Document No : 032/OPD/III/17
Rev :0
Date : 21st March 2017
Issue Number :1
1
No. Doc 032/OPD/III/17
RUSSINDO GROUP CORPORATION
No. Rev 00
STANDARD OPERATION PROCEDURE Date 21 March 2017
FOR INTERNAL ROTATING Page 2 of 11
INSPECTION SYSTEM
Prepared by
SATWAN SINGH
ASNT NDT LEVEL III
Approved by
ADITYA ROMAS
PRESIDENT DIRECTOR
REVISION RECORD
Approvals
Issue No Date Revision
Originator Checked Approved
1 21/03/2017 0
2
No. Doc 032/OPD/III/17
RUSSINDO GROUP CORPORATION
No. Rev 00
STANDARD OPERATION PROCEDURE Date 21 March 2017
FOR INTERNAL ROTATING Page 3 of 11
INSPECTION SYSTEM
TABLE OF CONTENTS
SECTION TITLE
1 Purpose
2 Scope
3 Reference
5 Equipment Safety
6 Tube Details
7 Inspection Principle
9 Software
10 Iris Probe
12 Tube Cleanliness
13 Testing Procedures
14 Documentation
15 Acceptance Criteria
3
No. Doc 032/OPD/III/17
RUSSINDO GROUP CORPORATION
No. Rev 00
STANDARD OPERATION PROCEDURE Date 21 March 2017
FOR INTERNAL ROTATING Page 4 of 11
INSPECTION SYSTEM
1.0 PURPOSE
This document describes the prosedures to be followed during Ultrasonic Internal Rotating
Inspection System ( IRIS ) on Heat Exchangers, Air Fin Coolers and Boiler tubes by using R/D
TechMS5800
2.0 SCOPE
This scope outlines the Inspection Principles, Equipment used, Testing Procedures and the
preparations prior to IRIS inspection
It also covers the basic qualification of NDT inspection and safety rules and regulation during
the inspection
3.0 REFERENCE
IRIS Interperter: He shall be a graduate and certified by R/D-TECH and with a minimum of 3
years field experience in IRIS data collection and analysis
IRIS Asseistan: He shall be responsible for probe pulling at side. The IRIS Inspector will train
the IRIS Assistan
Equipment shall be grounded properly while inspection. The power socket for the equipmnet
shall be matched with the plant power socket. And this power point should not allow sharing
with other activities such as grinding, welding and compressor because it would damage the
equipment and data collection.
Preesurized clean water supply is required because this system uses water as a couplant and
also for rotating turbine
4
No. Doc 032/OPD/III/17
RUSSINDO GROUP CORPORATION
No. Rev 00
STANDARD OPERATION PROCEDURE Date 21 March 2017
FOR INTERNAL ROTATING Page 5 of 11
INSPECTION SYSTEM
Preparation: Prior to the IRIS inspection, the IRIS inspector must have all the relevant
information about the unit that going to be inspected. For instants the dimentions of the tubes,
history of the unit, number of tubes and the orientation the tubes, the cleanlines, and the location
of the heat exchanger must be known.
Data collection and Reporting: This involves the setup of IRIS equipment. Data collection and
analysis will be done as using the correct parameter
The IRIS inspection principle is based on pulse-echo detection. A high frequency tranducer
producing ultrasonic wave that propagates into water. This ultrasonic wave will turn into
normal incidence beam on the inner diameter by the 45o mirror, which is mounted in the turbine
(Figure.1). While the turbine rotates 360o, the tranducer collects the front and back wall echoes
which are digitally processed, and calculate the probe delay, tube OD and ID, and tube wall
thicknes
5
No. Doc 032/OPD/III/17
RUSSINDO GROUP CORPORATION
No. Rev 00
STANDARD OPERATION PROCEDURE Date 21 March 2017
FOR INTERNAL ROTATING Page 6 of 11
INSPECTION SYSTEM
9.0 SOFTWARE
Multi View Version 6.0 Rev 8 is the R/D Tech software used for inspection and analysis. It has
three of modes
1) Setup Mode
The setup mode is used for all setup operation such as RFET, IRIS and MFL, Multi View
environment setup, calibration setup, and analysis setup. Data acquisition can be done in
the setup mode to perfome the probe calibration
2) Inspection Mode
The inspection mode is designed to perfome inspections using a predefined filing system
3) Analysis Mode
The analysis mode is used to load and data files for analysis purposes
IRIS probe are in various frequecies: 15MHz and 10MHz. The frequency selection is based on
the thickness of a material. For example 19.05 mm OD with 2.11 mm Thickness tube requires
15MHz probe. IRIS probes usually mounted with a hydraulic turbine (Figure.2)
The list below show the sizes of centering device and turbines
6
No. Doc 032/OPD/III/17
RUSSINDO GROUP CORPORATION
No. Rev 00
STANDARD OPERATION PROCEDURE Date 21 March 2017
FOR INTERNAL ROTATING Page 7 of 11
INSPECTION SYSTEM
Calibration Standard is very important. It must be of the same material, diameter, and thickness
as the tube to be inspected. Figure.3 show a calibration standard with artificial flaws. Wall lose
can be a through hole, round bottom, flat bottom hole, circumferentiel grooves and one-side
flaws, a long flaw, a short flaw, and a taper or pitting. Diameter of a pitting or trough hole in a
calibration tube is usually the tube wall thickness or 1.5 times tube wall thickness
Calibration is always perfomed in the lap prior to leaving for the inspection. The same
calibration will be repeated at the side to confirm that the equipment does not experience any
frequency interference or other unwanted noisy signals.
7
No. Doc 032/OPD/III/17
RUSSINDO GROUP CORPORATION
No. Rev 00
STANDARD OPERATION PROCEDURE Date 21 March 2017
FOR INTERNAL ROTATING Page 8 of 11
INSPECTION SYSTEM
8
No. Doc 032/OPD/III/17
RUSSINDO GROUP CORPORATION
No. Rev 00
STANDARD OPERATION PROCEDURE Date 21 March 2017
FOR INTERNAL ROTATING Page 9 of 11
INSPECTION SYSTEM
Usually the numbering process of a tube bundle is based on the drawing provided by
the client. Otherwise, row run horizontally ( from left to right) and columns run
vertically (from top to bottom)
13.2.1 First setup the equipment with all the necessary parameters and
connection. Then load the particular calibration file from the setup wizard
to perform the side job. Then adjust the gain parameters to obtain good
signal on the A-Scan
13.2.2 Input client’s name, inspection date, and unit number for the reporting
purpose
14.0 DOCUMENTATION
Once the data acquisition is completed, a preliminary report will be prepared. This
preliminary report is given to the client before the inspection team leaving the plant. It
contains details of the tubes that were tested and along with a tube sheet diagram.
9
No. Doc 032/OPD/III/17
RUSSINDO GROUP CORPORATION
No. Rev 00
STANDARD OPERATION PROCEDURE Date 21 March 2017
FOR INTERNAL ROTATING Page 10 of 11
INSPECTION SYSTEM
CLIENT :........................
UNIT NO:..........................
Scanning Direction
......................................... ............................................
10
No. Doc 032/OPD/III/17
RUSSINDO GROUP CORPORATION
No. Rev 00
STANDARD OPERATION PROCEDURE Date 21 March 2017
FOR INTERNAL ROTATING Page 11 of 11
INSPECTION SYSTEM
FINAL REPORT
A detailed final report of inspection of the heat exchanger that was inspected will be presented
with in two weeks. This report contains a tube sheet diagram, which illustrates all the tubes
with color codes. A sample waveform of tubes (Figure.3) with wall loss also will be included.
The inspection results shall be reported as in percentage wall loss values. The acceptance
orrejection criteria of a tube bundles are based on the requirement of the client.
11