WATER TREATMENT PLANT Classic Schedule Layout 20-Mar-21 11:48

Activity ID Activity Name Original Remaining Start Finish Predecessors Successors Total A M J J A S O N D J F M A M J J A S O N D J F M A M
Duration Duration Float 3 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 1 2 0 0 1 2 0 0 1 2 2 0 1 1 2 0 1 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 2 2 0 1 1 2 3 0 1 2 2 0 1 2 2 0 1 1 2 0 0 1 2

WTP WATER TREATMENT PLANT 601 601 02-Apr-19 25-Nov-20 0 25-Nov-20, WTP WATER TREATMENT PLANT

A1000 START OF PROJECT 0 0 02-Apr-19 A1010 0 START OF PROJECT, 02-Apr-19

WTP.PLS PLANNING AND SURVEY 73 73 02-Apr-19 13-Jun-19 0 13-Jun-19, WTP.PLS PLANNING AND SURVEY

A1010 PREPARATION OF DRAFT REPORT 15 15 02-Apr-19 16-Apr-19 A1000 A1020 0 PREPARATION OF DRAFT REPORT
A1020 APPOINTMENT OF CONSULTANT 20 20 17-Apr-19 06-May-19 A1010 A1030, A1040 0 APPOINTMENT OF CONSULTANT
A1030 DATA COLLECTION FOR DESIGN 2 2 07-May-19 08-May-19 A1020 A1050, A1100 0 DATA COLLECTION FOR DESIGN
A1040 SEARCHING OF WATER SOURCE 5 5 07-May-19 11-May-19 A1020 A1090 21 SEARCHING OF WATER SOURCE
A1050 FEASIBILITY REPORT 12 12 09-May-19 20-May-19 A1030 A1060 0 FEASIBILITY REPORT
A1060 SELECTION OF SITE 2 2 21-May-19 22-May-19 A1050 A1070 0 SELECTION OF SITE
A1070 PREPARATION OF LAYOUT PLAN 2 2 23-May-19 24-May-19 A1060 A1080 0 PREPARATION OF LAYOUT PLAN
A1080 GEOTECHNICAL IN VESTIGATION 20 20 25-May-19 13-Jun-19 A1070 A1150 0 GEOTECHNICAL INVESTIGATION
A1090 TESTING OF WATER SOURCE 8 8 16-May-19 23-May-19 A1040 A1150 21 TESTING OF WATER SOURCE
A1100 COLLECTION OF NOC AND APPROVAL 30 30 09-May-19 07-Jun-19 A1030 A1150, A1160, A1170
4 COLLECTION OF NOC AND APPROVAL

WTP.WTP DESIGN OF WTP UNIT 33 33 08-Jun-19 10-Jul-19 0 10-Jul-19, WTP.WTP DESIGN OF WTP UNIT

A1150 DESIGN OF FILTRATION GALARY 5 5 14-Jun-19 18-Jun-19 A1080, A1090,A1180


A1100 0 DESIGN OF FILTRATION GALARY
A1160 DESIGN OF INTAKE WALL 5 5 08-Jun-19 12-Jun-19 A1100 A1190, A1200 13 DESIGN OF INTAKE WALL
A1170 DESIGN OF PIPE LINE 5 5 08-Jun-19 12-Jun-19 A1100 A1190, A1200 13 DESIGN OF PIPE LINE
A1180 DESIGN OF FILTRATION UNIT 5 5 21-Jun-19 25-Jun-19 A1150 A1200 0 DESIGN OF FILTRATION UNIT
A1190 DESIGN OF ESR 5 5 13-Jun-19 17-Jun-19 A1160, A1170A1210 13 DESIGN OF ESR
A1200 DESIGN OF GSR 5 5 26-Jun-19 30-Jun-19 A1160, A1170,A1210
A1180 0 DESIGN OF GSR
A1210 DESIGN OF PUMP ROOM 5 5 01-Jul-19 05-Jul-19 A1190, A1200A1220 0 DESIGN OF PUMP ROOM
A1220 DESIGN OF ELECTRICAL LAYOUT 2 2 07-Jul-19 08-Jul-19 A1210 A1230 0 DESIGN OF ELECTRICAL LAYOUT
A1230 DESIGN OF PUMPS 2 2 09-Jul-19 10-Jul-19 A1220 A1240 0 DESIGN OF PUMPS

WTP.PPAF PROPOSAL PREPARATION AND APF 37 37 15-Jul-19 21-Aug-19 0 21-Aug-19, WTP.PPAF PROPOSAL PREPARATION AND APF

A1240 SCHEDULES OF ITEMS 5 5 15-Jul-19 19-Jul-19 A1230 A1250 0 SCHEDULES OF ITEMS


A1250 ESTIMATION OF WORKS 10 10 20-Jul-19 29-Jul-19 A1240 A1260 0 ESTIMATION OF WORKS
A1260 FINANCIAL REVIEW AND SCRUTINY 2 2 30-Jul-19 31-Jul-19 A1250 A1270 0 FINANCIAL REVIEW AND SCRUTINY
A1270 APPROVAL OF PROPOSAL 20 20 01-Aug-19 21-Aug-19 A1260 A1280 0 APPROVAL OF PROPOSAL

WTP.TDOC TENDER AND DOCUMENTATION 52 52 22-Aug-19 13-Oct-19 408 13-Oct-19, WTP.TDOC TENDER AND DOCUMENTATION

A1280 PREPARATION OF TENDER DOCUMENT 4 4 22-Aug-19 25-Aug-19 A1270 A1290 0 PREPARATION OF TENDER DOCUMENT
A1290 PUBLISHING OF TENDER 2 2 26-Aug-19 27-Aug-19 A1280 A1300 0 PUBLISHING OF TENDER
A1300 SUBMISSION OF TENDER DOCUMENT 30 30 28-Aug-19 26-Sep-19 A1290 A1310 0 SUBMISSION OF TENDER DOCUMENT
A1310 OPENING OF PART-I 1 1 27-Sep-19 27-Sep-19 A1300 A1320, A1330 0 OPENING OF PART-I
A1320 OPENING OF PART-II 15 15 28-Sep-19 13-Oct-19 A1310 408 OPENING OF PART-II
A1330 AWARD OF WORK 12 12 28-Sep-19 10-Oct-19 A1310 A1340, A1390, A1480
0 AWARD OF WORK

WTP.WOS WORK ON SITE 386 386 11-Oct-19 31-Oct-20 25 31-Oct-20, WTP.WOS WORK ON SITE

WTP.WOS.DG DRAINAGE GALARY 16 16 16-Oct-19 31-Oct-19 390 31-Oct-19, WTP.WOS.DG DRAINAGE GALARY
A1340 EXCAVATION 2 2 16-Oct-19 17-Oct-19 A1330 A1350 69 EXCAVATION
A1350 PCC 2 2 18-Oct-19 19-Oct-19 A1340 A1360, A1370 69 PCC
A1360 RCC M30 10 10 20-Oct-19 29-Oct-19 A1350 A1380 69 RCC M30
A1370 REINFORCEMENT 10 10 20-Oct-19 29-Oct-19 A1350 392 REINFORCEMENT
A1380 FILLING 2 2 30-Oct-19 31-Oct-19 A1360 A1920 69 FILLING
WTP.WOS.IW INTAKE WALL 108 108 11-Oct-19 27-Jan-20 303 27-Jan-20, WTP.WOS.IW INTAKE WALL
A1390 EXCAVATION 6 6 11-Oct-19 16-Oct-19 A1330 A1400 0 EXCAVATION
A1400 PCC 2 2 17-Oct-19 18-Oct-19 A1390 A1410, A1420 0 PCC
A1410 RCC M25 65 65 19-Oct-19 22-Dec-19 A1400 A1430 0 RCC M25
A1420 REINFORCEMENT 65 65 19-Oct-19 22-Dec-19 A1400 A1430 0 REINFORCEMENT
A1430 BRICKWORK 15 15 23-Dec-19 07-Jan-20 A1410, A1420A1440, A1470 0 BRICKWORK
A1440 PLASTERING 8 8 08-Jan-20 15-Jan-20 A1430 A1450 303 PLASTERING
A1450 STRUCTURAL STEEL WORK 8 8 16-Jan-20 23-Jan-20 A1440 A1460 303 STRUCTURAL STEEL WORK
A1460 PAINTING 4 4 24-Jan-20 27-Jan-20 A1450 303 PAINTING
A1470 FILLING 2 2 08-Jan-20 09-Jan-20 A1430 A1920 0 FILLING
WTP.WOS.APL ALL PIPE LINES 111 111 11-Oct-19 30-Jan-20 300 30-Jan-20, WTP.WOS.APL ALL PIPE LINES
A1480 EXCAVATION 40 40 11-Oct-19 19-Nov-19 A1330 A1490 16 EXCAVATION
A1490 PCC 15 15 20-Nov-19 04-Dec-19 A1480 A1500, A1510 16 PCC
A1500 RCC 15 15 05-Dec-19 19-Dec-19 A1490 A1520, A1530, A1540
16 RCC
A1510 REINFORCEMENT 15 15 05-Dec-19 19-Dec-19 A1490 A1520, A1530, A1540
16 REINFORCEMENT
A1520 150mm HDPE 20 20 20-Dec-19 09-Jan-20 A1500, A1510A1550, A1560, A1570,
300 A1580 150mm HDPE
A1530 100mm HDPE 12 12 20-Dec-19 01-Jan-20 A1500, A1510A1550, A1560, A1570,
308 A1580, A1590 100mm HDPE
A1540 150mm GI PIPE 4 4 20-Dec-19 23-Dec-19 A1500, A1510A1550, A1560, A1570,
16 A1580, A1920, A1840, A1760 150mm GI PIPE
A1550 50mm HDPE 15 15 10-Jan-20 24-Jan-20 A1520, A1530,A1600
A1540 300 50mm HDPE
A1560 25mm HDPE 12 12 10-Jan-20 21-Jan-20 A1520, A1530,A1610
A1540 303 25mm HDPE
A1570 AIR VALVE 150mm 1 1 10-Jan-20 10-Jan-20 A1520, A1530,A1620
A1540 315 AIR VALVE 150mm
A1580 STOP VALVE 150mm 1 1 10-Jan-20 10-Jan-20 A1520, A1530,A1620
A1540 315 STOP VALVE 150mm
A1590 STOP VALVE 100mm 1 1 02-Jan-20 02-Jan-20 A1530 A1620 323 STOP VALVE 100mm
A1600 STOP VALVE 50mm 1 1 25-Jan-20 25-Jan-20 A1550 A1620 300 STOP VALVE 50mm
A1610 STOP VALVE 25mm 1 1 22-Jan-20 22-Jan-20 A1560 A1620 303 STOP VALVE 25mm
A1620 NON RETURN VALVE 100mm 5 5 26-Jan-20 30-Jan-20 A1570, A1580, A1590, A1600, A1610
300 NON RETURN VALVE 100mm
WTP.WOS.FU FILTRATION UNIT 228 228 10-Jan-20 24-Aug-20 93 24-Aug-20, WTP.WOS.FU FILTRATION UNIT
A1920 EXCAVATION 15 15 10-Jan-20 24-Jan-20 A1380, A1470,A1930,
A1540A1660 0 EXCAVATION

Actual Level of Effort Remaining Work Milestone Page 1 of 2 TASK filter: All Activities
Actual Work Critical Remaining Work summary © Oracle Corporation
WATER TREATMENT PLANT Classic Schedule Layout 20-Mar-21 11:48
Activity ID Activity Name Original Remaining Start Finish Predecessors Successors Total A M J J A S O N D J F M A M J J A S O N D J F M A M
Duration Duration Float 3 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 1 2 0 0 1 2 0 0 1 2 2 0 1 1 2 0 1 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 2 2 0 1 1 2 3 0 1 2 2 0 1 2 2 0 1 1 2 0 0 1 2
A1930 PCC 8 8 25-Jan-20 01-Feb-20 A1920 A1940, A1950 0 PCC
A1940 RCC M25 120 120 02-Feb-20 31-May-20 A1930 A1960, A1980 0 RCC M25
A1950 REINFORCEMENT 120 120 02-Feb-20 31-May-20 A1930 A1960, A1980 0 REINFORCEMENT
A1960 BRICKWORK 45 45 01-Jun-20 15-Jul-20 A1940, A1950A1970 0 BRICKWORK
A1970 PLASTERING 15 15 16-Jul-20 30-Jul-20 A1960 A1990, A2060 0 PLASTERING
A1980 FILLING 4 4 01-Jun-20 04-Jun-20 A1940, A1950A1990, A2050 56 FILLING
A1990 FLOORING 8 8 31-Jul-20 07-Aug-20 A1970, A1980A2000, A2010, A2020,
0 A2030, A2040 FLOORING
A2000 PAINTING 5 5 08-Aug-20 12-Aug-20 A1990 A2100 10 PAINTING
A2010 STRUCTURAL STEEL 14 14 08-Aug-20 21-Aug-20 A1990 A2100 1 STRUCTURAL STEEL
A2020 STEEL GRILL 12 12 08-Aug-20 19-Aug-20 A1990 A2100 3 STEEL GRILL
A2030 STEEL DOOR 14 14 08-Aug-20 21-Aug-20 A1990 A2100 1 STEEL DOOR
A2040 WINDOW VENT 15 15 08-Aug-20 22-Aug-20 A1990 A2100 0 WINDOW VENT
A2050 PIPING OF UNITS 4 4 05-Jun-20 08-Jun-20 A1980 A2070 67 PIPING OF UNITS
A2060 SAND FILTERS 20 20 31-Jul-20 19-Aug-20 A1970 98 SAND FILTERS
A2070 VALVE 1 1 09-Jun-20 09-Jun-20 A2050 A2080 67 VALVE
A2080 PUMP 1 1 10-Jun-20 10-Jun-20 A2070 A2090, A2100 67 PUMP
A2090 SMALL LABORATORY 6 6 11-Jun-20 16-Jun-20 A2080 A2100 67 SMALL LABORATORY
A2100 CHLORINATION UNIT 2 2 23-Aug-20 24-Aug-20 A2010, A2000,A1630
A2020, A2030, A2040,
0 A2080, A2090 CHLORINATION UNIT
WTP.WOS.EST CONST ESR 133 133 24-Dec-19 05-May-20 204 05-May-20, WTP.WOS.EST CONST ESR
A1840 EXCAVATION 5 5 24-Dec-19 29-Dec-19 A1540 A1850 111 EXCAVATION
A1850 PCC 2 2 30-Dec-19 31-Dec-19 A1840 A1860, A1870 111 PCC
A1860 RCC M25 120 120 01-Jan-20 29-Apr-20 A1850 A1880, A1890, A1900
111 RCC M25
A1870 REINFORCEMENT 120 120 01-Jan-20 29-Apr-20 A1850 A1880, A1890, A1900
111 REINFORCEMENT
A1880 STRUCTURAL STEEL 4 4 30-Apr-20 03-May-20 A1860, A1870A1910 111 STRUCTURAL STEEL
A1890 FILLING 2 2 30-Apr-20 01-May-20 A1860, A1870 208 FILLING
A1900 WATER PROOFING TO TANK 4 4 30-Apr-20 03-May-20 A1860, A1870 206 WATER PROOFING TO TANK
A1910 PAINTING EXPOXY EXTERNAL 2 2 04-May-20 05-May-20 A1880 A1630 111 PAINTING EXPOXY EXTERNAL
WTP.WOS.GSR CONST OF GSR 76 76 24-Dec-19 09-Mar-20 168 09-Mar-20, WTP.WOS.GSR CONST OF GSR
A1760 EXCAVATION 4 4 24-Dec-19 28-Dec-19 A1540 A1770 168 EXCAVATION
A1770 PCC 2 2 29-Dec-19 30-Dec-19 A1760 A1780, A1790 168 PCC
A1780 RCC M25 62 62 31-Dec-19 01-Mar-20 A1770 A1800, A1810, A1820
168 RCC M25
A1790 REINFORCEMENT 62 62 31-Dec-19 01-Mar-20 A1770 A1800, A1810, A1820
168 REINFORCEMENT
A1800 STRUCTURAL STEEL 6 6 02-Mar-20 07-Mar-20 A1780, A1790A1830 168 STRUCTURAL STEEL
A1810 FILLING 2 2 02-Mar-20 03-Mar-20 A1780, A1790A1830 172 FILLING
A1820 WATER PROOFING TO TANK 5 5 02-Mar-20 06-Mar-20 A1780, A1790A1830 169 WATER PROOFING TO TANK
A1830 PAINTING EPOXY EXTERNAL 2 2 08-Mar-20 09-Mar-20 A1800, A1810,A1630
A1820 168 PAINTING EPOXY EXTERNAL
WTP.WOS.PRBW PUMP ROOM BOUNDARY WALL 161 161 25-Jan-20 03-Jul-20 52 03-Jul-20, WTP.WOS.PRBW PUMP ROOM BOUNDARY WALL
A1660 EXCAVATION 14 14 25-Jan-20 07-Feb-20 A1920 A1670 52 EXCAVATION
A1670 PCC 12 12 08-Feb-20 19-Feb-20 A1660 A1680, A1690 52 PCC
A1680 RCC 60 60 20-Feb-20 19-Apr-20 A1670 A1700, A1710 52 RCC
A1690 REINFORCEMENT 60 60 20-Feb-20 19-Apr-20 A1670 A1710 52 REINFORCEMENT
A1700 FILLING 8 8 20-Apr-20 27-Apr-20 A1680 A2110 54 FILLING
A1710 BRICKWORK 10 10 20-Apr-20 29-Apr-20 A1680, A1690A2110 52 BRICKWORK
A1720 PAINTING 4 4 05-May-20 08-May-20 A2110 A1730 52 PAINTING
A1730 STRUCTURAL STEEL WORK 4 4 09-May-20 12-May-20 A1720 A1740 52 STRUCTURAL STEEL WORK
A1740 STEEL DOOR 46 46 13-May-20 27-Jun-20 A1730 A1750 52 STEEL DOOR
A1750 WINDOW 6 6 28-Jun-20 03-Jul-20 A1740 A1630 52 WINDOW
A2110 PLASTERING 5 5 30-Apr-20 04-May-20 A1700, A1710A1720 52 PLASTERING
WTP.WOS.CEL COMPLETE ELECTRICAL LAYOUT 68 68 25-Aug-20 31-Oct-20 0 31-Oct-20, WTP.WOS.CEL COMPLETE ELECTRICAL LAYOUT
A1630 EXTERNAL ELECTRIFICATION 20 20 25-Aug-20 13-Sep-20 A1910, A2100,A1640
A1830, A1750 0 EXTERNAL ELECTRIFICATION
A1640 INTERNAL ELECTRIFICATION 28 28 14-Sep-20 11-Oct-20 A1630 A1650 0 INTERNAL ELECTRIFIC ATION
A1650 POINT WIRING 20 20 12-Oct-20 31-Oct-20 A1640 A1110, A1120 0 POINT WIRING

WTP.HOS HANDING OVER SITE 25 25 01-Nov-20 25-Nov-20 0 25-Nov-20, WTP.HOS HANDING OVER SITE

A1110 COLLECTION OF TEST REPORT 10 10 01-Nov-20 10-Nov-20 A1650 A1130 0 COLLECTION OF TEST REPORT
A1120 PREPARING AND FINISHING WORK 10 10 01-Nov-20 10-Nov-20 A1650 A1130 0 PREPARING AND FINISHING WORK
A1130 SUBMISSION OF ALL RESERVE DRA 15 15 11-Nov-20 25-Nov-20 A1110, A1120A1140 0 SUBMISSION OF ALL RESERVE DRA
A1140 END OF PROJECT 0 0 25-Nov-20 A1130 0 END OF PROJECT,

Actual Level of Effort Remaining Work Milestone Page 2 of 2 TASK filter: All Activities
Actual Work Critical Remaining Work summary © Oracle Corporation

You might also like