QATAR DESIGN CONSORTIUM

ARCHITECTS, ENGINEERS, PROJECT MANAGERS & CONSULTANTS

NCR. No:- QDC-REI-NCR-CIV-00107 NON CONFORMANCE REPORT Date: 09-12-2020.


(Site/Project)

Design, Construction, Completion and Maintenance of GWC Al -


PROJECT:
Wukair Logistic Park – Phase 1
CLIENT: GWC
CONTRACTOR: Redco International
DETAILS OF NON-CONFORMANCE TO BE FILLED BY INITIATOR

Part 1 – DETAIL OF DEVIATION:


(i) Area / Location: - Inspection chamber on the following locations: B1 – A10 Grid A, A08 Grid E,
A07 Grid A and A09 Grid A.
(ii) Evaluation Criteria: - Approved Method Statement, Standard practice and Project requirements.
(iii) Description: --

Continuously backfilling on the inspection chamber without inspection of water proofing installation on the
precast manhole chamber.

Name: Mohd. Muztaba Kamal Signature: Title: R.E. Date:09-12-2020


PART 2 – PROPOSAL BY THE CONTRACTOR

Part 2A - Root Cause:


………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………

Part 2B - Proposed Rectification:


…………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………

Part 2C - Corrective Action:


…………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………

Part 2D – Target to Close the NCR:


Name: Signature: Title: Date:
PART 3 - ENGINEER’S ASSESSMENT ON CONTRACTOR’S PROPOSAL

Part 3A: -Proposed Rectification:


Contractor’s Proposals are acceptable and rectification works may proceed.

Contractor’s Proposals are unacceptable for the following reasons. (Contractor should Revise &
Resubmit):
.......................................................................................................................................................................................................
………………………………………………………………………………………………………………………………………………….

Part 3B: Corrective Action (To avoid re-occurrence):


Contractor’s Proposals are acceptable and rectification works may proceed.
Contractor’s Proposals are unacceptable for the following reasons. (Contractor should Revise &
Resubmit):
…………………………………………………………………………………………………………………………………………………..
………………………………………………………………………………………………………………………..

Name: Signature: Title: Date:


Doc. No: F 378 Rev. No: 01 Dated 19th July, 2020 Page 1 of 2
QATAR DESIGN CONSORTIUM
ARCHITECTS, ENGINEERS, PROJECT MANAGERS & CONSULTANTS

NCR. No:- QDC-REI-NCR-CIV-00107 NON CONFORMANCE REPORT Date: 09-12-2020.


(Site/Project)

PART 4- ACTION BY THE CONTRACTOR

Part 4A: Proposal on the rectification works approved in part 3A are completed and ready for inspection.
…………………………………………………………………………………………………………………………………….
…………………………………………………………………………………………………………………………………….

Name: Signature: Title: Date:

Part 4B: Corrective Action to avoid re-occurrence:


…………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………

Name: Signature: Title: Date:


PART 5 – CLOSURE OF NCR

Part 5A: Rectification works (Inspection by the Engineer) vide RFI No…………
Rectification works have been undertaken and are acceptable. This NCR may be closed.
Rectification works undertaken by the Contractor are not acceptable for the following reasons and this
NCR may not be closed (Contractor must address the Non-Conformance in proper way).
…………………………………………………………………………………………………………………………………………………..
…………………………………………………………………………………………………………………………………………………..

Part 5B: Corrective action (To avoid re-occurrence):


Corrective actions are acceptable. This NCR may be closed.
Corrective actions are not acceptable for the following reasons and this NCR may not be closed.
(Contractor must take further actions).
Part 5C: Closure of NCR by the Engineer:

NCR is considered as closed.

Name: Signature: Title: Date

Doc. No: F 378 Rev. No: 01 Dated 19th July, 2020 Page 2 of 2