You are on page 1of 1

WORK INSPECTION REQUEST (WIR)

System / Package No. F14A.1 Company Name: MTU POWER SYSTEMS SDN BHD
WIR No. P&ID/Dwg No.
Equipment Name / Tag No. Room No.

1. Discipline/Trade :
CSA MECH ELE Others:

2. Type of Inspection:
Material Incoming Installation Verification
Mock-Up Others:
Testing & Commissioning

We would like Exyte representatives to witness a joint inspection according to the schedule below

3. Inspection Details:
Place/ Area: Description of work:
GENSET .

Ready for inspection : Time/Date :


Note: 24 hours notice must be given
RECEIVING
Requested by Sub-Con: Acknowledge/Verified by Exyte : Acknowledge/Verified by Consultant :
Amirshah Shahrizad

(Name, Signature) (Name, Signature) (Name, Signature)


Date/Time: Date/Time: Date/Time:

4. Inspection Results:
Approved. Rejected
Comment:

5. Re-Inspection Required: Yes / No Date Re-Inspection: __________________

6. Joint Inspection (If Required): C&S ARCH MEP ELE


Comment:

CLOSING
Con. Exyte : QA/QC Exyte : Consultant :

(Name, Signature) (Name, Signature) (Name, Signature)


Date/Time: _________________ Date/Time: _________________ Date/Time: _________________

S96027 CON 5703 REC 04 – Work Inspection Request (WIR)


Revision Date: 20-Oct-2022
Prepared by : W.M.Khairin Karudin
Revision: 2

You might also like