Professional Documents
Culture Documents
Cat® 6060 FS
RH Joystick
Boom Down
(Float)
Horn Boom
(Power)
Down
Boom Up
2
LH Joystick Service Training
LH Joystick
Stick
Out
Stick In Spare
(Power)
Swing Swing
Left Right
Stick in
(Float)
3
Pedals Service Training
4
Main Pump Assembly Service Training
P8
P7
P6
P5
P4
P3
P2
P1
5
Filter Block Assembly Service Training
P 1/7
P 2/8
P 3/5
P 4/6
6
Travel Supply: P1/P7 and P2/P8 (P3/5 and P4/6 Attachment) Service Training
7
Rotary Joint and Main Valves (side views) Service Training
*The High pressure routing from Pump 3/5 and 4/6 leads direct to the attachment functions
*The High pressure routing from Pump 1/7 and 2/8 leads direct via Rotary Joint to the travel functions
8
Main Valves on FS Attachment Service Training
P3/P5
P1/P7
P4/P6
P2/P8 Clam
9
Main Valves on FS Attachment Service Training
10
Main Control Valves (Triple – Spool Valve) Service Training
Secondary- and
Anti Cavitation
Valves
Main
Valve
Spool
Load
Check
Valves
11
Secondary Relief Valves Service Training
12
Secondary Relief Valves with Anti Cavitation Function Service Training
Valve short before opening Valve open due to high pressure Anti cavitation function
13
Attachment Main Valves Service Training
14
Functions – Proportional Valve Banks - Attachment
FS-Version Service Training
-2Y36
-2Y10
-2Y8 Stick Cylinder out (Stick out)
-2Y2
-2Y5
-2Y8
-2Y10 Clam Cylinder out (Clam close)
Tank Return
Tank Return
-2Y37 Valveblock Pre Heating
Stick Float Valve Tank Return (no electrical signal)
-2Y37 -2Y7 Stick Cylinder in- Float (Stick float)
-2Y7
-2Y4
-2Y4 Boom Cylinder in- Float (Boom float)
Boom Float Valve Tank Return (no electrical signal)
-2Y6
-2Y3
-2Y2
-2Y9
-2Y3 Boom Cylinder in (Boom power down)
-2Y2 Bucket Cylinder out (Bucket fill)
-2Y9 Clam Cylinder in (Clam open)
Tank 35 bar
15
Proportional Valve Banks – Installation Service Training
P - 35 bar
16
Proportional Valve Banks – Routing Servo-Control Hoses Service Training
17
Main Valves – Front View with Servo-Control Hoses Service Training
18
Main Valves – Rear View with Servo-Control Hoses Service Training
19
Main Valves – side view – with HP-Hose- and Pipe-Routing Service Training
20
Main Valves – side view – with HP-Hose- and Pipe-Routing Service Training
21
Main Valve – Installation with detailed HP-Pipe-Routing Service Training
22
Main Valve Installation – with full HP-Hose- and Pipe-Routing Service Training
23
Main Valve Installation – with full HP- Hose-and Pipe-Routing Service Training
Top - view
24
Main Valve Installation – with full HP-Hose- and Pipe-Routing Service Training
Side view - LH
Side view - RH
25
Condition: Boom Up Service Training
26
Condition: Boom Down (Floating) Service Training
Stick
Bucket
Boom
Tank
35 bar Servo
27
Condition: Boom Down (Floating) Service Training
35b
28
Condition: Boom Down (Floating) Service Training
29
Example: Float Valve – Condition Service Training
Boom 182 / 2
160 / 1
Tank lines
Boom 182 / 1
30
Attachment: Boom Up – Condition Service Training
Tank- Line
HP- Lines = Servo- Pressure Lines – 35 bar
182/2
164
boom 182/1
P2 / P8
HP - Line
Routing to Spool- Block 160 / 2
31
Condition: Boom Power Down Service Training
32
Condition: Close Clam Service Training
33
Condition: Open Clam Service Training
34
Condition: Open Clam Service Training
35
Clam Valve and Secondary's plus Safety Valve Service Training
P2/P8
36
More Information? Service Training
Hey Fellows,
37