Professional Documents
Culture Documents
Project Name: TUBLI STP SITE EXPANSION PHASE 4 / Project No: SES-11-40-002
Consultant: JV KEO INTERNATIONAL / P2M BERLIN MIDDLE EAST IR. No: SYS-M04-B76
Contractor: JV WTE / TECTON / AZMEEL Date: 07-01-2023
TO: JV KEO INTERNATIONAL / P2M BERLIN MIDDLE EAST ATTENTION: Mr. El Dakhakhny
WORK MATERIAL OTHER………………………………
DETAILS OF INSPECTION:
Date: 08 January 2023 Location: Structure No. 76
Works involve the
Time: 10:00Am Blower room following discipline:
Description: Surveying
Civil/Structural
Inspection of the Installed 12ton EOT Crane Structure as highlighted in
QA/QC
the attached approved drawing
MEP
Attachment: Layout drawing.
FOR CONTRACTORS:
Consultant’s Review
COMMENTS
Name: …………………………….
Signature: Date: