TEST RESULT SUBMITTAL (TR)

PARAGON III PROJECT


Submittal Title: Compressive Strength Result Date 06/12/2022
Submittal No.: PRG3-ABEC-MIM-CIVIL-TR-0002 Revision 00

We are sending herewith under separate cover (please check one box):
 Shop drawings  Sample  Quality Plan  Inspection & Test Plan  Calculations
 Test Results  Schedule  Manufacturer’s data  Health & Safety Plan  Certificate
 Specification  Guarantee  Method Statement  Operation Manual  Other

SR Description Rev Action Remarks

PLATE LOAD TEST from axis (26-15) & (swa-L)


1 00
& axis (26-19) & (swB-L)

Contractor Name: Signature: Date: Received By:


06/12/2022

We certify that the documents / materials submitted herewith have been reviewed in detail and are in strict
conformance with the contract drawings and specifications except as otherwise stated.
Signature / Date:

Consultant Remarks

Approved Approved as noted Resubmit Not Approved Not Required


(A) (B) (C) (D ) (E )
Received By:

    

Consultant Name / Signature / Date Signature / Date:

Corrections or comments made relative to submittals during this review do not relieve the contractor from compliance with the requirements of The
Contract. This check is only for review of general conformance with the design concept of the project and general compliance with the information
given in the contract documents. The contractor is responsible for confirming and correlating all quantities and dimensions, selecting fabrication
processes and techniques of construction, coordinating his work with that of other trades and performing his work in a safe and satisfactory manner.

Distribution:  Owner  Consultant  QS  Contractor  Others