Project Name: RIVAN

SUBJECT WORK REQUESTED FOR INSPECTION Work Place: UNDER RAFT Inspection Ref No.:

SBC-RIV-ZONE-A-INS-
A5
CIV-SUR-1-REV.00

Discipline: Date of Submission:


Excavation level as per drawing (+98.34)
CIVIL

Date of
1st Inspection YES
Inspection:25/12/2022

CONTRACTOR 2n d Inspection

Eng. Name: ABDELRAHMAN Khalil Signature: 3rd Inspection Time:

Consultant's Recommendation

Consultant Eng. Name: Signature Date

Action Code

A Approved as Submitted B Approved Except as Noted C


Disapproved

D
Reject E No Action Taken F information
For

CONTRACTOR CONSULTANT
Above subject works have been visually inspected by
the Consultant and found acceptable/ Not acceptable
This review does not relieve the contractor
as per the code given above.
of his Responsibility under the terms of the
contract nor Authorized additional
compensation.
We hereby submit/ resubmit for inspection of
above subject works and confirm herewith
that above works are completed and ready
for inspection as stated above all in
accordance with the specification, drawings,
and consultant instruction. Contractor to
complete the information below.

Position: Project Manager Position: Project Manager

Name: Eng. Mohamed Fouad Name: Eng. Mahmoud Ezz Aldeen

Signature: Signature
Date: Date: