You are on page 1of 2

Internal Correspondences

FACTS Projects Engineering & Design Division Manager Office


Office Address: Riyadh, SEC HQ, Tower C, Floor 03
Tel: 011-80-78540 , E-mail: AMZahrani29@se.com.sa

Project : Installation of DRPC and Expansion of 132kV GIS at Kudmi BSP

Contract # : 4400014231 Signed Date: 30-Dec-2020 TCC Date: 28-Feb-2023


Contractor : SIEMENS COMPANY LIMITED

Our ref.# 12024301 - 0166 22 Date: 13-Mar-2022

To : Projects Department South


Civil & Electromechanical Projects Division
Attention : Engr. Ali A. Al-Khairi Mail
Division Manager e-mail_1: AAKhairi@ngrid.sa
e-mail_2:

Your ref. # : DTS-CE-045


Date : 10-Mar-2022
Subject : TECHNICAL MATERIAL SUBMITTAL FOR GYPSUM BOARD, DRYWALL SYSTEM & WALL INSULATION
Received as : Original Copy Fax Copy e-mail Copy

Contractor ref. # DTS-CE-045


Date : 09-Mar-2022
Submittal is N_ New R_Revised Rev # 0
Including Only Letter Hard Copy, No. of folders : Soft Copy, No. of CD :

We received it on 10-Mar-2022 and registered under ref. # by MLS

Kindly be informed that the received submittal has been reviewed and below is our conclusion for your information, record and
further necessary action:
A_ Acceptable

B_ Acceptable as Noted (No need to Resubmit)

C_ Uncompleted and need further data to be evaluated with the received Submittal ( need to submit)

D_ Rejected for the attached mentioned reason(s)

E_ No action needed from our division

F_ Need a meeting to discuss the attached agenda with: Manufacturer Contractor SEC/ NG Department(s)

Review of this submittal is for general conformance with the SOW/PTS of this project.
This review does not relieve the contractor from responsibility of full compliance with the contract documents.
If the status is "C" or "D" or "F", We expect to receive your positive response to this letter no later than
to close this project technically together within the target date.

If you need any further clarification on this subject, please call Mr. SureshKumar L. Mikilinen @ 011-807-9338

Regards,

Reviewed by: RSD/MLS


Basem M. Al-Suhaibani

Manager (A), FACTS Project Engineering & Design Division


cc: Project File

Form 1: General Response to Submittals_ 2022_R0

1 of 2
FACTS Projects Engineering & Design Division
Attachment of letter # 12024301 - 166 -22 Dated
13-Mar-2022
CN # 4400014231
Subject: TECHNICAL MATERIAL SUBMITTAL FOR GYPSUM BOARD, DRYWALL SYSTEM & WALL INSULATION

Sr. FACTS Comments on the Submittal (Rev 0) Reply of Contractor (Rev. 1) FACTS Comments on the Submittal (Rev 1) Reply of Contractor (Rev. 2) FACTS Comments on the Submittal (Rev 2)
1
It is noted that suppliers United Mining Industries
(UMI) for Gypsum Board, SFSP-Drywall System for
Stud & Runners and KIMCO for Fiberglass Wall
Insulation are in in approved list for each materials
and have been applied & approved for previous SEC
Projects
2 Contractor shall ensure that the supplied materials
are in compliance with Appendix-VIIIb, Sections 3.11
& 3.12

2 of 2

You might also like