Professional Documents
Culture Documents
PART A
The following works are ready for inspection at: Date : Time :
Work is intended to commence at: Date : Time :
Description of Work:
Consultant/Representative:
Date: Date:
PART B INSPECTION RESPONSE
Work acceptable. Allowed to proceed
Remedial work as stated below to be completed but no further inspection required.
Works unacceptable. Remedial work as stated below to be completed & further inspection is required.
Works rejected. A new INSPECTION FORM to be issued
Comment:
Approved by (Consultant/Representative)
Name :
Date :
PART C FURTHER INSPECTION FOLLOW-UP
Verification:
Consultant/Representative:
PART D FOR QA/QC USE ONLY