BUREAU VERITAS

VIETNAM
NSRP
MASTER LIST OF PROCEDURE DOCUMENT No.:
DCSM PROJECT 2019 D-P5-BV-LL-001

Contractor’s Name : BUREAU VERITAS VIETNAM

Company’s Name : Nghi Son Refinery and Petrochemical LLC.


Plant Location : Nghi Son, Viet Nam

W/ Order No. :
Package No. : 5

Scope of Work : INSPECTION SERVICE FOR DCSM


Discipline : DCSM

NSRP DCSM PROJECT 2019


Discipline
Receiving Date
Reviewed By
Review Date
Review Result code
Document Review codes:
1- Rejected (Revise and resubmit), 2- Comments as Noted (Revise and
resubmit. Work may proceed subject to full compliance with comments),
3- Minor Comments (Acceptable, Works may proceed. Revise &
Resubmit as “Certified Final), 4- No comments (Works may Proceed)
Returned on
Next Submission Due
Date

THIS DOCUMENT IS CONTROLLED BY THE BUREAU VERITAS - VIETNAM AND MAY NOT BE AMENDED, REVISED OR ALTERED IN
ANY OTHER WAY WITHOUT THE CONSENT OF THAT COMPANY.

THE SIGNATURES BELOW AUTHORISE ALL PAGES OF THIS PROCEDURE FOR USE FROM THE DATE OF APPROVAL AS SHOWN.

Rev Date Description Prepared By Reviewed by Approved By


.
0 26/09/2019

Page 1 of 5
BUREAU VERITAS
VIETNAM
NSRP
MASTER LIST OF PROCEDURE DOCUMENT No.:
DCSM PROJECT 2019 D-P5-BV-LL-001

Nguyen Gia Dinh Annamalai Natarajan Annamalai Natarajan

INDEX

Section Description Page

1.0 NDE Procedure 4

2.0

3.0

4.0

Page 2 of 5
BUREAU VERITAS
VIETNAM
NSRP
MASTER LIST OF PROCEDURE DOCUMENT No.:
DCSM PROJECT 2019 D-P5-BV-LL-001

NDE PROCEDURE

Page 3 of 5
BUREAU VERITAS
VIETNAM
NSRP
MASTER LIST OF PROCEDURE DOCUMENT No.:
DCSM PROJECT 2019 D-P5-BV-LL-001

Sr. No. Method Procedure No. Remark

Included Radiography
D-P5-BV-PD-001, ISSUE 01, REV
01 Radiography Test (RT) Profile to check
00.
thickness
Magnetic Particle Test D-P5-BV-PD-002, ISSUE 01, REV included dark area
02
(MT) 00. application

Liquid Penetrant Test D-P5-BV-PD-003, ISSUE 01, REV


03
(PT) 00.

Ultrasonic Thickness D-P5-BV-PD-004, ISSUE 01, REV


04
Measurement (UTM) 00.

Phased Array Ultrasonic D-P5-BV-PD-005, ISSUE 01, REV


05
Test (PAUT) 00.

Time Of Flight Diffraction D-P5-BV-PD-006, ISSUE 01, REV


06
Test (TOFD) 00.

D-P5-BV-PD-007, ISSUE 01, REV


07 Eddy Current Test (ECT)
00.

D-P5-BV-PD-008, ISSUE 01, REV


08 Remote Field Test (RFT)
00.

D-P5-BV-PD-009, ISSUE 01, REV


09 Near Field Test (NFT)
00.

Magnetic Flux Leakage D-P5-BV-PD-010, ISSUE 01, REV


10
Test (MFL) 00.

Internal Rotary Inspection D-P5-BV-PD-011, ISSUE 01, REV


11
System (IRIS) 00.

Remote Visual Inspection D-P5-BV-PD-012, ISSUE 01, REV


12
(Borescope) 00.

D-P5-BV-PD-013, ISSUE 01, REV


13 Visual Inspection (VI)
00.

Page 4 of 5
BUREAU VERITAS
VIETNAM
NSRP
MASTER LIST OF PROCEDURE DOCUMENT No.:
DCSM PROJECT 2019 D-P5-BV-LL-001

In-Situ Metallography D-P5-BV-PD-014, ISSUE 01, REV


14
Test (Replica) 00.

D-P5-BV-PD-015, ISSUE 01, REV


15 Hardness Test (HT)
00.

D-P5-BV-PD-016, ISSUE 01, REV


16 Ferrite Test (FT)
00.

Positive Material D-P5-BV-PD-017, ISSUE 01, REV


17
Identification Test (PMI) 00.

ULTRASONIC TESTING D-P5-BV-PD-018, ISSUE 01, REV


18
(ASME SEC V) 00.
DIGITAL
19 RADIOGRAPHY D-P5-BV-PD-019, ISSUE 01, REV 00
TESTING
D-P5-BV-PD-020, ISSUE 01, REV NSRP requires
20 Helium Test Procedure
00. additionally

Shear Wave Ultrasonic D-P5-BV-PD-021, ISSUE 01, REV NSRP requires


21
Testing 00. additionally

Page 5 of 5