List of employees proposing for Sub Contractor Approval

PROJECT :CONSTRUCTION OF 33/11KV 4X20 MVA PRIMARY SUBSTATION DESIGNATED AS ASHOOR PSS Reference Number:
First party: SHARIKAT FANNIYA OMANIYA LLC
Second party:AL REHAN UNITED LLC Approval Validity:

Resident card Serial Number of HSE Training,Yes/ No


Resident card No Validity (Attach proposed W.C insurance
Sl No Name Designation (attach training
resident card employees in W.C validity certificate copy)
copy) Insurance.

MOHAMMAD GULAM
1 PAINTER 116224135 15.12.2020 446 22.8.2020 YES
SARWAR

2 SAGAR ALI PAINTER 119157951 03.08.2021 536 22.8.2020 YES

ALAGUMALAI
3 MASON 67742945 03.09.2021 204 22.8.2020 YES
GURUSAMY

4 SHYAM BIHARI SINGH STEEL FIXER 114814685 24.06.2020 389 22.8.2020 YES

5 MURUTUJA ANSARI CARPENTER 114814882 24.06.2020 399 22.8.2020 YES

Proposed By (Contractor): Recommended By (Owner's Engineer):

Name Name

Designation Designation

Signature Signature
Date: Date:

Reviewed By (DPC HSE): Approved By (Project/ O&M):

Name Name

Designation Designation

Signature Signature
Date: Date:
Remarks

ed By (Owner's Engineer):
(Project/ O&M):
List of employees proposing for hiring man power Approval
Project : Reference Number:
First party:
Second party: Approval Validity:

Resident card Serial Number


Resident card Validity (Attach of proposed W.C insurance
Sl No Name Designation No resident card employees in validity.
copy) W.C Insurance.

1
2
3
4
5
6
8

Proposed By (Contractor): Recommended By (Owner's Engineer):


Name Name
Designation Designation
Signature Signature
Date: Date:

Reviewed By (DPC HSE): Approved By (Project/ O&M):


Name Name
Designation Designation
Signature Signature
Date: Date:
Approval
nce Number:

val Validity:

HSE Training,Yes/ No
(attach training Remarks
certificate copy)

mended By (Owner's Engineer):

ved By (Project/ O&M):


List of Plant & Machinery and operators proposing for DPC approval
Project :
First party:
Second party:

Type,Reg. No certificate Driver/ Driver/ Operator Driving license


Sl No & Make of Reg. Validity TPI Operator residence card type & validity
Validity
P&M name validity.

1
2
3
4
5
6
7
8

Proposed By (Contractor):
Name
Designation
Signature
Date:

Reviewed By (DPC HSE):


Name
Designation
Signature
Date:
rs proposing for DPC approval
Reference Number:

Approval Validity:

Serial Number of Validity of HSE Training,Yes/


driver/operator in Insurance of No (attach training Remarks
Insurance. driver/operator. certificate copy)

Recommended By (Owner's Engineer):


Name
Designation
Signature
Date:

Approved By (Project/ O&M):


Name
Designation
Signature
Date:
Sheet 4