You are on page 1of 2

NOC Application Form

NOC details Ref no. NOC/Sep/2022/087

Applicant name NOC/Sep/2022/087


Applicant client TestRejEmail
Project title rte
Location MUSCAT-MUSCAT
Email TestRejEmail@d
Date 07/09/2022 Phone no. 34343333

Asset Info & GIS use


rrrr

Observations

ƒ GIS drawing map is produced & attached …


ƒ GIS observation and attached map is only for supporting engineers and it is not considered as an
approval
Designation : Asset Information & GIS Section Head Designation : Asset Information & GIS Section Head
Signature : puser7 Signature : PUSER3 PUSER3
Date : 07/09/2022 Date : 07/09/2022

Page 1 From 2
Transmission Dept. ; Project Dept. … AM &Planning Dept. …
Transmission Dept.:
sdd

No Objection

Transmission Dept.
Designation : Designation : Zone Incharge- any zone
Signature : Signature : Puser1
Date : Date : 07/09/2022
Notes:
ƕ Approved NOC is valid for six months only, starting from authorized date of TRM, PRJ and AMP.
ƕ The applicant should approach OETC O&M Engineer prior to starting any construction to avoid any
unexpected updates/ changes.
ƕ OETC O&M Engineer will follow-up at site randomly.
ƕ This NOC application is automatically generated by the system and all processes are digitally signed by OETC
concerned personnel¶s.

Page 2 From 2

You might also like