinets etc.
12/28/16
12/14/16

12/18/16
DATE

 Other Servers as shown in drawing IN-A00001.001.


Cabinet mounted workstations (where applicable) with KVM switches shall be
NO.
REV

G
E

DISCIPLINE
utilized. All field wiring with the exception of Automation communication links
ENGINEER shall be terminated inside marshaling cabinets in accordance with SAES-J-902;
ALL LEADS
and, all incoming cables must be sealed in accordance with Section 15.4 of
DATE: 12/28/16
PROJECT
SAES-P-104. Refer drawing IN-A00004.002 for preliminary cabinet layout.
ENGINEER

A M ALMATROOK

DATE: 12/28/16 Engineering Room


CERTIFIED
AMR EL SHARKAWY All Engineering workstation shall be located in engineering room of Operations
12/28/16 building. The engineering workstations such as DCS/ESD/VMS/RTG are to be
DATE:
CONSTRUCTION
AGENCY
installed in this room as shown in drawing IN-A00001.001
SHAHZAD YAZDANI
Operations Room
DATE: 12/28/16
OPERATIONS The process automation requirements of the Operations Room, Equipment
ALI H GHAMDI Rack Room and Engineering Room are as follows:
12/28/16
DATE: The Operations Room shall be designed within the Operations building. The
CONTROL NUMBER

HMI console shall be provided to control the facility. The Operations Room
VERIFICATION

shall house operator workstations, Printers, FACP, PSA workstation, RTG


EDSD

workstation etc.
DATE:
BY:

The Operations Room shall be designed so that only activities associated with
plant control are performed there. The operation room shall be engineered to
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

accommodate future planned expansion.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

The building shall be located to minimize the risk of external damage from fires,
explosions, or toxic releases per SAES-B-014 and shall provide essential
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 199


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG administrative facilities necessary to support the continuous operation of the
SAY
SAY
SAY

YDH.
ENGG CERT

ASH
ASH
ASH

Refer drawing IN-A00004.001 for preliminary layout.


LEADS

LEADS
LEADS
ALL

ALL
ALL

Remote Instrument Building (RIB)


The project shall provide minimum two (2) remote instrument buildings at the
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

location indicated in the Plot Plan. The RIB shall house the following as
minimum:
 Remote I/O with FTA & marshalling cabinets for DCS.
DESCRIPTION

 Remote I/O with FTA & marshalling cabinets for ESD.


 Vibration Monitoring System (VMS) racks in cabinets.
 F & G instrumentation & UPS
The buildings shall be designed considering the future expansions. All
incoming cables must be sealed in accordance with Section 15.4 of SAES-P-
104. The number of cabinets and I/O required for each RIB shall be defined
during FEL-3 stage.
10-02399-
JO/EWO

Refer drawing IN-A00004.003/004 for preliminary cabinet layout.


10-02399-
10-02399-
0001

0001
0001

12/28/16
12/14/16

12/18/16

4.24 INTEGRATED SECURITY SYSTEM


DATE

Purpose
NO.
REV

G
E

DISCIPLINE
ENGINEER The purpose of this budget item is to provide an integrated Security System at
ALL LEADS the new Yanbu Distribution Hub. The Security System is composed of the
DATE: 12/28/16 following sub-systems:
PROJECT
ENGINEER

A M ALMATROOK a) Security Access Control System (SACS)


DATE: 12/28/16
CERTIFIED b) Plate Recognition System (PRS)
AMR EL SHARKAWY

DATE:
12/28/16 c) Intrusion Detection and Assessment System (IDAS) / Long Range
CONSTRUCTION
AGENCY
Detection and Assessment System (LRDAS)
SHAHZAD YAZDANI

DATE: 12/28/16
OPERATIONS The PRS System equipment shall be installed at the YDH Main Gatehouse;
ALI H GHAMDI
The SACS systems shall be installed at the YDH Tank Farm Gatehouse. The
12/28/16 IDAS cameras and field sensors shall be installed in the Yanbu Distribution
DATE:
Hub perimeter to provide full perimeter fence coverage intrusion detection and
CONTROL NUMBER
VERIFICATION

assessment. CCTV will also encompass the monitoring of Main Gatehouse,


EDSD

Computer Gatehouse and Security Support Building.


DATE:

Present Situation
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

Yanbu Distribution is a grass-root plant with no existing interconnection to any


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

existing facilities. The combined IDAS/LRDAS system shall be installed along


(DCC) NO. _____________________

the approximately 5.5 km perimeter fence.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 200


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

The Yanbu Distribution Hub IDAS/LRDAS system remote monitoring and


control equipment will be installed in the existing Yanbu Regional Security
ENGG CERT

ASH
ASH
ASH

Control Center (RSCC).


LEADS

LEADS
LEADS
ALL

ALL
ALL

Related Documents

The following Functional Specification Document (FSD) describes the design


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

requirements and equipment characteristics for each of the security system as


stated above:

a) GENE0006067 Functional Specification Document - IDAS/LRDAS


DESCRIPTION

b) GENE0007042 Functional Specification Document - PRS

c) GENE0008041 Functional Specification Document - SACS

PROJECT OBJECTIVES
10-02399-
JO/EWO

10-02399-
10-02399-

General
0001

0001
0001

This project shall provide a Security Access Control System (SACS) for access
12/28/16
12/14/16

12/18/16
DATE

control functions, sensor management and monitoring functions. The system


shall interface to the SAUDI ARAMCO Identification System, SAUDI ARAMCO
NO.
REV

G
E

Active Directory and IDAS.


DISCIPLINE
ENGINEER
ALL LEADS
The SACS system automatically controls access to the processing facilities.
DATE: 12/28/16
PROJECT The SACS is located at the Tank Farm Gatehouse entrance. The system is
ENGINEER

A M ALMATROOK
comprised of card readers on the turnstiles and drop gate for vehicles, SACS
DATE: 12/28/16 servers and storage equipment, display and logging devices, single entry
CERTIFIED
AMR EL SHARKAWY
device interfaces/controllers. Intercoms and communications interfaces,
12/28/16 relational databases and data extraction and reporting capabilities.
DATE:
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
The SACS system shall be connected to the central SAUDI ARAMCO SACS
DATE: 12/28/16
system located in Dhahran through the corporate data network.
OPERATIONS
ALI H GHAMDI
This project shall provide a Plate Recognition System (PRS) and CCTV camera
12/28/16
DATE: will also be provided. The PRS also monitors public vehicles accessing the
CONTROL NUMBER
VERIFICATION

outer Main Gatehouse. The system consists of fixed cameras, illuminators,


EDSD

detector sensors, and computer software for intelligent vehicle license plate
recognition capabilities.
DATE:
BY:
REVISIONCERTIFICATION

The project shall provide an Intrusion Detection and Assessment System


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(IDAS)/ Long Range Detection and Assessment System (LRDAS) to monitor,


(DCC) NO. _____________________

detect, assess, trace and video record intrusion alarm situations.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 201


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG The IDAS/LRDAS equipment shall be remotely controlled by Yanbu RSCC and
SAY
SAY
SAY

locally controlled in Tank Farm Gatehouse of YDH. The system includes control
ENGG CERT

ASH
ASH

and monitoring of all the IDAS/LRDAS field equipment.


ASH
LEADS

LEADS
LEADS
ALL

ALL
ALL

The IDAS system provided shall monitor the approximately 5.5 kilometer
perimeter fence and critical gates. The IDAS/LRDAS shall be integrated with
the existing C2I system of the existing Yanbu Regional Security Center.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

The FOFSS and MIDS sensor shall detect intrusion and transmit data to Yanbu
Regional Security Control Center (YNBRSCC). Failure of one of the field
DESCRIPTION

devices connected to the communications network shall not affect the ability of
the system. Communication network shall be supplied in one-to-one redundant
configuration with automatic changeover.

The project shall design Shelters and Field Equipment Cabinets to house the
IDAS/LRDAS electronics and network interface equipment. The Security
Equipment Building shall house the Security System Servers, recorders,
Workstations, Fiber Optic Network termination and related security equipment
10-02399-
JO/EWO

10-02399-
10-02399-

for IDAS/LRDAS, SACS and PRS.


0001

0001
0001

12/28/16
12/14/16

12/18/16

DESIGN OBJECTIVES
DATE

Intrusion Detection & Assessment System (IDAS)/ Long Range


NO.
REV

G
E

DISCIPLINE
Detection and Assessment System (LRDAS)
ENGINEER
ALL LEADS
The IDAS system has different types of distinct field sensor technologies for
DATE: 12/28/16
PROJECT intrusion detection:
ENGINEER

A M ALMATROOK

DATE: 12/28/16  CCTV which consists of Fixed and PTZ cameras installed along the
CERTIFIED
AMR EL SHARKAWY
perimeter fence to ensure full coverage of the plant so as to secure it from
12/28/16 possible intruders.
DATE:
CONSTRUCTION

 Microwave Intrusion Detection System (MIDS) which is installed in the


AGENCY
SHAHZAD YAZDANI

DATE: 12/28/16 “sterile” area between the Category 1/Outer fence and the SAUDI
OPERATIONS ARAMCO Type III/Inner fence. Sterile area measures 8 meters from the
ALI H GHAMDI
Outer fence to the Inner fence.
12/28/16
DATE:
CONTROL NUMBER

 Fiber Optic Fence Sensor System (FOFSS) shall be constructed on the


VERIFICATION
EDSD

Anti-Personnel Fence Fabric and on the side of the Barbed Tape Wire
(Concertina) which is located on top of the Anti-Personnel Fence Fabric.
DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

The distance between the poles will be reduced for areas in the site where
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

there are curves and/or corners to ensure no “dead” zones within the area. The
(DCC) NO. _____________________

final number of MIDS pairs shall be determined during the detail design.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 202


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

For the assessment part, fixed color day/night cameras with at least 5 meter
ENGG CERT

ASH
ASH

high poles with vari-focal lens located in parallel to the perimeter fence and
ASH

spaced at a maximum distance 75 meters apart for straight line fence. The
LEADS

LEADS
LEADS
ALL

ALL
ALL

distance between the poles will be reduced for areas in the site where there are
curves and/or corners to ensure no “dead” zones of the “sterile” area. Based on
this, it is estimated that the project will utilize approximately 82 fixed cameras.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

The final number of fixed cameras will be determined during the detail design
phase.
DESCRIPTION

Pan Tilt Zoom (PTZ) day/night cameras with at least 7 meter high poles facing
perpendicularly to the perimeter fence, set at approximately 300m apart, no
“dead” zones between the camera coverage. Based on this, it is estimated that
the project will utilize approximately 18 PTZ cameras. The final number of
cameras will be determined during the detail design.

For the traceability part of the IDAS/LRDAS, the project shall provide the
following:
10-02399-
JO/EWO


10-02399-
10-02399-

Network Video Recorders (NVR) with Raid 5 hard disks to


0001

0001
0001

record in real time all video signals from fixed and PTZ cameras.
12/28/16
12/14/16

12/18/16

The Video Recording systems shall record 5-60 seconds of pre


DATE

alarm and 5-60 seconds of post alarm video for the


corresponding cameras.
NO.
REV

G
E

DISCIPLINE
ENGINEER
ALL LEADS
For integrating all these technologies, the project shall provide the following:
DATE: 12/28/16
PROJECT
ENGINEER  Alarm Management Software (AMS) with Servers to be installed
A M ALMATROOK at the Security Support Building.
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY  Approximately 94 Field Equipment foundations and 94 cabinets
DATE:
12/28/16 IP 66/NEMA 4X type with ancillary hardware for mounting.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI  Industrial grade Ethernet switches with dual fiber optic uplink for
DATE: 12/28/16 communications redundancy.
OPERATIONS
ALI H GHAMDI

12/28/16  Digital Input/output units for signal aggregation and onward


DATE:
processing.
CONTROL NUMBER
VERIFICATION
EDSD

 Patch panels, racks and other ancillary hardware.


DATE:
BY:

Provide Alarm Management Software (AMS) system with redundant


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

servers and applications located in the Security Support Building. The AMS
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

shall function as follows:


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 203


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG  It shall integrate different IDAS sensors subsystem technologies
SAY
SAY
SAY

to manage the alarms such as intrusion/detection, fault and


ENGG CERT

ASH
ASH
ASH

tamper.
LEADS

LEADS
LEADS
ALL


ALL
ALL

It shall integrate the relevant site Graphical User Interface (GUI),


NVR’s, PTZ control and Video Wall display for operator
functionality.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

 It shall provide the infrastructure to function in a real time


environment by being capable to report an alarm within 1
DESCRIPTION

second of the detection system resulting from a sensor and/or


communications equipment digital output (DO) such as a relay
or an alarm data packet.

 It shall have the capability to monitor its sensor subsystems and


related communication hardware via Simple Network
Management Protocol (SNMP) or similar function and report in a
log.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

 It shall have the capability for the application to switch-over from


12/28/16
12/14/16

12/18/16
DATE

the primary to the secondary server at a maximum 1 second


with no loss of field alarms.
NO.
REV

G
E

DISCIPLINE  Given proper communication hardware, the AMS application and


ENGINEER
ALL LEADS its servers shall be redundant and able to switch-over from the
DATE: 12/28/16 primary to the secondary server at a maximum 1 second. The
PROJECT
ENGINEER redundancy doesn’t apply to the Operating system since a fault
A M ALMATROOK in one will render the secondary server also non-functional.
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY The perimeter fence shall be divided into physical zones. The zone size
12/28/16
DATE: shall be adjusted within a range of 30-150 meters to accommodate
CONSTRUCTION
AGENCY optimum detection by field sensor systems while remaining within minimum
SHAHZAD YAZDANI
assessment requirements. The architecture and zone size shall be
DATE: 12/28/16
determined during the preliminary design stage. The larger the zone size
OPERATIONS
ALI H GHAMDI
the lesser the Probability of Detection (PD) and the higher the expected
12/28/16 Nuisance Alarm Rate (NAR).
DATE:
CONTROL NUMBER
VERIFICATION

Individual field sensor sub-system coverage shall be designed so that there


EDSD

are no “dead zones” along the perimeter fence.


DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

All IDAS day/night Fixed and PTZ Cameras shall run at 25fps PAL or 30fps
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

NTSC requiring approximately 8 Mbps bandwidth per camera. Each


(DCC) NO. _____________________

camera shall have a minimum of 525 TVL and run in MJPEG, MPEG-4, and

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 204


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG H.264 format.
SAY
SAY
SAY
ENGG CERT

The radar shall be fully solid state and have a modular construction
ASH
ASH
ASH

allowing for a limited workshop repair.


LEADS

LEADS
LEADS
ALL

ALL
ALL

All components of the radar shall be installed in one assembly with


enclosure ready for installation in the field. The antenna with drive motor
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

can be part of the assembly but can also be detachable for the ease of
transportation and installation.
DESCRIPTION

The System shall be able to detect the vehicles or personnel at the


minimum specified range and at a specified speed (to be finalized during
detailed design).

The System shall interface with the Long Range Surveillance System. It
shall trigger alarms and activate the long range cameras on receipt of a
possible intrusion.

The IDAS/LRDAS AMS servers shall include a “hot” back up master


10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

computer with automatic switch over capability within a 1 second. No loss


of IDAS functionality from the field sensor subsystem shall occur during or
12/28/16
12/14/16

12/18/16
DATE

after automatic switch over.


NO.
REV

G
E

Primary IDAS/LRDAS AMS Servers shall have an availability of 99.99%.


DISCIPLINE
ENGINEER Standby or redundant IDAS Servers shall have an availability of 99.99%.
ALL LEADS
The combined availability of the Primary and Standby IDAS/LRDAS shall
DATE: 12/28/16
PROJECT
be at least 99.999%.
ENGINEER

A M ALMATROOK

DATE: 12/28/16
The IDAS/LRDAS AMS and sensor subsystems shall be provided based on
CERTIFIED an “open architecture” concept that allows for future inter-operability of
AMR EL SHARKAWY
other security systems that use standardized systems interfaces and
12/28/16
DATE:
Commercial off the shelf products (COTS). The system shall have the
CONSTRUCTION
AGENCY capability to remotely monitor and manage with these parameters.
SHAHZAD YAZDANI

DATE: 12/28/16
OPERATIONS
ALI H GHAMDI
This project shall provide shelters, typically 32 m2 in size consisting of one
12/28/16 security room and one electrical room, approximately positioned one every
DATE:
two (2) km for the following reasons:
CONTROL NUMBER
VERIFICATION
EDSD

 It shall house the IDAS and its field sensors systems for this
DATE:

particular area of the fence including the video signals from all
BY:

cameras, control and alarm signals, convert them to IP and


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

transfer them to Security Equipment Building where they would


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

be ultimately accessed by the AMS software.


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 205


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG  It shall provide UPS based 230VAC power to the IDAS field
SAY
SAY
SAY

sensors systems for this particular area of the fence. Each


ENGG CERT

ASH
ASH
ASH

shelter shall have dual independent power feeds from the


nearby transformer/substations, an ATS and the UPS to regulate
LEADS

LEADS
LEADS
ALL

ALL
ALL

with two (2) hour battery back-up. The UPS shall also function in
the always “on” mode.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

CCTV Camera Main Gate and Tank Farm Gate

Main Entry gates shall use IP Fixed cameras for surveillance


DESCRIPTION

and are exclusively use for inbound and outbound vehicles.


These cameras shall be at least 82 degree angle to achieved
maximum view for the entrance and exit lanes.

All CCTV system traffic that is directly connected to an IT


managed switch shall be mapped to a dedicated video VLAN as
per SAES-T-555 Section 6.1.5
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

Security Access Control System


12/28/16
12/14/16

12/18/16
DATE

The Security Access Control System (SACS) which shall be installed at the
Yanbu Distribution Hub’s Computer Gatehouse’s vehicle lanes drop gates,
NO.
REV

G
E

turnstiles entrance shall be configured as follows:


DISCIPLINE
ENGINEER
ALL LEADS
 Proximity card readers shall be provided at each drop arm gate
DATE: 12/28/16
PROJECT
and turnstile. Proximity Readers shall be capable of reading from
ENGINEER
up to 4 centimeters.
A M ALMATROOK

DATE: 12/28/16
 Access controlled drop gates and turnstiles will be provided with
CERTIFIED electronically controlled locks or opening mechanism. The drop
AMR EL SHARKAWY

12/28/16
gate and turnstile shall be provided with a secure mechanical
DATE:
CONSTRUCTION
override to allow operation of the turnstile/drop gate in the event of
AGENCY
system or power failure
SHAHZAD YAZDANI

DATE: 12/28/16
 The System shall offer consistent read range unaffected by body
OPERATIONS shielding or variable environment conditions.
ALI H GHAMDI
 The System shall be capable of preventing repeated entries
12/28/16
DATE: except when an entry is followed by an exit.
CONTROL NUMBER
VERIFICATION

Provide Access Control Proximity Card with contact smart chip modules
EDSD

used for gate card readers. Must have at least 1 second approve or cancel
DATE:
BY:

reaction time on smart chip modules.


REVISIONCERTIFICATION

The system Administrative Client Work Server, Local Client Server and
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Main Server should be located so that both remote support and local
(DCC) NO. _____________________

operation is made available. Except for the client workstation with an


independent card reader and all ancillary equipment necessary to stay in
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 206


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG the gatehouse for the efficient operation of the RFID system, all other
SAY
SAY
SAY

equipment or devices are to be located in the Security Equipment Building.


ENGG CERT

ASH
ASH
ASH

Administration should be made available from Yanbu Regional Security


LEADS

LEADS
LEADS
ALL

ALL
ALL

Control Center (YNBRSCC) and YNB Identification (ID) office.

Plate Recognition System


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

The PRS shall have a minimum 95% Arabic and 95% Latin character
recognition accuracy.
DESCRIPTION

System availability shall be in the order of 98% subject to a mean time


repair of 3 hours.

Failure of any component or system must be automatically notified to the


staff in the gatehouse and in Yanbu Regional Security Control Center
(RSCC).
10-02399-
JO/EWO

10-02399-
10-02399-

The PRS System shall capture all vehicles entering and leaving at a rate of
0001

0001
0001

100%. These images shall be of the front license plates, together with the
12/28/16

front of the vehicle.


12/14/16

12/18/16
DATE

The characters recognized by the system will be stored in ASCII (American


NO.
REV

G
E

DISCIPLINE
Standard Code for Information Interchange), Unicode or USC (Universal
ENGINEER
ALL LEADS
Character Set) format. Only one character format will be used throughout
DATE: 12/28/16
the system.
PROJECT
ENGINEER

A M ALMATROOK The PRS shall read all types of rectangular Saudi number plates (Short and
DATE: 12/28/16 long). The PRS shall also be capable of Saudi license plate (Red, Blue,
CERTIFIED
AMR EL SHARKAWY
White, Yellow, Black and Green) and shall be capable of distinguishing
DATE:
12/28/16 similar alphanumeric license plates with different background colors.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI The PRS shall read the newly released types of rectangular Saudi number
DATE: 12/28/16 plates, four (4) numbers and three (3) alphabet and added features. The
OPERATIONS
PRS shall also be capable of recognizing all six (6) different colors
ALI H GHAMDI
representing different classes of Saudi License plate (Blue, White, Yellow,
12/28/16
DATE:
Black, Grey and Green), and shall be capable of distinguishing similar
CONTROL NUMBER
VERIFICATION

alphanumeric license plates with different background colors. In addition,


EDSD

the system shall have the capability of reading the newly added shapes
(triangle, circle) with all direction and configuration.
DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

The system shall have the capability of capturing images of all retro-
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

reflective number plates. Such functionality shall be provided with the


(DCC) NO. _____________________

capability of this installation.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 207


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

The PRS shall provide full time image capturing capability by use of color
ENGG CERT

ASH
ASH

cameras in addition to the OCR capable cameras.


ASH
LEADS

LEADS
LEADS
ALL

ALL
ALL

The PRS shall be able to read any plate tilted or mounted away from a
normal vertical position at an angle of 15º or less.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

The PRS may use additional external system triggers to detect vehicles.

White light illuminators shall be provided for the automatic number plate
DESCRIPTION

recognition (ANPR) cameras.

Cameras and illuminators shall be fixed and housed together to be


protected from deliberate or accidental movement from position.

The Cameras will be positioned in the area below the sunshade/canopy at


the maximum possible distance outward from the security inspection point
subject to illumination levels.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

Illuminators matched to the characteristics of the color cameras shall be


12/28/16

provided as necessary.
12/14/16

12/18/16
DATE

The PRS shall recognize number plates of vehicles traveling at speeds up


NO.
REV

G
E

DISCIPLINE
to 80Km/h at the capture point.
ENGINEER
ALL LEADS

DATE: 12/28/16
The width of the camera footprint for the color cameras is to be no greater
PROJECT
ENGINEER
than 1.6 meters at the optimum capture point.
A M ALMATROOK

DATE: 12/28/16 The PRS shall display all characters of a number plate.
CERTIFIED
AMR EL SHARKAWY

DATE:
12/28/16 The PRS should be based on optical character recognition (OCR)
CONSTRUCTION processing with the capacity to “learn” variation in characters through
AGENCY
SHAHZAD YAZDANI system input.
DATE: 12/28/16
OPERATIONS
The PRS shall provide both monochrome and color images of the number
ALI H GHAMDI
plate for OCR identification and license color verification purposes.
12/28/16
DATE:
CONTROL NUMBER
VERIFICATION

The system shall process color images to allow the color background of
EDSD

vehicle licensing class to be determines automatically and a corresponding


ASCII, Unicode or UCS reference added to the relevant vehicle record.
DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

The PRS software shall be implemented on an open architecture operating


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

system and permit multitasking.


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 208


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG The PRS shall be compatible with TCP/IP communications architecture.
SAY
SAY
SAY
ENGG CERT

ASH
ASH

The PRS shall have the capability to alert staff of the approach of a suspect
ASH

vehicle by comparing the number plates of approaching vehicles with those


LEADS

LEADS
LEADS
ALL

ALL
ALL

installed in a local or centralized database. This alert will be generated


within one second of the number plate image being captured by the PRS
Camera.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

An alarm shall be triggered if an unrecognized or flagged vehicle is


detected by the system.
DESCRIPTION

The alarm signal shall be both visual and audible, and shall indicate in
which lane the vehicle is traveling.

The alarm type for each category of suspect vehicle (unrecognized or


flagged) shall be different and the system shall allow the alarm notification
for unrecognized vehicles to be disabled from YNB RSCC and not from the
gatehouse.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

The PRS shall be able to simultaneously monitor; process and store the
12/28/16

information from all lanes approaching the Gates. The system shall be
12/14/16

12/18/16
DATE

designed so as to maximize the read performance in each lane.


NO.
REV

G
E

DISCIPLINE
The local PRS Processing/ Storage Equipment shall fully monitor, store,
ENGINEER
ALL LEADS
and send PRS Alarms and Transaction Events to a centralized database.
DATE: 12/28/16
The processing unit shall integrate (OCR) information and license plate
PROJECT
ENGINEER
color information from each vehicle plate.
A M ALMATROOK

DATE: 12/28/16 CONTRACTORS shall refer to the provided drawings to identify the position
CERTIFIED
AMR EL SHARKAWY
and space requirements for the local PRS Processing Equipment. The form
DATE:
12/28/16 factor of the equipment at Gatehouse should reflect the limited space at
CONSTRUCTION these locations. All ancillary equipment necessary for the proper operation
AGENCY
SHAHZAD YAZDANI of the PRS system shall remain in the gatehouse including the PRS
DATE: 12/28/16 workstation for the local monitoring & control of PRS system. The PRS
OPERATIONS
system shall be able to work independently when a breakdown occurs in
ALI H GHAMDI
the corporate network connectivity.
12/28/16
DATE:
CONTROL NUMBER
VERIFICATION

The Fault Tolerant PRS Main Server shall be provided and installed by
EDSD

CONTRACTOR as approved and procured thru the specifications of SAUDI


ARAMCO; CONTRACTOR is to provide a Full Specification and
DATE:
BY:

configuration of the PRS Main Server. It is this project responsibility to


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

configure and utilize the existing SAUDI ARAMCO server as required by


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

the PRS system.


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 209


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG The Fault Tolerant Main Server shall have redundancy in terms of storage
SAY
SAY
SAY

failures.
ENGG CERT

ASH
ASH
ASH

The PRS Main Server shall be interconnected with all the Local PRS
LEADS

LEADS
LEADS
ALL

ALL
ALL

Processing Equipment located at the gatehouse, Security Equipment


Building and with PRS monitoring workstation located0 at Yanbu RSCC via
existing SAUDI ARAMCO corporate network.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

The PRS main Server shall distribute the updated hot list inputs concerning
flagged vehicles within (60) seconds to the new local PRS Processing
DESCRIPTION

Equipment automatically.

The PRS Main Server shall have sufficient storage capacity to store
information for the following periods of time:

- Text database of events in Oracle or SQL or PL/SQL ASCII


Format- 3months
10-02399-
JO/EWO

10-02399-
10-02399-

The PRS Main Server shall have an option to automatically archive records,
0001

0001
0001

and to provide records on Write Once-Read Many (WO-RM) format


12/28/16

medium.
12/14/16

12/18/16
DATE

The PRS Main Server shall maintain an accurate clock set to local time
NO.
REV

G
E

DISCIPLINE
using Coordinated Universal Time (UTC) information derived from the
ENGINEER
ALL LEADS
SAUDI ARAMCO Master Clock. The local time will be synchronized to all
DATE: 12/28/16
Local Processor from the Main Server, by the use of a Network Time
PROJECT
ENGINEER
Protocol (NTP). All system transactions will be appended with a tamper-
A M ALMATROOK proof time-stamp.
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY
The Local PRS Processing Equipment shall distribute its database
DATE:
12/28/16 transactions events to the PRS Main Server automatically within not more
CONSTRUCTION than thirty (30) minutes and upon request from local machine at gatehouse.
AGENCY
SHAHZAD YAZDANI The local PRS Processing Equipment shall automatically distribute its
DATE: 12/28/16 database Alarm within no more than one (1) second to the PRS Main
OPERATIONS
Server.
ALI H GHAMDI

12/28/16
DATE:
The Local PRS Processing Equipment shall have sufficient storage
CONTROL NUMBER
VERIFICATION

capacity to store information for the following periods of time (based upon
EDSD

throughput of 2000 vehicles per lane per day).


DATE:
BY:

– Database transactions events and Alarms in Oracle or SQL or


REVISIONCERTIFICATION

PL/SQL ASCII Format – 30 days.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

– PRS monochrome and color images linked to above database

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 210


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG entries – 30 days.
SAY
SAY
SAY
ENGG CERT

ASH
ASH

System Users shall be able to query the PRS System which shall be
ASH

capable of generating, saving and printing Local and Site Global reports
LEADS

LEADS
LEADS
ALL

ALL
ALL

listing:

- Quantity of Vehicles processed


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

- Number of Vehicles with unrecognized/flagged plates


(Recorded Alarms)
- Mean processing time
DESCRIPTION

- Time, Date, Location, and Direction of travel for each


transaction.
- The relevant color image and a monochrome number plate
image shall be linked to each vehicle transaction

The PRS system shall ensure that there is a clear view of each vehicle’s
license plate and shall propose measures to ensure vehicle license plates
are captured and processed in all traffic conditions, which may require
10-02399-
JO/EWO

10-02399-
10-02399-

traffic calming measures.


0001

0001
0001

12/28/16

The PRS System shall be expandable and able to accommodate up to 25%


12/14/16

12/18/16
DATE

additional locations without changes to the Main Server.


NO.
REV

G
E

DISCIPLINE
ENGINEER Outside Plant System (OSP)
ALL LEADS

DATE: 12/28/16 The Outside Plant Cable and Conduit System shall support the Security Cabling
PROJECT
ENGINEER connectivity from Security Support Building to various locations of Field
A M ALMATROOK
Equipment Cabinets (FECs) through Shelter #1 and Shelter #2 along the
DATE: 12/28/16
CERTIFIED perimeter fence.
AMR EL SHARKAWY

DATE:
12/28/16 The works includes excavation, installation of buried and underground (in
CONSTRUCTION
AGENCY
conduit) fiber optic cables, construction of conduit facilities, installation of
SHAHZAD YAZDANI pedestal with guard post, cable splicing, installation of fiber optic patch panels,
DATE: 12/28/16 cutting and replacing of paved and asphalt areas to original condition,
OPERATIONS
installation of marker post, installation of electronic marker, termination of fiber
ALI H GHAMDI

12/28/16
cables, cable testing and tagging.
DATE:
CONTROL NUMBER
VERIFICATION

INTERFACE WITH OTHER SYSTEMS


EDSD

Interface to External Systems


DATE:
BY:

The security system shall be capable to interface with external systems.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

The Systems design shall use industry standard Application Programming


C

Interface (API) that permit easy upgrade to new versions of Operating


(DCC) NO. _____________________

Systems, data bases and device drivers.


`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 211


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

The security systems provided by this project shall provide inter-connection


ENGG CERT

ASH
ASH

to the C2I platform to integrate with the different Security systems installed
ASH

under BI-10-00555.
LEADS

LEADS
LEADS
ALL

ALL
ALL

The C2I as compared to an Alarm Management System is the “master”


because it provides situational awareness such as location and status of an
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

adversary from a top level view. It is a necessary component in achieving


superiority in decision making by integrating diverse technologies such as
IDAS, PRS, SACS and others. By combining these technologies into a
DESCRIPTION

comprehensive solution, it takes the mundane tasks of Alarm Management


System from each subsystem, quantifies the risks, minimizes decision
making (such as fatigue, judgment and difficult to assess situation) and
provides plausible outcomes and actions. In addition, it minimizes the
number of facilities that require viewing while allowing for efficient
deployment of Security personnel.

The C2I application software installed in the Dhahran RSCC under BI-10-
10-02399-
JO/EWO

10-02399-
10-02399-

00555 shall have the capability to view each site and when required, a
0001

0001
0001

password protection scheme to take over the application of this site. The
12/28/16

maximum capability is now dependent on the Video Wall which has


12/14/16

12/18/16
DATE

allocated space for the sites that normally report to other RSCCs.
NO.
REV

G
E

DISCIPLINE
SAUDI ARAMCO Corporate Network
ENGINEER
ALL LEADS

DATE: 12/28/16
The security system platform shall be capable of utilizing a high-
PROJECT
ENGINEER
performance standard IP-based network to establish internal
A M ALMATROOK communications between the systems components and to interface with
DATE: 12/28/16 SAUDI ARAMCO Corporate Data Network.
CERTIFIED
AMR EL SHARKAWY

12/28/16 The proposed system shall be connected to the IP-Data network. The
DATE:
CONSTRUCTION connection shall utilize Gigabit Ethernet Local Area Network.
AGENCY
SHAHZAD YAZDANI

DATE: 12/28/16
OPERATIONS
ALI H GHAMDI

12/28/16
DATE:
CONTROL NUMBER

ENVIRONMENTAL IMPACT
VERIFICATION
EDSD

All work under the Scope of this project shall conform to all SAUDI
DATE:

ARAMCO and Saudi Government environmental standards and


BY:

requirements. In general, any disturbance to the environment caused by


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

this project shall be restored to the original condition at project completion.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 212


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

4.25 STRUCTURAL
ENGG CERT

ASH
ASH
ASH

GENERAL
LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR SHALL NOTE that all construction works shall be done in


accordance with latest international and Saudi Aramco Engineering standards
and procedures.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

CONTRACTOR shall perform excavation and backfill as per SAES-A-114, and


remove the debris and surplus material to the Saudi Aramco designated site. If
any underground utility encounters during excavation, CONTRACTOR shall
DESCRIPTION

inform Saudi Aramco representative and re-route the facility in agreement of


SAUDI ARAMCO representative.

CONTRACTOR shall provide transportation, storage, conservation, operation,


inspection and maintenance of construction equipment, tools, lifting devices,
scaffolding, temporary facilities, consumable materials, etc. necessary to
execute the Work safely.
10-02399-
JO/EWO

10-02399-
10-02399-

CONTRACTOR shall ensure achieving high safety and security standards and
0001

0001
0001

levels of control throughout all phases of the project. CONTRACTOR shall


perform any other activity, not specifically mentioned above, but necessary to
12/28/16
12/14/16

12/18/16
DATE

achieve Completion of the Work.


NO.
REV

G
E

DISCIPLINE CONTRACTOR shall provide earthquake-resistant design and associated


ENGINEER
ALL LEADS detailing to enable designated structures and/or architectural, mechanical,
DATE: 12/28/16 electrical and nonstructural components and their supporting structures to
PROJECT
ENGINEER
respond satisfactory to seismic effects recognizing site seismic hazards such
A M ALMATROOK
as ground motion adjusted for site class amplification, soil
DATE: 12/28/16
liquefaction/foundation settlement, etc. Satisfactory performance objectives
CERTIFIED shall achieved by protecting human life, avoiding structural collapses and
AMR EL SHARKAWY
damages to neighboring facilities, maintaining functionality of essential
12/28/16
DATE: facilities, controlling loss of containment/toxic releases/fire and minimizing
CONSTRUCTION
AGENCY
damages to non-structural components.
SHAHZAD YAZDANI

DATE: 12/28/16 The mapped Maximum Considered Earthquake (MCE) spectral response
OPERATIONS accelerations for the Yanbu area are documented in SAES-A-112 as follows:
ALI H GHAMDI

12/28/16
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

Criteria Parameter
DATE:

Short Period Acceleration (Ss) in %g 20.4


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

1-Sec Period Acceleration (S1) in %g 5.8


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

Peak Ground Acceleration in %g 4

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 213


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

Criteria Parameter
Site Class as per geotechnical D
ENGG CERT

ASH
ASH
ASH

investigation report 2015/104.


LEADS

LEADS
LEADS
ALL

ALL
ALL

Importance factor for seismic design 1.5


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

CONTRACTOR shall utilize geotechnical recommendations given in


geotechnical report (Saudi Aramco File Number- 2015/104) for foundation
design, for any change in location of equipment, building or facility away from
DESCRIPTION

the given test location contractor shall utilize the nearest test location and
prepare standalone report for utilization of nearest test location and submit it to
SAUDI ARAMCO for approval.

CONTRACTOR shall be responsible for the correctness of all Drawings and


Documents and Software provided from vendors / manufactures / suppliers /
sub-contractors, etc. Approval or Acceptance of these Drawings and
Documents and Software by SAUDI ARAMCO does not relive CONTRACTOR
of the responsibility of correct design, right equipment, proper installation,
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

testing and commissioning.


12/28/16
12/14/16

12/18/16

CONTRACTOR shall check and verify all Sub-Contractor and Vendor design
DATE

and drawings provided comply with the Scope of Work, and documents
provided with this Scope, relevant SAUDI ARAMCO and International
NO.
REV

G
E

Standards and are in keeping with “Good Engineering Practices”.


DISCIPLINE
ENGINEER
ALL LEADS
CONTRACTOR shall refer project proposal drawing ST-A00002.001/002 for
DATE: 12/28/16 general notes on concrete work. CONTRACTOR shall execute all concrete
PROJECT
ENGINEER work in accordance with SAUDI ARAMCO standards.
A M ALMATROOK

DATE: 12/28/16 CONTRACTOR shall refer project proposal drawing ST-A00100.001 for
CERTIFIED
AMR EL SHARKAWY
general notes on structural steel work. CONTRACTOR shall execute all
12/28/16
structural steel work in accordance with SAUDI ARAMCO standards.
DATE:
CONSTRUCTION
AGENCY CONTRACTOR shall note that all structural drawings of project proposal are
SHAHZAD YAZDANI
indicative; CONTRACTOR shall perform detailed structural calculations during
DATE: 12/28/16 detailed design as per vendor data and in accordance with SAUDI ARAMCO
OPERATIONS
standards.
ALI H GHAMDI

12/28/16
DATE: CONTRACTOR shall finalize all building design incorporating
CONTROL NUMBER

recommendations given in BRA report (issue 6.0) for all buildings.


VERIFICATION
EDSD

DATE:

Yanbu distribution hub (YDH) scope


BY:
REVISIONCERTIFICATION

Receipt pipeline and connection


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Equipment Foundations
(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 214


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG CONTRACTOR shall provide concrete foundations for dye injection skid, SDA
SAY
SAY
SAY

injection skid, conductivity enhancer skid, custody metering skid, meter prover
and custody metering shelter (vendor package).
ENGG CERT

ASH
ASH
ASH

CONTRACTOR shall design foundations as per vendor requirement of size


LEADS

LEADS
LEADS
ALL

ALL
ALL

and loading in accordance with SAUDI ARAMCO standards.

CONTRACTOR shall provide slab on grade and toe wall as per vendor
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

requirement for equipment’s.

CONTRACTOR shall provide anchor bolts as per vendor requirement in


accordance with SAUDI ARAMCO standards.
DESCRIPTION

CONTRACTOR shall utilize approved NMR 602 vendor data for preparation of
IFC drawing for all equipment foundations.

Spur rack, platforms and pipe supports

CONTRACTOR shall provide structural spur rack, platforms, pipe supports at


manifold location as per piping plans and design in accordance with SAUDI
ARAMCO standards. CONTRACTOR shall provide all structural calculations for
10-02399-
JO/EWO

10-02399-
10-02399-
0001

SAUDI ARAMCO approval.


0001
0001

CONTRACTOR shall provide steel fabrication drawings for SAUDI ARAMCO


12/28/16
12/14/16

12/18/16
DATE

approval.
NO.
REV

G
E

CONTRACTOR shall provide concrete foundations for spur rack, platforms,


DISCIPLINE
ENGINEER
pipe supports at manifold location as per piping plans. CONTRACTOR shall
ALL LEADS design foundations as per stress analysis load data in accordance with SAUDI
DATE: 12/28/16 ARAMCO standards. CONTRACTOR shall provide all foundation design
PROJECT
ENGINEER
calculations for SAUDI ARAMCO approval.
A M ALMATROOK

DATE: 12/28/16
Tank farm and support infrastructure
CERTIFIED
AMR EL SHARKAWY Equipment Foundations
12/28/16
DATE:
CONSTRUCTION CONTRACTOR shall provide concrete foundations for diesel day tank, 2 No’s
AGENCY
SHAHZAD YAZDANI
of emergency generator set, DPK filtration skid, surge skid (DO/DPK), surge
skid (GASOLINE), utility water tank, fire water tank, 2 No’s of foam skid, pumps
DATE: 12/28/16
OPERATIONS and OWS treatment package.
ALI H GHAMDI

12/28/16 CONTRACTOR shall design foundations as per vendor requirement of size


DATE:
and loading in accordance with SAUDI ARAMCO standards.
CONTROL NUMBER
VERIFICATION
EDSD

CONTRACTOR shall provide slab on grade and toe wall as per vendor
requirement for equipment’s.
DATE:
BY:

CONTRACTOR shall provide anchor bolts as per vendor requirement in


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

accordance with SAUDI ARAMCO standards.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

CONTRACTOR shall utilize approved NMR 602 vendor data for preparation of
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 215


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG IFC drawing for all equipment foundations.
SAY
SAY
SAY
ENGG CERT

ASH
ASH
ASH

Shelters
LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall provide following Shelter in YDH facility

Foam skid shelter (2 No’s)


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

Fire water and Utility water pump shelter


Sanitary metering shelter-MARAFIQ
Utility water metering shelter-MARAFIQ
Oily waste water metering shelter-MARAFIQ
DESCRIPTION

CONTRACTOR shall design and detail shelter structures in accordance with


12-SAMSS-014 through Pre Engineering building PEB vendor. PEB structures
shall be designed and fabricated by approved SAUDI ARAMCO vendors.
CONTRACTOR shall coordinate with PEB Vendors for design and fabrication.

CONTRACTOR shall submit the structural calculation for PEB shelters to


SAUDI ARAMCO for review.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

CONTRACTOR shall design shelter foundations as per PEB- vendor load data
and provide anchor bolts as per vendor requirement.
12/28/16
12/14/16

12/18/16
DATE

CONTRACTOR shall provide slab on grade for foam skid shelter with isolation
NO.
REV

joint between major foundations and miscellaneous pipe supports shall be


G
E

DISCIPLINE provided based on load data and piping plans.


ENGINEER
ALL LEADS

DATE: 12/28/16
Oily water lift stations (2 No’s)
PROJECT
ENGINEER
CONTRACTOR shall design and detail reinforced cement concrete oily water
A M ALMATROOK
lift station as per sizing requirement with appropriate coating on inside and
DATE: 12/28/16
CERTIFIED outside face as per SAUDI ARAMCO standards.
AMR EL SHARKAWY

DATE:
12/28/16 CONTRACTOR shall provide dewatering system based on the depth of lift
CONSTRUCTION station and water table level and shall dispose the water to an approved
AGENCY
SHAHZAD YAZDANI
location by SAUDI ARAMCO.
DATE: 12/28/16
OPERATIONS CONTRACTOR shall take appropriate measures as per SAUDI ARAMCO
ALI H GHAMDI standards for deep soil excavations.
12/28/16
DATE:
CONTROL NUMBER
VERIFICATION

Sanitary lift stations


EDSD

CONTRACTOR shall design and detail reinforced cement concrete sanitary lift
DATE:

station as per sizing requirement with appropriate coating on inside and outside
BY:

face as per SAUDI ARAMCO standards.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

CONTRACTOR shall provide dewatering system based on the depth of lift


(DCC) NO. _____________________

station and water table level and shall dispose the water to an approved
location by SAUDI ARAMCO.
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 216


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

CONTRACTOR shall take appropriate measures as per SAUDI ARAMCO


standards for deep soil excavations.
ENGG CERT

ASH
ASH
ASH

If required CONTRACTOR shall provide steel structure and monorail to handle


LEADS

LEADS
LEADS
ALL

ALL
ALL

sanitary pump.

Dike wall
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

CONTRACTOR shall design dike wall in accordance with Saudi Aramco


Standard.
DESCRIPTION

CONTRACTOR shall provide vertical expansion joint in dike wall as per figure 2
of SAES-B-005.

CONTRACTOR shall provide 1.5 mm thick HDPE liner below dike area with
appropriate HDPE insert on concrete dike wall inside face.

CONTRACTOR shall weld 1.5 mm thick HDPE liner for dike area with HDPE
liner provided by other CONTRACTOR around the tank foundations.
10-02399-
JO/EWO

10-02399-
10-02399-

CONTRACTOR shall provide protective coating APCS-10 on concrete surfaces


0001

0001
0001

below grade.
12/28/16
12/14/16

12/18/16
DATE

CONTRACTOR shall provide protective coating APCS-1B on concrete surfaces


above grade.
NO.
REV

G
E

DISCIPLINE CONTRACTOR shall provide minimum 500 mm MARL cover for HDPE liner
ENGINEER
ALL LEADS provided inside dike area.
DATE: 12/28/16
PROJECT
ENGINEER
Steel pipe support, pipe sleepers, structural platforms and crossovers
A M ALMATROOK

DATE: 12/28/16
CERTIFIED CONTRACTOR shall provide structural pipe support, structural platforms and
AMR EL SHARKAWY crossovers as per piping plans and design in accordance with SAUDI
DATE:
12/28/16 ARAMCO standards. CONTRACTOR shall provide all structural calculations for
CONSTRUCTION SAUDI ARAMCO approval.
AGENCY
SHAHZAD YAZDANI

DATE: 12/28/16
CONTRACTOR shall provide steel fabrication drawings for SAUDI ARAMCO
OPERATIONS approval.
ALI H GHAMDI

12/28/16 CONTRACTOR shall provide concrete foundations for pipe supports, platforms,
DATE:
crossovers and pipe sleepers as per piping plans. CONTRACTOR shall design
CONTROL NUMBER
VERIFICATION

foundations as per stress analysis load data in accordance with SAUDI


EDSD

ARAMCO standards. CONTRACTOR shall provide all foundation design


calculations for SAUDI ARAMCO approval.
DATE:
BY:

Culvert
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

CONTRACTOR shall provide reinforcement cement concrete culvert inside


(DCC) NO. _____________________

plant for pipe way crossing the plant roads.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 217


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG CONTRACTOR shall provide clearance from pipe to concrete edges as per
SAY
SAY
SAY

SAES-L-460. CONTRACTOR shall provide minimum 750 mm wide access on


either side of sleeper inside the culvert.
ENGG CERT

ASH
ASH
ASH

CONTRACTOR shall design RCC culvert for all possible load cases and load
LEADS

LEADS
LEADS
ALL

ALL
ALL

combinations as per SAUDI ARAMCO and AASHTO standards requirement.

CONTRACTOR shall provide culvert design calculations to SAUDI ARAMCO


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

for review and approval.

Buildings
DESCRIPTION

Main Gate/Tank farm gate House

CONTRACTOR shall pre-engineer space frame structural sunshade as per


SAUDI ARAMCO standard drawing AA-036024-001 for main gate and tank
farm gate.

CONTRACTOR shall provide PEB vendor space frame structural design


calculation for SAUDI ARAMCO review and approval. Space frame design
shall be in accordance with SAUDI ARAMCO standards.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

CONTRACTOR shall provide foundation size as per vendor data. Design of


foundation shall be as per foundation load data provided by vendor. Anchor
12/28/16
12/14/16

12/18/16
DATE

bolts shall be specified by vendor and selection of anchor bolt shall be as per
SAUDI ARAMCO standards.
NO.
REV

G
E

DISCIPLINE Musallah
ENGINEER
ALL LEADS
CONTRACTOR shall provide reinforced cement concrete frame and roof slab
DATE: 12/28/16
PROJECT as per architectural plans, sections and elevations.
ENGINEER

A M ALMATROOK
CONTACTOR shall perform structural design of Musallah building in
DATE: 12/28/16
CERTIFIED
accordance with SAUDI ARAMCO standards and submit design calculations to
AMR EL SHARKAWY SAUDI ARAMCO for review and approval.
12/28/16
DATE:
CONSTRUCTION Security Guard house (2 No’s)
AGENCY
SHAHZAD YAZDANI
CONTRACTOR shall provide reinforced cement concrete frame and roof slab
DATE: 12/28/16
OPERATIONS
as per architectural plans, sections and elevations.
ALI H GHAMDI

12/28/16
CONTACTOR shall perform structural design of security guard house building
DATE:
in accordance with SAUDI ARAMCO standards and submit design calculations
CONTROL NUMBER
VERIFICATION

to SAUDI ARAMCO for review and approval.


EDSD

Operator shelter (2 No’s)


DATE:
BY:

CONTRACTOR shall provide reinforced cement concrete frame and roof slab
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

as per architectural plans, sections and elevations.


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

CONTACTOR shall perform structural design of operator shelter building in


accordance with SAUDI ARAMCO standards and submit design calculations to
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 218


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG SAUDI ARAMCO for review and approval.
SAY
SAY
SAY

Smoking shelter
ENGG CERT

ASH
ASH
ASH

CONTRACTOR shall provide structural steel smoking shelter as per


LEADS

LEADS
LEADS
ALL

ALL
ALL

architectural plans, sections and elevations

CONTACTOR shall perform structural design of smoking shelter in accordance


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

with SAUDI ARAMCO standards and submit design calculations to SAUDI


ARAMCO for review and approval.

CONTRACTOR shall provide foundation for smoking shelter as per load data
DESCRIPTION

for structural steel shelter and providing anchor bolts as per SAUDI ARAMCO
standards.

FSF Support building and Facility Security Forces (FSF) sunshade

CONTRACTOR shall provide reinforced cement concrete frame and roof slab
as per architectural plans, sections and elevations.

CONTACTOR shall perform structural design of FSF support building in


10-02399-
JO/EWO

10-02399-
10-02399-

accordance with SAUDI ARAMCO standards and submit design calculations to


0001

0001
0001

SAUDI ARAMCO for review and approval.


12/28/16
12/14/16

12/18/16
DATE

CONTRACTOR shall pre-engineered space frame structural sunshade for FSF


sunshade.
NO.
REV

G
E

DISCIPLINE CONTRACTOR shall provide PEB vendor space frame structural design
ENGINEER
ALL LEADS calculation for SAUDI ARAMCO review and approval. Space frame design
DATE: 12/28/16
shall be in accordance with SAUDI ARAMCO standards.
PROJECT
ENGINEER

A M ALMATROOK
CONTRACTOR shall provide foundation size as per vendor data. Design of
DATE: 12/28/16
CERTIFIED foundation shall be as per foundation load data provided by vendor. Anchor
AMR EL SHARKAWY bolts shall be specified by vendor and selection of anchor bolt shall be as per
DATE:
12/28/16 SAUDI ARAMCO standards.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI
Receiving substation
DATE: 12/28/16
OPERATIONS CONTRACTOR during detail design shall validate the use of SAUDI ARAMCO
ALI H GHAMDI library drawing for receiving substation and adopt appropriate structural
12/28/16 arrangement to support overhead crane for GIS room.
DATE:
CONTROL NUMBER
VERIFICATION

CONTRACTOR shall perform structural design as per SAUDI ARAMCO


EDSD

standards and provide design calculations to SAUDI ARAMCO for review and
approval.
DATE:
BY:

CONTRACTOR shall co-ordinate with SAUDI ARAMCO approved precast


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

vendors for the design and fabrication of precast walls and double tee slabs.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Necessary loading on roof shall be considered for the design of double tee.
(DCC) NO. _____________________

CONTRACTOR shall provide transformer foundation as per Vendor data.


`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 219


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

CONTRACTOR shall provide reinforced cement concrete fire walls for


transformers as per vendor data, per SAES-P-119.
ENGG CERT

ASH
ASH
ASH

CONTRACTOR shall provide slab on grade and toe/curb wall around the slab
LEADS

LEADS
LEADS
ALL

ALL
ALL

on grade with required slopes towards oily water catch basins.

Utility power substation


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

CONTRACTOR shall provide substation as per SAUDI ARAMCO library


drawings.
DESCRIPTION

CONTRACTOR shall co-ordinate with SAUDI ARAMCO approved precast


vendors for the design and fabrication of precast walls and double tee slabs.
Necessary loading on roof shall be considered for the design of double tee.

CONTRACTOR shall provide transformer foundation as per Vendor data.

CONTRACTOR shall provide reinforced cement concrete fire walls for


transformers as per vendor data.
10-02399-
JO/EWO

10-02399-
10-02399-

CONTRACTOR shall provide slab on grade and toe/curb wall around the slab
0001

0001
0001

on grade with required slopes towards oily water catch basins.


12/28/16
12/14/16

12/18/16
DATE

Engineering & Maintenance (E & M) building

CONTRACTOR shall provide reinforced cement concrete frame and roof slab
NO.
REV

G
E

DISCIPLINE
as per architectural plans, sections and elevations.
ENGINEER
ALL LEADS
CONTACTOR shall perform structural design of E & M building in accordance
DATE: 12/28/16
PROJECT
with SAUDI ARAMCO standards and submit design calculations to SAUDI
ENGINEER
ARAMCO for review and approval.
A M ALMATROOK

DATE: 12/28/16 Security support building (2 No’s)


CERTIFIED
AMR EL SHARKAWY

12/28/16 CONTRACTOR shall provide reinforced cement concrete frame and roof slab
DATE:
CONSTRUCTION
as per architectural plans, sections and elevations.
AGENCY
SHAHZAD YAZDANI
CONTACTOR shall perform structural design of security support building in
DATE: 12/28/16
accordance with SAUDI ARAMCO standards and submit design calculations to
OPERATIONS
SAUDI ARAMCO for review and approval.
ALI H GHAMDI

12/28/16
DATE: Temporary construction facility
CONTROL NUMBER
VERIFICATION

CONTRACTOR shall provide all required foundations for facilities, equipment’s,


EDSD

structural pipe supports and structural platform in accordance with SAUDI


DATE:

ARAMCO standards.
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

CONTRACTOR shall provide structural pipe support and platforms for TCF
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

facility as required in accordance with SAUDI ARAMCO standards.


(DCC) NO. _____________________

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 220


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG X-Ray Building
SAY
SAY
SAY

CONTRACTOR shall provide reinforced cement concrete frame and roof slab
ENGG CERT

ASH
ASH
ASH

as per architectural plans, sections and elevations.


LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTACTOR shall perform structural design of X-Ray building in accordance


with SAUDI ARAMCO standards and submit design calculations to SAUDI
ARAMCO for review and approval.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

Covered car parking sheds

CONTRACTOR shall provide structural framing for covered car parking as per
DESCRIPTION

SAUDI ARAMCO library drawings DA-950182.001, DA-950183.001 and DA-


950185.001.

CONTRACTOR shall provide foundation for covered car parking as per SAUDI
ARAMCO library drawings DA-950184.001, DA-950185.001.

Chemical shelter
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

CONTRACTOR shall provide reinforced cement concrete frame and roof slab
as per architectural plans, sections and elevations.
12/28/16
12/14/16

12/18/16
DATE

CONTACTOR shall perform structural design of Chemical shelter building in


accordance with SAUDI ARAMCO standards and submit design calculations to
NO.
REV

G
E

DISCIPLINE
SAUDI ARAMCO for review and approval.
ENGINEER
ALL LEADS
For revised location of chemical shelter building refer revised YDH plot plan
DATE: 12/28/16
PROJECT
Rev E.
ENGINEER

A M ALMATROOK Remote I/O Buildings (2 No’s)


DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY
CONTRACTOR shall provide reinforced cement concrete frame and roof slab
12/28/16 as per architectural plans, sections and elevations.
DATE:
CONSTRUCTION
AGENCY CONTACTOR shall perform structural design of Remote I/O building in
SHAHZAD YAZDANI
accordance with SAUDI ARAMCO standards and submit design calculations to
DATE: 12/28/16
SAUDI ARAMCO for review and approval.
OPERATIONS
ALI H GHAMDI
IDAS Shelter (2 No’s)
12/28/16
DATE:
CONTROL NUMBER

CONTRACTOR shall provide reinforced cement concrete frame and roof slab
VERIFICATION

as per architectural plans, sections and elevations.


EDSD

DATE:

CONTACTOR shall perform structural design of IDAS shelter building in


BY:

accordance with SAUDI ARAMCO standards and submit design calculations to


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

SAUDI ARAMCO for review and approval.


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

Operation building

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 221


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG CONTRACTOR shall provide reinforced cement concrete frame and roof slab
SAY
SAY
SAY

as per architectural plans, sections and elevations.


ENGG CERT

ASH
ASH
ASH

CONTACTOR shall perform structural design of Operation building in


accordance with SAUDI ARAMCO standards and submit design calculations to
LEADS

LEADS
LEADS
ALL

ALL
ALL

SAUDI ARAMCO for review and approval.

Security Support foundations


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

CONTRACTOR shall provide continuous concrete anchor constructed


according to Standard Drawing AC-036680.001 for SAUDI ARAMCO General
Purpose Fencing.
DESCRIPTION

CONTRACTOR shall provide foundations for fixed camera, PTZ camera, field
equipment cabinet, MIDS poles and PRS supports.

Lighting pole foundations

CONTRACTOR shall provide concrete foundations as per vendor data for


lighting pole and design of foundation shall be done as per vendor load data
and shall be in compliance with SAUDI ARAMCO standards. Anchor bolts shall
10-02399-
JO/EWO

10-02399-
10-02399-

be specified by vendor in accordance with SAUDI ARAMCO standards.


0001

0001
0001

Electrical switch racks and junction box foundations


12/28/16
12/14/16

12/18/16
DATE

CONTRACTOR shall provide concrete foundations as per vendor data for


switch racks and junction box. Design of foundation shall be done as per
NO.
REV

G
E

DISCIPLINE vendor load data and shall be in compliance with SAUDI ARAMCO standards.
ENGINEER
ALL LEADS
Anchor bolts shall be specified by vendor in accordance with SAUDI ARAMCO
standards.
DATE: 12/28/16
PROJECT
ENGINEER
Miscellaneous Structural Works
A M ALMATROOK

DATE: 12/28/16
CERTIFIED
CONTRACTOR shall construct concrete paving slab at entrance near Security
AMR EL SHARKAWY Guardhouse and wherever indicated on civil drawings. CONTRACTOR shall
12/28/16 provide construction, contraction and isolation/expansion joints as per ACI 224
DATE:
CONSTRUCTION in order to transfer traffic loads across the joints.
AGENCY
SHAHZAD YAZDANI
CONTRACTOR shall construct concrete duct banks for cable routing as shown
DATE: 12/28/16
OPERATIONS
in electrical drawings.
ALI H GHAMDI

12/28/16
CONTRACTOR shall construct crash rated barriers, crash rated beams and
DATE:
valve boxes.
CONTROL NUMBER
VERIFICATION

CONTRACTOR shall construct all required concrete sanitary manholes and


EDSD

catch basins.
DATE:
BY:

CONTRACTOR shall construct all required oily water manholes.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Contractor shall provide all HVAC equipment foundation including foundation


(DCC) NO. _____________________

for air stack as per HVAC drawings.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 222


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Contractor shall provide 18 No’s ground water monitoring well in accordance
SAY
SAY
SAY

with Royal Commission Environmental Regulation 2015 Volume II and satisfy


minimum construction requirement as stated in Royal commission standard
ENGG CERT

ASH
ASH
ASH

drawing RC-EN-1. For proposed location of ground water monitoring wells refer
SKETCH-ST-001. Contractor shall take prior approval from royal commission
LEADS

LEADS
LEADS
ALL

ALL
ALL

on final locations of ground water monitoring well during detailed design.


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

SAMREF refinery scope

General
DESCRIPTION

CONTRACTOR shall conduct detailed geotechnical investigation for all


foundation required inside SAMREF refinery, as per SAES-A-113.

CONTRACTOR shall conduct site survey to finalize the locations of


equipment’s and routing of piping, location of pipe supports, platforms and
crossovers inside SAMREF refinery.

Equipment Foundations
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

CONTRACTOR shall provide concrete foundations for surge relief pumps,


custody metering skid, meter prover and custody metering shelter (vendor
12/28/16
12/14/16

12/18/16
DATE

package).

CONTRACTOR shall design foundations as per vendor requirement of size


NO.
REV

G
E

DISCIPLINE and loading in accordance with SAUDI ARAMCO standards.


ENGINEER
ALL LEADS
CONTRACTOR shall provide slab on grade and toe wall as per vendor
DATE: 12/28/16
PROJECT requirement for equipment’s.
ENGINEER

A M ALMATROOK
CONTRACTOR shall provide anchor bolts as per vendor requirement in
DATE: 12/28/16
CERTIFIED
accordance with SAUDI ARAMCO standards.
AMR EL SHARKAWY

DATE:
12/28/16 CONTRACTOR shall utilize approved NMR 602 vendor data for preparation of
CONSTRUCTION IFC drawing for all equipment foundations.
AGENCY
SHAHZAD YAZDANI
CONTRACTOR shall refer to Project Scoping Paper GEN-E0103 for changes
DATE: 12/28/16
OPERATIONS in SAMREF due to relocation of surge tank, surge tank dike, and surge pumps,
ALI H GHAMDI addition of Foam skid and its shelter, oily water lift station, Electrical room and
12/28/16 culvert for pipe crossing.
DATE:
CONTROL NUMBER
VERIFICATION

Surge relief tank


EDSD

CONTRACTOR shall conduct detailed geotechnical investigation at tank


DATE:

location to access tank settlement (immediate and long term) and soil bearing
BY:

capacity for foundation design.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Foundation sizes shown in project proposal drawings are indicative and


(DCC) NO. _____________________

CONTRACTOR shall design tank foundations for all loadings as per final IFC
load data. IFC load data shall cover all loadings for tank including tank shell,
`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 223


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG tank roof and bottom plates, Empty weight, operating weight, hydro test weight,
SAY
SAY
SAY

corroded weight, wind load and seismic loading etc. and all loading shall be
reported as per API-650 standard.
ENGG CERT

ASH
ASH
ASH

CONTRACTOR is fully responsible for the design of tank foundations. E.g. type
LEADS

LEADS
LEADS
ALL

ALL
ALL

of foundation, materials, quantities etc. the drawings those are being provided
to CONTRACTOR are for their reference and for cost estimate purpose. It is
CONTRACTOR’s responsibility to ensure that adequate tank foundations are
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

designed and built, including any soil improvement/replacement resulting from


soil investigation/geotechnical report.

In case anchor bolts are required for tank anchorage to the foundations, then
DESCRIPTION

anchor bolts shall as per SASD AA-036322-001 Rev 08. Coating requirement
of anchor bolts shall be as per 32-SAMSS-005 and bolts shall be coated with
fluoropolymer/ceramic; galvanized bolts shall not be used.
Fluoropolymer/ceramic coating shall be in accordance with 09-SAMSS-107.

CONTRACTOR shall work in close coordination with cathodic protection and


leak detection sub-contractor regarding the scheduling and sequence of
construction.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

CONTRACTOR shall submit allowable settlement limits for tanks foundations


0001
0001

as per tank vendor specifications for SAUDI ARAMCO review and approval. In
case actual settlements are more than recommended and not acceptable to
12/28/16
12/14/16

12/18/16
DATE

Saudi Aramco, CONTRACTOR shall improve the soil to ensure that edge and
differential settlements are within the limits concurred by SAUDI ARAMCO.
NO.
REV

G
E

DISCIPLINE
ENGINEER
CONTRACTOR shall coordinate with his Cathodic Protection Subcontractor
ALL LEADS (CPS) to keep sleeves for conduits.
DATE: 12/28/16
PROJECT
ENGINEER
CONTRACTOR shall fulfill all requirements specified in Appendix B of 32-
A M ALMATROOK
SAMSS-005 for foundation design and construction.
DATE: 12/28/16
CERTIFIED CONTRACTOR shall provide complete system for leak detection. Tanks in
AMR EL SHARKAWY
services other than water shall be provided with an under tank leak detection
12/28/16
DATE: and sub-grade protection according to API STD 650, Appendix I.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI CONTRACTOR shall develop procedure and monitor tank settlement as per
DATE: 12/28/16 API 650 standard and shall submit method statement to Saudi Aramco for
OPERATIONS approval.
ALI H GHAMDI

DATE:
12/28/16 Dike wall for surge relief tank
CONTROL NUMBER
VERIFICATION
EDSD

CONTRACTOR shall design dike wall in accordance with Saudi Aramco


Standard.
DATE:
BY:

CONTRACTOR shall provide vertical expansion joint in dike wall as per figure 2
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

of SAES-B-005.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

CONTRACTOR shall provide 1.5 mm thick HDPE liner below dike area with

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 224


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG appropriate HDPE insert on concrete dike wall inside face and outer face of
SAY
SAY
SAY

tank ring beam.


ENGG CERT

ASH
ASH
ASH

CONTRACTOR shall provide protective coating APCS-10 on concrete surfaces


below grade.
LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall provide protective coating APCS-1B on concrete surfaces


above grade.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

CONTRACTOR shall provide minimum 500 mm MARL cover for HDPE liner
provided inside dike area.
DESCRIPTION

Steel pipe support, pipe sleepers, structural platforms and crossovers

CONTRACTOR shall provide structural pipe support, structural platforms and


crossovers as per piping plans and design in accordance with SAUDI
ARAMCO standards. CONTRACTOR shall provide all structural calculations for
SAUDI ARAMCO approval.

CONTRACTOR shall provide steel fabrication drawings for SAUDI ARAMCO


10-02399-
JO/EWO

10-02399-
10-02399-
0001

approval.
0001
0001

CONTRACTOR shall provide concrete foundations for pipe supports, platforms,


12/28/16
12/14/16

12/18/16
DATE

crossovers and pipe sleepers as per piping plans. CONTRACTOR shall design
foundations as per stress analysis load data in accordance with SAUDI
NO.
REV

G
E

ARAMCO standards. CONTRACTOR shall provide all foundation design


DISCIPLINE
ENGINEER
calculations for SAUDI ARAMCO approval.
ALL LEADS

DATE: 12/28/16 CONTRACTOR shall note due to changes defined in Project Scoping Paper
PROJECT
ENGINEER
GEN-E0103, modification required in sleepers, pipe supports, structural
A M ALMATROOK
platforms and crossover inside SAMREF refinery shall be done during detailed
DATE: 12/28/16
design as per changes shown in marked up piping plans (refer appendix 04
CERTIFIED given along with Project Scoping Paper GEN-E0103).
AMR EL SHARKAWY

12/28/16
DATE: Yanbu refinery scope
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI General
DATE: 12/28/16
OPERATIONS CONTRACTOR shall conduct detailed geotechnical investigation if required
ALI H GHAMDI during detailed design for foundation required inside Yanbu refinery as per
12/28/16 SAES-A-113.
DATE:
CONTROL NUMBER
VERIFICATION

CONTRACTOR shall conduct site survey to finalize the routing of piping,


EDSD

location of culverts, location of pipe supports, platforms and crossovers inside


Yanbu refinery.
DATE:
BY:

CONTRACTOR shall conduct site visits to finalize the piping road crossing
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

inside Yanbu refinery plant as per piping plans. CONTRACTOR shall check
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

available space inside existing culverts to cross pipes for proposed lines and if
(DCC) NO. _____________________

space is not adequate to cross the proposed lines CONTRACTOR shall

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 225


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG propose modifications of Existing culvert or new culverts with prior approval
SAY
SAY
SAY

from SAUDI ARAMCO.


ENGG CERT

ASH
ASH
ASH

CONTRACTOR shall consider construction of 5 No’s of culverts inside Yanbu


refinery as marked in revised piping plans (refer appendix 02 given along with
LEADS

LEADS
LEADS
ALL

ALL
ALL

Project Scoping Paper GEN-E0104). Height of new culvert shall match with the
road top level of Yanbu refinery roads where these culverts are required.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

CONTRACTOR shall develop culvert details during detailed design as per as


pipe routing and as built drawings for Yanbu refinery.

CONTRACTOR shall consider required modification of existing storm water


DESCRIPTION

channel road crossings at the new culvert location.

CONTRACTOR shall consider required shfting of 1 number of lighting pole and


required modification of underground fire water line for new culvert near
junction of grid I and 4.

Refer to Project Scoping Paper GEN-E0104 for details of YR – YDH surge


system changes.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

Steel pipe support, pipe sleepers, structural platforms and crossovers


0001
0001

CONTRACTOR shall provide structural pipe support, structural platforms and


12/28/16
12/14/16

12/18/16
DATE

crossovers as per piping plans and design in accordance with SAUDI


ARAMCO standards. CONTRACTOR shall provide all structural calculations for
NO.
REV

G
E

SAUDI ARAMCO approval.


DISCIPLINE
ENGINEER
ALL LEADS CONTRACTOR shall provide steel fabrication drawings for SAUDI ARAMCO
DATE: 12/28/16 approval.
PROJECT
ENGINEER

A M ALMATROOK
CONTRACTOR shall provide concrete foundations for pipe supports, platforms,
DATE: 12/28/16
crossovers and pipe sleepers as per piping plans. CONTRACTOR shall design
CERTIFIED foundations as per stress analysis load data in accordance with SAUDI
AMR EL SHARKAWY
ARAMCO standards. CONTRACTOR shall provide all foundation design
12/28/16
DATE: calculations for SAUDI ARAMCO approval.
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI CONTRACTOR shall note due to change in surge system which is defined in
DATE: 12/28/16 Project Scoping Paper GEN-E0104, modification required in sleepers, pipe
OPERATIONS supports, structural platforms and crossover inside Yanbu refinery shall be
ALI H GHAMDI done during detailed design as per changes shown in marked up piping plans
DATE:
12/28/16 (refer appendix 02 given along with Project Scoping Paper GEN-E0104)
CONTROL NUMBER
VERIFICATION
EDSD

Pipeline from SAMREF and Yanbu refinery to YDH scope


DATE:
BY:

General
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

CONTRACTOR shall conduct site survey to finalize the pipeline routing


(DCC) NO. _____________________

proposed during detailed design.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 226


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

CONTRACTOR shall provide all adequate civil /structural arrangements for


road crossings as proposed in pipeline drawings and this shall include but not
ENGG CERT

ASH
ASH
ASH

limited to soil excavation, backfilling, concrete lining, dewatering if required and


detour for open cut road crossings.
LEADS

LEADS
LEADS
ALL

ALL
ALL

CONTRACTOR shall conduct detailed geotechnical investigation at road


crossing location to assess soil condition to determine methodology to be used
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

for thrust boring option.

If CONTRACTOR intends to use existing geotechnical report for sleeper


foundation designs along the route of pipelines, CONTRACTOR shall take prior
DESCRIPTION

approval from SAUDI ARAMCO and prepare standalone report indicating use
of existing borehole for deriving bearing capacity for foundation design.

CONTRACTOR shall utilize project proposal geotechnical report 2015/104 for


assessing soil conditions for Yanbu –Jiddah Highway crossing and Yanbu
refinery exit crossing.

Steel pipe support, pipe sleepers, structural platforms and crossovers


10-02399-
JO/EWO

10-02399-
10-02399-
0001

CONTRACTOR shall provide structural pipe support, structural platforms and


0001
0001

crossovers as per piping plans and design in accordance with SAUDI


ARAMCO standards. CONTRACTOR shall provide all structural calculations for
12/28/16
12/14/16

12/18/16
DATE

SAUDI ARAMCO approval.


NO.
REV

G
E

CONTRACTOR shall provide steel fabrication drawings for SAUDI ARAMCO


DISCIPLINE
ENGINEER
approval.
ALL LEADS

DATE: 12/28/16 CONTRACTOR shall provide concrete foundations for pipe supports, platforms,
PROJECT
ENGINEER
crossovers and pipe sleepers as per piping plans. CONTRACTOR shall design
A M ALMATROOK
foundations as per stress analysis load data in accordance with SAUDI
DATE: 12/28/16
ARAMCO standards. CONTRACTOR shall provide all foundation design
CERTIFIED calculations for SAUDI ARAMCO approval.
AMR EL SHARKAWY

DATE:
12/28/16
SECTION 5.0 – BUILDINGS
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI

DATE: 12/28/16 GENERAL DESCRIPTION


OPERATIONS
ALI H GHAMDI  All Fire Protection Equipment and Appurtenances shall be purchased as
DATE:
12/28/16 specified in the SAUDI ARAMCO Materials System and SAES-U-101
CONTROL NUMBER
VERIFICATION

GENERAL ARCHITECTURAL BASIS OF DESIGN


EDSD

DATE:
BY:

 All exterior walls will be CMU and insulated and cladded with drywalls from
REVISIONCERTIFICATION

inside the buildings (Except Substation Building which will have precast panels
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

walls as per SA standards) as per the BRA recommendations.


C

(DCC) NO. _____________________

 All interior walls will be CMU and drywalls as per the standards and codes

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 227


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG requirements.
SAY
SAY
SAY

 All exterior walls (Except Substation Building) will have plaster with paint
ENGG CERT

ASH
ASH
ASH

finish.

LEADS

All interior wall surfaces and exposed structures shall be painted and finished
LEADS
LEADS
ALL

ALL
ALL

in accordance with SAES-H-101V.


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

Buildings will have acoustical ceiling tiles where allowed by standards and
codes.

 All roofs shall have waterproofing membrane system including complete


DESCRIPTION

insulation and roof accessories in compliance with SAES-M-100.

 All buildings will have finishing materials as per Building Design and Finishing
Guidelines (SAES-R-004) and as per the applicable standards.

 Smoking Shelter is open (No walls) covered by steel structure shelter and
including 4 wooden bench.

 Substation Building design (Precast concrete Structure) shall be as per SAES-


10-02399-

M-009.
JO/EWO

10-02399-
10-02399-
0001

0001
0001

 Fire barriers shall be provided to separate different use area. Fire walls shall
12/28/16
12/14/16

12/18/16
DATE

be provided to the Control room, equipment Room, Rack/Server room,


Telecom, HVAC, Electrical /UPS and Battery rooms. All fire barriers shall be
extending up to the underside of the roof.
NO.
REV

G
E

DISCIPLINE
ENGINEER
ALL LEADS
 Interior framing, members, finishes, partition, cabinets, doors, and trim, shall
be non-combustible.
DATE: 12/28/16
PROJECT
ENGINEER
 Provide gypsum board (fire rated and moisture resistant) drywall partitions
A M ALMATROOK
with insulation on metal studs with painted finish and ceramic tiles at wet
DATE: 12/28/16
CERTIFIED areas where required.
AMR EL SHARKAWY

DATE:
12/28/16  All ceramic wall tiles finished shall be full height extended to under face of
CONSTRUCTION ceiling. Ceramic wall base shall be cove and rounded edges at exposed
AGENCY
SHAHZAD YAZDANI
corner angles.
DATE: 12/28/16
OPERATIONS  All separating wall shall be constructed to achieve a giving fire rating where
ALI H GHAMDI necessary exposed internal concrete surfaces shall be paint finished.
12/28/16
DATE:
 Provide 19 mm thick plywood and finished with 2 coats of fire retardant paint
CONTROL NUMBER
VERIFICATION

to Telecommunication Room. Plywood shall be installed on a fire resistive wall


EDSD

assembly such as type ‘X’ fire rated gypsum board or concrete wall.
DATE:


BY:

Raised Access Floor shall be heavy grade access floor system with coated
REVISIONCERTIFICATION

steel and durable anti-static pressure laminate floor. Where required this shall
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

be chemical resistant and anti-static floor compound.


C

(DCC) NO. _____________________

 Provide anti-static vinyl tiles to Telecommunication Room and Electrical

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 228


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Room.
SAY
SAY
SAY

 Provide non-slip acid resistant quarry tiles to Battery Room.


ENGG CERT

ASH
ASH
ASH


LEADS

The ceiling at the Telecommunication Room, Mechanical and


LEADS
LEADS
ALL

ALL
ALL

Electrical/Instrument Workshop shall be exposed smooth surface structure


and paint finished.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

 Battery Room shall be exposed smooth surface concrete structure with acid
resistant paint finished.


DESCRIPTION

All fire rated doors assemblies shall be labeled by an approved international


testing agency. The labels shall comply with NFPA-80 and shall be
permanently affixed to the door frame. The label shall be applied at the factory
and shall show the following:

 Name of manufacturer.
 Trademark of the third-party inspection agency.
 Fire-protection rating.
 Maximum transmitted temperature end point for fire door exit enclosure and
exit passageway.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

 Smoke and draft control door shall show the letter “S” on the label.
12/28/16
12/14/16

12/18/16


DATE

All fire rated doors shall be provided with required fire rating including smoke
and draft seals in accordance with IBC Chapter 7, and UL listed, with
complete door assemblies and shutters according to IBC, under Section
NO.
REV

G
E

715.3, and NFPA 80. Fire rated door shall not be provided with stoppers.
DISCIPLINE
ENGINEER Double door shall be provided with dust proof and astragal, weather strip and
ALL LEADS
door bottom sweep.
DATE: 12/28/16
PROJECT
ENGINEER  Provide all exit doors with panic devices as per IBC 2009, Section 1008.1.10
A M ALMATROOK and SAES-B-014, Section 5.13 and SAES-P-103 , Section 6.2.4
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY  All fire rated doors shall be provided with door closers and with smoke/in
12/28/16 tumescent seals to heads and both sides. Closer shall be specified to operate
DATE:
CONSTRUCTION for individual door size/weight and for particular internal and external.
AGENCY


SHAHZAD YAZDANI
Provide all internal door sets paint finished galvanized steel and providing fire
DATE: 12/28/16
OPERATIONS
and sound resistance where necessary. Doors with vision glass panel shall be
ALI H GHAMDI
wired-glass. All ironmongery shall be stainless steel.
12/28/16

DATE:
Provide all external door paint finished, thermally insulated and fire-resistant
CONTROL NUMBER
VERIFICATION

galvanized steel door with gas, dust and weather seals. Entrance door to air
EDSD

lock shall be safety tempered clear glass on powder coated aluminum


finished.
DATE:
BY:

 Provide handrail and guard or combination of handrail and guard in


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

accordance with all requirements set forth in IBC-2009, Section 1012 and
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

1013 respectively.
(DCC) NO. _____________________

 Provide Emergency eyewash and shower to each Battery Room according to

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 229


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG SAES-B-069. (Typical for all the buildings which include Battery Room)
SAY
SAY
SAY

 All buildings windows must have, LOW-E (on 2nd. Face) double glazed (6mm,
ENGG CERT

ASH
ASH
ASH

16mm, 6mm), reflective heat strengthen exterior & clear tempered interior
glazing set in powder-coated (PVDF)-Thermally Broken aluminum window
LEADS

LEADS
LEADS
ALL

ALL
ALL

5.1. MAIN GATEHOUSE


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

CIVIL

 For civil scope refer to section 4.22.


DESCRIPTION

STRUCTURAL

 For structural scope refer to section 4.25.

FIRE PROTECTION

 Placement of portable extinguisher in building shall comply with section


906, SAES-M-100.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

 Hand-type portable extinguisher shall be mounted in easily accessible


12/28/16
12/14/16

12/18/16
DATE

locations at grade. Their location shall be marked in RED in a way that will
attract attention, and otherwise meet the requirements of NFPA 10, Chapter
6.
NO.
REV

G
E

DISCIPLINE
ENGINEER  CONTRACTOR shall provide and Install Portable type Fire Extinguisher
ALL LEADS
inside the Buildings as per Table -1, SAES-B-019.
DATE: 12/28/16
PROJECT
ENGINEER  CONTRACTOR shall install all fire Extinguisher units less than 18 kg shall
A M ALMATROOK
be mounted so that the extinguisher top is not more than 1.5 m above the
DATE: 12/28/16 floor level. Extinguisher units weighing over 18 Kg shall be mounted so that
CERTIFIED
AMR EL SHARKAWY extinguisher top is not more than 1.0 m above the floor level.
12/28/16
DATE:
CONSTRUCTION TELECOMMUNICATION
AGENCY


SHAHZAD YAZDANI
CONTRACTOR shall procure, install, test and commission 1 basic IP
DATE: 12/28/16
OPERATIONS
phone and 2 analog phones.
ALI H GHAMDI

12/28/16  CONTRACTOR shall provide this building 4 outlets for voice and data
DATE:
communication. UTP Cat 6 4-pr x 23 ga. Cable will be used going to each
CONTROL NUMBER
VERIFICATION

RJ45 modules in each faceplate outlets.


EDSD

 CONTRACTOR shall procure, install, test and commission one (1) Radio
DATE:

Frequency Dispatch Terminal (RFDT) at the Guardhouse. The transceiver


BY:

shall be located at the Security Support Building and the control head at the
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

Guardhouse.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

(DCC) NO. _____________________

 Outdoor type Cat 6 4-pr x 23ga cable will be extended from the Support

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 230


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG Facility building for the connectivity required in the gatehouse. Cat 6
SAY
SAY
SAY

protector modules shall be provided by the Contactor.


ENGG CERT

ASH
ASH
ASH

ELECTRICAL
LEADS

LEADS
LEADS
ALL

ALL
ALL

 For Building electrical scope refer to section 4.15.


RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

5.2. MUSALLAH

CIVIL
DESCRIPTION

 Provide 8” diameter RTR pipe, 80FEOD, for sanitary waste water from
the support buildings toilet sanitary pipe and shall be connected to
sanitary sewer network then heading to the sanitary lift station area.
These will include the provision of sanitary manholes, cleanouts and other
fixtures.

 Provide 2” diameter RTR pipe, 12FEOU, from water supply network loop
to support building facilities toilet.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

 Provide concrete sidewalks as required around the Support Building


Facilities as shown site development plan. The sidewalk shall be 100mm
12/28/16
12/14/16

12/18/16
DATE

thick concrete provided with 150x150xMW9xMW9 welded wire fabric


(WWF) and shall be in accordance, as applicable, as per SAUDI
NO.
REV

ARAMCO Standard drawing no. AB-036260 sheet 001 rev. 05.


G
E

DISCIPLINE
ENGINEER
ALL LEADS ARCHITECTURAL
DATE: 12/28/16
PROJECT
ENGINEER
 CONTRACTOR shall provide a 110 m2 air-conditioned building with
A M ALMATROOK ablution, janitor store and toilets which shall be constructed to serve as the
DATE: 12/28/16 main Musallah near the E & M building. The proposed Musallah capacity
CERTIFIED
AMR EL SHARKAWY
shall be for approximately 45 persons with an ablution area and toilets.
12/28/16
DATE:
CONSTRUCTION  The proposed building shall be CMU external wall, concrete frame structure
AGENCY
SHAHZAD YAZDANI and concrete roof slab with all utilities to be provided. For the proposed
DATE: 12/28/16 building floor plan refer to drawing # ARA00002-001
OPERATIONS
ALI H GHAMDI
STRUCTURAL
12/28/16
DATE:


CONTROL NUMBER

For structural scope refer to section 4.25.


VERIFICATION
EDSD

HVAC
DATE:
BY:

 CONTRACTOR shall provide & install Packaged Air-conditioning Units


REVISIONCERTIFICATION

(PACU-1 – Duty) outside the building to serve the building along with
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

Sand trap louvers, ductwork, insulation, supports, vibration isolators and


(DCC) NO. _____________________

accessories. Refer to drawings HV-A00002-001 and 002 for HVAC


Layout and System design data and performance requirement of the

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 231


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG units.
SAY
SAY
SAY

 CONTRACTOR shall provide HVAC Equipment foundation of minimum


ENGG CERT

ASH
ASH
ASH

150mm height to mount HVAC Equipment.


LEADS

LEADS
LEADS
ALL

ALL
ALL

 The condensate drain line from each HVAC Equipment shall be routed
to a nearby drain line with proper slope and P trap.
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

 CONTRACTOR shall provide and install supply and return GI ductwork


along with fiberglass insulation (50mm thick – Indoor, Density: 48 kg/m3
& 100mm thick – Outdoor, Density: 48kg/m3) along with supports and
DESCRIPTION

all accessories such as motorized volume dampers, volume control


dampers and Air terminal devices such as diffuser’s and grilles.

 All Electrical Devices provided by CONTRACTOR such as the


Motorized isolation dampers, Exhaust Fans, Fire smoke dampers & Fan
Motors shall be UL Listed.

 CONTRACTOR shall ensure that all HVAC Equipment selected for the
project are as per the EER requirements tabulated under Chapter 7 of
SAES-K-001.
10-02399-
JO/EWO

10-02399-
10-02399-
0001

0001
0001

 CONTRACTOR shall provide cladding for all externally exposed


12/28/16
12/14/16

12/18/16
DATE

ductwork with 0.9mm thick Aluminum sheet.

 CONTRACTOR shall provide and install Exhaust Fans for the different
NO.
REV

G
E

DISCIPLINE
areas listed in the building as per HVAC Layouts along with all
ENGINEER accessories such as back draft dampers and disconnect switch.
ALL LEADS

DATE: 12/28/16
PROJECT
 Fire & Smoke Dampers shall be installed on all fire rated walls and
ENGINEER
these fire & smoke dampers shall be manufactured according to UL555
A M ALMATROOK
and UL 555S standard and shall bear a seal from UL.
DATE: 12/28/16
CERTIFIED
AMR EL SHARKAWY  CONTRACTOR shall provide and install a Direct Digital Control Panel
DATE:
12/28/16 to sequence the HVAC Equipment and Exhaust Fans along with
CONSTRUCTION necessary field devices such as temperature sensors, transmitters,
AGENCY
SHAHZAD YAZDANI
pressure differential switches, damper actuators, duct smoke detectors
and air-flow switches as per the requirements of SAUDI ARAMCO
DATE: 12/28/16
OPERATIONS standards.
ALI H GHAMDI

12/28/16  The DDC Panel shall provide following alarms (Audio & visual) as a
DATE:
minimum:
CONTROL NUMBER
VERIFICATION

- Unit Trip Alarm


EDSD

- Dirty Filter Alarm


- Low Airflow Alarm
DATE:

- High Temperature Alarm


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

CONTRACTOR shall provide necessary termination details, interfacing


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


C

and wiring details and programming of DDC Panels to initiate alarms


(DCC) NO. _____________________

and to sequence or shutdown HVAC Equipment.

`
PROJECT PROPOSAL NARRATIVE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YDH & NJBP EXPANSION DOC 232


YANBU DISTRIBUTION HUB PORTION
X40 A GEN-E0102 Of G
YANBU SAUDI ARABIA JO / EWO: 10-02399-0001 290
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

AHG
AHG
SAUDI ARABIAN OIL COMPANY
AHG

SAY
SAY
SAY

 CONTRACTOR shall interface the DDC Panel with Fire Alarm Control
Panel & DCS.
ENGG CERT

ASH
ASH
ASH


LEADS

CONTRACTOR shall provide Common Trouble alarm to DCS.


LEADS
LEADS
ALL

ALL
ALL

 CONTRACTOR shall provide & install Gas Detectors on the Fresh Air
RE-ISSUED FOR 100% PROJECT PROPOSAL
RE-ISSUED FOR 100% PROJECT PROPOSAL

RE-ISSUED FOR 100% PROJECT PROPOSAL

Intake duct as per layout drawing and shall be connected to DDC and
DCS System.

 The Testing and Air - Balancing requirements shall be provided for the
DESCRIPTION

building as per the SAES-K-001 through an independent 3rd Party. THE


3rd Party CONTRACTOR shall be approved by SAUDI ARAMCO.

PLUMBING

WATER SUPPLY SYSTEM

 CONTRACTOR shall provide and install complete water distribution


piping system to serve toilet fixtures, Lavatories, Janitor sinks of the
10-02399-
JO/EWO

10-02399-
10-02399-

building. The water supply system shall provide both Cold and Hot
0001

0001
0001

water requirements to the building utility areas. For water supply layout,
12/28/16

refer to drawing PL-A00002.001.


12/14/16

12/18/16
DATE

 CONTRACTOR shall provide and install hose bib with vacuum breaker
NO.
REV

G
E

within close proximity of PACU unit for periodic washing.


DISCIPLINE
ENGINEER
ALL LEADS  CONTRACTOR shall ensure that the installation of water supply system
DATE: 12/28/16
shall be in accordance with SAUDI ARAMCO Engineering Standards
PROJECT
ENGINEER
(SAES-S-060) and Uniform Plumbing Code (UPC).
A M ALMATROOK

DATE: 12/28/16
CERTIFIED
 CONTRACTOR shall provide water supply piping material as per the
AMR EL SHARKAWY Plumbing Drawings. The hot water pipes shall be provided with closed
12/28/16 cell fiberglass insulation of density 64 kg/m3.
DATE:
CONSTRUCTION
AGENCY
SHAHZAD YAZDANI  Domestic hot water will be generated by point of use water heaters.
DATE: 12/28/16 Point of use or “instantaneous” types will be provided for remote, single
OPERATIONS
fixture applications and will be mounted on the wall below the fixture
ALI H GHAMDI
being served.
12/28/16
DATE:


CONTROL NUMBER

CONTRACTOR shall provide tie –in to the building water supply lines
VERIFICATION

along with standard accessories such as Isolation valves and back flow
EDSD

preventer. For details regarding the building tie-ins relevant civil


DATE:

You might also like