Professional Documents
Culture Documents
Vi)}. 0 FAITHFUL
The Contractor certifies that the Technical data subm itted herewith is in compliance with the Contract drawings and specifications unless specifically
noted' highlighted here or on the attached documents.
D Code A -Approved
Reviewed By Date
Engineer's Comments
Reviewed By Date
Corrections or comments made relative to submittals during this review do not relieve the contractor from compliance with the Contract requirements
and specifications. Any changes from previous revisions of the submittal or contract documents , unless specifically highlighted are not necessarily
reveiwed and hence not necessarily approved .
Received Date
MIRAL
VAS SOUTH-lOR
HSE MANAGEMENT SITE WALK REPORT
26 SEPTEMBER 2017
VAS SOUTH-lOR
HSE MANAGEMENT SITE
WALK REPORT
MIRAL
WSP
P.O. BOX 7497
DUBAI
UNITED ARAB EMIRATES
Management
Remarks
Site Walk
Date 26 September
2017
Checked by Shakil
Panniyottil
Signature .>,$
Signature ~':-!-
Document HS-F29
Reference
Report number 02
The following items, in the inspection findings, were discussed in order to address and
identify the areas of concern and agree on Improvements required to maintain the HSE
requirements for the site.
Overall, the report identifies an unsatisfactory level of H&S standards on site, the
observations clearly indicates that lack of planning and monitoring from the contractor
to ensure that necessary control measures are implemented. It is necessary to undertake
a thorough review of current practices and deal with the daily issues In a more robust
and structured manner through the commitment and engagement of Hilalco site
supervision team.
The contractor safety team and supervision team must work together to create the
management processes to raise the standards on the project.
03
adequate robust barriers
and warninq sign age
around the excavation.
05
materials properly
de- nailing.
to
the nailed wooden shuttering
materials scattered towards
the access
Deviation of Cop Section B.O
1 GOULD "'I)
CLIENT PMC CONSULTANT CONTRACTOR
~
Project: YSIDR - FAMILY HOTEL SUBSTRUCTURE Ref.No. YSD-P02-0208-HS-WSP-RP·
WORKS
Contractor: IDLALCO Date & Time: 26.09.2017 @ 3 PM
Report No 02 Doc. Ref HS-F29
3. I Action Required:
Advised Hilalco to provide adequate robust barriers and
warning signage around the excavation.
,
ulJJ--O
MIRAL "'I)
CLIENT PMC CONSULTANT CONTRACTOR
Action Required:
U1JJ---.Jl FAITHFUL
MIRAL 1 'GOULD "'I)
CLIENT PMC CONSULTANT CONTRACTOR