Reference No.

: MHP-22-DEC-CEB-0660
Date: December 30, 2022

To: Project Manager - Lot B Consultant


Moragolla Hydropower Project, CEB
Moragolla, Gampola 20500, Sri Lanka

Construction of Moragolla Hydropower Plant-Lot B: Mechanical & Electrical Facilities


Contract No.: CEB/PD/ICB/MOGL-L2

Sub: Submission of Draft Tube Gate Embedded Parts Drawing– Rev.5-for work

Dear Sir,

Ref: 1) MHP/LB/DEIC/22-772 Dated: November 16, 2022

We are pleased to submit herewith the following drawings and/or document for your
□Approval. □Re-approval. □Confirmation. □Reference. □Information.
For Work(approved). □As-build.
No. Drawing No. REV. Title or Description Remarks
01 DEC-MHP-HM-301-1/2 5 Draft Tube Gate Embedded Parts AD
02 DEC-MHP-HM-301-2/2 5 Draft Tube Gate Embedded Parts AD
NOTE: (remarks) AA: Application for approval
RA: Re-application for approval
RD: Information or Reference (No need to return)
AD: Approved Drawing (For Work) (No need to return)
<Recipients>
L C O CO CL Name (Remarks) Address
3 CEB PMU Office Moragolla, Gampola, Sri Lanka
2 CEB Consultants Moragolla, Gampola, Sri Lanka
O: Original letter + attachment, C: Copy of letter + attachment, L: Original letter only,
CO: Copy of letter with original attachment, CL: Copy of letter only

Thank you very much for your kind attention.

Best regards,

Wu Zhangwei
Contractor’s Representative (MHP)
Dongfang Electric International Corporation

18 Xixin Avenue, High-tech Zone West Park, Chengdu, Sichuan 611731, P.R. China
Tel: +86 28 87898693, Fax: +86 28 87019555 E-mail: decmhp@dongfang.com.cn Page 1 of 1
Annexure #1

Lot B Project Manager’s Conditions – Draft Tube Gate Embedded Parts Drawings - Rev. 4 (MHP-22-DEC-CEB-0507 dated 10/10/2022)

No. Drawing Reference Project Manager’s Conditions Contractor’s Response


1. Contractor shall use non-corrosive, paint protected items
1 General 1.Noted
as the embedded parts. The guide tracks shall be well
corrosion protected with substantial thick paint to resist
the delivery damages. Suitable sea-worthy packing shall
be provided for all items.

2 DEC-MHP-HM-301- 1. The maximum distance from EL.486.300 to the bottom 1. It is observed that the filling valve lifting shaft
1/2 of dogging device shall not be more than 1600mm as will be touched the steel grating if the distance
agreed in the meeting held on September 28, 2022. from EL.486.300 to the bottom of dogging device
Draft Tube Gate
is not more than 1600mm. On the other hand, the
Embedded Parts
height of the dogging device cannot be shorted
considering the operation requirement.
Therefore, 1800mm shall be retained.

3 DEC-MHP-HM-301- 1. Contractor shall show the boundary between first stage 1. It is indicated in the drawing that the anchor bar
2/2 and second stage concrete as commented in the drawing. shall be welded with the concrete reinforcement
Draft Tube Gate
Embedded Parts

Page 1 of 1 
 