SUBJECT WORK REQUESTED FOR INSPECTION Work Place: UNDER RAFT Inspection Ref No.:
SBC-RIV-ZONE-A-INS-
A5
CIV-SUR-1-REV.00
Date of
1st Inspection YES
Inspection:25/12/2022
CONTRACTOR 2n d Inspection
Consultant's Recommendation
Action Code
D
Reject E No Action Taken F information
For
CONTRACTOR CONSULTANT
Above subject works have been visually inspected by
the Consultant and found acceptable/ Not acceptable
This review does not relieve the contractor
as per the code given above.
of his Responsibility under the terms of the
contract nor Authorized additional
compensation.
We hereby submit/ resubmit for inspection of
above subject works and confirm herewith
that above works are completed and ready
for inspection as stated above all in
accordance with the specification, drawings,
and consultant instruction. Contractor to
complete the information below.
Signature: Signature
Date: Date: