You are on page 1of 17

RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE1)

TECHNICAL BID EVALUATION FOR AUTOMATIC RECIRCULATION


VALVES
Doc No: 9686-8230-TBE-000-5026 Rev. 01 Doc. Class 1 /Cat: 2

RAS MARKAZ CRUDE OIL PARK

TECHNICAL BID EVALUATION FOR AUTOMATIC


RECIRCULATION VALVES

01 18 Jan 21 332 Issued for Purchase Ashish Ikhe Kishore Kumar Harikrishna Pillai Mo Juhua

Issue for Review /


B1 10 Dec 20 332 Ashish Ikhe Kishore Kumar Harikrishna Pillai Mo Juhua
Comments

Issue for Review /


A1 09 Nov 20 327 Ashish Ikhe Kishore Kumar Harikrishna Pillai Mo Juhua
Comments

REV DATE PAGES DESCRIPTION PP CHK APP-1 APP-2

Page 1 of 332
RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE1)
TECHNICAL BID EVALUATION FOR AUTOMATIC RECIRCULATION
VALVES
Doc No: 9686-8230-TBE-000-5026 Rev. 01 Doc. Class 1 /Cat: 2

Table of Contents
1. GENERAL ..................................................................................................................................................... 4
1.1 PURPOSE ........................................................................................................................................................ 4
1.2 BRIEF SCOPE OF SUPPLY .................................................................................................................................. 4
1.3 EXECUTIVE SUMMARY...................................................................................................................................... 4
2. TECHNICAL BID EVALUATION ................................................................................................................ 5
2.1 BIDDER #1: M/S CROSBY MIDDLE EAST, UAE (SHANGHAI DATIAN VALVE CO., CHINA) ..................................... 5
3. NOTES FOR PROCUREMENT.................................................................................................................... 6
3.1 TECHNICAL ANNEXES TO BE PART OF PURCHASE ORDER .................................................................................... 6
3.2 SITE ASSISTANCE ............................................................................................................................................. 6
3.3 SPARES AND SERVICES ..................................................................................................................................... 6
3.4 MANUFACTURING LOCATION........................................................................................................................... 6
3.5 DELIVERY LOCATION........................................................................................................................................ 6
4. TECHNICAL RECOMMENDATION ........................................................................................................... 7
5. REFERENCE DOCUMENTS FOR TECHNICAL BID EVALUATION .......................................................... 8
5.1 LIST OF PROJECT REFERENCE DOCUMENTS ....................................................................................................... 8
5.2 LIST OF BIDDER OFFERS AND TECHNICAL CLARIFICATIONS ................................................................................. 8
6. TBE SUMMARY .......................................................................................................................................... 9
7. TBE DETAILS ..............................................................................................................................................10
8. TECHNICAL INFORMATION ....................................................................................................................11
8.1 ATTACHMENT-1 (TECHNICAL BID EVALUATION DETAILS CROSBY MIDDLE EAST, UAE)...................................... 12

Page 2 of 332
RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE1)
TECHNICAL BID EVALUATION FOR AUTOMATIC RECIRCULATION
VALVES
Doc No: 9686-8230-TBE-000-5026 Rev. 01 Doc. Class 1 /Cat: 2

REVISION CONTROL SHEET


REV. NO. DATE PAGE NO. DESCRIPTION OF CHANGES
A1 09 Nov 20 All Pages Issued for Review / Comments
B1 10 Dec 20 All Pages Revised as per COMPANY Comments
01 18 Jan 21 All Pages Final issue

This page records the revision status of this document


NOTES:
Revisions after first issue are denoted as follows:
a) By a vertical line in the right-hand margin against the revised text and,
b) By a triangle symbol for graphics, the revision number being denoted within the symbol.
Revision symbols are positioned adjacent to the revision.

Page 3 of 332
RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE1)
TECHNICAL BID EVALUATION FOR AUTOMATIC RECIRCULATION
VALVES
Doc No: 9686-8230-TBE-000-5026 Rev. 01 Doc. Class 1 /Cat: 2

1. GENERAL

1.1 Purpose
This Technical Bid Evaluation (TBE) is related to technical requirements for the design,
engineering, materials, inspection & testing, painting, marking, colour coding, export packing
and transportation/ shipping and documentation of Automatic Recirculation Valves for the
Ras Markaz Crude Oil Park Project.

The TBE for the Automatic Recirculation Valve has been carried out with the following bidders:

1. M/s Crosby Middle East, UAE (Manufacturer: Shanghai Datian Valve Co, China)

1.2 Brief Scope of Supply


The Scope of supply shall comply with section 5 of Material Requisition Doc. No. 9686-8230-
RQ-000-5019, all the reference documents, codes and standards called therein, and technical
clarifications carried out during technical bid evaluation phase.

1. Scope of supply by each Bidder

2. Deviations/Exceptions list by each Bidder

3. Technical Bid Evaluation list

1.3 Executive Summary


The Technical Bid Evaluation for the Automatic Recirculation Valves is carried out with one
Bidders and the details of the same are summarized in Attachment-1, ‘Technical Bid
Evaluation’.

Bidder offers are evaluated based on requirements stated in Datasheets and Material
requisition. Subsequently technical clarifications were performed.

Page 4 of 332
RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE1)
TECHNICAL BID EVALUATION FOR AUTOMATIC RECIRCULATION
VALVES
Doc No: 9686-8230-TBE-000-5026 Rev. 01 Doc. Class 1 /Cat: 2

2. TECHNICAL BID EVALUATION

2.1 Bidder #1: M/s Crosby Middle East, UAE (Shanghai Datian Valve Co.,
China)
Bidder is in compliance with the technical attachments in Material Requisition, doc. no.
9686-8230-RQ-000-5019.

1. BIDDER has specified 4-8 weeks (after PO placement) as delivery period in initial offer.
The delivery to site is confirmed by Bidder.

2. Refer Attachment-1 for detailed Technical Bid Evaluation.

Page 5 of 332
RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE1)
TECHNICAL BID EVALUATION FOR AUTOMATIC RECIRCULATION
VALVES
Doc No: 9686-8230-TBE-000-5026 Rev. 01 Doc. Class 1 /Cat: 2

3. NOTES FOR PROCUREMENT

3.1 Technical annexes to be part of Purchase Order


Following documents shall be attached as technical annexes of Purchase Order:

1. Scope of supply summary duly signed by selected BIDDER.

2. Deviation and Clarification list if any duly signed by selected BIDDER.

3. Price tables to be provided by the BIDDER as part of the commercial proposal agreed
through technical clarifications/ queries.

Hence, Procurement is kindly requested to check the congruence between the Priced and
Unpriced proposals for each Bidder prior to placement of Purchase Order.

3.2 Site Assistance


No Site activities shall be considered in this Lump-sum base scope. All site activities such as
support for pre-commissioning and commissioning shall be as per man-day rates (if
required).

3.3 Spares and Services


Following equipment spares and services shall be included in the Purchase Order:

1. Commissioning Spare Parts.

2. Bidder recommended 2 Years Operation Spare Parts.

3.4 Manufacturing Location


M/s Crosby Middle East, UAE (Manufacturer: Shanghai Datian Valve Co, China)

3.5 Delivery Location


Delivery shall be to the Project Site for Automatic Recirculation Valves.

Page 6 of 332
RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE1)
TECHNICAL BID EVALUATION FOR AUTOMATIC RECIRCULATION
VALVES
Doc No: 9686-8230-TBE-000-5026 Rev. 01 Doc. Class 1 /Cat: 2

4. TECHNICAL RECOMMENDATION

1. The offer from bidder M/s Crosby Middle East, UAE (Manufacturer: Shanghai Datian
Valve Co, China) is technically acceptable.

Conclusion/ Recommendation:

EPC Contractor recommends M/s Crosby Middle East, UAE (Manufacturer: Shanghai Datian
Valve Co, China) is technically acceptable.

Page 7 of 332
RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE1)
TECHNICAL BID EVALUATION FOR AUTOMATIC RECIRCULATION
VALVES
Doc No: 9686-8230-TBE-000-5026 Rev. 01 Doc. Class 1 /Cat: 2

5. REFERENCE DOCUMENTS FOR TECHNICAL BID EVALUATION

5.1 List of Project Reference Documents

Sl. No. Document Number Rev. Description


Material Requisition for Automatic
1. 9686-8230-RQ-000-5019 01
Recirculation Valves.
2. 9686-8230-SP-000-5007 01 Specification for Piping Valves

Datasheet for Automatic Recirculation


3. 9686-8230-DS-000-5015 01
Valves.

5.2 List of Bidder Offers and Technical Clarifications

Sl. No. Document Number Rev. Description

Attachment-1: M/s Crosby Middle East,


1. Q20- CME526-R1 03 UAE (Manufacturer: Shanghai Datian
Valve Co, China)

Page 8 of 332
RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE1)
TECHNICAL BID EVALUATION FOR AUTOMATIC RECIRCULATION
VALVES
Doc No: 9686-8230-TBE-000-5026 Rev. 01 Doc. Class 1 /Cat: 2

6. TBE SUMMARY

(Total 01 Page)

Page 9 of 332
Technical Bid Evaluation Summary
Customer OMAN TANK TERMINAL COMPANY L.L.C. (OTTCO) Equipment Name / No(s) AUTOMATIC RECIRCULATION VALVES
Project Title RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE1) Project No. 9686

Requisition Title TECHNICAL BID EVALUATION FOR AUTOMATIC RECIRCULATION VALVES Requisition No. 9686-8230-RQ-000-5019 Rev 01
TBE Document No. 9686-8230-TBE-000-5026
Revision 01
TENDERER 1

M/s Crosby Middle East, UAE


Tenderer’s Name
(Manufacturer: Shanghai Datian Valve Co., China)

Tenderer’s Proposal No Q20- CME526-R1

Summary Comments Acceptable

Country of Origin China


Delivery Period 4-8 Weeks
Delivery Destination On Project Site
Technically Acceptable (Y/N) Y
Bid Clarification Meeting Required (Y/N) N

Recommendation Technically Acceptable.

Material of Construction: Carbon Steel Body + Internally Epoxy Lined (FBE), Trim DSS
Size: 4" and Bypass 2" Class 300
Piping Class: B2Q1
Quantity: 2
Tag No's: 711-SP-0003, 711-SP-0004

SIGNATURES

Requisitioning Engineer Mechanical Engineer Piping Engineer Process Engineer Pipeline Engineer
Ashish Ikhe Kishore Kumar
(required) (if applicable) (if applicable) (if applicable)

Date 18-Jan-2021 Date Date 18-Jan-2021 Date Date

Instrument Engineer Electrical Engineer Civil/Structural Engineer Quality Manager Mahima Tripathi/ Safety & Risk Engineer
(if applicable) (if applicable) (if applicable) (required) Anil PK (if applicable)

Date Date Date Date 18-Jan-2021 Date


APPROVALS
Primary Discipline Lead Project Engineering Customer
Kishore Kumar Mo Juhua Project Manager Xing Hang
Engineer Manager (if required)
Date 18-Jan-2021 Date 18-Jan-2021 Date 18-Jan-2021 Date

Document File No: 9686-8230-TBE-000-5026


RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE1)
TECHNICAL BID EVALUATION FOR AUTOMATIC RECIRCULATION
VALVES
Doc No: 9686-8230-TBE-000-5026 Rev. 01 Doc. Class 1 /Cat: 2

7. TBE DETAILS

(Total 04 Pages)

Page 10 of 332
Technical Bid Evaluation Detail
Customer OMAN TANK TERMINAL COMPANY L.L.C. (OTTCO) Equipment Name/ No(s) AUTOMATIC RECIRCULATION VALVES
Project Title RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE1) Project No. 9686
Requisition Title TECHNICAL BID EVALUATION FOR AUTOMATIC RECIRCULATION VALVES Requisition No. 9686-8230-RQ-000-5019 Rev 01
TBE Document No. 9686-8230-TBE-000-5026
0
Revision 01
TENDERER 1
SL. No. Technical Description - List of Tender Requirements As per Material Requisition
0 A
Legend for Column A: A=Acceptable Alternative C=Supplier Clarification Required E=Exceeds Specification N=Not Acceptable Y=Complies with Specification
1.0 General Information

M/s Crosby Middle East, UAE


1.1 Vendor Name -
(Manufacturer: Shanghai Datian Valve Co., China)

1.2 Quotation Reference - Q20- CME526-R1


1.3 Quotation Date - 25.10.2020
1.4 Manufacturer Country of Origin - China
1.5 Delevery Period - 4 -8 Weeks
1.6 Delevery Destination - On Project Site
1.7 Approved in AVL - PQR Required
Tag Numbers:
1.8 Quoted Yes
711-SP-0003, 711-SP-0004
2.0 Scope of Supply
Material Requisition: Attachment 1A (Scope of
2.1 Quoted for all items (size & rating) Yes Y
supply)
3.0 Quantity
Material Requisition: Attachment 1A (Scope of
3.1 Whether quoted for all quantities Yes Y
supply)
4.0 Technical Requirements

4.1 General Requirements

4.1.1 Design standard Manufacturer Standard Complied Y

4.1.2 Size Inlet, Outlet and Bleed / Rating Inlet & Outlet: 4", Bleed: 2" Class 300 Complied Y

4.1.3 Process Parameters As per datasheets 9686-8230-DS-000-5015 Complied Y

4.1.4 Valve Type Automatic Recirculation valve Complied Y

Modular design with in build Non return function


4.1.5 Body design Complied Y
& Pressure modulation in bypass

Flange WN, Raised Face to ASME B 16.5, 125-250


4.1.6 End connection/ Flange Facing Complied Y
AARH, Class 300

4.1.7 Face to face dimension Manufacturer Standard Complied Y

Valve end ports shall be covered with close fitting


4.1.8 End Protection Complied Y
protection

• For CS Material:
Carbon content: 0.23% max.
Carbon Equivalent: 0.45 max.

4.1.9 Chemical composition for CS, & DSS Material Complied Y


• For DSS Material:
PREN value shall be 35 Minimum
Nitrogen 0.15% Minimum
Ferrite Content : 40 to 60%
•CS Material
Fully killed and fine grained
4.1.10 Heat Treatment Normalized condition Complied Y
•DSS Material:
Solution annealed and quenched

Document File No: 9686-8230-TBE-000-5026 1 of 4


Technical Bid Evaluation Detail
Customer OMAN TANK TERMINAL COMPANY L.L.C. (OTTCO) Equipment Name/ No(s) AUTOMATIC RECIRCULATION VALVES
Project Title RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE1) Project No. 9686
Requisition Title TECHNICAL BID EVALUATION FOR AUTOMATIC RECIRCULATION VALVES Requisition No. 9686-8230-RQ-000-5019 Rev 01
TBE Document No. 9686-8230-TBE-000-5026
0
Revision 01
TENDERER 1
SL. No. Technical Description - List of Tender Requirements As per Material Requisition
0 A
Legend for Column A: A=Acceptable Alternative C=Supplier Clarification Required E=Exceeds Specification N=Not Acceptable Y=Complies with Specification

The minimum body wall thickness of ASME


B16.34 is sufficient for 2.5mm corrosion
allowance. When the corrosion allowance
4.1.11 Minimum wall thickness specified in data sheet in excess of 3mm, the Complied Y
additional corrosion allowance shall be added to
the valve body, in the amount of the specified line
corrosion allowance that is in excess of 3mm.

4.2 Material of Construction

4.2.1 CS body with Trim UNS S32205

ASTM A216 Gr. WCB + (FBE Internally Epoxy


4.2.1.1 Body Refer Note 1.1 A
lined)

4.2.1.2 Disc with Spindle UNS S32205 Complied Y

4.2.1.3 Spring Guide UNS S32205 Complied Y

4.2.1.4 Bypass Body UNS S32205 Complied Y

4.2.1.5 Control Bushing UNS S32205 Complied Y

4.2.1.6 Bush UNS S32205 Complied Y

4.2.1.7 Letdown Unit UNS S32205 Complied Y

4.2.1.8 Gasket Spiral Wound, Graphite Filler,2205 Duplex SS Complied Y

4.2.1.9 Bolting ASTM A 193 Gr B7/A194 Gr 7 Complied Y

4.2.1.10 Spring UNS N07750/ N07718/N06625 Complied Y

5.0 Compliance to Specification


Compliance to Attachment 6A of Material requisition "Piping Material
5.1 9686-8230-SP-000-5001 Complied Y
Specification"
Compliance to Attachment 6B of Material requisition "Specification for Flanges,
5.2 9686-8230-SP-000-5004 Complied Y
Figure-8, Blanks,Spades and Spacers"

5.3 Compliance to Attachment 6C of Material requisition "Specification for Gaskets" 9686-8230-SP-000-5005 Complied Y

5.4 Compliance to Attachment 6D of Material requisition "Specification of Bolting" 9686-8230-SP-000-5006 Complied Y

Compliance to Attachment 6E of Material requisition "Specification for Piping


5.5 9686-8230-SP-000-5007 Complied Y
Valves "
Compliance to Attachment 6F of Material requisition "Specification for Colour
5.6 9686-8230-SP-000-5012 Complied Y
Coding and Marking"
Compliance to Attachment 6G of Material requisition "Specification for External
5.7 9686-8360-SP-000-2502 Complied Y
Painting"
Compliance for Attachment 6H of Material requisition "Specification for Positive
5.8 9686-8470-SP-000-4004 Complied Y
Material Identification"

Document File No: 9686-8230-TBE-000-5026 2 of 4


Technical Bid Evaluation Detail
Customer OMAN TANK TERMINAL COMPANY L.L.C. (OTTCO) Equipment Name/ No(s) AUTOMATIC RECIRCULATION VALVES
Project Title RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE1) Project No. 9686
Requisition Title TECHNICAL BID EVALUATION FOR AUTOMATIC RECIRCULATION VALVES Requisition No. 9686-8230-RQ-000-5019 Rev 01
TBE Document No. 9686-8230-TBE-000-5026
0
Revision 01
TENDERER 1
SL. No. Technical Description - List of Tender Requirements As per Material Requisition
0 A
Legend for Column A: A=Acceptable Alternative C=Supplier Clarification Required E=Exceeds Specification N=Not Acceptable Y=Complies with Specification
Compliance to Attachment 6I of Material requisition "Specification for Welding
5.9 9686-8470-SP-000-4005 Complied Y
and NDE for Equipment and Piping"
Compliance to Attachment 6J of Material requisition "Equipment Criticality Rating
5.10 9686-8820-PR-000-9005 Complied Y
and Inspection Level Report"
Compliance to Attachment 6K of Material requisition "Engineering Design Data
5.11 9686-8850-SP-000-9001 Complied Y
(EDD)"
5.12 Compliance to Attachment 7A of Material requisition "Purchase Procedure" 9686-6120-PR-000-0001 Complied Y

5.13 Compliance to Attachment 7B of Material requisition "Expediting Procedure" 9686-6120-PR-000-0002 Complied Y


Compliance to Attachment 7C of Material requisition "Shop Inspection and
5.14 9686-6120-PR-000-0003 Complied Y
Testing Procedure"
Compliance to Attachment 7D of Material requisition "Transportation
5.15 9686-6120-PR-000-0004 Complied Y
Management & Customs Clearance Procedure"
Compliance to Attachment 7E of Material requisition "Materials Handling &
5.16 9686-6120-PR-000-0005 Complied Y
Storage Procedure"

5.17 Compliance to Attachment 7F of Material requisition "Spare Parts Procedure" 9686-6120-PR-000-0006 Complied Y

Compliance to Attachment 7G of Material requisition "Vendor Documents


5.18 9686-6120-PR-000-0008 Complied Y
Management Procedure"
Compliance to Attachment 7H of Material requisition "Material Identification and
5.19 9686-6150-PR-000-0006 Complied Y
Traceability Procedure"
5.20 Compliance to Attachment 8 of Material requisition "Project Quality Plan" 9686-6150-PR-000-0001 Complied Y
Compliance to Attachment 2 of Material Requisition " Datasheet for Automatic
5.21 9686-8230-DS-000-5015
Recirculation Valve".
6.0 Inspection & Testing Requirements
BS EN 10204 3.1 for Pressure Parts and BS EN
10204 2.1 for Non Pressure Parts As per
6.1 Certification Complied Y
Specification for Piping Valves Doc. No. 9686-
8230-SP-000-5007

6.2 Pressure Test (Hydrostatic & Pneumatic) As per datasheets 9686-8230-DS-000-5015 Complied Y

As per Specification For Piping Valves Doc. No.


6.3 Non Destructive Examination (NDE) Complied Y
9686-8230-SP-000-5007
As per Specification For Piping Valves Doc. No.
6.4 Impact Test on DSS Complied Y
9686-8230-SP-000-5007
6.5 Positive Material Identification (PMI) As per Doc. No. 9686-8470-SP-000-4004 Complied Y

6.6 Leakage Rate As per datasheets 9686-8230-DS-000-5015 Complied Y

7.0 Vendor Quality Requirement

7.1 ISO Certificate (9001:2015) To be submitted along with Bid Complied Y


7.2 Vendor Quality Requirements (VQR) As per Section 6.2.2 of Material Requisition Complied Y
7.3 Inspection Test Plan (ITP) To be submitted along with Bid (Typical) Complied Y
7.4 Quality Control Plan To be submitted along with Bid (Typical) Complied Y
8.0 Documentation Requirements

8.1 Vendor Document Requirement List (VDRL) Material Requisition: Attachment 3 Complied Y

Document File No: 9686-8230-TBE-000-5026 3 of 4


Technical Bid Evaluation Detail

Customer OMAN TANK TERMINAL COMPANY L.L.C. (OTTCO) Equipment Name/ No(s) AUTOMATIC RECIRCULATION VALVES
Project Title RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE1) Project No. 9686
Requisition Title TECHNICAL BID EVALUATION FOR AUTOMATIC RECIRCULATION VALVES Requisition No. 9686-8230-RQ-000-5019, Rev 01
TBE Document No. 9686-8230-TBE-000-5026
0
Revision 01

NOTES

1.0 M/s Crosby Middle East, UAE

1.1 Bidder has proposed the Duplex Stainless Steel body material in place of CS with internally FBE Lined. This is technically acceptable.

Document File No: 9686-8230-TBE-000-5026 4 of 4


RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE1)
TECHNICAL BID EVALUATION FOR AUTOMATIC RECIRCULATION
VALVES
Doc No: 9686-8230-TBE-000-5026 Rev. 01 Doc. Class 1 /Cat: 2

8. TECHNICAL INFORMATION

Page 11 of 332
RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE1)
TECHNICAL BID EVALUATION FOR AUTOMATIC RECIRCULATION
VALVES
Doc No: 9686-8230-TBE-000-5026 Rev. 01 Doc. Class 1 /Cat: 2

8.1 Attachment-1 (Technical Bid Evaluation Details Crosby Middle East, UAE)
(Total 315 Pages)

Page 12 of 332