NSRP DOCUMENT No.:
DCSM PROJECT 2019 INTERNAL ROTARY INSPECTION D-P5-BV-PD-011

Contractor’s Name : BUREAU VERITAS VIETNAM

Company’s Name : Nghi Son Refinery and Petrochemical LLC.


Plant Location : Nghi Son, Viet Nam

W/ Order No. :
Package No. : 5

Scope of Work : INSPECTION SERVICE FOR DCSM


Discipline : DCSM

NSRP DCSM PROJECT 2019


Discipline
Receiving Date
Reviewed By
Review Date
Review Result code
Document Review codes:
1- Rejected (Revise and resubmit), 2- Comments as Noted (Revise and
resubmit. Work may proceed subject to full compliance with comments),
3- Minor Comments (Acceptable, Works may proceed. Revise &
Resubmit as “Certified Final), 4- No comments (Works may Proceed)
Returned on
Next Submission Due
Date

THIS DOCUMENT IS CONTROLLED BY THE BUREAU VERITAS - VIETNAM AND MAY NOT BE AMENDED, REVISED OR ALTERED IN
ANY OTHER WAY WITHOUT THE CONSENT OF THAT COMPANY.

THE SIGNATURES BELOW AUTHORISE ALL PAGES OF THIS PROCEDURE FOR USE FROM THE DATE OF APPROVAL AS SHOWN.

Rev Date Description Prepared By Reviewed by Approved By


.
0 26/09/2019

Page 1 of 11
BUREAU VERITAS
VIETNAM
NSRP DOCUMENT No.:
DCSM PROJECT 2019 INTERNAL ROTARY INSPECTION D-P5-BV-PD-011

Nguyen Gia Dinh Annamalai Natarajan Annamalai Natarajan

REVISION HISTORY

Rev. Date Issued Comments Prepared by Reviewed & Approved by

00 26.Sep.2019 First Issue. Nguyen Gia Dinh Annamalai Natarajan

Page 2 of 11
BUREAU VERITAS
VIETNAM
NSRP DOCUMENT No.:
DCSM PROJECT 2019 INTERNAL ROTARY INSPECTION D-P5-BV-PD-011

INDEX

Section Description Page

1 Scope 04

2 Reference 04

3 Personnel Qualification 04

4 Principle Of Iris System 05

5 Components Of The Iris System 05

6 Pre Inspection Preparation 05

7 Site Requirements 06

8 Iris Inspection Procedure 06

Appendix 1 Data Recording 07

Appendix 2 Data Analysis 08

Acceptance Criteria 08

Page 3 of 11
BUREAU VERITAS
VIETNAM
NSRP DOCUMENT No.:
DCSM PROJECT 2019 INTERNAL ROTARY INSPECTION D-P5-BV-PD-011

Reporting Of Results 08

Attachment Report Format 09

INTERNAL ROTARY INSPECTION SYSTEM (IRIS)

1.0 SCOPE:

1.1 This procedure describes the method of applying Internal Rotary Inspection System
(IRIS) to test heat exchanger/boiler tubing.

1.2 This procedure is suitable for tube having tube ID 0.49” to 3” and wall thickness 12.5mm
to 75mm.

2.0 REFERENCES:

2.1 ASME Section V, 2019 Edition Non Destructive Examination.

Guidelines for Personnel Qualification &


2.2 ASNT SNT TC –1A, 2016 Edition
Certification.

2.3 SVPL-QHSE-SOP-GSP Procedure for General Safety Practices.

CLIENT SPECIFICATIONS
2.4

3.0 PERSONNEL QUALIFICATION:

3.1 The personnel who operate the IRIS test equipment with the exception of the probe
positioner / puller technician shall be a minimum Level-II in Ultrasonic Testing Method.

3.2 Certification of the personnel shall be according to BVV written practice.

Page 4 of 11
BUREAU VERITAS
VIETNAM
NSRP DOCUMENT No.:
DCSM PROJECT 2019 INTERNAL ROTARY INSPECTION D-P5-BV-PD-011

3.3 The evaluation of the result of the IRIS must be conducted by personnel qualified to at
least Level II.

4.0 PRINCIPLE OF IRIS SYSTEM:

4.1 The operating principle of the system is based upon the ultrasonic pulse echo Immersion
technique.

4.2 Two pulses (inner wall reflection and outer wall reflection) reflected back to the
transducer generate electrical signals which are separated by the time required to make
a round trip through the tube walls.

4.3 Since this time proportional to the wall thickness the thickness can be measured by
measuring the time delay between the inner and outer wall reflection.

5.0 COMPONENTS OF THE IRIS SYSTEM:

The IRIS system model MS 5800 manufactured by M/s R/D Tech Canada or equivalent working
on the IRIS principle.

The system shall be consists of following three functional elements:

5.1 Water Supply unit.

5.2 The inspection head assembly.

5.3 Laptop with IRIS inspection software i.e. Multiview Software.

6.0 SURFACE PREPARATION:

6.1 All tubes inner surface shall be adequately cleaned to remove any dust, loose
foreign particles, internal deposits or contaminants by a suitable process such as
pressurized water jet cleaning.

Page 5 of 11
BUREAU VERITAS
VIETNAM
NSRP DOCUMENT No.:
DCSM PROJECT 2019 INTERNAL ROTARY INSPECTION D-P5-BV-PD-011

6.2 It is also recommended to clean the outer surface of tube if possible.

7.0 SITE REQUIREMENT:

7.1 IRIS system requires a 110-240 V, 50-60 Hz AC supply at work location.

7.2 The main requirement of the IRIS is the provision of a clean, relatively high pressure
water supply.

7.3 The IRIS turbine requires a drive pressure of maximum 45 PSI to operate system at the
recommended 1800 RPM.

8.0 IRIS INSPECTION PROCEDURE:

8.1 The IRIS system shall be calibrated on the standard calibration sample as per Standard
operating procedure.

8.2 Calibration standards shall be manufactured from a tubing of the same material
specification, same heat treatment, and same nominal size.

8.3 Inspection head should be connected to the water supply kit.

8.4 The inspection head with centering device should be installed within the tube.

8.5 Then water valve can be opened.

8.6 The operator shall check all water hose and electrical connections are made good, and
that the electronic units are protected from spray.

8.7 The inspection is conducted with the probes and turbine assembly located at the far end
of the tube.

Page 6 of 11
BUREAU VERITAS
VIETNAM
NSRP DOCUMENT No.:
DCSM PROJECT 2019 INTERNAL ROTARY INSPECTION D-P5-BV-PD-011

8.8 The assembly is pushed to the end of the tube by feeding the hose through the end
plate of the adaptor.

8.9 To start the inspection the assembly is gradually pulled along the tube towards the
operator.

8.10 The rate at which the inspection head assembly is moved along the tube governs the
degree of coverage of the tube, if flooding is there water supply should be turned off.

8.11 The inspection head assembly can then be withdrawn from the tube.

8.12 The above procedure can be repeated for as many tubes are to be inspected during the
operating session.

8.13 The equipment dismantle procedures are to be inspected during the operating session.

8.14 The equipment dismantle procedures are the reverse of those carried out during the
setup of the inspection.

8.15 The pulling speed of the probe shall be kept constant during the inspection.

8.16 The pulling speed shall be at 40-80mm/s depending on the rotating speed of the turbine.

9.0 DATA RECORDING:

9.1 For the purposes of this procedure all test results will be recorded on suitable data
acquisition system.

9.2 Each data storage unit shall contain the following information.

9.2.1 Positive identification of the item under test.

9.2.2 Data storage unit number.

9.2.3 A reference to the contents.

Page 7 of 11
BUREAU VERITAS
VIETNAM
NSRP DOCUMENT No.:
DCSM PROJECT 2019 INTERNAL ROTARY INSPECTION D-P5-BV-PD-011

9.2.4 Date.

9.2.5 Probe identification.

9.3 Each trace shall be identified according to zone / row / tube number as applicable.

10.0 DATA ANALYSIS:

10.1 All indications shall be evaluated based on the client’s acceptance criteria.

10.2 All indications shall be evaluated and reported in the form of wall thickness loss.

11.0 ACCEPTANCE CRITERIA:

11.1 The acceptance criteria or rejection of tubes based on wall loss is at the discretion of the
client.

12.0 REPORTING RESULTS:

12.1 Report shall be prepared with the information gathered using the computer data files.

12.2 Report all tubes wall with a wall loss reading and all reports issued to the clients shall be
signed by the person performing the inspection and endorsed by the Inspector.

12.3 The test reports to contain the following information

12.3.1 Client's name and address.

12.3.2 Information of equipment tested.

12.3.3 Information of test instruments used.

12.3.4 Information on instruments settings.

12.3.5 Date and place of inspection.

Page 8 of 11
BUREAU VERITAS
VIETNAM
NSRP DOCUMENT No.:
DCSM PROJECT 2019 INTERNAL ROTARY INSPECTION D-P5-BV-PD-011

12.3.6 Test System Calibration.

12.3.7 Inspection Summary.

12.3.8 Job reference Number, Comments,

12.3.9 Signature of testing officer and Inspector.

ATTACHMENT
REPORT FORMAT

Page 9 of 11
BUREAU VERITAS
VIETNAM
NSRP DOCUMENT No.:
DCSM PROJECT 2019 INTERNAL ROTARY INSPECTION D-P5-BV-PD-011

Page 10 of 11
BUREAU VERITAS
VIETNAM
NSRP DOCUMENT No.:
DCSM PROJECT 2019 INTERNAL ROTARY INSPECTION D-P5-BV-PD-011

Page 11 of 11

You might also like