Professional Documents
Culture Documents
Continuously backfilling on the inspection chamber without inspection of water proofing installation on the
precast manhole chamber.
Contractor’s Proposals are unacceptable for the following reasons. (Contractor should Revise &
Resubmit):
.......................................................................................................................................................................................................
………………………………………………………………………………………………………………………………………………….
Part 4A: Proposal on the rectification works approved in part 3A are completed and ready for inspection.
…………………………………………………………………………………………………………………………………….
…………………………………………………………………………………………………………………………………….
Part 5A: Rectification works (Inspection by the Engineer) vide RFI No…………
Rectification works have been undertaken and are acceptable. This NCR may be closed.
Rectification works undertaken by the Contractor are not acceptable for the following reasons and this
NCR may not be closed (Contractor must address the Non-Conformance in proper way).
…………………………………………………………………………………………………………………………………………………..
…………………………………………………………………………………………………………………………………………………..
Doc. No: F 378 Rev. No: 01 Dated 19th July, 2020 Page 2 of 2