Professional Documents
Culture Documents
Observations
Page 1 From 2
Transmission Dept. ; Project Dept.
AM &Planning Dept.
Transmission Dept.:
sdd
No Objection
Transmission Dept.
Designation : Designation : Zone Incharge- any zone
Signature : Signature : Puser1
Date : Date : 07/09/2022
Notes:
ƕ Approved NOC is valid for six months only, starting from authorized date of TRM, PRJ and AMP.
ƕ The applicant should approach OETC O&M Engineer prior to starting any construction to avoid any
unexpected updates/ changes.
ƕ OETC O&M Engineer will follow-up at site randomly.
ƕ This NOC application is automatically generated by the system and all processes are digitally signed by OETC
concerned personnel¶s.
Page 2 From 2