WORK PROCEDURE FOR IVRCL/PWSP/KAPP
CONTROL OF NON- 3&4/PM/05 REV:0
DATE:
CONFORMANCE
CLIENT
NUCLEAR POWER CORPORATION OF INDIA LIMITED
EPC CONTRACTOR
This Document is the property of IVRCL Infrastructures &Projects Limited; it should not be used,
copied or reproduced without their written permission.
Page 2 of 8
DOC.NO.
WORK PROCEDURE FOR IVRCL/PWSP/KAPP
CONTROL OF NON- 3&4/PM/05 REV:0
DATE:
CONFORMANCE
PREPARED BY:
(Bappadittya Nandi)
Sr. Engineer(QC-Mech)
REVIEWED BY:
(Anil C Nadgir) / (D. Satish Reddy)
Assistant Manager (Project)/ Manager (Projects)
APPROVED BY:
(L. Srinivas)
RCM
Page 3 of 8
DOC.NO.
WORK PROCEDURE FOR IVRCL/PWSP/KAPP
CONTROL OF NON- 3&4/PM/05 REV:0
DATE:
CONFORMANCE
CONTENTS
Page 4 of 8
DOC.NO.
WORK PROCEDURE FOR IVRCL/PWSP/KAPP
CONTROL OF NON- 3&4/PM/05 REV:0
DATE:
CONFORMANCE
1. Purpose
2. Scope of work
3. Applicability
4. References
5. Responsibility
6. Procedure
7. Acceptance Criteria
8. Records
9. Distribution
10. Format –Encl.
1.0 PURPOSE
To ensure that the product / service / specfication / standard / drawings that does not
conform to contractual specified and subsequently approved requirements is prevented
Page 5 of 8
DOC.NO.
WORK PROCEDURE FOR IVRCL/PWSP/KAPP
CONTROL OF NON- 3&4/PM/05 REV:0
DATE:
CONFORMANCE
from unintended use and the non conformance is analyzed to bring required changes to
prevent re-occurrence.
3.0 APPLICABILITY
The described procedure is applicable as a norm to inspect, record document of non-
conformance and in turn take necessary corrective action with the prior approval from
NPCIL’s concerned competent authority.
4.0 REFERENCES
Following document in totality or in part shall form the reference part of the
document.
4.1.1 Tenders Specification
4.1.2 NPPL’s standard contract specifications and laid down procedures.
4.1.3 Approved QAP/ITP and drawings and PO’s.
4.1.4 National & international standards.
5.0 RESPONSIBILITY
The prime responsibility of implementation of the procedure lies with RCM, IVRCL.
The below chart shows the the control of Non-Conformance flow chart in the project:
Method of
Rectification
Recommendation/ Comments
by NPCIL
Suggestion by
IVRCL
Page 7 of 8
DOC.NO.
WORK PROCEDURE FOR IVRCL/PWSP/KAPP
CONTROL OF NON- 3&4/PM/05 REV:0
DATE:
CONFORMANCE
8.0 RECORDS:
The formats/records that shall be used as evidential records of the site activities that have
been carried out shall be recorded and preserved in the below mentioned subsequent formats
given as below under NCR Format.
9.0 DISTRIBUTION
NPCIL ACE(PIPING)
NPCIL PIPING
NPCIL QA
NPCIL FE
IVRCL- Execution
IVRCL-QA